Latest
Coming up
Companies
One card per operator. Commitment depth counts the operator’s own published statements, theme by theme.
- Specific at least one statement with a figure (jobs, dollars, megawatts, gallons)
- General a written commitment without a figure
- None found nothing published on the theme
- Specific: a statement with a figure
- General: written, no figure
- None found
- Number = published statements
| Company |
|---|
Read the quotes
What each operator has announced across the sites tracked here.
| Company | Projects | Power | Investment | Jobs | Claims | Responses |
|---|
—
—
Select a company.
- Official community page
- —
- Recorded claims
- —
- Tracked projects
- —
- Last reviewed
- —
Community responses
Sites
—
— · — · announced —
- Claimed investment
- —
- Claimed jobs
- —
- Acreage
- —
- Power capacity
- —
- GPU / accelerator count
- —
- Offtaker
- —
- Project page
- —
- Record source
- —
- Notes
- —
At a glance
Summarized from this site's claims. Quotes and sources are on the Claims tab.
- No site-specific claims captured yet.
What officials, residents, advocates, regulators, and reporters have said about this site.
- No on-the-ground feedback captured for this site yet.
Hearings, votes, permits, filings and coverage at this site, newest first. Announced future dates lead.
Sites with documented pushback: a critical community response, disputed ratepayer costs, a disputed promise, or a lawsuit. Each carries a dated local timeline of hearings, votes, permits, filings and coverage.
| State | Companies | Projects | Power | Investment | Jobs | Responses |
|---|
The Pledge
Who signed the White House Ratepayer Protection Pledge of March 4, 2026, and which sites show it. Read the pledge →
The five commitments, and how tracked sites measure up
Commitment titles and text quoted verbatim from the White House Ratepayer Protection Pledge. Counts cover assessed sites only.
Signatory roster
From the White House roster.
Coverage
Buyers, utilities, cooperatives, developers, and governors.
States
Darker states have more tracked sites, pauses, policies, tariffs and rate cases. ★ = governor signed the addendum.
Tracked sites
Sites announced after their operator signed, plus earlier sites with later reporting that confirms the pledge applies.
Not yet assessed. Each card identifies pledge-era timing or an unpublished signing date.
Announced before the operator signed. Covered by the company's national pledge only.
Companies that have not signed. Shown for comparison; some publish their own ratepayer commitments.
Signer categories
| Category | Companies | Sites | Power | Investment | Assessed | Contested |
|---|
Utilities
| Utility | Pledge | States | Tariffs | Rate cases | Served sites |
|---|
Assessments are editorial judgments. A site without a site-specific commitment has not failed; the company has not published one for it.
State
—
—
Loading election records…
Power Costs
Who pays for data center power: rate cases, and large-load tariffs read against Berkeley Lab's 2026 rate-design elements ↗
What to watch
Where regulators decide who pays: rate cases, special contracts, and rulemakings. Pending cases show their next step. Federal cases are marked FED.
Tariff directory
| Utility | State | Tariff | Status | Min load | Decision |
|---|
The 18 elements in Berkeley Lab's August 2026 update, grouped the way it groups them: established, stable, emerging and declining practice. Each card shows how many tariffs tracked here include the element, and how many of the 55 tariffs in LBL's sample do.
Curated, not exhaustive. Many states have no data-center tariff yet. Element counts measure what a tariff's text covers, not how well it works. One federal FERC co-location case (badged FED) is included because the LBL brief covers co-location. It is left out of the state counts.
—
—
— · —
- Utility
- —
- Regulator
- —
- Docket / case
- —
- Status
- —
- Decision date
- —
- Minimum load
- —
- Large-load customers
- —
Rate-design elements
Other terms
Related legislation
Sources & Resources
Policy
U.S. laws, bills, executive orders, commission orders, moratoriums and community benefit agreements.
All frameworks
| Title | Type | Where | Status | Date | Topics |
|---|---|---|---|---|---|
| Loading… | |||||
Community benefit agreements
Signed agreements that put the most of the nine terms in writing. A count of terms on paper, not a measure of enforcement or delivery.
Nine terms a strong agreement puts in writing, from the NAACP 2026 template and signed agreements.
Loading draft plans…
Loading evidence guide…
Coverage varies by state. Jurisdiction map · Utility tariffs.
—
—
— · —
- Identifier
- —
- Date
- —
- Parties
- —
- Stated value
- —
- Topics
- —
- Themes
- —
Key terms
Sources & Resources
Next step
Moratoriums
Moratoriums directory
| Jurisdiction | Date | Type | Status | Duration | Key Reasons |
|---|
Loading map…
Concerns cited
How many moratoriums cite each concern.
—
—
— · —
- Status
- —
- Enacted date
- —
- Effective date
- —
- Duration
- —
- Power threshold
- —
- Key reasons
- —
- Policy type
- —
- Bill / Resolution
- —
- Introduced by
- —
- Signed / enacted by
- —
- Vote
- —
- Session
- —
- Why it failed
- —
Key stakeholders
Sources & Resources
International
Could not load international records.
Amounts are shown as each source states them. The "≈ US$" figure uses the Federal Reserve's 2025 annual-average rate (G.5A) and is approximate; nothing is summed across currencies. Quotes stay in their original language, followed by a labelled English translation.