ER26-3650: the filed comments

These passages match a topic and a request or argument in the same sentence. A filing can quote another party. Read its page before attributing a position.

Connecting load and generation

Data Center Coalition

ER26-3650-000 · 2026-09-18

Additionally, if MISO is going to apply its proposed reliability requirements to co-located load, it should demonstrate that the proposed standards are appropriately tailored to account for the characteristics of these arrangements. PDF p. 18

Cost allocation

Data Center Coalition

ER26-3650-000 · 2026-09-18

- 30 - responsible load growth, support the development of new generation, and enhance grid resilience system-wide without imposing undue costs on existing ratepayers. PDF p. 30