ER27-454-000 · 2026-11-09 · PJM
Attachment C - Gwen Kelly Affidavit
Back to sections and commentaryPDF page 1
Attachment C
Affidavit of Gwen Kelly
PDF page 2
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
)
Docket No. ER27-____-000
AFFIDAVIT OF GWEN KELLY
ON BEHALF OF PJM INTERCONNECTION, L.L.C.
1.
My name is Gwen Kelly. I am the Senior Director, Credit Risk and Collateral
Management at PJM Interconnection, L.L.C. (“PJM”). My business address is
2750 Monroe Boulevard, Audubon, Pennsylvania 19403.
2.
I hold a Bachelor of Business Administration from the University of Hartford. I
have more than 34 years of experience in credit and collateral management,
including approximately 29 years in credit, treasury, and finance functions at
subsidiaries of Public Service Enterprise Group, Inc. I have served in my current
position at PJM since March 2021.
3.
In my current position, I am responsible for overseeing PJM’s credit risk
management program, including the development and administration of collateral
requirements and the evaluation of financial risks associated with participation in
PJM-administered markets.
4.
The purpose of this affidavit is to explain and support PJM’s revised proposal for
determining the credit requirements applicable to Load Serving Entities (“LSE”)
allocated responsibility for charges associated with the Reliability Backstop
Procurement (“RBP”). Specifically, I explain the credit risk considerations
underlying the proposal, the economic analysis used to determine the proposed
collateral level, and the manner in which the resulting credit requirements will be
calculated and administered.
5.
I participated in the development and evaluation of the revised methodology. My
statements are based on my experience in credit risk management, my
responsibilities at PJM, and my review of the analyses underlying the proposal.
I.
Credit Risks Associated with Long-Term RBP Commitments
6.
The RBP provides for the procurement of capacity resources through commitments
that may extend for up to 15 years. LSEs allocated responsibility for RBP Charges
will have payment obligations associated with those commitments. The purpose of
the buyer-side requirements is to mitigate the risk that an LSE will fail to satisfy
those obligations, potentially resulting in unpaid amounts that may be allocated to
other LSEs.
PDF page 3
2
7.
In developing the proposed credit methodology, PJM considered the long-term
nature of RBP commitments. Although RBP Charges are calculated and settled
periodically, the underlying procurement commitments extend over a substantially
longer period. From a credit risk management perspective, PJM must establish
appropriate protection against the financial exposure associated with those
commitments over their terms.
8.
Assessing credit exposure over the term of an RBP commitment is not the same as
estimating an LSE’s payment obligations for an individual Delivery Year. The
periodic calculation of payment obligations does not necessarily mean that
collateral requirements should be based primarily on expected payment exposure
for each individual Delivery Year.
9.
Under the RBP settlement provisions, RBP Charges are calculated using a contract-
for-differences mechanism. The RBP clearing price is established through the
procurement process, but the Reliability Pricing Model (“RPM”) clearing prices
used to calculate future settlement amounts are not known when the RBP
commitments are established. Although RPM clearing prices affect RBP Charges,
they are not inputs to PJM’s proposed calculation of the RBP LSE credit
requirement.
10.
As a result, the actual RBP Charges payable over the commitment term may be
substantially lower than the gross payment obligation calculated using the RBP
clearing price. However, the amount of those future settlement obligations cannot
be determined with certainty when the RBP commitments are established.
11.
One alternative approach to determining collateral requirements, which PJM is not
proposing, would be to forecast future RPM clearing prices and use the estimated
differences between those prices and the RBP clearing price to calculate expected
payment exposure. Although such an approach could more closely reflect
anticipated settlement obligations, it would depend on forecasts of RPM clearing
prices extending many years into the future.
12.
Another approach would be to periodically adjust collateral requirements as future
RPM clearing prices become known. Such adjustments could account for changes
in expected payment exposure, but their effectiveness would depend on PJM’s
ability to obtain additional collateral when needed.
13.
An increase in payment exposure may occur at a time when an LSE’s financial
condition has deteriorated or when the LSE is otherwise unable to satisfy an
additional collateral requirement. Under those circumstances, PJM could be left
with insufficient collateral to secure the LSE’s payment obligations.
14.
Accordingly, PJM favors a methodology that establishes meaningful credit
protection based on long-term RBP commitments rather than making that
protection substantially dependent on forecasts of future RPM clearing prices or on
the ability to obtain additional collateral over time.
PDF page 4
3
15.
This does not mean that PJM assumes LSEs will ultimately pay the full gross value
of their allocated RBP commitments, nor does it mean that collateral must equal the
full gross value of those commitments. Instead, the RBP weighted-average clearing
price provides a known and objectively determinable basis for calculating collateral
requirements, while the appropriate level of collateral is determined through a
separate economic analysis.
II.
Objective of the Revised LSE Credit Methodology
16.
PJM’s revised proposal is designed to establish a collateral requirement that
balances the cost of providing collateral against the expected cost of socialized
losses resulting from LSE payment defaults.
17.
In evaluating the appropriate amount of collateral, PJM considered two principal
categories of costs. The first is the cost incurred by LSEs in posting the required
collateral. The second is the expected cost of socialized default amounts that may
be borne by non-defaulting LSEs if an LSE fails to satisfy its RBP payment
obligations.
18.
These costs generally move in opposite directions as the amount of collateral
changes. As the proportion of the gross RBP payment obligation secured by
collateral increases, the cost of posting collateral increases, while the expected cost
of socialized default amounts decreases.
19.
Accordingly, PJM sought to identify the collateral percentage at which the
combined expected costs of posting collateral and socialized default amounts are
minimized.
20.
This approach recognizes that requiring collateral equal to the entire gross RBP
payment obligation would not necessarily produce the most economically
reasonable result. Although additional collateral reduces the amount of unsecured
exposure, it also imposes costs on the LSEs required to provide it.
21.
Similarly, a collateral requirement based primarily on minimizing the cost of
posting collateral could result in insufficient protection against payment defaults,
potentially leaving other LSEs to bear the resulting losses.
III.
Economic Analysis Supporting the Proposed Collateral Requirement
22.
To determine the appropriate collateral percentage, PJM performed an economic
analysis evaluating the cost of posting collateral and the expected cost of socialized
default amounts at different collateral levels, expressed as percentages of the net
present value of the total RBP payment obligation.
23.
The principal inputs to this analysis include the weighted-average RBP clearing
price, the credit quality of the LSE portfolio, the probability of default, the loss
given default, and the cost of posting collateral.
PDF page 5
4
24.
As noted in PJM’s July 31, 2026 transmittal letter and my supporting affidavit for
that filing, PJM has used a discount rate of 9.5%, based on the capacity market
Weighted Average Cost of Capital developed by The Brattle Group as part of PJM’s
2025 periodic review of the Cost of New Entry of Capacity Resources into the PJM
Region. PJM considers this rate appropriate for purposes of calculating the net
present value of the total RBP payment obligation.1
A.
Weighted-Average RBP Clearing Price
25.
The RBP clearing price is used to calculate the gross payment obligation that serves
as the reference for determining collateral requirements. Because different RBP
Resources may clear at different prices and have different quantities of committed
capacity over their respective commitment terms, PJM proposes to use a weighted-
average RBP clearing price.
26.
The weighted-average RBP clearing price is calculated by summing, for each RBP
Seller and each Delivery Year of its commitment, the product of the applicable RBP
clearing price and the committed RBP UCAP MW, and dividing that sum by the
total RBP UCAP MW-years associated with those commitments.
27.
For purposes of the economic analysis and illustrative calculations, PJM assumed
a weighted-average RBP clearing price of $555/MW-day. The actual RBP Credit
Rate will be calculated using the weighted-average RBP clearing price determined
from the procurement results rather than the illustrative $555/MW-day assumption.
B.
LSE Credit Quality and Probability of Default
28.
PJM also considered the overall credit quality of the LSEs serving load in the PJM
Region in developing its economic analysis. The weighted-average credit rating of
this portfolio is BBB, which PJM used as an input to the analysis. A portfolio-level
approach is appropriate because potential losses resulting from LSE payment
defaults may be shared among non-defaulting LSEs, and the LSEs responsible for
RBP payment obligations, as well as their credit quality, may change over the RBP
commitment term, which can extend for up to 15 years. Accordingly, PJM’s
methodology establishes a uniform collateral requirement based on the RBP
obligations being secured rather than the individual credit ratings of the LSEs
responsible for those obligations.
29.
The analysis uses the current LSE portfolio’s UCAP MW obligation weighted-
average credit rating to determine the probability-of-default assumption. PJM used
historical default information published by S&P Global in its Default, Transition,
and Recovery: 2025 Annual U.S. Corporate Default and Rating Transition Study,
particularly Table 11 (Average 10-Year Corporate Transition Rate (1981-
2025)(%)), to inform that assumption. Based on this historical default information
1 The Brattle Group, Brattle 2025 CONE Report for PJM, PJM Interconnection, L.L.C., 26-34 (Apr. 9, 2025),
https://www.pjm.com/-/media/DotCom/committees-groups/committees/mic/2025/20250411-special/item-1-
02-revised-cone-report-final.pdf [https://perma.cc/B3VN-EY34].
PDF page 6
5
and the assumed portfolio credit rating of BBB, PJM’s economic analysis uses a
probability-of-default assumption of 4.05%.
30.
Using a portfolio-wide credit rating assumption is consistent with PJM’s objective
of establishing a uniform collateral methodology for LSEs assigned responsibility
for RBP Charges. This does not mean that every LSE has a BBB credit rating or
the same probability of default, but a uniform methodology is appropriate for the
reasons discussed above.
C.
Loss Given Default
31.
Another input is loss given default, which represents the percentage of the relevant
payment exposure that PJM would not expect to recover following an LSE default.
32.
PJM’s economic analysis assumes a loss given default of 100% with respect to
unsecured exposure, based on PJM’s historical experience with socialized losses
resulting from LSE defaults. In those circumstances, PJM has generally not
recovered amounts beyond the collateral available to secure the defaulting LSE’s
obligations. Accordingly, the analysis assumes that any exposure remaining after
application of available collateral would not be recovered following a default.
D.
Cost of Posting Collateral
33.
The analysis also considers the cost incurred by LSEs in posting collateral.
34.
PJM’s analysis estimates the cost of posting collateral using a bank facility pricing
approach based on the five-year historical trend in the 30-day average Secured
Overnight Financing Rate (“SOFR”), plus an indicative credit spread associated
with the assumed BBB credit rating of the LSE portfolio.
35.
PJM’s economic analysis uses an assumed cost-of-collateral rate of 4.93%,
consisting
of
(a)
a
SOFR
rate
of
3.73%
(https://www.newyorkfed.org/markets/reference-rates/sofr); and (b) an indicative
average BBB bank facility spread of 1.20%.
36.
To calculate the cost of posting collateral, PJM applied the assumed 4.93% annual
cost of collateral to the gross RBP payment obligation associated with one MW of
committed capacity over a 15-year term, multiplied by the applicable collateral
percentage. PJM used a 40% collateral level because, as discussed below, its
economic analysis identified that level as minimizing the combined cost of posting
collateral and expected socialized default amounts. At that collateral level, using
the illustrative weighted-average RBP clearing price of $555/MW-day, the
calculated cost of posting collateral is approximately $59,962. This calculation is
reflected as Point A in Figure 1 below.
PDF page 7
6
E.
Cost of Socialized Default Amounts
37.
The cost of socialized default amounts represents the losses that may be borne by
non-defaulting LSEs if an LSE fails to satisfy its RBP payment obligations. For
illustrative purposes, PJM calculated the expected cost of socialized default
amounts using the methodology shown in Table 1 below:
Table 1: Cost of Socialized Default Amounts
38.
In Table 1:
a)
LSE Credit Ratings represents the LSE portfolio’s UCAP MW obligation
weighted-average credit rating.
b)
Probability of Default is 4.05%, based on the historical 10-year corporate
default rate for BBB rated entities reported by S&P Global.
c)
Loss Given Default is assumed to be 100%, reflecting the assumption that
PJM would not recover any unsecured losses from LSEs.
d)
Expected default % represents the assumed probability of default after
accounting for the effect of collateral posted to PJM. For purposes of its
economic analysis, PJM assumes that the probability of default decreases
proportionately as the percentage of the RBP payment obligation secured
by collateral increases, from 4.05% with no collateral to zero with full
collateralization. This simplifying assumption reflects PJM’s judgment that
posting collateral can reduce the risk of default. At the proposed 40%
collateral level, the resulting expected default percentage is approximately
2.4%.
e)
Defaulted Amount is calculated by multiplying the gross RBP payment
obligation by the Expected default %. For illustrative purposes, the gross
RBP payment obligation is calculated using the assumed weighted-average
RBP clearing price of $555/MW-day, 1 MW of committed capacity, 365
days per year, and a 15-year commitment term.
a) LSE Credit Ratings (weighted average)
BBB
b) Probability of Default
4.05%
c) Loss Given Default
100%
d) expected default %
2.4%
adjusted by the amount
posted to PJM
e) Defaulted Amount
$73,839 =$555 x 1 x 365 x 15 x 2.4%
f) Collateral Held
$29,535 =$73,839 x 40%
g) Socialized Amount (=Defaulted Amount- Collateral Held)
$44,303 =$73,839 - $29,535
h) Socialized Cost to Non Default LSEs
$45,407 =$44,303 / (1-2.4%)
PDF page 8
7
f)
Collateral Held represents the LSE collateral requirement calculated using
the applicable collateral percentage.
g)
Socialized Amount represents the Defaulted Amount less the Collateral
Held.
h)
Socialized Cost to Non Default LSEs represents the Socialized Amount
allocated among non-defaulting LSEs.
The Socialized Cost to Non Default LSEs of $45,407 is reflected as Point B in
Figure 1 below.
F.
Determination of the Optimal Collateral Percentage
39.
Using these inputs, PJM evaluated the combined expected costs of posting
collateral and socialized default amounts at different collateral levels, expressed as
percentages of the total RBP payment obligation (see Table 2 below).
40.
Based on the assumptions used in PJM’s economic analysis, the combined cost of
posting collateral and expected socialized default amounts is minimized at a
collateral level equal to 40% of the net present value of the total RBP payment
obligation.
PDF page 9
8
Table 2: Total Cost
Collateral Held %
Cost of Posted
Collateral
Cost of Socialized
Default Amount
Total Cost
0%
-
128,259
128,259
5%
7,495
115,510
123,005
10%
14,991
103,453
118,443
15%
22,486
92,084
114,570
20%
29,981
81,398
111,380
25%
37,476
71,392
108,869
30%
44,972
62,061
107,033
35%
52,467
53,400
105,867
40%
59,962
45,407
105,369
45%
67,457
38,075
105,532
50%
74,953
31,402
106,355
55%
82,448
25,383
107,831
60%
89,943
20,015
109,958
65%
97,438
15,292
112,731
70%
104,934
11,212
116,146
75%
112,429
7,770
120,199
80%
119,924
4,963
124,887
85%
127,419
2,786
130,205
90%
134,915
1,236
136,150
95%
142,410
308
142,718
100%
149,905
-
149,905PDF page 10
9
Figure 1: Optimal Collateralization
41.
PJM therefore proposes to use a 40% factor in determining the RBP Credit Rate.
42.
The 40% factor does not represent the percentage of gross RBP payments that PJM
expects LSEs to pay through contract-for-differences settlements. Rather, it is the
collateral percentage identified by PJM’s economic analysis as minimizing the
combined cost of posting collateral and expected socialized default amounts.
IV.
Calculation of the RBP LSE Credit Requirement
43.
Under PJM’s proposed methodology, each LSE allocated responsibility for RBP
Charges must maintain RBP Collateral sufficient to satisfy its RBP LSE credit
requirement.
44.
Each LSE’s RBP LSE credit requirement is calculated by multiplying the RBP
Credit Rate established following the applicable RBP auction by the LSE’s
Allocated RBP Credit MW.
RBP LSE Credit Requirement = RBP Credit Rate x Allocated RBP Credit MW
45.
The RBP Credit Rate is an amount per MW calculated by applying the 40% factor
to the net present value of the total RBP payment obligation per MW over the
applicable RBP commitment term, using the weighted-average RBP clearing price
of all RBP UCAP MW committed through the RBP.
PDF page 11
10
46.
Allocated RBP Credit MW means the RBP UCAP MW for which the LSE has been
allocated responsibility for RBP Charges in accordance with the applicable Tariff
provisions.
47.
The RBP Credit Rate therefore establishes a uniform dollar-per-MW amount based
on the weighted-average RBP clearing price and the proposed collateral
methodology. Each LSE’s total collateral requirement depends on the quantity of
its Allocated RBP Credit MW.
48.
For example, at an assumed weighted-average RBP clearing price of $555/MW-
day, the proposed methodology produces an illustrative RBP Credit Rate of
approximately $686,000 per MW. This amount is equivalent to approximately 3.4
years of undiscounted RBP payments per MW at the assumed clearing price.
49.
The approximately $686,000-per-MW amount is illustrative and does not represent
a fixed RBP Credit Rate under the proposed Tariff provisions. The actual RBP
Credit Rate will be calculated using the weighted-average RBP clearing price
determined from the procurement results.
50.
The proposed methodology establishes the RPM Credit Rate by applying the 40%
factor to the net present value of the total RBP payment obligation, rather than by
requiring collateral equal to a specified number of years of payments.
V.
Administration of the RBP LSE Credit Requirement
A.
Posting of Collateral
51.
The proposed Tariff provisions establish procedures for identifying the LSEs
responsible for RBP Charges and requiring those LSEs to provide the applicable
collateral before the beginning of each Delivery Year.
52.
Electric Distributors will provide PJM with the information necessary to identify
the LSEs responsible for RBP Charges and their respective Allocated RBP Credit
MW.
53.
LSEs responsible for RBP Charges must post or maintain the required RBP
Collateral no later than 45 days before the beginning of the applicable Delivery
Year.
54.
The annual identification and collateral posting process recognizes that
responsibility for serving load, and consequently responsibility for RBP Charges,
may change over the RBP commitment term. This annual process does not alter
the long-term nature of the underlying RBP commitments or the long-term
economic basis for determining the RBP Credit Rate.
55.
The proposed Tariff provisions also address circumstances in which an LSE is
responsible for RBP Charges, but the information necessary to determine its
Allocated RBP Credit MW has not been reported for the applicable Electric
PDF page 12
11
Distributor zone or area. In those circumstances, PJM may determine the LSE’s
Allocated RBP Credit MW using its proportional share of the Daily Unforced
Capacity Obligation for the zone or area, as specified in the Tariff.
56.
In addition, the proposed Tariff provisions preserve PJM’s authority to evaluate an
LSE under the Unreasonable Credit Risk provisions of Attachment Q.
B.
Acceptable Forms of Collateral
57.
PJM proposes to accept RBP Collateral in the form of cash, letters of credit, or
surety bonds, subject to PJM’s acceptance of the provider, form, and amount of
such collateral. Consistent with PJM’s existing credit requirements, these forms of
collateral are intended to provide reliable financial protection that PJM can access
promptly when necessary, without conditions that could delay or impair its ability
to obtain payment.
C.
Relationship to Other PJM Credit Requirements
58.
The RBP LSE credit requirement addresses payment exposure associated with RBP
commitments and is separate from the credit requirements applicable to other PJM
market activities.
59.
PJM proposes that settlement during any Delivery Year of cleared positions
resulting from, or expected to result from, the RBP, including payments and
Locational Reliability Charges associated with the capacity commitments of RBP
Resources, as well as RBP Charges, shall not be considered in Peak Market Activity
under Tariff, Attachment Q, section VII.A. This treatment is intended to avoid
duplicative collateral requirements for RBP-related exposure while preserving the
application of other PJM credit requirements.
VI.
Review of the RBP Credit Rate
60.
Over the RBP commitment term, the inputs used to determine the RBP Credit Rate,
including the overall credit quality of the LSE portfolio, may change.
61.
Following the commencement of commercial operation of all capacity resources
with RBP commitments, PJM shall review the RBP Credit Rate, including inputs
used to determine that rate.
62.
If PJM identifies material changes that would affect the RBP Credit Rate, PJM will
reassess the RBP Credit Rate and present any resulting recommendations to PJM
stakeholders through the Members Committee.
63.
A change in the credit characteristics of an individual LSE does not, by itself,
trigger an adjustment to the RBP Credit Rate.
PDF page 13
12
VII.
Reasonableness of the Revised Methodology
64.
In my opinion, the revised RBP LSE credit methodology represents a reasonable
approach to managing the financial risks associated with long-term RBP
commitments.
65.
Using the known weighted-average RBP clearing price as the basis for determining
collateral allows PJM to establish meaningful credit protection without relying on
forecasts of future RPM clearing prices or on the ability to obtain additional
collateral later in the commitment term.
66.
By considering both collateral costs and expected socialized default amounts, the
methodology balances the interests of LSEs required to post collateral against those
of LSEs that may bear losses resulting from another LSE’s payment default.
67.
Although alternative collateral methodologies are possible, including approaches
based on projected contract-for-differences settlement exposure, PJM’s proposed
methodology reflects a reasonable credit risk management judgment that balances
the need for long-term credit protection against collateral costs and expected
socialized default amounts.
VIII. Conclusion
68.
For the reasons explained above, I believe the proposed methodology represents a
reasonable approach to establishing the RBP LSE credit requirement.
69.
This concludes my affidavit.
PDF page 14
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
)
Docket No. ER27-____-000
VERIFICATION
I, Gwen Kelly, pursuant to 28 U.S.C. § 1746, state, under penalty of perjury, that I
am the Gwen Kelly referred to in the foregoing document entitled “Affidavit of Gwen
Kelly, Senior Director Credit Risk and Collateral Management at PJM Interconnection,
L.L.C.,” that I have read the same and am familiar with the contents thereof, and that the
facts set forth therein are true and correct to the best of my knowledge, information, and
belief.
/s/ Gwen Kelly
Gwen Kelly
Sr. Director,
Credit Risk & Collateral Management
Risk Management
PJM Interconnection, L.L.C.