{"document":{"slug":"notice-cnf-20261102","title":"Combined Notice of Filings #1, November 2, 2026: ER27-330-000 and -001 comment date 5 pm ET November 30, 2026","issued":"2026-11-02","accession":"20261102-3050","docket":"ER27-330-000","group":"PJM Reliability Backstop Procurement","filer":"FERC","kind":"combined notice of filings","file":"sources/originals/20261102-3050_CNF110226.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261102-3050","sha256":"74ee4065f0f4a2f1560c8e14ae0fc3dd390224ee2df41a773a209eaf164a8fd4","pages":null,"tokens":1094,"emptyPages":[]},"pages":[{"page":1,"startToken":0,"endToken":1094,"text":"UNITED STATES OF AMERICA\nFEDERAL ENERGY REGULATORY COMMISSION\n\nCOMBINED NOTICE OF FILINGS #1\n\n(November 2, 2026)\n\n\tTake notice that the Commission received the following Electric Corporate filings:\n\nDocket Numbers:\nEC27-11-000\nApplicants:\nCampbell County Wind Farm, LLC\nDescription:\nApplication for Authorization Under Section 203 of the Federal Power Act of Campbell County Wind Farm, LLC.\nFiled Date:\n10/28/26\nAccession Number:\n20261028-5235\nComment Date:\n5 pm ET 11/18/26\n\n\n\tTake notice that the Commission received the following Exempt Wholesale Generator filings:\n\nDocket Numbers:\nEG27-28-000\nApplicants:\nYUMA bn, LLC\nDescription:\nYUMA bn, LLC submits Notice of Self–Certification of Exempt Wholesale Generator Status.\nFiled Date:\n10/30/26\nAccession Number:\n20261030-5335\nComment Date:\n5 pm ET 11/20/26\n\n\n\tTake notice that the Commission received the following Electric Rate filings:\n\nDocket Numbers:\nER10-2475-043; ER10-2474-042; ER10-3246-038; ER26-2531-003; ER26-2533-003; ER26-2536-003; ER24-1587-016; ER22-1385-026; ER26-2535-002; ER23-674-022; ER13-1266-066; ER15-2211-063;  ER10-1520-032; ER10-1521-032\nApplicants:\nOccidental Power Marketing, L.P., Occidental Power Services, Inc., MidAmerican Energy Services, LLC, CalEnergy, LLC, BHE Wind Watch, LLC, Power Watch, LLC, BHER Market Operations, LLC., AlbertaEx, L.P., Rim Rock Wind, LLC, Glacier Wind 2, LLC, Glacier Wind 1, LLC, PacifiCorp, Sierra Pacific Power Company, Nevada Power Company\nDescription:\nNotice of Non-Material Change in Status of Nevada Power Company, et al.\nFiled Date:\n10/28/26\nAccession Number:\n20261028-5230\nComment Date:\n5 pm ET 11/18/26\n\n\nDocket Numbers:\nER11-2154-015\nApplicants:\nTwin Eagle Resource Management, LLC\nDescription:\nNotice of Change in Status of Twin Eagle Resource Management, LLC.\nFiled Date:\n10/28/26\nAccession Number:\n20261028-5226\nComment Date:\n5 pm ET 11/18/26\n\n\nDocket Numbers:\nER17-242-024\nApplicants:\nGavin Power, LLC\nDescription:\nNotice of Non-Material Change in Status of Gavin Power, LLC.\nFiled Date:\n10/28/26\nAccession Number:\n20261028-5228\nComment Date:\n5 pm ET 11/18/26\n\n\nDocket Numbers:\nER17-1329-010; ER26-210-002; ER26-211-002\nApplicants:\nPierpont Energy Prepay 10, LLC, Pierpont Energy Prepay 9, LLC, J.P. Morgan Ventures Energy Corporation\nDescription:\nNotice of Change in Status of J.P. Morgan Ventures Energy Corporation, et al.\nFiled Date:\n10/28/26\n\n\nAccession Number:\n20261028-5225\nComment Date:\n5 pm ET 11/18/26\n\n\nDocket Numbers:\nER19-1411-008; ER21-573-009; ER21-574-009;    ER12-1436-023; ER22-48-008; ER21-575-009;     ER18-534-011; ER18-537-011; ER18-536-011;      ER11-4266-021; ER18-538-012; ER18-535-011;    \nApplicants:\nYankee Street, LLC, Sidney, LLC, Richland-Stryker Generation LLC, O.H. Hutchings CT, LLC, Monument Generating Station, LLC, Montpelier Generating Station, LLC, Lanyard Power Marketing, LLC, Gridflex Generation, LLC, Eagle Point Power Generation LLC, Dickerson Power, LLC, Chalk Point Power, LLC, GenOn Bowline, LLC\nDescription:\nNotice of Non-Material Change in Status and Market Based Rate Tariff Changes of GenOn Bowline, LLC.\nFiled Date:\n10/22/26\nAccession Number:\n20261022-5227\nComment Date:\n5 pm ET 11/12/26\n\n\nDocket Numbers:\nER19-1865-007; ER19-2142-008; ER19-2143-008; ER19-1866-007; ER19-2148-009; ER19-2147-008; ER19-2141-008; ER19-1868-007; ER19-1869-007; ER19-2145-008; ER19-2144-008; ER19-1870-007; ER19-2140-008; ER19-1871-007; ER19-1872-007; ER19-2146-008\nApplicants:\nWarren Generation, LLC, Tolna Power, LLC, Titus Power, LLC, Shawville Power, LLC, Shawnee Power, LLC, Sayreville Power, LLC, Portland Power, LLC, Orrtanna Power, LLC, Niles Power, LLC, New Castle Power, LLC, Mountain Power, LLC, Heritage Power Marketing, LLC, Hamilton Power, LLC, Gilbert Power, LLC, Brunot Island Power, LLC, Blossburg Power, LLC\nDescription:\nNotice of Change in Status of Blossburg Power, LLC, et al.\nFiled Date:\n10/27/26\n\n\nAccession Number:\n20261027-5202\nComment Date:\n5 pm ET 11/17/26\n\n\nDocket Numbers:\nER25-2883-004; ER26-1873-002\nApplicants:\nHollis Creek PV I, LLC, Redfield PV I, LLC\nDescription:\nNotice of Non-Material Change in Status of Redfield PV I, LLC, et al.\nFiled Date:\n10/28/26\nAccession Number:\n20261028-5227\nComment Date:\n5 pm ET 11/18/26\n\n\nDocket Numbers:\nER25-3475-007; ER10-1292-021; ER10-1319-023; ER10-1276-023; ER10-1353-023; ER10-1287-022; ER10-1303-021; ER25-3172-005; ER26-2521-002; ER24-3028-005; ER24-3029-005; ER26-1987-002; ER23-1411-008; ER25-1962-007\nApplicants:\nCentury Oaks Energy Storage, LLC, Newport Solar LLC, Lake Iris Solar, LLC, Livingston Generating Station, LLC, Kalamazoo Generating Station, LLC, Hart Solar Partners, LLC, Genesee Solar Energy, LLC, Genesee Power Station Limited Partnership, Grayling Generation Station Limited Partnership, Dearborn Industrial Generation, L.L.C., Consumers Energy Company, CMS Generation Michigan Power, LLC, CMS Energy Resource Management Company, Branch Solar, LLC\nDescription:\nNotice of Change in Status of Branch Solar, LLC, et al.\nFiled Date:\n10/28/26\nAccession Number:\n20261028-5231\nComment Date:\n5 pm ET 11/18/26\n\n\nDocket Numbers:\nER27-153-001\nApplicants:\nCitizens Sunrise Transmission LLC\nDescription:\nTariff Amendment:  Correction to Annual TRBAA Filing to be effective 1/1/2027.\nFiled Date:\n11/2/26\n\n\nAccession Number:\n20261102-5186\nComment Date:\n5 pm ET 11/23/26\n\n\nDocket Numbers:\nER27-154-001\nApplicants:\nCitizens Sycamore-Penasquitos Transmission LLC\nDescription:\nTariff Amendment:  Correction to Annual TRBAA Filing to be effective 1/1/2027.\nFiled Date:\n11/2/26\nAccession Number:\n20261102-5193\nComment Date:\n5 pm ET 11/23/26\n\n\nDocket Numbers:\nER27-155-001\nApplicants:\nCitizens S-Line Transmission LLC\nDescription:\nTariff Amendment:  Correction to Annual TRBAA Filing to be effective 1/1/2027.\nFiled Date:\n11/2/26\nAccession Number:\n20261102-5197\nComment Date:\n5 pm ET 11/23/26\n\n\nDocket Numbers:\nER27-320-000\nApplicants:\nSouthwest Power Pool Inc.\nDescription:\nNotice of Cancellation of Generator Interconnection Agreement of Southwest Power Pool, Inc.\nFiled Date:\n10/23/26\nAccession Number:\n20261023-5230\nComment Date:\n5 pm ET 11/13/26\n\n\nDocket Numbers:\nER27-330-000\nApplicants:\nPJM Interconnection, L.L.C.\nDescription:\nCompliance filing:  Proposed Amendments to the Reliability Backstop Procurement in ER26-3380 to be effective 1/15/2027.\nFiled Date:\n10/29/26\nAccession Number:\n20261029-5227\nComment Date:\n5 pm ET 11/30/26\n\n\n\n\nDocket Numbers:\nER27-330-001\nApplicants:\nPJM Interconnection, L.L.C.\nDescription:\nCompliance filing:  Errata to Correct Metadata and Waiver Request in RBP Compliance Filing to be effective 1/29/2027.\nFiled Date:\n10/30/26\nAccession Number:\n20261030-5172\nComment Date:\n5 pm ET 11/30/26\n\n\n\n\tThe filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number.\n\n\tAny person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 pm Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding.\n\n\teFiling is encouraged.  More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: http://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.\n\n\tFor public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202) 502-6595 or OPP@ferc.gov. \n\n\n\n\nCarlos D. Clay,\nDeputy Secretary.\n\n\nheader1 (Word template)\nCNF1102261"}],"sections":[{"p":1,"at":0,"title":"Document text","method":"document text","endPage":1,"endAt":7750,"startToken":0,"endToken":1094}]}
