PJM stakeholder record · 2026-10-02

Letter to the PJM Board of Managers on PJM's large-load show cause response

Topics in the text: Cost allocation

Responses and related views

No section-specific public response is linked for this document.

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Pages 1 to 2

page range · Topic match: Cost allocation

Under PJM's proposal, large loads must first progress through the Transmission Owner study process for the Transmission Owner to approve entry into PJM’s proposed new queue.
Read this passage