{"document":{"slug":"filing-20260918-5333","title":"Protest of Iowa Office of Consumer Advocate et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5333","docket":"ER26-3650-000","group":"MISO filings","filer":"Iowa Office of Consumer AdvocateIllinois Attorney General's OfficeIllinois Citizens Utility Board ,Michigan Attorney General ,Citizens Utility Board of Michigan ,Citizens Utility Board of Minnesota ,Citizens Utility Board of Wisconsin ,Citizens Action Coalition of Indiana, Inc. ,ALLIANCE FOR AFFORDABLE ENERGY ,","kind":"filing","file":"sources/originals/20260918-5333_01.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260918-5333","sha256":"18706aa74c81fd37af04fa87e8c787bed8697ed8fc55e1cb23e345cea9de3f74","pages":null,"tokens":1603,"emptyPages":[]},"pages":[{"page":1,"startToken":0,"endToken":1603,"text":"\t\t\tUNITED STATES OF AMERICA\n\t\t\tBEFORE THE\n\t\t\tFEDERAL ENERGY REGULATORY COMMISSION\n\t\t\t\n\t\t\t\t\t\t)\n\t\t\tMidcontinent Independent System\t)\t\tDocket ER26-3650-000\n\t\t\t      Operator, Inc.\t)\t\n\t\t\t\t\t\t)\n\t\t\t\t\n\t\t\tJOINT PROTEST OF THE IOWA OFFICE OF THE CONSUMER ADVOCATE, OFFICE OF THE ILLINOIS ATTORNEY GENERAL, Illinois Citizens Utility Board, MICHIGAN ATTORNEY GENERAL, MICHIGAN CITIZENS UTILITY BOARD, MINNESOTA DEPARTMENT OF COMMERCE, mINNESOTA CITIZENS UTILITY BOARD, WISCONSIN CITIZENS UTILITY BOARD, Citizens Action Coalition of Indiana, INC., and Alliance for Affordable Energy\n\t\t\t\n\t\t\t\t\tPursuant to Rule 211 the Federal Energy Regulatory Commission’s (“Commission”) Rules of Practice and Procedure, 18 C.F.R. section 385.211 and the August 31, 2026 Combined Notice of Filings #1, the Iowa Office of Consumer Advocate (“Iowa OCA”), Office of the Illinois Attorney General (“IL OAG”), Illinois Citizens Utility Board (“IL CUB”), Michigan Attorney General, Michigan Citizens Utility Board (“MI CUB”), Minnesota Department of Commerce (“Commerce”), Citizens Utility Board of Minnesota (“MN CUB”), Wisconsin Citizens Utility Board (“WI CUB”), Citizens Action Coalition of Indiana, Inc., and Alliance for Affordable Energy respectfully submit this Protest in the above-captioned proceeding.  \n\t\t\t\tPROTEST\n\t\t\t\t\n\t\t\t\t\tThe Iowa OCA, IL OAG, IL CUB, Michigan Attorney General, MI CUB, Commerce, MN CUB, WI CUB, Citizens Action Coalition of Indiana, Inc., and Alliance for Affordable Energy (“Joint Protestors”) submit this Protest regarding the proposed tariff revisions filed by MISO regarding Interconnection Reliability Requirements for Large Loads with the Commission \n\n\n\t\t\t\tin the above-captioned action.[fn:1]  \n\t\t\t\t\tOn August 28, 2026, MISO filed proposed revisions to its Open Access Transmission, Energy, and Operating Reserves Markets Tariff (“Tariff”) to establish certain Interconnection Reliability Requirements for Large Loads.  As noted in its transmittal letter, MISO’s filing purports to respond to several concerns raised by the Commission in its Show Cause Order in Docket No. EL26-70-000.  Specifically, MISO proposes visibility, ramp rate, and disturbance ride-through requirements for Large Loads, as well as grandfathering transition provisions designed to minimize disruption to existing commercial arrangements.  As demonstrated below, MISO’s proposed Tariff grandfathering transition provisions under Section 37A, discussed at pages 13 and 14 of the transmittal letter do not address the cost-shifting concerns expressed by the Commission in the Show Cause Order.  \n\tIn the Show Cause Order, the Commission found MISO’s Tariff “appears to be unjust and unreasonable because it lacks adequate mechanisms to mitigate the risk of cost shifting among transmission customers, which may result in unjust and unreasonable rates for transmission service.”  Show Cause Order at P 66.  In the ruling, the Commission expressed concern about the lack of transparency regarding the assignment of costs, including Network Upgrades, necessary to provide transmission service to Eligible Customers or Large Load Customers on behalf of Large Loads to ensure Eligible Customers bear the risk and are ultimately responsible for costs incurred to provide transmission service, including the cost of Network Upgrades.  Id. at PP 70-77.  \nMISO is proposing to fully exempt or “grandfather” any Large Load with a service commencement date on or prior to December 4, 2026, from all requirements of proposed Section 37A.  MISO is also proposing to partially exempt a Large Load or portion of a Large Load, that does not have a Service Commencement Date prior to December 4, 2026, but that meets the MTEP/EPR Condition from the ramp and ride-through requirements set forth in Sections 37A.6 through 37A.7.  The proposal fully or partially exempts approximately 30 gigawatts of existing and in-flight capacity based on an arbitrary date.[fn:2]  The Joint Protestors are concerned the proposed grandfathering terms would exempt a large portion of the new large data center loads in Iowa and potentially other MISO regions from the reliability protections proposed in MISO’s filing.  Additionally, if this exemption is carried forward to the series of future Federal Power Act section 205 filings that MISO intends to make in response to the Show Cause Order, this could deprive electric consumers of the cost shifting and other consumer protections that MISO has been directed to address in the Show Cause Order.  \nLarge Loads have reliability impacts regardless of operational date.  Under proposed Section 37A, MISO cannot mandate a grandfathered facility install facility-side hardware protections to prevent severe spikes and triggering system protections from cascading through the grid, shifting the burden to the bulk electric system.  Under this proposal, local electric utilities will be forced to remedy the problem by building expensive, large-scale system and network reliability upgrades to cushion the grid against sudden destabilizing effects.  The cost of these system and network reliability upgrades will be passed onto other customers and will not be assigned to the Large Load, the cost-causer.  This will force captive ratepayers to subsidize the integration of Large Loads, violating the core principles of cost causation.  \nIf the Commission allows MISO to fully or partially exempt or “grandfather” any Large Load from all requirements of the proposed Section 37A, the costs associated with local reliability projects will not be assigned to the Large Load customer, the cost-causer.  Local reliability costs caused or materially accelerated by a Large Load should follow the cost-causer, the Large Load customer.  Broader allocation of costs to other customers should occur only if the other customers receive commensurate benefits.  Moreover, Large Load customers, and not other customers, should bear the risk if the load does not materialize as planned.  MISO’s Show Cause proposals should apply to any incremental large new load, as defined in this filing, that comes online after December 4, 2026.  \nWHEREFORE, the Iowa OCA, IL OAG, IL CUB, Michigan Attorney General, MI CUB, Commerce, MN CUB, WI CUB, Citizens Action Coalition of Indiana, Inc., and Alliance for Affordable Energy pray the Commission reject MISO’s proposed Tariff grandfathering transition provisions under Section 37A, to ensure Large Load customers bear the cost and risk of all costs caused by the Large Load customer, and for any additional relief Commission deems appropriate under the circumstances.\n\n\n\t\t\t\t\t\t\t\tRespectfully submitted,\n\t\t\t\t\n\t\t\t\t\t\t/s/ Jennifer Easler\t\t\t/s/ Heather L. Palmer\t\t\t\n\t\t\t\t\tJennifer Easler \t\tHeather L. Palmer\n\t\t\t\t\tAttorney\t\tAttorney\n\t\t\t\t\tIowa Attorney General \t\tIowa Attorney General\n\t\t\t\t\tOffice of the Consumer Advocate\t\tOffice of the Consumer Advocate\n\t\t\t\t\t1375 East Court Avenue\t\t1375 East Court Avenue\n\t\t\t\t\tDes Moines, IA  50319\t\tDes Moines, IA  50319\n\t\t\t\t\tJennifer.Easler@oca.iowa.gov\t\tHeather.Palmer@oca.iowa.gov \n\t\t\t\t\t\n\t\t\t\t\tAttorneys for Iowa Office of the Consumer Advocate\n\t\t\t\t\t\n\t\t\t\t\n\t\t\t\t\t/s/ Susan L. Satter\t\t/s/ Samuel C. Lukens\t\t\t\n\t\t\t\t\tSusan L. Satter\t\tSamuel C. Lukens\n\t\t\t\t\tBureau Chief\t\tAssistant Attorney General\n\t\t\t\t\tPublic Utilities Bureau\t\tPublic Utilities Bureau\n\t\t\t\t\tOffice of the Illinois Attorney General\t\tOffice of the Illinois Attorney General\n\t\t\t\t\t115 South LaSalle Street, 25th Floor\t\t115 South LaSalle, 25th Floor\n\t\t\t\t\tChicago, IL  60603\t\tChicago, IL  60603\n\t\t\t\t\tsusan.satter@ilag.gov\t\tsamuel.lukens@ilag.gov \n\t\t\t\t\n\t\t\t\tAttorneys for the Office of the Illinois Attorney General\n\t\t\t\t\t\n\t\t\t\t\t\t/s/ Sarah Moskowitz\t\t\t/s/ Eric DeBellis\t\t\t\t\n\t\t\t\t\tSarah Moskowitz\t\tEric DeBellis\n\t\t\t\t\tExecutive Director\t\tGeneral Counsel\n\t\t\t\t\tIllinois Citizens Utility Board\t\tIllinois Citizens Utility Board\n\t\t\t\t\t309 West Washington Street, Suite 800\t\t309 West Washington Street, Suite 800\n\t\t\t\t\tChicago, IL  60606\t\tChicago, IL  60606\n\t\t\t\t\tsmoskowitz@citizensutilityboard.org\t\tedebellis@citizensutilityboard.org\n\t\t\t\t\n\t\t\t\tFor the Illinois Citizens Utility Board\n\t\t\t\t\n\t\t\t\t\t\t/s/ Michael E. Moody\t\t\t/s/ John Liskey\t\t\t\t\n\t\t\t\t\tMichael E. Moody\t\tJohn Liskey\n\t\t\t\t\tSpecial Litigation Division Chief\t\tGeneral Counsel\n\t\t\t\t\tAssistant Attorney General\t\tCitizens Utility Board of Michigan\n\t\t\t\t\tMichigan Department of Attorney General\t921 North Washington Avenue\n\t\t\t\t\tP.O. Box 30212\t\tLansing, MI  48906\n\t\t\t\t\tLansing, MI  48909\t\tjohn.liskey@cubofmichigan.org\n\t\t\t\t\tMoodym2@michigan.gov \t\t\n\t\t\t\t\n\t\t\t\t\tAttorney for the Michigan\t\tAttorney for the Citizens Utility\n\t\t\t\t\t    Attorney General\t\t   Board of Michigan\n\t\t\t\t\t\t\t/s/ Sydnie Lieb\t\t\t\t/s/ Brandon Crawford\t\t\t\n\t\t\t\t\tSydnie Lieb \t\t\tBrandon Crawford\n\t\t\t\t\tAssistant Commissioner of Regulatory\t\t\tRegulatory Advocate\n\t\t\t\t\t  Affairs, Energy Resources Division \t\t\tCitizens Utility Board of Minnesota\n\t\t\t\t\tMinnesota Department of Commerce\t\t\t332 Minnesota Street, Suite W1360\n\t\t\t\t\t85 7th Place East, Suite 280\t\t\tSaint Paul, MN  55101\n\t\t\t\t\tSaint Paul, MN  55101  \t\t\tbrandonc@cubminnesota.org\n\t\t\t\t\tSydnie.Lieb@state.mn.us\n\t\t\t\t\n\t\t\t\t\tFor the Minnesota Department of \t\tFor the Citizens Utility Board of \n\t\t\t\t\t   Commerce\t\t   Minnesota\n\t\t\t\t\t\n\t\t\t\t\t\t/s/ Corey Singletary\t\t\t/s/ Daniel Narvey\t\t\t\t\n\t\t\t\t\tCorey Singletary\t\tDaniel Narvey\n\t\t\t\t\tExecutive Director\t\tGeneral Counsel\n\t\t\t\t\tCitizens Utility Board of Wisconsin \t\tCitizens Utility Board of Wisconsin\n\t\t\t\t\t625 North Segoe Road, Suite 101\t\t625 North Segoe Road, Suite 101\n\t\t\t\t\tMadison, WI  53705\t\tMadison, WI  53705\n\t\t\t\t\tsingletary@cubwi.org\t\tnarvey@cubwi.org\n\t\t\t\t\t\n\t\t\t\t\tFor the Citizens Utility Board of Wisconsin\n\t\t\t\t\n\t\t\t\t\tKewin L. Olson\t\tJennifer A. Washburn\n\t\t\t\t\tExecutive Director\t\tRegulatory Director\n\t\t\t\t\tCitizens Action Coalition of Indiana, Inc.\tCitizens Action Coalition of Indiana, Inc.\n\t\t\t\t\t1915 West 18th Street, Suite C\t\t1915 West 18th Street, Suite C\n\t\t\t\t\tIndianapolis, IN  46202\t\tIndianapolis, IN  46202\n\t\t\t\t\tkolson@citact.org\t\tjwashburn@citact.org\n\t\t\t\t\t\n\t\t\t\tFor the Citizens Action Coalition of Indiana, Inc.\n\t\t\t\t\n\t\t\t\t\t\t\t/s/ Yvonne Cappel-Vickery\t\t\t\n\t\t\t\t\tYvonne Cappel-Vickery\t\n\t\t\t\t\tClean Grid Manager\t\n\t\t\t\t\tAlliance for Affordable Energy\t\n\t\t\t\t\t4505 South Claiborne Avenue\t\n\t\t\t\t\tNew Orleans, LA  70125\t\n\t\t\t\t\tyvonne@all4energy.org\t\n\t\t\t\t\t\n\t\t\t\t\tFor the Alliance for Affordable Energy\t\n\t\t\t\t\t\n\t\t\t\t\n\t\t\t\tDated:\t\tSeptember 18, 2026\n\t\t\t\t\n\n\n\t\t\t\tCERTIFICATE OF SERVICE\n\t\t\t\t\n\t\t\t\tI hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding.\n\t\t\t\t\n\t\t\t\t\tDated at this 18th day of September, 2026.\n\t\t\t\t\n\t\t\t\t\t\tHeather L. Palmer\t\t\n\t\t\t\t\tHeather L. Palmer\n\t\t\t\t\tAttorney\n\t\t\t\t\tOffice of Consumer Advocate of Iowa\n\t\t\t\t\t1375 East Court Avenue\n\t\t\t\t\tDes Moines, IA 50319-0063\n\t\t\t\t\t(515) 725-7217\n\t\t\t\t\theather.palmer@oca.iowa.gov\n\n\nFootnotes\n[fn:1] In the Show Cause Order discussed below, the Commission expressly “encourage[d] . . . state consumer advocates to submit comments explaining whether this information is sufficient and granular enough or to submit comments explaining precisely which additional information on transmission cost allocation may be needed to inform proper state-jurisdictional cost allocation.”  Midcontinent Indep. Sys. Operator, Inc., 195 FERC ¶ 61,212 at P 70 (2026) (“Show Cause Order”).\n[fn:2] Midcontinent Indep. Sys. Operator, Large Load Working Group, Large Load Interconnection Reliability Requirements (LLWG) at 8 (Aug. 12, 2026), https://www.misoenergy.org/events/2026/large-load-working-group-llwg---august-12-2026/ (last visited on Sept. 16, 2026).\n\nfooter1 (Word template)\n2"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":10314,"startToken":0,"endToken":1429},{"p":1,"at":10314,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":1,"endAt":10797,"startToken":1429,"endToken":1496},{"p":1,"at":10797,"title":"Footnotes","method":"Word notes","endPage":1,"endAt":11581,"startToken":1496,"endToken":1603}]}