EL26-70-000 · 2026-08-13 · FERC

Errata correcting the caption and footnote 11 of 195 FERC ¶ 61,212 (Wabash Valley Power Association)

Back to sections and commentary

Word notes use stable document IDs, such as [fn:8], which can differ from printed footnote numbers.

Document text

196 FERC ¶ 61,123
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

Midcontinent Independent System Operator, Inc.

AEP Indiana Michigan Transmission Company, Inc.
ALLETE, Inc.
Ameren Illinois Company
Ameren Transmission Company of Illinois
American Transmission Company, LLC
Cleco Power LLC
Duke Energy Indiana, LLC
Entergy Arkansas, LLC
Entergy Louisiana, LLC
Entergy Mississippi, LLC
Entergy New Orleans, LLC
Entergy Texas, Inc.
GridLiance Heartland LLC
Indianapolis Power & Light Company
International Transmission Company
ITC Midwest LLC
Michigan Electric Transmission Company, LLC
MidAmerican Energy Company
Montana-Dakota Utilities Company
Northern Indiana Public Service Company LLC
Northern States Power Company, a Minnesota Corporation
Northern States Power Company, a Wisconsin Corporation
Northwestern Wisconsin Electric Company
Otter Tail Power Company
Pioneer Transmission, LLC
Republic Transmission, LLC
Southern Indiana Gas & Electric Company
Union Electric Company
Wolverine Power Supply Cooperative, Inc.
Docket No.
EL26-70-000


ERRATA NOTICE

(August 13, 2026)

On June 18, 2026, the Commission issued an “Order Instituting Proceeding Under Section 206 of the Federal Power Act” in the above-captioned proceeding.  Midcontinent Indep. Sys. Operator, Inc., 195 FERC ¶ 61,212 (2026).  The caption in the order inadvertently included “Wabash Valley Power Association, Inc.” and footnote 11 inadvertently omitted “Wabash Valley Power Association, Inc.”  This errata notice hereby corrects the caption, as shown above, by deleting “Wabash Valley Power Association, Inc.”  In addition, this errata notice hereby corrects footnote 11 to add “Wabash Valley Power Association, Inc.,” as follows:

Transmission Owners refers to the entities listed in the caption of this order.  We recognize that MISO’s transmission owners include entities that are not subject to the Commission’s jurisdiction because they are not public utilities pursuant to section 201(f) of the FPA.  See 16 U.S.C. § 824(f); Sw. Power Pool, Inc., 180 FERC ¶ 61,022, at PP 44-45 (2022).  Accordingly, the Commission has not included 1803 Electric Cooperative, Inc.; Ames Municipal Electric System; Arkansas Electric Cooperative Corporation; Big Rivers Electric Corporation; Board of Water, Electric and Communications Trustees of the City of Muscatine, Iowa; Central Minnesota Municipal Power Agency; Citizens Electric Corporation; City of Alexandria, Louisiana; City of Columbia, Missouri, Water & Light Department; City of Henderson, Kentucky, Utility Commission; City Water, Light and Power - City of Springfield, Illinois City Water and Light Plant of the City of Jonesboro; Cooperative Energy; Dairyland Power Cooperative; East Texas Electric Cooperative, Inc.; Great River Energy; Hoosier Energy Rural Electric Cooperative, Inc.; Indiana Municipal Power Agency; Lafayette City-Parish Consolidated Government; Michigan Public Power Agency; Michigan South Central Power Agency; Minnesota Municipal Power Agency; Missouri Joint Municipal Electric Utility Commission; Missouri River Energy Services; Municipal Electric Utility of the City of Cedar Falls, Iowa; Municipal Energy Agency of Nebraska; Prairie Power, Inc.; Rochester Public Utilities; Sam Houston Electric Cooperative, Inc.; Southern Illinois Power Cooperative; Southern Minnesota Municipal Power Agency; Wabash Valley Power Association, Inc.; Willmar Municipal Utilities; and WPPI Energy here as Transmission Owners that must respond to this order to show cause.  Nonetheless, the Commission retains the authority to review each entity’s formula rates as a component of MISO’s Tariff in an order to show cause directed towards MISO, and MISO must respond to this order regarding the non-public utilities’ MISO Tariff provisions on file with the Commission.  See Sw. Power Pool, Inc., 180 FERC ¶ 61,022 at P 40.
							

Debbie-Anne A. Reese,
Secretary.

header1 (Word template)
CUICUI- 1 -
CUI
CUI

header2 (Word template)
Docket No. EL26-70-000	- 1 -