[{"slug":"abeyance-el26-67-pjm","title":"Letter order granting the PJM, Indicated PJM Transmission Owners and Silver Run Electric abeyance motions","issued":"2026-08-14","accession":"20260814-3059","docket":"EL26-67-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"letter order","file":"sources/originals/20260814-3059_EL26-67-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3059","sha256":"b9b801a2dd278cb8811942d656cabfbb9c75063548cf1ae827abc01407d02aaa","pages":null,"tokens":2090,"emptyPages":[]},{"slug":"abeyance-el26-68-spp","title":"Letter order granting the SPP Joint Movants' abeyance motion for 95 days, to November 20, 2026","issued":"2026-08-14","accession":"20260814-3060","docket":"EL26-68-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"letter order","file":"sources/originals/20260814-3060_EL26-68-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3060","sha256":"c3c8dc5f4d101c83453a73b45b0f535257dec4f39b543949eba38c60c7d8c5e5","pages":null,"tokens":1890,"emptyPages":[]},{"slug":"abeyance-el26-69-nyiso","title":"Letter order granting the NYISO, New York Transmission Owners and Non-Incumbent Transmission Owners abeyance motions","issued":"2026-08-14","accession":"20260814-3068","docket":"EL26-69-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"letter order","file":"sources/originals/20260814-3068_EL26-69-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3068","sha256":"56c964bb2211a6531f4f50e8905be969c10df43ef2aa4b59e6a3b1587535b490","pages":null,"tokens":1872,"emptyPages":[]},{"slug":"abeyance-el26-70-miso","title":"Letter order granting the MISO and MISO Transmission Owners abeyance motion over American Municipal Power's opposition","issued":"2026-08-14","accession":"20260814-3058","docket":"EL26-70-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"letter order","file":"sources/originals/20260814-3058_EL26-70-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3058","sha256":"0bbebbc8f815dd3667eae7824eb9bfd80bee342f5d5c20e5a2e9c6466a1fd267","pages":null,"tokens":2173,"emptyPages":[]},{"slug":"abeyance-el26-71-caiso","title":"Order Granting Rescission and Abeyance Requests (rescinds the order as to the Six Cities and WAPA)","issued":"2026-08-14","accession":"20260814-3061","docket":"EL26-71-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260814-3061_EL26-71-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3061","sha256":"02371da5d139e8ef4c56724c2e03ffffbcc011a4110defa4ee2a1e5d180809c3","pages":null,"tokens":2367,"emptyPages":[]},{"slug":"abeyance-el26-72-isone","title":"Letter order granting the ISO-NE and PTO Administrative Committee joint abeyance motion","issued":"2026-08-14","accession":"20260814-3056","docket":"EL26-72-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"letter order","file":"sources/originals/20260814-3056_EL26-72-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3056","sha256":"15e8b4fdf8a1667d478fddad21c574332a9a3c05bcf42636c99fb759a14c6e20","pages":null,"tokens":1603,"emptyPages":[]},{"slug":"amendment-er27-432-spp-chills","title":"SPP corrects the Upper Missouri rate sheet for conditional large-load service","issued":"2026-11-10","accession":"20261110-5175","docket":"ER27-432-001","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"tariff amendment","file":"sources/originals/20261110-5175_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261110-5175","sha256":"f0142df24e3abb50c39b84be343fb7ea02fdbf2be8baad99c9606a5d1b40dc6d","pages":5,"tokens":1168,"emptyPages":[]},{"slug":"amendment-er27-432-spp-chills-attachment-1","title":"Clean8543-8e690f19-d23f-4f93-8bbe-f1d8db8928e2.pdf","issued":"2026-11-10","accession":"20261110-5175","docket":"ER27-432-001","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/originals/20261110-5175_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261110-5175","parent":"amendment-er27-432-spp-chills","sha256":"7ad6baf7f8473e789eade8a17f964edda47241cff208e25bad77ba2345709a3a","pages":3,"tokens":729,"emptyPages":[]},{"slug":"amendment-er27-432-spp-chills-attachment-2","title":"Marked8543-c98d2db8-21b1-4bff-8977-95b41bb9803c.pdf","issued":"2026-11-10","accession":"20261110-5175","docket":"ER27-432-001","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/originals/20261110-5175_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261110-5175","parent":"amendment-er27-432-spp-chills","sha256":"bf5895108042183facbd9736d3446bd181910c3c68ba52bcd1619a6921607a44","pages":3,"tokens":743,"emptyPages":[]},{"slug":"answer-el25-49-pjm-limited-protests","title":"Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to the limited protests of its August 17, 2026 compliance filing (EL25-49 and ER26-1479)","issued":"2026-10-14","accession":"20261015-5003","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM","kind":"motion for leave to answer and answer","file":"sources/originals/20261015-5003_PJM Answer to Limited Protests - ER26-1479 and EL25-49 .pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261015-5003","sha256":"742d4f5e3c6e1f973860d7c0bc8bd174f44a11c17903e2af286ed60da5039217","pages":21,"tokens":5948,"emptyPages":[]},{"slug":"answer-el26-71-morongo","title":"Answer of Morongo Transmission LLC: no tariff amendment required, a non-load-serving participating transmission owner","issued":"2026-08-12","accession":"20260812-5158","docket":"EL26-71-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"Morongo Transmission","kind":"answer to order to show cause","file":"sources/originals/20260812-5158_Morongo Transmission - PTO OSC Answer.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260812-5158","sha256":"2446f4cf733f6ec9fe8e375c3b6293aa1d25019d8043406b0b1fc87bb1e7dfa3","pages":6,"tokens":1339,"emptyPages":[]},{"slug":"answer-er27-25-miso","title":"MISO Answer to Comments and Protests on the Large Load Addition Resource Study","issued":"2026-11-09","accession":"20261109-5205","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"MISO","kind":"motion for leave to answer and answer","file":"sources/originals/20261109-5205_FINAL AnswerER27-25-000.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5205","sha256":"8cf8065935fae99e4f035e6bf7512455a3721c9f4b2fcd6dc2166845fe46ae1f","pages":30,"tokens":8990,"emptyPages":[]},{"slug":"attachment-er27-454-a","title":"Attachment A -Marked Tariff","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"attachment","file":"sources/originals/attachment-er27-454-a.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5216","parent":"refiling-er27-454-pjm-backstop","sha256":"90a78243fcf772408da7c90809a87860373b6372a59265e857889763e317d428","pages":68,"tokens":25220,"emptyPages":[]},{"slug":"attachment-er27-454-b","title":"Attachment B- Clean Tariff Revisions","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"attachment","file":"sources/originals/attachment-er27-454-b.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5216","parent":"refiling-er27-454-pjm-backstop","sha256":"e9866f181a49cc3f35b35f144e772210af9a4c02fbefc9dc5fe5d3c95d6bae96","pages":66,"tokens":24243,"emptyPages":[]},{"slug":"attachment-er27-454-c","title":"Attachment C - Gwen Kelly Affidavit","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"attachment","file":"sources/originals/attachment-er27-454-c.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5216","parent":"refiling-er27-454-pjm-backstop","sha256":"04053d2b35875f820234c0fba30b3bfdf0352bba47dcaa194f269611e887c9c7","pages":14,"tokens":3851,"emptyPages":[]},{"slug":"attachment-er27-454-d","title":"Attachment D - Danielle Croop Affidavit","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"attachment","file":"sources/originals/attachment-er27-454-d.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5216","parent":"refiling-er27-454-pjm-backstop","sha256":"3d744c78710f0acc1a361f4b9b26a4e3cbe066ae215db72da6016d2aa88395fd","pages":8,"tokens":2564,"emptyPages":[]},{"slug":"clarification-er26-3380-amp","title":"Request for Clarification and Alternative Request for Rehearing of American Municipal Power, Inc.","issued":"2026-10-13","accession":"20261013-5514","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"American Municipal Power","kind":"request for clarification or rehearing","file":"sources/originals/20261013-5514_AMP_Clarification_ER26-3380.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261013-5514","sha256":"35d7abe57fa7077b76596d1c2122d41757c02457f86732daf7c3f71a79a57cc7","pages":17,"tokens":4643,"emptyPages":[]},{"slug":"comments-el26-67-spartz","title":"Rep. Victoria Spartz asks FERC and DOE to condition approvals and protect ratepayers","issued":"2026-11-05","accession":"20261110-4002","docket":"EL26-67-000","group":"PJM filings","filer":"US HOUSE OF REPRESENTATIVES","kind":"congressional letter","file":"sources/originals/20261110-4002_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261110-4002","sha256":"12c864a0d8f9d3b7887d75955c37a552db82dba0d7945e3d52bb253de352f507","pages":9,"tokens":2135,"emptyPages":[]},{"slug":"comments-er27-25-alliant-consumers","title":"Comments of Alliant Energy Corporate Services, Inc. and Consumers Energy Company in Support of MISO's Proposed Tariff Revisions","issued":"2026-10-23","accession":"20261023-5096","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Alliant and Consumers Energy","kind":"comments in support","file":"sources/originals/20261023-5096_AECS Consumers Comments ER27-25.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5096","sha256":"c8105774a3c9cc6018285a1bc0052793e920d0b740921107843a757a9a26964f","pages":5,"tokens":1028,"emptyPages":[]},{"slug":"comments-er27-25-arkansas-psc","title":"Comments of the Arkansas Public Service Commission in Support of MISO Application","issued":"2026-10-23","accession":"20261023-5180","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Arkansas PSC","kind":"comments in support","file":"sources/originals/20261023-5180_ER27-25-000 AR LARS comments.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5180","sha256":"482698d52fe64b7cc338fc1df3c5f5c5eb60606f73a1e392f8b89281675fda2b","pages":null,"tokens":345,"emptyPages":[]},{"slug":"comments-er27-25-dte","title":"Comments of DTE Electric Company","issued":"2026-10-23","accession":"20261023-5161","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"DTE Electric","kind":"comments","file":"sources/originals/20261023-5161_DTE Electric_LARS_Support Comments.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5161","sha256":"028911d8552e41a25b5364d8b07b70954defc9c8c5a7865b7f5370197fe91f88","pages":5,"tokens":885,"emptyPages":[]},{"slug":"comments-er27-25-entergy-cleco","title":"Supporting Comments of the Entergy Operating Companies and Cleco Power LLC","issued":"2026-10-23","accession":"20261023-5035","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Entergy and Cleco","kind":"comments in support","file":"sources/originals/20261023-5035_Entergy Comments in Support MISO LARS Filing FINAL1.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5035","sha256":"ff7d1cd1c0d996887155de1c866fb865485dea9b200af641e0f47fd3aa310ef5","pages":6,"tokens":1485,"emptyPages":[]},{"slug":"comments-er27-25-southern-regulators","title":"Comments on Behalf of the Southern Regulators (Mississippi and Louisiana PSCs) in Support of MISO Application","issued":"2026-10-23","accession":"20261023-5073","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Mississippi and Louisiana PSCs","kind":"comments in support","file":"sources/originals/20261023-5073_ER27-25 southern regulator comments.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5073","sha256":"14ad7911b2bb9743f6ecebfbe8e058f2eedc308d994d7b9845f352b9b0114330","pages":5,"tokens":797,"emptyPages":[]},{"slug":"complaint-el27-11-exelon","title":"Complaint Requesting Fast Track Processing of Exelon Corporation (prompt capacity auction from the 2030/31 Delivery Year)","issued":"2026-11-03","accession":"20261103-5191","docket":"EL27-11-000","group":"Exelon complaint seeking a prompt PJM capacity auction","filer":"Exelon","kind":"complaint (fast track)","file":"sources/originals/20261103-5191_Complaint of Exelon Corporation - 11.3.2026.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261103-5191","sha256":"25acac84decf91df2aa5c3b823440f1949a78fb4dbac9dd718bc7db19f9b57a7","pages":61,"tokens":18031,"emptyPages":[]},{"slug":"compliance-er26-1479-pjm","title":"PJM partial compliance filing in response to the June 18, 2026 order on rehearing in EL25-49-002 et al.","issued":"2026-08-17","accession":"20260817-5195","docket":"ER26-1479-002","group":"PJM co-location compliance","filer":"PJM","kind":"compliance filing (transmittal)","file":"sources/originals/20260817-5195_Transmittal for August Compliance Filing.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5195","sha256":"8bb53306c1f94f03859a6aaba8125e91e28b7084609244fb5f298fe4a07999a2","pages":27,"tokens":8096,"emptyPages":[]},{"slug":"compliance-er26-3515-pjm","title":"Thirty-Day Compliance Filing on PJM’s Large Load Definition and Large Load Registry","issued":"2026-11-09","accession":"20261109-5217","docket":"ER26-3515-002","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"PJM","kind":"compliance filing","file":"sources/originals/20261109-5217_PJM compliance filing.pdf","url":"https://www.pjm.com/pjmfiles/directory/etariff/FercDockets/9976/20261109-er26-3515-002.pdf","sha256":"092e39a95b0fcd6cdd7c05d842d70fe0f9121a4a446026164614bf98ba029f6f","pages":125,"tokens":41534,"emptyPages":[]},{"slug":"compliance-er26-3515-pjm-etariff-rendition","title":"FERC rendition of the electronically filed tariff records","issued":"2026-11-09","accession":"20261109-5217","docket":"ER26-3515-002","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"PJM","kind":"attachment","file":"sources/originals/20261109-5217_tariff-rendition.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261109-5217","parent":"compliance-er26-3515-pjm","sha256":"88ba29f810896777212763f515e69b59695864092069ddb1002a65cdb70ed215","pages":64,"tokens":20698,"emptyPages":[]},{"slug":"compliance-er26-3537-pjm-tos","title":"PJM Transmission Owners' partial compliance filing implementing the Interim NITS rate","issued":"2026-08-17","accession":"20260817-5175","docket":"ER26-3537-000","group":"PJM co-location compliance","filer":"PJM Transmission Owners","kind":"compliance filing (transmittal)","file":"sources/originals/20260817-5175_Transmittal Letter.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5175","sha256":"4d76a381a475671c3073ff8dc598a13bd4311090d1b37d1483494446b3bb390c","pages":4,"tokens":1205,"emptyPages":[]},{"slug":"e-10-caiso-el26-71-000","title":"CAISO show cause order","issued":"2026-06-18","docket":"EL26-71-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-10-caiso-el26-71-000.pdf","url":"https://www.ferc.gov/media/e-10-el26-71-000","sha256":"6a01f45e89c07fe1ccdc21742b1ea73c32b1e81a4710040728c9134201ec8d74","pages":118,"tokens":43959,"emptyPages":[]},{"slug":"e-11-isone-el26-72-000","title":"ISO-NE show cause order","issued":"2026-06-18","docket":"EL26-72-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-11-isone-el26-72-000.pdf","url":"https://www.ferc.gov/media/e11-el26-72-000","sha256":"af071275199a16d6b6240b1332b2d67d6b4512daed1601bcd5e7ae7002524cb8","pages":115,"tokens":43320,"emptyPages":[]},{"slug":"e-12-nyiso-el26-69-000","title":"NYISO show cause order","issued":"2026-06-18","docket":"EL26-69-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-12-nyiso-el26-69-000.pdf","url":"https://www.ferc.gov/media/e12-el26-69-000","sha256":"2cbbe4a06823bc8d86d40484159f655921db057cafd92a1d3c4a73389a5c1648","pages":119,"tokens":44897,"emptyPages":[]},{"slug":"e-2-pjm-el25-49-002","title":"PJM co-location rehearing order","issued":"2026-06-18","docket":"EL25-49-002","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-2-pjm-el25-49-002.pdf","url":"https://www.ferc.gov/media/e-2-el25-49-002","sha256":"924f3bc65ab8aa0c9bf803d704e08db658f5a598ebac95b7a8dbd7b45897e11c","pages":278,"tokens":107648,"emptyPages":[]},{"slug":"e-7-pjm-el26-67-000","title":"PJM show cause order","issued":"2026-06-18","docket":"EL26-67-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-7-pjm-el26-67-000.pdf","url":"https://www.ferc.gov/media/e-7-el26-67-000","sha256":"f9c747cfb6f16b646556d1149b529b467a402b6a62e7e7f861c583180a0a383f","pages":114,"tokens":41694,"emptyPages":[]},{"slug":"e-8-miso-el26-70-000","title":"MISO show cause order","issued":"2026-06-18","docket":"EL26-70-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-8-miso-el26-70-000.pdf","url":"https://www.ferc.gov/media/e-8-el26-70-000","sha256":"3946eea46ef8014cd75a1ecde6d3d9b1c555c7bf7ad23fbf503ec252de7facc8","pages":115,"tokens":43221,"emptyPages":[]},{"slug":"e-9-spp-el26-68-000","title":"SPP show cause order","issued":"2026-06-18","docket":"EL26-68-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-9-spp-el26-68-000.pdf","url":"https://www.ferc.gov/media/e-9-el26-68-000","sha256":"28c88f38e615d84bfc93c6a0b89995b40f86520d08d0e277afed8038ef884d3d","pages":92,"tokens":33815,"emptyPages":[]},{"slug":"eot-el25-49-pjm","title":"Notice of Extension of Time granting PJM and the Indicated PJM Transmission Owners 90 days, to November 16, 2026","issued":"2026-08-14","accession":"20260814-3005","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"FERC","kind":"notice of extension of time","file":"sources/originals/20260814-3005_EL25-49-002 EOT.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3005","sha256":"175e73020c49921881b9302c961465f22d7e16d27d55a8a4bd1d963e1595db67","pages":null,"tokens":1067,"emptyPages":[]},{"slug":"errata-el26-67-pjm","title":"Errata correcting the caption and footnote 13 of 195 FERC ¶ 61,211 (Allegheny Electric Cooperative, Wabash Valley Power Association)","issued":"2026-08-13","accession":"20260813-3025","docket":"EL26-67-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"errata notice","file":"sources/originals/20260813-3025_EL26-67-000 Errata Notice.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260813-3025","sha256":"bff287ba7fa503b1f71c094012cdfa0b9b8a387841998c91e65cc128c66a4251","pages":null,"tokens":518,"emptyPages":[]},{"slug":"errata-el26-70-miso","title":"Errata correcting the caption and footnote 11 of 195 FERC ¶ 61,212 (Wabash Valley Power Association)","issued":"2026-08-13","accession":"20260813-3026","docket":"EL26-70-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"errata notice","file":"sources/originals/20260813-3026_EL26-70-000 Errata.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260813-3026","sha256":"1c37ebd4969e121a1320dd08eb6c8c66ba864e068fab0a9fd611828f08b91567","pages":null,"tokens":555,"emptyPages":[]},{"slug":"errata-er27-330-pjm-backstop","title":"PJM corrects its October backstop transmittal letter","issued":"2026-10-30","accession":"20261030-5172","docket":"ER27-330-001","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20261030-5172_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261030-5172","sha256":"554dbedb526554560290e9df54926c38ee407cfd0ed68d265871ac4942cdab04","pages":3,"tokens":805,"emptyPages":[]},{"slug":"errata-er27-330-pjm-backstop-attachment-1","title":"Att A- Corrected Transmittal (Clean).pdf","issued":"2026-10-30","accession":"20261030-5172","docket":"ER27-330-001","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20261030-5172_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261030-5172","parent":"errata-er27-330-pjm-backstop","sha256":"62e0d7cbad4478989cf238f5fab99ca717d50a98e741a4a8a21237438a31467e","pages":67,"tokens":19535,"emptyPages":[]},{"slug":"errata-er27-330-pjm-backstop-attachment-2","title":"Att B- Corrected Transmittal (Marked).pdf","issued":"2026-10-30","accession":"20261030-5172","docket":"ER27-330-001","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20261030-5172_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261030-5172","parent":"errata-er27-330-pjm-backstop","sha256":"0909d7652b8eb183090052799ecbec979f5df41c97296c08aaca356ed3bf51b2","pages":67,"tokens":19537,"emptyPages":[]},{"slug":"filing-20260622-5134","title":"Vermont Electric Cooperative, Inc. submits Request for Issuance of an Errata re the Notice of Institution of Section 206 Proceeding and Refund Effective Date re ISO New England Inc. et al","issued":"2026-06-22","accession":"20260622-5134","docket":"EL26-72-000","group":"ISO-NE filings","filer":"Vermont Electric Cooperative, Inc.","kind":"request","file":"sources/originals/20260622-5134_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260622-5134","sha256":"eb18d8db16c2ea2516e5a9666422d6bb73186dd3ae4f73b667dd1fc89d016c51","pages":6,"tokens":1240,"emptyPages":[]},{"slug":"filing-20260624-5016","title":"Comments of Debra Ann Ostroski providing documented correspondence with American Transmission Company re the alternative transmission evaluation for the Large Load Show Cause Proceeding","issued":"2026-06-24","accession":"20260624-5016","docket":"EL26-70-000","group":"MISO filings","filer":"Individual No Affiliation","kind":"comments","file":"sources/originals/20260624-5016_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260624-5016","sha256":"6ba71781d7ee7a8f5e21b402ddc788031658da3e179f785696e7a9e014437ada","pages":1,"tokens":157,"emptyPages":[]},{"slug":"filing-20260629-5029","title":"Comments of Lisa Melton concerning the integration of large, high-density electric loads and the associated deterministic stability and cost-allocation methodologies","issued":"2026-06-29","accession":"20260629-5029","docket":"EL26-68-000","group":"SPP, CAISO filings","filer":"Individual No Affiliation","kind":"comments","file":"sources/originals/20260629-5029_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260629-5029","sha256":"34eaa0ac7837b5a717c2ba1f6229afd54463bdcfe62354720db3e2acff57a8c1","pages":2,"tokens":442,"emptyPages":[]},{"slug":"filing-20260708-5011","title":"Comments of Maven Solutions on the Commission's Show Cause Order regarding large-load interconnection tariff provisions","issued":"2026-07-08","accession":"20260708-5011","docket":"EL26-67-000","group":"PJM filings","filer":"MAVEN SOLUTIONS","kind":"comments","file":"sources/originals/20260708-5011_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260708-5011","sha256":"19d1d3a444195fc4bac958ec025b3dc691b37a72f2dc1fb4057bf9859bbd9419","pages":16,"tokens":4986,"emptyPages":[]},{"slug":"filing-20260708-5012","title":"Comments of Maven Solutions on the Show Cause Order regarding Civic Bankability Rating Standard to FERC's Five Reform Categories","issued":"2026-07-08","accession":"20260708-5012","docket":"EL26-67-000","group":"PJM filings","filer":"MAVEN SOLUTIONS","kind":"comments","file":"sources/originals/20260708-5012_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260708-5012","sha256":"19d1d3a444195fc4bac958ec025b3dc691b37a72f2dc1fb4057bf9859bbd9419","pages":16,"tokens":4986,"emptyPages":[]},{"slug":"filing-20260708-5018","title":"Supplemental Technical Comment of L.M. Marlowe on the integration of large, high-density electric loads and the associated reliability, observability, and cost-allocation methodologies under consideration by the Commission","issued":"2026-07-08","accession":"20260708-5018","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Individual No Affiliation","kind":"filing","file":"sources/originals/20260708-5018_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260708-5018","sha256":"285f5579e6e030bcf4c281d0903d66d6e18b5915b0a5aac529c9ad235ae0348d","pages":9,"tokens":3536,"emptyPages":[6]},{"slug":"filing-20260708-5103","title":"Motion to Intervene and Initial Comments of Global Capacity Alliance in response to FERC's 06/18/2026 Show Cause Order","issued":"2026-07-08","accession":"20260708-5103","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Global Capacity Alliance","kind":"comments","file":"sources/originals/20260708-5103_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260708-5103","sha256":"3891f5f85ddf5f9567bcd5d2dfbe139679f9cdf15e6506eaab91197a352a3e37","pages":4,"tokens":1662,"emptyPages":[]},{"slug":"filing-20260708-5207","title":"Motion of L.M. Marlowe for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement Judge","issued":"2026-07-08","accession":"20260708-5207","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Individual No Affiliation","kind":"motion","file":"sources/originals/20260708-5207_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260708-5207","sha256":"590f7636faf25554a4cdfc3a18e673f13e52b227497083d37bb1b2de3465b1b5","pages":3,"tokens":1083,"emptyPages":[]},{"slug":"filing-20260709-3012","title":"Errata to the Commission issued Order Instituting Proceeding Under Section 206 of the Federal Power Act; correcting the caption re ISO New England Inc. et al","issued":"2026-07-09","accession":"20260709-3012","docket":"EL26-72-000","group":"ISO-NE filings","filer":"SECRETARY OF THE COMMISSION, FERCCOMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)","kind":"errata","file":"sources/originals/20260709-3012_01.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260709-3012","sha256":"f1c7876e3ba404a898efd73af1475e4d7b8fd7d4c8fcaeabf860c4e26f897643","pages":null,"tokens":430,"emptyPages":[]},{"slug":"filing-20260709-5023","title":"Second Supplemental Technical Comment of L.M. Marlowe on the Frequency-Response Absorption Standard and Coupling-Discrimination Protocol","issued":"2026-07-09","accession":"20260709-5023","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Individual No Affiliation","kind":"filing","file":"sources/originals/20260709-5023_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260709-5023","sha256":"a6f3babf59b0d2d1c7f92f8a31a21d890d468b0a589b8640e7c3a78a7e2fa727","pages":4,"tokens":1621,"emptyPages":[]},{"slug":"filing-20260709-5287","title":"Motion to Intervene and Comments of Evan Pierce re the large-load interconnection tariff provisions","issued":"2026-07-09","accession":"20260709-5287","docket":"EL26-67-000","group":"PJM filings","filer":"Individual No Affiliation","kind":"comments","file":"sources/originals/20260709-5287_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260709-5287","sha256":"1feb71d7e777624167ee8d97016fcb821ba171f87563fc618badaf8f039e5339","pages":6,"tokens":2332,"emptyPages":[]},{"slug":"filing-20260715-5011","title":"Comments of Relentless Energy Systems LLC providing technical evidence and Xyce netlists demonstrating Geometric Phase Isolation, a Grid Enhancing Technology, for passive hardware-level VAR-offloading at Point-of-Load","issued":"2026-07-15","accession":"20260715-5011","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Relentless Energy Systems LLC","kind":"comments","file":"sources/originals/20260715-5011_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5011","sha256":"fde82fe634aca50ecb2db2007be8fa93ee69de2d611bbfb77d30b91c87b5810e","pages":3,"tokens":395,"emptyPages":[]},{"slug":"filing-20260715-5011-attachment-1","title":"GPI_Composite_Dashboard.pdf","issued":"2026-07-15","accession":"20260715-5011","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Relentless Energy Systems LLC","kind":"attachment","file":"sources/originals/20260715-5011_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5011","parent":"filing-20260715-5011","text_file":"20260715-5011_02.pdf.ocr.txt","sha256":"73b9aac69c8ce3e19567a118b7ab7c9c1b8ba115b4026611c99912b7d4ee5780","pages":2,"tokens":172,"emptyPages":[]},{"slug":"filing-20260715-5011-attachment-2","title":"RR-5D-LCFVR-GPI-ResilientResonance-Graph-Table.pdf","issued":"2026-07-15","accession":"20260715-5011","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Relentless Energy Systems LLC","kind":"attachment","file":"sources/originals/20260715-5011_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5011","parent":"filing-20260715-5011","text_file":"20260715-5011_03.pdf.ocr.txt","sha256":"e188156fe7fccd8dfe7ce67ca6f7d30c504f792cc1ee12012b29585a24b2d677","pages":1,"tokens":156,"emptyPages":[]},{"slug":"filing-20260715-5011-attachment-3","title":"SPECIFICATION.pdf","issued":"2026-07-15","accession":"20260715-5011","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Relentless Energy Systems LLC","kind":"attachment","file":"sources/originals/20260715-5011_04.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5011","parent":"filing-20260715-5011","sha256":"ed0fcb069ae0d4cc63c22e1c6ec500d3c134c9c202a7b04110a5ccdcc866f792","pages":21,"tokens":5397,"emptyPages":[]},{"slug":"filing-20260715-5011-attachment-4","title":"DRAWINGS.pdf","issued":"2026-07-15","accession":"20260715-5011","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Relentless Energy Systems LLC","kind":"attachment","file":"sources/originals/20260715-5011_05.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5011","parent":"filing-20260715-5011","sha256":"0398673056cb75d3aa2fc5c616270cca7618a04b7cbaadae242c05f388e2f03e","pages":4,"tokens":39,"emptyPages":[]},{"slug":"filing-20260715-5116","title":"Answer of Southwest Power Pool Transmission Owner Group to L.M. Marlowe's 07/08/2026 Motion for Settlement Procedures","issued":"2026-07-15","accession":"20260715-5116","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool Transmission Owner Group","kind":"answer","file":"sources/originals/20260715-5116_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5116","sha256":"16863b2d463b307d5ca30ec91eb84f8368e981249274647f85005f8c08b8844c","pages":6,"tokens":1423,"emptyPages":[]},{"slug":"filing-20260717-5246","title":"The Pennsylvania Office of Consumer Advocate submits Request for Clarification or, in the alternative, Rehearing of the 06/18/2026 Order","issued":"2026-07-17","accession":"20260717-5246","docket":"EL26-67-001","group":"PJM filings","filer":"Pennsylvania Office of Consumer Advocate","kind":"request","file":"sources/originals/20260717-5246_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260717-5246","sha256":"7f9b820dfcbe88d14667ea108f52c7934bcd8e45f661fc3d66ef933aa08b85e9","pages":28,"tokens":8843,"emptyPages":[]},{"slug":"filing-20260717-5258","title":"The Maryland Office of People's Counsel, et al. submit Request for Rehearing of the 06/18/2026 Order","issued":"2026-07-17","accession":"20260717-5258","docket":"EL26-67-001","group":"PJM filings","filer":"Maryland Office of People's CounselOHIO CONSUMERS' COUNSELDELAWARE DIVISION OF THE PUBLIC ADVOCATE ,OFFICE OF THE ILLINOIS ATTORNEY GENERAL ,","kind":"request","file":"sources/originals/20260717-5258_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260717-5258","sha256":"55abd0949a9d4b51e70ee8db437454dd4cbeadf4a241c682aaa83db71dad88e6","pages":30,"tokens":8051,"emptyPages":[]},{"slug":"filing-20260720-5172","title":"Exelon Corporation and FirstEnergy Service Company submit Request for Rehearing of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5172","docket":"EL26-67-001","group":"PJM filings","filer":"Exelon CorporationThe FirstEnergy Transmission Companies","kind":"request","file":"sources/originals/20260720-5172_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5172","sha256":"c21b865f999456b69c7eae0a4fccddc7256473b27b13933cd56f9343f79773b8","pages":33,"tokens":11932,"emptyPages":[]},{"slug":"filing-20260720-5198","title":"The Indicated PJM Transmission Owners submit Request for Clarification, or in the Alternative, Rehearing of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5198","docket":"EL26-67-001","group":"PJM filings","filer":"Indicated PJM Transmission Owners","kind":"request","file":"sources/originals/20260720-5198_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5198","sha256":"f0fe7f881559ab5486be034c467e4657c97b2521c37771f2598fbf7f83b32127","pages":10,"tokens":3070,"emptyPages":[]},{"slug":"filing-20260720-5218","title":"Eolian, L.P. submits Limited Request for Clarification or, In the Alternative, Rehearing of the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act","issued":"2026-07-20","accession":"20260720-5218","docket":"EL26-67-001","group":"PJM, NYISO, MISO, CAISO, ISO-NE filings","filer":"Eolian, L.P.","kind":"request","file":"sources/originals/20260720-5218_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5218","sha256":"7d234b5709c8f1ba8328d85eaa1a3cfa9f44c8dfe5cccd6e194d961edbfd8e45","pages":28,"tokens":8310,"emptyPages":[]},{"slug":"filing-20260722-5143","title":"Answer of Southwest Power Pool, Inc. in opposition to Motion for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement Judge of L.M. Marlowe","issued":"2026-07-22","accession":"20260722-5143","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"answer","file":"sources/originals/20260722-5143_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260722-5143","sha256":"0983778f0e690e6f94aff996f1b1d04d5a05652b319db57ca6d0182b9d1a6a46","pages":8,"tokens":1744,"emptyPages":[]},{"slug":"filing-20260722-5175","title":"Motion to Rescind Show Cause Order of Allegheny Electric Cooperative, Inc","issued":"2026-07-22","accession":"20260722-5175","docket":"EL26-67-000","group":"PJM filings","filer":"Allegheny Electric Cooperative, Inc.","kind":"motion","file":"sources/originals/20260722-5175_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260722-5175","sha256":"e5f9b9c770db336705ea3b3c984eb5157fc6834a6ae811a5b177dd44575e8818","pages":6,"tokens":1174,"emptyPages":[]},{"slug":"filing-20260728-5071","title":"Motion for Abeyance of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment Period","issued":"2026-07-28","accession":"20260728-5071","docket":"EL26-67-000","group":"PJM filings","filer":"Indicated PJM Transmission Owners","kind":"motion","file":"sources/originals/20260728-5071_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260728-5071","sha256":"68099cdc9e5ad5b8e9cadb97303e90f5b673ac4f50f4e713f950fd05c5f9ef72","pages":12,"tokens":3326,"emptyPages":[]},{"slug":"filing-20260728-5074","title":"Wabash Valley Power Association, Inc. submits Request for Issuance of an Errata to the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act","issued":"2026-07-28","accession":"20260728-5074","docket":"EL26-67-000","group":"PJM filings","filer":"Wabash Valley Power Association, Inc.","kind":"request","file":"sources/originals/20260728-5074_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260728-5074","sha256":"a879a6b974d2d35124206d2cd21dc282974aa1515b7c94423909f545e60b1bc5","pages":7,"tokens":1361,"emptyPages":[]},{"slug":"filing-20260728-5083","title":"Motion of Wabash Valley Power Association, Inc. for Request for Issuance of an Errata of the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act","issued":"2026-07-28","accession":"20260728-5083","docket":"EL26-70-000","group":"MISO filings","filer":"Wabash Valley Power Association, Inc.","kind":"motion","file":"sources/originals/20260728-5083_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260728-5083","sha256":"41d1c773401fc3951546100480f2b1160fdc77f530b56eabd1935a136cc5299c","pages":7,"tokens":1449,"emptyPages":[]},{"slug":"filing-20260731-5157","title":"Motion to Rescind Show Cause Order on behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California","issued":"2026-07-31","accession":"20260731-5157","docket":"EL26-71-000","group":"CAISO filings","filer":"Six Cities CA","kind":"motion","file":"sources/originals/20260731-5157_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5157","sha256":"ed8537798b22b6e87a5997ddf137ed81de3c54ec652a894483022356ba2d63f9","pages":6,"tokens":1229,"emptyPages":[]},{"slug":"filing-20260803-5106","title":"Answer in Support of the PJM Industrial Customer Coalition to the Motions for Extension and Abeyance by PJM Interconnection, L.L.C","issued":"2026-08-03","accession":"20260803-5106","docket":"EL26-67-000","group":"PJM filings","filer":"PJM Industrial Customer Coalition","kind":"answer","file":"sources/originals/20260803-5106_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5106","sha256":"1e8d58dfe0def165db82242d46dfae8049a4326edeba64213ad6aca08149bd2c","pages":5,"tokens":958,"emptyPages":[]},{"slug":"filing-20260803-5166","title":"Request for Abeyance of Southern California Edison Company, et al. in response to the Order issued on 06/18/2026","issued":"2026-08-03","accession":"20260803-5166","docket":"EL26-71-000","group":"CAISO filings","filer":"Southern California Edison CompanySan Diego Gas & Electric CompanyPacific Gas & Electric Company ,SunZia Transmission, LLC ,Citizens Sunrise Transmission LLC ,Citizens Sycamore-Penasquitos Transmission LLC ,Citizens S-Line Transmission LLC ,LS Power Grid California, LLC ,DesertLink, LLC ,Horizon West Transmission, LLC ,GridLiance West LLC ,Trans Bay Cable, LLC ,Viridon Path 15 LLC ,Valley Electric Association, Inc. ,Startrans IO, L.L.C. ,","kind":"request","file":"sources/originals/20260803-5166_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5166","sha256":"3db264502e19151cd857e32226b3e33eb59aa7965d004bed12cc39d521843c45","pages":13,"tokens":2774,"emptyPages":[]},{"slug":"filing-20260803-5170","title":"Motion to Hold Filing Obligation in Abeyance of DCR Transmission, L.L.C","issued":"2026-08-03","accession":"20260803-5170","docket":"EL26-71-000","group":"CAISO filings","filer":"DCR Transmission, L.L.C.","kind":"motion","file":"sources/originals/20260803-5170_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5170","sha256":"a79cecd49f7e9b702f6acbcf9a220eab221b44e8619809ab919580890f1a33fb","pages":16,"tokens":4247,"emptyPages":[]},{"slug":"filing-20260803-5202","title":"Motion to Rescind Show Cause Order as applied to Western Area Power Administration","issued":"2026-08-03","accession":"20260803-5202","docket":"EL26-71-000","group":"CAISO filings","filer":"Western Area Power Administration","kind":"motion","file":"sources/originals/20260803-5202_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5202","sha256":"f21b5c1f96518f3b591f85e63b82f41a3a7fe281e1356e5210090d7185c0b0a6","pages":6,"tokens":1124,"emptyPages":[]},{"slug":"filing-20260803-5210","title":"Request for Abeyance of the New York Transmission Owners and Request for Expedited Commission Action and Shortened Comment Period","issued":"2026-08-03","accession":"20260803-5210","docket":"EL26-69-000","group":"NYISO filings","filer":"Central Hudson Gas & Electric CorporationConsolidated Edison Company of New York, Inc.New York State Electric & Gas Corporation ,Niagara Mohawk Power Corporation d/b/a National Grid ,Orange and Rockland Utilities, Inc. ,Rochester Gas and Electric Corporation ,","kind":"request","file":"sources/originals/20260803-5210_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5210","sha256":"c32715bd75f1c791df6d79d7b247d23d8609d51db8152cdb0f4f2d1469d8ed0d","pages":31,"tokens":8655,"emptyPages":[]},{"slug":"filing-20260803-5227","title":"Conditional Motion for Abeyance on Behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California,","issued":"2026-08-03","accession":"20260803-5227","docket":"EL26-71-000","group":"CAISO filings","filer":"Six Cities CA","kind":"motion","file":"sources/originals/20260803-5227_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5227","sha256":"eb181e3eee2a62c7ddcddb1c1e525a55ada39317bf6357eccd911bb740d5dc9e","pages":6,"tokens":1368,"emptyPages":[]},{"slug":"filing-20260803-5234","title":"Answer of Constellation Energy Generation, LLC in support of PJM Interconnection, L.L.C.'s Motion for Abeyance","issued":"2026-08-03","accession":"20260803-5234","docket":"EL26-67-000","group":"PJM filings","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/originals/20260803-5234_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5234","sha256":"76b892a0ee562c62f7342673f8c400f34cb9ff2d585e7dd1c2990ece97709c53","pages":5,"tokens":1174,"emptyPages":[]},{"slug":"filing-20260803-5241","title":"Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of LS Power Grid New York Corporation I and New York Transco LLC","issued":"2026-08-03","accession":"20260803-5241","docket":"EL26-69-000","group":"NYISO filings","filer":"LS Power Grid New York Corporation INew York Transco LLC","kind":"answer","file":"sources/originals/20260803-5241_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5241","sha256":"d86d3bd52647731273c2295346cbb8e1ede4152aae7d0b8904903140495f1d3f","pages":10,"tokens":2739,"emptyPages":[]},{"slug":"filing-20260803-5261","title":"Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of Silver Run Electric, LLC","issued":"2026-08-03","accession":"20260803-5261","docket":"EL26-67-000","group":"PJM filings","filer":"Silver Run Electric, LLC","kind":"answer","file":"sources/originals/20260803-5261_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5261","sha256":"c15f2d68d392d42f8dce5c9552959527837292eda9a7f0349d172aaf19ce278f","pages":9,"tokens":2603,"emptyPages":[]},{"slug":"filing-20260803-5265","title":"Amended Joint Motion of Southwest Power Pool, Inc. et al. to Hold Section 206 Proceeding in Abeyance","issued":"2026-08-03","accession":"20260803-5265","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.AMERICAN ELECTRIC POWER SERVICE CORPORATIONEVERGY, INC. ,GRIDLIANCE HIGH PLAINS LLC ,ITC GREAT PLAINS LLC ,","kind":"motion","file":"sources/originals/20260803-5265_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5265","sha256":"a07f3b6849b6780764c71a4179e1bbdfe5359a6dc3c3a3ee8d373dd4ae017743","pages":23,"tokens":5605,"emptyPages":[]},{"slug":"filing-20260804-5159","title":"Answer of Constellation Energy Generation, LLC in response to Transmission Owner's 07/20/2026 Request for Clarification","issued":"2026-08-04","accession":"20260804-5159","docket":"EL26-67-000","group":"PJM filings","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/originals/20260804-5159_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260804-5159","sha256":"668810a3f180671270107fa324b466fc7b3f94f5e0c3a0e51f317e19472a1ae7","pages":4,"tokens":1105,"emptyPages":[]},{"slug":"filing-20260807-5123","title":"Comments of the Southwest Power Pool Regional State Committee in support of Southwest Power Pool, Inc.’s request for an extension of time until 11/20/2026 to respond to the FERC's 06/18/2026 Order to Show Cause","issued":"2026-08-07","accession":"20260807-5123","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool Regional State Committee","kind":"comments","file":"sources/originals/20260807-5123_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5123","sha256":"bd87e8dc04d1b5f445294792f7433f1678874ccf1612bd58a42c767a05bd53aa","pages":3,"tokens":492,"emptyPages":[]},{"slug":"filing-20260807-5150","title":"Comments of the Public Service Commission of the State of Missouri in support of Southwest Power Pool, Inc.'s et al. request for abeyance filed 08/03/2026","issued":"2026-08-07","accession":"20260807-5150","docket":"EL26-68-000","group":"SPP filings","filer":"Missouri Public Service Commission","kind":"comments","file":"sources/originals/20260807-5150_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5150","sha256":"10b96ea28199ba96b4e32b3b0eb32be99421abf30cafa39bd8d4a5601711e6d6","pages":5,"tokens":1251,"emptyPages":[]},{"slug":"filing-20260807-5186","title":"Answer of the Organization of MISO States, Inc. in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion to Hold Proceeding in Abeyance","issued":"2026-08-07","accession":"20260807-5186","docket":"EL26-70-000","group":"MISO filings","filer":"Organization of MISO States, Inc.","kind":"answer","file":"sources/originals/20260807-5186_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5186","sha256":"3ecd2aa2dbce42fa4c45eb0656a79b150c053a737a5fefb6e1f166e67a15bfbf","pages":8,"tokens":1990,"emptyPages":[]},{"slug":"filing-20260807-5196","title":"Answer of the New England States Committee on Electricity in Response to Joint Motion for Abeyance filed by ISO New England, Inc. et al","issued":"2026-08-07","accession":"20260807-5196","docket":"EL26-72-000","group":"ISO-NE filings","filer":"New England States Committee on Electricity","kind":"answer","file":"sources/originals/20260807-5196_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5196","sha256":"934d6705f3d9a8a61386b45c34e3f5625c56d7bb225269bca07dbf42085a6c2c","pages":6,"tokens":1142,"emptyPages":[]},{"slug":"filing-20260807-5199","title":"Answer of American Municipal Power, Inc. in Response to the Motion to Hold Abeyance filed by Midcontinent Independent System Operator, Inc. et al","issued":"2026-08-07","accession":"20260807-5199","docket":"EL26-70-000","group":"MISO filings","filer":"American Municipal Power, Inc.","kind":"answer","file":"sources/originals/20260807-5199_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5199","sha256":"e3f12bf5083e3ed802bd500a25e400180f64c8a43ea871ba8a08d0d852acd6ed","pages":13,"tokens":2280,"emptyPages":[]},{"slug":"filing-20260807-5215","title":"Answer of Corporate Energy Buyers Association in Support of California Independent System Operator Corporation's et al. 08/03/2026 et al. Motion for Abeyance","issued":"2026-08-07","accession":"20260807-5215","docket":"EL26-71-000","group":"CAISO filings","filer":"Corporate Energy Buyers Association","kind":"answer","file":"sources/originals/20260807-5215_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5215","sha256":"4cd6634fda25212c3a349aaba68d784f6f80920b2e31c90d0b2f6cbf2d1b19a5","pages":3,"tokens":477,"emptyPages":[]},{"slug":"filing-20260807-5216","title":"Answer of Corporate Energy Buyers Association in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion for Abeyance","issued":"2026-08-07","accession":"20260807-5216","docket":"EL26-70-000","group":"MISO filings","filer":"Corporate Energy Buyers Association","kind":"answer","file":"sources/originals/20260807-5216_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5216","sha256":"13118fdcc6dee90d3e98eec8749a84f1ab52d2c5fc35cd5a4114bc111ef9523d","pages":3,"tokens":404,"emptyPages":[]},{"slug":"filing-20260807-5219","title":"Answer of Corporate Energy Buyers Association in support of PJM Interconnection, L.L.C.'s et al. 07/28/2026 Motion for Abeyance","issued":"2026-08-07","accession":"20260807-5219","docket":"EL26-67-000","group":"PJM filings","filer":"Corporate Energy Buyers Association","kind":"answer","file":"sources/originals/20260807-5219_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5219","sha256":"ff25d6d44bcf6c1af7c9201eb4d8b666afc6ec2507164fbc6355337c7c726ead","pages":3,"tokens":435,"emptyPages":[]},{"slug":"filing-20260807-5220","title":"Answer of Corporate Energy Buyers Association in Support of the Amended Motion for Abeyance filed on 08/03/2026 by Southwest Power Pool, Inc. et al","issued":"2026-08-07","accession":"20260807-5220","docket":"EL26-68-000","group":"SPP filings","filer":"Corporate Energy Buyers Association","kind":"answer","file":"sources/originals/20260807-5220_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5220","sha256":"13ecdb68a201b4a2686cdfd8bceb43b06017270a05b378cf801bca34977069f9","pages":3,"tokens":434,"emptyPages":[]},{"slug":"filing-20260810-5108","title":"Comments of the Natural Gas Supply Association on the Informational Reports re Resource Adequacy Measures and Proposals, PJM Interconnection L.L.C., et al","issued":"2026-08-10","accession":"20260810-5108","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"NATURAL GAS SUPPLY ASSOCIATION (DC)","kind":"comments","file":"sources/originals/20260810-5108_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260810-5108","sha256":"be7564d73a92cdea55a64fad269bf3f5911cffb8528f473a9fbbf9e85b7b5aa4","pages":3,"tokens":842,"emptyPages":[]},{"slug":"filing-20260812-5036","title":"Comments of Sparkfund on Midcontinent Independent System Operator Inc.’s Informational Report filed on 07/20/2026","issued":"2026-08-12","accession":"20260812-5036","docket":"EL26-70-000","group":"MISO filings","filer":"Sparkfund","kind":"comments","file":"sources/originals/20260812-5036_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260812-5036","sha256":"8d2a1b1fbd6b04a5a3dcb306406c5c56b5ffe54ac08d9b76d85ebe49b90b0adf","pages":4,"tokens":966,"emptyPages":[]},{"slug":"filing-20260814-5198","title":"Comments of the Organization of MISO States, Inc. on the Informational Report of the Midcontinent Independent System Operator, Inc. filed on 07/20/2026","issued":"2026-08-14","accession":"20260814-5198","docket":"EL26-70-000","group":"MISO filings","filer":"Organization of MISO States, Inc.","kind":"comments","file":"sources/originals/20260814-5198_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260814-5198","sha256":"9b19c86df6751de48fed202901c1e5774c81471fe8e663a3e64d8eff8822754d","pages":7,"tokens":1586,"emptyPages":[]},{"slug":"filing-20260814-5244","title":"PJM Interconnection, L.L.C. submits tariff filing per : Supplemental Filing of Croop Affidavit in ER26-3380 to be effective N/A","issued":"2026-08-14","accession":"20260814-5244","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20260814-5244_01.pdf","url":"https://www.pjm.com/pjmfiles/directory/etariff/FercDockets/9829/20260814-er26-3380-000.pdf","sha256":"9a645549a2f58c9e4743b8de42cee7c77c311f3d4f2c080c57a59a937322b188","pages":22,"tokens":3334,"emptyPages":[]},{"slug":"filing-20260819-5134","title":"Comments of the Illinois Commerce Commission in support of PJM Interconnection, L.L.C.’s 07/31/2026 filing","issued":"2026-08-19","accession":"20260819-5134","docket":"ER26-3380-000","group":"PJM filings","filer":"Illinois Commerce Commission","kind":"comments","file":"sources/originals/20260819-5134_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260819-5134","sha256":"1154f23903589a43650328526c68eef2bcd45a05256f0ceff41afa9b2bad8694","pages":9,"tokens":2134,"emptyPages":[]},{"slug":"filing-20260821-5096","title":"Comments of the Organization of PJM States, Inc. in support of PJM Interconnection, L.L.C.’s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5096","docket":"ER26-3380-000","group":"PJM filings","filer":"Organization of PJM States, Inc.","kind":"comments","file":"sources/originals/20260821-5096_01.pdf","url":"https://opsi.us/wp-content/uploads/2026/08/OPSI-ER26-3380-000-RBP-Comments.pdf","sha256":"524dd309d58000166d48f2b237418d01420ac3ab034c2b2fc4e0ed5018fa46c8","pages":5,"tokens":1213,"emptyPages":[]},{"slug":"filing-20260821-5145","title":"Comments of Public Service Commission of West Virginia in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal","issued":"2026-08-21","accession":"20260821-5145","docket":"ER26-3380-000","group":"PJM filings","filer":"Public Service Commission of West Virginia","kind":"comments","file":"sources/originals/20260821-5145_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5145","sha256":"c1bb720518255106e15e5a983fbafb97e5e05f224c6d73880b52f8e48bcdeb96","pages":7,"tokens":1952,"emptyPages":[]},{"slug":"filing-20260821-5176","title":"Comments of PJM Industrial Customer Coalition on PJM Interconnection, L.L.C.’s Reliability Backstop Procurement Proposal","issued":"2026-08-21","accession":"20260821-5176","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Industrial Customer Coalition","kind":"comments","file":"sources/originals/20260821-5176_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5176","sha256":"7facc14dd714c14db8df5f21027365ffe4a1c4b526fc46feda950e2fa70abe87","pages":11,"tokens":2946,"emptyPages":[]},{"slug":"filing-20260821-5180","title":"Limited Protest of Sierra Club et al. to one aspect of PJM Interconnection, LLC’s proposed Reliability Backstop Procurement","issued":"2026-08-21","accession":"20260821-5180","docket":"ER26-3380-000","group":"PJM filings","filer":"Sierra ClubNatural Resources Defense Council","kind":"filing","file":"sources/originals/20260821-5180_01.pdf","url":"https://sustainableferc.org/wp-content/uploads/2026/08/20260821-5180_Limited-Protest-of-Public-Interest-Organizations.pdf","sha256":"cdcd999fa9ff74dfe38b9920c469c1927d6d8df827ddf23fced9991f77e3d742","pages":43,"tokens":12758,"emptyPages":[]},{"slug":"filing-20260821-5183","title":"Protest, Motion to Reject, and Alternative Request for the Imposition of Conditions of Delaware Division of the Public Advocate et al","issued":"2026-08-21","accession":"20260821-5183","docket":"ER26-3380-000","group":"PJM filings","filer":"Delaware Division of the Public AdvocateDistrict of Columbia Office of People's CounselIllinois Citizens Utility Board ,Maryland Office of the People's Counsel ,New Jersey Division of Rate Counsel ,Office of the Illinois Attorney General ,","kind":"motion","file":"sources/originals/20260821-5183_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5183","sha256":"e280af49f099cd9e42a9d0ac0618baae4ca5258975c3350e3500781bbabc747b","pages":38,"tokens":12346,"emptyPages":[]},{"slug":"filing-20260821-5217","title":"Protest of the Pennsylvania Office of Consumer Advocate to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal","issued":"2026-08-21","accession":"20260821-5217","docket":"ER26-3380-000","group":"PJM filings","filer":"Pennsylvania Office of Consumer Advocate","kind":"filing","file":"sources/originals/20260821-5217_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5217","sha256":"a8e680b578c6427d73d9da46b0dbdfd7f882d89b09f696aa689737ededceaa04","pages":31,"tokens":9866,"emptyPages":[]},{"slug":"filing-20260821-5281","title":"The Ohio Consumers' Counsel submits Protest and Request for Rejection of Filing or in the Alternative for Evidentiary Hearings and/or Settlement Proceedings re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing","issued":"2026-08-21","accession":"20260821-5281","docket":"ER26-3380-000","group":"PJM filings","filer":"Office of the Ohio Consumers' Counsel","kind":"request","file":"sources/originals/20260821-5281_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5281","sha256":"8bc2954ddf4f790bdb8c9238083c8395cf07a4639e3c97c66938db5f8110cee1","pages":22,"tokens":6428,"emptyPages":[]},{"slug":"filing-20260821-5306","title":"Comments of the Data Center Coalition in response to PJM Interconnection, L.L.C.’s 07/31/2026 proposed tariff filing to establish the Reliability Backstop Procurement","issued":"2026-08-21","accession":"20260821-5306","docket":"ER26-3380-000","group":"PJM filings","filer":"Data Center Coalition","kind":"comments","file":"sources/originals/20260821-5306_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5306","sha256":"e6c9f5a0c6ff9d73c3d42e633d6174aa6e438f30b6cfa067f6f18b956f53ed07","pages":10,"tokens":2385,"emptyPages":[]},{"slug":"filing-20260821-5317","title":"Protest of the Independent Market Monitor for PJM re PJM Interconnection, LLC's 07/31/2026 proposed Reliability Backstop Procurement filing","issued":"2026-08-21","accession":"20260821-5317","docket":"ER26-3380-000","group":"PJM filings","filer":"Monitoring Analytics, LLC","kind":"filing","file":"sources/originals/20260821-5317_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5317","sha256":"5691314f7dd1816b1e2fdcb12313e961644b93176ce8f6eb3789fbab7b62c9b7","pages":42,"tokens":13452,"emptyPages":[]},{"slug":"filing-20260828-5287","title":"Motion for Extension of Time of the Organization of PJM States, Inc. to submit comments in response to PJM Interconnection, L.L.C.'s 08/13/2026 proposal","issued":"2026-08-28","accession":"20260828-5287","docket":"ER26-3515-000","group":"PJM filings","filer":"Organization of PJM States, Inc.","kind":"comments","file":"sources/originals/20260828-5287_01.pdf","url":"https://opsi.us/wp-content/uploads/2026/09/ER26-3515-000-IRAS-Extension-Request.pdf","sha256":"d4a2cb8b10279706c0ebe0b8586f25630a51e2b939c247b2a21790a216b11346","pages":4,"tokens":820,"emptyPages":[]},{"slug":"filing-20260901-5028","title":"Answer of the Pennsylvania Public Utility Commission in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in response to PJM Interconnection, L.L.C.’s filing","issued":"2026-09-01","accession":"20260901-5028","docket":"ER26-3515-000","group":"PJM filings","filer":"Pennsylvania Public Utility Commission","kind":"comments","file":"sources/originals/20260901-5028_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260901-5028","sha256":"9e70754aba977407925d3346100ad47af31a6f7ea0f7549c73b673329ba529aa","pages":4,"tokens":753,"emptyPages":[]},{"slug":"filing-20260902-5107","title":"Answer of Southern Regulators in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026","issued":"2026-09-02","accession":"20260902-5107","docket":"ER26-3552-000","group":"MISO filings","filer":"Mississippi Public Service CommissionLouisiana Public Service CommissionArkansas Public Service Commission ,Council of the City of New Orleans, Louisiana ,","kind":"answer","file":"sources/originals/20260902-5107_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260902-5107","sha256":"02ab3abc0cd562f8c71110235a6f51cda90d4cfd2c7d7b66c4c3abdc73b21a5d","pages":4,"tokens":710,"emptyPages":[]},{"slug":"filing-20260903-5021","title":"Answer of Mississippi Public Service Commission et al. in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026","issued":"2026-09-03","accession":"20260903-5021","docket":"ER26-3552-000","group":"MISO filings","filer":"Mississippi Public Service CommissionLouisiana Public Service CommissionCouncil of the City of New Orleans, Louisiana ,Arkansas Public Service Commission ,","kind":"answer","file":"sources/originals/20260903-5021_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260903-5021","sha256":"6ec9d32e840f5df554e98b6a9ab6ef41c20eabd4a98aa215bbf16b17cef718d0","pages":4,"tokens":717,"emptyPages":[]},{"slug":"filing-20260903-5199","title":"Motion to Intervene and Protest of the Data Center Coalition to PJM Interconnection, L.L.C.’s proposal to establish Interim Resource Adequacy Service and a Large Load Registry","issued":"2026-09-03","accession":"20260903-5199","docket":"ER26-3515-000","group":"PJM filings","filer":"Data Center Coalition","kind":"motion","file":"sources/originals/20260903-5199_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260903-5199","sha256":"b2e7e478d0ba9e16fc7d5fe79c76e2cab402c92d63ab9425f68e6f61bcebdaae","pages":71,"tokens":15543,"emptyPages":[]},{"slug":"filing-20260903-5206","title":"Comments of the Pennsylvania Public Utility Commission to the Proposal of PJM Interconnection, L.L.C. to establish Interim Resource Adequacy Service and Large Load Registry to address System Reliability","issued":"2026-09-03","accession":"20260903-5206","docket":"ER26-3515-000","group":"PJM filings","filer":"Pennsylvania Public Utility Commission","kind":"comments","file":"sources/originals/20260903-5206_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260903-5206","sha256":"a4c0d5023283667f5280b153113dcfdd77b223354be442f8001157b266e3ac50","pages":10,"tokens":2210,"emptyPages":[]},{"slug":"filing-20260903-5212","title":"Protest and Comments of Joint Consumer Advocates on the 08/13/2026 filing by PJM Interconnection, L.L.C","issued":"2026-09-03","accession":"20260903-5212","docket":"ER26-3515-000","group":"PJM filings","filer":"Delaware Division of the Public AdvocateDistrict of Columbia Office of People's CounselIllinois Citizens Utility Board ,Maryland Office of People's Counsel ,New Jersey Division of Rate Counsel ,Office of the Illinois Attorney General ,","kind":"comments","file":"sources/originals/20260903-5212_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260903-5212","sha256":"cb8f02622e1a1fc6f86c837d433d3f8d003d400a3bb07edaa6607a8ce750d6f9","pages":41,"tokens":13118,"emptyPages":[]},{"slug":"filing-20260908-5329","title":"Motion to Intervene and Comments of Consumers Energy Company re the 08/18/2026 filing by Midcontinent Independent System Operator, Inc","issued":"2026-09-08","accession":"20260908-5329","docket":"ER26-3552-000","group":"MISO filings","filer":"Consumers Energy Company","kind":"comments","file":"sources/originals/20260908-5329_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260908-5329","sha256":"5c60d55f74dac524650cf091294087c28c8c3c9f2586a9d0ebd9118364f8a37e","pages":6,"tokens":1231,"emptyPages":[]},{"slug":"filing-20260908-5341","title":"Protest of Community Collaboration on Climate Change, et al. re the Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish the Zero Injection Generator Interconnection Agreement","issued":"2026-09-08","accession":"20260908-5341","docket":"ER26-3552-000","group":"MISO filings","filer":"Community Collaboration on Climate ChangeMichigan Environmental Justice CoalitionMidwest Tribal Energy Resources Association ,Sierra Club ,Natural Resources Defense Council ,Clean Grid Alliance ,","kind":"filing","file":"sources/originals/20260908-5341_01.pdf","url":"https://sustainableferc.org/wp-content/uploads/2026/09/ER26-3552-Community-Orgs-and-Clean-Energy-Advocates-Protest.pdf","sha256":"460e52ad30528d82dc2268ae49cba9e9cb6a7e0a2b11e5e6a463d77a968a2d12","pages":32,"tokens":9334,"emptyPages":[]},{"slug":"filing-20260910-4000","title":"Comments of U.S. House of Representatives Victoria Spartz requesting independent federal review of the energy generation, grid resiliency, transmission, water-resource, and consumer-cost implications etc","issued":"2026-09-10","accession":"20260910-4000","docket":"EL26-70-000","group":"MISO filings","filer":"US HOUSE OF REPRESENTATIVES","kind":"comments","file":"sources/originals/20260910-4000_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260910-4000","sha256":"dff41b3156cf3d31761cb698ccb03f0e1e45e4fedbf41f3d67a29b5a78386c0b","pages":5,"tokens":1667,"emptyPages":[]},{"slug":"filing-20260910-5296","title":"Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to Comments and Protests re the 07/31/2026 revised Open Access Transmission Tariff filing et al","issued":"2026-09-10","accession":"20260910-5296","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"comments","file":"sources/originals/20260910-5296_01.pdf","url":"https://www.pjm.com/-/media/DotCom/documents/ferc/filings/2026/20260910-er26-3380-000.pdf","sha256":"d4178f9996d3c6252e5f39ef4be7a1d1aed47bc33ab160725e316443cc95677c","pages":112,"tokens":36584,"emptyPages":[]},{"slug":"filing-20260911-5203","title":"Motion for Acceptance of Late-Filed Comments and Comments in Conditional Support of the Organization of MISO States, Inc. re Midcontinent Independent System Operator, Inc.’s proposed tariff revisions","issued":"2026-09-11","accession":"20260911-5203","docket":"ER26-3552-000","group":"MISO filings","filer":"Organization of MISO States, Inc.","kind":"comments","file":"sources/originals/20260911-5203_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260911-5203","sha256":"7b670e5cab16dd60ac2aa432d9d65334d46fc86eb1b4e5ecdf08fa4dc31ab6bf","pages":15,"tokens":3579,"emptyPages":[]},{"slug":"filing-20260918-5272","title":"Motion to Intervene and Comments of Central Municipal Power Agency/Services et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5272","docket":"ER26-3650-000","group":"MISO filings","filer":"CENTRAL MINNESOTA MUNICIPAL POWER AGENCYIndiana Municipal Power AgencyMissouri Joint Municipal Electric Utility Commission ,WPPI Energy ,","kind":"comments","file":"sources/originals/20260918-5272_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260918-5272","sha256":"a5a9cb434e542dcc5004351608b7c710ff1be59b69d45bf713a8ac42e0bad61c","pages":21,"tokens":5334,"emptyPages":[]},{"slug":"filing-20260918-5323","title":"Protest of Mississippi Public Service Commission et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5323","docket":"ER26-3650-000","group":"MISO filings","filer":"Mississippi Public Service CommissionArkansas Public Service Commission","kind":"filing","file":"sources/originals/20260918-5323_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260918-5323","sha256":"331b0be8140b667173995823d0ea5ad3842ee6e82199c31844675e1fa93575fc","pages":4,"tokens":684,"emptyPages":[]},{"slug":"filing-20260918-5333","title":"Protest of Iowa Office of Consumer Advocate et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5333","docket":"ER26-3650-000","group":"MISO filings","filer":"Iowa Office of Consumer AdvocateIllinois Attorney General's OfficeIllinois Citizens Utility Board ,Michigan Attorney General ,Citizens Utility Board of Michigan ,Citizens Utility Board of Minnesota ,Citizens Utility Board of Wisconsin ,Citizens Action Coalition of Indiana, Inc. ,ALLIANCE FOR AFFORDABLE ENERGY ,","kind":"filing","file":"sources/originals/20260918-5333_01.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260918-5333","sha256":"18706aa74c81fd37af04fa87e8c787bed8697ed8fc55e1cb23e345cea9de3f74","pages":null,"tokens":1603,"emptyPages":[]},{"slug":"filing-20260918-5397","title":"Protest of Sierra Club et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5397","docket":"ER26-3650-000","group":"MISO filings","filer":"Sierra ClubNatural Resources Defense CouncilEnvironmental Law and Policy Center ,Clean Wisconsin ,UNION OF CONCERNED SCIENTISTS ,Sustainable FERC Project ,Fresh Energy ,","kind":"filing","file":"sources/originals/20260918-5397_01.pdf","url":"https://sustainableferc.org/wp-content/uploads/2026/10/ER26-3650-Protest-of-Public-Interest-Organizations-MISO-Interconnection-Requirements-for-Large-Loads.pdf","sha256":"ef2bd68b7446322ee2ff61ab0086034691416f4f0eaee2dbbfdbe342c924dcd9","pages":30,"tokens":9540,"emptyPages":[]},{"slug":"filing-20260918-5412","title":"Motion to Intervene and Comments of the Data Center Coalition re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5412","docket":"ER26-3650-000","group":"MISO filings","filer":"Data Center Coalition","kind":"comments","file":"sources/originals/20260918-5412_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260918-5412","sha256":"20bbad72479dde41d3ffc39ade55fc623b5cb6573ae610ca29bd63a2461395d8","pages":32,"tokens":9317,"emptyPages":[]},{"slug":"filing-20260925-5208","title":"Answer and Motion for Leave to Answer of the Independent Market Monitor for PJM Interconnection, L.L.C. to the Answer of PJM Interconnection, L.L.C. filed on 09/10/2026","issued":"2026-09-25","accession":"20260925-5208","docket":"ER26-3380-000","group":"PJM filings","filer":"Monitoring Analytics, LLC","kind":"answer","file":"sources/originals/20260925-5208_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260925-5208","sha256":"88400af045854979c5c49d3369c43e3c159d22db2df918b782fc5d8600a5d4ee","pages":33,"tokens":11223,"emptyPages":[]},{"slug":"filing-20260928-4001","title":"Comments of U.S. House of Representatives Committee on Energy and Commerce Ranking Member Frank Pallone, Jr. urging FERC to make important improvements, approve amended proposals, etc. re energy costs from data centers,","issued":"2026-09-28","accession":"20260928-4001","docket":"ER26-3380-000","group":"PJM filings","filer":"COMMITTEE ON ENERGY AND COMMERCE","kind":"comments","file":"sources/originals/20260928-4001_01.pdf","url":"https://democrats-energycommerce.house.gov/sites/evo-subsites/democrats-energycommerce.house.gov/files/evo-media-document/ferc.2026.09.28-letter.pdf","sha256":"4d2865873efee72c458a23c7472b6dc3371441577d0be02e221e0ac2198c4d07","pages":4,"tokens":1686,"emptyPages":[]},{"slug":"filing-20261001-5390","title":"Comments of Jessica Kivell asking the Commission to keep transparency, cost responsibility, reliable planning, and protection of existing customers at the center of the proceeding","issued":"2026-10-01","accession":"20261001-5390","docket":"EL26-70-000","group":"MISO filings","filer":"Individual No Affiliation","kind":"comments","file":"sources/originals/20261001-5390_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261001-5390","sha256":"73f3da8500959dcd4cf8de14e89f0c4ceac1aad17a37f05268d2b579b718f8b0","pages":1,"tokens":134,"emptyPages":[]},{"slug":"filing-20261001-5390-attachment-1","title":"FERC_Public_Comment.pdf","issued":"2026-10-01","accession":"20261001-5390","docket":"EL26-70-000","group":"MISO filings","filer":"Individual No Affiliation","kind":"attachment","file":"sources/originals/20261001-5390_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261001-5390","parent":"filing-20261001-5390","sha256":"9cd1bb986c64852815caecfdc64c3feecde77de3b38151384a50243bc8386e25","pages":5,"tokens":1611,"emptyPages":[]},{"slug":"filing-20261002-5120","title":"Motion for Leave to Answer and Answer of Coalition of MISO Transmission Customers et al. to the Joint Protest of the Sierra Club et al","issued":"2026-10-02","accession":"20261002-5120","docket":"ER26-3650-000","group":"MISO filings","filer":"Coalition of MISO Transmission CustomersIllinois Industrial Energy ConsumersAssociation of Businesses Advocating Tariff Equity ,NIPSCO Large Customer Group ,Louisiana Energy Users Group ,Texas Industrial Energy Consumers ,","kind":"answer","file":"sources/originals/20261002-5120_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261002-5120","sha256":"f9439d379cc07295f47b1e4a6167f5fadd488759b3210d51232dff9a8a1d08da","pages":11,"tokens":2786,"emptyPages":[]},{"slug":"filing-20261008-5175","title":"Motion for Leave to Answer and Answer of Community Organizations and Clean Energy Advocates to Midcontinent Independent System Operator, Inc.’s 09/23/2026 Answer","issued":"2026-10-08","accession":"20261008-5175","docket":"ER26-3552-000","group":"MISO filings","filer":"Natural Resources Defense CouncilSierra ClubCommunity Collaboration on Climate Change ,Michigan Environmental Justice Coalition ,","kind":"answer","file":"sources/originals/20261008-5175_01.pdf","url":"https://sustainableferc.org/wp-content/uploads/2026/10/ZGIA_Answer.pdf","sha256":"8807355b3cd192b33de3e88f461750ba7f4029cddd3f41f4d5652409139fd372","pages":72,"tokens":19689,"emptyPages":[]},{"slug":"filing-20261013-5440","title":"Motion for Leave to Answer and Answer of Midcontinent Independent System Operator Inc. to the Comments and Protests re the proposal to establish Interconnection Reliability Requirements for Large Loads","issued":"2026-10-13","accession":"20261013-5440","docket":"ER26-3650-000","group":"MISO filings","filer":"Midcontinent Independent System Operator Inc.","kind":"comments","file":"sources/originals/20261013-5440_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261013-5440","sha256":"52151a0f91fa5675f4e97f9b1e18d311818bea79b25f2d892b907201553342b5","pages":35,"tokens":9521,"emptyPages":[]},{"slug":"filing-20261026-4001","title":"Comments of the National Congress of American Indians urging FERC for a Moratorium on Hyperscale Data Center Approvals Pending Comprehensive Grid Reliability and Ratepayer Impact Assessments","issued":"2026-10-26","accession":"20261026-4001","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"NATIONAL CONGRESS OF AMERICAN INDIANS","kind":"comments","file":"sources/originals/20261026-4001_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261026-4001","sha256":"5b693489a159013d93a342e494e5f3fda2659ac06a5da309b1883709a17e30c0","pages":2,"tokens":634,"emptyPages":[]},{"slug":"filing-20261028-5128","title":"Motion for Leave to Answer and Answer of Central Municipal Power Agency Services, et al. to Midcontinent Independent System Operator, Inc.’s 10/13/2026 Motion for Leave to Answer and Answer","issued":"2026-10-28","accession":"20261028-5128","docket":"ER26-3650-000","group":"MISO filings","filer":"Central Municipal Power Agency/ServicesMissouri Joint Municipal Electric Utility CommissionWPPI Energy ,Indiana Municipal Power Agency ,","kind":"answer","file":"sources/originals/20261028-5128_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261028-5128","sha256":"179870ac37409ecfeb6e2d73dde290c76921cab31362eaa10a6f34e1a93184ec","pages":9,"tokens":2062,"emptyPages":[]},{"slug":"filing-20261103-5190","title":"Motion for Leave to Answer and Answer of the Data Center Coalition re the 10/13/2026 Answer of Midcontinent Independent System Operator, Inc. et al","issued":"2026-11-03","accession":"20261103-5190","docket":"ER26-3650-000","group":"MISO filings","filer":"Data Center Coalition","kind":"answer","file":"sources/originals/20261103-5190_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261103-5190","sha256":"01a547cf9dc70445ccc1bc696ce887b5ebdd4f2d1ce45fc709b2924f047824d9","pages":21,"tokens":6181,"emptyPages":[]},{"slug":"filing-ad26-7-pjm-governance-vote","title":"PJM informational filing on the September 30, 2026 Members Committee vote on governance term sheets","issued":"2026-09-30","accession":"20261001-5164","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM","kind":"informational filing","file":"sources/originals/20261001-5164_20260930-ad26-7-000.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261001-5164","sha256":"bdf1461bc9d05a792450d238a440f70e6956c3009e6fa120e2c5f810f709c367","pages":2,"tokens":332,"emptyPages":[]},{"slug":"filing-er26-3380-pjm-original","title":"PJM proposes its first reliability backstop procurement","issued":"2026-07-31","accession":"20260731-5214","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20260731-5214_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5214","sha256":"e96deb3b5cbe4ed23eb3ee234a27c6d4a38b887bc1d6aa507dba9f90856e4b65","pages":142,"tokens":43966,"emptyPages":[]},{"slug":"filing-er26-3380-pjm-original-attachment-1","title":"Attachment A - Marked Tariff Records.pdf","issued":"2026-07-31","accession":"20260731-5214","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260731-5214_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5214","parent":"filing-er26-3380-pjm-original","sha256":"355b06c95cd0c69126eaeaa9f29b04da0d9c0f530cbdf5c681551d2350e245ac","pages":165,"tokens":64462,"emptyPages":[]},{"slug":"filing-er26-3380-pjm-original-attachment-2","title":"Attachment B - Clean Tariff Records.pdf","issued":"2026-07-31","accession":"20260731-5214","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260731-5214_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5214","parent":"filing-er26-3380-pjm-original","sha256":"b359e6150f6323d9178d079475f84129fd63b5bb68c73a6f1db01ad7d8d9963f","pages":165,"tokens":64428,"emptyPages":[]},{"slug":"filing-er26-3380-pjm-original-attachment-3","title":"Attachment C - Croop Affidavit.pdf","issued":"2026-07-31","accession":"20260731-5214","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260731-5214_04.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5214","parent":"filing-er26-3380-pjm-original","text_file":"20260731-5214_04.txt","sha256":"912dbc5b83b638428ec9ee76eb873c70514a5df128c66b6df374c71a92be9da3","pages":26,"tokens":7950,"emptyPages":[]},{"slug":"filing-er26-3380-pjm-original-attachment-4","title":"Attachment D - Kelly Affidavit.pdf","issued":"2026-07-31","accession":"20260731-5214","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260731-5214_05.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5214","parent":"filing-er26-3380-pjm-original","text_file":"20260731-5214_05.txt","sha256":"e210f4ebfb3a8e3798e5c6c100d42daab64040c66f0ebb5f38d4d453228bd276","pages":8,"tokens":2384,"emptyPages":[]},{"slug":"filing-er26-3515-pjm-iras","title":"PJM proposes a large-load registry, interim service and bring-your-own capacity","issued":"2026-08-13","accession":"20260813-5118","docket":"ER26-3515-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20260813-5118_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260813-5118","sha256":"c8e685cd114c739dbd879674f3e913b77f16f18ef2d6d3ff0ab14db8b5322f3a","pages":132,"tokens":42328,"emptyPages":[]},{"slug":"filing-er26-3515-pjm-iras-attachment-1","title":"Attachment A- Marked Tariff 4919-3670-8807 v.1.pdf","issued":"2026-08-13","accession":"20260813-5118","docket":"ER26-3515-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260813-5118_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260813-5118","parent":"filing-er26-3515-pjm-iras","sha256":"9d634285694586181ff073c6a1d65b01d66cfee7adcec30cea28c8cba8cbcd60","pages":145,"tokens":52020,"emptyPages":[]},{"slug":"filing-er26-3515-pjm-iras-attachment-2","title":"Attachment B- Clean Tariff 4930-8837-2935 v.2.pdf","issued":"2026-08-13","accession":"20260813-5118","docket":"ER26-3515-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260813-5118_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260813-5118","parent":"filing-er26-3515-pjm-iras","sha256":"5f94d6023ed2841252d4c46afb266577e2173d72631b2b83f2af59c9845e948e","pages":145,"tokens":52007,"emptyPages":[]},{"slug":"filing-er26-3515-pjm-iras-attachment-3","title":"Attachment C IRAS - Pilong Affifdavit .pdf","issued":"2026-08-13","accession":"20260813-5118","docket":"ER26-3515-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260813-5118_04.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260813-5118","parent":"filing-er26-3515-pjm-iras","sha256":"6bd9e23954ca7a2502f1c60404d418121c7a2544456762fa1aa050ba8e3dfacf","pages":13,"tokens":4169,"emptyPages":[]},{"slug":"filing-er26-3552-miso-zgia","title":"MISO proposes a zero-injection generator interconnection agreement","issued":"2026-08-18","accession":"20260818-5152","docket":"ER26-3552-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"filing","file":"sources/originals/20260818-5152_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260818-5152","sha256":"f9c5d6e391132c81088abfb805f53bf3006d8990325cde3be59b9d32e7452eaf","pages":48,"tokens":22347,"emptyPages":[]},{"slug":"filing-er26-3552-miso-zgia-attachment-1","title":"Tab A - Marked Tariff Sheets.pdf","issued":"2026-08-18","accession":"20260818-5152","docket":"ER26-3552-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260818-5152_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260818-5152","parent":"filing-er26-3552-miso-zgia","sha256":"a3edcadd726fb6efea53b5f67704a6e7a0955fba7d4bbea6bd791fbd1e33f6c9","pages":772,"tokens":211131,"emptyPages":[]},{"slug":"filing-er26-3552-miso-zgia-attachment-2","title":"Tab B - Clean Tariff Sheets.pdf","issued":"2026-08-18","accession":"20260818-5152","docket":"ER26-3552-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260818-5152_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260818-5152","parent":"filing-er26-3552-miso-zgia","sha256":"3b99afe6fea6cd613a05d98e041b196a179a740ccc32897de1a2da7884149615","pages":772,"tokens":209337,"emptyPages":[]},{"slug":"filing-er26-3552-miso-zgia-attachment-3","title":"Tab C - Testimony of Marc Keyser.pdf","issued":"2026-08-18","accession":"20260818-5152","docket":"ER26-3552-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260818-5152_04.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260818-5152","parent":"filing-er26-3552-miso-zgia","sha256":"0011179ee22d74702e0ca884d88557ff9ccdaa47f59cd728d3b87b2f683b0a18","pages":48,"tokens":12958,"emptyPages":[]},{"slug":"filing-er26-3552-miso-zgia-attachment-4","title":"Tab D - Redline ZGIA to pro forma GIA.pdf","issued":"2026-08-18","accession":"20260818-5152","docket":"ER26-3552-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260818-5152_05.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260818-5152","parent":"filing-er26-3552-miso-zgia","sha256":"82c9bedb338a10cf76c867d050addbe221f9578bed77363445fc8d4dec6963ff","pages":179,"tokens":51057,"emptyPages":[]},{"slug":"filing-er26-3650-miso-irr","title":"MISO proposes interconnection reliability requirements for large loads","issued":"2026-08-28","accession":"20260828-5278","docket":"ER26-3650-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"filing","file":"sources/originals/20260828-5278_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260828-5278","sha256":"1538849c6d1d9693074670570c0adcaf29d33a249344052519655f6449c83e57","pages":32,"tokens":13271,"emptyPages":[]},{"slug":"filing-er26-3650-miso-irr-attachment-1","title":"Tab A - IRR Tariff Redline.pdf","issued":"2026-08-28","accession":"20260828-5278","docket":"ER26-3650-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260828-5278_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260828-5278","parent":"filing-er26-3650-miso-irr","sha256":"30e33305b3ec59724158df255a62cc35852591e2bd84b0cc9703abadc570cf4d","pages":41,"tokens":9414,"emptyPages":[]},{"slug":"filing-er26-3650-miso-irr-attachment-2","title":"Tab B - IRR Tariff Clean.pdf","issued":"2026-08-28","accession":"20260828-5278","docket":"ER26-3650-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260828-5278_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260828-5278","parent":"filing-er26-3650-miso-irr","sha256":"5f33fff97546838db696e44f3e862d739b49d79f67de54c4811e99df4f35577f","pages":41,"tokens":9333,"emptyPages":[]},{"slug":"filing-er26-3650-miso-irr-attachment-3","title":"Tab C - Testimony of BeiBei Li.pdf","issued":"2026-08-28","accession":"20260828-5278","docket":"ER26-3650-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260828-5278_04.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260828-5278","parent":"filing-er26-3650-miso-irr","sha256":"642d42621fce69e0a804ef3a455019644f3a09984b8788d0441c27ed72c7a585","pages":45,"tokens":10398,"emptyPages":[]},{"slug":"filing-er27-25-miso-lars","title":"Midcontinent Independent System Operator, Inc.'s Large Load Addition Resource Study Process (transmittal letter; requested effective date December 2, 2026)","issued":"2026-10-02","accession":"20261002-5074","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"MISO","kind":"section 205 filing (transmittal letter)","file":"sources/originals/20261002-5074_Transmittal Letter_LARS.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261002-5074","sha256":"e43c8b54877ecc55b90d9f02a5574062d7321cdda7386187b782a8847326d8d5","pages":54,"tokens":25989,"emptyPages":[]},{"slug":"filing-er27-330-pjm-rbp-amendments","title":"PJM Interconnection, L.L.C., Proposed Amendments to the Reliability Backstop Procurement (transmittal letter; comments requested by November 30, 2026)","issued":"2026-10-29","accession":"20261029-5227","docket":"ER27-330-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"section 205 filing (transmittal letter)","file":"sources/originals/20261029-5227_RBP 205 Transmittal Letter 4905-1593-4685 v.2.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5227","sha256":"a3eacb3c040ba021692d6461b7e44de4dba4bd89fb839939399a7f6ec495c1f7","pages":66,"tokens":19525,"emptyPages":[]},{"slug":"filing-er27-432-spp-chills","title":"SPP proposes conditional large-load service revenue credits for its western zones","issued":"2026-11-06","accession":"20261106-5091","docket":"ER27-432-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"filing","file":"sources/originals/20261106-5091_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261106-5091","sha256":"47b5cbd837e21ab9bac701d33016ae70982c54eafc6ece6fc5b4a972120a1568","pages":7,"tokens":2080,"emptyPages":[]},{"slug":"filing-er27-432-spp-chills-attachment-1","title":"Marked8536-632c41b6-f9bd-419c-a455-959e8e8e7314.pdf","issued":"2026-11-06","accession":"20261106-5091","docket":"ER27-432-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/originals/20261106-5091_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261106-5091","parent":"filing-er27-432-spp-chills","sha256":"5864630ae609ad49eedfc3c01d3bf6b50bb30a9cd8d32ebb1e270a66fdc3e392","pages":19,"tokens":4626,"emptyPages":[]},{"slug":"filing-er27-432-spp-chills-attachment-2","title":"Clean8536-7e21cab7-1b8e-4b1a-925e-3a1d8da6d4fc.pdf","issued":"2026-11-06","accession":"20261106-5091","docket":"ER27-432-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/originals/20261106-5091_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261106-5091","parent":"filing-er27-432-spp-chills","sha256":"fa359d0619b6cd4d69c631a631647d500a442a75eb27ce2883a499ff382da0de","pages":19,"tokens":4515,"emptyPages":[]},{"slug":"letter-er26-3552-miso-deficiency","title":"FERC requests information about MISO’s zero-injection agreement","issued":"2026-10-09","accession":"20261009-3000","docket":"ER26-3552-000","group":"MISO filings","filer":"OFFICE OF ENERGY MARKET REGULATION","kind":"request","file":"sources/originals/20261009-3000_01.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261009-3000","sha256":"b28bc1d0b07d0f771a0f5c49135404427633a7319d37f6507322c3777bd10d32","pages":null,"tokens":2529,"emptyPages":[]},{"slug":"motion-el26-67-pjm-abeyance","title":"PJM requests more time to answer the June 18 show cause order","issued":"2026-07-28","accession":"20260728-5084","docket":"EL26-67-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"motion for abeyance","file":"sources/originals/20260728-5084_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260728-5084","sha256":"2510bf46b2aa7f3c83adbdd11ecbde3a583f59c56fc34c33dbf61596b1cce1b3","pages":12,"tokens":3079,"emptyPages":[]},{"slug":"motion-el26-68-spp-abeyance","title":"SPP requests more time to answer the June 18 show cause order","issued":"2026-08-03","accession":"20260803-5209","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"motion for abeyance","file":"sources/originals/20260803-5209_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5209","sha256":"3d38654a3a352a4dab6dc643698f39a26c667630a216409a926ccae29977a3f8","pages":23,"tokens":5559,"emptyPages":[]},{"slug":"motion-el26-69-nyiso-abeyance","title":"NYISO requests more time to answer the June 18 show cause order","issued":"2026-08-03","accession":"20260803-5229","docket":"EL26-69-000","group":"NYISO filings","filer":"New York Independent System Operator, Inc.","kind":"motion for abeyance","file":"sources/originals/20260803-5229_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5229","sha256":"3ebb72a07927d5be18b28e74a2549e7e26a74f6a055e18943d0f9945940dd72f","pages":13,"tokens":4187,"emptyPages":[]},{"slug":"motion-el26-70-miso-abeyance","title":"MISO requests more time to answer the June 18 show cause order","issued":"2026-08-03","accession":"20260803-5249","docket":"EL26-70-000","group":"MISO filings","filer":"Midcontinent Independent System Operator Inc.MISO Transmission Owners","kind":"motion for abeyance","file":"sources/originals/20260803-5249_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5249","sha256":"5e7d429cddb597a84a9e9cb546d03fe276df88de49b0587262bbca63cf33075d","pages":16,"tokens":4874,"emptyPages":[]},{"slug":"motion-el26-71-caiso-abeyance","title":"CAISO requests more time to answer the June 18 show cause order","issued":"2026-08-03","accession":"20260803-5206","docket":"EL26-71-000","group":"CAISO filings","filer":"California Independent System Operator Corporation","kind":"motion for abeyance","file":"sources/originals/20260803-5206_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5206","sha256":"fd35dd424201ad87b6ce4ff4cea43b8e6e4b600dc269a1337dfe2616eb35ad32","pages":11,"tokens":2264,"emptyPages":[]},{"slug":"motion-el26-72-isone-abeyance","title":"ISO-NE requests more time to answer the June 18 show cause order","issued":"2026-08-03","accession":"20260803-5083","docket":"EL26-72-000","group":"ISO-NE filings","filer":"ISO New England Inc.PTO AC","kind":"motion for abeyance","file":"sources/originals/20260803-5083_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5083","sha256":"6eef8772c27ded458bc7a34c196e0d6a34732faf43c77114102c0915f07871a6","pages":14,"tokens":3353,"emptyPages":[]},{"slug":"motion-er26-3380-pjm-abeyance","title":"Motion for Abeyance of PJM Interconnection, L.L.C. (ER26-3380-000 and EL26-108-000), holding the backstop paper hearing pending a new section 205 filing","issued":"2026-10-12","accession":"20261013-5141","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"motion for abeyance","file":"sources/originals/20261013-5141_20261012-el26-108-000.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261013-5141","sha256":"0926b57053a561149237e068f356f7e1e9d72e38d63860b7b1ecd730ff391609","pages":4,"tokens":614,"emptyPages":[]},{"slug":"notice-ad26-8-third-supplemental","title":"Third Supplemental Notice of Commissioner-Led Technical Conference: 2026 Reliability Technical Conference, October 21, 2026 (agenda; Panel 1 on integrating large loads)","issued":"2026-10-15","accession":"20261015-3040","docket":"AD26-8-000","group":"2026 FERC reliability technical conference: integrating large loads","filer":"FERC","kind":"notice of technical conference","file":"sources/originals/20261015-3040_AD26-8-000 Technical Conference.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261015-3040","sha256":"ce462969e8a2ff1edc1ac41d3be16965c068a012e10c76660a7462195cfd7541","pages":null,"tokens":1909,"emptyPages":[]},{"slug":"notice-cnf-20261102","title":"Combined Notice of Filings #1, November 2, 2026: ER27-330-000 and -001 comment date 5 pm ET November 30, 2026","issued":"2026-11-02","accession":"20261102-3050","docket":"ER27-330-000","group":"PJM Reliability Backstop Procurement","filer":"FERC","kind":"combined notice of filings","file":"sources/originals/20261102-3050_CNF110226.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261102-3050","sha256":"74ee4065f0f4a2f1560c8e14ae0fc3dd390224ee2df41a773a209eaf164a8fd4","pages":null,"tokens":1094,"emptyPages":[]},{"slug":"notice-er26-3380-abeyance","title":"Notice Addressing Motion to Hold Proceeding in Abeyance: EL26-108 initial briefs moved to January 11, 2027 and reply briefs to January 26, 2027","issued":"2026-10-23","accession":"20261023-3114","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"FERC","kind":"notice addressing motion for abeyance","file":"sources/originals/20261023-3114_ER26-3380-000 and EL26-108-000 Notice in Abeyance.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-3114","sha256":"61c2307f93e57a49b31c995ae41bec1e7043a49fa1a3a74dc1ed92e45f455313","pages":null,"tokens":214,"emptyPages":[]},{"slug":"notice-er26-3380-answer-period","title":"Notice Establishing Answer Period on PJM's motion for abeyance (answers due 5:00 pm Eastern Time, October 21, 2026)","issued":"2026-10-16","accession":"20261016-3047","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"FERC","kind":"notice establishing answer period","file":"sources/originals/20261016-3047_ER26-3380-000 Notice Establishing Answer Period.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261016-3047","sha256":"b14b58c823745590b57928ad9b0a5e0e78b3093fbd7222275560c8b996e8c73b","pages":null,"tokens":168,"emptyPages":[]},{"slug":"notice-er26-3515-1110","title":"Combined Notice of Filings #1","issued":"2026-11-10","accession":"20261110-3030","docket":"ER26-3515-002","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"FERC","kind":"combined notice","file":"sources/originals/20261110-3030_CNF111026A.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261110-3030","sha256":"7fbb2499d4993f732c0b05beab7f1702b9786e2a7d93c2de972ea88d92c00bab","pages":null,"tokens":1218,"emptyPages":[]},{"slug":"opsi-september-iras-comments","filename":"opsi-september-iras-comments.pdf","title":"PJM states request clarification or separate consideration of the interim service proposal","url":"https://opsi.us/wp-content/uploads/2026/09/ER26-3515-000-IRAS-Comments.pdf","issued":"2026-09-03","group":"PJM filings","docket":"ER26-3515-000","filer":"Organization of PJM States","provenance":"Signed original published by the filer; eLibrary accession not verified.","file":"sources/originals/opsi-september-iras-comments.pdf","kind":"stakeholder document","sha256":"ca5f1ac293fbb5337384eff35b7f740e5fec94d5ea655c2ef3c93ad4439f96a5","pages":12,"tokens":3171,"emptyPages":[]},{"slug":"order-el26-67-001-pjm-rehearing","title":"Order dismissing requests for rehearing and clarification of the June 18, 2026 PJM show-cause order","issued":"2026-09-21","accession":"20260921-3020","docket":"EL26-67-001","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260921-3020_order.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3020","sha256":"42f96f55bb25fa92320a781422e652ba3fd7730327d84f540a5cf0899fb314e3","pages":11,"tokens":3812,"emptyPages":[]},{"slug":"order-el26-69-001-nyiso-rehearing","title":"Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 NYISO show-cause order","issued":"2026-09-21","accession":"20260921-3021","docket":"EL26-69-001","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260921-3021_EL26-69-001.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3021","sha256":"ee57391128dee1ceba921f847bd04fbc6c5dcd938beeb39d1d06e772f768001a","pages":null,"tokens":1813,"emptyPages":[]},{"slug":"order-el26-70-001-miso-rehearing","title":"Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 MISO show-cause order","issued":"2026-09-21","accession":"20260921-3047","docket":"EL26-70-001","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260921-3047_EL26-70-001.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3047","sha256":"0e28dba127d80e2158ebadefafe73f48fd3ab077794c0cbc72cda3a30aa09601","pages":null,"tokens":2026,"emptyPages":[]},{"slug":"order-el26-71-001-caiso-rehearing","title":"Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 CAISO show-cause order","issued":"2026-09-21","accession":"20260921-3019","docket":"EL26-71-001","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260921-3019_EL26-71-001.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3019","sha256":"032310cc612802b36561583d2dc716a15b8cf45a5d31858202abbb7b1cd98d87","pages":null,"tokens":1893,"emptyPages":[]},{"slug":"order-el26-72-001-isone-rehearing","title":"Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 ISO-NE show-cause order","issued":"2026-09-21","accession":"20260921-3056","docket":"EL26-72-001","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260921-3056_EL26-72-001.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3056","sha256":"bce3bbbe5b9b8a45f37b98b59fd085c952045dd8236ca82b960d8c8214ca4a14","pages":null,"tokens":1968,"emptyPages":[]},{"slug":"order-er26-2691-duke-nitsa","title":"Order Accepting Proposed Tariff Revisions (Duke Energy Carolinas pro forma NITSA, ER26-2691-000 and -001)","issued":"2026-10-09","accession":"20261009-3054","docket":"ER26-2691-000","group":"Duke Energy Carolinas network service agreement and large-load shortfall payments","filer":"FERC","kind":"order","file":"sources/originals/20261009-3054_ER26-2691-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261009-3054","sha256":"68f645a380ba52b947da302814df50e9d1a8ef8be647002abfa01547eb366701","pages":null,"tokens":19613,"emptyPages":[]},{"slug":"order-er26-3380-pjm-backstop","title":"Order accepting PJM's Reliability Backstop Procurement, suspending it to February 28, 2027, and establishing further procedures","issued":"2026-09-29","accession":"20260929-3099","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"FERC","kind":"order","file":"sources/originals/20260929-3099_order.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-3099","sha256":"3efe24a0a8d45db5251b8fdec097c495e5acaa37e12e882751b39056d9d1cb47","pages":97,"tokens":37818,"emptyPages":[]},{"slug":"order-er26-3515-pjm-large-load","title":"Order accepting PJM's Large Load definition and Large Load Registry and rejecting the Interim Resource Adequacy Service, BYONC and VRR-curve revisions","issued":"2026-10-09","accession":"20261009-3055","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"FERC","kind":"order","file":"sources/originals/20261009-3055_ER26-3515-000.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261009-3055","sha256":"b4dc477b5aa5985b42aa10b372a888196499f9d2b70ab310b6541cb3f35bc002","pages":57,"tokens":21287,"emptyPages":[]},{"slug":"pjm-20261005-ceba-dcc-letter-to-pjm-board","filename":"pjm-20261005-ceba-dcc-letter-to-pjm-board.pdf","title":"Letter to the PJM Board of Managers on PJM's large-load show cause response","url":"https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20261005-ceba-dcc-letter-to-pjm-board-re-ll-show-cause-response.pdf","issued":"2026-10-02","group":"PJM stakeholder record","docket":"PJM stakeholder record","file":"sources/originals/pjm-20261005-ceba-dcc-letter-to-pjm-board.pdf","kind":"stakeholder document","sha256":"10d514c418e1fee320fb00820ee8e60564de364347372d90fdc94dfc9d589c82","pages":2,"tokens":653,"emptyPages":[]},{"slug":"pjm-20261028-mc-agenda","filename":"pjm-20261028-mc-agenda.pdf","title":"Members Committee agenda, Oct 28, 2026 (as of Oct 28)","url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20261028/20261028-agenda.pdf","issued":"2026-10-28","group":"PJM stakeholder record","docket":"PJM stakeholder record","file":"sources/originals/pjm-20261028-mc-agenda.pdf","kind":"stakeholder document","sha256":"fd3a8ab746a60751f1e97b3dd573daee540136d6e83ce8c368ea12ed92bf3f07","pages":5,"tokens":1343,"emptyPages":[]},{"slug":"pjm-20261028-mc-regulatory-report","filename":"pjm-20261028-mc-regulatory-report.pdf","title":"MC Legal Report: Summary of Significant Filings, Legal Activity and Commission and Court Orders (Sep 14 to Oct 16, 2026)","url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20261028/20261028-item-05c---pjm-regulatory-report.pdf","issued":"2026-10-28","group":"PJM stakeholder record","docket":"PJM stakeholder record","file":"sources/originals/pjm-20261028-mc-regulatory-report.pdf","kind":"stakeholder document","sha256":"6e782fbe29c6bbf931e261352edbcefc3f7ff8d10ceaa663ba52d04352d5c5ed","pages":7,"tokens":3706,"emptyPages":[]},{"slug":"pjm-20261105-special-mc-agenda","filename":"pjm-20261105-special-mc-agenda.pdf","title":"Special Members Committee agenda, Nov 5, 2026 (as of Oct 29)","url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20261105-special/agenda.pdf","issued":"2026-10-29","group":"PJM stakeholder record","docket":"PJM stakeholder record","file":"sources/originals/pjm-20261105-special-mc-agenda.pdf","kind":"stakeholder document","sha256":"d456ad16b7cd5548893827c2574c2b2cef4bf2b03581ee0b1df303a76aab9328","pages":2,"tokens":912,"emptyPages":[]},{"slug":"pjm-september-iras-answer","filename":"pjm-september-iras-answer.pdf","title":"PJM answers comments and protests about interim resource adequacy service","url":"https://www.pjm.com/-/media/DotCom/documents/ferc/filings/2026/20260923-er26-3515-000.pdf","issued":"2026-09-23","group":"PJM filings","docket":"ER26-3515-000","filer":"PJM","provenance":"Signed original published by the filer; eLibrary accession not verified.","file":"sources/originals/pjm-september-iras-answer.pdf","kind":"stakeholder document","sha256":"ac097dfe57a0906d43ff19ba74b8c1f958bccb47028dfd178968f797ac070b4d","pages":71,"tokens":24667,"emptyPages":[]},{"slug":"protest-er27-25-acp-srea","title":"Protest and Request for Clarification of the American Clean Power Association and Southern Renewable Energy Association","issued":"2026-10-23","accession":"20261023-5176","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"ACP and SREA","kind":"protest and request for clarification","file":"sources/originals/20261023-5176_ACP_Protest_MISO_LARS_ER27-25_CLEAN_10.23.2026.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5176","sha256":"152c9efc4f1d75bed3c1a2287e1105cb37861f4e4cdb827be183379fedf799ae","pages":32,"tokens":9632,"emptyPages":[]},{"slug":"protest-er27-25-bloom","title":"Limited Protest of Bloom Energy Corporation","issued":"2026-10-23","accession":"20261023-5195","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Bloom Energy","kind":"limited protest","file":"sources/originals/20261023-5195_ER27-25_Bloom Energy Limited Protest_10-23-2026.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5195","sha256":"eba933de2a30cd94011b34ee09266ea9dab1be80ab03ed53c8f7e01c1d3404b2","pages":5,"tokens":1593,"emptyPages":[]},{"slug":"protest-er27-25-clean-energy-advocates","title":"Protest of Clean Energy Advocates and Community Organizations","issued":"2026-10-23","accession":"20261023-5163","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Sierra Club, NRDC and other clean energy and community groups","kind":"protest","file":"sources/originals/20261023-5163_Final LARS Protest.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5163","sha256":"78535dffd5b2995f5c9510d6b24abf428f45799e637bc5fad9998615e9f6efee","pages":49,"tokens":14195,"emptyPages":[]},{"slug":"protest-er27-25-consumer-advocates","title":"Joint Protest of the Iowa Office of the Consumer Advocate, the Citizens Utility Boards of Michigan, Illinois, Wisconsin and Minnesota, Citizens Action Coalition of Indiana, the Michigan and Illinois Attorneys General, and the Minnesota Department of Commerce","issued":"2026-10-23","accession":"20261023-5197","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Iowa OCA and 8 consumer advocates","kind":"protest","file":"sources/originals/20261023-5197_Consumer Advocate AG Joint Protest.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5197","sha256":"e20ebc271540db782c81e479ad96ae49969673777f4abeba7c463c5921fe2621","pages":14,"tokens":3961,"emptyPages":[]},{"slug":"protest-er27-25-google","title":"Limited Protest of Google LLC","issued":"2026-10-23","accession":"20261023-5177","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Google","kind":"limited protest","file":"sources/originals/20261023-5177_Limited Protest of Google LLC - ER27-25-000.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5177","sha256":"373b876a3681d902cab2b0c90eb3c17e73fa9b58b4bd522521791958e9350897","pages":11,"tokens":3016,"emptyPages":[]},{"slug":"protest-er27-25-seia-united","title":"Protest of the Solar Energy Industries Association and Advanced Energy United","issued":"2026-10-23","accession":"20261023-5181","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"SEIA and Advanced Energy United","kind":"protest","file":"sources/originals/20261023-5181_ER27-25 - SEIA and United protest.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5181","sha256":"704992d7f5fc029414e5b57783dfb4e11963b8368a37655dbd378bf08a81e59e","pages":16,"tokens":4337,"emptyPages":[]},{"slug":"refiling-er27-454-pjm-backstop","title":"Proposed Amendments to the Reliability Backstop Procurement; Request for Waiver","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"section 205 refiling","file":"sources/originals/20261109-5216_RBP Revised 205 Transmittal Letter.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5216","sha256":"7f06a47b85ffe2fdc50d3bc970c285ee4be02e6139a3ed09841dde8fafded817","pages":66,"tokens":19694,"emptyPages":[]},{"slug":"refiling-er27-454-pjm-backstop-etariff-rendition","title":"FERC rendition of the electronically filed tariff records","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"attachment","file":"sources/originals/20261109-5216_tariff-rendition.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261109-5216","parent":"refiling-er27-454-pjm-backstop","sha256":"b8319acbb7d0893b4c5993601a19d76050c657316bbdc4ef53f720c16204d5af","pages":79,"tokens":25352,"emptyPages":[]},{"slug":"rehearing-er26-3380-constellation","title":"Request for Rehearing and Clarification of Constellation Energy Generation, LLC","issued":"2026-10-29","accession":"20261029-5261","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"Constellation Energy Generation","kind":"request for rehearing","file":"sources/originals/20261029-5261_Constellation Request for Rehearing (10-29-26).pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5261","sha256":"33743afe054d66f679fe6e668be974d25b0c9980bb7dd075f94cc701198736d1","pages":21,"tokens":5805,"emptyPages":[]},{"slug":"rehearing-er26-3380-firstenergy","title":"Request for Rehearing of FirstEnergy Service Company","issued":"2026-10-29","accession":"20261029-5270","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"FirstEnergy Service Company","kind":"request for rehearing","file":"sources/originals/20261029-5270_FE RBP Request for Rehearing 10.29.2026.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5270","sha256":"4ff9f7e26485e1021643b3cf68775c9f6f14343d698cce4fca7a9f9edbe2569e","pages":18,"tokens":5206,"emptyPages":[]},{"slug":"rehearing-er26-3380-indicated-pjm-tos","title":"Request for Rehearing of the Indicated PJM Transmission Owners of the September 29, 2026 backstop order (TO exit amendment)","issued":"2026-10-29","accession":"20261029-5265","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"Indicated PJM Transmission Owners","kind":"request for rehearing","file":"sources/originals/20261029-5265_Indicated PJM Transmission Owners' Request for Rehearing.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5265","sha256":"eaf4067ca474db69aaa33c7ac8209e64599f3e6823949dff2471cfd5ddb87019","pages":10,"tokens":2502,"emptyPages":[]},{"slug":"rehearing-er26-3380-joint-consumer-advocates","title":"Request for Rehearing of the Joint Consumer Advocates (DE, DC, IL CUB, IL AG, MD, NJ) of the September 29, 2026 backstop order","issued":"2026-10-29","accession":"20261029-5262","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"Joint Consumer Advocates (DE, DC, IL CUB, IL AG, MD, NJ)","kind":"request for rehearing","file":"sources/originals/20261029-5262_ER26-3380 JCA Request for Rehearing.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5262","sha256":"f4c344f0dcde13afdfd88b0ac9781903eb29caa7ac3b69cc49324509416b230c","pages":35,"tokens":11656,"emptyPages":[]},{"slug":"rehearing-er26-3380-novec","title":"Request for Rehearing and Clarification or Alternative Request for Rehearing of Northern Virginia Electric Cooperative, Inc.","issued":"2026-10-29","accession":"20261029-5264","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"Northern Virginia Electric Cooperative","kind":"request for rehearing","file":"sources/originals/20261029-5264_ER26-3380_EL26-108 NOVEC Request for Rehearing.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5264","sha256":"3fa98ca4fddc31c8e7bc5d394499c4751325801298848c0719bb04aeb594a959","pages":19,"tokens":6238,"emptyPages":[]},{"slug":"rehearing-er26-3380-ohio-occ","title":"Request for Rehearing to Protect Consumers from Excessive Transmission Rates by Office of the Ohio Consumers' Counsel","issued":"2026-10-29","accession":"20261029-5263","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"Ohio Consumers' Counsel","kind":"request for rehearing","file":"sources/originals/20261029-5263_FIN Rehearing Request Reliability Backstop Procurement ER26-3380 (002).pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5263","sha256":"74d23855cf0dacee481b4778c33b38a6dbeef7de0461b1af74686b0d6e246c5f","pages":26,"tokens":7748,"emptyPages":[]},{"slug":"rehearing-er26-3515-ohio","title":"Request for Rehearing to Promote Transparency for Ohio Consumers","issued":"2026-11-09","accession":"20261109-5209","docket":"ER26-3515-001","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Ohio Consumers’ Counsel","kind":"request for rehearing","file":"sources/originals/20261109-5209_FIN Reheairng IRAS filing ER26-3515.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5209","sha256":"20e280a4d362ce7e2167988143fb47ef305a8b4e16ce01e8c81a48b79283b625","pages":21,"tokens":5419,"emptyPages":[]},{"slug":"report-el26-67-pjm","title":"PJM reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5203","docket":"EL26-67-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"informational report","file":"sources/originals/20260720-5203_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5203","sha256":"44f49025b30ce76a0c5c722d9f15ce8d42664f1eb44c381b6f546e3e0713506d","pages":12,"tokens":3633,"emptyPages":[]},{"slug":"report-el26-68-spp","title":"SPP reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5205","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"informational report","file":"sources/originals/20260720-5205_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5205","sha256":"0081403cc87eb228bdea8473b113039d217a2d248311497c489665f65e33d677","pages":29,"tokens":7097,"emptyPages":[]},{"slug":"report-el26-69-nyiso","title":"NYISO reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5217","docket":"EL26-69-000","group":"NYISO filings","filer":"New York Independent System Operator, Inc.","kind":"informational report","file":"sources/originals/20260720-5217_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5217","sha256":"a8d77161c68268e5ddc6b3be3fa72e6b6d1a15b6cd5746ba268b80a01821bffe","pages":15,"tokens":7259,"emptyPages":[]},{"slug":"report-el26-70-miso","title":"MISO reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5204","docket":"EL26-70-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"informational report","file":"sources/originals/20260720-5204_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5204","sha256":"bd3f20e9a427bfa913991fb1ea3a2356285ccea734bad275ad7efb9a8a692dbe","pages":14,"tokens":5560,"emptyPages":[]},{"slug":"report-el26-71-caiso","title":"CAISO reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5202","docket":"EL26-71-000","group":"CAISO filings","filer":"California Independent System Operator Corporation","kind":"informational report","file":"sources/originals/20260720-5202_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5202","sha256":"5b84365a6842ca80acdb8b17bd392f0f3155d2212fda3ed535872f1c97912edc","pages":19,"tokens":6245,"emptyPages":[]},{"slug":"report-el26-72-isone","title":"ISO-NE reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5216","docket":"EL26-72-000","group":"ISO-NE filings","filer":"ISO New England Inc.","kind":"informational report","file":"sources/originals/20260720-5216_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5216","sha256":"2b751d867e08a1b161960af0dced27409fd226b82e35464e51025f94ef21fe89","pages":8,"tokens":3542,"emptyPages":[]},{"slug":"senate-ferc-oversight-20260722","filename":"senate-ferc-oversight-20260722.pdf","text_file":"senate-ferc-oversight-20260722.txt","title":"Senate oversight of FERC: testimony and questions for the record","url":"https://www.govinfo.gov/content/pkg/CHRG-119shrg64322/pdf/CHRG-119shrg64322.pdf","issued":"2026-07-22","docket":"S. Hrg. 119-494","file":"sources/videos/hearings/senate-ferc-oversight-20260722.pdf","kind":"hearing transcript","group":"Congressional testimony","sha256":"02f808679f076ff8028daa99c2a1c50d08f574876fc46e9069f2e893bd0dfc1f","pages":117,"tokens":50221,"emptyPages":[]},{"slug":"statement-ad26-8-pjm-pilong","title":"Reliability Technical Conference Comments from PJM Interconnection, L.L.C. (Christopher Pilong, Panel 1)","issued":"2026-10-21","accession":"20261021-4003","docket":"AD26-8-000","group":"2026 FERC reliability technical conference: integrating large loads","filer":"PJM","kind":"pre-conference statement","file":"sources/originals/20261021-4003_Panel 1-PJM -Chris Pilong Testimony.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261021-4003","sha256":"9a23360b830f7f9a47fb3449cfa2819521c88d53d54ad310d0f3482478ab3616","pages":7,"tokens":2204,"emptyPages":[]},{"slug":"statement-er26-3380-doe","title":"U.S. Department of Energy notice of intervention and statement of position supporting the September 29, 2026 backstop order","issued":"2026-10-07","accession":"20261007-5181","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"U.S. Department of Energy","kind":"notice of intervention and statement of position","file":"sources/originals/20261007-5181_ER26-3380-000 DOE Intervention re PJM Backstop Filing_10072026_.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261007-5181","sha256":"19966a790918e35aba0c621159e001ff6741c3f77daa8e7cc255f7d2d5b86410","pages":9,"tokens":2617,"emptyPages":[]}]