{
  "format_version": "1",
  "case": "materials",
  "title": "Materials evidence sheet",
  "question": "Inspect a computed GaN structure and a separate basis-set example.",
  "mode": "recorded",
  "simulation": false,
  "registry_revision": "2026-11-09",
  "generated_at": null,
  "replay_clock": "2026-11-09T00:00:00Z",
  "timestamp_note": "Envelope retrieval timestamps use a fixed replay clock, not publisher retrieval times. Actual fixture capture times appear in the manifest; null means unrecorded.",
  "fixtures": [
    {
      "file": "basis-set-exchange.json",
      "sha256": "0dfd2e7d23d4802bc7325a7334ccd4e306ad519c222ca0436964c901e17e8043",
      "captured_at": null
    },
    {
      "file": "lbnl-mp-optimade.json",
      "sha256": "8a5d15ebe6a47c4103d3611661903b8f41de8b5d101ba203df541e2a7b35e280",
      "captured_at": null
    }
  ],
  "limitations": [
    "Computed structures are not experimental validation.",
    "The H/C/O basis set is a separate chemistry example, not a recommendation for gallium nitride."
  ],
  "steps": [
    {
      "tool": "materials.search_structures",
      "args": {
        "elements": "Ga,N",
        "rows": 5
      },
      "envelope": {
        "data": {
          "structures": [
            {
              "id": "mp-1244984",
              "formula": "GaN",
              "formula_descriptive": "GaN",
              "formula_hill": "Ga50N50",
              "elements": [
                "Ga",
                "N"
              ],
              "element_ratios": [
                0.5,
                0.5
              ],
              "element_count": 2,
              "sites": 100,
              "space_group_number": null,
              "space_group_symbol": null,
              "periodic_dimensions": 3,
              "last_modified": "2019-07-02T00:29:18.792000",
              "provider_fields": {
                "_mp_chemical_system": "Ga-N",
                "_mp_stability": {
                  "gga_gga+u_r2scan": {
                    "thermo_id": "mp-1244984_GGA_GGA+U_R2SCAN",
                    "energy_above_hull": 0.7416738018000011,
                    "formation_energy_per_atom": 0.07162439492499971,
                    "last_updated_thermo": "2023-04-27T01:24:08.875000"
                  },
                  "gga_gga+u": {
                    "thermo_id": "mp-1244984_GGA_GGA+U",
                    "energy_above_hull": 0.7416738018000002,
                    "formation_energy_per_atom": 0.0848569330500004,
                    "last_updated_thermo": "2023-04-27T01:24:20.078000"
                  }
                }
              }
            },
            {
              "id": "mp-1223660",
              "formula": "GaInN2",
              "formula_descriptive": "GaInN2",
              "formula_hill": "GaInN2",
              "elements": [
                "Ga",
                "In",
                "N"
              ],
              "element_ratios": [
                0.25,
                0.25,
                0.5
              ],
              "element_count": 3,
              "sites": 4,
              "space_group_number": null,
              "space_group_symbol": null,
              "periodic_dimensions": 3,
              "last_modified": "2022-06-10T06:23:20.905000",
              "provider_fields": {
                "_mp_chemical_system": "Ga-In-N",
                "_mp_stability": {
                  "gga_gga+u_r2scan": {
                    "thermo_id": "mp-1223660_GGA_GGA+U_R2SCAN",
                    "energy_above_hull": 0.07719281500000008,
                    "formation_energy_per_atom": -0.3166822218750003,
                    "last_updated_thermo": "2023-04-27T01:30:31.450000"
                  },
                  "gga_gga+u": {
                    "thermo_id": "mp-1223660_GGA_GGA+U",
                    "energy_above_hull": 0.07719281500000008,
                    "formation_energy_per_atom": -0.2906402068750005,
                    "last_updated_thermo": "2023-04-27T01:30:39.045000"
                  }
                }
              }
            },
            {
              "id": "mp-1199250",
              "formula": "F6GaN3",
              "formula_descriptive": "F24Ga4N12",
              "formula_hill": "F24Ga4N12",
              "elements": [
                "F",
                "Ga",
                "N"
              ],
              "element_ratios": [
                0.1,
                0.3,
                0.6
              ],
              "element_count": 3,
              "sites": 40,
              "space_group_number": null,
              "space_group_symbol": null,
              "periodic_dimensions": 3,
              "last_modified": "2021-03-09T23:05:01.374000",
              "provider_fields": {
                "_mp_chemical_system": "F-Ga-N",
                "_mp_stability": {
                  "gga_gga+u_r2scan": {
                    "thermo_id": "mp-1199250_GGA_GGA+U_R2SCAN",
                    "energy_above_hull": 1.3350707470000014,
                    "formation_energy_per_atom": 0.19073120524999893,
                    "last_updated_thermo": "2023-04-27T01:29:59.276000"
                  },
                  "gga_gga+u": {
                    "thermo_id": "mp-1199250_GGA_GGA+U",
                    "energy_above_hull": 1.3350707470000014,
                    "formation_energy_per_atom": 0.16329291549999994,
                    "last_updated_thermo": "2023-04-27T01:30:03.644000"
                  }
                }
              }
            },
            {
              "id": "mp-1245997",
              "formula": "Cd3Ga3N5",
              "formula_descriptive": "Cd6Ga6N10",
              "formula_hill": "Cd6Ga6N10",
              "elements": [
                "Cd",
                "Ga",
                "N"
              ],
              "element_ratios": [
                0.2727272727272727,
                0.2727272727272727,
                0.45454545454545453
              ],
              "element_count": 3,
              "sites": 22,
              "space_group_number": null,
              "space_group_symbol": null,
              "periodic_dimensions": 3,
              "last_modified": "2021-02-04T20:40:18.753000",
              "provider_fields": {
                "_mp_chemical_system": "Cd-Ga-N",
                "_mp_stability": {
                  "gga_gga+u_r2scan": {
                    "thermo_id": "mp-1245997_GGA_GGA+U_R2SCAN",
                    "energy_above_hull": 0.36648617227272595,
                    "formation_energy_per_atom": 0.0010046776136350259,
                    "last_updated_thermo": "2023-04-27T01:14:17.472000"
                  },
                  "gga_gga+u": {
                    "thermo_id": "mp-1245997_GGA_GGA+U",
                    "energy_above_hull": 0.36648617227272773,
                    "formation_energy_per_atom": 0.008222425681818312,
                    "last_updated_thermo": "2023-04-27T01:14:22.121000"
                  }
                }
              }
            },
            {
              "id": "mp-1198425",
              "formula": "BGaH5NO9P2",
              "formula_descriptive": "B4Ga4H20N4O36P8",
              "formula_hill": "B4Ga4H20N4O36P8",
              "elements": [
                "B",
                "Ga",
                "H",
                "N",
                "O",
                "P"
              ],
              "element_ratios": [
                0.05263157894736842,
                0.05263157894736842,
                0.10526315789473684,
                0.2631578947368421,
                0.05263157894736842,
                0.47368421052631576
              ],
              "element_count": 6,
              "sites": 76,
              "space_group_number": null,
              "space_group_symbol": null,
              "periodic_dimensions": 3,
              "last_modified": "2021-03-10T07:53:43.904000",
              "provider_fields": {
                "_mp_chemical_system": "B-Ga-H-N-O-P",
                "_mp_stability": {
                  "gga_gga+u_r2scan": {
                    "thermo_id": "mp-1198425_GGA_GGA+U_R2SCAN",
                    "energy_above_hull": 0.005111285844309421,
                    "formation_energy_per_atom": -2.0148944074843356,
                    "last_updated_thermo": "2023-04-27T04:27:33.583000"
                  },
                  "gga_gga+u": {
                    "thermo_id": "mp-1198425_GGA_GGA+U",
                    "energy_above_hull": 0.002660023563606728,
                    "formation_energy_per_atom": -2.018499772083334,
                    "last_updated_thermo": "2023-04-27T04:27:34.891000"
                  }
                }
              }
            }
          ],
          "record_count": 5,
          "total_matches": 264,
          "entries_in_database": 154387,
          "offset": 0,
          "filter_sent": "elements HAS ALL \"Ga\",\"N\"",
          "provider": "Materials Project - OPTIMADE",
          "coverage_note": "This keyless route serves structures and formulas. The Materials Project's electronic structure, phase diagrams, elastic tensors and the rest are behind its own keyed API and the mp-api library, which is a separate source in this registry. A caller reading \"Materials Project\" will assume the whole database; this route is one part of it.\n",
          "federation_note": "This is one provider in the OPTIMADE federation, and the DOE member of it. A material absent here may exist at another provider; that is a different answer from its not existing.",
          "note": "Crystal structures matching the filter. `filter` takes the OPTIMADE grammar directly through filter_expression, and the named arguments build one for the common cases; call materials.describe_structure_fields for the properties this provider allows and for its own extension fields."
        },
        "provenance": [
          {
            "id": "source_01",
            "source_id": "lbnl-mp-optimade",
            "steward": "Lawrence Berkeley National Laboratory",
            "funder": "Office of Science",
            "system": "Materials Project OPTIMADE endpoint",
            "dataset": "Materials Project OPTIMADE endpoint",
            "dataset_version": "1.2.0",
            "authority_level": "primary",
            "access_path": "live",
            "source_updated_at": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "cache_age_seconds": 0
          }
        ],
        "evidence": [
          {
            "id": "evidence_01",
            "source_ref": "source_01",
            "record_id": "mp-1244984",
            "locator": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "effective_at": "2019-07-02T00:29:18.792000",
            "transformations": [],
            "payload_hash": null,
            "raw_recovery": "available"
          },
          {
            "id": "evidence_02",
            "source_ref": "source_01",
            "record_id": "mp-1223660",
            "locator": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "effective_at": "2022-06-10T06:23:20.905000",
            "transformations": [],
            "payload_hash": null,
            "raw_recovery": "available"
          },
          {
            "id": "evidence_03",
            "source_ref": "source_01",
            "record_id": "mp-1199250",
            "locator": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "effective_at": "2021-03-09T23:05:01.374000",
            "transformations": [],
            "payload_hash": null,
            "raw_recovery": "available"
          },
          {
            "id": "evidence_04",
            "source_ref": "source_01",
            "record_id": "mp-1245997",
            "locator": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "effective_at": "2021-02-04T20:40:18.753000",
            "transformations": [],
            "payload_hash": null,
            "raw_recovery": "available"
          },
          {
            "id": "evidence_05",
            "source_ref": "source_01",
            "record_id": "mp-1198425",
            "locator": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "effective_at": "2021-03-10T07:53:43.904000",
            "transformations": [],
            "payload_hash": null,
            "raw_recovery": "available"
          }
        ],
        "coverage": {
          "registry": "covered",
          "execution": "complete",
          "pagination": "truncated",
          "source_claim": "partial",
          "result": "hit",
          "sources_searched": [
            "lbnl-mp-optimade"
          ],
          "known_limitations": [
            "Computed, not measured. A Materials Project structure is a calculation's output under a stated functional, and treating it as an experimental crystal structure is a category error.",
            "This route is narrower than the publisher's own API. Structures and formulas are here; energetics beyond the stability block, electronic structure, and phase diagrams are behind the keyed route.",
            "OPTIMADE is a federation standard with 29 providers, of which this is the DOE member. A structure absent here may well exist at another provider, and that is a different answer from its not existing.",
            "The provider extension fields are not portable. `_mp_stability` means what the Materials Project says it means and has no counterpart at another provider."
          ]
        },
        "warnings": [
          {
            "code": "derived_layer",
            "message": "These are computed structures, not measured ones: each is a calculation's output under a stated functional. Reporting one as an experimentally determined crystal structure is a category error.",
            "source_id": "lbnl-mp-optimade"
          }
        ],
        "_execution": {
          "server": "doe-mcp",
          "server_version": "0.1.0.dev0",
          "tool": "materials.search_structures",
          "tool_contract_version": "1",
          "envelope_version": "1",
          "adapters": {
            "osti_family": "1",
            "opendatasoft": "1",
            "json_document": "1",
            "curated": "1",
            "eia_v2": "1",
            "fueleconomy": "1",
            "text_feed": "1",
            "postgrest": "1",
            "federal_register": "1",
            "vips": "1",
            "daymet": "1",
            "essdive": "1",
            "esgf": "1",
            "sage": "1",
            "optimade": "1",
            "basis_sets": "1",
            "facility_status": "1",
            "gcam_csv": "1",
            "nmdc": "1",
            "none": "1",
            "self_registry": "1"
          },
          "registry_revision": "2026-11-09",
          "request_id": "recorded-workflow"
        }
      }
    },
    {
      "tool": "materials.get_structure",
      "args": {
        "structure_id": "mp-1244984"
      },
      "envelope": {
        "data": {
          "id": "mp-1244984",
          "formula": "GaN",
          "formula_descriptive": "GaN",
          "formula_hill": "Ga50N50",
          "elements": [
            "Ga",
            "N"
          ],
          "element_ratios": [
            0.5,
            0.5
          ],
          "element_count": 2,
          "sites": 100,
          "space_group_number": null,
          "space_group_symbol": null,
          "periodic_dimensions": 3,
          "last_modified": "2019-07-02T00:29:18.792000",
          "provider_fields": {
            "_mp_chemical_system": "Ga-N",
            "_mp_stability": {
              "gga_gga+u_r2scan": {
                "thermo_id": "mp-1244984_GGA_GGA+U_R2SCAN",
                "energy_above_hull": 0.7416738018000011,
                "formation_energy_per_atom": 0.07162439492499971,
                "last_updated_thermo": "2023-04-27T01:24:08.875000"
              },
              "gga_gga+u": {
                "thermo_id": "mp-1244984_GGA_GGA+U",
                "energy_above_hull": 0.7416738018000002,
                "formation_energy_per_atom": 0.0848569330500004,
                "last_updated_thermo": "2023-04-27T01:24:20.078000"
              }
            }
          },
          "lattice_vectors": [
            [
              13.01620829,
              0.74325844,
              0.67698607
            ],
            [
              0.78279776,
              13.27587227,
              1.26189026
            ],
            [
              0.66583054,
              1.25062875,
              13.2247994
            ]
          ],
          "structure_features": [],
          "immutable_id": "645d2b75bcd30f748b474a14",
          "coverage_note": "This keyless route serves structures and formulas. The Materials Project's electronic structure, phase diagrams, elastic tensors and the rest are behind its own keyed API and the mp-api library, which is a separate source in this registry. A caller reading \"Materials Project\" will assume the whole database; this route is one part of it.\n",
          "note": "One structure in full. Fields under provider_fields are this database's own additions to the OPTIMADE standard and have no counterpart at another provider."
        },
        "provenance": [
          {
            "id": "source_01",
            "source_id": "lbnl-mp-optimade",
            "steward": "Lawrence Berkeley National Laboratory",
            "funder": "Office of Science",
            "system": "Materials Project OPTIMADE endpoint",
            "dataset": "Materials Project OPTIMADE endpoint",
            "dataset_version": "OPTIMADE 1.2.0",
            "authority_level": "primary",
            "access_path": "live",
            "source_updated_at": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "cache_age_seconds": 0
          }
        ],
        "evidence": [
          {
            "id": "evidence_01",
            "source_ref": "source_01",
            "record_id": "mp-1244984",
            "locator": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "effective_at": "2019-07-02T00:29:18.792000",
            "transformations": [],
            "payload_hash": null,
            "raw_recovery": "available"
          }
        ],
        "coverage": {
          "registry": "covered",
          "execution": "complete",
          "pagination": "complete",
          "source_claim": "partial",
          "result": "hit",
          "sources_searched": [
            "lbnl-mp-optimade"
          ]
        },
        "warnings": [
          {
            "code": "derived_layer",
            "message": "A computed structure under a stated functional, not a measured one.",
            "source_id": "lbnl-mp-optimade"
          }
        ],
        "_execution": {
          "server": "doe-mcp",
          "server_version": "0.1.0.dev0",
          "tool": "materials.get_structure",
          "tool_contract_version": "1",
          "envelope_version": "1",
          "adapters": {
            "osti_family": "1",
            "opendatasoft": "1",
            "json_document": "1",
            "curated": "1",
            "eia_v2": "1",
            "fueleconomy": "1",
            "text_feed": "1",
            "postgrest": "1",
            "federal_register": "1",
            "vips": "1",
            "daymet": "1",
            "essdive": "1",
            "esgf": "1",
            "sage": "1",
            "optimade": "1",
            "basis_sets": "1",
            "facility_status": "1",
            "gcam_csv": "1",
            "nmdc": "1",
            "none": "1",
            "self_registry": "1"
          },
          "registry_revision": "2026-11-09",
          "request_id": "recorded-workflow"
        }
      }
    },
    {
      "tool": "chemistry.get_basis_set",
      "args": {
        "name": "6-31g",
        "output_format": "nwchem",
        "elements": "H,C,O"
      },
      "envelope": {
        "data": {
          "key": "6-31g",
          "name": "6-31G",
          "family": "pople",
          "role": "orbital",
          "description": "6-31G valence double-zeta",
          "version": "1",
          "output_format": "nwchem",
          "format_name": "NWChem",
          "elements_requested": [
            "H",
            "C",
            "O"
          ],
          "elements_available": [
            "H",
            "He",
            "Li",
            "Be",
            "B",
            "C",
            "N",
            "O",
            "F",
            "Ne",
            "Na",
            "Mg",
            "Al",
            "Si",
            "P",
            "S",
            "Cl",
            "Ar",
            "K",
            "Ca",
            "Sc",
            "Ti",
            "V",
            "Cr",
            "Mn",
            "Fe",
            "Co",
            "Ni",
            "Cu",
            "Zn",
            "Ga",
            "Ge",
            "As",
            "Se",
            "Br",
            "Kr"
          ],
          "data": "#----------------------------------------------------------------------\n# Basis Set Exchange\n# Version 0.12\n# https://www.basissetexchange.org\n#----------------------------------------------------------------------\n#   Basis set: 6-31G\n# Description: 6-31G valence double-zeta\n#        Role: orbital\n#     Version: 1  (Data from Gaussian 09/GAMESS)\n#----------------------------------------------------------------------\n\n\nBASIS \"ao basis\" SPHERICAL PRINT\n#BASIS SET: (4s) -> [2s]\nH    S\n      0.1873113696E+02       0.3349460434E-01\n      0.2825394365E+01       0.2347269535E+00\n      0.6401216923E+00       0.8137573261E+00\nH    S\n      0.1612777588E+00       1.0000000\n#BASIS SET: (10s,4p) -> [3s,2p]\nC    S\n      0.3047524880E+04       0.1834737132E-02\n      0.4573695180E+03       0.1403732281E-01\n      0.1039486850E+03       0.6884262226E-01\n      0.2921015530E+02       0.2321844432E+00\n      0.9286662960E+01       0.4679413484E+00\n      0.3163926960E+01       0.3623119853E+00\nC    SP\n      0.7868272350E+01      -0.1193324198E+00       0.6899906659E-01\n      0.1881288540E+01      -0.1608541517E+00       0.3164239610E+00\n      0.5442492580E+00       0.1143456438E+01       0.7443082909E+00\nC    SP\n      0.1687144782E+00       0.1000000000E+01       0.1000000000E+01\n#BASIS SET: (10s,4p) -> [3s,2p]\nO    S\n      0.5484671660E+04       0.1831074430E-02\n      0.8252349460E+03       0.1395017220E-01\n      0.1880469580E+03       0.6844507810E-01\n      0.5296450000E+02       0.2327143360E+00\n      0.1689757040E+02       0.4701928980E+00\n      0.5799635340E+01       0.3585208530E+00\nO    SP\n      0.1553961625E+02      -0.1107775495E+00       0.7087426823E-01\n      0.3599933586E+01      -0.1480262627E+00       0.3397528391E+00\n      0.1013761750E+01       0.1130767015E+01       0.7271585773E+00\nO    SP\n      0.2700058226E+00       0.1000000000E+01       0.1000000000E+01\nEND\n",
          "references": "%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%\n% If you downloaded data from the basis set\n% exchange or used the basis set exchange python library, please cite:\n%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%\n@article{pritchard2019a,\n    author = {Pritchard, Benjamin P. and Altarawy, Doaa and Didier, Brett and Gibsom, Tara D. and Windus, Theresa L.},\n    title = {A New Basis Set Exchange: An Open, Up-to-date Resource for the Molecular Sciences Community},\n    journal = {J. Chem. Inf. Model.},\n    volume = {59},\n    pages = {4814-4820},\n    year = {2019},\n    doi = {10.1021/acs.jcim.9b00725}\n}\n\n@article{feller1996a,\n    author = {Feller, David},\n    title = {The role of databases in support of computational chemistry calculations},\n    journal = {J. Comput. Chem.},\n    volume = {17},\n    pages = {1571-1586},\n    year = {1996},\n    doi = {10.1002/(SICI)1096-987X(199610)17:13<1571::AID-JCC9>3.0.CO;2-P}\n}\n\n@article{schuchardt2007a,\n    author = {Schuchardt, Karen L. and Didier, Brett T. and Elsethagen, Todd and Sun, Lisong and Gurumoorthi, Vidhya and Chase, Jared and Li, Jun and Windus, Theresa L.},\n    title = {Basis Set Exchange: A Community Database for Computational Sciences},\n    journal = {J. Chem. Inf. Model.},\n    volume = {47},\n    pages = {1045-1052},\n    year = {2007},\n    doi = {10.1021/ci600510j}\n}\n\n%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%\n% References for the basis set\n%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%\n% H\n%     31G Split-valence basis set for H,He\n%         ditchfield1971a\n%\n% C,O\n%     6-31G Split-valence basis set\n%         hehre1972a\n%\n\n\n@article{ditchfield1971a,\n    author = {Ditchfield, R. and Hehre, W. J. and Pople, J. A.},\n    title = {Self-Consistent Molecular-Orbital Methods. IX. An Extended Gaussian-Type Basis for Molecular-Orbital Studies of Organic Molecules},\n    journal = {J. Chem. Phys.},\n    volume = {54},\n    pages = {724-728},\n    year = {1971},\n    doi = {10.1063/1.1674902}\n}\n\n@article{hehre1972a,\n    author = {Hehre, W. J. and Ditchfield, R. and Pople, J. A.},\n    title = {Self-Consistent Molecular Orbital Methods. XII. Further Extensions of Gaussian-Type Basis Sets for Use in Molecular Orbital Studies of Organic Molecules},\n    journal = {J. Chem. Phys.},\n    volume = {56},\n    pages = {2257-2261},\n    year = {1972},\n    doi = {10.1063/1.1677527}\n}\n\n",
          "note": "The basis set as this program's own input text, ready to paste into a calculation. `references` holds the citations for the set itself, which are separate from the citation for the service and are what the publisher asks be cited alongside it."
        },
        "provenance": [
          {
            "id": "source_01",
            "source_id": "basis-set-exchange",
            "steward": "Molecular Sciences Software Institute",
            "system": "Basis Set Exchange",
            "dataset": "6-31G (NWChem)",
            "dataset_version": "1",
            "authority_level": "primary",
            "access_path": "live",
            "source_updated_at": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "cache_age_seconds": 0,
            "citation": {
              "doi": null,
              "recommended": "Pritchard, B.P., Altarawy, D., Didier, B., Gibson, T.D., and Windus, T.L. 2019. New Basis Set Exchange: An Open, Up-to-Date Resource for the Molecular Sciences Community. Journal of Chemical Information and Modeling 59(11):4814-4820. https://doi.org/10.1021/acs.jcim.9b00725 \u2014 and, in addition, the references the service returns for the particular set used.",
              "required": true
            }
          }
        ],
        "evidence": [
          {
            "id": "evidence_01",
            "source_ref": "source_01",
            "record_id": "6-31g",
            "locator": null,
            "retrieved_at": "2026-11-09T00:00:00Z",
            "effective_at": null,
            "transformations": [
              "rendered into nwchem format"
            ],
            "payload_hash": null,
            "raw_recovery": "available"
          }
        ],
        "coverage": {
          "registry": "covered",
          "execution": "complete",
          "pagination": "complete",
          "source_claim": "complete",
          "result": "hit",
          "sources_searched": [
            "basis-set-exchange"
          ]
        },
        "warnings": [
          {
            "code": "citation_required",
            "message": "This publisher requires citation as a condition of use. Cite: Pritchard, B.P., Altarawy, D., Didier, B., Gibson, T.D., and Windus, T.L. 2019. New Basis Set Exchange: An Open, Up-to-Date Resource for the Molecular Sciences Community. Journal of Chemical Information and Modeling 59(11):4814-4820. https://doi.org/10.1021/acs.jcim.9b00725 \u2014 and, in addition, the references the service returns for the particular set used.",
            "source_id": "basis-set-exchange"
          }
        ],
        "access_recipes": [
          {
            "kind": "landing_page",
            "uri": "https://www.basissetexchange.org/basis/6-31g/",
            "label": "6-31G at the Basis Set Exchange",
            "instructions": null,
            "requires_account": false,
            "approximate_size": null
          }
        ],
        "_execution": {
          "server": "doe-mcp",
          "server_version": "0.1.0.dev0",
          "tool": "chemistry.get_basis_set",
          "tool_contract_version": "1",
          "envelope_version": "1",
          "adapters": {
            "osti_family": "1",
            "opendatasoft": "1",
            "json_document": "1",
            "curated": "1",
            "eia_v2": "1",
            "fueleconomy": "1",
            "text_feed": "1",
            "postgrest": "1",
            "federal_register": "1",
            "vips": "1",
            "daymet": "1",
            "essdive": "1",
            "esgf": "1",
            "sage": "1",
            "optimade": "1",
            "basis_sets": "1",
            "facility_status": "1",
            "gcam_csv": "1",
            "nmdc": "1",
            "none": "1",
            "self_registry": "1"
          },
          "registry_revision": "2026-11-09",
          "request_id": "recorded-workflow"
        }
      }
    }
  ]
}
