ER26-3380-000 · 2026-09-28 · COMMITTEE ON ENERGY AND COMMERCE
Comments of U.S. House of Representatives Committee on Energy and Commerce Ranking Member Frank Pallone, Jr. urging FERC to make important improvements, approve amended proposals, etc. re energy costs from data centers,
Back to sections and commentaryPDF page 1
BRETT GUTHRIE, KENTUCKY
CHAIRMAN
FRANK PALLONE, JR., NEW JERSEY
RANKING MEMBER
ONE HUNDRED NINETEENTH CONGRESS
Congress of the United States
House of Representatives
COMMITTEE ON ENERGY AND COMMERCE
2125 RAYBURN HOUSE OFFICE BUILDING
WASHINGTON, DC 20515-6115
Majority (202) 225-3641
Minority (202) 225-2927
September 28, 2026
The Honorable Laura V. Swett
Chairman
Federal Energy Regulatory Commission
888 First Street NE
Washington, DC 20426
RE: Docket Nos. ER26-3380, ER26-3515
Dear Chairman Swett:
I write in reference to two recent proposals from PJM designed to help shield Americans
from the skyrocketing energy costs from power-hungry data centers. While I support many of
the provisions included in the proposals, I am concerned that they do not go far enough and
believe the Federal Energy Regulatory Commission (FERC) should use its authority to improve
PJM’s proposals to protect families across the mid-Atlantic region. While these proposals are
not sufficient by themselves, they represent an important and necessary step to protect
Americans’ access to affordable and reliable electricity, and I urge FERC to approve them in
part, with a few important exceptions.
Americans are deeply frustrated and concerned that the rapid and unceasing development
of data centers is driving up their monthly energy bills. At the end of the day, protecting
Americans’ power bills is FERC’s responsibility. While the Commission has initiated potentially
promising actions that would impact roughly two-thirds of the nation, it is not enough.
Last year, Energy Subcommittee Ranking Member Kathy Castor and I wrote the
Commission to warn how data centers could make electricity unaffordable to Americans, and I
urged FERC to take immediate action to protect ratepayers and ensure that data centers paid their
fair share.1 Since then, the situation has only worsened. Data centers are responsible for an
increase in PJM capacity market costs of nearly $30 billion since the summer of 2024 – costs
1 Letter from Frank Pallone Jr., Ranking Member, House Committee on Energy and Commerce, to Laura V.
Swett, Chairman, Federal Energy Regulatory Commission (December 5, 2025).
PDF page 2
The Honorable Laura V. Swett
September 28, 2026
Page 2
that my constituents will ultimately have to pay.2 Demand for electricity over the next decade is
expected to explode – PJM is forecasting a roughly four percent increase in peak demand each
year, driven almost entirely by the massive growth in data centers.3
Under PJM’s proposals new data centers would have to pay for their own generation
capacity and data centers that do not develop their own new generation capacity would be the
first ones to have their lights shutoff in the face of larger grid issues. The second proposal is
precisely in line with one of the principles I suggested last year to FERC.4 While I have
concerns that the specifics of PJM’s proposals are insufficient to grant ratepayers the protections
they need, broadly these core concepts are deeply necessary, and FERC should work to
implement and improve them as quickly as possible.
I support one key idea across both PJM’s Reliability Backstop Procurement (RBP) and
Interim Resource Adequacy Service (IRAS) – ensuring that data centers are responsible for
bringing new generation capacity to the grid. Data centers are largely responsible for PJM’s
current reliability and cost crisis. The only way out is more generation, and the data centers
responsible for PJM’s issues should be the ones responsible for finding and incentivizing
generation to fix those issues.
I also want to express my support for PJM’s proposed allocation of costs for its RBP
auction to wholesale electricity customers. While FERC largely lacks the authority to allocate
costs directly to data centers, it must get as close as it can – by allocating costs not to the entire
PJM region, but to the zones that are fueling data center growth. New Jersey ratepayers have not
caused PJM’s current reliability issues, and therefore data center owners and operators should
pay to fix the system they are largely responsible for breaking.
Regardless of whether FERC decides to accept the broader IRAS filing, it must retain a
critical provision to exclude any future data center load that refuses to procure its own generation
capacity from PJM’s capacity auction. Last year, my constituents saw an outrageous 20 percent
increase in their power bills, fueled by skyrocketing prices in PJM’s capacity market.5 Over 90
percent of the increased demand PJM expects to see on its system by the end of the decade is
from data centers, and excluding data centers that do not partner with generation capacity will
help prevent my constituents from a future price shock even worse than the one they have
experienced over the past 18 months.6
Unfortunately, PJM’s proposed approaches are incomplete. The RBP only covers the
approximately 6.8 gigawatt gap between PJM’s reliability targets and recent generation capacity
2 Monitoring Analytics, LLC, State of the Market Report for PJM: January - June 2026 (Aug. 2026)
3 PJM Interconnection, 2026 PJM Load Forecast Report (Jan. 2026).
4 See note 1.
5 New Jersey Residential Customers Face 20% Bill Hikes, Driven by PJM Capacity Prices: BPU, UtilityDive
Feb. 13, 2025).
6 Letter from David E. Mills, Chair, PJM Board of Managers, to PJM Stakeholders (Aug. 8, 2025).
PDF page 3
The Honorable Laura V. Swett
September 28, 2026
Page 3
auctions. It does not cover the broader demand imposed by existing and soon-to-come-online
data centers upon PJM’s energy and capacity markets that have caused PJM prices to skyrocket
since last June. It is those data centers that are responsible for the increases in my constituents’
electricity bills over the last few years – not data centers that will not come online until 2028 or
later. I strongly believe the costs for procuring all additional generation capacity for data centers
should be allocated to zones with large amounts of data center-driven load growth instead of
across PJM as a whole.
Similarly, provisions of the IRAS proposal do not go far enough to protect consumers.
PJM’s requirement that new data centers bring their own new generation capacity effectively
turns off and resets if PJM can meet its reliability requirement for three years in a row. Given the
Commission’s goal of protecting ratepayers and providing American households with a stable
power grid, letting new data centers off the hook after three years without a crisis does not meet
the moment. If passing data center costs onto other customers is unjust and unreasonable now, it
would still be unjust and unreasonable in three years – FERC must reject that part of PJM’s
proposal. Likewise, PJM’s proposal to compensate new data centers for their downtime due to
grid instability caused by those very same data centers fails to grant ratepayers the protection
they need. I echo the New Jersey Board of Public Utilities’ proposal to strike the compensation
mechanism from IRAS.7
While I commend PJM on its proposal to establish a registry of large consumers of
electricity (including data centers), that registry – or as much of it as possible – must be public.
A registry of large consumers of electricity would be invaluable for improving forecasts of
electricity demand, which even PJM has noted needs drastic improvement.8 But that is not all.
Over the last year, Americans have become increasingly concerned over the air, water, and noise
pollution issues represented by data centers. Instead of responding with transparency, data center
developers and utilities have attempted to wield non-disclosure agreements to block information
on data center developments from the public view. In one instance earlier this month in
Arkansas, a utility attempted to sue a newspaper for publishing information about the utility’s
involvement in a data center project.9 Making PJM’s registry as public as possible, while still
mandating participation from data centers and other large consumers of electricity, would go a
long way in providing the transparency around data centers that we desperately need. A public
registry is also the only way of facilitating public confidence in the many differing commitments
Big Tech companies have made to not increase residential electricity rates. The public must have
access to data center-specific information on capacity, peak-shaving or demand response
agreements, and any arrangements a data center has made to bring its own generation capacity.
Finally, while PJM has gone as far as it can under FERC’s current jurisdiction to ensure
that data centers are responsible for the costs they impose upon the grid, the ultimate authorities
7 PJM Interconnection, L.L.C., Supportive Comments and Limited Protest of the New Jersey Board of Public
Utilities, Docket No. ER26-3515-000 (Sep. 3, 2026).
8 Letter from David E. Mills, Chair, PJM Board of Managers, to PJM Stakeholders (Jan. 16, 2026).
9 How NDAs Keep AI Data Center Details Hidden from Americans, NBC News (Oct. 28, 2025); Judge Refuses
to Block Arkansas News Reporting on Google Data Center Energy Documents, CNBC (Sep. 2, 2026).
PDF page 4
The Honorable Laura V. Swett
September 28, 2026
Page 4
that make that guarantee are state ratemaking authorities. FERC must ensure as a part of its
decisions in these filings that PJM, load serving entities, transmission owners, and the data
centers themselves provide state regulators with enough information to properly allocate any
costs resulting from data centers. If state regulators do not have the right information, then I fear
American families will be left on the hook for Big Tech’s investments.
I urge FERC to make these important improvements to PJM’s proposals and approve the
proposals as amended as quickly as possible, and to act expeditiously in its related show-cause
orders for grid operators around the country. If FERC gets this right, then it will have granted
American families a measure of protection from the costs imposed by data centers. If the
Commission falls short, then American families will pay the price. I hope FERC takes these
suggestions for improvements to PJM’s proposals seriously, and I stand ready to work to keep
electricity affordable and reliable across the country.
Sincerely,
Frank Pallone, Jr.
Ranking Member
cc:
The Honorable David Rosner
Commissioner
Federal Energy Regulatory Commission
The Honorable Lindsay S. See
Commissioner
Federal Energy Regulatory Commission
The Honorable Judy W. Chang
Commissioner
Federal Energy Regulatory Commission
The Honorable David A. LaCerte
Commissioner
Federal Energy Regulatory Commission