{"document":{"slug":"filing-20260624-5016","title":"Comments of Debra Ann Ostroski providing documented correspondence with American Transmission Company re the alternative transmission evaluation for the Large Load Show Cause Proceeding","issued":"2026-06-24","accession":"20260624-5016","docket":"EL26-70-000","group":"MISO filings","filer":"Individual No Affiliation","kind":"comments","file":"sources/originals/20260624-5016_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260624-5016","sha256":"6ba71781d7ee7a8f5e21b402ddc788031658da3e179f785696e7a9e014437ada","pages":1,"tokens":157,"emptyPages":[]},"pages":[{"page":1,"startToken":0,"endToken":157,"text":"RE: Public Comment in Docket No. EL26-70-000 (MISO Large Load Show Cause Proceeding) \nTo the Commission: \nIn light of the Commission's June 18, 2026 orders directing RTOs to evaluate alternative \ntransmission technologies and upgrades to accommodate large loads, I am submitting the \nattached correspondence with American  \nTransmission Company (ATC) for the official record. \nAs a local concerned citizen regarding the Viridon WISE project in Wisconsin, I formally asked \nATC to evaluate upgrading their existing infrastructure (such as reconductoring) as a cheaper, \nratepayer-protective alternative to Viridon's $350 million greenfield transmission line. \nAs the attached emails demonstrate, the incumbent utility refused to provide an answer and \ndeflected the inquiry to the greenfield developer. This correspondence serves as documented \nevidence that incumbent utilities and developers in the MISO footprint are actively avoiding the \nevaluation of cost-effective Grid-Enhancing Technologies and existing line upgrades in favor of \nmore expensive new-build projects. \nPlease add this correspondence to the record. \nSincerely, \nDebra Ann Ostroski"}],"sections":[{"p":1,"at":0,"title":"Page 1","method":"page range","endPage":1,"endAt":1152,"startToken":0,"endToken":157}]}
