Comments of U.S. House of Representatives Victoria Spartz requesting independent federal review of the energy generation, grid resiliency, transmission, water-resource, and consumer-cost implications etc
Read topic-matched comments in EL26-70
Topics in the text: Cost allocation · Credit and exit
Responses and related views
No section-specific public response is linked for this document.
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Pages 1 to 4
page range · Topic match: Cost allocation
However, development must be economically responsible.Read this passage Filed comments: Cost allocation
Page 5
page range
The cumulative effects of these loads on generation, transmission, utility rates, water resources, and taxpayers must be evaluated, not merely each project in isolation.Read this passage