{
  "format_version": "1",
  "case": "bibliography",
  "title": "Perovskite bibliography worksheet",
  "question": "Which citation fields did DOE PAGES supply for this page of results?",
  "mode": "recorded",
  "simulation": false,
  "registry_revision": "2026-11-09",
  "generated_at": null,
  "replay_clock": "2026-11-09T00:00:00Z",
  "timestamp_note": "Envelope retrieval timestamps use a fixed replay clock, not publisher retrieval times. Actual fixture capture times appear in the manifest; null means unrecorded.",
  "fixtures": [
    {
      "file": "osti-doe-pages.json",
      "sha256": "d985dce1d781b9a7484437ab297f66f39c5d89febdf5acc3527d09b3316e19d8",
      "captured_at": "2026-09-22T12:33:16.478603+00:00"
    }
  ],
  "limitations": [
    "Only the first DOE PAGES results page was read. No full text or citation counts were retrieved.",
    "Author strings come from the catalog. Check omitted authors against the publisher before citing."
  ],
  "steps": [
    {
      "tool": "research.search_literature",
      "args": {
        "query": "perovskite solar",
        "rows": 3,
        "public_access_only": true
      },
      "envelope": {
        "data": {
          "records": [
            {
              "id": "3409109",
              "title": "Reducing non-radiative recombination in perovskite solar cells with a SiO<sub>2</sub>-graphene oxide buried interface layer",
              "authors": [
                "Cao, Zikun [Univ. of Texas, Arlington, TX (United States); Univ. of Miami, FL (United States)]",
                "You, Shuai [National Laboratory of the Rockies (NLR), Golden, CO (United States)]",
                "Zhang, Xiyao [Univ. of Texas, Arlington, TX (United States); Univ. of Akron, OH (United States)]",
                "Liu, Lei [Univ. of Akron, OH (United States)]",
                "Zhang, Haixing [Univ. of Miami, FL (United States)]"
              ],
              "publication_date": "2026-08-31",
              "product_type": "Journal Article",
              "authors_truncated": 4,
              "doi": "10.1016/j.nanoen.2026.112209",
              "journal": "Nano Energy",
              "report_number": "NLR/JA-5900-101333",
              "research_orgs": [
                "National Laboratory of the Rockies (NLR), Golden, CO (United States)"
              ]
            },
            {
              "id": "3818255",
              "title": "Direct Microscale Observation of Additive-Triggered Reduction in Tin Halide Perovskites",
              "authors": [
                "Westbrook, Robert J. E. [University of Washington, Seattle, WA (United States)] (ORCID:0000000212030712)",
                "Taddei, Margherita [University of Washington, Seattle, WA (United States)] (ORCID:0000000341228418)",
                "Sanchez-Diaz, Jes\u00fas [Universitat Jaume, Castell\u00f3n (Spain)]",
                "Mushtaq, Tehmina [Universitat Jaume, Castell\u00f3n (Spain)]",
                "S\u00e1nchez, Rafael S [Universitat Jaume, Castell\u00f3n (Spain)] (ORCID:0000000189486120)"
              ],
              "publication_date": "2026-08-26",
              "product_type": "Journal Article",
              "authors_truncated": 4,
              "doi": "10.1021/acsenergylett.6c01751",
              "journal": "ACS Energy Letters",
              "research_orgs": [
                "University of Washington, Seattle, WA (United States)"
              ]
            },
            {
              "id": "3818626",
              "title": "Mixed-Ligand-Driven Phase-Pure 2D Perovskite for Interfacial Passivation of Perovskite Photovoltaics",
              "authors": [
                "Shih, Meng-Chen",
                "Tan, Shaun",
                "Lu, Yongli",
                "Kodalle, Tim",
                "Terlier, Tanguy"
              ],
              "publication_date": "2026-08-11",
              "product_type": "Journal Article",
              "authors_truncated": 10,
              "doi": "10.1021/jacs.6c05503",
              "journal": "Journal of the American Chemical Society",
              "research_orgs": [
                "Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)"
              ]
            }
          ],
          "record_count": 3,
          "per_source": [
            {
              "source_id": "osti-doe-pages",
              "system": "DOE PAGES (Public Access Gateway for Energy and Science)",
              "total_matches": 5669,
              "returned": 3
            }
          ]
        },
        "provenance": [
          {
            "id": "source_01",
            "source_id": "osti-doe-pages",
            "steward": "Office of Scientific and Technical Information",
            "system": "DOE PAGES (Public Access Gateway for Energy and Science)",
            "dataset": "DOE PAGES (Public Access Gateway for Energy and Science)",
            "dataset_version": "current",
            "authority_level": "primary",
            "access_path": "live",
            "source_updated_at": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "cache_age_seconds": 0
          }
        ],
        "evidence": [
          {
            "id": "evidence_01",
            "source_ref": "source_01",
            "record_id": "3409109",
            "locator": "https://www.osti.gov/biblio/3409109",
            "retrieved_at": "2026-11-09T00:00:00Z",
            "effective_at": "2026-09-18T11:49:56Z",
            "transformations": [
              "normalize"
            ],
            "payload_hash": null,
            "raw_recovery": "available"
          },
          {
            "id": "evidence_02",
            "source_ref": "source_01",
            "record_id": "3818255",
            "locator": "https://www.osti.gov/biblio/3818255",
            "retrieved_at": "2026-11-09T00:00:00Z",
            "effective_at": "2026-09-17T10:27:35Z",
            "transformations": [
              "normalize"
            ],
            "payload_hash": null,
            "raw_recovery": "available"
          },
          {
            "id": "evidence_03",
            "source_ref": "source_01",
            "record_id": "3818626",
            "locator": "https://www.osti.gov/biblio/3818626",
            "retrieved_at": "2026-11-09T00:00:00Z",
            "effective_at": "2026-09-18T08:11:09Z",
            "transformations": [
              "normalize"
            ],
            "payload_hash": null,
            "raw_recovery": "available"
          }
        ],
        "coverage": {
          "registry": "covered",
          "execution": "complete",
          "pagination": "truncated",
          "source_claim": "partial",
          "result": "hit",
          "sources_searched": [
            "osti-doe-pages"
          ],
          "known_limitations": [
            "A 12-month administrative embargo interval applies before an accepted manuscript appears. Recent DOE-funded work is therefore systematically absent, and an empty result for a 2026 paper means \"not yet released\", not \"does not exist\".",
            "DOIs arrive as full https://doi.org/ URLs rather than bare DOIs, which breaks naive deduplication against OSTI.GOV records of the same work. The adapter normalizes both to a bare DOI and keeps the URL form as the locator.",
            "Sixteen times smaller than OSTI.GOV (260K against 4.38M) by design, not by omission. A literature search that finds nothing here should try OSTI.GOV before concluding anything."
          ]
        },
        "warnings": [
          {
            "code": "terms_note",
            "message": "No published rate limit, same as the rest of the OSTI family.",
            "source_id": "osti-doe-pages"
          },
          {
            "code": "terms_note",
            "message": "Restricted to DOE PAGES, which holds public-access literature after a 12-month administrative embargo. Recent work is systematically absent; search without public_access_only to see the wider index.",
            "source_id": "osti-doe-pages"
          }
        ],
        "access_recipes": [
          {
            "kind": "doi",
            "uri": "https://doi.org/10.1016/j.nanoen.2026.112209",
            "label": "Reducing non-radiative recombination in perovskite solar cells with a\u2026",
            "instructions": null,
            "requires_account": false,
            "approximate_size": null
          },
          {
            "kind": "fulltext_pdf",
            "uri": "https://www.osti.gov/servlets/purl/3409109",
            "label": "Full text (OSTI)",
            "instructions": null,
            "requires_account": false,
            "approximate_size": null
          },
          {
            "kind": "doi",
            "uri": "https://doi.org/10.1021/acsenergylett.6c01751",
            "label": "Direct Microscale Observation of Additive-Triggered Reduction in Tin Halide\u2026",
            "instructions": null,
            "requires_account": false,
            "approximate_size": null
          },
          {
            "kind": "fulltext_pdf",
            "uri": "https://www.osti.gov/servlets/purl/3818255",
            "label": "Full text (OSTI)",
            "instructions": null,
            "requires_account": false,
            "approximate_size": null
          },
          {
            "kind": "doi",
            "uri": "https://doi.org/10.1021/jacs.6c05503",
            "label": "Mixed-Ligand-Driven Phase-Pure 2D Perovskite for Interfacial Passivation of\u2026",
            "instructions": null,
            "requires_account": false,
            "approximate_size": null
          },
          {
            "kind": "fulltext_pdf",
            "uri": "https://www.osti.gov/servlets/purl/3818626",
            "label": "Full text (OSTI)",
            "instructions": null,
            "requires_account": false,
            "approximate_size": null
          }
        ],
        "next_actions": [
          {
            "finding": "More matches exist than the 3 returned.",
            "suggested_capability": "literature.search",
            "reason": "Call again with a higher page number, or narrow the filters. Do not describe these as all the results."
          }
        ],
        "_execution": {
          "server": "doe-mcp",
          "server_version": "0.1.0.dev0",
          "tool": "research.search_literature",
          "tool_contract_version": "1",
          "envelope_version": "1",
          "adapters": {
            "osti_family": "1",
            "opendatasoft": "1",
            "json_document": "1",
            "curated": "1",
            "eia_v2": "1",
            "fueleconomy": "1",
            "text_feed": "1",
            "postgrest": "1",
            "federal_register": "1",
            "vips": "1",
            "daymet": "1",
            "essdive": "1",
            "esgf": "1",
            "sage": "1",
            "optimade": "1",
            "basis_sets": "1",
            "facility_status": "1",
            "gcam_csv": "1",
            "nmdc": "1",
            "none": "1",
            "self_registry": "1"
          },
          "registry_revision": "2026-11-09",
          "request_id": "recorded-workflow"
        }
      }
    }
  ],
  "worksheet": {
    "caption": "Bibliography worksheet",
    "columns": [
      "Record ID",
      "Title",
      "Listed authors",
      "Authors omitted by DOE-MCP",
      "Publication date",
      "Journal",
      "DOI",
      "Step 1 evidence ID"
    ],
    "rows": [
      [
        "3409109",
        "Reducing non-radiative recombination in perovskite solar cells with a SiO2-graphene oxide buried interface layer",
        "Cao, Zikun [Univ. of Texas, Arlington, TX (United States); Univ. of Miami, FL (United States)]; You, Shuai [National Laboratory of the Rockies (NLR), Golden, CO (United States)]; Zhang, Xiyao [Univ. of Texas, Arlington, TX (United States); Univ. of Akron, OH (United States)]; Liu, Lei [Univ. of Akron, OH (United States)]; Zhang, Haixing [Univ. of Miami, FL (United States)]",
        4,
        "2026-08-31",
        "Nano Energy",
        "10.1016/j.nanoen.2026.112209",
        "evidence_01"
      ],
      [
        "3818255",
        "Direct Microscale Observation of Additive-Triggered Reduction in Tin Halide Perovskites",
        "Westbrook, Robert J. E. [University of Washington, Seattle, WA (United States)] (ORCID:0000000212030712); Taddei, Margherita [University of Washington, Seattle, WA (United States)] (ORCID:0000000341228418); Sanchez-Diaz, Jes\u00fas [Universitat Jaume, Castell\u00f3n (Spain)]; Mushtaq, Tehmina [Universitat Jaume, Castell\u00f3n (Spain)]; S\u00e1nchez, Rafael S [Universitat Jaume, Castell\u00f3n (Spain)] (ORCID:0000000189486120)",
        4,
        "2026-08-26",
        "ACS Energy Letters",
        "10.1021/acsenergylett.6c01751",
        "evidence_02"
      ],
      [
        "3818626",
        "Mixed-Ligand-Driven Phase-Pure 2D Perovskite for Interfacial Passivation of Perovskite Photovoltaics",
        "Shih, Meng-Chen; Tan, Shaun; Lu, Yongli; Kodalle, Tim; Terlier, Tanguy",
        10,
        "2026-08-11",
        "Journal of the American Chemical Society",
        "10.1021/jacs.6c05503",
        "evidence_03"
      ]
    ]
  }
}
