[{"slug":"abeyance-el26-67-pjm","title":"Letter order granting the PJM, Indicated PJM Transmission Owners and Silver Run Electric abeyance motions","issued":"2026-08-14","accession":"20260814-3059","docket":"EL26-67-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"letter order","file":"sources/originals/20260814-3059_EL26-67-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3059","sha256":"b9b801a2dd278cb8811942d656cabfbb9c75063548cf1ae827abc01407d02aaa","pages":null,"tokens":2090,"emptyPages":[]},{"slug":"abeyance-el26-68-spp","title":"Letter order granting the SPP Joint Movants' abeyance motion for 95 days, to November 20, 2026","issued":"2026-08-14","accession":"20260814-3060","docket":"EL26-68-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"letter order","file":"sources/originals/20260814-3060_EL26-68-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3060","sha256":"c3c8dc5f4d101c83453a73b45b0f535257dec4f39b543949eba38c60c7d8c5e5","pages":null,"tokens":1890,"emptyPages":[]},{"slug":"abeyance-el26-69-nyiso","title":"Letter order granting the NYISO, New York Transmission Owners and Non-Incumbent Transmission Owners abeyance motions","issued":"2026-08-14","accession":"20260814-3068","docket":"EL26-69-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"letter order","file":"sources/originals/20260814-3068_EL26-69-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3068","sha256":"56c964bb2211a6531f4f50e8905be969c10df43ef2aa4b59e6a3b1587535b490","pages":null,"tokens":1872,"emptyPages":[]},{"slug":"abeyance-el26-70-miso","title":"Letter order granting the MISO and MISO Transmission Owners abeyance motion over American Municipal Power's opposition","issued":"2026-08-14","accession":"20260814-3058","docket":"EL26-70-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"letter order","file":"sources/originals/20260814-3058_EL26-70-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3058","sha256":"0bbebbc8f815dd3667eae7824eb9bfd80bee342f5d5c20e5a2e9c6466a1fd267","pages":null,"tokens":2173,"emptyPages":[]},{"slug":"abeyance-el26-71-caiso","title":"Order Granting Rescission and Abeyance Requests (rescinds the order as to the Six Cities and WAPA)","issued":"2026-08-14","accession":"20260814-3061","docket":"EL26-71-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260814-3061_EL26-71-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3061","sha256":"02371da5d139e8ef4c56724c2e03ffffbcc011a4110defa4ee2a1e5d180809c3","pages":null,"tokens":2367,"emptyPages":[]},{"slug":"abeyance-el26-72-isone","title":"Letter order granting the ISO-NE and PTO Administrative Committee joint abeyance motion","issued":"2026-08-14","accession":"20260814-3056","docket":"EL26-72-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"letter order","file":"sources/originals/20260814-3056_EL26-72-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3056","sha256":"15e8b4fdf8a1667d478fddad21c574332a9a3c05bcf42636c99fb759a14c6e20","pages":null,"tokens":1603,"emptyPages":[]},{"slug":"amendment-er27-432-spp-chills","title":"SPP corrects the Upper Missouri rate sheet for conditional large-load service","issued":"2026-11-10","accession":"20261110-5175","docket":"ER27-432-001","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"tariff amendment","file":"sources/originals/20261110-5175_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261110-5175","sha256":"f0142df24e3abb50c39b84be343fb7ea02fdbf2be8baad99c9606a5d1b40dc6d","pages":5,"tokens":1168,"emptyPages":[]},{"slug":"amendment-er27-432-spp-chills-attachment-1","title":"Clean8543-8e690f19-d23f-4f93-8bbe-f1d8db8928e2.pdf","issued":"2026-11-10","accession":"20261110-5175","docket":"ER27-432-001","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/originals/20261110-5175_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261110-5175","parent":"amendment-er27-432-spp-chills","sha256":"7ad6baf7f8473e789eade8a17f964edda47241cff208e25bad77ba2345709a3a","pages":3,"tokens":729,"emptyPages":[]},{"slug":"amendment-er27-432-spp-chills-attachment-2","title":"Marked8543-c98d2db8-21b1-4bff-8977-95b41bb9803c.pdf","issued":"2026-11-10","accession":"20261110-5175","docket":"ER27-432-001","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/originals/20261110-5175_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261110-5175","parent":"amendment-er27-432-spp-chills","sha256":"bf5895108042183facbd9736d3446bd181910c3c68ba52bcd1619a6921607a44","pages":3,"tokens":743,"emptyPages":[]},{"slug":"answer-el25-49-pjm-limited-protests","title":"Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to the limited protests of its August 17, 2026 compliance filing (EL25-49 and ER26-1479)","issued":"2026-10-14","accession":"20261015-5003","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM","kind":"motion for leave to answer and answer","file":"sources/originals/20261015-5003_PJM Answer to Limited Protests - ER26-1479 and EL25-49 .pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261015-5003","sha256":"742d4f5e3c6e1f973860d7c0bc8bd174f44a11c17903e2af286ed60da5039217","pages":21,"tokens":5948,"emptyPages":[]},{"slug":"answer-el26-71-morongo","title":"Answer of Morongo Transmission LLC: no tariff amendment required, a non-load-serving participating transmission owner","issued":"2026-08-12","accession":"20260812-5158","docket":"EL26-71-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"Morongo Transmission","kind":"answer to order to show cause","file":"sources/originals/20260812-5158_Morongo Transmission - PTO OSC Answer.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260812-5158","sha256":"2446f4cf733f6ec9fe8e375c3b6293aa1d25019d8043406b0b1fc87bb1e7dfa3","pages":6,"tokens":1339,"emptyPages":[]},{"slug":"answer-el27-11-exelon-extension","title":"Exelon answers PJM’s request for more time on its capacity-auction complaint","issued":"2026-11-09","accession":"20261109-5139","docket":"EL27-11-000","group":"PJM filings","filer":"Exelon Corporation","kind":"answer","file":"sources/originals/20261109-5139_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261109-5139","sha256":"2032b6a61bc5c65507757cd713fd410f76b44dabe809d2d69f2e48f7c973be29","pages":6,"tokens":1794,"emptyPages":[]},{"slug":"answer-er27-25-consumer-advocates","title":"Six MISO-state consumer advocates answer in support of the Organization of MISO States","issued":"2026-11-12","accession":"20261112-5134","docket":"ER27-25-000","group":"MISO filings","filer":"Citizens Utility Board of Michigan and five other consumer advocates","kind":"answer","file":"sources/originals/20261112-5134_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261112-5134","sha256":"246fc8b777aa54c68c2634c866f1b9c93fb513287132fc31b44446c8c299794f","pages":12,"tokens":3104,"emptyPages":[]},{"slug":"answer-er27-25-miso","title":"MISO Answer to Comments and Protests on the Large Load Addition Resource Study","issued":"2026-11-09","accession":"20261109-5205","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"MISO","kind":"motion for leave to answer and answer","file":"sources/originals/20261109-5205_FINAL AnswerER27-25-000.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5205","sha256":"8cf8065935fae99e4f035e6bf7512455a3721c9f4b2fcd6dc2166845fe46ae1f","pages":30,"tokens":8990,"emptyPages":[]},{"slug":"answer-er27-484-epsa-comment-period","title":"EPSA supports ISO-NE’s request for a 24-day comment period","issued":"2026-11-13","accession":"20261113-5086","docket":"ER27-484-000","group":"ISO-NE filings","filer":"Electric Power Supply Association","kind":"answer","file":"sources/originals/20261113-5086_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261113-5086","sha256":"fa30051227de554981ec07322605f13d6c7ad96502b65a5480a6d9bb6def5661","pages":4,"tokens":631,"emptyPages":[]},{"slug":"attachment-er27-454-a","title":"Attachment A -Marked Tariff","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"attachment","file":"sources/originals/attachment-er27-454-a.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5216","parent":"refiling-er27-454-pjm-backstop","sha256":"90a78243fcf772408da7c90809a87860373b6372a59265e857889763e317d428","pages":68,"tokens":25220,"emptyPages":[]},{"slug":"attachment-er27-454-b","title":"Attachment B- Clean Tariff Revisions","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"attachment","file":"sources/originals/attachment-er27-454-b.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5216","parent":"refiling-er27-454-pjm-backstop","sha256":"e9866f181a49cc3f35b35f144e772210af9a4c02fbefc9dc5fe5d3c95d6bae96","pages":66,"tokens":24243,"emptyPages":[]},{"slug":"attachment-er27-454-c","title":"Attachment C - Gwen Kelly Affidavit","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"attachment","file":"sources/originals/attachment-er27-454-c.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5216","parent":"refiling-er27-454-pjm-backstop","sha256":"04053d2b35875f820234c0fba30b3bfdf0352bba47dcaa194f269611e887c9c7","pages":14,"tokens":3851,"emptyPages":[]},{"slug":"attachment-er27-454-d","title":"Attachment D - Danielle Croop Affidavit","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"attachment","file":"sources/originals/attachment-er27-454-d.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5216","parent":"refiling-er27-454-pjm-backstop","sha256":"3d744c78710f0acc1a361f4b9b26a4e3cbe066ae215db72da6016d2aa88395fd","pages":8,"tokens":2564,"emptyPages":[]},{"slug":"clarification-er26-3380-amp","title":"Request for Clarification and Alternative Request for Rehearing of American Municipal Power, Inc.","issued":"2026-10-13","accession":"20261013-5514","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"American Municipal Power","kind":"request for clarification or rehearing","file":"sources/originals/20261013-5514_AMP_Clarification_ER26-3380.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261013-5514","sha256":"35d7abe57fa7077b76596d1c2122d41757c02457f86732daf7c3f71a79a57cc7","pages":17,"tokens":4643,"emptyPages":[]},{"slug":"comments-el26-67-spartz","title":"Rep. Victoria Spartz asks FERC and DOE to condition approvals and protect ratepayers","issued":"2026-11-05","accession":"20261110-4002","docket":"EL26-67-000","group":"PJM filings","filer":"US HOUSE OF REPRESENTATIVES","kind":"congressional letter","file":"sources/originals/20261110-4002_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261110-4002","sha256":"12c864a0d8f9d3b7887d75955c37a552db82dba0d7945e3d52bb253de352f507","pages":9,"tokens":2135,"emptyPages":[]},{"slug":"comments-er27-25-alliant-consumers","title":"Comments of Alliant Energy Corporate Services, Inc. and Consumers Energy Company in Support of MISO's Proposed Tariff Revisions","issued":"2026-10-23","accession":"20261023-5096","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Alliant and Consumers Energy","kind":"comments in support","file":"sources/originals/20261023-5096_AECS Consumers Comments ER27-25.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5096","sha256":"c8105774a3c9cc6018285a1bc0052793e920d0b740921107843a757a9a26964f","pages":5,"tokens":1028,"emptyPages":[]},{"slug":"comments-er27-25-arkansas-psc","title":"Comments of the Arkansas Public Service Commission in Support of MISO Application","issued":"2026-10-23","accession":"20261023-5180","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Arkansas PSC","kind":"comments in support","file":"sources/originals/20261023-5180_ER27-25-000 AR LARS comments.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5180","sha256":"482698d52fe64b7cc338fc1df3c5f5c5eb60606f73a1e392f8b89281675fda2b","pages":null,"tokens":345,"emptyPages":[]},{"slug":"comments-er27-25-dte","title":"Comments of DTE Electric Company","issued":"2026-10-23","accession":"20261023-5161","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"DTE Electric","kind":"comments","file":"sources/originals/20261023-5161_DTE Electric_LARS_Support Comments.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5161","sha256":"028911d8552e41a25b5364d8b07b70954defc9c8c5a7865b7f5370197fe91f88","pages":5,"tokens":885,"emptyPages":[]},{"slug":"comments-er27-25-entergy-cleco","title":"Supporting Comments of the Entergy Operating Companies and Cleco Power LLC","issued":"2026-10-23","accession":"20261023-5035","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Entergy and Cleco","kind":"comments in support","file":"sources/originals/20261023-5035_Entergy Comments in Support MISO LARS Filing FINAL1.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5035","sha256":"ff7d1cd1c0d996887155de1c866fb865485dea9b200af641e0f47fd3aa310ef5","pages":6,"tokens":1485,"emptyPages":[]},{"slug":"comments-er27-25-southern-regulators","title":"Comments on Behalf of the Southern Regulators (Mississippi and Louisiana PSCs) in Support of MISO Application","issued":"2026-10-23","accession":"20261023-5073","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Mississippi and Louisiana PSCs","kind":"comments in support","file":"sources/originals/20261023-5073_ER27-25 southern regulator comments.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5073","sha256":"14ad7911b2bb9743f6ecebfbe8e058f2eedc308d994d7b9845f352b9b0114330","pages":5,"tokens":797,"emptyPages":[]},{"slug":"complaint-el27-11-exelon","title":"Complaint Requesting Fast Track Processing of Exelon Corporation (prompt capacity auction from the 2030/31 Delivery Year)","issued":"2026-11-03","accession":"20261103-5191","docket":"EL27-11-000","group":"Exelon complaint seeking a prompt PJM capacity auction","filer":"Exelon","kind":"complaint (fast track)","file":"sources/originals/20261103-5191_Complaint of Exelon Corporation - 11.3.2026.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261103-5191","sha256":"25acac84decf91df2aa5c3b823440f1949a78fb4dbac9dd718bc7db19f9b57a7","pages":61,"tokens":18031,"emptyPages":[]},{"slug":"compliance-er26-1479-pjm","title":"PJM partial compliance filing in response to the June 18, 2026 order on rehearing in EL25-49-002 et al.","issued":"2026-08-17","accession":"20260817-5195","docket":"ER26-1479-002","group":"PJM co-location compliance","filer":"PJM","kind":"compliance filing (transmittal)","file":"sources/originals/20260817-5195_Transmittal for August Compliance Filing.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5195","sha256":"8bb53306c1f94f03859a6aaba8125e91e28b7084609244fb5f298fe4a07999a2","pages":27,"tokens":8096,"emptyPages":[]},{"slug":"compliance-er26-3515-pjm","title":"Thirty-Day Compliance Filing on PJM’s Large Load Definition and Large Load Registry","issued":"2026-11-09","accession":"20261109-5217","docket":"ER26-3515-002","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"PJM","kind":"compliance filing","file":"sources/originals/20261109-5217_PJM compliance filing.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5217","mirror":"https://www.pjm.com/pjmfiles/directory/etariff/FercDockets/9976/20261109-er26-3515-002.pdf","sha256":"092e39a95b0fcd6cdd7c05d842d70fe0f9121a4a446026164614bf98ba029f6f","pages":125,"tokens":41534,"emptyPages":[]},{"slug":"compliance-er26-3515-pjm-etariff-rendition","title":"FERC rendition of the electronically filed tariff records","issued":"2026-11-09","accession":"20261109-5217","docket":"ER26-3515-002","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"PJM","kind":"attachment","file":"sources/originals/20261109-5217_tariff-rendition.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261109-5217","parent":"compliance-er26-3515-pjm","sha256":"88ba29f810896777212763f515e69b59695864092069ddb1002a65cdb70ed215","pages":64,"tokens":20698,"emptyPages":[]},{"slug":"compliance-er26-3537-pjm-tos","title":"PJM Transmission Owners' partial compliance filing implementing the Interim NITS rate","issued":"2026-08-17","accession":"20260817-5175","docket":"ER26-3537-000","group":"PJM co-location compliance","filer":"PJM Transmission Owners","kind":"compliance filing (transmittal)","file":"sources/originals/20260817-5175_Transmittal Letter.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5175","sha256":"4d76a381a475671c3073ff8dc598a13bd4311090d1b37d1483494446b3bb390c","pages":4,"tokens":1205,"emptyPages":[]},{"slug":"e-10-caiso-el26-71-000","title":"CAISO show cause order","issued":"2026-06-18","docket":"EL26-71-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-10-caiso-el26-71-000.pdf","url":"https://www.ferc.gov/media/e-10-el26-71-000","sha256":"6a01f45e89c07fe1ccdc21742b1ea73c32b1e81a4710040728c9134201ec8d74","pages":118,"tokens":43959,"emptyPages":[]},{"slug":"e-11-isone-el26-72-000","title":"ISO-NE show cause order","issued":"2026-06-18","docket":"EL26-72-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-11-isone-el26-72-000.pdf","url":"https://www.ferc.gov/media/e11-el26-72-000","sha256":"af071275199a16d6b6240b1332b2d67d6b4512daed1601bcd5e7ae7002524cb8","pages":115,"tokens":43320,"emptyPages":[]},{"slug":"e-12-nyiso-el26-69-000","title":"NYISO show cause order","issued":"2026-06-18","docket":"EL26-69-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-12-nyiso-el26-69-000.pdf","url":"https://www.ferc.gov/media/e12-el26-69-000","sha256":"2cbbe4a06823bc8d86d40484159f655921db057cafd92a1d3c4a73389a5c1648","pages":119,"tokens":44897,"emptyPages":[]},{"slug":"e-2-pjm-el25-49-002","title":"PJM co-location rehearing order","issued":"2026-06-18","docket":"EL25-49-002","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-2-pjm-el25-49-002.pdf","url":"https://www.ferc.gov/media/e-2-el25-49-002","sha256":"924f3bc65ab8aa0c9bf803d704e08db658f5a598ebac95b7a8dbd7b45897e11c","pages":278,"tokens":107648,"emptyPages":[]},{"slug":"e-7-pjm-el26-67-000","title":"PJM show cause order","issued":"2026-06-18","docket":"EL26-67-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-7-pjm-el26-67-000.pdf","url":"https://www.ferc.gov/media/e-7-el26-67-000","sha256":"f9c747cfb6f16b646556d1149b529b467a402b6a62e7e7f861c583180a0a383f","pages":114,"tokens":41694,"emptyPages":[]},{"slug":"e-8-miso-el26-70-000","title":"MISO show cause order","issued":"2026-06-18","docket":"EL26-70-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-8-miso-el26-70-000.pdf","url":"https://www.ferc.gov/media/e-8-el26-70-000","sha256":"3946eea46ef8014cd75a1ecde6d3d9b1c555c7bf7ad23fbf503ec252de7facc8","pages":115,"tokens":43221,"emptyPages":[]},{"slug":"e-9-spp-el26-68-000","title":"SPP show cause order","issued":"2026-06-18","docket":"EL26-68-000","filer":"FERC","group":"June 18 orders","kind":"order","file":"docs/orders/e-9-spp-el26-68-000.pdf","url":"https://www.ferc.gov/media/e-9-el26-68-000","sha256":"28c88f38e615d84bfc93c6a0b89995b40f86520d08d0e277afed8038ef884d3d","pages":92,"tokens":33815,"emptyPages":[]},{"slug":"eot-el25-49-pjm","title":"Notice of Extension of Time granting PJM and the Indicated PJM Transmission Owners 90 days, to November 16, 2026","issued":"2026-08-14","accession":"20260814-3005","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"FERC","kind":"notice of extension of time","file":"sources/originals/20260814-3005_EL25-49-002 EOT.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3005","sha256":"175e73020c49921881b9302c961465f22d7e16d27d55a8a4bd1d963e1595db67","pages":null,"tokens":1067,"emptyPages":[]},{"slug":"errata-el26-67-pjm","title":"Errata correcting the caption and footnote 13 of 195 FERC ¶ 61,211 (Allegheny Electric Cooperative, Wabash Valley Power Association)","issued":"2026-08-13","accession":"20260813-3025","docket":"EL26-67-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"errata notice","file":"sources/originals/20260813-3025_EL26-67-000 Errata Notice.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260813-3025","sha256":"bff287ba7fa503b1f71c094012cdfa0b9b8a387841998c91e65cc128c66a4251","pages":null,"tokens":518,"emptyPages":[]},{"slug":"errata-el26-70-miso","title":"Errata correcting the caption and footnote 11 of 195 FERC ¶ 61,212 (Wabash Valley Power Association)","issued":"2026-08-13","accession":"20260813-3026","docket":"EL26-70-000","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"errata notice","file":"sources/originals/20260813-3026_EL26-70-000 Errata.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260813-3026","sha256":"1c37ebd4969e121a1320dd08eb6c8c66ba864e068fab0a9fd611828f08b91567","pages":null,"tokens":555,"emptyPages":[]},{"slug":"errata-er27-330-pjm-backstop","title":"PJM corrects its October backstop transmittal letter","issued":"2026-10-30","accession":"20261030-5172","docket":"ER27-330-001","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20261030-5172_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261030-5172","sha256":"554dbedb526554560290e9df54926c38ee407cfd0ed68d265871ac4942cdab04","pages":3,"tokens":805,"emptyPages":[]},{"slug":"errata-er27-330-pjm-backstop-attachment-1","title":"Att A- Corrected Transmittal (Clean).pdf","issued":"2026-10-30","accession":"20261030-5172","docket":"ER27-330-001","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20261030-5172_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261030-5172","parent":"errata-er27-330-pjm-backstop","sha256":"62e0d7cbad4478989cf238f5fab99ca717d50a98e741a4a8a21237438a31467e","pages":67,"tokens":19535,"emptyPages":[]},{"slug":"errata-er27-330-pjm-backstop-attachment-2","title":"Att B- Corrected Transmittal (Marked).pdf","issued":"2026-10-30","accession":"20261030-5172","docket":"ER27-330-001","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20261030-5172_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261030-5172","parent":"errata-er27-330-pjm-backstop","sha256":"0909d7652b8eb183090052799ecbec979f5df41c97296c08aaca356ed3bf51b2","pages":67,"tokens":19537,"emptyPages":[]},{"slug":"filing-20260622-5134","title":"Vermont Electric Cooperative, Inc. submits Request for Issuance of an Errata re the Notice of Institution of Section 206 Proceeding and Refund Effective Date re ISO New England Inc. et al","issued":"2026-06-22","accession":"20260622-5134","docket":"EL26-72-000","group":"ISO-NE filings","filer":"Vermont Electric Cooperative, Inc.","kind":"request","file":"sources/originals/20260622-5134_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260622-5134","sha256":"eb18d8db16c2ea2516e5a9666422d6bb73186dd3ae4f73b667dd1fc89d016c51","pages":6,"tokens":1240,"emptyPages":[]},{"slug":"filing-20260624-5016","title":"Comments of Debra Ann Ostroski providing documented correspondence with American Transmission Company re the alternative transmission evaluation for the Large Load Show Cause Proceeding","issued":"2026-06-24","accession":"20260624-5016","docket":"EL26-70-000","group":"MISO filings","filer":"Individual No Affiliation","kind":"comments","file":"sources/originals/20260624-5016_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260624-5016","sha256":"6ba71781d7ee7a8f5e21b402ddc788031658da3e179f785696e7a9e014437ada","pages":1,"tokens":157,"emptyPages":[]},{"slug":"filing-20260629-5029","title":"Comments of Lisa Melton concerning the integration of large, high-density electric loads and the associated deterministic stability and cost-allocation methodologies","issued":"2026-06-29","accession":"20260629-5029","docket":"EL26-68-000","group":"SPP, CAISO filings","filer":"Individual No Affiliation","kind":"comments","file":"sources/originals/20260629-5029_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260629-5029","sha256":"34eaa0ac7837b5a717c2ba1f6229afd54463bdcfe62354720db3e2acff57a8c1","pages":2,"tokens":442,"emptyPages":[]},{"slug":"filing-20260708-5011","title":"Comments of Maven Solutions on the Commission's Show Cause Order regarding large-load interconnection tariff provisions","issued":"2026-07-08","accession":"20260708-5011","docket":"EL26-67-000","group":"PJM filings","filer":"MAVEN SOLUTIONS","kind":"comments","file":"sources/originals/20260708-5011_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260708-5011","sha256":"19d1d3a444195fc4bac958ec025b3dc691b37a72f2dc1fb4057bf9859bbd9419","pages":16,"tokens":4986,"emptyPages":[]},{"slug":"filing-20260708-5012","title":"Comments of Maven Solutions on the Show Cause Order regarding Civic Bankability Rating Standard to FERC's Five Reform Categories","issued":"2026-07-08","accession":"20260708-5012","docket":"EL26-67-000","group":"PJM filings","filer":"MAVEN SOLUTIONS","kind":"comments","file":"sources/originals/20260708-5012_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260708-5012","sha256":"19d1d3a444195fc4bac958ec025b3dc691b37a72f2dc1fb4057bf9859bbd9419","pages":16,"tokens":4986,"emptyPages":[]},{"slug":"filing-20260708-5018","title":"Supplemental Technical Comment of L.M. Marlowe on the integration of large, high-density electric loads and the associated reliability, observability, and cost-allocation methodologies under consideration by the Commission","issued":"2026-07-08","accession":"20260708-5018","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Individual No Affiliation","kind":"filing","file":"sources/originals/20260708-5018_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260708-5018","sha256":"285f5579e6e030bcf4c281d0903d66d6e18b5915b0a5aac529c9ad235ae0348d","pages":9,"tokens":3536,"emptyPages":[6]},{"slug":"filing-20260708-5103","title":"Motion to Intervene and Initial Comments of Global Capacity Alliance in response to FERC's 06/18/2026 Show Cause Order","issued":"2026-07-08","accession":"20260708-5103","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Global Capacity Alliance","kind":"comments","file":"sources/originals/20260708-5103_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260708-5103","sha256":"3891f5f85ddf5f9567bcd5d2dfbe139679f9cdf15e6506eaab91197a352a3e37","pages":4,"tokens":1662,"emptyPages":[]},{"slug":"filing-20260708-5207","title":"Motion of L.M. Marlowe for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement Judge","issued":"2026-07-08","accession":"20260708-5207","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Individual No Affiliation","kind":"motion","file":"sources/originals/20260708-5207_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260708-5207","sha256":"590f7636faf25554a4cdfc3a18e673f13e52b227497083d37bb1b2de3465b1b5","pages":3,"tokens":1083,"emptyPages":[]},{"slug":"filing-20260709-3012","title":"Errata to the Commission issued Order Instituting Proceeding Under Section 206 of the Federal Power Act; correcting the caption re ISO New England Inc. et al","issued":"2026-07-09","accession":"20260709-3012","docket":"EL26-72-000","group":"ISO-NE filings","filer":"SECRETARY OF THE COMMISSION, FERCCOMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)","kind":"errata","file":"sources/originals/20260709-3012_01.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260709-3012","sha256":"f1c7876e3ba404a898efd73af1475e4d7b8fd7d4c8fcaeabf860c4e26f897643","pages":null,"tokens":430,"emptyPages":[]},{"slug":"filing-20260709-5023","title":"Second Supplemental Technical Comment of L.M. Marlowe on the Frequency-Response Absorption Standard and Coupling-Discrimination Protocol","issued":"2026-07-09","accession":"20260709-5023","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Individual No Affiliation","kind":"filing","file":"sources/originals/20260709-5023_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260709-5023","sha256":"a6f3babf59b0d2d1c7f92f8a31a21d890d468b0a589b8640e7c3a78a7e2fa727","pages":4,"tokens":1621,"emptyPages":[]},{"slug":"filing-20260709-5287","title":"Motion to Intervene and Comments of Evan Pierce re the large-load interconnection tariff provisions","issued":"2026-07-09","accession":"20260709-5287","docket":"EL26-67-000","group":"PJM filings","filer":"Individual No Affiliation","kind":"comments","file":"sources/originals/20260709-5287_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260709-5287","sha256":"1feb71d7e777624167ee8d97016fcb821ba171f87563fc618badaf8f039e5339","pages":6,"tokens":2332,"emptyPages":[]},{"slug":"filing-20260715-5011","title":"Comments of Relentless Energy Systems LLC providing technical evidence and Xyce netlists demonstrating Geometric Phase Isolation, a Grid Enhancing Technology, for passive hardware-level VAR-offloading at Point-of-Load","issued":"2026-07-15","accession":"20260715-5011","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Relentless Energy Systems LLC","kind":"comments","file":"sources/originals/20260715-5011_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5011","sha256":"fde82fe634aca50ecb2db2007be8fa93ee69de2d611bbfb77d30b91c87b5810e","pages":3,"tokens":395,"emptyPages":[]},{"slug":"filing-20260715-5011-attachment-1","title":"GPI_Composite_Dashboard.pdf","issued":"2026-07-15","accession":"20260715-5011","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Relentless Energy Systems LLC","kind":"attachment","file":"sources/originals/20260715-5011_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5011","parent":"filing-20260715-5011","text_file":"20260715-5011_02.pdf.ocr.txt","sha256":"73b9aac69c8ce3e19567a118b7ab7c9c1b8ba115b4026611c99912b7d4ee5780","pages":2,"tokens":172,"emptyPages":[]},{"slug":"filing-20260715-5011-attachment-2","title":"RR-5D-LCFVR-GPI-ResilientResonance-Graph-Table.pdf","issued":"2026-07-15","accession":"20260715-5011","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Relentless Energy Systems LLC","kind":"attachment","file":"sources/originals/20260715-5011_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5011","parent":"filing-20260715-5011","text_file":"20260715-5011_03.pdf.ocr.txt","sha256":"e188156fe7fccd8dfe7ce67ca6f7d30c504f792cc1ee12012b29585a24b2d677","pages":1,"tokens":156,"emptyPages":[]},{"slug":"filing-20260715-5011-attachment-3","title":"SPECIFICATION.pdf","issued":"2026-07-15","accession":"20260715-5011","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Relentless Energy Systems LLC","kind":"attachment","file":"sources/originals/20260715-5011_04.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5011","parent":"filing-20260715-5011","sha256":"ed0fcb069ae0d4cc63c22e1c6ec500d3c134c9c202a7b04110a5ccdcc866f792","pages":21,"tokens":5397,"emptyPages":[]},{"slug":"filing-20260715-5011-attachment-4","title":"DRAWINGS.pdf","issued":"2026-07-15","accession":"20260715-5011","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"Relentless Energy Systems LLC","kind":"attachment","file":"sources/originals/20260715-5011_05.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5011","parent":"filing-20260715-5011","sha256":"0398673056cb75d3aa2fc5c616270cca7618a04b7cbaadae242c05f388e2f03e","pages":4,"tokens":39,"emptyPages":[]},{"slug":"filing-20260715-5116","title":"Answer of Southwest Power Pool Transmission Owner Group to L.M. Marlowe's 07/08/2026 Motion for Settlement Procedures","issued":"2026-07-15","accession":"20260715-5116","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool Transmission Owner Group","kind":"answer","file":"sources/originals/20260715-5116_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260715-5116","sha256":"16863b2d463b307d5ca30ec91eb84f8368e981249274647f85005f8c08b8844c","pages":6,"tokens":1423,"emptyPages":[]},{"slug":"filing-20260717-5246","title":"The Pennsylvania Office of Consumer Advocate submits Request for Clarification or, in the alternative, Rehearing of the 06/18/2026 Order","issued":"2026-07-17","accession":"20260717-5246","docket":"EL26-67-001","group":"PJM filings","filer":"Pennsylvania Office of Consumer Advocate","kind":"request","file":"sources/originals/20260717-5246_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260717-5246","sha256":"7f9b820dfcbe88d14667ea108f52c7934bcd8e45f661fc3d66ef933aa08b85e9","pages":28,"tokens":8843,"emptyPages":[]},{"slug":"filing-20260717-5258","title":"The Maryland Office of People's Counsel, et al. submit Request for Rehearing of the 06/18/2026 Order","issued":"2026-07-17","accession":"20260717-5258","docket":"EL26-67-001","group":"PJM filings","filer":"Maryland Office of People's CounselOHIO CONSUMERS' COUNSELDELAWARE DIVISION OF THE PUBLIC ADVOCATE ,OFFICE OF THE ILLINOIS ATTORNEY GENERAL ,","kind":"request","file":"sources/originals/20260717-5258_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260717-5258","sha256":"55abd0949a9d4b51e70ee8db437454dd4cbeadf4a241c682aaa83db71dad88e6","pages":30,"tokens":8051,"emptyPages":[]},{"slug":"filing-20260720-5172","title":"Exelon Corporation and FirstEnergy Service Company submit Request for Rehearing of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5172","docket":"EL26-67-001","group":"PJM filings","filer":"Exelon CorporationThe FirstEnergy Transmission Companies","kind":"request","file":"sources/originals/20260720-5172_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5172","sha256":"c21b865f999456b69c7eae0a4fccddc7256473b27b13933cd56f9343f79773b8","pages":33,"tokens":11932,"emptyPages":[]},{"slug":"filing-20260720-5198","title":"The Indicated PJM Transmission Owners submit Request for Clarification, or in the Alternative, Rehearing of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5198","docket":"EL26-67-001","group":"PJM filings","filer":"Indicated PJM Transmission Owners","kind":"request","file":"sources/originals/20260720-5198_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5198","sha256":"f0fe7f881559ab5486be034c467e4657c97b2521c37771f2598fbf7f83b32127","pages":10,"tokens":3070,"emptyPages":[]},{"slug":"filing-20260720-5218","title":"Eolian, L.P. submits Limited Request for Clarification or, In the Alternative, Rehearing of the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act","issued":"2026-07-20","accession":"20260720-5218","docket":"EL26-67-001","group":"PJM, NYISO, MISO, CAISO, ISO-NE filings","filer":"Eolian, L.P.","kind":"request","file":"sources/originals/20260720-5218_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5218","sha256":"7d234b5709c8f1ba8328d85eaa1a3cfa9f44c8dfe5cccd6e194d961edbfd8e45","pages":28,"tokens":8310,"emptyPages":[]},{"slug":"filing-20260722-5143","title":"Answer of Southwest Power Pool, Inc. in opposition to Motion for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement Judge of L.M. Marlowe","issued":"2026-07-22","accession":"20260722-5143","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"answer","file":"sources/originals/20260722-5143_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260722-5143","sha256":"0983778f0e690e6f94aff996f1b1d04d5a05652b319db57ca6d0182b9d1a6a46","pages":8,"tokens":1744,"emptyPages":[]},{"slug":"filing-20260722-5175","title":"Motion to Rescind Show Cause Order of Allegheny Electric Cooperative, Inc","issued":"2026-07-22","accession":"20260722-5175","docket":"EL26-67-000","group":"PJM filings","filer":"Allegheny Electric Cooperative, Inc.","kind":"motion","file":"sources/originals/20260722-5175_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260722-5175","sha256":"e5f9b9c770db336705ea3b3c984eb5157fc6834a6ae811a5b177dd44575e8818","pages":6,"tokens":1174,"emptyPages":[]},{"slug":"filing-20260728-5071","title":"Motion for Abeyance of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment Period","issued":"2026-07-28","accession":"20260728-5071","docket":"EL26-67-000","group":"PJM filings","filer":"Indicated PJM Transmission Owners","kind":"motion","file":"sources/originals/20260728-5071_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260728-5071","sha256":"68099cdc9e5ad5b8e9cadb97303e90f5b673ac4f50f4e713f950fd05c5f9ef72","pages":12,"tokens":3326,"emptyPages":[]},{"slug":"filing-20260728-5074","title":"Wabash Valley Power Association, Inc. submits Request for Issuance of an Errata to the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act","issued":"2026-07-28","accession":"20260728-5074","docket":"EL26-67-000","group":"PJM filings","filer":"Wabash Valley Power Association, Inc.","kind":"request","file":"sources/originals/20260728-5074_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260728-5074","sha256":"a879a6b974d2d35124206d2cd21dc282974aa1515b7c94423909f545e60b1bc5","pages":7,"tokens":1361,"emptyPages":[]},{"slug":"filing-20260728-5083","title":"Motion of Wabash Valley Power Association, Inc. for Request for Issuance of an Errata of the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act","issued":"2026-07-28","accession":"20260728-5083","docket":"EL26-70-000","group":"MISO filings","filer":"Wabash Valley Power Association, Inc.","kind":"motion","file":"sources/originals/20260728-5083_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260728-5083","sha256":"41d1c773401fc3951546100480f2b1160fdc77f530b56eabd1935a136cc5299c","pages":7,"tokens":1449,"emptyPages":[]},{"slug":"filing-20260731-5157","title":"Motion to Rescind Show Cause Order on behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California","issued":"2026-07-31","accession":"20260731-5157","docket":"EL26-71-000","group":"CAISO filings","filer":"Six Cities CA","kind":"motion","file":"sources/originals/20260731-5157_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5157","sha256":"ed8537798b22b6e87a5997ddf137ed81de3c54ec652a894483022356ba2d63f9","pages":6,"tokens":1229,"emptyPages":[]},{"slug":"filing-20260803-5106","title":"Answer in Support of the PJM Industrial Customer Coalition to the Motions for Extension and Abeyance by PJM Interconnection, L.L.C","issued":"2026-08-03","accession":"20260803-5106","docket":"EL26-67-000","group":"PJM filings","filer":"PJM Industrial Customer Coalition","kind":"answer","file":"sources/originals/20260803-5106_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5106","sha256":"1e8d58dfe0def165db82242d46dfae8049a4326edeba64213ad6aca08149bd2c","pages":5,"tokens":958,"emptyPages":[]},{"slug":"filing-20260803-5166","title":"Request for Abeyance of Southern California Edison Company, et al. in response to the Order issued on 06/18/2026","issued":"2026-08-03","accession":"20260803-5166","docket":"EL26-71-000","group":"CAISO filings","filer":"Southern California Edison CompanySan Diego Gas & Electric CompanyPacific Gas & Electric Company ,SunZia Transmission, LLC ,Citizens Sunrise Transmission LLC ,Citizens Sycamore-Penasquitos Transmission LLC ,Citizens S-Line Transmission LLC ,LS Power Grid California, LLC ,DesertLink, LLC ,Horizon West Transmission, LLC ,GridLiance West LLC ,Trans Bay Cable, LLC ,Viridon Path 15 LLC ,Valley Electric Association, Inc. ,Startrans IO, L.L.C. ,","kind":"request","file":"sources/originals/20260803-5166_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5166","sha256":"3db264502e19151cd857e32226b3e33eb59aa7965d004bed12cc39d521843c45","pages":13,"tokens":2774,"emptyPages":[]},{"slug":"filing-20260803-5170","title":"Motion to Hold Filing Obligation in Abeyance of DCR Transmission, L.L.C","issued":"2026-08-03","accession":"20260803-5170","docket":"EL26-71-000","group":"CAISO filings","filer":"DCR Transmission, L.L.C.","kind":"motion","file":"sources/originals/20260803-5170_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5170","sha256":"a79cecd49f7e9b702f6acbcf9a220eab221b44e8619809ab919580890f1a33fb","pages":16,"tokens":4247,"emptyPages":[]},{"slug":"filing-20260803-5202","title":"Motion to Rescind Show Cause Order as applied to Western Area Power Administration","issued":"2026-08-03","accession":"20260803-5202","docket":"EL26-71-000","group":"CAISO filings","filer":"Western Area Power Administration","kind":"motion","file":"sources/originals/20260803-5202_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5202","sha256":"f21b5c1f96518f3b591f85e63b82f41a3a7fe281e1356e5210090d7185c0b0a6","pages":6,"tokens":1124,"emptyPages":[]},{"slug":"filing-20260803-5210","title":"Request for Abeyance of the New York Transmission Owners and Request for Expedited Commission Action and Shortened Comment Period","issued":"2026-08-03","accession":"20260803-5210","docket":"EL26-69-000","group":"NYISO filings","filer":"Central Hudson Gas & Electric CorporationConsolidated Edison Company of New York, Inc.New York State Electric & Gas Corporation ,Niagara Mohawk Power Corporation d/b/a National Grid ,Orange and Rockland Utilities, Inc. ,Rochester Gas and Electric Corporation ,","kind":"request","file":"sources/originals/20260803-5210_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5210","sha256":"c32715bd75f1c791df6d79d7b247d23d8609d51db8152cdb0f4f2d1469d8ed0d","pages":31,"tokens":8655,"emptyPages":[]},{"slug":"filing-20260803-5227","title":"Conditional Motion for Abeyance on Behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California,","issued":"2026-08-03","accession":"20260803-5227","docket":"EL26-71-000","group":"CAISO filings","filer":"Six Cities CA","kind":"motion","file":"sources/originals/20260803-5227_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5227","sha256":"eb181e3eee2a62c7ddcddb1c1e525a55ada39317bf6357eccd911bb740d5dc9e","pages":6,"tokens":1368,"emptyPages":[]},{"slug":"filing-20260803-5234","title":"Answer of Constellation Energy Generation, LLC in support of PJM Interconnection, L.L.C.'s Motion for Abeyance","issued":"2026-08-03","accession":"20260803-5234","docket":"EL26-67-000","group":"PJM filings","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/originals/20260803-5234_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5234","sha256":"76b892a0ee562c62f7342673f8c400f34cb9ff2d585e7dd1c2990ece97709c53","pages":5,"tokens":1174,"emptyPages":[]},{"slug":"filing-20260803-5241","title":"Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of LS Power Grid New York Corporation I and New York Transco LLC","issued":"2026-08-03","accession":"20260803-5241","docket":"EL26-69-000","group":"NYISO filings","filer":"LS Power Grid New York Corporation INew York Transco LLC","kind":"answer","file":"sources/originals/20260803-5241_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5241","sha256":"d86d3bd52647731273c2295346cbb8e1ede4152aae7d0b8904903140495f1d3f","pages":10,"tokens":2739,"emptyPages":[]},{"slug":"filing-20260803-5261","title":"Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of Silver Run Electric, LLC","issued":"2026-08-03","accession":"20260803-5261","docket":"EL26-67-000","group":"PJM filings","filer":"Silver Run Electric, LLC","kind":"answer","file":"sources/originals/20260803-5261_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5261","sha256":"c15f2d68d392d42f8dce5c9552959527837292eda9a7f0349d172aaf19ce278f","pages":9,"tokens":2603,"emptyPages":[]},{"slug":"filing-20260803-5265","title":"Amended Joint Motion of Southwest Power Pool, Inc. et al. to Hold Section 206 Proceeding in Abeyance","issued":"2026-08-03","accession":"20260803-5265","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.AMERICAN ELECTRIC POWER SERVICE CORPORATIONEVERGY, INC. ,GRIDLIANCE HIGH PLAINS LLC ,ITC GREAT PLAINS LLC ,","kind":"motion","file":"sources/originals/20260803-5265_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5265","sha256":"a07f3b6849b6780764c71a4179e1bbdfe5359a6dc3c3a3ee8d373dd4ae017743","pages":23,"tokens":5605,"emptyPages":[]},{"slug":"filing-20260804-5159","title":"Answer of Constellation Energy Generation, LLC in response to Transmission Owner's 07/20/2026 Request for Clarification","issued":"2026-08-04","accession":"20260804-5159","docket":"EL26-67-000","group":"PJM filings","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/originals/20260804-5159_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260804-5159","sha256":"668810a3f180671270107fa324b466fc7b3f94f5e0c3a0e51f317e19472a1ae7","pages":4,"tokens":1105,"emptyPages":[]},{"slug":"filing-20260807-5123","title":"Comments of the Southwest Power Pool Regional State Committee in support of Southwest Power Pool, Inc.’s request for an extension of time until 11/20/2026 to respond to the FERC's 06/18/2026 Order to Show Cause","issued":"2026-08-07","accession":"20260807-5123","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool Regional State Committee","kind":"comments","file":"sources/originals/20260807-5123_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5123","sha256":"bd87e8dc04d1b5f445294792f7433f1678874ccf1612bd58a42c767a05bd53aa","pages":3,"tokens":492,"emptyPages":[]},{"slug":"filing-20260807-5150","title":"Comments of the Public Service Commission of the State of Missouri in support of Southwest Power Pool, Inc.'s et al. request for abeyance filed 08/03/2026","issued":"2026-08-07","accession":"20260807-5150","docket":"EL26-68-000","group":"SPP filings","filer":"Missouri Public Service Commission","kind":"comments","file":"sources/originals/20260807-5150_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5150","sha256":"10b96ea28199ba96b4e32b3b0eb32be99421abf30cafa39bd8d4a5601711e6d6","pages":5,"tokens":1251,"emptyPages":[]},{"slug":"filing-20260807-5186","title":"Answer of the Organization of MISO States, Inc. in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion to Hold Proceeding in Abeyance","issued":"2026-08-07","accession":"20260807-5186","docket":"EL26-70-000","group":"MISO filings","filer":"Organization of MISO States, Inc.","kind":"answer","file":"sources/originals/20260807-5186_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5186","sha256":"3ecd2aa2dbce42fa4c45eb0656a79b150c053a737a5fefb6e1f166e67a15bfbf","pages":8,"tokens":1990,"emptyPages":[]},{"slug":"filing-20260807-5196","title":"Answer of the New England States Committee on Electricity in Response to Joint Motion for Abeyance filed by ISO New England, Inc. et al","issued":"2026-08-07","accession":"20260807-5196","docket":"EL26-72-000","group":"ISO-NE filings","filer":"New England States Committee on Electricity","kind":"answer","file":"sources/originals/20260807-5196_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5196","sha256":"934d6705f3d9a8a61386b45c34e3f5625c56d7bb225269bca07dbf42085a6c2c","pages":6,"tokens":1142,"emptyPages":[]},{"slug":"filing-20260807-5199","title":"Answer of American Municipal Power, Inc. in Response to the Motion to Hold Abeyance filed by Midcontinent Independent System Operator, Inc. et al","issued":"2026-08-07","accession":"20260807-5199","docket":"EL26-70-000","group":"MISO filings","filer":"American Municipal Power, Inc.","kind":"answer","file":"sources/originals/20260807-5199_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5199","sha256":"e3f12bf5083e3ed802bd500a25e400180f64c8a43ea871ba8a08d0d852acd6ed","pages":13,"tokens":2280,"emptyPages":[]},{"slug":"filing-20260807-5215","title":"Answer of Corporate Energy Buyers Association in Support of California Independent System Operator Corporation's et al. 08/03/2026 et al. Motion for Abeyance","issued":"2026-08-07","accession":"20260807-5215","docket":"EL26-71-000","group":"CAISO filings","filer":"Corporate Energy Buyers Association","kind":"answer","file":"sources/originals/20260807-5215_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5215","sha256":"4cd6634fda25212c3a349aaba68d784f6f80920b2e31c90d0b2f6cbf2d1b19a5","pages":3,"tokens":477,"emptyPages":[]},{"slug":"filing-20260807-5216","title":"Answer of Corporate Energy Buyers Association in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion for Abeyance","issued":"2026-08-07","accession":"20260807-5216","docket":"EL26-70-000","group":"MISO filings","filer":"Corporate Energy Buyers Association","kind":"answer","file":"sources/originals/20260807-5216_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5216","sha256":"13118fdcc6dee90d3e98eec8749a84f1ab52d2c5fc35cd5a4114bc111ef9523d","pages":3,"tokens":404,"emptyPages":[]},{"slug":"filing-20260807-5219","title":"Answer of Corporate Energy Buyers Association in support of PJM Interconnection, L.L.C.'s et al. 07/28/2026 Motion for Abeyance","issued":"2026-08-07","accession":"20260807-5219","docket":"EL26-67-000","group":"PJM filings","filer":"Corporate Energy Buyers Association","kind":"answer","file":"sources/originals/20260807-5219_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5219","sha256":"ff25d6d44bcf6c1af7c9201eb4d8b666afc6ec2507164fbc6355337c7c726ead","pages":3,"tokens":435,"emptyPages":[]},{"slug":"filing-20260807-5220","title":"Answer of Corporate Energy Buyers Association in Support of the Amended Motion for Abeyance filed on 08/03/2026 by Southwest Power Pool, Inc. et al","issued":"2026-08-07","accession":"20260807-5220","docket":"EL26-68-000","group":"SPP filings","filer":"Corporate Energy Buyers Association","kind":"answer","file":"sources/originals/20260807-5220_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260807-5220","sha256":"13ecdb68a201b4a2686cdfd8bceb43b06017270a05b378cf801bca34977069f9","pages":3,"tokens":434,"emptyPages":[]},{"slug":"filing-20260810-5108","title":"Comments of the Natural Gas Supply Association on the Informational Reports re Resource Adequacy Measures and Proposals, PJM Interconnection L.L.C., et al","issued":"2026-08-10","accession":"20260810-5108","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"NATURAL GAS SUPPLY ASSOCIATION (DC)","kind":"comments","file":"sources/originals/20260810-5108_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260810-5108","sha256":"be7564d73a92cdea55a64fad269bf3f5911cffb8528f473a9fbbf9e85b7b5aa4","pages":3,"tokens":842,"emptyPages":[]},{"slug":"filing-20260812-5036","title":"Comments of Sparkfund on Midcontinent Independent System Operator Inc.’s Informational Report filed on 07/20/2026","issued":"2026-08-12","accession":"20260812-5036","docket":"EL26-70-000","group":"MISO filings","filer":"Sparkfund","kind":"comments","file":"sources/originals/20260812-5036_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260812-5036","sha256":"8d2a1b1fbd6b04a5a3dcb306406c5c56b5ffe54ac08d9b76d85ebe49b90b0adf","pages":4,"tokens":966,"emptyPages":[]},{"slug":"filing-20260814-5198","title":"Comments of the Organization of MISO States, Inc. on the Informational Report of the Midcontinent Independent System Operator, Inc. filed on 07/20/2026","issued":"2026-08-14","accession":"20260814-5198","docket":"EL26-70-000","group":"MISO filings","filer":"Organization of MISO States, Inc.","kind":"comments","file":"sources/originals/20260814-5198_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260814-5198","sha256":"9b19c86df6751de48fed202901c1e5774c81471fe8e663a3e64d8eff8822754d","pages":7,"tokens":1586,"emptyPages":[]},{"slug":"filing-20260814-5244","title":"PJM Interconnection, L.L.C. submits tariff filing per : Supplemental Filing of Croop Affidavit in ER26-3380 to be effective N/A","issued":"2026-08-14","accession":"20260814-5244","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20260814-5244_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5244","mirror":"https://www.pjm.com/pjmfiles/directory/etariff/FercDockets/9829/20260814-er26-3380-000.pdf","sha256":"9a645549a2f58c9e4743b8de42cee7c77c311f3d4f2c080c57a59a937322b188","pages":22,"tokens":3334,"emptyPages":[]},{"slug":"filing-20260819-5134","title":"Comments of the Illinois Commerce Commission in support of PJM Interconnection, L.L.C.’s 07/31/2026 filing","issued":"2026-08-19","accession":"20260819-5134","docket":"ER26-3380-000","group":"PJM filings","filer":"Illinois Commerce Commission","kind":"comments","file":"sources/originals/20260819-5134_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260819-5134","sha256":"1154f23903589a43650328526c68eef2bcd45a05256f0ceff41afa9b2bad8694","pages":9,"tokens":2134,"emptyPages":[]},{"slug":"filing-20260821-5096","title":"Comments of the Organization of PJM States, Inc. in support of PJM Interconnection, L.L.C.’s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5096","docket":"ER26-3380-000","group":"PJM filings","filer":"Organization of PJM States, Inc.","kind":"comments","file":"sources/originals/20260821-5096_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5096","mirror":"https://opsi.us/wp-content/uploads/2026/08/OPSI-ER26-3380-000-RBP-Comments.pdf","sha256":"524dd309d58000166d48f2b237418d01420ac3ab034c2b2fc4e0ed5018fa46c8","pages":5,"tokens":1213,"emptyPages":[]},{"slug":"filing-20260821-5145","title":"Comments of Public Service Commission of West Virginia in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal","issued":"2026-08-21","accession":"20260821-5145","docket":"ER26-3380-000","group":"PJM filings","filer":"Public Service Commission of West Virginia","kind":"comments","file":"sources/originals/20260821-5145_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5145","sha256":"c1bb720518255106e15e5a983fbafb97e5e05f224c6d73880b52f8e48bcdeb96","pages":7,"tokens":1952,"emptyPages":[]},{"slug":"filing-20260821-5176","title":"Comments of PJM Industrial Customer Coalition on PJM Interconnection, L.L.C.’s Reliability Backstop Procurement Proposal","issued":"2026-08-21","accession":"20260821-5176","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Industrial Customer Coalition","kind":"comments","file":"sources/originals/20260821-5176_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5176","sha256":"7facc14dd714c14db8df5f21027365ffe4a1c4b526fc46feda950e2fa70abe87","pages":11,"tokens":2946,"emptyPages":[]},{"slug":"filing-20260821-5180","title":"Limited Protest of Sierra Club et al. to one aspect of PJM Interconnection, LLC’s proposed Reliability Backstop Procurement","issued":"2026-08-21","accession":"20260821-5180","docket":"ER26-3380-000","group":"PJM filings","filer":"Sierra ClubNatural Resources Defense Council","kind":"filing","file":"sources/originals/20260821-5180_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5180","mirror":"https://sustainableferc.org/wp-content/uploads/2026/08/20260821-5180_Limited-Protest-of-Public-Interest-Organizations.pdf","sha256":"cdcd999fa9ff74dfe38b9920c469c1927d6d8df827ddf23fced9991f77e3d742","pages":43,"tokens":12758,"emptyPages":[]},{"slug":"filing-20260821-5183","title":"Protest, Motion to Reject, and Alternative Request for the Imposition of Conditions of Delaware Division of the Public Advocate et al","issued":"2026-08-21","accession":"20260821-5183","docket":"ER26-3380-000","group":"PJM filings","filer":"Delaware Division of the Public AdvocateDistrict of Columbia Office of People's CounselIllinois Citizens Utility Board ,Maryland Office of the People's Counsel ,New Jersey Division of Rate Counsel ,Office of the Illinois Attorney General ,","kind":"motion","file":"sources/originals/20260821-5183_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5183","sha256":"e280af49f099cd9e42a9d0ac0618baae4ca5258975c3350e3500781bbabc747b","pages":38,"tokens":12346,"emptyPages":[]},{"slug":"filing-20260821-5217","title":"Protest of the Pennsylvania Office of Consumer Advocate to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal","issued":"2026-08-21","accession":"20260821-5217","docket":"ER26-3380-000","group":"PJM filings","filer":"Pennsylvania Office of Consumer Advocate","kind":"filing","file":"sources/originals/20260821-5217_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5217","sha256":"a8e680b578c6427d73d9da46b0dbdfd7f882d89b09f696aa689737ededceaa04","pages":31,"tokens":9866,"emptyPages":[]},{"slug":"filing-20260821-5281","title":"The Ohio Consumers' Counsel submits Protest and Request for Rejection of Filing or in the Alternative for Evidentiary Hearings and/or Settlement Proceedings re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing","issued":"2026-08-21","accession":"20260821-5281","docket":"ER26-3380-000","group":"PJM filings","filer":"Office of the Ohio Consumers' Counsel","kind":"request","file":"sources/originals/20260821-5281_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5281","sha256":"8bc2954ddf4f790bdb8c9238083c8395cf07a4639e3c97c66938db5f8110cee1","pages":22,"tokens":6428,"emptyPages":[]},{"slug":"filing-20260821-5306","title":"Comments of the Data Center Coalition in response to PJM Interconnection, L.L.C.’s 07/31/2026 proposed tariff filing to establish the Reliability Backstop Procurement","issued":"2026-08-21","accession":"20260821-5306","docket":"ER26-3380-000","group":"PJM filings","filer":"Data Center Coalition","kind":"comments","file":"sources/originals/20260821-5306_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5306","sha256":"e6c9f5a0c6ff9d73c3d42e633d6174aa6e438f30b6cfa067f6f18b956f53ed07","pages":10,"tokens":2385,"emptyPages":[]},{"slug":"filing-20260821-5317","title":"Protest of the Independent Market Monitor for PJM re PJM Interconnection, LLC's 07/31/2026 proposed Reliability Backstop Procurement filing","issued":"2026-08-21","accession":"20260821-5317","docket":"ER26-3380-000","group":"PJM filings","filer":"Monitoring Analytics, LLC","kind":"filing","file":"sources/originals/20260821-5317_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260821-5317","sha256":"5691314f7dd1816b1e2fdcb12313e961644b93176ce8f6eb3789fbab7b62c9b7","pages":42,"tokens":13452,"emptyPages":[]},{"slug":"filing-20260828-5287","title":"Motion for Extension of Time of the Organization of PJM States, Inc. to submit comments in response to PJM Interconnection, L.L.C.'s 08/13/2026 proposal","issued":"2026-08-28","accession":"20260828-5287","docket":"ER26-3515-000","group":"PJM filings","filer":"Organization of PJM States, Inc.","kind":"comments","file":"sources/originals/20260828-5287_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260828-5287","mirror":"https://opsi.us/wp-content/uploads/2026/09/ER26-3515-000-IRAS-Extension-Request.pdf","sha256":"d4a2cb8b10279706c0ebe0b8586f25630a51e2b939c247b2a21790a216b11346","pages":4,"tokens":820,"emptyPages":[]},{"slug":"filing-20260901-5028","title":"Answer of the Pennsylvania Public Utility Commission in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in response to PJM Interconnection, L.L.C.’s filing","issued":"2026-09-01","accession":"20260901-5028","docket":"ER26-3515-000","group":"PJM filings","filer":"Pennsylvania Public Utility Commission","kind":"comments","file":"sources/originals/20260901-5028_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260901-5028","sha256":"9e70754aba977407925d3346100ad47af31a6f7ea0f7549c73b673329ba529aa","pages":4,"tokens":753,"emptyPages":[]},{"slug":"filing-20260902-5107","title":"Answer of Southern Regulators in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026","issued":"2026-09-02","accession":"20260902-5107","docket":"ER26-3552-000","group":"MISO filings","filer":"Mississippi Public Service CommissionLouisiana Public Service CommissionArkansas Public Service Commission ,Council of the City of New Orleans, Louisiana ,","kind":"answer","file":"sources/originals/20260902-5107_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260902-5107","sha256":"02ab3abc0cd562f8c71110235a6f51cda90d4cfd2c7d7b66c4c3abdc73b21a5d","pages":4,"tokens":710,"emptyPages":[]},{"slug":"filing-20260903-5021","title":"Answer of Mississippi Public Service Commission et al. in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026","issued":"2026-09-03","accession":"20260903-5021","docket":"ER26-3552-000","group":"MISO filings","filer":"Mississippi Public Service CommissionLouisiana Public Service CommissionCouncil of the City of New Orleans, Louisiana ,Arkansas Public Service Commission ,","kind":"answer","file":"sources/originals/20260903-5021_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260903-5021","sha256":"6ec9d32e840f5df554e98b6a9ab6ef41c20eabd4a98aa215bbf16b17cef718d0","pages":4,"tokens":717,"emptyPages":[]},{"slug":"filing-20260903-5199","title":"Motion to Intervene and Protest of the Data Center Coalition to PJM Interconnection, L.L.C.’s proposal to establish Interim Resource Adequacy Service and a Large Load Registry","issued":"2026-09-03","accession":"20260903-5199","docket":"ER26-3515-000","group":"PJM filings","filer":"Data Center Coalition","kind":"motion","file":"sources/originals/20260903-5199_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260903-5199","sha256":"b2e7e478d0ba9e16fc7d5fe79c76e2cab402c92d63ab9425f68e6f61bcebdaae","pages":71,"tokens":15543,"emptyPages":[]},{"slug":"filing-20260903-5206","title":"Comments of the Pennsylvania Public Utility Commission to the Proposal of PJM Interconnection, L.L.C. to establish Interim Resource Adequacy Service and Large Load Registry to address System Reliability","issued":"2026-09-03","accession":"20260903-5206","docket":"ER26-3515-000","group":"PJM filings","filer":"Pennsylvania Public Utility Commission","kind":"comments","file":"sources/originals/20260903-5206_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260903-5206","sha256":"a4c0d5023283667f5280b153113dcfdd77b223354be442f8001157b266e3ac50","pages":10,"tokens":2210,"emptyPages":[]},{"slug":"filing-20260903-5212","title":"Protest and Comments of Joint Consumer Advocates on the 08/13/2026 filing by PJM Interconnection, L.L.C","issued":"2026-09-03","accession":"20260903-5212","docket":"ER26-3515-000","group":"PJM filings","filer":"Delaware Division of the Public AdvocateDistrict of Columbia Office of People's CounselIllinois Citizens Utility Board ,Maryland Office of People's Counsel ,New Jersey Division of Rate Counsel ,Office of the Illinois Attorney General ,","kind":"comments","file":"sources/originals/20260903-5212_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260903-5212","sha256":"cb8f02622e1a1fc6f86c837d433d3f8d003d400a3bb07edaa6607a8ce750d6f9","pages":41,"tokens":13118,"emptyPages":[]},{"slug":"filing-20260908-5329","title":"Motion to Intervene and Comments of Consumers Energy Company re the 08/18/2026 filing by Midcontinent Independent System Operator, Inc","issued":"2026-09-08","accession":"20260908-5329","docket":"ER26-3552-000","group":"MISO filings","filer":"Consumers Energy Company","kind":"comments","file":"sources/originals/20260908-5329_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260908-5329","sha256":"5c60d55f74dac524650cf091294087c28c8c3c9f2586a9d0ebd9118364f8a37e","pages":6,"tokens":1231,"emptyPages":[]},{"slug":"filing-20260908-5341","title":"Protest of Community Collaboration on Climate Change, et al. re the Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish the Zero Injection Generator Interconnection Agreement","issued":"2026-09-08","accession":"20260908-5341","docket":"ER26-3552-000","group":"MISO filings","filer":"Community Collaboration on Climate ChangeMichigan Environmental Justice CoalitionMidwest Tribal Energy Resources Association ,Sierra Club ,Natural Resources Defense Council ,Clean Grid Alliance ,","kind":"filing","file":"sources/originals/20260908-5341_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5341","mirror":"https://sustainableferc.org/wp-content/uploads/2026/09/ER26-3552-Community-Orgs-and-Clean-Energy-Advocates-Protest.pdf","sha256":"460e52ad30528d82dc2268ae49cba9e9cb6a7e0a2b11e5e6a463d77a968a2d12","pages":32,"tokens":9334,"emptyPages":[]},{"slug":"filing-20260910-4000","title":"Comments of U.S. House of Representatives Victoria Spartz requesting independent federal review of the energy generation, grid resiliency, transmission, water-resource, and consumer-cost implications etc","issued":"2026-09-10","accession":"20260910-4000","docket":"EL26-70-000","group":"MISO filings","filer":"US HOUSE OF REPRESENTATIVES","kind":"comments","file":"sources/originals/20260910-4000_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260910-4000","sha256":"dff41b3156cf3d31761cb698ccb03f0e1e45e4fedbf41f3d67a29b5a78386c0b","pages":5,"tokens":1667,"emptyPages":[]},{"slug":"filing-20260910-5296","title":"Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to Comments and Protests re the 07/31/2026 revised Open Access Transmission Tariff filing et al","issued":"2026-09-10","accession":"20260910-5296","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"comments","file":"sources/originals/20260910-5296_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260910-5296","mirror":"https://www.pjm.com/-/media/DotCom/documents/ferc/filings/2026/20260910-er26-3380-000.pdf","sha256":"d4178f9996d3c6252e5f39ef4be7a1d1aed47bc33ab160725e316443cc95677c","pages":112,"tokens":36584,"emptyPages":[]},{"slug":"filing-20260911-5203","title":"Motion for Acceptance of Late-Filed Comments and Comments in Conditional Support of the Organization of MISO States, Inc. re Midcontinent Independent System Operator, Inc.’s proposed tariff revisions","issued":"2026-09-11","accession":"20260911-5203","docket":"ER26-3552-000","group":"MISO filings","filer":"Organization of MISO States, Inc.","kind":"comments","file":"sources/originals/20260911-5203_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260911-5203","sha256":"7b670e5cab16dd60ac2aa432d9d65334d46fc86eb1b4e5ecdf08fa4dc31ab6bf","pages":15,"tokens":3579,"emptyPages":[]},{"slug":"filing-20260918-5272","title":"Motion to Intervene and Comments of Central Municipal Power Agency/Services et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5272","docket":"ER26-3650-000","group":"MISO filings","filer":"CENTRAL MINNESOTA MUNICIPAL POWER AGENCYIndiana Municipal Power AgencyMissouri Joint Municipal Electric Utility Commission ,WPPI Energy ,","kind":"comments","file":"sources/originals/20260918-5272_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260918-5272","sha256":"a5a9cb434e542dcc5004351608b7c710ff1be59b69d45bf713a8ac42e0bad61c","pages":21,"tokens":5334,"emptyPages":[]},{"slug":"filing-20260918-5323","title":"Protest of Mississippi Public Service Commission et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5323","docket":"ER26-3650-000","group":"MISO filings","filer":"Mississippi Public Service CommissionArkansas Public Service Commission","kind":"filing","file":"sources/originals/20260918-5323_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260918-5323","sha256":"331b0be8140b667173995823d0ea5ad3842ee6e82199c31844675e1fa93575fc","pages":4,"tokens":684,"emptyPages":[]},{"slug":"filing-20260918-5333","title":"Protest of Iowa Office of Consumer Advocate et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5333","docket":"ER26-3650-000","group":"MISO filings","filer":"Iowa Office of Consumer AdvocateIllinois Attorney General's OfficeIllinois Citizens Utility Board ,Michigan Attorney General ,Citizens Utility Board of Michigan ,Citizens Utility Board of Minnesota ,Citizens Utility Board of Wisconsin ,Citizens Action Coalition of Indiana, Inc. ,ALLIANCE FOR AFFORDABLE ENERGY ,","kind":"filing","file":"sources/originals/20260918-5333_01.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260918-5333","sha256":"18706aa74c81fd37af04fa87e8c787bed8697ed8fc55e1cb23e345cea9de3f74","pages":null,"tokens":1603,"emptyPages":[]},{"slug":"filing-20260918-5397","title":"Protest of Sierra Club et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5397","docket":"ER26-3650-000","group":"MISO filings","filer":"Sierra ClubNatural Resources Defense CouncilEnvironmental Law and Policy Center ,Clean Wisconsin ,UNION OF CONCERNED SCIENTISTS ,Sustainable FERC Project ,Fresh Energy ,","kind":"filing","file":"sources/originals/20260918-5397_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5397","mirror":"https://sustainableferc.org/wp-content/uploads/2026/10/ER26-3650-Protest-of-Public-Interest-Organizations-MISO-Interconnection-Requirements-for-Large-Loads.pdf","sha256":"ef2bd68b7446322ee2ff61ab0086034691416f4f0eaee2dbbfdbe342c924dcd9","pages":30,"tokens":9540,"emptyPages":[]},{"slug":"filing-20260918-5412","title":"Motion to Intervene and Comments of the Data Center Coalition re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5412","docket":"ER26-3650-000","group":"MISO filings","filer":"Data Center Coalition","kind":"comments","file":"sources/originals/20260918-5412_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260918-5412","sha256":"20bbad72479dde41d3ffc39ade55fc623b5cb6573ae610ca29bd63a2461395d8","pages":32,"tokens":9317,"emptyPages":[]},{"slug":"filing-20260925-5208","title":"Answer and Motion for Leave to Answer of the Independent Market Monitor for PJM Interconnection, L.L.C. to the Answer of PJM Interconnection, L.L.C. filed on 09/10/2026","issued":"2026-09-25","accession":"20260925-5208","docket":"ER26-3380-000","group":"PJM filings","filer":"Monitoring Analytics, LLC","kind":"answer","file":"sources/originals/20260925-5208_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260925-5208","sha256":"88400af045854979c5c49d3369c43e3c159d22db2df918b782fc5d8600a5d4ee","pages":33,"tokens":11223,"emptyPages":[]},{"slug":"filing-20260928-4001","title":"Comments of U.S. House of Representatives Committee on Energy and Commerce Ranking Member Frank Pallone, Jr. urging FERC to make important improvements, approve amended proposals, etc. re energy costs from data centers,","issued":"2026-09-28","accession":"20260928-4001","docket":"ER26-3380-000","group":"PJM filings","filer":"COMMITTEE ON ENERGY AND COMMERCE","kind":"comments","file":"sources/originals/20260928-4001_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260928-4001","mirror":"https://democrats-energycommerce.house.gov/sites/evo-subsites/democrats-energycommerce.house.gov/files/evo-media-document/ferc.2026.09.28-letter.pdf","sha256":"4d2865873efee72c458a23c7472b6dc3371441577d0be02e221e0ac2198c4d07","pages":4,"tokens":1686,"emptyPages":[]},{"slug":"filing-20261001-5390","title":"Comments of Jessica Kivell asking the Commission to keep transparency, cost responsibility, reliable planning, and protection of existing customers at the center of the proceeding","issued":"2026-10-01","accession":"20261001-5390","docket":"EL26-70-000","group":"MISO filings","filer":"Individual No Affiliation","kind":"comments","file":"sources/originals/20261001-5390_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261001-5390","sha256":"73f3da8500959dcd4cf8de14e89f0c4ceac1aad17a37f05268d2b579b718f8b0","pages":1,"tokens":134,"emptyPages":[]},{"slug":"filing-20261001-5390-attachment-1","title":"FERC_Public_Comment.pdf","issued":"2026-10-01","accession":"20261001-5390","docket":"EL26-70-000","group":"MISO filings","filer":"Individual No Affiliation","kind":"attachment","file":"sources/originals/20261001-5390_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261001-5390","parent":"filing-20261001-5390","sha256":"9cd1bb986c64852815caecfdc64c3feecde77de3b38151384a50243bc8386e25","pages":5,"tokens":1611,"emptyPages":[]},{"slug":"filing-20261002-5120","title":"Motion for Leave to Answer and Answer of Coalition of MISO Transmission Customers et al. to the Joint Protest of the Sierra Club et al","issued":"2026-10-02","accession":"20261002-5120","docket":"ER26-3650-000","group":"MISO filings","filer":"Coalition of MISO Transmission CustomersIllinois Industrial Energy ConsumersAssociation of Businesses Advocating Tariff Equity ,NIPSCO Large Customer Group ,Louisiana Energy Users Group ,Texas Industrial Energy Consumers ,","kind":"answer","file":"sources/originals/20261002-5120_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261002-5120","sha256":"f9439d379cc07295f47b1e4a6167f5fadd488759b3210d51232dff9a8a1d08da","pages":11,"tokens":2786,"emptyPages":[]},{"slug":"filing-20261008-5175","title":"Motion for Leave to Answer and Answer of Community Organizations and Clean Energy Advocates to Midcontinent Independent System Operator, Inc.’s 09/23/2026 Answer","issued":"2026-10-08","accession":"20261008-5175","docket":"ER26-3552-000","group":"MISO filings","filer":"Natural Resources Defense CouncilSierra ClubCommunity Collaboration on Climate Change ,Michigan Environmental Justice Coalition ,","kind":"answer","file":"sources/originals/20261008-5175_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261008-5175","mirror":"https://sustainableferc.org/wp-content/uploads/2026/10/ZGIA_Answer.pdf","sha256":"8807355b3cd192b33de3e88f461750ba7f4029cddd3f41f4d5652409139fd372","pages":72,"tokens":19689,"emptyPages":[]},{"slug":"filing-20261013-5440","title":"Motion for Leave to Answer and Answer of Midcontinent Independent System Operator Inc. to the Comments and Protests re the proposal to establish Interconnection Reliability Requirements for Large Loads","issued":"2026-10-13","accession":"20261013-5440","docket":"ER26-3650-000","group":"MISO filings","filer":"Midcontinent Independent System Operator Inc.","kind":"comments","file":"sources/originals/20261013-5440_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261013-5440","sha256":"52151a0f91fa5675f4e97f9b1e18d311818bea79b25f2d892b907201553342b5","pages":35,"tokens":9521,"emptyPages":[]},{"slug":"filing-20261026-4001","title":"Comments of the National Congress of American Indians urging FERC for a Moratorium on Hyperscale Data Center Approvals Pending Comprehensive Grid Reliability and Ratepayer Impact Assessments","issued":"2026-10-26","accession":"20261026-4001","docket":"EL26-67-000","group":"PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings","filer":"NATIONAL CONGRESS OF AMERICAN INDIANS","kind":"comments","file":"sources/originals/20261026-4001_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261026-4001","sha256":"5b693489a159013d93a342e494e5f3fda2659ac06a5da309b1883709a17e30c0","pages":2,"tokens":634,"emptyPages":[]},{"slug":"filing-20261028-5128","title":"Motion for Leave to Answer and Answer of Central Municipal Power Agency Services, et al. to Midcontinent Independent System Operator, Inc.’s 10/13/2026 Motion for Leave to Answer and Answer","issued":"2026-10-28","accession":"20261028-5128","docket":"ER26-3650-000","group":"MISO filings","filer":"Central Municipal Power Agency/ServicesMissouri Joint Municipal Electric Utility CommissionWPPI Energy ,Indiana Municipal Power Agency ,","kind":"answer","file":"sources/originals/20261028-5128_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261028-5128","sha256":"179870ac37409ecfeb6e2d73dde290c76921cab31362eaa10a6f34e1a93184ec","pages":9,"tokens":2062,"emptyPages":[]},{"slug":"filing-20261103-5190","title":"Motion for Leave to Answer and Answer of the Data Center Coalition re the 10/13/2026 Answer of Midcontinent Independent System Operator, Inc. et al","issued":"2026-11-03","accession":"20261103-5190","docket":"ER26-3650-000","group":"MISO filings","filer":"Data Center Coalition","kind":"answer","file":"sources/originals/20261103-5190_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261103-5190","sha256":"01a547cf9dc70445ccc1bc696ce887b5ebdd4f2d1ce45fc709b2924f047824d9","pages":21,"tokens":6181,"emptyPages":[]},{"slug":"filing-ad26-7-pjm-governance-vote","title":"PJM informational filing on the September 30, 2026 Members Committee vote on governance term sheets","issued":"2026-09-30","accession":"20261001-5164","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM","kind":"informational filing","file":"sources/originals/20261001-5164_20260930-ad26-7-000.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261001-5164","sha256":"bdf1461bc9d05a792450d238a440f70e6956c3009e6fa120e2c5f810f709c367","pages":2,"tokens":332,"emptyPages":[]},{"slug":"filing-er26-3380-pjm-original","title":"PJM proposes its first reliability backstop procurement","issued":"2026-07-31","accession":"20260731-5214","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20260731-5214_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5214","sha256":"e96deb3b5cbe4ed23eb3ee234a27c6d4a38b887bc1d6aa507dba9f90856e4b65","pages":142,"tokens":43966,"emptyPages":[]},{"slug":"filing-er26-3380-pjm-original-attachment-1","title":"Attachment A - Marked Tariff Records.pdf","issued":"2026-07-31","accession":"20260731-5214","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260731-5214_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5214","parent":"filing-er26-3380-pjm-original","sha256":"355b06c95cd0c69126eaeaa9f29b04da0d9c0f530cbdf5c681551d2350e245ac","pages":165,"tokens":64462,"emptyPages":[]},{"slug":"filing-er26-3380-pjm-original-attachment-2","title":"Attachment B - Clean Tariff Records.pdf","issued":"2026-07-31","accession":"20260731-5214","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260731-5214_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5214","parent":"filing-er26-3380-pjm-original","sha256":"b359e6150f6323d9178d079475f84129fd63b5bb68c73a6f1db01ad7d8d9963f","pages":165,"tokens":64428,"emptyPages":[]},{"slug":"filing-er26-3380-pjm-original-attachment-3","title":"Attachment C - Croop Affidavit.pdf","issued":"2026-07-31","accession":"20260731-5214","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260731-5214_04.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5214","parent":"filing-er26-3380-pjm-original","text_file":"20260731-5214_04.txt","sha256":"912dbc5b83b638428ec9ee76eb873c70514a5df128c66b6df374c71a92be9da3","pages":26,"tokens":7950,"emptyPages":[]},{"slug":"filing-er26-3380-pjm-original-attachment-4","title":"Attachment D - Kelly Affidavit.pdf","issued":"2026-07-31","accession":"20260731-5214","docket":"ER26-3380-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260731-5214_05.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260731-5214","parent":"filing-er26-3380-pjm-original","text_file":"20260731-5214_05.txt","sha256":"e210f4ebfb3a8e3798e5c6c100d42daab64040c66f0ebb5f38d4d453228bd276","pages":8,"tokens":2384,"emptyPages":[]},{"slug":"filing-er26-3515-pjm-iras","title":"PJM proposes a large-load registry, interim service and bring-your-own capacity","issued":"2026-08-13","accession":"20260813-5118","docket":"ER26-3515-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20260813-5118_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260813-5118","sha256":"c8e685cd114c739dbd879674f3e913b77f16f18ef2d6d3ff0ab14db8b5322f3a","pages":132,"tokens":42328,"emptyPages":[]},{"slug":"filing-er26-3515-pjm-iras-attachment-1","title":"Attachment A- Marked Tariff 4919-3670-8807 v.1.pdf","issued":"2026-08-13","accession":"20260813-5118","docket":"ER26-3515-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260813-5118_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260813-5118","parent":"filing-er26-3515-pjm-iras","sha256":"9d634285694586181ff073c6a1d65b01d66cfee7adcec30cea28c8cba8cbcd60","pages":145,"tokens":52020,"emptyPages":[]},{"slug":"filing-er26-3515-pjm-iras-attachment-2","title":"Attachment B- Clean Tariff 4930-8837-2935 v.2.pdf","issued":"2026-08-13","accession":"20260813-5118","docket":"ER26-3515-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260813-5118_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260813-5118","parent":"filing-er26-3515-pjm-iras","sha256":"5f94d6023ed2841252d4c46afb266577e2173d72631b2b83f2af59c9845e948e","pages":145,"tokens":52007,"emptyPages":[]},{"slug":"filing-er26-3515-pjm-iras-attachment-3","title":"Attachment C IRAS - Pilong Affifdavit .pdf","issued":"2026-08-13","accession":"20260813-5118","docket":"ER26-3515-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/originals/20260813-5118_04.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260813-5118","parent":"filing-er26-3515-pjm-iras","sha256":"6bd9e23954ca7a2502f1c60404d418121c7a2544456762fa1aa050ba8e3dfacf","pages":13,"tokens":4169,"emptyPages":[]},{"slug":"filing-er26-3552-miso-zgia","title":"MISO proposes a zero-injection generator interconnection agreement","issued":"2026-08-18","accession":"20260818-5152","docket":"ER26-3552-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"filing","file":"sources/originals/20260818-5152_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260818-5152","sha256":"f9c5d6e391132c81088abfb805f53bf3006d8990325cde3be59b9d32e7452eaf","pages":48,"tokens":22347,"emptyPages":[]},{"slug":"filing-er26-3552-miso-zgia-attachment-1","title":"Tab A - Marked Tariff Sheets.pdf","issued":"2026-08-18","accession":"20260818-5152","docket":"ER26-3552-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260818-5152_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260818-5152","parent":"filing-er26-3552-miso-zgia","sha256":"a3edcadd726fb6efea53b5f67704a6e7a0955fba7d4bbea6bd791fbd1e33f6c9","pages":772,"tokens":211131,"emptyPages":[]},{"slug":"filing-er26-3552-miso-zgia-attachment-2","title":"Tab B - Clean Tariff Sheets.pdf","issued":"2026-08-18","accession":"20260818-5152","docket":"ER26-3552-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260818-5152_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260818-5152","parent":"filing-er26-3552-miso-zgia","sha256":"3b99afe6fea6cd613a05d98e041b196a179a740ccc32897de1a2da7884149615","pages":772,"tokens":209337,"emptyPages":[]},{"slug":"filing-er26-3552-miso-zgia-attachment-3","title":"Tab C - Testimony of Marc Keyser.pdf","issued":"2026-08-18","accession":"20260818-5152","docket":"ER26-3552-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260818-5152_04.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260818-5152","parent":"filing-er26-3552-miso-zgia","sha256":"0011179ee22d74702e0ca884d88557ff9ccdaa47f59cd728d3b87b2f683b0a18","pages":48,"tokens":12958,"emptyPages":[]},{"slug":"filing-er26-3552-miso-zgia-attachment-4","title":"Tab D - Redline ZGIA to pro forma GIA.pdf","issued":"2026-08-18","accession":"20260818-5152","docket":"ER26-3552-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260818-5152_05.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260818-5152","parent":"filing-er26-3552-miso-zgia","sha256":"82c9bedb338a10cf76c867d050addbe221f9578bed77363445fc8d4dec6963ff","pages":179,"tokens":51057,"emptyPages":[]},{"slug":"filing-er26-3650-miso-irr","title":"MISO proposes interconnection reliability requirements for large loads","issued":"2026-08-28","accession":"20260828-5278","docket":"ER26-3650-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"filing","file":"sources/originals/20260828-5278_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260828-5278","sha256":"1538849c6d1d9693074670570c0adcaf29d33a249344052519655f6449c83e57","pages":32,"tokens":13271,"emptyPages":[]},{"slug":"filing-er26-3650-miso-irr-attachment-1","title":"Tab A - IRR Tariff Redline.pdf","issued":"2026-08-28","accession":"20260828-5278","docket":"ER26-3650-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260828-5278_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260828-5278","parent":"filing-er26-3650-miso-irr","sha256":"30e33305b3ec59724158df255a62cc35852591e2bd84b0cc9703abadc570cf4d","pages":41,"tokens":9414,"emptyPages":[]},{"slug":"filing-er26-3650-miso-irr-attachment-2","title":"Tab B - IRR Tariff Clean.pdf","issued":"2026-08-28","accession":"20260828-5278","docket":"ER26-3650-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260828-5278_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260828-5278","parent":"filing-er26-3650-miso-irr","sha256":"5f33fff97546838db696e44f3e862d739b49d79f67de54c4811e99df4f35577f","pages":41,"tokens":9333,"emptyPages":[]},{"slug":"filing-er26-3650-miso-irr-attachment-3","title":"Tab C - Testimony of BeiBei Li.pdf","issued":"2026-08-28","accession":"20260828-5278","docket":"ER26-3650-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"attachment","file":"sources/originals/20260828-5278_04.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260828-5278","parent":"filing-er26-3650-miso-irr","sha256":"642d42621fce69e0a804ef3a455019644f3a09984b8788d0441c27ed72c7a585","pages":45,"tokens":10398,"emptyPages":[]},{"slug":"filing-er27-25-miso-lars","title":"Midcontinent Independent System Operator, Inc.'s Large Load Addition Resource Study Process (transmittal letter; requested effective date December 2, 2026)","issued":"2026-10-02","accession":"20261002-5074","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"MISO","kind":"section 205 filing (transmittal letter)","file":"sources/originals/20261002-5074_Transmittal Letter_LARS.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261002-5074","sha256":"e43c8b54877ecc55b90d9f02a5574062d7321cdda7386187b782a8847326d8d5","pages":54,"tokens":25989,"emptyPages":[]},{"slug":"filing-er27-330-pjm-rbp-amendments","title":"PJM Interconnection, L.L.C., Proposed Amendments to the Reliability Backstop Procurement (transmittal letter; comments requested by November 30, 2026)","issued":"2026-10-29","accession":"20261029-5227","docket":"ER27-330-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"section 205 filing (transmittal letter)","file":"sources/originals/20261029-5227_RBP 205 Transmittal Letter 4905-1593-4685 v.2.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5227","sha256":"a3eacb3c040ba021692d6461b7e44de4dba4bd89fb839939399a7f6ec495c1f7","pages":66,"tokens":19525,"emptyPages":[]},{"slug":"filing-er27-432-spp-chills","title":"SPP proposes conditional large-load service revenue credits for its western zones","issued":"2026-11-06","accession":"20261106-5091","docket":"ER27-432-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"filing","file":"sources/originals/20261106-5091_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261106-5091","sha256":"47b5cbd837e21ab9bac701d33016ae70982c54eafc6ece6fc5b4a972120a1568","pages":7,"tokens":2080,"emptyPages":[]},{"slug":"filing-er27-432-spp-chills-attachment-1","title":"Marked8536-632c41b6-f9bd-419c-a455-959e8e8e7314.pdf","issued":"2026-11-06","accession":"20261106-5091","docket":"ER27-432-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/originals/20261106-5091_02.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261106-5091","parent":"filing-er27-432-spp-chills","sha256":"5864630ae609ad49eedfc3c01d3bf6b50bb30a9cd8d32ebb1e270a66fdc3e392","pages":19,"tokens":4626,"emptyPages":[]},{"slug":"filing-er27-432-spp-chills-attachment-2","title":"Clean8536-7e21cab7-1b8e-4b1a-925e-3a1d8da6d4fc.pdf","issued":"2026-11-06","accession":"20261106-5091","docket":"ER27-432-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/originals/20261106-5091_03.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261106-5091","parent":"filing-er27-432-spp-chills","sha256":"fa359d0619b6cd4d69c631a631647d500a442a75eb27ce2883a499ff382da0de","pages":19,"tokens":4515,"emptyPages":[]},{"slug":"filing-er27-484-isone-large-loads","title":"ISO-NE, NEPOOL and the transmission owners file large-load tariff revisions under section 205","issued":"2026-11-13","accession":"20261113-5007","docket":"ER27-484-000","group":"ISO-NE filings","filer":"ISO New England Inc., NEPOOL Participants Committee and the Participating Transmission Owners","kind":"filing","file":"sources/originals/20261113-5007_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261113-5007","sha256":"f56d92888c894551a2353c3192112961cd2943e4fe0cec6725ba4bb788c59e77","pages":99,"tokens":45666,"emptyPages":[]},{"slug":"filing-er27-506-caiso-large-loads","title":"CAISO files large-load tariff revisions under section 205 in response to the show cause order","issued":"2026-11-16","accession":"20261116-5179","docket":"ER27-506-000","group":"CAISO filings","filer":"California Independent System Operator Corporation","kind":"filing","file":"sources/originals/20261116-5179_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261116-5179","sha256":"ca3237a5dfe7cff2a87445b260e851588c138a31b8dbc567f7b489557ee91571","pages":48,"tokens":20166,"emptyPages":[]},{"slug":"filing-er27-517-nyiso-large-loads","title":"NYISO files large-load integration procedures and market rules under section 205","issued":"2026-11-16","accession":"20261116-5282","docket":"ER27-517-000","group":"NYISO filings","filer":"New York Independent System Operator, Inc.","kind":"filing","file":"sources/originals/20261116-5282_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261116-5282","sha256":"e613db4b957ab1140ad166915a4429846f592cba8bc7dad98b222c1270e5f347","pages":130,"tokens":65616,"emptyPages":[]},{"slug":"filing-er27-520-pjm-tos-large-loads","title":"PJM Transmission Owners file tariff revisions for service to co-located and large loads under section 205","issued":"2026-11-16","accession":"20261116-5300","docket":"ER27-520-000","group":"PJM filings","filer":"PJM Transmission Owners (filed by PECO Energy Company and PJM)","kind":"filing","file":"sources/originals/20261116-5300_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5300","mirror":"https://www.pjm.com/-/media/DotCom/documents/ferc/filings/2026/20261116-er27-520-000.pdf","sha256":"13a9774395aacc74eb8ece2aa111029e886faabeb1a1494fe5c81f1d246c917b","pages":336,"tokens":121986,"emptyPages":[]},{"slug":"filing-er27-522-pjm-ride-through","title":"PJM files ride-through and operating requirements for large computational loads under section 205","issued":"2026-11-16","accession":"20261116-5309","docket":"ER27-522-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20261116-5309_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261116-5309","sha256":"4fd2bb8c85194eae383a571c67dcf6b82e3ff555ec7401a0cebf3dc5b4125396","pages":27,"tokens":8260,"emptyPages":[]},{"slug":"filing-er27-526-miso-large-loads","title":"MISO and its transmission owners file large-load review, cost recovery and transmission service revisions under section 205","issued":"2026-11-16","accession":"20261116-5323","docket":"ER27-526-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc. and the MISO Transmission Owners","kind":"filing","file":"sources/originals/20261116-5323_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261116-5323","sha256":"3cda4ad54863190c7fdfa4ad76bf92c64948f31fff7bf781166a9abb7b8a15d0","pages":67,"tokens":28241,"emptyPages":[]},{"slug":"filing-er27-527-miso-grits","title":"MISO files the Grid Responsive Integration Transmission Service under section 205","issued":"2026-11-16","accession":"20261116-5326","docket":"ER27-527-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"filing","file":"sources/originals/20261116-5326_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261116-5326","sha256":"78dbd6e4e171f7e033521d948b5bcd0b7f935954d9cd3c9957428bec9e086239","pages":18,"tokens":6912,"emptyPages":[]},{"slug":"filing-er27-531-pjm-large-loads","title":"PJM files large-load tariff revisions and co-location compliance changes under section 205","issued":"2026-11-16","accession":"20261116-5340","docket":"ER27-531-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20261116-5340_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261116-5340","sha256":"816478c587a2668626547b6ece6d63a6504be0156ec6a2ed4175af0f4169485d","pages":91,"tokens":28369,"emptyPages":[]},{"slug":"letter-er26-3552-miso-deficiency","title":"FERC requests information about MISO’s zero-injection agreement","issued":"2026-10-09","accession":"20261009-3000","docket":"ER26-3552-000","group":"MISO filings","filer":"OFFICE OF ENERGY MARKET REGULATION","kind":"request","file":"sources/originals/20261009-3000_01.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261009-3000","sha256":"b28bc1d0b07d0f771a0f5c49135404427633a7319d37f6507322c3777bd10d32","pages":null,"tokens":2529,"emptyPages":[]},{"slug":"motion-el26-67-pjm-abeyance","title":"PJM requests more time to answer the June 18 show cause order","issued":"2026-07-28","accession":"20260728-5084","docket":"EL26-67-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"motion for abeyance","file":"sources/originals/20260728-5084_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260728-5084","sha256":"2510bf46b2aa7f3c83adbdd11ecbde3a583f59c56fc34c33dbf61596b1cce1b3","pages":12,"tokens":3079,"emptyPages":[]},{"slug":"motion-el26-68-spp-abeyance","title":"SPP requests more time to answer the June 18 show cause order","issued":"2026-08-03","accession":"20260803-5209","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"motion for abeyance","file":"sources/originals/20260803-5209_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5209","sha256":"3d38654a3a352a4dab6dc643698f39a26c667630a216409a926ccae29977a3f8","pages":23,"tokens":5559,"emptyPages":[]},{"slug":"motion-el26-69-nyiso-abeyance","title":"NYISO requests more time to answer the June 18 show cause order","issued":"2026-08-03","accession":"20260803-5229","docket":"EL26-69-000","group":"NYISO filings","filer":"New York Independent System Operator, Inc.","kind":"motion for abeyance","file":"sources/originals/20260803-5229_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5229","sha256":"3ebb72a07927d5be18b28e74a2549e7e26a74f6a055e18943d0f9945940dd72f","pages":13,"tokens":4187,"emptyPages":[]},{"slug":"motion-el26-70-miso-abeyance","title":"MISO requests more time to answer the June 18 show cause order","issued":"2026-08-03","accession":"20260803-5249","docket":"EL26-70-000","group":"MISO filings","filer":"Midcontinent Independent System Operator Inc.MISO Transmission Owners","kind":"motion for abeyance","file":"sources/originals/20260803-5249_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5249","sha256":"5e7d429cddb597a84a9e9cb546d03fe276df88de49b0587262bbca63cf33075d","pages":16,"tokens":4874,"emptyPages":[]},{"slug":"motion-el26-71-caiso-abeyance","title":"CAISO requests more time to answer the June 18 show cause order","issued":"2026-08-03","accession":"20260803-5206","docket":"EL26-71-000","group":"CAISO filings","filer":"California Independent System Operator Corporation","kind":"motion for abeyance","file":"sources/originals/20260803-5206_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5206","sha256":"fd35dd424201ad87b6ce4ff4cea43b8e6e4b600dc269a1337dfe2616eb35ad32","pages":11,"tokens":2264,"emptyPages":[]},{"slug":"motion-el26-71-valley-electric-rescind","title":"Valley Electric asks FERC to rescind the CAISO show cause order as to it","issued":"2026-11-13","accession":"20261113-5103","docket":"EL26-71-000","group":"CAISO filings","filer":"Valley Electric Association, Inc.","kind":"motion","file":"sources/originals/20261113-5103_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261113-5103","sha256":"d1ca6d9459e78db0cc2e6914dc59b24cb8fe9fd8405db1eadd8271f8b103ee49","pages":43,"tokens":8902,"emptyPages":[]},{"slug":"motion-el26-72-isone-abeyance","title":"ISO-NE requests more time to answer the June 18 show cause order","issued":"2026-08-03","accession":"20260803-5083","docket":"EL26-72-000","group":"ISO-NE filings","filer":"ISO New England Inc.PTO AC","kind":"motion for abeyance","file":"sources/originals/20260803-5083_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260803-5083","sha256":"6eef8772c27ded458bc7a34c196e0d6a34732faf43c77114102c0915f07871a6","pages":14,"tokens":3353,"emptyPages":[]},{"slug":"motion-er26-3380-pjm-abeyance","title":"Motion for Abeyance of PJM Interconnection, L.L.C. (ER26-3380-000 and EL26-108-000), holding the backstop paper hearing pending a new section 205 filing","issued":"2026-10-12","accession":"20261013-5141","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"motion for abeyance","file":"sources/originals/20261013-5141_20261012-el26-108-000.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261013-5141","sha256":"0926b57053a561149237e068f356f7e1e9d72e38d63860b7b1ecd730ff391609","pages":4,"tokens":614,"emptyPages":[]},{"slug":"motion-er27-330-pjm-withdraw","title":"PJM moves to withdraw its October backstop filing in favor of ER27-454","issued":"2026-11-12","accession":"20261112-5227","docket":"ER27-330-001","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"motion","file":"sources/originals/20261112-5227_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261112-5227","sha256":"bd4522edbcbeee3c7a688909c66acfc98b0329a6156d86c34e8b7382d9b5e298","pages":4,"tokens":922,"emptyPages":[]},{"slug":"notice-ad26-8-third-supplemental","title":"Third Supplemental Notice of Commissioner-Led Technical Conference: 2026 Reliability Technical Conference, October 21, 2026 (agenda; Panel 1 on integrating large loads)","issued":"2026-10-15","accession":"20261015-3040","docket":"AD26-8-000","group":"2026 FERC reliability technical conference: integrating large loads","filer":"FERC","kind":"notice of technical conference","file":"sources/originals/20261015-3040_AD26-8-000 Technical Conference.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261015-3040","sha256":"ce462969e8a2ff1edc1ac41d3be16965c068a012e10c76660a7462195cfd7541","pages":null,"tokens":1909,"emptyPages":[]},{"slug":"notice-cnf-20261102","title":"Combined Notice of Filings #1, November 2, 2026: ER27-330-000 and -001 comment date 5 pm ET November 30, 2026","issued":"2026-11-02","accession":"20261102-3050","docket":"ER27-330-000","group":"PJM Reliability Backstop Procurement","filer":"FERC","kind":"combined notice of filings","file":"sources/originals/20261102-3050_CNF110226.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261102-3050","sha256":"74ee4065f0f4a2f1560c8e14ae0fc3dd390224ee2df41a773a209eaf164a8fd4","pages":null,"tokens":1094,"emptyPages":[]},{"slug":"notice-el27-11-comment-period","title":"FERC gives PJM until December 21 to answer Exelon’s complaint","issued":"2026-11-13","accession":"20261113-3006","docket":"EL27-11-000","group":"PJM filings","filer":"Federal Energy Regulatory Commission","kind":"notice","file":"sources/originals/20261113-3006_01.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261113-3006","sha256":"cba1bd6c903afc048fc58743b906860062d6d7b4b4fd0efb6133ae753a4f51d9","pages":null,"tokens":259,"emptyPages":[]},{"slug":"notice-er26-3380-abeyance","title":"Notice Addressing Motion to Hold Proceeding in Abeyance: EL26-108 initial briefs moved to January 11, 2027 and reply briefs to January 26, 2027","issued":"2026-10-23","accession":"20261023-3114","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"FERC","kind":"notice addressing motion for abeyance","file":"sources/originals/20261023-3114_ER26-3380-000 and EL26-108-000 Notice in Abeyance.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-3114","sha256":"61c2307f93e57a49b31c995ae41bec1e7043a49fa1a3a74dc1ed92e45f455313","pages":null,"tokens":214,"emptyPages":[]},{"slug":"notice-er26-3380-answer-period","title":"Notice Establishing Answer Period on PJM's motion for abeyance (answers due 5:00 pm Eastern Time, October 21, 2026)","issued":"2026-10-16","accession":"20261016-3047","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"FERC","kind":"notice establishing answer period","file":"sources/originals/20261016-3047_ER26-3380-000 Notice Establishing Answer Period.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261016-3047","sha256":"b14b58c823745590b57928ad9b0a5e0e78b3093fbd7222275560c8b996e8c73b","pages":null,"tokens":168,"emptyPages":[]},{"slug":"notice-er26-3515-1110","title":"Combined Notice of Filings #1","issued":"2026-11-10","accession":"20261110-3030","docket":"ER26-3515-002","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"FERC","kind":"combined notice","file":"sources/originals/20261110-3030_CNF111026A.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261110-3030","sha256":"7fbb2499d4993f732c0b05beab7f1702b9786e2a7d93c2de972ea88d92c00bab","pages":null,"tokens":1218,"emptyPages":[]},{"slug":"opsi-september-iras-comments","filename":"opsi-september-iras-comments.pdf","title":"PJM states request clarification or separate consideration of the interim service proposal","url":"https://opsi.us/wp-content/uploads/2026/09/ER26-3515-000-IRAS-Comments.pdf","issued":"2026-09-03","group":"PJM filings","docket":"ER26-3515-000","filer":"Organization of PJM States","provenance":"Signed original published by the filer; eLibrary accession not verified.","file":"sources/originals/opsi-september-iras-comments.pdf","kind":"stakeholder document","sha256":"ca5f1ac293fbb5337384eff35b7f740e5fec94d5ea655c2ef3c93ad4439f96a5","pages":12,"tokens":3171,"emptyPages":[]},{"slug":"order-el26-67-001-pjm-rehearing","title":"Order dismissing requests for rehearing and clarification of the June 18, 2026 PJM show-cause order","issued":"2026-09-21","accession":"20260921-3020","docket":"EL26-67-001","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260921-3020_order.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3020","sha256":"42f96f55bb25fa92320a781422e652ba3fd7730327d84f540a5cf0899fb314e3","pages":11,"tokens":3812,"emptyPages":[]},{"slug":"order-el26-69-001-nyiso-rehearing","title":"Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 NYISO show-cause order","issued":"2026-09-21","accession":"20260921-3021","docket":"EL26-69-001","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260921-3021_EL26-69-001.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3021","sha256":"ee57391128dee1ceba921f847bd04fbc6c5dcd938beeb39d1d06e772f768001a","pages":null,"tokens":1813,"emptyPages":[]},{"slug":"order-el26-70-001-miso-rehearing","title":"Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 MISO show-cause order","issued":"2026-09-21","accession":"20260921-3047","docket":"EL26-70-001","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260921-3047_EL26-70-001.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3047","sha256":"0e28dba127d80e2158ebadefafe73f48fd3ab077794c0cbc72cda3a30aa09601","pages":null,"tokens":2026,"emptyPages":[]},{"slug":"order-el26-71-001-caiso-rehearing","title":"Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 CAISO show-cause order","issued":"2026-09-21","accession":"20260921-3019","docket":"EL26-71-001","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260921-3019_EL26-71-001.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3019","sha256":"032310cc612802b36561583d2dc716a15b8cf45a5d31858202abbb7b1cd98d87","pages":null,"tokens":1893,"emptyPages":[]},{"slug":"order-el26-72-001-isone-rehearing","title":"Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 ISO-NE show-cause order","issued":"2026-09-21","accession":"20260921-3056","docket":"EL26-72-001","group":"Six large-load show-cause orders, one per RTO/ISO","filer":"FERC","kind":"order","file":"sources/originals/20260921-3056_EL26-72-001.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3056","sha256":"bce3bbbe5b9b8a45f37b98b59fd085c952045dd8236ca82b960d8c8214ca4a14","pages":null,"tokens":1968,"emptyPages":[]},{"slug":"order-er26-2691-duke-nitsa","title":"Order Accepting Proposed Tariff Revisions (Duke Energy Carolinas pro forma NITSA, ER26-2691-000 and -001)","issued":"2026-10-09","accession":"20261009-3054","docket":"ER26-2691-000","group":"Duke Energy Carolinas network service agreement and large-load shortfall payments","filer":"FERC","kind":"order","file":"sources/originals/20261009-3054_ER26-2691-000.docx","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261009-3054","sha256":"68f645a380ba52b947da302814df50e9d1a8ef8be647002abfa01547eb366701","pages":null,"tokens":19613,"emptyPages":[]},{"slug":"order-er26-3380-pjm-backstop","title":"Order accepting PJM's Reliability Backstop Procurement, suspending it to February 28, 2027, and establishing further procedures","issued":"2026-09-29","accession":"20260929-3099","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"FERC","kind":"order","file":"sources/originals/20260929-3099_order.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-3099","sha256":"3efe24a0a8d45db5251b8fdec097c495e5acaa37e12e882751b39056d9d1cb47","pages":97,"tokens":37818,"emptyPages":[]},{"slug":"order-er26-3515-pjm-large-load","title":"Order accepting PJM's Large Load definition and Large Load Registry and rejecting the Interim Resource Adequacy Service, BYONC and VRR-curve revisions","issued":"2026-10-09","accession":"20261009-3055","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"FERC","kind":"order","file":"sources/originals/20261009-3055_ER26-3515-000.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261009-3055","sha256":"b4dc477b5aa5985b42aa10b372a888196499f9d2b70ab310b6541cb3f35bc002","pages":57,"tokens":21287,"emptyPages":[]},{"slug":"pjm-20261005-ceba-dcc-letter-to-pjm-board","filename":"pjm-20261005-ceba-dcc-letter-to-pjm-board.pdf","title":"Letter to the PJM Board of Managers on PJM's large-load show cause response","url":"https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20261005-ceba-dcc-letter-to-pjm-board-re-ll-show-cause-response.pdf","issued":"2026-10-02","group":"PJM stakeholder record","docket":"PJM stakeholder record","filer":"Corporate Energy Buyers Association and Data Center Coalition","file":"sources/originals/pjm-20261005-ceba-dcc-letter-to-pjm-board.pdf","kind":"stakeholder document","sha256":"10d514c418e1fee320fb00820ee8e60564de364347372d90fdc94dfc9d589c82","pages":2,"tokens":653,"emptyPages":[]},{"slug":"pjm-20261028-mc-agenda","filename":"pjm-20261028-mc-agenda.pdf","title":"Members Committee agenda, Oct 28, 2026 (as of Oct 28)","url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20261028/20261028-agenda.pdf","issued":"2026-10-28","group":"PJM stakeholder record","docket":"PJM stakeholder record","filer":"PJM","file":"sources/originals/pjm-20261028-mc-agenda.pdf","kind":"stakeholder document","sha256":"fd3a8ab746a60751f1e97b3dd573daee540136d6e83ce8c368ea12ed92bf3f07","pages":5,"tokens":1343,"emptyPages":[]},{"slug":"pjm-20261028-mc-regulatory-report","filename":"pjm-20261028-mc-regulatory-report.pdf","title":"MC Legal Report: Summary of Significant Filings, Legal Activity and Commission and Court Orders (Sep 14 to Oct 16, 2026)","url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20261028/20261028-item-05c---pjm-regulatory-report.pdf","issued":"2026-10-28","group":"PJM stakeholder record","docket":"PJM stakeholder record","filer":"PJM","file":"sources/originals/pjm-20261028-mc-regulatory-report.pdf","kind":"stakeholder document","sha256":"6e782fbe29c6bbf931e261352edbcefc3f7ff8d10ceaa663ba52d04352d5c5ed","pages":7,"tokens":3706,"emptyPages":[]},{"slug":"pjm-20261105-special-mc-agenda","filename":"pjm-20261105-special-mc-agenda.pdf","title":"Special Members Committee agenda, Nov 5, 2026 (as of Oct 29)","url":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20261105-special/agenda.pdf","issued":"2026-10-29","group":"PJM stakeholder record","docket":"PJM stakeholder record","filer":"PJM","file":"sources/originals/pjm-20261105-special-mc-agenda.pdf","kind":"stakeholder document","sha256":"d456ad16b7cd5548893827c2574c2b2cef4bf2b03581ee0b1df303a76aab9328","pages":2,"tokens":912,"emptyPages":[]},{"slug":"pjm-20261106-iti-letter-to-pjm-board","filename":"pjm-20261106-iti-letter-to-pjm-board.pdf","title":"ITI letter to the PJM Board of Managers on large-load integration reforms","url":"https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20261106-information-technology-industry-council-letter-to-the-pjm-board-regarding-large-load.pdf","issued":"2026-11-05","group":"PJM stakeholder record","docket":"PJM stakeholder record","filer":"Information Technology Industry Council","file":"sources/originals/pjm-20261106-iti-letter-to-pjm-board.pdf","kind":"stakeholder document","sha256":"74d5ff4c2d0f31f00d7639879c020f699d1b3e7d9fcaa4b8288b32e86b15c57c","pages":7,"tokens":2652,"emptyPages":[]},{"slug":"pjm-20261106-pjm-ceo-response-to-ceba-dcc-acp-iti","filename":"pjm-20261106-pjm-ceo-response-to-ceba-dcc-acp-iti.pdf","title":"PJM’s chief executive replies to CEBA, the Data Center Coalition, ACP and ITI","url":"https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20261106-pjm-board-response-to-ceba-acpa-dcc-and-iti-concerning-large-load-show-cause-issues.pdf","issued":"2026-11-05","group":"PJM stakeholder record","docket":"PJM stakeholder record","filer":"PJM","file":"sources/originals/pjm-20261106-pjm-ceo-response-to-ceba-dcc-acp-iti.pdf","kind":"stakeholder document","sha256":"c70d3b2b3ff8d96e2ac7724e8c7b09c101996c83c06dc3c1c539e3d55c3d23df","pages":1,"tokens":215,"emptyPages":[]},{"slug":"pjm-september-iras-answer","filename":"pjm-september-iras-answer.pdf","title":"PJM answers comments and protests about interim resource adequacy service","url":"https://www.pjm.com/-/media/DotCom/documents/ferc/filings/2026/20260923-er26-3515-000.pdf","issued":"2026-09-23","group":"PJM filings","docket":"ER26-3515-000","filer":"PJM","provenance":"Signed original published by the filer; eLibrary accession not verified.","file":"sources/originals/pjm-september-iras-answer.pdf","kind":"stakeholder document","sha256":"ac097dfe57a0906d43ff19ba74b8c1f958bccb47028dfd178968f797ac070b4d","pages":71,"tokens":24667,"emptyPages":[]},{"slug":"protest-er27-25-acp-srea","title":"Protest and Request for Clarification of the American Clean Power Association and Southern Renewable Energy Association","issued":"2026-10-23","accession":"20261023-5176","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"ACP and SREA","kind":"protest and request for clarification","file":"sources/originals/20261023-5176_ACP_Protest_MISO_LARS_ER27-25_CLEAN_10.23.2026.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5176","sha256":"152c9efc4f1d75bed3c1a2287e1105cb37861f4e4cdb827be183379fedf799ae","pages":32,"tokens":9632,"emptyPages":[]},{"slug":"protest-er27-25-bloom","title":"Limited Protest of Bloom Energy Corporation","issued":"2026-10-23","accession":"20261023-5195","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Bloom Energy","kind":"limited protest","file":"sources/originals/20261023-5195_ER27-25_Bloom Energy Limited Protest_10-23-2026.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5195","sha256":"eba933de2a30cd94011b34ee09266ea9dab1be80ab03ed53c8f7e01c1d3404b2","pages":5,"tokens":1593,"emptyPages":[]},{"slug":"protest-er27-25-clean-energy-advocates","title":"Protest of Clean Energy Advocates and Community Organizations","issued":"2026-10-23","accession":"20261023-5163","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Sierra Club, NRDC and other clean energy and community groups","kind":"protest","file":"sources/originals/20261023-5163_Final LARS Protest.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5163","sha256":"78535dffd5b2995f5c9510d6b24abf428f45799e637bc5fad9998615e9f6efee","pages":49,"tokens":14195,"emptyPages":[]},{"slug":"protest-er27-25-consumer-advocates","title":"Joint Protest of the Iowa Office of the Consumer Advocate, the Citizens Utility Boards of Michigan, Illinois, Wisconsin and Minnesota, Citizens Action Coalition of Indiana, the Michigan and Illinois Attorneys General, and the Minnesota Department of Commerce","issued":"2026-10-23","accession":"20261023-5197","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Iowa OCA and 8 consumer advocates","kind":"protest","file":"sources/originals/20261023-5197_Consumer Advocate AG Joint Protest.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5197","sha256":"e20ebc271540db782c81e479ad96ae49969673777f4abeba7c463c5921fe2621","pages":14,"tokens":3961,"emptyPages":[]},{"slug":"protest-er27-25-google","title":"Limited Protest of Google LLC","issued":"2026-10-23","accession":"20261023-5177","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Google","kind":"limited protest","file":"sources/originals/20261023-5177_Limited Protest of Google LLC - ER27-25-000.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5177","sha256":"373b876a3681d902cab2b0c90eb3c17e73fa9b58b4bd522521791958e9350897","pages":11,"tokens":3016,"emptyPages":[]},{"slug":"protest-er27-25-seia-united","title":"Protest of the Solar Energy Industries Association and Advanced Energy United","issued":"2026-10-23","accession":"20261023-5181","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"SEIA and Advanced Energy United","kind":"protest","file":"sources/originals/20261023-5181_ER27-25 - SEIA and United protest.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5181","sha256":"704992d7f5fc029414e5b57783dfb4e11963b8368a37655dbd378bf08a81e59e","pages":16,"tokens":4337,"emptyPages":[]},{"slug":"rec-20250219-4002","title":"Comments of U.S. Senator Chris Van Hollen et al. urging the Commission to host a technical conference to provide recommendations and to address resource…","issued":"2025-02-19","accession":"20250219-4002","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"US SENATOR","kind":"comments","file":"sources/filings/text/20250219-4002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250219-4002","tier":"record","sha256":"ef8fb56b0e6925b0ada2687695d9a18c00c6f36e2d8ffb82d550643d54f5910c","pages":2,"tokens":698,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20250220-3091","title":"Order Instituting Proceeding Under Section 206 of the Federal Power Act and Consolidating with Other Proceedings re PJM Interconnection, L.L.C. et al. v.…","issued":"2025-02-20","accession":"20250220-3091","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)SECRETARY OF THE COMMISSION - FERC","kind":"order","file":"sources/filings/text/20250220-3091_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250220-3091","tier":"record","sha256":"02683595b969240a5b1462587c7c6f5693022aca8ebc3f0de736b78feeae6bee","pages":null,"tokens":22468,"emptyPages":[],"textThemes":["colo","study","adequacy","cost"]},{"slug":"rec-20250321-4003","title":"Chairman Mark C. Christie's response to the Commonwealth of Virginia Governor Glenn Youngkin's 10/31/2024 letter re the Commissioner-Led Technical…","issued":"2025-03-21","accession":"20250321-4003","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"CHAIR AND IMMEDIATE STAFF (FERC)","kind":"filing","file":"sources/filings/text/20250321-4003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250321-4003","tier":"record","sha256":"3c3cbb3238cfb6e42daabe9e2e791a49398e6c171711da99d4006fa8babecd9c","pages":2,"tokens":397,"emptyPages":[],"textThemes":[]},{"slug":"rec-20250321-4004","title":"Chairman Mark C. Christie's response to the Governor of Pennsylvania Josh Shapiro's 10/02/2024 letter re the large loads co-located at generation…","issued":"2025-03-21","accession":"20250321-4004","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"CHAIR AND IMMEDIATE STAFF (FERC)","kind":"filing","file":"sources/filings/text/20250321-4004_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250321-4004","tier":"record","sha256":"9edc9ea39f17672db520747e025688f440008edb398e2e5b8066a944730c5ae9","pages":2,"tokens":416,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250324-5183","title":"Answer of NextEra Energy Transmission MidAtlantic, Inc. to the Order Instituting Proceeding Under Section 206 of the Federal Power Act and Consolidating…","issued":"2025-03-24","accession":"20250324-5183","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"NextEra Energy Transmission MidAtlantic, Inc.","kind":"answer","file":"sources/filings/text/20250324-5183_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5183","tier":"record","sha256":"2351fd8ad28327411e287cd52ffae9c05934339ee5b71d8a14d34f32da3c62b8","pages":6,"tokens":1425,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250324-5240","title":"Answer of The Dayton Power and Light Company d/b/a AES Ohio to Order Instituting Proceeding Under Section 206 of the Federal Power Act and Consolidating…","issued":"2025-03-24","accession":"20250324-5240","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Dayton Power and Light Company, The","kind":"answer","file":"sources/filings/text/20250324-5240_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5240","tier":"record","sha256":"7642d080d5e5ebe454a6931ebf90e54ebc36b564f2876dec2fc9e831058fc419","pages":16,"tokens":3864,"emptyPages":[],"textThemes":["colo","study","adequacy","cost"]},{"slug":"rec-20250324-5261","title":"Answer of Allegheny Electric Cooperative, Inc. to the Show Cause Order Issued in Connection with the Treatment of Co-Located Load within PJM…","issued":"2025-03-24","accession":"20250324-5261","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Allegheny Electric Cooperative, Inc.","kind":"answer","file":"sources/filings/text/20250324-5261_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5261","tier":"record","sha256":"c2516e9e4d01bc42893a363536a6e08c728f6681297d217d436a90d720aa6862","pages":10,"tokens":2584,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250324-5298","title":"Answer of the Indicated PJM Transmission Owners to the Order Instituting the Proceeding Under Section 206 of the Federal Power Act and Consolidating with…","issued":"2025-03-24","accession":"20250324-5298","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Exelon CorporationAmerican Electric Power CorporationAMP Transmission, LLC ,City of Cleveland, Department of Public Utilities, Division ,City of Hamilton, OH ,Dominion Energy Services, Inc. ,Duke Energy Corporation ,Duquesne Light Energy, LLC ,The FirstEnergy Transmission Companies ,East Kentucky Power Cooperative, Inc. ,Old Dominion Electric Cooperative ,PPL Electric Utilities Corporation ,Rockland Electric Company ,southern maryland electric cooperative ,Wabash Valley Power Association, Inc. ,UGI Utilities Inc. ,","kind":"answer","file":"sources/filings/text/20250324-5298_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5298","tier":"record","sha256":"9afc8dfeed3325c8ce7b906e5cb378b5b71a706e6cd70ab6bea23214c75a5e9c","pages":47,"tokens":17206,"emptyPages":[],"textThemes":["colo","study","retail","adequacy"]},{"slug":"rec-20250324-5299","title":"Response of Public Service Electric and Gas Company to Show Cause Order issued on 02/20/2025","issued":"2025-03-24","accession":"20250324-5299","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Public Service Electric and Gas Company","kind":"filing","file":"sources/filings/text/20250324-5299_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5299","tier":"record","sha256":"03849587ef1a1cfe2934e606a8c1a435fe01a042b1c0f23104c91f7c0a9cc964","pages":26,"tokens":6854,"emptyPages":[],"textThemes":["colo","cost"]},{"slug":"rec-20250324-5310","title":"Answer of Silver Run Electric, LLC to the 02/20/2025 Order Instituting Proceeding Under Section 206 of the Federal Power Act","issued":"2025-03-24","accession":"20250324-5310","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Silver Run Electric, LLC","kind":"answer","file":"sources/filings/text/20250324-5310_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5310","tier":"record","sha256":"ecad773bdcd24132f48216e196e80062610346790eb5fde5a497f76f4373af7d","pages":4,"tokens":891,"emptyPages":[],"textThemes":[]},{"slug":"rec-20250324-5313","title":"Answer of PJM Interconnection, L.L.C. to the 02/20/2025 Order Instituting Proceeding Under Section 206 of the Federal Power Act and Consolidating with Other…","issued":"2025-03-24","accession":"20250324-5313","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"answer","file":"sources/filings/text/20250324-5313_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5313","tier":"record","sha256":"c4dd59718570ea6e2ab4988d2aff6b355b53c560a9394e68a4a235cb62923d15","pages":74,"tokens":23335,"emptyPages":[],"textThemes":["colo","study","adequacy","cost"]},{"slug":"rec-20250324-5313-2","title":"Exhibit A","issued":"2025-03-24","accession":"20250324-5313","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/filings/text/20250324-5313_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5313","tier":"record","parent":"rec-20250324-5313","sha256":"4d31bbdebe5ec0f3b3945f888af4094b452fb2b74b9ebeaae57a96967cc18870","pages":3,"tokens":1666,"emptyPages":[],"textThemes":["study","colo","cost","flex"]},{"slug":"rec-20250324-5313-3","title":"AD24-11 Stu Bresler Statement (Exh B)","issued":"2025-03-24","accession":"20250324-5313","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/filings/text/20250324-5313_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5313","tier":"record","parent":"rec-20250324-5313","sha256":"5a89f96eb488a1219bd9741d89f7867cafc509decb32759b2ab2f1ce1bcef5db","pages":11,"tokens":4697,"emptyPages":[],"textThemes":["colo","study","adequacy","cost"]},{"slug":"rec-20250402-4001","title":"Chairman Mark C. Christie's response to U.S. Senator Chris Van Hollen's et al. 02/14/2025 letter re the request for the Commission to convene a technical…","issued":"2025-04-02","accession":"20250402-4001","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"CHAIR AND IMMEDIATE STAFF (FERC)","kind":"filing","file":"sources/filings/text/20250402-4001_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250402-4001","tier":"record","sha256":"b42c18b4e316058c031cd0211f7d2baa83b4a6b9c2e78cad60985f6084503c40","pages":2,"tokens":343,"emptyPages":[],"textThemes":[]},{"slug":"rec-20250409-5178","title":"Answer of Talen Energy Corporation in Opposition to Vistra Corp.'s Motion for Clarification and Request for Expedited Treatment","issued":"2025-04-09","accession":"20250409-5178","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Talen Energy Corporation","kind":"rehearing request","file":"sources/filings/text/20250409-5178_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250409-5178","tier":"record","sha256":"f38c50222cc4da367fa8270b8d30ce36597ef3053d4465d477f49baddd974210","pages":4,"tokens":880,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250411-5020","title":"Comments of the Union of Concerned Scientists in support of the filings dated 03/24/2025 of PJM Interconnection, L.L.C. et al","issued":"2025-04-11","accession":"20250411-5020","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"UNION OF CONCERNED SCIENTISTS","kind":"comments","file":"sources/filings/text/20250411-5020_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250411-5020","tier":"record","sha256":"756e71ebc5b9e72008bf89c4c2f5633beede24a8825edef8eb702c6bb4714069","pages":18,"tokens":4964,"emptyPages":[],"textThemes":["colo","registry"]},{"slug":"rec-20250422-5129","title":"Comments of Paul Stockton et al. re artificial intelligence data centers","issued":"2025-04-22","accession":"20250422-5129","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20250422-5129_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250422-5129","tier":"record","sha256":"fce17c95c61b03045bbc6381d25c5ae487ceb689941281786904a5e819f65f06","pages":2,"tokens":778,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250422-5166","title":"Joint Comments and Motion to Stay Proceedings and Request to Establish Settlement Judge Procedures of the Electric Power Supply Association et al","issued":"2025-04-22","accession":"20250422-5166","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Electric Power Supply AssociationPJM Power Providers GroupCalpine Corporation ,Cogentrix Energy Power Management, LLC ,Constellation Energy Generation, LLC ,LS Power Development, LLC ,","kind":"comments","file":"sources/filings/text/20250422-5166_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250422-5166","tier":"record","sha256":"87f4014fb62d7b28be84b78cc7729527ba05702eea95ee2071550998552a4bab","pages":10,"tokens":2992,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250422-5178","title":"Comments of Pennsylvania Public Utility Commission","issued":"2025-04-22","accession":"20250422-5178","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Pennsylvania Public Utility Commission","kind":"comments","file":"sources/filings/text/20250422-5178_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250422-5178","tier":"record","sha256":"5e5f3c82dfe9aa2b3fd605407f386c36e71284bfd290c6516dd1ece486d9a371","pages":11,"tokens":2448,"emptyPages":[],"textThemes":["colo","adequacy","cost","retail"]},{"slug":"rec-20250423-5020","title":"Comments of ENGIE North America Inc. in response to PJM Interconnection, L.L.C.'s et al. 03/24/2025 filing","issued":"2025-04-23","accession":"20250423-5020","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"ENGIE North America Inc.","kind":"comments","file":"sources/filings/text/20250423-5020_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5020","tier":"record","sha256":"6a4c24d8d8e8d10fa250284cf5c9bfe28258de447e65b101e2947633b002aa27","pages":10,"tokens":2131,"emptyPages":[],"textThemes":["colo","flex"]},{"slug":"rec-20250423-5093","title":"Comments of the North American Electric Reliability Corporation","issued":"2025-04-23","accession":"20250423-5093","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"North American Electric Reliability Corporation","kind":"comments","file":"sources/filings/text/20250423-5093_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5093","tier":"record","sha256":"cde416e9a4a06f7cc4f4fc988a853744b904afc76ea475dc924f238861720496","pages":32,"tokens":5855,"emptyPages":[],"textThemes":["colo","adequacy","study"]},{"slug":"rec-20250423-5125","title":"Motion to Intervene Out of Time and Comments of Antora Energy LLC in Response to FERC’s Co-location Order","issued":"2025-04-23","accession":"20250423-5125","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Antora Energy LLC","kind":"comments","file":"sources/filings/text/20250423-5125_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5125","tier":"record","sha256":"5b4d5d99aad34893900a5d8e573661aa00726f7c83313b65ec88208ae60176f9","pages":20,"tokens":5852,"emptyPages":[],"textThemes":["flex","colo","study","adequacy"]},{"slug":"rec-20250423-5147","title":"Comments and Intervention of Delaware Public Service Commission on the Show Cause Order issued on 02/20/2025","issued":"2025-04-23","accession":"20250423-5147","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Delaware Public Service Commission","kind":"comments","file":"sources/filings/text/20250423-5147_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5147","tier":"record","sha256":"b9cb0fcba16f21f5c4c896f050eeff6e1dc1ed537949fb3feef612a791ac0e93","pages":9,"tokens":2077,"emptyPages":[],"textThemes":["adequacy","colo","study"]},{"slug":"rec-20250423-5148","title":"Reply Comments of Southern California Edison Company and Pacific Gas and Electric Company in response to PJM Interconnection, L.L.C.'s Answer filed on…","issued":"2025-04-23","accession":"20250423-5148","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Southern California Edison Company and Pacific Gas and Elect","kind":"answer","file":"sources/filings/text/20250423-5148_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5148","tier":"record","sha256":"33e130cebe41877423d8c26b628535bbead04fd92386e62df3a6052ec5f1145a","pages":11,"tokens":2992,"emptyPages":[],"textThemes":["colo","retail","adequacy","cost"]},{"slug":"rec-20250423-5154","title":"Comments of Buckeye Power, Inc. in support of PJM Interconnection, L.L.C.’s 03/24/2025 response to the show cause order","issued":"2025-04-23","accession":"20250423-5154","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Buckeye Power, Inc.","kind":"comments","file":"sources/filings/text/20250423-5154_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5154","tier":"record","sha256":"c25e51f357af07b6a464251de7fab7f974ff232a3a26288f1e7dc48add8654f0","pages":15,"tokens":4041,"emptyPages":[],"textThemes":["colo","cost","adequacy","flex"]},{"slug":"rec-20250423-5159","title":"Comments of the Organization of PJM States, Inc. in response to PJM Interconnection, L.L.C.'s 03/24/2025 Answer","issued":"2025-04-23","accession":"20250423-5159","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Organization of PJM States, Inc.","kind":"answer","file":"sources/filings/text/20250423-5159_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5159","tier":"record","sha256":"8d8529a5b5b26aa9ccea44f14a06bb4e4bc42e0b81d24ec91975ff9f6d7ebcdd","pages":8,"tokens":1804,"emptyPages":[],"textThemes":["colo","study","retail","adequacy"]},{"slug":"rec-20250423-5161","title":"Comments of Solar Energy Industries Association in response to FERC's 02/20/2025 Order Instituting Proceeding under Section 206 of the Federal Power Act et al","issued":"2025-04-23","accession":"20250423-5161","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Solar Energy Industries Association","kind":"comments","file":"sources/filings/text/20250423-5161_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5161","tier":"record","sha256":"1b3238b058eac8f79c0eab929a9a679c1a50fbb82ad80a7982771b9c02cf5247","pages":13,"tokens":3868,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20250423-5162","title":"Comments of Mainspring Energy, Inc. on Co-located Generation and Data Center Integration","issued":"2025-04-23","accession":"20250423-5162","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Mainspring Energy","kind":"comments","file":"sources/filings/text/20250423-5162_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5162","tier":"record","sha256":"2bc9da713b955c9418acb9f38d8957431db86e507964400329e88cfbfcf645c7","pages":15,"tokens":4902,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20250423-5162-2","title":"Mainspring article_byop_2024-03-18_v01","issued":"2025-04-23","accession":"20250423-5162","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Mainspring Energy","kind":"attachment","file":"sources/filings/text/20250423-5162_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5162","tier":"record","parent":"rec-20250423-5162","sha256":"1ba89a7717c9bfb2d47057ffc2ba9c71955f871c3c69001620e7a6c58a6a0b82","pages":8,"tokens":3763,"emptyPages":[],"textThemes":["flex"]},{"slug":"rec-20250423-5165","title":"Comments of Electric Power Supply Association and the PJM Power Providers Group","issued":"2025-04-23","accession":"20250423-5165","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Electric Power Supply Association","kind":"comments","file":"sources/filings/text/20250423-5165_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5165","tier":"record","sha256":"36c9530baf2d80d8b8f12c05a6ce050662ceadfe100a1ba8693c8c29bf53e592","pages":16,"tokens":4858,"emptyPages":[],"textThemes":["colo","flex","retail"]},{"slug":"rec-20250423-5168","title":"Answer of PPL Electric Utilities Corporation to PJM Interconnection, L.L.C.'s et al. Answers","issued":"2025-04-23","accession":"20250423-5168","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PPL Electric Utilities Corporation","kind":"answer","file":"sources/filings/text/20250423-5168_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5168","tier":"record","sha256":"cc6017a6fb5279beea6a13116734e313e55a9d029725097bcb763719dd3d809e","pages":17,"tokens":5055,"emptyPages":[],"textThemes":["colo","retail","adequacy"]},{"slug":"rec-20250423-5175","title":"Comments of Edison Electric Institute in response to FERC’s Order issued on 02/20/2025","issued":"2025-04-23","accession":"20250423-5175","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Edison Electric Institute","kind":"comments","file":"sources/filings/text/20250423-5175_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5175","tier":"record","sha256":"03451d8a3c98b2af6253f7876b937a0faf81539abf3da69ed7360c547c3d6956","pages":9,"tokens":2147,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250423-5179","title":"Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate in response to FERC's 02/20/2025 Order","issued":"2025-04-23","accession":"20250423-5179","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Ohio Federal Energy Advocate","kind":"comments","file":"sources/filings/text/20250423-5179_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5179","tier":"record","sha256":"ee551975d39f9bcfb0c788dbeda135b472842f84d50477c5fee9c1b66a9e59b2","pages":7,"tokens":1425,"emptyPages":[],"textThemes":["colo","adequacy"]},{"slug":"rec-20250423-5188","title":"Comments of the American Council on Renewable Energy on the 03/24/2025 Answer of PJM Interconnection, L.L.C","issued":"2025-04-23","accession":"20250423-5188","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"American Council on Renewable Energy","kind":"answer","file":"sources/filings/text/20250423-5188_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5188","tier":"record","sha256":"e4fb220239c983b8a4d0a26fc1286866e4c4cf03806ffcb432d98146416daa1c","pages":7,"tokens":1499,"emptyPages":[],"textThemes":["study","colo"]},{"slug":"rec-20250423-5193","title":"Comments of Northeastern Rural Electric Membership Corporation on the Order Instituting Proceeding Under Section 206 of the Federal Power Act and…","issued":"2025-04-23","accession":"20250423-5193","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"NORTHEASTERN REMC","kind":"comments","file":"sources/filings/text/20250423-5193_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5193","tier":"record","sha256":"7c4f5d260c6842c9e7c43902c05405329b6e32f601b5cbad0b91c2faff811f87","pages":9,"tokens":2047,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250423-5196","title":"Response of American Municipal Power, Inc","issued":"2025-04-23","accession":"20250423-5196","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"American Municipal Power, Inc.","kind":"filing","file":"sources/filings/text/20250423-5196_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5196","tier":"record","sha256":"017c7581adccec2568e4e61943affbc9c582634c70c7ccd4d32c233c9c959bfc","pages":15,"tokens":4204,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250423-5208","title":"Answer of the Indicated PJM Transmission Owners in response to PJM Interconnection, L.L.C.'s 03/24/2025 Answer, et al","issued":"2025-04-23","accession":"20250423-5208","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Exelon CorporationAmerican Electric Power Service CorporationAMP Transmission, LLC ,City of Cleveland, Department of Public Utilities, Division ,City of Hamilton, OH ,Dominion Energy Services, Inc. ,Duke Energy Corporation ,Duquesne Light Company ,The FirstEnergy Transmission Companies ,East Kentucky Power Cooperative, Inc. ,Old Dominion Electric Cooperative ,PPL Electric Utilities Corporation ,Rockland Electric Company ,southern maryland electric cooperative ,Wabash Valley Power Association, Inc. ,UGI Utilities Inc. ,","kind":"answer","file":"sources/filings/text/20250423-5208_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5208","tier":"record","sha256":"360fd8f14f52c6118edded26b8b4ba5c548afa41284964d9d3a776a9fb28e4b0","pages":20,"tokens":5655,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250423-5209","title":"Joint Comments of PJM Industrial Customer Coalition and Industrial Energy Consumers of America","issued":"2025-04-23","accession":"20250423-5209","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Industrial Customer Coalition and Industrial Energy Cons","kind":"comments","file":"sources/filings/text/20250423-5209_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5209","tier":"record","sha256":"84d6a3152c7cdd419e66a06844949769fb081d92f95c9b12fd73833fac06489e","pages":17,"tokens":5129,"emptyPages":[],"textThemes":["colo","cost","flex"]},{"slug":"rec-20250423-5213","title":"Response of Enchanted Rock, LLC on the Order Instituting Proceeding Under Section 206 of the Federal Power Act and Consolidating with Other Proceedings","issued":"2025-04-23","accession":"20250423-5213","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Enchanted Rock, LLC","kind":"filing","file":"sources/filings/text/20250423-5213_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5213","tier":"record","sha256":"29307f3748a7ec63a2b55bff4dbdd622fa2ead89a72a3839b40e415f8373a9aa","pages":41,"tokens":9783,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20250423-5214","title":"Comments of Consumers' Research re the large loads co-located at generation facilities","issued":"2025-04-23","accession":"20250423-5214","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Consumers' Research","kind":"comments","file":"sources/filings/text/20250423-5214_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5214","tier":"record","sha256":"af0f088111c4843eff7edff0c80fa57218660cb16bdefca7d3e8938db9fcc433","pages":5,"tokens":1330,"emptyPages":[],"textThemes":["colo","study"]},{"slug":"rec-20250423-5220","title":"Comments of Talen Energy Corporation on Answer of PJM Interconnection, L.L.C. to the Order Instituting Proceeding Under Section 206 of the Federal Power Act…","issued":"2025-04-23","accession":"20250423-5220","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Talen Energy Corporation","kind":"answer","file":"sources/filings/text/20250423-5220_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5220","tier":"record","sha256":"97d5d317c0010832b8ee29477f7c90c1912503c81436bd949693011268431b24","pages":15,"tokens":4442,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250423-5227","title":"Comments of Bloom Energy Corporation","issued":"2025-04-23","accession":"20250423-5227","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Bloom Energy Corporation","kind":"comments","file":"sources/filings/text/20250423-5227_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5227","tier":"record","sha256":"f5e9134e095b0a847cad2bffc815f5f092806acf843f172fddd933f5888d2aae","pages":15,"tokens":4224,"emptyPages":[],"textThemes":["colo","study","flex","adequacy"]},{"slug":"rec-20250423-5227-2","title":"Brattle Energy Park Integration Report 2025-04-23","issued":"2025-04-23","accession":"20250423-5227","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Bloom Energy Corporation","kind":"attachment","file":"sources/filings/text/20250423-5227_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5227","tier":"record","parent":"rec-20250423-5227","sha256":"221ef96d8455745cc7cf9fd5becfd7760010d0f0b818826beb1e0ab1b68a1835","pages":35,"tokens":11588,"emptyPages":[],"textThemes":["study","colo","adequacy","flex"]},{"slug":"rec-20250423-5240","title":"Comments of EDF Renewables, Inc. in response to PJM Interconnection, L.L.C.’s Answer filed on 03/24/2025","issued":"2025-04-23","accession":"20250423-5240","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EDF Renewables, Inc.","kind":"answer","file":"sources/filings/text/20250423-5240_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5240","tier":"record","sha256":"d90a1a196799f66eb2c422c4c4ec77e32784cf1b3fdb9b60a0c92278e0b99f0f","pages":13,"tokens":3193,"emptyPages":[],"textThemes":["colo","flex"]},{"slug":"rec-20250423-5243","title":"Comments of Public Interest Organizations in response to PJM Interconnection, L.L.C.’s 03/24/2025 Answer to FERC’s 02/20/2025 Order","issued":"2025-04-23","accession":"20250423-5243","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EARTHJUSTICE","kind":"answer","file":"sources/filings/text/20250423-5243_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5243","tier":"record","sha256":"e9fdc9937aa7678eba76f0d6e6c94eee8e9dff5255340d19f6eb1eac75436cc2","pages":137,"tokens":19967,"emptyPages":[70,77],"textThemes":["colo","registry","study","cost"]},{"slug":"rec-20250423-5244","title":"Comments of Data Center Coalition","issued":"2025-04-23","accession":"20250423-5244","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Data Center Coalition","kind":"comments","file":"sources/filings/text/20250423-5244_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5244","tier":"record","sha256":"8597bb9646c5ca18a77f7f9476799673d66dab192948dca751c8de05342804cc","pages":15,"tokens":4335,"emptyPages":[],"textThemes":["colo","registry","flex","cost"]},{"slug":"rec-20250423-5245","title":"Comments of Invenergy Renewables LLC and Invenergy Thermal LLC","issued":"2025-04-23","accession":"20250423-5245","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Invenergy Renewables LLCInvenergy Thermal LLC","kind":"comments","file":"sources/filings/text/20250423-5245_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5245","tier":"record","sha256":"7a38aa79576d5a7dcc4e05215e58a9382bb7afad83e7d4bf28223dffe0839d89","pages":9,"tokens":2377,"emptyPages":[],"textThemes":["study","colo","cost","registry"]},{"slug":"rec-20250423-5246","title":"Comments of BrightNight Power Marketing, LLC in response to FERC’s Order Instituting Proceeding Under Section 206 of the Federal Power Act etc. and Answers…","issued":"2025-04-23","accession":"20250423-5246","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"BrightNight Power Marketing, LLC","kind":"comments","file":"sources/filings/text/20250423-5246_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5246","tier":"record","sha256":"99b9d86b6fb4ce97bcc3cc6d5c24a1ab9b51311a08f112a9ec4e2ebc94aeab28","pages":11,"tokens":2840,"emptyPages":[],"textThemes":["colo","flex","study"]},{"slug":"rec-20250423-5247","title":"Comments of Northern Virginia Electric Cooperative, Inc","issued":"2025-04-23","accession":"20250423-5247","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"comments","file":"sources/filings/text/20250423-5247_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5247","tier":"record","sha256":"23e30613ddbee55fc330d3940665b99f8dc99578bbedb0e9b4890a77dee8d8af","pages":21,"tokens":6760,"emptyPages":[],"textThemes":["colo","adequacy","retail"]},{"slug":"rec-20250423-5248","title":"Comments of Suzanne Glatz and Abraham Silverman in response to PJM Interconnection, L.L.C.'s et al. 03/24/2025 filings","issued":"2025-04-23","accession":"20250423-5248","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"JOHNS HOPKINS UNIVERSITY","kind":"comments","file":"sources/filings/text/20250423-5248_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5248","tier":"record","sha256":"1ddc8c4dde37ee729bf335a0138c7e17bfacdedc0a4c2e9a04f224f8b2a0f202","pages":16,"tokens":5504,"emptyPages":[],"textThemes":["colo","study","flex","adequacy"]},{"slug":"rec-20250423-5250","title":"Comments of the Maryland Office of Joint Consumer Advocates et al","issued":"2025-04-23","accession":"20250423-5250","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Maryland Office of People's CounselNew Jersey Office of Ratepayer Advocate","kind":"comments","file":"sources/filings/text/20250423-5250_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5250","tier":"record","sha256":"69c46c4ee478861943645d9685359ae9346090bac635ed7cabd329ff82046aa6","pages":11,"tokens":2302,"emptyPages":[],"textThemes":["colo","retail"]},{"slug":"rec-20250423-5252","title":"Motion to Intervene and Comments of the Electricity Consumers Resource Council to PJM Interconnection, L.L.C. 's Answer to the Section 206 Show Cause Order","issued":"2025-04-23","accession":"20250423-5252","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Electricity Consumers Resource Council","kind":"answer","file":"sources/filings/text/20250423-5252_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5252","tier":"record","sha256":"f3048055aa333e26be97b629ca1558faded4dc25bc239cd3869d0f9dc8bfeb71","pages":11,"tokens":2231,"emptyPages":[],"textThemes":["colo","registry","flex","cost"]},{"slug":"rec-20250423-5259","title":"Comments of Vistra Corp","issued":"2025-04-23","accession":"20250423-5259","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Vistra Corp.","kind":"comments","file":"sources/filings/text/20250423-5259_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5259","tier":"record","sha256":"a6500470c421fd3c158f57e61ac5516601d02615aa935b822e31150b9d7973bf","pages":114,"tokens":33359,"emptyPages":[81],"textThemes":["colo","study","adequacy","flex"]},{"slug":"rec-20250423-5260","title":"Comments of the Independent Market Monitor for PJM","issued":"2025-04-23","accession":"20250423-5260","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Monitoring Analytics, LLC","kind":"comments","file":"sources/filings/text/20250423-5260_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5260","tier":"record","sha256":"732b8e6e6bc5f430dec18fc3cd8fc780730f7951a7e09c35f369e5ee8dd9a0fd","pages":15,"tokens":4754,"emptyPages":[],"textThemes":["colo","adequacy","study"]},{"slug":"rec-20250423-5261","title":"Response of Advanced Energy United to PJM Interconnection, L.L.C.’s Answer to the Show Cause Order","issued":"2025-04-23","accession":"20250423-5261","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Advanced Energy United","kind":"answer","file":"sources/filings/text/20250423-5261_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5261","tier":"record","sha256":"6c00247cb31a832bcb15eb4b7b9dc868e1dfdf47c7091b7b89d25e8859c4e2d3","pages":26,"tokens":7254,"emptyPages":[],"textThemes":["colo","flex","adequacy","study"]},{"slug":"rec-20250423-5262","title":"Answer of Constellation Energy Generation, LLC re PJM Interconnection, L.L.C.’s Tariff filing","issued":"2025-04-23","accession":"20250423-5262","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20250423-5262_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5262","tier":"record","sha256":"5ceaa382de69ad00fda8b547543fe7d697dd8dc21ee2219eaad7e7ac9e3b2721","pages":110,"tokens":36340,"emptyPages":[],"textThemes":["colo","study","adequacy","flex"]},{"slug":"rec-20250423-5262-2","title":"Exhibit 1 (Stockton)","issued":"2025-04-23","accession":"20250423-5262","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"attachment","file":"sources/filings/text/20250423-5262_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5262","tier":"record","parent":"rec-20250423-5262","sha256":"0d1661b3206fb56a0791727acb613f9d879425c28bdadf828ec70d5caa988ae9","pages":19,"tokens":6526,"emptyPages":[17],"textThemes":["colo"]},{"slug":"rec-20250423-5262-3","title":"Exhibit 2 (Ming)","issued":"2025-04-23","accession":"20250423-5262","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"attachment","file":"sources/filings/text/20250423-5262_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5262","tier":"record","parent":"rec-20250423-5262","sha256":"f10dfb0e3dca875540971091b1e456fbd8cbcdc3976d834f5a439ac8982a0144","pages":69,"tokens":15918,"emptyPages":[],"textThemes":["colo","flex","adequacy","cost"]},{"slug":"rec-20250423-5262-4","title":"Exhibit 3 (Patterson)","issued":"2025-04-23","accession":"20250423-5262","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"attachment","file":"sources/filings/text/20250423-5262_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5262","tier":"record","parent":"rec-20250423-5262","sha256":"46ffe58b99cc4a3133fae9f17a99f7b8261f95079a7621adf50aea7c06821a05","pages":33,"tokens":11124,"emptyPages":[31],"textThemes":["adequacy","study","flex","colo"]},{"slug":"rec-20250423-5262-5","title":"Exhibit 4 (Herling)","issued":"2025-04-23","accession":"20250423-5262","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"attachment","file":"sources/filings/text/20250423-5262_005.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5262","tier":"record","parent":"rec-20250423-5262","sha256":"00da0b435184c0d15914c4063798d50d0580eb9640e65a3d7c03512561585d09","pages":20,"tokens":5002,"emptyPages":[],"textThemes":["colo","study","cost"]},{"slug":"rec-20250423-5262-6","title":"Exhibit 5 (Kormos)","issued":"2025-04-23","accession":"20250423-5262","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"attachment","file":"sources/filings/text/20250423-5262_006.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5262","tier":"record","parent":"rec-20250423-5262","sha256":"d6c7a2bf2e93d2c8fcad7cf0e160a95306b767c1827fa97c2ff8336eceba4e3e","pages":39,"tokens":11875,"emptyPages":[12],"textThemes":["colo","study","cost","adequacy"]},{"slug":"rec-20250423-5263","title":"Comments of Natural Resources Defense Council in response to FERC's 02/20/2025 Order and PJM Interconnection, L.L.C.'s 03/24/2025 Answer","issued":"2025-04-23","accession":"20250423-5263","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Natural Resources Defense Council","kind":"answer","file":"sources/filings/text/20250423-5263_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5263","tier":"record","sha256":"5ad73a6c1fc554ff0740aaf80f3ddadb9f219ec060c94c201e810f917c20cc46","pages":11,"tokens":2670,"emptyPages":[],"textThemes":["colo","flex","registry","cost"]},{"slug":"rec-20250423-5264","title":"Comments of Business Council for Sustainable Energy in response to FERC's 02/21/2025 Notice of Institution of Section 206 Proceeding and Refund Effectives Dates","issued":"2025-04-23","accession":"20250423-5264","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Business Council for Sustainable Energy","kind":"comments","file":"sources/filings/text/20250423-5264_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5264","tier":"record","sha256":"fe32b95826a1f3e9fb6f50b668af33b7c6791d958eba2a2fc7319ba77994ff0d","pages":5,"tokens":954,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250424-5023","title":"Comments of RMI on the Answers of PJM Interconnection, L.L.C. to the Order Instituting Proceeding under Section 206 of the Federal Power Act and…","issued":"2025-04-24","accession":"20250424-5023","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"RMI","kind":"comments","file":"sources/filings/text/20250424-5023_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250424-5023","tier":"record","sha256":"764707ea30fa1563a6289376f43fd15071cecd0309b082cc49e8d96bbd9dba47","pages":5,"tokens":1478,"emptyPages":[],"textThemes":["colo","study"]},{"slug":"rec-20250424-5211","title":"Comments of Center for Biological Diversity","issued":"2025-04-24","accession":"20250424-5211","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Center for Biological Diversity","kind":"comments","file":"sources/filings/text/20250424-5211_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250424-5211","tier":"record","sha256":"485691b11b3887a117b8d6d6154d6a6b25b7e947dbcc88d52e6ccecba13bc47b","pages":35,"tokens":10846,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20250425-5013","title":"Comments of Clean Air Task Force re FERC's Order Instituting Proceeding under Section 206 of the Federal Power Act and Consolidating with Other Proceedings","issued":"2025-04-25","accession":"20250425-5013","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Clean Air Task Force","kind":"comments","file":"sources/filings/text/20250425-5013_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250425-5013","tier":"record","sha256":"b3000433a7e86b25b436daaaa73e3eee87e986b4e62e6b4b48428f0ea87ba8a6","pages":17,"tokens":4971,"emptyPages":[],"textThemes":["colo","study","adequacy","flex"]},{"slug":"rec-20250429-5216","title":"Amended Comments of Rocky Mountain Institute re the Answers of PJM Interconnection, L.L.C. to the Order Instituting Proceeding under Section 206 of the…","issued":"2025-04-29","accession":"20250429-5216","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"ROCKY MOUNTAIN INSTITUTE","kind":"comments","file":"sources/filings/text/20250429-5216_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250429-5216","tier":"record","sha256":"d17e0283e864baf3cbd28aeb20f2b1c2c092699af6ab4777b925e80aa1b99a35","pages":5,"tokens":1570,"emptyPages":[],"textThemes":["colo","study","registry"]},{"slug":"rec-20250502-5173","title":"Answer of Northern Virginia Electric Cooperative, Inc. and Northeastern Rural Electric Membership Corporation Opposing the Joint Comments and Motion to Stay…","issued":"2025-05-02","accession":"20250502-5173","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Northern Virginia Electric Cooperative, Inc.NORTHEASTERN REMC","kind":"answer","file":"sources/filings/text/20250502-5173_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250502-5173","tier":"record","sha256":"e8f05c9b275783604732ca01773bdb55bfceb2a04a225f83778f1932be395e3a","pages":6,"tokens":1195,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250505-5241","title":"Answer of PJM Interconnection, L.L.C. to Joint Comments and Motion to Stay Proceedings and Request to Establish Settlement Judge Procedures","issued":"2025-05-05","accession":"20250505-5241","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"answer","file":"sources/filings/text/20250505-5241_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250505-5241","tier":"record","sha256":"93f05372a51713b168477b336092f0b12b4866f1c24c59e9366dcb94646e4fec","pages":7,"tokens":1780,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250507-5129","title":"Answer of American Municipal Power, Inc. in Opposition to Motion for Stay and Settlement Judge Procedures","issued":"2025-05-07","accession":"20250507-5129","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"American Municipal Power, Inc.","kind":"answer","file":"sources/filings/text/20250507-5129_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250507-5129","tier":"record","sha256":"f432bd6c043e903a64924da2b40eeedbee5af609c2115c23524f661f87555edb","pages":11,"tokens":2660,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250507-5143","title":"Answer of the Indicated PJM Transmission Owners to the 04/22/2025 Joint Comments, Motion to Stay Proceedings and Request to Establish Settlement Judge…","issued":"2025-05-07","accession":"20250507-5143","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Exelon CorporationAmerican Electric Power Service CorporationAMP Transmission, LLC ,CITY OF CLEVELAND V CLEV ELEC ILLUM ,City of Hamilton, OH ,Dominion Energy Services, Inc. ,Duke Energy Corporation ,Duquesne Light Company ,FirstEnergy Service Company ,East Kentucky Power Cooperative, Inc. ,Old Dominion Electric Cooperative ,PPL Electric Utilities Corporation ,Rockland Electric Company ,Southern Maryland Electric Cooperative, Inc. ,Wabash Valley Power Association, Inc. ,UGI Utilities Inc. ,","kind":"answer","file":"sources/filings/text/20250507-5143_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250507-5143","tier":"record","sha256":"081cc00b855f5abe1a8f93c38c5d334258988755b2fd7ce79eb768d7bbe72b46","pages":10,"tokens":2321,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250508-5081","title":"Motion for Leave to Answer and Answer of Vistra Corp. to the 04/23/2025 comments filed by North American Electric Reliability Corporation, et al","issued":"2025-05-08","accession":"20250508-5081","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Vistra Corp.","kind":"answer","file":"sources/filings/text/20250508-5081_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250508-5081","tier":"record","sha256":"9a9bbdadde625f87d5046fe355bb8d5364c53c481e6d9aa7f9f9d41d6c5db3c8","pages":29,"tokens":7492,"emptyPages":[],"textThemes":["colo","study","registry","adequacy"]},{"slug":"rec-20250508-5131","title":"Motion for Leave and Answer of Constellation Energy Generation, LLC","issued":"2025-05-08","accession":"20250508-5131","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20250508-5131_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250508-5131","tier":"record","sha256":"1d8287b21b5e01ce7e814ddf5b974fec8e9958dc44b271d47befca2eaf373156","pages":17,"tokens":7041,"emptyPages":[],"textThemes":["colo","adequacy","flex","study"]},{"slug":"rec-20250509-5126","title":"Errata to the 5/8/2025 Motion for Leave and Answer of Constellation Energy Generation, LLC","issued":"2025-05-09","accession":"20250509-5126","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20250509-5126_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250509-5126","tier":"record","sha256":"d18436d56d4cd9c4a71d2d333d111535b415ab5f2fac76b7422c53f90a4433bc","pages":19,"tokens":7288,"emptyPages":[],"textThemes":["colo","adequacy","flex","study"]},{"slug":"rec-20250513-5078","title":"Answer of Talen Energy Corporation to Joint Comments and Motion to Stay Proceedings and Request to Establish Settlement Judge Procedures","issued":"2025-05-13","accession":"20250513-5078","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Talen Energy Corporation","kind":"answer","file":"sources/filings/text/20250513-5078_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250513-5078","tier":"record","sha256":"b15e3b1b0653a618b6f65e11157dea5484fc4fc2d304a439814a6197779b42cb","pages":6,"tokens":1399,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250515-0003","title":"Comments of Exus Renewables North America in support of Option 6 proposed in PJM Interconnection, L.L.C.’s 03/24/2025 response to FERC's February Order to…","issued":"2025-05-15","accession":"20250515-0003","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EXUS RENEWABLES NORTH AMERICA","kind":"comments","file":"sources/filings/text/20250515-0003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250515-0003","tier":"record","sha256":"9ce5ed8f9ff75c5b41d342ab78a4b11489b01a3d40825f30ffcc7ed16a61a186","pages":3,"tokens":694,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250522-5125","title":"Motion for Leave to Respond and Limited Response of Buckeye Power, Inc. to the 05/08/2025 Answer of Vistra Corp","issued":"2025-05-22","accession":"20250522-5125","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Buckeye Power, Inc.","kind":"answer","file":"sources/filings/text/20250522-5125_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250522-5125","tier":"record","sha256":"d875379fb6328ddcd392023c444ec3035fa16f59946a054b496346d77692c894","pages":9,"tokens":2174,"emptyPages":[],"textThemes":["cost","retail"]},{"slug":"rec-20250523-5192","title":"Motion for Leave to Answer and Answer of Public Service Electric and Gas Company to the initial and reply comments re FERC's 02/20/2025 Show Cause Order","issued":"2025-05-23","accession":"20250523-5192","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Public Service Electric and Gas Company","kind":"answer","file":"sources/filings/text/20250523-5192_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250523-5192","tier":"record","sha256":"850f4599c90fd3e7490a1ae2bd331e2605de13fae5857a047a79b0c9d8943fe0","pages":13,"tokens":3534,"emptyPages":[],"textThemes":["colo","flex"]},{"slug":"rec-20250603-5174","title":"Motion for Leave to Answer and Answer of the Indicated PJM Transmission Owners to various filings made on and after 04/23/2025","issued":"2025-06-03","accession":"20250603-5174","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Exelon CorporationAmerican Electric Power CorporationAMP Transmission, LLC ,City of Cleveland, Department of Public Utilities, Division ,City of Hamilton, OH ,southern maryland electric cooperative ,Duke Energy Corporation ,Duquesne Light Company ,The FirstEnergy Transmission Companies ,East Kentucky Power Cooperative, Inc. ,Old Dominion Electric Cooperative ,PPL Electric Utilities Corporation ,Rockland Electric Company ,UGI Utilities Inc. ,Wabash Valley Power Association, Inc. ,","kind":"answer","file":"sources/filings/text/20250603-5174_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250603-5174","tier":"record","sha256":"4bb94b43218b8ce47363ace80e85ba83ec112d39f1e5d610c96a0a72e5280f15","pages":48,"tokens":12951,"emptyPages":[],"textThemes":["colo","study","flex","cost"]},{"slug":"rec-20250612-5210","title":"Motion for Leave and Answer of Constellation Energy Generation, LLC in response to the Indicated Transmission Owners’ fourth answer, etc","issued":"2025-06-12","accession":"20250612-5210","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20250612-5210_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250612-5210","tier":"record","sha256":"a7d257680400fb45ecd4803c70ec5ce4aa141d0becd1a7d6a4ff7b8430f8138c","pages":32,"tokens":7127,"emptyPages":[],"textThemes":["colo","flex","study"]},{"slug":"rec-20250627-5146","title":"Motion For Leave to Answer and Limited Answer of the Indicated PJM Transmission Owners to Constellation Energy Generation, LLC's 06/12/2025 Answer","issued":"2025-06-27","accession":"20250627-5146","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Exelon CorporationAmerican Electric Power Service CorporationAMP Transmission, LLC ,City of Cleveland, Department of Public Utilities, Division ,City of Hamilton, OH ,Duke Energy Corporation ,Wabash Valley Power Association, Inc. ,The FirstEnergy Transmission Companies ,Southern Maryland Electric Cooperative, Inc. ,East Kentucky Power Cooperative, Inc. ,Old Dominion Electric Cooperative ,PPL Electric Utilities Corporation ,Rockland Electric Company ,UGI Utilities Inc. ,","kind":"answer","file":"sources/filings/text/20250627-5146_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250627-5146","tier":"record","sha256":"7c8577ffe4045867d06a4204969daf88aa4866934a60dc1a198d91aba4d12d4f","pages":11,"tokens":3581,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20250919-4001","title":"Chairman David Rosner requests PJM Interconnection President and CEO, Manu Asthana's perspective re large load forecasting for America's significant…","issued":"2025-09-19","accession":"20250919-4001","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"CHAIR AND IMMEDIATE STAFF (FERC)","kind":"filing","file":"sources/filings/text/20250919-4001_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250919-4001","tier":"record","sha256":"0ef72cac6072ee18a18c2c8152e00ffc06f4947b303afc795e6ae315796d85ca","pages":2,"tokens":540,"emptyPages":[],"textThemes":["registry"]},{"slug":"rec-20251020-5079","title":"Pre-Technical Conference Remarks of Jason Connell Vice President, Planning PJM Interconnection, L.L.C. re Panel 2: Ensuring Reliability with Large Loads","issued":"2025-10-20","accession":"20251020-5079","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/filings/text/20251020-5079_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251020-5079","tier":"record","sha256":"bc9689ccd752337fdf28121c278461eb62247f70d2eb0c88c8c12eb40631e06d","pages":13,"tokens":4214,"emptyPages":[],"textThemes":["registry","credit","study"]},{"slug":"rec-20251121-5536","title":"Motion for Expedited Action of Constellation Energy Generation, LLC re PJM Interconnection, L.L.C.’s Open Access Transmission Tariff et al","issued":"2025-11-21","accession":"20251121-5536","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"motion","file":"sources/filings/text/20251121-5536_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251121-5536","tier":"record","sha256":"c7542f7412e88c3c9f03cc6a8ae73e4565bc6fda6144dcec9da39d8d7893cc5e","pages":70,"tokens":18888,"emptyPages":[],"textThemes":["colo","study","flex","adequacy"]},{"slug":"rec-20251125-4000","title":"Comments of U.S. Senator Edward J. Markey et al. urging FERC to reject unfair grid operator proposals, proactively investigate and address bad utility…","issued":"2025-11-25","accession":"20251125-4000","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"US SENATOR","kind":"comments","file":"sources/filings/text/20251125-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251125-4000","tier":"record","sha256":"7c4ced18e11e688d4f9532490cf8748b1a40f5a5835b66140e10423a145a1e36","pages":4,"tokens":1500,"emptyPages":[],"textThemes":["registry"]},{"slug":"rec-20251205-5310","title":"Answer of PJM Interconnection, L.L.C. to Motion for Expedited Action of Constellation Energy Generation, LLC","issued":"2025-12-05","accession":"20251205-5310","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"answer","file":"sources/filings/text/20251205-5310_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251205-5310","tier":"record","sha256":"95824a204359bc0fc6e74ab55638542190134f76a3593c6938e66b04c4a1c6bd","pages":7,"tokens":1700,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20251205-5321","title":"Motion to File Supplemental Comments of Constellation Energy Generation, LLC","issued":"2025-12-05","accession":"20251205-5321","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"comments","file":"sources/filings/text/20251205-5321_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251205-5321","tier":"record","sha256":"7d3b43d3177bcdbe999007e3e2ab2d62dc2144a6fd627a4331bac4d1afc040ba","pages":65,"tokens":23424,"emptyPages":[62],"textThemes":["study","colo","flex","adequacy"]},{"slug":"rec-20251208-5309","title":"Answer of Old Dominion Electric Cooperative in Opposition to Motion for Expedited Action of Constellation Energy Generation, LLC,","issued":"2025-12-08","accession":"20251208-5309","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Old Dominion Electric Cooperative","kind":"answer","file":"sources/filings/text/20251208-5309_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251208-5309","tier":"record","sha256":"b1815447d9b31d62004fff52db7a066bd7d909e92dc7c0e241f4a6eb1b656c44","pages":8,"tokens":1971,"emptyPages":[],"textThemes":["colo","adequacy"]},{"slug":"rec-20251208-5345","title":"Answer of Exelon Corporation to the Motion for Expedited Action of Constellation Energy Generation, LLC,","issued":"2025-12-08","accession":"20251208-5345","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Exelon Corporation","kind":"answer","file":"sources/filings/text/20251208-5345_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251208-5345","tier":"record","sha256":"0ec8911b712cf55a673571d4646e5d6844cafceaf7c9012cb791e41ca1ba3f84","pages":22,"tokens":6249,"emptyPages":[],"textThemes":["study","colo","retail"]},{"slug":"rec-20251208-5354","title":"Answer of Indicated PJM Interconnection, L.L.C. Transmission Owners to the 11/21/2025 Motion for Expedited Action filed by Constellation Energy Generation, LLC","issued":"2025-12-08","accession":"20251208-5354","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Exelon CorporationAMP Transmission, LLCOld Dominion ,City Of Cleveland, Ohio ,City of Hamilton ,Duquesne Light Company ,FIRST ENERGY CORPORATION ,East Kentucky Power Cooperative, Inc. ,PPL Corporation ,Wabash Valley Power Association ,","kind":"answer","file":"sources/filings/text/20251208-5354_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251208-5354","tier":"record","sha256":"758ba0eb715e62a00e5a3e1e85baf47ad20b317dd0c4f3869827ac2c1611c75b","pages":18,"tokens":5518,"emptyPages":[],"textThemes":["colo","cost","study"]},{"slug":"rec-20251210-5232","title":"Comments of American Electric Power Service Corporation on the Motion of Constellation Energy Generation, LLC","issued":"2025-12-10","accession":"20251210-5232","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"American Electric Power Service Corporation","kind":"comments","file":"sources/filings/text/20251210-5232_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251210-5232","tier":"record","sha256":"9062144e0cefd8da6c5f9057d09108d8809cda7e012591c5258a903232beebcc","pages":5,"tokens":939,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20251215-5406","title":"Answer of the Virginia State Corporation Commission in opposition to Constellation Energy Generation, LLC's Motion to File Supplemental Comments","issued":"2025-12-15","accession":"20251215-5406","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Virginia State Corporation Commission","kind":"answer","file":"sources/filings/text/20251215-5406_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251215-5406","tier":"record","sha256":"2c3b30efc3d2ff73b67852792114fb1dce72c3464a19d7ecbfb0af2d9ac8156c","pages":10,"tokens":2285,"emptyPages":[],"textThemes":["colo","retail"]},{"slug":"rec-20251218-3081","title":"Order on Show Cause Proceeding, Directing Compliance Filings, etc. re Allegheny Electric Cooperative, Inc. et al. v. PJM Interconnection, L.L.C","issued":"2025-12-18","accession":"20251218-3081","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)SECRETARY OF THE COMMISSION - FERC","kind":"order","file":"sources/filings/text/20251218-3081_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251218-3081","tier":"record","sha256":"3aacfda4d681b0884380e06a35080dce68dff29ec58b2297d95fb3db747db825","pages":null,"tokens":54552,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20260114-5185","title":"Motion for Extension of Time, Shortened Answer Period and Request for Expedited Action of the Indicated PJM Transmission Owners","issued":"2026-01-14","accession":"20260114-5185","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"answer","file":"sources/filings/text/20260114-5185_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260114-5185","tier":"record","sha256":"6c7f33058056e06c27f5c67c7d8101b62a48a7bc48239ff0164efbae9626fa9a","pages":7,"tokens":1891,"emptyPages":[],"textThemes":["colo","procedure"]},{"slug":"rec-20260116-4000","title":"Non-Decisional: Emerald AI submits comment to FERC's Chairman and Commissioners regarding the FERC Co-Location Show Cause to PJM , (the two redactions…","issued":"2026-01-16","accession":"20260116-4000","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EMERALD AI","kind":"comments","file":"sources/filings/text/20260116-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260116-4000","tier":"record","sha256":"fe8be34bc2940ed37ee2a1993124ff526301b0ea6f98280a8237760ad6226757","pages":7,"tokens":1830,"emptyPages":[7],"textThemes":["flex","colo"]},{"slug":"rec-20260116-5200","title":"The Indicated PJM Interconnection, L.L.C. Transmission Owners submit Request for Rehearing of the 12/18/2025 Order","issued":"2026-01-16","accession":"20260116-5200","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"Exelon CorporationThe FirstEnergy Transmission Companies","kind":"rehearing request","file":"sources/filings/text/20260116-5200_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260116-5200","tier":"record","sha256":"5a5e02d7122b92a7693c4b598696a7f5cc4bcdbd570f8e2bf49954d53f89e4b1","pages":58,"tokens":20381,"emptyPages":[],"textThemes":["colo","study","flex","cost"]},{"slug":"rec-20260120-5256","title":"Answer of Constellation Energy Generation, LLC in Opposition to the Indicated PJM Transmission Owners' Motion for Extension of Time","issued":"2026-01-20","accession":"20260120-5256","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20260120-5256_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260120-5256","tier":"record","sha256":"eaf5d820073b5b878f2c5c0b0b16433fa649efcfd4f60f0cb39b9336ba9edd0a","pages":5,"tokens":1301,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20260120-5280","title":"PJM Industrial Customer Coalition et al. submit Request for Clarification or, in the Alternative, Rehearing of the 12/18/2025 Order","issued":"2026-01-20","accession":"20260120-5280","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"PJM Industrial Customer Coalition and Industrial Energy Cons","kind":"rehearing request","file":"sources/filings/text/20260120-5280_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260120-5280","tier":"record","sha256":"e1ff2cc4aacabdbb8f2a7f503632ca7f3d6e4a8d85f5d6160893b1acbc8c912d","pages":46,"tokens":14975,"emptyPages":[],"textThemes":["colo","adequacy","flex","retail"]},{"slug":"rec-20260120-5293","title":"Public Interest Organizations submit Limited Request for Clarification of the 12/18/2025 Order","issued":"2026-01-20","accession":"20260120-5293","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"EARTHJUSTICE","kind":"rehearing request","file":"sources/filings/text/20260120-5293_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260120-5293","tier":"record","sha256":"53fc7945f7d8b33aae6ea405a83f6df78928135cbacfe7cad9c8670b3e2798a2","pages":10,"tokens":2990,"emptyPages":[],"textThemes":["registry","adequacy","colo","study"]},{"slug":"rec-20260120-5297","title":"Eolian, L.P. et al. submit Request for Rehearing of the 12/18/2025 Order","issued":"2026-01-20","accession":"20260120-5297","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"Eolian, L.P.Antora Energy LLC","kind":"rehearing request","file":"sources/filings/text/20260120-5297_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260120-5297","tier":"record","sha256":"05b6a972d8afd80334b4b42cea973a39b95e176f3ac77bedb9c797dca470fda8","pages":13,"tokens":3206,"emptyPages":[],"textThemes":["colo","study","flex"]},{"slug":"rec-20260120-5298","title":"Constellation Energy Generation, LLC submits Request for Clarification or, in the Alternative, Rehearing of the 12/18/2025 Order","issued":"2026-01-20","accession":"20260120-5298","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"rehearing request","file":"sources/filings/text/20260120-5298_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260120-5298","tier":"record","sha256":"b140828cda1ad3e01401beb8586deabd63ab9e6be35477d8cfbaae1eeb9f9ec3","pages":10,"tokens":3053,"emptyPages":[],"textThemes":["colo","flex","retail"]},{"slug":"rec-20260120-5301","title":"PJM Interconnection, L.L.C. submits Informational Report addressing several categories of requested information in response to FERC’s 12/18/2025 Order","issued":"2026-01-20","accession":"20260120-5301","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/filings/text/20260120-5301_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260120-5301","tier":"record","sha256":"056b201c118e2f24c0f34a90035438e7d098d8eb366f0dd89438a8de2c5e2684","pages":25,"tokens":7719,"emptyPages":[],"textThemes":["adequacy","registry","flex","cost"]},{"slug":"rec-20260120-5337","title":"Notice of Compliance Filing in ER26-1088-000 of PJM Interconnection, L.L.C.,","issued":"2026-01-20","accession":"20260120-5337","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"notice","file":"sources/filings/text/20260120-5337_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260120-5337","tier":"record","sha256":"aab15485990ddc237d74707db70c0652afb0a08bfb7badc27ff2f0310960b0fc","pages":2,"tokens":262,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260126-5075","title":"Motion to Intervene and Comments of Andrew D. Hinz on Federal Interconnection Tariffs for Large Loads Co-Located at Generating Facilities","issued":"2026-01-26","accession":"20260126-5075","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260126-5075_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260126-5075","tier":"record","sha256":"ca686f6857e6b98d7b20e06b8fd9ed0cc356ffbcf0a1c76f8948311272a9947b","pages":6,"tokens":1150,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20260202-5197","title":"Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC in response to the rehearing request filed by the Indicated PJM Transmission…","issued":"2026-02-02","accession":"20260202-5197","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"rehearing request","file":"sources/filings/text/20260202-5197_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260202-5197","tier":"record","sha256":"512705ae2b37f07c8d6866f505c7891ba9044ed9f6f1a10d9512fd908e7b242c","pages":18,"tokens":6549,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20260205-5144","title":"Answer and Motion for Leave to Answer of the Independent Market Monitor for PJM to the Request for Clarification or, in the Alternative, Rehearing filed on…","issued":"2026-02-05","accession":"20260205-5144","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Monitoring Analytics, LLC","kind":"rehearing request","file":"sources/filings/text/20260205-5144_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260205-5144","tier":"record","sha256":"f5ebf20e117b860a6922eeb8d702c29ec052a2c039ba382988974c23187175fa","pages":9,"tokens":2605,"emptyPages":[],"textThemes":["colo","adequacy"]},{"slug":"rec-20260209-5035","title":"Andrew D. Hinz submits Request for Rehearing of the 12/18/2025 Order","issued":"2026-02-09","accession":"20260209-5035","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"Individual No Affiliation","kind":"rehearing request","file":"sources/filings/text/20260209-5035_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260209-5035","tier":"record","sha256":"424e5169ac2afd42cd0e8270d8600aa282b135418fd17164ebcc47700d9678bb","pages":3,"tokens":584,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20260212-5155","title":"Answer of Exelon Corporation et al. in Opposition to Constellation Energy Generation LLC's 02/02/2026 Motion and Answer to the 01/16/2026 Rehearing Request","issued":"2026-02-12","accession":"20260212-5155","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Exelon CorporationThe FirstEnergy Transmission Companies","kind":"rehearing request","file":"sources/filings/text/20260212-5155_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260212-5155","tier":"record","sha256":"2e72b196bf164bd93e50385d949df4ead21032020e083df2154e4697e710dfd7","pages":6,"tokens":1453,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20260213-3014","title":"Notice of Staff Attendance at North American Electric Reliability Corporation Emerging Large Loads Technical Conference re Constellation Energy Corporation…","issued":"2026-02-13","accession":"20260213-3014","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"notice","file":"sources/filings/text/20260213-3014_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260213-3014","tier":"record","sha256":"e036d263b31a756b3db01ddf7f9d1db526da43455cafdb988064982dff88ffab","pages":null,"tokens":283,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260219-5002","title":"Motion for Leave to Answer and Answer of Pennsylvania Office of Consumer Advocate in support of PJM Industrial Customer Coalition's et al. 1/20/2026 Request…","issued":"2026-02-19","accession":"20260219-5002","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Pennsylvania Office of Consumer Advocate","kind":"rehearing request","file":"sources/filings/text/20260219-5002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260219-5002","tier":"record","sha256":"5e9f36d8c03feb3779240eaf5ae2f93aab39126f866641e5930b804001f38330","pages":13,"tokens":3867,"emptyPages":[],"textThemes":["colo","adequacy","cost"]},{"slug":"rec-20260220-3002","title":"Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re Allegheny Electric Cooperative, Inc. et al. v. PJM…","issued":"2026-02-20","accession":"20260220-3002","docket":"EL25-49-002","group":"PJM co-location compliance","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"rehearing request","file":"sources/filings/text/20260220-3002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260220-3002","tier":"record","sha256":"69f83ada3ef7f0cd74a3409f9802802846a4843fa894c69b513672f9259dee51","pages":null,"tokens":451,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260220-5263","title":"Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC in response to the Independent Market Monitor for PJM’s Answer et al","issued":"2026-02-20","accession":"20260220-5263","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20260220-5263_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260220-5263","tier":"record","sha256":"a29fa2f0483d2fe09b9f564980e54adf7620d406e5749e7619290b5ce788a087","pages":7,"tokens":1920,"emptyPages":[],"textThemes":["colo","flex","adequacy"]},{"slug":"rec-20260223-5181","title":"Co-Located Load Tariff Revisions to Comply with Order in EL25-49, et al","issued":"2026-02-23","accession":"20260223-5181","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"tariff filing","file":"sources/filings/text/20260223-5181_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5181","tier":"record","sha256":"d00276ca9e0324892134bfc43f5ed988f31932690dd9bddecbd700f132c89ee1","pages":39,"tokens":11373,"emptyPages":[],"textThemes":["colo","study","flex","adequacy"]},{"slug":"rec-20260223-5189","title":"Initial Brief of PJM Interconnection, L.L.C","issued":"2026-02-23","accession":"20260223-5189","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"brief","file":"sources/filings/text/20260223-5189_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5189","tier":"record","sha256":"2c8e7693c6426b51524c08ac058be2656c7502393facb8432564683dd4b5c8d7","pages":89,"tokens":23538,"emptyPages":[],"textThemes":["colo","flex","study","adequacy"]},{"slug":"rec-20260223-5189-2","title":"Attachment A - New Transmission Services Tariff Sheets","issued":"2026-02-23","accession":"20260223-5189","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/filings/text/20260223-5189_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5189","tier":"record","parent":"rec-20260223-5189","sha256":"83dbbaa1031964e95db4fa7d539fa292c3cf2aae1e9179b410e891cda81eccab","pages":42,"tokens":11757,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20260223-5189-3","title":"Att. B - Abdulsalam Affidavit","issued":"2026-02-23","accession":"20260223-5189","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/filings/text/20260223-5189_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5189","tier":"record","parent":"rec-20260223-5189","sha256":"950bf2de1b88fde5fd6cd658e9eae69974d762040b7e6d87b518c232b6e469da","pages":9,"tokens":2853,"emptyPages":[],"textThemes":["flex","colo"]},{"slug":"rec-20260223-5189-4","title":"Att. C - Wharton Affidavit","issued":"2026-02-23","accession":"20260223-5189","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/filings/text/20260223-5189_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5189","tier":"record","parent":"rec-20260223-5189","sha256":"5267d0fe8580b1b037b8342a32db46335cf6b1bdb22db26c9735d9633865bfef","pages":12,"tokens":3774,"emptyPages":[],"textThemes":["colo","flex"]},{"slug":"rec-20260223-5189-5","title":"Att. D - Horger Affidavit","issued":"2026-02-23","accession":"20260223-5189","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/filings/text/20260223-5189_005.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5189","tier":"record","parent":"rec-20260223-5189","sha256":"ad4bf4d0ce7c26fb7ac688b18593257215eb7a6e3fb83323753144a0455bd16c","pages":8,"tokens":2129,"emptyPages":[],"textThemes":["colo","registry","study"]},{"slug":"rec-20260223-5190","title":"Initial Brief and Joint Responses of the Indicated PJM Transmission Owners to Paper Hearing Questions","issued":"2026-02-23","accession":"20260223-5190","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"brief","file":"sources/filings/text/20260223-5190_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5190","tier":"record","sha256":"3f57fef70271fbc5cefb29e92dec072f542ecd9f47cda57505a5ed12a8d538ca","pages":26,"tokens":8629,"emptyPages":[],"textThemes":["flex","colo","cost","study"]},{"slug":"rec-20260223-5190-2","title":"Exhibit No. PTO-0001 - Direct Joint Testimony of Blazunas, Shafer, & Hammer","issued":"2026-02-23","accession":"20260223-5190","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260223-5190_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5190","tier":"record","parent":"rec-20260223-5190","sha256":"0f308db2d97c18c58a8520d48eb26d3f6a96e5f8a5484042750ea82b11147e11","pages":42,"tokens":11841,"emptyPages":[41],"textThemes":["flex","colo","cost","study"]},{"slug":"rec-20260223-5190-3","title":"Exhibit No. PTO-0002","issued":"2026-02-23","accession":"20260223-5190","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260223-5190_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5190","tier":"record","parent":"rec-20260223-5190","sha256":"75e7d3a9faa3f853cbc7766d205a4bd001d3cba1228346eda16440cd8748edd6","pages":12,"tokens":3234,"emptyPages":[],"textThemes":["cost","study"]},{"slug":"rec-20260223-5190-4","title":"Exhibit No. PTO-0003","issued":"2026-02-23","accession":"20260223-5190","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260223-5190_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5190","tier":"record","parent":"rec-20260223-5190","sha256":"7bc9dc61ad044c661a7afa272a3b29e48d4ec3e894b07fd9d82f690d55cf9071","pages":3,"tokens":668,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260223-5190-5","title":"Exhibit No. PTO-0004","issued":"2026-02-23","accession":"20260223-5190","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260223-5190_005.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5190","tier":"record","parent":"rec-20260223-5190","sha256":"848a443ee0a9ea76c6ed4f7dee2fd1482f4596808c9abfab92b7db2d437b0f7b","pages":2,"tokens":714,"emptyPages":[],"textThemes":["flex"]},{"slug":"rec-20260223-5198","title":"PJM Interconnection, L.L.C. submits Supplemental Informational Report with additional detail regarding the timeline and process for developing the revisions…","issued":"2026-02-23","accession":"20260223-5198","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/filings/text/20260223-5198_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260223-5198","tier":"record","sha256":"c7d7b4dd547df203ddca36f3a4bd47d3ed71e688924390b4c137682c776d18e2","pages":4,"tokens":842,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260225-5219","title":"Notice of Compliance Filing in ER26-1479-000 of PJM Interconnection, L.L.C.,","issued":"2026-02-25","accession":"20260225-5219","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"notice","file":"sources/filings/text/20260225-5219_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260225-5219","tier":"record","sha256":"2dfb4e0051b2d9eedde9b558af671f9bf821cc2aa1b32a4efff759cf7a37995a","pages":2,"tokens":311,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260306-3015","title":"Notice of Staff Attendance at North American Electric Reliability Corporation Reliability and Security Technical Committee Meetings re Constellation Energy…","issued":"2026-03-06","accession":"20260306-3015","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"notice","file":"sources/filings/text/20260306-3015_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260306-3015","tier":"record","sha256":"d94fe30687ba92d906b1ecafba4de674c8bdc3d44cb2e10e03bbb78ea0c7b01f","pages":null,"tokens":381,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260309-5165","title":"PJM Interconnection, L.L.C. submits second supplemental Information Report re timeline for stakeholder deliberation on the reliability backstop procurement…","issued":"2026-03-09","accession":"20260309-5165","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/filings/text/20260309-5165_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260309-5165","tier":"record","sha256":"765668b851bd1d186871573be52879a9fd932087d59a963aca0e81df60aea6e9","pages":3,"tokens":483,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260309-5267","title":"Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to the 02/20/2026 Motion for Leave to Answer and Answer, and the 01/20/2026 Request for…","issued":"2026-03-09","accession":"20260309-5267","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"rehearing request","file":"sources/filings/text/20260309-5267_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260309-5267","tier":"record","sha256":"33ffc26cb9e23e6452fec1e851a851d650550f0432d23d975058197225c90046","pages":9,"tokens":2399,"emptyPages":[],"textThemes":["colo","adequacy","flex"]},{"slug":"rec-20260316-5207","title":"Protest and Comments of Eastman Chemical Company on PJM Interconnection, L.L.C.'s 60- day compliance filing submitted on 02/23/2026","issued":"2026-03-16","accession":"20260316-5207","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"EASTMAN CHEMICAL COMPANY","kind":"protest","file":"sources/filings/text/20260316-5207_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5207","tier":"record","sha256":"bb93bf17f8aa929a7e25d8adee39a6c6987973714e9a5853e5ee25da64606515","pages":9,"tokens":2099,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20260316-5220","title":"Comments of Digital Power Network on the 02/23/2026 compliance filing submitted by PJM Interconnection, L.L.C","issued":"2026-03-16","accession":"20260316-5220","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Digital Power Network","kind":"comments","file":"sources/filings/text/20260316-5220_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5220","tier":"record","sha256":"92727e823e0bfeed92cad5e386d1998b542362b16bc21f9f6ae3581187347a9f","pages":7,"tokens":2284,"emptyPages":[],"textThemes":["flex","colo","study"]},{"slug":"rec-20260316-5222","title":"Comments of EDF Power Solutions, Inc. in response to the 60-Day Compliance Filing by PJM Interconnection, L.L.C. on 02/23/2026","issued":"2026-03-16","accession":"20260316-5222","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"EDF Power Solutions, Inc.","kind":"comments","file":"sources/filings/text/20260316-5222_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5222","tier":"record","sha256":"0eb49a828c40e2394f71f1c69d31ff2f6aa50032d82e3376162cbcc48e6fd310","pages":10,"tokens":2695,"emptyPages":[],"textThemes":["colo","flex","cost","study"]},{"slug":"rec-20260316-5254","title":"Comments of Invenergy Renewables LLC et al. in response to PJM Interconnection, L.L.C.’s Initial Brief in the Order to Show Cause Proceeding and Compliance…","issued":"2026-03-16","accession":"20260316-5254","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Invenergy Renewables LLCInvenergy Thermal LLC","kind":"comments","file":"sources/filings/text/20260316-5254_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5254","tier":"record","sha256":"85c10d3f66bfb3a222f3b7f45f67d84bcace17d50a31c1f61137a02f581f11f3","pages":8,"tokens":2075,"emptyPages":[],"textThemes":["colo","study","cost"]},{"slug":"rec-20260316-5268","title":"Comments of Energy Artisans, LLC re PJM Interconnection, L.L.C. Compliance Filing submitted on 02/23/2026","issued":"2026-03-16","accession":"20260316-5268","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Energy Artisans, LLC","kind":"comments","file":"sources/filings/text/20260316-5268_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5268","tier":"record","sha256":"3dfea537dbf0432ccff2aeb41f146d588212ea00131d9279474bccd48816945b","pages":3,"tokens":1430,"emptyPages":[],"textThemes":["flex","colo","study"]},{"slug":"rec-20260316-5300","title":"Limited Protest of Advanced Energy United et al. in response to PJM Interconnection, L.L.C.’s 02/23/2026 compliance filing","issued":"2026-03-16","accession":"20260316-5300","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Advanced Energy UnitedSolar Energy Industries Association","kind":"protest","file":"sources/filings/text/20260316-5300_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5300","tier":"record","sha256":"916f72f53f8571588480b1f4e572efee3059c7c14d092d557214ef175302e13b","pages":14,"tokens":3945,"emptyPages":[],"textThemes":["colo","study","flex","adequacy"]},{"slug":"rec-20260316-5303","title":"Joint Protest of the PJM Industrial Customer Coalition et al. in response to PJM Interconnection, L.L.C.’s 60-Day Compliance Filing for Co-Located Load…","issued":"2026-03-16","accession":"20260316-5303","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"PJMICC, IECA, AF&PA, and Amtrak","kind":"protest","file":"sources/filings/text/20260316-5303_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5303","tier":"record","sha256":"550029d9f6ed934d7666ac3745311217b69853b643e34fbd9d8d81da01f4238c","pages":101,"tokens":28739,"emptyPages":[],"textThemes":["colo","retail","adequacy","flex"]},{"slug":"rec-20260316-5323","title":"Comments of Data Center Coalition in response to PJM Interconnection, L.L.C.’s 02/23/2026 tariff filing in compliance","issued":"2026-03-16","accession":"20260316-5323","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Data Center Coalition","kind":"comments","file":"sources/filings/text/20260316-5323_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5323","tier":"record","sha256":"9f6ac6cfd38aecf1a0eefebc598ce0b8b64666221face26ffcfd010570b6d304","pages":10,"tokens":2461,"emptyPages":[],"textThemes":["colo","flex","study"]},{"slug":"rec-20260316-5327","title":"Protest of Vistra Corp. to PJM Interconnection, L.L.C.'s 02/23/2026 compliance filing","issued":"2026-03-16","accession":"20260316-5327","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Vistra Corp.","kind":"protest","file":"sources/filings/text/20260316-5327_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5327","tier":"record","sha256":"9ebe34cc313d4cf112b5ab6b06283750fe1db467b2d880f3131e74d14e7e4fc7","pages":21,"tokens":7183,"emptyPages":[],"textThemes":["colo","study","adequacy","flex"]},{"slug":"rec-20260316-5333","title":"Motion to Intervene and Protest of Eolian, L.P. et al. to PJM Interconnection, L.L.C.’s proposed revisions to the PJM Open Access Transmission Tariff","issued":"2026-03-16","accession":"20260316-5333","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Eolian, L.P.Antora Energy LLCCalibrant Energy ,Convergent Energy and Power LP ,Mainspring Energy ,Verrus LLC ,","kind":"protest","file":"sources/filings/text/20260316-5333_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5333","tier":"record","sha256":"3231a05538c61676368e960637aab1701850bdcbefe57a22645fe24b7eaf7aaa","pages":17,"tokens":4718,"emptyPages":[],"textThemes":["colo","study","flex","cost"]},{"slug":"rec-20260316-5339","title":"Comments or, in the Alternative, Limited Protest of Appalachian Voices in response to PJM Interconnection, L.L.C.’s 02/23/2026 compliance filing proposing…","issued":"2026-03-16","accession":"20260316-5339","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Appalachian Voices","kind":"protest","file":"sources/filings/text/20260316-5339_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5339","tier":"record","sha256":"5d576c649c51d2e02d860d65767120f54142491364d22628a4700b2a8c41a647","pages":7,"tokens":1544,"emptyPages":[],"textThemes":["colo","adequacy"]},{"slug":"rec-20260316-5340","title":"Joint Protest of Calibrant Energy et al. to PJM Interconnection, LLC’s proposed revisions to its Open Access Transmission Tariff","issued":"2026-03-16","accession":"20260316-5340","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Calibrant EnergyAntora Energy LLCEolian, L.P. ,Convergent Energy and Power LP ,Mainspring Energy ,","kind":"protest","file":"sources/filings/text/20260316-5340_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5340","tier":"record","sha256":"621e9d0f5576fd69f0aec07bc718a276a3e1c4f7e8881651c6437652d7fd71f6","pages":18,"tokens":5479,"emptyPages":[],"textThemes":["colo","adequacy","cost","retail"]},{"slug":"rec-20260316-5346","title":"Protest and Comments of Constellation Energy Generation, LLC in response to PJM Interconnection, L.L.C.’s 02/23/2026 60-Day Compliance Filing","issued":"2026-03-16","accession":"20260316-5346","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"protest","file":"sources/filings/text/20260316-5346_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5346","tier":"record","sha256":"103941dad9c04bdeff0976f5d6f71688bf92c070164f80487494fe66da64e311","pages":22,"tokens":7428,"emptyPages":[],"textThemes":["colo","study","flex","retail"]},{"slug":"rec-20260316-5351","title":"Limited Protest of American Municipal Power, Inc. to PJM Interconnection, L.L.C.’s 02/23/2026 Compliance filing","issued":"2026-03-16","accession":"20260316-5351","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"American Municipal Power, Inc.","kind":"protest","file":"sources/filings/text/20260316-5351_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5351","tier":"record","sha256":"58b8a48a9b71bc7a070d3a12847b7a62c6783a37de0bc398a1eba3b1ba81e4a1","pages":10,"tokens":2791,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20260316-5371","title":"Protest of Maryland Office of People's Counsel re PJM Interconnection, L.L.C.’s compliance filing submitted on 02/23/2026","issued":"2026-03-16","accession":"20260316-5371","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Maryland Office of People's Counsel","kind":"protest","file":"sources/filings/text/20260316-5371_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5371","tier":"record","sha256":"d244d3d1df2d2cf06ccf1bd38f792c3bc5e43108881c5c61bd9fa5b3c80ad74a","pages":13,"tokens":2724,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20260316-5379","title":"Comments of Crusoe Technologies LLC in response to PJM Interconnection, L.L.C.’s 60-Day Compliance Filing for Co-Located Load Related Revisions to Open…","issued":"2026-03-16","accession":"20260316-5379","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Crusoe Energy Systems, Inc.","kind":"comments","file":"sources/filings/text/20260316-5379_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260316-5379","tier":"record","sha256":"c7de1dfcff335f34c7c18e4aeb845fc8b49580a62287c9595388c44e21c61bfd","pages":11,"tokens":2615,"emptyPages":[],"textThemes":["colo","study","flex"]},{"slug":"rec-20260324-5119","title":"Motion for Leave to Answer and Second Answer of Constellation Energy Generation, LLC in response to the Answer filed by PJM Interconnection, L.L.C","issued":"2026-03-24","accession":"20260324-5119","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20260324-5119_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260324-5119","tier":"record","sha256":"33c2bb34b328ed03bb75cd864d38890c6bade605b7019e291abe659a64d211e7","pages":8,"tokens":2283,"emptyPages":[],"textThemes":["colo","flex","adequacy"]},{"slug":"rec-20260325-5191","title":"Reply Brief and Protest of Enchanted Rock, LLC in response to PJM Interconnection, L.L.C.’s initial brief filed on 02/23/2026","issued":"2026-03-25","accession":"20260325-5191","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Enchanted Rock, LLC","kind":"protest","file":"sources/filings/text/20260325-5191_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5191","tier":"record","sha256":"0c9e6d99b6eb12dfc17391ef79a3728e721aa3925d4f4d37e34d3adde324cb8e","pages":12,"tokens":3508,"emptyPages":[],"textThemes":["colo","flex","cost"]},{"slug":"rec-20260325-5203","title":"Joint Response of the Indicated PJM Transmission Owners to PJM Interconnection, L.L.C.’s Initial Brief filed on 02/23/2026","issued":"2026-03-25","accession":"20260325-5203","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"brief","file":"sources/filings/text/20260325-5203_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5203","tier":"record","sha256":"ae230a80271a0de70d965de192dd3f440942caaf5ad8bab498e0f84938c4b0b4","pages":26,"tokens":7168,"emptyPages":[],"textThemes":["colo","flex","study"]},{"slug":"rec-20260325-5208","title":"Response of Data Center Coalition to the 02/23/2026 Initial Brief of PJM Interconnection, L.L.C. and the 02/23/2026 Initial Brief of the PJM Transmission…","issued":"2026-03-25","accession":"20260325-5208","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Data Center Coalition","kind":"brief","file":"sources/filings/text/20260325-5208_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5208","tier":"record","sha256":"1c32cbd4542be208f4c7d334a298686a823987ccd2dd220dded915f294dd7d28","pages":13,"tokens":2775,"emptyPages":[],"textThemes":["flex","colo"]},{"slug":"rec-20260325-5220","title":"Response of Northern Virginia Electric Cooperative, Inc. to Initial Brief of PJM Interconnection, L.L.C. and to Initial Brief and Joint Responses of the…","issued":"2026-03-25","accession":"20260325-5220","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"brief","file":"sources/filings/text/20260325-5220_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5220","tier":"record","sha256":"d9c2e61ca76f6ac327bc5e1c04bb70042f858e1b80a962b230bf5718c2446a60","pages":19,"tokens":5157,"emptyPages":[],"textThemes":["colo","flex","cost"]},{"slug":"rec-20260325-5233","title":"Reply Brief of Old Dominion Electric Cooperative","issued":"2026-03-25","accession":"20260325-5233","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Old Dominion Electric Cooperative","kind":"brief","file":"sources/filings/text/20260325-5233_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5233","tier":"record","sha256":"3973d1732844c48eca8aa10533f50191154443774ed8e6fedecf5b5f20dd933b","pages":14,"tokens":3731,"emptyPages":[],"textThemes":["colo","flex"]},{"slug":"rec-20260325-5234","title":"Responsive Brief of Industrial Customer Organizations and Amtrak","issued":"2026-03-25","accession":"20260325-5234","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Industrial Customer Coalition and Industrial Energy ConsNational Railroad Passenger Corporation (\"Amtrak\")American Forest and Paper Association, Inc. ,","kind":"brief","file":"sources/filings/text/20260325-5234_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5234","tier":"record","sha256":"57aa503159d62ff0f12f6723517d232180e47802dd4745e3eba01864337080ad","pages":86,"tokens":24086,"emptyPages":[],"textThemes":["colo","retail","flex","cost"]},{"slug":"rec-20260325-5235","title":"Response Brief of Geronimo Power, LLC","issued":"2026-03-25","accession":"20260325-5235","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"GERONIMO POWER, LLC","kind":"brief","file":"sources/filings/text/20260325-5235_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5235","tier":"record","sha256":"51da403addc048ce505b58920cc6aeaa800afad79b6c908c3cd29c7334b31662","pages":16,"tokens":5101,"emptyPages":[],"textThemes":["flex","colo"]},{"slug":"rec-20260325-5236","title":"Reply Brief of Joint Co-Location Developers and Motion to Intervene Out-of-Time of Calibrant, Convergent, U.S. Energy Storage Coalition, and Versus","issued":"2026-03-25","accession":"20260325-5236","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Eolian, L.P.Antora Energy LLCCalibrant Energy ,Convergent Energy and Power LP ,Mainspring Energy ,U.S. Energy Storage Coalition ,Verrus LLC ,","kind":"motion","file":"sources/filings/text/20260325-5236_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5236","tier":"record","sha256":"d312c35f5b6f624d8b512fa74648ceedc937715be9729345aecfec29ce28fc2b","pages":59,"tokens":20102,"emptyPages":[],"textThemes":["flex","colo","study","adequacy"]},{"slug":"rec-20260325-5237","title":"Reply Brief of Advanced Energy United and the Solar Energy Industries Association","issued":"2026-03-25","accession":"20260325-5237","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Advanced Energy UnitedSolar Energy Industries Association","kind":"brief","file":"sources/filings/text/20260325-5237_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5237","tier":"record","sha256":"3f038c6528d8172685a2b0ea4e3641601c593554707c4f831de76a1d25416022","pages":23,"tokens":6020,"emptyPages":[],"textThemes":["flex","colo","study","adequacy"]},{"slug":"rec-20260325-5238","title":"Reply Brief of Constellation Energy Generation, LLC","issued":"2026-03-25","accession":"20260325-5238","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"brief","file":"sources/filings/text/20260325-5238_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5238","tier":"record","sha256":"936022f422c5f4fcb72441d4f740eef613ec0d14beb059d80e4a8e7a8baf7f78","pages":61,"tokens":16933,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20260325-5239","title":"Response Brief of Vistra Corp","issued":"2026-03-25","accession":"20260325-5239","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Vistra Corp.","kind":"brief","file":"sources/filings/text/20260325-5239_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260325-5239","tier":"record","sha256":"f6b6acdefdb13854d96808bf9ee044379d5b3dbab0120a6e9faa4ba723cbd0e7","pages":56,"tokens":17925,"emptyPages":[],"textThemes":["flex","study","colo","cost"]},{"slug":"rec-20260326-5062","title":"Reply Brief of the Independent Market Monitor in response to PJM Interconnection, L.L.C.’s initial brief filed on 02/23/2026","issued":"2026-03-26","accession":"20260326-5062","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Monitoring Analytics, LLC","kind":"brief","file":"sources/filings/text/20260326-5062_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260326-5062","tier":"record","sha256":"b8724074f90d2509feb8524db5b3a750105fe0b1c61387038126cc92b1be1e13","pages":10,"tokens":2494,"emptyPages":[],"textThemes":["flex","colo"]},{"slug":"rec-20260326-5217","title":"Comments of the Alliance to Save Energy in support of clear, durable rules that enable responsible large-load integration while preserving reliability, cost…","issued":"2026-03-26","accession":"20260326-5217","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"ALLIANCE TO SAVE ENERGY","kind":"comments","file":"sources/filings/text/20260326-5217_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260326-5217","tier":"record","sha256":"ca0b63be68c426abd614304ee38470f5222c6547b95ec9c56daa792316bc7f7f","pages":8,"tokens":2819,"emptyPages":[],"textThemes":["flex","colo","cost","registry"]},{"slug":"rec-20260326-5217-2","title":"large_load_customer_concept_report_-_jan_2026","issued":"2026-03-26","accession":"20260326-5217","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"ALLIANCE TO SAVE ENERGY","kind":"attachment","file":"sources/filings/text/20260326-5217_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260326-5217","tier":"record","parent":"rec-20260326-5217","sha256":"eaaf6e028c90add4fbc88b73cf50fcd4751e3fa2ddae627b4cc0a6a8756ecc00","pages":15,"tokens":3770,"emptyPages":[1],"textThemes":["flex"]},{"slug":"rec-20260408-5119","title":"Motion for Leave and Supplemental Protest of Constellation Energy Generation, LLC to advise FERC of an important factual development underscoring why FERC…","issued":"2026-04-08","accession":"20260408-5119","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"protest","file":"sources/filings/text/20260408-5119_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260408-5119","tier":"record","sha256":"71f1e61323c94a60b9848aa0a58acd47eba5cacab660bd66b6df3b952833fcd6","pages":6,"tokens":1510,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20260414-5246","title":"Answer of Exelon Corporation to the Motion for Leave and Supplemental Protest of Constellation Energy Generation, LLC filed on 04/08/2026","issued":"2026-04-14","accession":"20260414-5246","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Exelon Corporation","kind":"protest","file":"sources/filings/text/20260414-5246_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260414-5246","tier":"record","sha256":"0b570526bf8ae0b14bcc7946b3e3d78ef75fc21669825730296f439685e224a9","pages":28,"tokens":6996,"emptyPages":[],"textThemes":["study"]},{"slug":"rec-20260421-0007","title":"McNees Wallace & Nurick LLC submits Petition for Review filed in the U.S. Court of Appeals for the Third Circuit of PJM Industrial Customer Coalition et al.…","issued":"2026-04-21","accession":"20260421-0007","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM INDUSTRIAL CUSTOMER COALITIONINDUSTRIAL ENERGY CONSUMERS OF AMERICANATIONAL RAILROAD PASSENGER CORPORATION (AMTRAK) ,","kind":"filing","file":"sources/filings/text/20260421-0007_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260421-0007","tier":"record","sha256":"7c8e871622fb3f750f2ecdd9278433882afdff649fbc0cac594d1bce9df76976","pages":5,"tokens":752,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260424-5110","title":"Reply Comments of Earthjustice in response to the stakeholder's comments re PJM Interconnection, LLC's 02/23/2026 Initial Brief et al","issued":"2026-04-24","accession":"20260424-5110","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EARTHJUSTICE","kind":"comments","file":"sources/filings/text/20260424-5110_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5110","tier":"record","sha256":"02a81344144d46d3c44379aa3b873c3ab76c5c83e0d7b37cc05b3dc22a34517d","pages":27,"tokens":7855,"emptyPages":[],"textThemes":["flex","colo","study","cost"]},{"slug":"rec-20260424-5196","title":"Reply of Old Dominion Electric Cooperative to Responses to Initial Briefs of PJM Interconnection, L.L.C. and Indicated Transmission Owners","issued":"2026-04-24","accession":"20260424-5196","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Old Dominion Electric Cooperative","kind":"brief","file":"sources/filings/text/20260424-5196_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5196","tier":"record","sha256":"de5bbbad2d4394d03219f3f4c8ab6d9657403ee11229d60bb8b685cf8d7bc3df","pages":8,"tokens":1658,"emptyPages":[],"textThemes":["colo","flex"]},{"slug":"rec-20260424-5219","title":"Motion for Leave to Answer and Answer of the Indicated PJM Transmission Owners in response to certain parties’ protests and comments on PJM Interconnection,…","issued":"2026-04-24","accession":"20260424-5219","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"protest","file":"sources/filings/text/20260424-5219_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5219","tier":"record","sha256":"8d9f348c95899746a18399d1338a841bc0fe166be005668eb3613cc45825004a","pages":9,"tokens":2495,"emptyPages":[],"textThemes":["colo","study","flex"]},{"slug":"rec-20260424-5247","title":"Reply Brief of PJM Interconnection, L.L.C","issued":"2026-04-24","accession":"20260424-5247","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"brief","file":"sources/filings/text/20260424-5247_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5247","tier":"record","sha256":"8558c8942d2ef16f1125e0652364326598a8b63454fe8152e4988001605131c7","pages":111,"tokens":34853,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20260424-5276","title":"Reply of Northern Virginia Electric Cooperative, Inc. to Responses to Initial Brief of PJM Interconnection, L.L.C. and to Initial Brief and Joint Responses…","issued":"2026-04-24","accession":"20260424-5276","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"brief","file":"sources/filings/text/20260424-5276_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5276","tier":"record","sha256":"a4f90194904c303f093412c5da277cb2ed07785f0f4a74cc26ec6aa5f8f5a31c","pages":29,"tokens":9173,"emptyPages":[],"textThemes":["colo","flex","cost","retail"]},{"slug":"rec-20260424-5278","title":"Reply Protest of Maryland Office of People's Counsel to PJM Interconnection, L.L.C. initial brief and responsive pleadings","issued":"2026-04-24","accession":"20260424-5278","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Maryland Office of People's Counsel","kind":"protest","file":"sources/filings/text/20260424-5278_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5278","tier":"record","sha256":"633fb5fbd822c868f5a92908a3fafce8a7125111bd497e64f7ec042aa4cc958d","pages":14,"tokens":2880,"emptyPages":[],"textThemes":["colo","adequacy","cost"]},{"slug":"rec-20260424-5295","title":"Second Reply Brief of Eolian, L.P., et al","issued":"2026-04-24","accession":"20260424-5295","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Eolian, L.P.Antora Energy LLCCalibrant Energy ,Mainspring Energy ,U.S. Energy Storage Coalition ,Verrus LLC ,","kind":"brief","file":"sources/filings/text/20260424-5295_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5295","tier":"record","sha256":"3a7f5980cf41ddded3dd813bdc4679f77f22559170832193570bf59e87a37578","pages":30,"tokens":9486,"emptyPages":[],"textThemes":["flex","colo","study"]},{"slug":"rec-20260424-5298","title":"Reply Brief of PJM Industrial Customer Coalition, et al","issued":"2026-04-24","accession":"20260424-5298","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Industrial Customer CoalitionIndustrial Energy Consumers of AmericaAmerican Forest and Paper Association, Inc. ,National Railroad Passenger Corporation (\"Amtrak\") ,","kind":"brief","file":"sources/filings/text/20260424-5298_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5298","tier":"record","sha256":"fcec260e010d0651d5326172f94b22a3ae94ff44fc91d0a40b24221a2cf8d021","pages":23,"tokens":7606,"emptyPages":[],"textThemes":["retail","flex","colo","study"]},{"slug":"rec-20260424-5303","title":"Response Brief of Constellation Energy Generation, LLC","issued":"2026-04-24","accession":"20260424-5303","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"brief","file":"sources/filings/text/20260424-5303_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5303","tier":"record","sha256":"8cc4e22e2f25a851b8d0ba7cc3448b86d1028ebaa780b4379a3f2598566df149","pages":31,"tokens":9544,"emptyPages":[],"textThemes":["colo","study","flex"]},{"slug":"rec-20260424-5312","title":"Reply Brief of the Indicated PJM Transmission Owners","issued":"2026-04-24","accession":"20260424-5312","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"brief","file":"sources/filings/text/20260424-5312_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5312","tier":"record","sha256":"a74519a63be4a119028b416c08013e40ec3ef798a655235a30b2dbbc3fe561a5","pages":34,"tokens":10234,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20260424-5312-2","title":"Exhibit No. PTO-0005 – Joint Rebuttal Testimony of Blazunas, Schafer, & Hammer","issued":"2026-04-24","accession":"20260424-5312","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260424-5312_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5312","tier":"record","parent":"rec-20260424-5312","sha256":"0cad5d1a41125a9fed5e4f684343f9a45d8f5a5f90934b253319e6f14e0cbe4d","pages":34,"tokens":9420,"emptyPages":[33],"textThemes":["flex","colo","study","cost"]},{"slug":"rec-20260424-5312-3","title":"Exhibit No. PTO-0006 – Illustrative Tariff Sheets","issued":"2026-04-24","accession":"20260424-5312","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260424-5312_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260424-5312","tier":"record","parent":"rec-20260424-5312","sha256":"fe1371184ebb96899d469e86d260bf5b3b5d6dca86469a06bedb2f70fc0cb647","pages":17,"tokens":4826,"emptyPages":[],"textThemes":["flex","colo","cost"]},{"slug":"rec-20260428-0001","title":"Berman and Todderud LLP submits Petition for Review filed in the U.S. Court of Appeals for the Third Circuit of Exelon Corp. re Order on Show Cause…","issued":"2026-04-28","accession":"20260428-0001","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EXELON CORPORATION","kind":"filing","file":"sources/filings/text/20260428-0001_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260428-0001","tier":"record","sha256":"75a75c25e71e617f1a3b410ef587d825a3ab4c63fe4412fb2d52d12b851d2341","pages":196,"tokens":70067,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20260430-0001","title":"Petition for Review filed in the U.S. Court of Appeals for the Third Circuit of the Industrial Energy Consumers of America, et al. re 12/18/2025 Order and…","issued":"2026-04-30","accession":"20260430-0001","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"MCNEES WALLACE AND NURICK LLC","kind":"filing","file":"sources/filings/text/20260430-0001_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260430-0001","tier":"record","sha256":"ca29a1a6e00e652a860318e0d5efe4d031ada4c880c2dee8d074a9dc89e63fb5","pages":9,"tokens":1398,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260430-0002","title":"Petition for Review filed in the U.S. Court of Appeals for the District of Columbia Circuit of American Transmission Systems, Incorporated, et al. re…","issued":"2026-04-30","accession":"20260430-0002","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"AMERICAN TRANSMISSION SYSTEMS, INCORPORATEDJERSEY CENTRAL POWER & LIGHT COMPANYMID-ATLANTIC INTERSTATE TRANSMISSION LLC ,KEYSTONE APPALACHIAN TRANSMISSION COMPANY ,THE POTOMAC EDISON COMPANY ,MONONGAHELA POWER COMPANY ,TRANS-ALLEGHENY INTERSTATE LINE COMPANY ,","kind":"filing","file":"sources/filings/text/20260430-0002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260430-0002","tier":"record","sha256":"0a16be2a04786d4420fd6ea4f73840350e9ab968ab9360454f330c76af287eb3","pages":219,"tokens":66783,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20260507-5103","title":"Motion for Leave to Answer and Answer of Enchanted Rock, LLC in response to PJM Interconnection, LLC's 04/24/2026 Reply Brief","issued":"2026-05-07","accession":"20260507-5103","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Enchanted Rock, LLC","kind":"answer","file":"sources/filings/text/20260507-5103_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260507-5103","tier":"record","sha256":"d6afed2ff23b26458cf6c80dac0202107b78daa506555288e8fda09c3523bbb4","pages":10,"tokens":3095,"emptyPages":[],"textThemes":["colo","flex","cost","study"]},{"slug":"rec-20260508-5176","title":"Motion for Leave to Answer and Answer of Calibrant Energy et al. in response to the 04/24/2026 Answer of the Indicated PJM Transmission Owners","issued":"2026-05-08","accession":"20260508-5176","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Calibrant EnergyAntora Energy LLCConvergent Energy and Power LP ,Eolian, LP ,Mainspring Energy ,Verrus LLC ,","kind":"answer","file":"sources/filings/text/20260508-5176_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260508-5176","tier":"record","sha256":"9ccdde3e51b138afeabb1e83912df3e105e50e826cd5368a7872c289f13ae3ce","pages":11,"tokens":2999,"emptyPages":[],"textThemes":["colo","flex"]},{"slug":"rec-20260508-5207","title":"Motion for Leave to Answer and Limited Answer of PJM Industrial Customer Coalition et al. to the Indicated PJM Transmission Owners’ 04/24/2026 Motion for…","issued":"2026-05-08","accession":"20260508-5207","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"PJM Industrial Customer CoalitionIndustrial Energy Consumers of AmericaAmerican Forest and Paper Association, Inc. ,National Railroad Passenger Corporation (\"Amtrak\") ,","kind":"answer","file":"sources/filings/text/20260508-5207_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260508-5207","tier":"record","sha256":"239f1c15db8661880c4687c109268da09e78fa787653217ec181d60a7d6620f8","pages":9,"tokens":2588,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20260511-5167","title":"Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC in response to PJM Interconnection, LLC's 04/24/2026 Reply Brief","issued":"2026-05-11","accession":"20260511-5167","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20260511-5167_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260511-5167","tier":"record","sha256":"05c08452d157c1d819ddf08db1ec42fa8ae4af91875fd2a12708c9a7ffe85670","pages":39,"tokens":9651,"emptyPages":[],"textThemes":["study","colo","flex","adequacy"]},{"slug":"rec-20260512-3049","title":"Notice of Commission-Led Technical Conference re PJM Governance and Stakeholder Reforms","issued":"2026-05-12","accession":"20260512-3049","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"notice","file":"sources/filings/text/20260512-3049_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260512-3049","tier":"record","sha256":"2a46a386fd9eab438e1bb98d4cab3ebc1fa52c0d227fe4ac794c8387ff752e2c","pages":null,"tokens":362,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260512-5049","title":"Motion for Leave to Answer and Answer of Eastman Chemical Company in response to the Indicated PJM Transmission Owners' 04/24/2026 Answer","issued":"2026-05-12","accession":"20260512-5049","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"EASTMAN CHEMICAL COMPANY","kind":"answer","file":"sources/filings/text/20260512-5049_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260512-5049","tier":"record","sha256":"10d8f57732ad0cf5741af9c9e4eb387fb603897ee359eb1747148043642a423f","pages":7,"tokens":1649,"emptyPages":[],"textThemes":["colo","adequacy"]},{"slug":"rec-20260520-5275","title":"PJM Interconnection, L.L.C. submits third supplemental Informational Report re timeline for stakeholder deliberation on the reliability backstop procurement…","issued":"2026-05-20","accession":"20260520-5275","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/filings/text/20260520-5275_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260520-5275","tier":"record","sha256":"252485f01ff9d064cc4b4b954829173137afc2ac11a066891ff2198b474e4df1","pages":6,"tokens":1207,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260521-5093","title":"Motion for Leave to Answer and Answer of Geronimo Power, LLC in response to the reply briefs filed by PJM Interconnection, L.L.C. et al","issued":"2026-05-21","accession":"20260521-5093","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"GERONIMO POWER, LLC","kind":"answer","file":"sources/filings/text/20260521-5093_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260521-5093","tier":"record","sha256":"84319f705297bd568ac2a834eafbf937601ccaea34dfd41da3d023b170bc897e","pages":14,"tokens":4503,"emptyPages":[],"textThemes":["flex","colo","cost","study"]},{"slug":"rec-20260528-5222","title":"Motion for Leave to Answer and Answer of the Indicated PJM Transmission Owners in response to certain reply briefs filed on 04/24/2026 and the Motion for…","issued":"2026-05-28","accession":"20260528-5222","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"answer","file":"sources/filings/text/20260528-5222_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260528-5222","tier":"record","sha256":"ed16a8787c258f4ac6c4d988e6efe8a379ac3d5cb7464f0caa11de32b02c7b44","pages":14,"tokens":4194,"emptyPages":[],"textThemes":["colo","study","flex","cost"]},{"slug":"rec-20260528-5222-2","title":"Attachment A_Reply Testimony of Lance Schafer (Final 5.28.2026)","issued":"2026-05-28","accession":"20260528-5222","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"attachment","file":"sources/filings/text/20260528-5222_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260528-5222","tier":"record","parent":"rec-20260528-5222","sha256":"dbab9783e83bbad882a6b250b8a36f85d2caa6c8a8c3113d0c8fefd35eb16488","pages":14,"tokens":3641,"emptyPages":[14],"textThemes":["study","cost","colo"]},{"slug":"rec-20260603-5149","title":"Motion for Leave to Answer and Limited Answer of the Indicated PJM Transmission Owners in response to certain parties' responses to the 04/24/2026 Answer","issued":"2026-06-03","accession":"20260603-5149","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"answer","file":"sources/filings/text/20260603-5149_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260603-5149","tier":"record","sha256":"68ea108fbaf956be313976086facb076300f521d1971717dd69ade033973a7d6","pages":5,"tokens":1475,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260605-3031","title":"Supplemental Notice of Commission-Led Technical Conference re PJM Governance and Stakeholder Reforms","issued":"2026-06-05","accession":"20260605-3031","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"filing","file":"sources/filings/text/20260605-3031_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260605-3031","tier":"record","sha256":"f59f3ac962480ac9797f176be7d4e74ec9f900814cb91ca29c43cbf6e54a2c72","pages":null,"tokens":1432,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260608-5078","title":"Comments of Persistence Analytics Group LLC/ United Grid related to the Commission-Led Technical Conference re PJM Governance and Stakeholder Reforms","issued":"2026-06-08","accession":"20260608-5078","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PERSISTENCE ANALYTICS GROUP LLC, UNITED GRID","kind":"comments","file":"sources/filings/text/20260608-5078_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260608-5078","tier":"record","sha256":"343791c6626421465b801a2e97e15f2ca4f0ed7e521f6dc4f3ed787a411d97f8","pages":4,"tokens":1012,"emptyPages":[],"textThemes":["flex"]},{"slug":"rec-20260618-3047","title":"Order Instituting Proceeding under Section 206 of the Federal Power Act re Midcontinent Independent System Operator, Inc. et al","issued":"2026-06-18","accession":"20260618-3047","docket":"EL26-70-000","group":"MISO show cause proceeding (E-8)","filer":"SECRETARY OF THE COMMISSION, FERCCOMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)","kind":"order","file":"sources/filings/text/20260618-3047_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3047","tier":"record","sha256":"4f1055a2c38bfbcccc67fbf8bdb642151ea3dd3e6dafe45e7b2bcab504105bc1","pages":null,"tokens":43486,"emptyPages":[],"textThemes":["colo","cost","study","flex"]},{"slug":"rec-20260618-3063","title":"Order Instituting Proceeding Under Section 206 of the Federal Power Act re New York Independent System Operator, Inc. et al., EL26-69. Chmn. Swett, Comm'r.…","issued":"2026-06-18","accession":"20260618-3063","docket":"EL26-69-000","group":"NYISO show cause proceeding (E-12)","filer":"COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)SECRETARY OF THE COMMISSION - FERC","kind":"order","file":"sources/filings/text/20260618-3063_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3063","tier":"record","sha256":"4eb528bb89570a2356ab90aa9c9aabd0fc2f8904206dcfa68a3d1b0db0f87e09","pages":null,"tokens":44949,"emptyPages":[],"textThemes":["colo","cost","study","flex"]},{"slug":"rec-20260618-3076","title":"Order Instituting Proceeding Under Section 206 etc. re ISO New England Inc. et al","issued":"2026-06-18","accession":"20260618-3076","docket":"EL26-72-000","group":"ISO-NE show cause proceeding (E-11)","filer":"COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)SECRETARY OF THE COMMISSION - FERC","kind":"order","file":"sources/filings/text/20260618-3076_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3076","tier":"record","sha256":"d3c4acc3cab0361d0aacbf9eeafd6647352e3cf1b8c01cca0636851170a9847d","pages":null,"tokens":43598,"emptyPages":[],"textThemes":["colo","cost","study","flex"]},{"slug":"rec-20260618-3083","title":"Order Instituting Proceeding Under Section 206 of the Federal Power Act re California Independent System Operator Corporation et al","issued":"2026-06-18","accession":"20260618-3083","docket":"EL26-71-000","group":"CAISO show cause proceeding (E-10)","filer":"COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)SECRETARY OF THE COMMISSION - FERC","kind":"order","file":"sources/filings/text/20260618-3083_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3083","tier":"record","sha256":"f77fa21ad3c9725950ed769d4fc0aaa1d06cbc2aadd2b2daf208d4417a61d695","pages":null,"tokens":44226,"emptyPages":[],"textThemes":["cost","colo","study","flex"]},{"slug":"rec-20260618-3103","title":"Order on Rehearing, Clarification, Compliance Filing, and Paper Hearing re PJM Interconnection, L.L.C. et al","issued":"2026-06-18","accession":"20260618-3103","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"SECRETARY OF THE COMMISSION - FERCCOMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)","kind":"order","file":"sources/filings/text/20260618-3103_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3103","tier":"record","sha256":"3fd02baaa90e70708fba93c3f8062bcdd4b780f2bc967d35ccab753632b3df74","pages":null,"tokens":108099,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20260618-3105","title":"Order Instituting Proceeding Under Section 206 etc. re PJM Interconnection, L.L.C. et al","issued":"2026-06-18","accession":"20260618-3105","docket":"EL26-67-000","group":"PJM show cause proceeding (E-7)","filer":"COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)SECRETARY OF THE COMMISSION - FERC","kind":"order","file":"sources/filings/text/20260618-3105_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3105","tier":"record","sha256":"993af8ee8c539ae93bab6b2edc37681325f2fe31f1c48f9b9244e374cfa20151","pages":null,"tokens":41918,"emptyPages":[],"textThemes":["cost","study","colo","flex"]},{"slug":"rec-20260618-3110","title":"Order Instituting Proceeding under Section 206 of the Federal Power Act re Southwest Power Pool, Inc. et al","issued":"2026-06-18","accession":"20260618-3110","docket":"EL26-68-000","group":"SPP show cause proceeding (E-9)","filer":"COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)SECRETARY OF THE COMMISSION - FERC","kind":"order","file":"sources/filings/text/20260618-3110_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3110","tier":"record","sha256":"5f5ed5d98d46f9ffe6fb8e6546427004681cdaf456dd181eeafe604a548d24ca","pages":null,"tokens":33998,"emptyPages":[],"textThemes":["cost","colo","study","flex"]},{"slug":"rec-20260702-3047","title":"Second Supplemental Notice of Technical Commission-Led Technical Conference re PJM Governance and Stakeholder Reforms","issued":"2026-07-02","accession":"20260702-3047","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"filing","file":"sources/filings/text/20260702-3047_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260702-3047","tier":"record","sha256":"df98eec17b3803098249e08a02e1e21d99190ce0c222341363fab2d7f585c560","pages":null,"tokens":1752,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260702-4001","title":"Open Letter to Technical Conference Participants re Grid Enhancing Technologies and Increasing Market Planning Efficiency through Improved Software","issued":"2026-07-02","accession":"20260702-4001","docket":"EL26-67-000","group":"PJM show cause proceeding (E-7)","filer":"COMMISSIONERS AND IMMEDIATE STAFF (THE COMMISSION)","kind":"filing","file":"sources/filings/text/20260702-4001_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260702-4001","tier":"record","sha256":"593e6834c7a275520565f60d97c5bd08b0f746510130ca4261abb1003246e403","pages":null,"tokens":367,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260702-5099","title":"Supplemental Comments of Persistence Analytics Group LLC re PJM Governance and Stakeholder Reforms","issued":"2026-07-02","accession":"20260702-5099","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PERSISTENCE ANALYTICS GROUP LLC","kind":"comments","file":"sources/filings/text/20260702-5099_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260702-5099","tier":"record","sha256":"0066973e7c1407031050f0c37c6c6f79736040b71ee14b5bfe24c27be8924e5d","pages":5,"tokens":1681,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260706-5036","title":"Comments of Abdur Rahman re PJM Governance and Stakeholder Reforms","issued":"2026-07-06","accession":"20260706-5036","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260706-5036_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260706-5036","tier":"record","sha256":"e20fdbdb6420bb06a0b50254809d7c972ae224d8547eb20ec1854d1830bbbbb5","pages":5,"tokens":1837,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260715-4000","title":"Pre-filed Statement of Stacey Burbure, Senior Vice President of Transmission Regulatory Engagement & Compliance for American Electric Power Company, Inc.…","issued":"2026-07-15","accession":"20260715-4000","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"AMERICAN ELECTRIC POWER COMPANY INC","kind":"tariff filing","file":"sources/filings/text/20260715-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4000","tier":"record","sha256":"51a8beb7a1c0ba13fc1f3861de56429f9e678c2d829713b318686e6f6c0bd354","pages":23,"tokens":6872,"emptyPages":[],"textThemes":["adequacy","study"]},{"slug":"rec-20260715-4001","title":"Pre-filed Statement of Steven Lieberman, Vice President of Transmission & Regulatory Affairs for American Municipal Power, Inc., for Panel 2 for the PJM…","issued":"2026-07-15","accession":"20260715-4001","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"AMERICAN MUNICIPAL POWER INC","kind":"testimony","file":"sources/filings/text/20260715-4001_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4001","tier":"record","sha256":"656cbd0d1be44ea67dd9a1589dc4c2e3252fe6967362d4cdf8a7cd1f1b29495b","pages":16,"tokens":4245,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260715-4002","title":"Pre-filed Statement of Susan Bruce, Counsel for PJM Industrial Customer Coalition, for the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-15","accession":"20260715-4002","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM INDUSTRIAL CUSTOMER COALITION","kind":"testimony","file":"sources/filings/text/20260715-4002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4002","tier":"record","sha256":"2003ffef0884771f2dd46796764fb2655bc6daa202bc7e29e8206eed0e0368a0","pages":19,"tokens":8039,"emptyPages":[],"textThemes":["retail"]},{"slug":"rec-20260715-4003","title":"Pre-filed Statement of Suzanne Jaworowski, Secretary of Energy and Natural Resources for Indiana Governor Mike Braun's Office, for the PJM Governance and…","issued":"2026-07-15","accession":"20260715-4003","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"INDIANA DEPARTMENT OF ENERGY AND NATURAL RESOURCES","kind":"testimony","file":"sources/filings/text/20260715-4003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4003","tier":"record","sha256":"564ed910dc854ca7372ce3899b40cc1de5e63483c3892e3465288c8253359c25","pages":4,"tokens":1448,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260715-4004","title":"Pre-filed Statement of Abraham Silverman, Assistant Research Scholar at Johns Hopkins University, for the PJM Governance and Stakeholder Reforms Technical…","issued":"2026-07-15","accession":"20260715-4004","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"JOHNS HOPKINS UNIVERSITY","kind":"testimony","file":"sources/filings/text/20260715-4004_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4004","tier":"record","sha256":"f5adf38b159dda0b7594b4c77c3d5b926a62249f566d6d18f75132294946ec76","pages":6,"tokens":2208,"emptyPages":[],"textThemes":["retail"]},{"slug":"rec-20260715-4005","title":"Pre-filed Statement of J. Arnold Quinn, Senior Vice President of Regulatory Policy for Vistra Corporation, for the PJM Governance and Stakeholder Reforms…","issued":"2026-07-15","accession":"20260715-4005","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"VISTRA CORPORATION","kind":"testimony","file":"sources/filings/text/20260715-4005_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4005","tier":"record","sha256":"cc973a7e5f95c6cc41cc73c4d41fa3cab0e5ea7fff4597cab497812f62590143","pages":12,"tokens":3442,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260715-4006","title":"Pre-filed Statement of Brian D. George, Senior Lead of U.S. Energy Markets for Google LLC, for the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-15","accession":"20260715-4006","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"GOOGLE LLC","kind":"testimony","file":"sources/filings/text/20260715-4006_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4006","tier":"record","sha256":"a61e86e11f16bfa1795e081953ba123c070840d90e413e4c258be23d38dc2ad1","pages":6,"tokens":2376,"emptyPages":[],"textThemes":["registry"]},{"slug":"rec-20260715-4007","title":"Pre-filed Statement of Glen Thomas, President of PJM Power Providers Group, for the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-15","accession":"20260715-4007","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM POWER PROVIDERS GROUP","kind":"testimony","file":"sources/filings/text/20260715-4007_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4007","tier":"record","sha256":"8e91602a562e0ff01ff87c8d4e4fd0305bec434f2ac8276c1ab29774ad6db8af","pages":5,"tokens":1385,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260715-4008","title":"Pre-filed Statement of Jodi L. Moskowitz, Vice President Regulatory – Law, Deputy General Counsel and RTO Strategy Officer for Public Service Enterprise…","issued":"2026-07-15","accession":"20260715-4008","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PUBLIC SERVICE ENTERPRISE GROUP INCORPORATED","kind":"testimony","file":"sources/filings/text/20260715-4008_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4008","tier":"record","sha256":"4f6d733eac07c7ef9b171a813b123bd0c920cd5a2131164885504fa604e9bd85","pages":16,"tokens":5770,"emptyPages":[],"textThemes":["adequacy","registry"]},{"slug":"rec-20260715-4009","title":"Pre-filed Statement of Kent Chandler, Non-Resident Senior Fellow of Energy and Environmental Policy at R Street Institute, for the PJM Governance and…","issued":"2026-07-15","accession":"20260715-4009","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"R STREET INSTITUTE","kind":"testimony","file":"sources/filings/text/20260715-4009_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4009","tier":"record","sha256":"0402cdec7e389e193aaa060a77868ffb23760930ed7bfe72e125dcd48c086733","pages":6,"tokens":2936,"emptyPages":[],"textThemes":["adequacy","retail","study"]},{"slug":"rec-20260715-4010","title":"Pre-filed Statement of Maria Gulluni, Vice President, General Counsel, and Chief Compliance Officer for ISO New England Inc., for Panel 1 PJM Governance…","issued":"2026-07-15","accession":"20260715-4010","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"ISO NEW ENGLAND INC","kind":"tariff filing","file":"sources/filings/text/20260715-4010_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-4010","tier":"record","sha256":"b3437ffdab7acd375ef54ec939eed8c35ce0808ad09d1bea3434ccc7adce84dd","pages":6,"tokens":2166,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260715-5006","title":"Comments of Advanced Energy United re PJM Governance and Stakeholder Reforms","issued":"2026-07-15","accession":"20260715-5006","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Advanced Energy United","kind":"comments","file":"sources/filings/text/20260715-5006_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-5006","tier":"record","sha256":"2aba5657505d858c81f66e98acb814ebbae2aa248a626af907ef333d08539f8a","pages":null,"tokens":3871,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260716-3012","title":"Third Supplemental Notice of Commission-Led Technical Conference re PJM Governance and Stakeholder Reforms","issued":"2026-07-16","accession":"20260716-3012","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"filing","file":"sources/filings/text/20260716-3012_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-3012","tier":"record","sha256":"34082aa63635641f46e1188ddcf82803318e1455c14214b1e86ce68846ede0ee","pages":null,"tokens":1824,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260716-4000","title":"Pre-filed Statement of Marjorie Rosenbluth Philips, Senior Vice President of Wholesale Market Policy for LS Power Development, LLC, for the PJM Governance…","issued":"2026-07-16","accession":"20260716-4000","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"LS POWER DEVELOPMENT, LLC","kind":"testimony","file":"sources/filings/text/20260716-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-4000","tier":"record","sha256":"a587d097f5f34cbbef69aa0948d255f3b0810586c9c9b98d3f3424aae4d4f20a","pages":13,"tokens":5106,"emptyPages":[],"textThemes":["retail"]},{"slug":"rec-20260716-4001","title":"Pre-filed Statement of Mason Emnett, Senior Vice President for Public Policy for Constellation Energy Generation, LLC, for the PJM Governance and…","issued":"2026-07-16","accession":"20260716-4001","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"CONSTELLATION ENERGY GENERATION, LLC","kind":"testimony","file":"sources/filings/text/20260716-4001_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-4001","tier":"record","sha256":"d34367bddc12d45c13dbbb0318541f31245203d50e356785423d4e09fbe9c291","pages":18,"tokens":5845,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260716-4002","title":"Pre-filed Statement of Pamela Quinlan, Principal at GQS New Energy Strategies, for the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-16","accession":"20260716-4002","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"GQS NEW ENERGY STRATEGIES","kind":"testimony","file":"sources/filings/text/20260716-4002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-4002","tier":"record","sha256":"4bc2617a30cfe412650e6001bea7988c992e2f68258ffbeed62b5734e60e46a9","pages":18,"tokens":7235,"emptyPages":[],"textThemes":["adequacy","study"]},{"slug":"rec-20260716-4003","title":"Pre-filed Statement of Pat Wood III, Executive Chairman for the Hunt Energy Network, for the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-16","accession":"20260716-4003","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"HUNT ENERGY NETWORK","kind":"testimony","file":"sources/filings/text/20260716-4003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-4003","tier":"record","sha256":"7fbed59fcb5c35bd45cb75f3b3ea8fc4847b96d881b234ce2f87ee875437a5bc","pages":1,"tokens":879,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260716-4004","title":"Prefiled Statement for Panelists from PJM Interconnection, L.L.C., for the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-16","accession":"20260716-4004","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM INTERCONNECTION, L.L.C.","kind":"testimony","file":"sources/filings/text/20260716-4004_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-4004","tier":"record","sha256":"4daaea7b58fc126bbbbd7134842f6d5e3d02d060183725cf9151a41eba17c7fc","pages":14,"tokens":5885,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260716-4005","title":"Pre-filed Statement of Jacob Finkel, Deputy Secretary of Policy for Pennsylvania Governor Josh Shapiro's Office, for the PJM Governance and Stakeholder…","issued":"2026-07-16","accession":"20260716-4005","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PENNSYLVANIA DEPARTMENT OF POLICY","kind":"testimony","file":"sources/filings/text/20260716-4005_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-4005","tier":"record","sha256":"f258d6be7d96dbc36eb913c825a60286e3079727f5786704200b6695a3484127","pages":10,"tokens":2990,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260716-5052","title":"Supplemental Comments of Persistence Analytics Group LLC in response to FERC’s Third Supplemental Notice of Commission-Led Technical Conference re PJM…","issued":"2026-07-16","accession":"20260716-5052","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PERSISTENCE ANALYTICS GROUP LLC","kind":"comments","file":"sources/filings/text/20260716-5052_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260716-5052","tier":"record","sha256":"2362590bb723bfb422779c4d03e19e21bafff47f3b5e693f7a87ad1f1cfa2ad8","pages":4,"tokens":829,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260717-5240","title":"Comments of the Independent Market Monitor for PJM in response to FERC’s Third Supplemental Notice of Commission-Led Technical Conference re PJM Governance…","issued":"2026-07-17","accession":"20260717-5240","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Monitoring Analytics, LLC","kind":"comments","file":"sources/filings/text/20260717-5240_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260717-5240","tier":"record","sha256":"e8a8d4efe0e9c6df19c946628cc10b2b8e8618a451ba8ab98c3e818048efcddd","pages":13,"tokens":3722,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260720-4000","title":"Pre-filed Statement of Dr. Joseph Bowring, President of Monitoring Analytics and the Independent Market Monitor for PJM, for the PJM Governance and…","issued":"2026-07-20","accession":"20260720-4000","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"MONITORING ANALYTICS, LLC","kind":"testimony","file":"sources/filings/text/20260720-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-4000","tier":"record","sha256":"e8a8d4efe0e9c6df19c946628cc10b2b8e8618a451ba8ab98c3e818048efcddd","pages":13,"tokens":3722,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260720-4002","title":"Pre-filed Statement of Jameson Tweedie, Public Advocate for Delaware, Delaware Division of the Public Advocate, for the PJM Governance and Stakeholder…","issued":"2026-07-20","accession":"20260720-4002","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"DELAWARE DIVISION OF THE PUBLIC ADVOCATE","kind":"testimony","file":"sources/filings/text/20260720-4002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-4002","tier":"record","sha256":"753ec5a31eda0d5cd1703dc2851ace66084564ea9c4204948586d9b90a893296","pages":2,"tokens":534,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260720-5047","title":"Comments of the National Caucus of Environmental Legislators in response to FERC’s Third Supplemental Notice of Commission-Led Technical Conference re PJM…","issued":"2026-07-20","accession":"20260720-5047","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"National Caucus of Environmental Legislators","kind":"comments","file":"sources/filings/text/20260720-5047_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5047","tier":"record","sha256":"63900cc1d1bcb45e5126ee56ba7486b8584f630048612a99c35742b38b948e7e","pages":4,"tokens":1173,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260720-5170","title":"Vistra Corp. submits Request for Clarification or, in the Alternative, Rehearing of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5170","docket":"ER26-1479-001","group":"PJM co-location compliance","filer":"Vistra Corp.","kind":"rehearing request","file":"sources/filings/text/20260720-5170_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5170","tier":"record","sha256":"0e013dcedf25ea1e80d2023588e07373caad46a4ce4c4e135aa09bae94114e4b","pages":19,"tokens":5682,"emptyPages":[],"textThemes":["colo","flex","adequacy","study"]},{"slug":"rec-20260720-5180","title":"Exelon Corporation and FirstEnergy Service Company submit Request for Rehearing of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5180","docket":"ER26-1479-001","group":"PJM co-location compliance","filer":"Exelon CorporationThe FirstEnergy Transmission Companies","kind":"rehearing request","file":"sources/filings/text/20260720-5180_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5180","tier":"record","sha256":"d5fec07de81e3c826a5153ca6285f2f403d46686e0a884ad80f962fd1932ad57","pages":43,"tokens":15731,"emptyPages":[],"textThemes":["colo","study","cost","flex"]},{"slug":"rec-20260720-5181","title":"Constellation Energy Generation, LLC submits Limited Request for Rehearing and Clarification of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5181","docket":"ER26-1479-001","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"rehearing request","file":"sources/filings/text/20260720-5181_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5181","tier":"record","sha256":"f9bbbde036ea6e81c3b84082a19a7daeb91d9db02d75a6ec769dbec0e0b40ec9","pages":19,"tokens":6634,"emptyPages":[],"textThemes":["colo","study","flex"]},{"slug":"rec-20260720-5199","title":"Eolian, L.P., et. al. submit Request for Clarification or, in the Alternative, Rehearing of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5199","docket":"ER26-1479-001","group":"PJM co-location compliance","filer":"Eolian, L.P.Calibrant EnergyVerrus LLC ,","kind":"rehearing request","file":"sources/filings/text/20260720-5199_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5199","tier":"record","sha256":"783b97ea229f28e449306981d15563db2176e2658741a45c5cc7db883bcd6cd2","pages":32,"tokens":9651,"emptyPages":[],"textThemes":["flex","colo","adequacy","proximate"]},{"slug":"rec-20260720-5200","title":"The PJM Industrial Customer Coalition, et al. submit Request for Rehearing and Clarification of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5200","docket":"ER26-1479-001","group":"PJM co-location compliance","filer":"PJMICC, et al.","kind":"rehearing request","file":"sources/filings/text/20260720-5200_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5200","tier":"record","sha256":"9c2935ea9940c913ef17234924e3e919c59b0b426c35f174e803e715608c9fc3","pages":36,"tokens":12255,"emptyPages":[],"textThemes":["colo","adequacy","retail","flex"]},{"slug":"rec-20260720-5201","title":"The Indicated PJM Transmission Owners submit Request for Rehearing and Clarification of the 06/18/2026 Order","issued":"2026-07-20","accession":"20260720-5201","docket":"ER26-1479-001","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"rehearing request","file":"sources/filings/text/20260720-5201_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5201","tier":"record","sha256":"21ef018113f709101a9ca9b45f1e16c9fbd7723521947fc5d375c6d282813203","pages":23,"tokens":7116,"emptyPages":[],"textThemes":["colo","flex","cost","study"]},{"slug":"rec-20260721-4000","title":"Pre-filed Statement of Judge Kelsey A. Bagot, Chair and Commissioner, Virginia State Corporation Commission, for the PJM Governance and Stakeholder Reforms…","issued":"2026-07-21","accession":"20260721-4000","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"VIRGINIA STATE CORPORATION COMMISSION","kind":"testimony","file":"sources/filings/text/20260721-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260721-4000","tier":"record","sha256":"e542b6cc9227279d93d3868b1979209ecbd7d97545a7a0fa4ce3b7e07dd73f31","pages":3,"tokens":1267,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260721-5049","title":"Pre-Conference Comments of the Organization of PJM States, Inc. for the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-21","accession":"20260721-5049","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Organization of PJM States, Inc.","kind":"comments","file":"sources/filings/text/20260721-5049_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260721-5049","tier":"record","sha256":"4ef965e94646cda24db04f1ad39ec63fb1ead339720becdb243e89035fa4427b","pages":21,"tokens":7799,"emptyPages":[],"textThemes":["adequacy","cost","retail"]},{"slug":"rec-20260721-5216","title":"Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate re the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-21","accession":"20260721-5216","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Ohio Federal Energy Advocate","kind":"comments","file":"sources/filings/text/20260721-5216_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260721-5216","tier":"record","sha256":"53296796b605daf31a959601a3346081f90bccdbebd31a0f72086b61da9173c8","pages":8,"tokens":2068,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260722-5054","title":"Pre-Technical Conferences Comments of ENGIE North America Inc. re the PJM Governance and Stakeholder Reforms","issued":"2026-07-22","accession":"20260722-5054","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"ENGIE North America Inc.","kind":"comments","file":"sources/filings/text/20260722-5054_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5054","tier":"record","sha256":"c29994b50b748f745962cee240e4ba21d4d9a6744d2e9b61796020932e60b6c2","pages":10,"tokens":2444,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260722-5113","title":"Comments of the PJM Cities and Communities Coalition re the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-22","accession":"20260722-5113","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM Cities and Communities Coalition","kind":"comments","file":"sources/filings/text/20260722-5113_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5113","tier":"record","sha256":"10146b11ede3c77e5600c14fa6725007415d467a1ddd026b0f3ab96f76aad2a7","pages":19,"tokens":6564,"emptyPages":[19],"textThemes":["adequacy","study"]},{"slug":"rec-20260722-5156","title":"Comments of Nikki Gerber in response to FERC's Notice of Technical Conference regarding PJM Interconnection, L.L.C.'s Governance and Stakeholder Reforms","issued":"2026-07-22","accession":"20260722-5156","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260722-5156_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5156","tier":"record","sha256":"f720ee9c17bcc8157f1acaab18994f01833f93217e71f07b3e545aba11c634c4","pages":3,"tokens":774,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260722-5167","title":"Pre-Technical Conference Comments of PPL Electric Utilities Corporation re the PJM Governance and Stakeholder Reforms","issued":"2026-07-22","accession":"20260722-5167","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PPL Electric Utilities Corporation","kind":"comments","file":"sources/filings/text/20260722-5167_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5167","tier":"record","sha256":"e91b74e8c24d6dd30fbbe2f3867b89703e851bb0192a10ff56372b7006ebf3ad","pages":27,"tokens":8224,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260722-5189","title":"Pre-Conference Comments of the PJM Legislators' Collaborative re the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-22","accession":"20260722-5189","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM Legislators' Collaborative","kind":"comments","file":"sources/filings/text/20260722-5189_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5189","tier":"record","sha256":"584dfdfda0e607ed969247ee1428392597a7123e871dd123a9bceeec286b504f","pages":55,"tokens":19990,"emptyPages":[],"textThemes":["registry","adequacy","study","cost"]},{"slug":"rec-20260722-5206","title":"Comments of Capital Power Corporation re the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-22","accession":"20260722-5206","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Capital Power Corporation","kind":"comments","file":"sources/filings/text/20260722-5206_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5206","tier":"record","sha256":"e3ee62b253a30730edca85a744f3b100bc3da1ca9fc758f0e9f36b1bc7fac219","pages":10,"tokens":2182,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260722-5224","title":"Pre-Technical Conference Comments of Pennsylvania Public Utility Commission re the PJM Governance and Stakeholder Reforms","issued":"2026-07-22","accession":"20260722-5224","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Pennsylvania Public Utility Commission","kind":"comments","file":"sources/filings/text/20260722-5224_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5224","tier":"record","sha256":"2619c4fb12d6c6fde948627c5c1d1c4905a0e2030c716d5447252a90f5c2d671","pages":4,"tokens":1686,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260723-4000","title":"Comments of the National Caucus of Environmental Legislators re the PJM Governance and Stakeholder Reforms Technical Conference","issued":"2026-07-23","accession":"20260723-4000","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"NATIONAL CAUCUS OF ENVIRONMENTAL LEGISLATORS","kind":"comments","file":"sources/filings/text/20260723-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260723-4000","tier":"record","sha256":"63900cc1d1bcb45e5126ee56ba7486b8584f630048612a99c35742b38b948e7e","pages":4,"tokens":1173,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260723-4001","title":"Pre-Conference Comments of The PJM Legislators’ Collaborative re the PJM Governance and Stakeholder Reforms","issued":"2026-07-23","accession":"20260723-4001","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM LEGISLATORS' COLLABORATIVE","kind":"comments","file":"sources/filings/text/20260723-4001_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260723-4001","tier":"record","sha256":"584dfdfda0e607ed969247ee1428392597a7123e871dd123a9bceeec286b504f","pages":55,"tokens":19990,"emptyPages":[],"textThemes":["registry","adequacy","study","cost"]},{"slug":"rec-20260723-5029","title":"Comment of Connie Bohl in Docket(s)/Project(s) AD26-7-000 Submission Date: 7/23/2026","issued":"2026-07-23","accession":"20260723-5029","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260723-5029_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260723-5029","tier":"record","sha256":"593b5d0dcf05ed4894645012e074737773ffd86d550abe854dd7deab300c29a3","pages":null,"tokens":307,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260723-5033","title":"Comments of Energy Artisans, LLC re PJM Interconnection, L.L.C.'s governance and stakeholder processes","issued":"2026-07-23","accession":"20260723-5033","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Energy Artisans, LLC","kind":"comments","file":"sources/filings/text/20260723-5033_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260723-5033","tier":"record","sha256":"20a506013bb6a7fa8d2f47572f368aaebfceb7e365c8b718cd5282e424138f59","pages":6,"tokens":1906,"emptyPages":[],"textThemes":["study"]},{"slug":"rec-20260723-5034","title":"Comments Based on Research from the RTO Governance Research Network re the PJM Governance and Stakeholder Reforms","issued":"2026-07-23","accession":"20260723-5034","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"RTO Governance Research Network","kind":"comments","file":"sources/filings/text/20260723-5034_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260723-5034","tier":"record","sha256":"2d26696ce7d7f58fd7b75183a81a2b534cbb1410f3ec8a7beb88cfa27202de0b","pages":14,"tokens":5310,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260723-5035","title":"Comments of Senator Scott A. Surovell, chair of Energy Commission of Virginia, re the PJM Governance and Stakeholder Reforms","issued":"2026-07-23","accession":"20260723-5035","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Energy Commission of Virginia","kind":"comments","file":"sources/filings/text/20260723-5035_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260723-5035","tier":"record","sha256":"ed826b654c4ccd380df8232b37d8eac8a603680f99691a523ec4efc8205905ac","pages":3,"tokens":990,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260728-5072","title":"Motion for Extension of Time for Specified Compliance Requirements and Request for Expedited Treatment of PJM Interconnection, L.L.C","issued":"2026-07-28","accession":"20260728-5072","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"motion","file":"sources/filings/text/20260728-5072_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260728-5072","tier":"record","sha256":"6ba8341a67967cf13354abc2b3251c6f80c35099a5ca2d5692d13af2fb499069","pages":10,"tokens":2419,"emptyPages":[],"textThemes":["study","colo","procedure"]},{"slug":"rec-20260728-5073","title":"Motion for Extension of Compliance Deadline of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment Period","issued":"2026-07-28","accession":"20260728-5073","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Indicated PJM Transmission Owners","kind":"comments","file":"sources/filings/text/20260728-5073_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260728-5073","tier":"record","sha256":"5a4bfed8572ff89dc44f80c1c39c31650ff9d5e0b4973b50a3b41079cd217069","pages":10,"tokens":2860,"emptyPages":[],"textThemes":["colo","procedure","flex"]},{"slug":"rec-20260730-3067","title":"Notice Requesting Post-Conference Comment re PJM Governance and Stakeholder Reforms","issued":"2026-07-30","accession":"20260730-3067","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"comments","file":"sources/filings/text/20260730-3067_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260730-3067","tier":"record","sha256":"1f2cb01cf3d518877eb9de683e5c43a2f7a08d3d5c06ccb8849fe3be920a8fc9","pages":null,"tokens":1139,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260803-5070","title":"Post-Conference Comments of Persistence Analytics Group LLC re the PJM Governance and Stakeholder Reforms","issued":"2026-08-03","accession":"20260803-5070","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260803-5070_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5070","tier":"record","sha256":"e5967fee79e79837741afd47a3e3ee14f521c0094b9ccc5790552d9fbfacde5b","pages":5,"tokens":1042,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260803-5143","title":"Comment of wilton c smit smith in Docket(s)/Project(s) AD26-7-000 Submission Date: 8/3/2026","issued":"2026-08-03","accession":"20260803-5143","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260803-5143_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5143","tier":"record","sha256":"74430b6930912bb18bb8147361345d45aa6f6ce4f695a8938f9a8c1567f4346e","pages":null,"tokens":447,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260803-5236","title":"Answer of Constellation Energy Generation, LLC in support of PJM Interconnection, L.L.C's Motion for Extension of Time","issued":"2026-08-03","accession":"20260803-5236","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20260803-5236_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5236","tier":"record","sha256":"4b7e06bacd58f034b83042a25846e88f4e0f16bbc9998e54e2f768607c1bb9e1","pages":5,"tokens":1206,"emptyPages":[],"textThemes":["colo","flex","procedure"]},{"slug":"rec-20260804-3091","title":"Notice of Shortened Answer Period re California Independent System Operator Corporation et al","issued":"2026-08-04","accession":"20260804-3091","docket":"EL26-71-000","group":"CAISO show cause proceeding (E-10)","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"answer","file":"sources/filings/text/20260804-3091_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-3091","tier":"record","sha256":"f6a264e343342fda690aec1794b46f22b13310485b88898e8b055bd1acfacf60","pages":null,"tokens":337,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260804-5163","title":"Motion for Leave and Answer of Constellation Energy Generation, LLC to Indicated PJM Transmission Owner's Rehearing Request","issued":"2026-08-04","accession":"20260804-5163","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"rehearing request","file":"sources/filings/text/20260804-5163_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-5163","tier":"record","sha256":"0baee63c685fd4ccd3222d6b3c94fc2eaa8f53afb8d61db049d9189c9b716e58","pages":6,"tokens":1446,"emptyPages":[],"textThemes":["colo","study"]},{"slug":"rec-20260805-5176","title":"Comment of Larry Fisher in Docket(s)/Project(s) AD26-7-000 Submission Date: 8/5/2026","issued":"2026-08-05","accession":"20260805-5176","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260805-5176_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260805-5176","tier":"record","sha256":"17c1387e86342d7492f985af48a0baedbe32e95b9db680167b34f40e30d4f88c","pages":null,"tokens":1418,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260810-3100","title":"Notice Regarding Dispute Resolution Procedures re PJM Governance and Stakeholder Reforms","issued":"2026-08-10","accession":"20260810-3100","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"notice","file":"sources/filings/text/20260810-3100_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260810-3100","tier":"record","sha256":"a9163aebacabe865c9bcab595087c865d3806ce42da9c35f5dd7b4e697e22fbf","pages":null,"tokens":674,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260810-5120","title":"Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to the Answer of Constellation Energy Generation, LLC filed on 08/03/2026","issued":"2026-08-10","accession":"20260810-5120","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"answer","file":"sources/filings/text/20260810-5120_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260810-5120","tier":"record","sha256":"94ec833b8df3a20af60bc30185464c834e7279f0a0f84eb82dccec926bbd9092","pages":7,"tokens":1358,"emptyPages":[],"textThemes":["procedure"]},{"slug":"rec-20260810-5149","title":"Post-Technical Conference Comments of Persistence Analytics Group LLC re PJM Governance and Stakeholder Reforms","issued":"2026-08-10","accession":"20260810-5149","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260810-5149_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260810-5149","tier":"record","sha256":"e1f4face20791eb747564397b960992195e08f207ce9e3673f914442bbf8e3f5","pages":4,"tokens":1541,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260811-4003","title":"Comments of East Kentucky Power Cooperative re PJM Interconnection’s recent proposals to FERC for addressing capacity needs in the short and long terms","issued":"2026-08-11","accession":"20260811-4003","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"EAST KENTUCKY POWER COOPERATIVE","kind":"comments","file":"sources/filings/text/20260811-4003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260811-4003","tier":"record","sha256":"2b9c02ae6a4f01e2e8be9f2485c45450def06056cbab6a9e411ab4f9a172c6df","pages":3,"tokens":799,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260814-5009","title":"Comments of Neil P. Osnato d/b/a Persistence Analytics Group LLC concerning PJM Interconnection, L.L.C.'s 08/13/2026 proposal to establish Interim Resource…","issued":"2026-08-14","accession":"20260814-5009","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260814-5009_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5009","tier":"record","sha256":"6ba8f4aac0859ea9f6707d04b78db48d6b91375e0e7d84f1fa0d0bda02dcb289","pages":1,"tokens":114,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260814-5009-2","title":"PAG_Comments_ER26-3515-000","issued":"2026-08-14","accession":"20260814-5009","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"attachment","file":"sources/filings/text/20260814-5009_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5009","tier":"record","parent":"rec-20260814-5009","sha256":"6064b724c8cd7a4ebfb7cc836c9cf293a8d743e9da23da90227d8b2f4c6b654a","pages":6,"tokens":2189,"emptyPages":[],"textThemes":["registry","retail"]},{"slug":"rec-20260814-5219","title":"(doc–less) Motion to Intervene of Enchanted Rock, LLC","issued":"2026-08-14","accession":"20260814-5219","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Enchanted Rock, LLC","kind":"motion","file":"sources/filings/text/20260814-5219_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5219","tier":"record","sha256":"0dc2245c3ed4df2fb2727b6e4c8dc845a4265db8bf8ea95cad14ce805dda02dc","pages":null,"tokens":325,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260817-5013","title":"Comment of Mark Christie in Docket(s)/Project(s) AD26-7-000 Submission Date: 8/16/2026","issued":"2026-08-17","accession":"20260817-5013","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260817-5013_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5013","tier":"record","sha256":"2d2186c42c3de6cac20458422102d73a6aae1534975f6c01deb2fe7e4deb7f08","pages":null,"tokens":1013,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20260817-5042","title":"Motion to Intervene and Comments of Neil P. Osnato o/b/o Persistence Analytics Group LLC in response to PJM Interconnection, L.L.C.'s 07/31/2026 filing…","issued":"2026-08-17","accession":"20260817-5042","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Individual No AffiliationPERSISTENCE ANALYTICS GROUP LLC","kind":"comments","file":"sources/filings/text/20260817-5042_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5042","tier":"record","sha256":"20865ba46d966d224f3d3ae4c7a0983930162f0142df42a486d282576825b6c9","pages":1,"tokens":264,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260817-5042-2","title":"PAG_Comments_ER26-3380-000_Pre-Procurement_Assumption_Verification","issued":"2026-08-17","accession":"20260817-5042","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Individual No AffiliationPERSISTENCE ANALYTICS GROUP LLC","kind":"attachment","file":"sources/filings/text/20260817-5042_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5042","tier":"record","parent":"rec-20260817-5042","sha256":"8b8a0054ed9c72e9391e02b09befbfc0fe62075a119854ce79c1820ec34b1e81","pages":4,"tokens":1386,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260817-5086","title":"Comments of Wolf Meridian Group re PJM Governance and Stakeholder Processes","issued":"2026-08-17","accession":"20260817-5086","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Wolf Meridian Group","kind":"comments","file":"sources/filings/text/20260817-5086_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5086","tier":"record","sha256":"e1d33ccb628c8054f61d9c34b8fe92e36e6ea755080d7a3e1403a6c5c87a23f6","pages":5,"tokens":1969,"emptyPages":[],"textThemes":["registry"]},{"slug":"rec-20260817-5124","title":"2026-08-17_Revisions to Attachment FF-ATCLLC re: Show Cause Order","issued":"2026-08-17","accession":"20260817-5124","docket":"ER26-3531-000","group":"ATC large-load planning revisions (Attachment FF-ATCLLC)","filer":"Midcontinent Independent System Operator, Inc.American Transmission Company LLC","kind":"tariff filing","file":"sources/filings/text/20260817-5124_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5124","tier":"record","sha256":"ec2836d68aebaf23789dbd9921259996d34c8000d258dadb452d6f89abef070d","pages":20,"tokens":8200,"emptyPages":[],"textThemes":["study","cost","retail","registry"]},{"slug":"rec-20260818-5146","title":"Motion for Leave to Answer and Answer of Vistra Corp. to Northern Virginia Electric Cooperative, Inc.'s 07/29/2026 Motion for Clarification of the…","issued":"2026-08-18","accession":"20260818-5146","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Vistra Corp.","kind":"rehearing request","file":"sources/filings/text/20260818-5146_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260818-5146","tier":"record","sha256":"61b0834eda5f4ca9c6a152461bf7d65f518d4ae588e8607fd74b1eb2ce037fe6","pages":8,"tokens":2140,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260819-5091","title":"Comments of Christine Pendzich o/b/o Third Act Maryland re PJM Governance and Stakeholder Reforms","issued":"2026-08-19","accession":"20260819-5091","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260819-5091_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260819-5091","tier":"record","sha256":"e84eb1f9101ac62dfe41b35501ae8220600e7ac4811642ee59efdddbf535d6cd","pages":3,"tokens":1302,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260819-5114","title":"Post Technical Conference Comments of the Illinois Commerce Commission re PJM Governance and Stakeholder Reforms","issued":"2026-08-19","accession":"20260819-5114","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Illinois Commerce Commission","kind":"comments","file":"sources/filings/text/20260819-5114_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260819-5114","tier":"record","sha256":"7ab376022ad0c420ddf2be46aacb61584ccf0a3b8fe8013867cdc59d57001a8a","pages":15,"tokens":3933,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260820-3006","title":"Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. et al","issued":"2026-08-20","accession":"20260820-3006","docket":"EL26-67-001","group":"PJM show cause proceeding (E-7)","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"rehearing request","file":"sources/filings/text/20260820-3006_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3006","tier":"record","sha256":"6bc151152d234ca06191eca7e1c28f80055cc6bb477e681072071c1733524475","pages":null,"tokens":396,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-3007","title":"Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re New York Independent System Operator, Inc. et al","issued":"2026-08-20","accession":"20260820-3007","docket":"EL26-69-001","group":"NYISO show cause proceeding (E-12)","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"rehearing request","file":"sources/filings/text/20260820-3007_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3007","tier":"record","sha256":"dd20c719da1ba5e540945ee061c0534844634b52250a2421e6588ebf9a254d69","pages":null,"tokens":266,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-3008","title":"Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. et al. v. Constellation Energy…","issued":"2026-08-20","accession":"20260820-3008","docket":"ER26-1479-001","group":"PJM co-location compliance","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"rehearing request","file":"sources/filings/text/20260820-3008_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3008","tier":"record","sha256":"9e9a4330f46bdd0504a827acb1d9a755750fff0686112a447106946294f1215b","pages":null,"tokens":456,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-3009","title":"Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re Midcontinent Independent System Operator, Inc. et al","issued":"2026-08-20","accession":"20260820-3009","docket":"EL26-70-001","group":"MISO show cause proceeding (E-8)","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"rehearing request","file":"sources/filings/text/20260820-3009_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3009","tier":"record","sha256":"11280f5b80110d388c0324ddd53e293f6f0a2e4281e108b17c3e69251f73dd4d","pages":null,"tokens":331,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-3010","title":"Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re California Independent System Operator Corporation et al","issued":"2026-08-20","accession":"20260820-3010","docket":"EL26-71-001","group":"CAISO show cause proceeding (E-10)","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"rehearing request","file":"sources/filings/text/20260820-3010_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3010","tier":"record","sha256":"da357940df959d01fa2d3eb0b418e14c5e4cefd2b2c38573cbdaae8375ec942f","pages":null,"tokens":307,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-3020","title":"Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re ISO New England Inc. et al","issued":"2026-08-20","accession":"20260820-3020","docket":"EL26-72-001","group":"ISO-NE show cause proceeding (E-11)","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"rehearing request","file":"sources/filings/text/20260820-3020_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3020","tier":"record","sha256":"cb68979a98c141044374b933da2c52bd98437fdad15909ead714d69a8def15ee","pages":null,"tokens":278,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-3043","title":"Notice Rescinding Prior Notice re PJM Interconnection, L.L.C","issued":"2026-08-20","accession":"20260820-3043","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"notice","file":"sources/filings/text/20260820-3043_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3043","tier":"record","sha256":"9ea439ee50a90d59ec11efe2083fa665d2f2aa613eb99f8d35f8f0306c0cabaf","pages":null,"tokens":106,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-5015","title":"Motion to Intervene and Protest of Nicholas Max Neal and David Neal, Delaware Standard Offer Service Ratepayers re PJM Interconnection, L.L.C.’s 07/31/2026…","issued":"2026-08-20","accession":"20260820-5015","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Individual No Affiliation","kind":"protest","file":"sources/filings/text/20260820-5015_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5015","tier":"record","sha256":"371dad7c1b1c4fd24417d6a2f99f7adf1df87928a5a5084896a67bb0aba2eb7e","pages":20,"tokens":5253,"emptyPages":[],"textThemes":["adequacy","registry","cost","study"]},{"slug":"rec-20260820-5015-2","title":"Attachment_A_E3_ELCC_RRS_Model_Evaluation_Dec2025","issued":"2026-08-20","accession":"20260820-5015","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Individual No Affiliation","kind":"attachment","file":"sources/filings/text/20260820-5015_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5015","tier":"record","parent":"rec-20260820-5015","sha256":"a0e66b7a515744bb73d756fb44ffc7a6d08882efc322f62259ac68e86264de46","pages":91,"tokens":27938,"emptyPages":[],"textThemes":["adequacy","study","registry","flex"]},{"slug":"rec-20260820-5015-3","title":"Attachment_B_PJM_ELCC_Sensitivity_Analyses_May2025","issued":"2026-08-20","accession":"20260820-5015","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Individual No Affiliation","kind":"attachment","file":"sources/filings/text/20260820-5015_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5015","tier":"record","parent":"rec-20260820-5015","sha256":"91575e5e2af4d2cb29988a9d6a663a3e399abbc7dc9e04a1ae7f967bd0503586","pages":30,"tokens":1701,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-5104","title":"Comments of Chesapeake Climate Action Network re PJM Governance and Stakeholder Reforms","issued":"2026-08-20","accession":"20260820-5104","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Chesapeake Climate Action Network","kind":"comments","file":"sources/filings/text/20260820-5104_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5104","tier":"record","sha256":"e56ba4bb5ba75512a37063ec350abeac35b9e2546c80c3a26ddd9f11bd5c7343","pages":3,"tokens":1119,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-5125","title":"Comments of League of Conservation Voters and state affiliates re PJM Governance and Stakeholder Reforms","issued":"2026-08-20","accession":"20260820-5125","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"League of Conservation Voters","kind":"comments","file":"sources/filings/text/20260820-5125_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5125","tier":"record","sha256":"ebbeb69a194ff7473c26682391024ced36c745c00900fb85beeb07fa1964a452","pages":4,"tokens":1029,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-5161","title":"Post-Conference Comments of Indiana Municipal Power Agency re PJM Governance and Stakeholder Reforms","issued":"2026-08-20","accession":"20260820-5161","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Indiana Municipal Power Agency","kind":"comments","file":"sources/filings/text/20260820-5161_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5161","tier":"record","sha256":"e1bd81d395024994f135ad817fc106c28cd94c85435cf3879cba9d03b3e2ce4e","pages":6,"tokens":1765,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-5164","title":"Comments of Ceres re PJM Governance and Stakeholder Reforms","issued":"2026-08-20","accession":"20260820-5164","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Ceres","kind":"comments","file":"sources/filings/text/20260820-5164_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5164","tier":"record","sha256":"832ee9c869ff302a45f4a78635665e1733bb8cbaa0099fe1d4822b979d0b4ec8","pages":3,"tokens":1012,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260820-5187","title":"PJM Transmission Owners submits Notice of Partial Compliance with the Commission’s 06/18/2026 order","issued":"2026-08-20","accession":"20260820-5187","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Transmission Owners","kind":"notice","file":"sources/filings/text/20260820-5187_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5187","tier":"record","sha256":"4f0406d53b2e3c3f254413fad2ae62604790a8954bc62dfe86330962541f4176","pages":2,"tokens":305,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5017","title":"Post-Conference Comments of the Delaware Division of the Public Advocate, et al. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5017","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Citizens Utility Board of Illinois","kind":"comments","file":"sources/filings/text/20260821-5017_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5017","tier":"record","sha256":"34b54a5f93b42dfa62021aaf9d2c2c51ef9ce0c1fffefe64f1d07cf639a8a08c","pages":20,"tokens":5294,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5032","title":"Comments of North Carolina Electric Membership Corporation re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5032","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"North Carolina Electric Membership Corporation","kind":"comments","file":"sources/filings/text/20260821-5032_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5032","tier":"record","sha256":"7adc21e6fcc33e3356d9127e0492cd77b5fb66421fd4c52126ca59485c51a25b","pages":7,"tokens":1410,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5060","title":"Comment of Terry Headley in Docket(s)/Project(s) AD26-7-000 Submission Date: 8/21/2026","issued":"2026-08-21","accession":"20260821-5060","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260821-5060_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5060","tier":"record","sha256":"4d9f682eb5c21648c92c8d3b1135e47fc8aa0d10e34b5fe1a2141d7d20787e84","pages":null,"tokens":1412,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5081","title":"Post-Technical Conference Comments of PJM Interconnection, L.L.C. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5081","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM Interconnection, L.L.C.","kind":"comments","file":"sources/filings/text/20260821-5081_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5081","tier":"record","sha256":"ef2fbfc58742144af15db7629d373348809629e9d9def25a432f2b7f9666c479","pages":19,"tokens":8572,"emptyPages":[],"textThemes":["adequacy","cost","study"]},{"slug":"rec-20260821-5090","title":"Motion to Intervene, Limited Protest, and Request for Clarification of PPL Electric Utilities Corporation","issued":"2026-08-21","accession":"20260821-5090","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"PPL Electric Utilities Corporation","kind":"protest","file":"sources/filings/text/20260821-5090_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5090","tier":"record","sha256":"0589c1aa3be8a3e6715f875e3a21524e44da019d67a4d23e0a74064b680ca122","pages":15,"tokens":4512,"emptyPages":[],"textThemes":["credit","adequacy","cost"]},{"slug":"rec-20260821-5098","title":"Post-Conference Comments of the R Street Institute re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5098","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"R Street Institute","kind":"comments","file":"sources/filings/text/20260821-5098_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5098","tier":"record","sha256":"31c3299996e3acdaa4808ad90210de0d1f6ab0dc1201258bd37cc2ef70103502","pages":null,"tokens":5241,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5102","title":"Post-Technical Conference Joint Comments of the Organization of PJM States, Inc. and the PJM Governors' Collaborative re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5102","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Organization of PJM States, Inc.PJM Governors' Collaborative","kind":"comments","file":"sources/filings/text/20260821-5102_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5102","tier":"record","sha256":"85a05fbf79ecae76a5bf4eda5628a5e730250296ac76e6b0f881b1db59f09eb8","pages":12,"tokens":3511,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5105","title":"Comments of the Solar Energy Industries Association in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal","issued":"2026-08-21","accession":"20260821-5105","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Solar Energy Industries Association","kind":"comments","file":"sources/filings/text/20260821-5105_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5105","tier":"record","sha256":"40a7a394cb93a51d7ee54a026e31bbb939e260a539ba6478939540f0995a53e4","pages":14,"tokens":4195,"emptyPages":[],"textThemes":["adequacy","cost","study"]},{"slug":"rec-20260821-5114","title":"Post-Conference Comments of PJM Legislators' Collaborative and the National Caucus of Environmental Legislators re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5114","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"National Caucus of Environmental LegislatorsPJM Legislators' Collaborative","kind":"comments","file":"sources/filings/text/20260821-5114_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5114","tier":"record","sha256":"24879f86d6bb66697b20d3e10225c475c3e35a462f4900a9c143d703d4508d79","pages":7,"tokens":2221,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20260821-5116","title":"Comments of Evergreen Action et. al. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5116","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Evergreen Action","kind":"comments","file":"sources/filings/text/20260821-5116_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5116","tier":"record","sha256":"ea578343e0452d2134132c62c03f4136d830f8244f2e61341b9b1af5fb2aa173","pages":4,"tokens":866,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5120","title":"Partial Protest and Comments of Dominion Energy Services, Inc. re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal","issued":"2026-08-21","accession":"20260821-5120","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Dominion Energy Services, Inc.","kind":"protest","file":"sources/filings/text/20260821-5120_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5120","tier":"record","sha256":"4d2e1cc7ed2f4151e26cff006bf23aa71b5fdfcdb07d82b2eab21dab2e0721a3","pages":10,"tokens":2991,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5122","title":"Comments of MAREC Action and Solar Energy Industries Association re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5122","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Solar Energy Industries AssociationMAREC Action","kind":"comments","file":"sources/filings/text/20260821-5122_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5122","tier":"record","sha256":"cd38936dd9d7840bef3ba5212e17a566acc423926cd23e6120c3312798ae74fa","pages":15,"tokens":4227,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5125","title":"Comments of Institute for Policy Integrity at New York University School of Law on PJM Interconnection, L.L.C.’s Section 205 filing to implement Reliability…","issued":"2026-08-21","accession":"20260821-5125","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Institute for Policy Integrity, New York University School o","kind":"comments","file":"sources/filings/text/20260821-5125_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5125","tier":"record","sha256":"cff6f4d6e3c54b7bc8227f523ec11e5df0cdb26730be5e94ab17859c6e09a6c5","pages":29,"tokens":10326,"emptyPages":[],"textThemes":["adequacy","cost","registry","flex"]},{"slug":"rec-20260821-5127","title":"Post-Technical Conference Comments and Responses of The PJM Power Providers Group re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5127","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM Power Providers Group","kind":"comments","file":"sources/filings/text/20260821-5127_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5127","tier":"record","sha256":"026fce1e27a5b178a3fa83ac8487beb72b59990242135852b7b57d63abb7e1ea","pages":8,"tokens":2121,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5133","title":"Comments of Sierra Club et al. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5133","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Sierra ClubNatural Resources Defense CouncilEARTHJUSTICE ,Southern Environmental Law Center ,RMI ,","kind":"comments","file":"sources/filings/text/20260821-5133_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5133","tier":"record","sha256":"8ba1cfbedda2e1e40e9b63ad5285714b1ce76b0694eb16d79832972709a485fc","pages":17,"tokens":7722,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5141","title":"Comments of Vitol Inc. offering perspectives on PJM governance arising from the Commissioner-led Technical Conference on 07/23/2026","issued":"2026-08-21","accession":"20260821-5141","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Vitol Inc.","kind":"comments","file":"sources/filings/text/20260821-5141_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5141","tier":"record","sha256":"0605f4ee432332796ee81f997d3306084aecd9991aa9453ca1af71577b499a35","pages":11,"tokens":3362,"emptyPages":[],"textThemes":["cost","adequacy"]},{"slug":"rec-20260821-5144","title":"Post-Technical Conference Comments of Duke Energy Ohio, Inc. and Duke Energy Kentucky, Inc. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5144","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Duke Energy Ohio, Inc. and Duke Energy Kentucky, Inc.","kind":"comments","file":"sources/filings/text/20260821-5144_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5144","tier":"record","sha256":"c782102eda8b5c1ae3e4cc3833abf141c30ba0d231f234dad1c818312dfda22d","pages":8,"tokens":2545,"emptyPages":[],"textThemes":["cost","adequacy"]},{"slug":"rec-20260821-5152","title":"Post-Conference Comments of Illinois Municipal Electric Agency re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5152","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Illinois Municipal Electric Agency","kind":"comments","file":"sources/filings/text/20260821-5152_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5152","tier":"record","sha256":"683c454be576a9ef8aef14d9f2535dfb60beac539088bdc57a07ae86fd3f6531","pages":7,"tokens":2062,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5155","title":"Comments of Institute for Policy Integrity at New York University School of Law on PJM Interconnection, L.L.C.’s Section 205 filing to implement Reliability…","issued":"2026-08-21","accession":"20260821-5155","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Institute for Policy Integrity, New York University School o","kind":"comments","file":"sources/filings/text/20260821-5155_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5155","tier":"record","sha256":"3612692fabec68ad39504542d18f8e7080b2187d23829edd7306fbf454134a2d","pages":29,"tokens":10326,"emptyPages":[],"textThemes":["adequacy","cost","registry","flex"]},{"slug":"rec-20260821-5158","title":"Post-Conference Comments of Harvard Electricity Law Initiative in response to Questions 12 and 13 re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5158","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Harvard Electricity Law Initiative","kind":"comments","file":"sources/filings/text/20260821-5158_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5158","tier":"record","sha256":"b9ac884a2be9c962d8b2ae6da76eb5f882416e84b5199843c829b6328bec4f0d","pages":31,"tokens":10411,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5159","title":"Post-Technical Conference Comments of East Kentucky Power Cooperative, Inc. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5159","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"East Kentucky Power Cooperative, Inc.","kind":"comments","file":"sources/filings/text/20260821-5159_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5159","tier":"record","sha256":"9d519f3f8b73918f5cd1159c5d1fbad40f898ebce7532d5f6621394c9afc2e4a","pages":12,"tokens":3175,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5175","title":"Motion to Intervene and Comments of Base Power Inc. re PJM Interconnection, L.L.C.’s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5175","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Base Power Company","kind":"comments","file":"sources/filings/text/20260821-5175_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5175","tier":"record","sha256":"b738bb73548051235e555b107d4f50485a007bb9fd7989e8a761acb1955e5c66","pages":10,"tokens":2478,"emptyPages":[],"textThemes":["registry","adequacy","flex"]},{"slug":"rec-20260821-5178","title":"Post-Conference Comments of Tenaska Power Services Company in response to the Commission’s examination of PJM Interconnection LLC’s governance and…","issued":"2026-08-21","accession":"20260821-5178","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Tenaska Power Services Co.","kind":"comments","file":"sources/filings/text/20260821-5178_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5178","tier":"record","sha256":"69aa8d95a9c61f4d35624252a84a6703307ffad2a0ded2ccdd51b67e00525af9","pages":5,"tokens":1241,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5185","title":"Post-Technical Conference Comments of PSEG Companies re PJM Governance and Stakeholder Reform","issued":"2026-08-21","accession":"20260821-5185","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PSEG CompaniesPSEG Energy Resources & Trade LLCPSEG Power LLC ,Public Service Electric and Gas Company ,","kind":"comments","file":"sources/filings/text/20260821-5185_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5185","tier":"record","sha256":"a9567924907e4e59946e5ea9654de43bcdb347fb7f2a350a6b666be246ff79ff","pages":15,"tokens":3870,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5187","title":"Comments of Edison Electric Institute re PJM Governance and Stakeholder Reform","issued":"2026-08-21","accession":"20260821-5187","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Edison Electric Institute","kind":"comments","file":"sources/filings/text/20260821-5187_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5187","tier":"record","sha256":"f7201dd0c2857b5e03c14d84857d9f4ed37d8f570bf3e4760f808390ff9d5c56","pages":9,"tokens":2393,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5192","title":"Comments of New Jersey Board of Public Utilities in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal","issued":"2026-08-21","accession":"20260821-5192","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"New Jersey Board of Public Utilities","kind":"comments","file":"sources/filings/text/20260821-5192_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5192","tier":"record","sha256":"a7a03785f2bf814d03d29c4273c63f1c48ffe2f1b1bd940c76a7aef5c6f59cff","pages":9,"tokens":2332,"emptyPages":[],"textThemes":["credit","adequacy"]},{"slug":"rec-20260821-5194","title":"Post-Conference Comments of Duquesne Light Company re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5194","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Duquesne Light Company","kind":"comments","file":"sources/filings/text/20260821-5194_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5194","tier":"record","sha256":"42be38a3bd092fac53db103dfe6fcbb76c778f5e4469262315958f4b0094c338","pages":15,"tokens":3790,"emptyPages":[],"textThemes":["cost","adequacy"]},{"slug":"rec-20260821-5196","title":"Post-Technical Conference Comments of Shell Energy North America (US), L.P. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5196","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Shell Energy North America (US), L.P.","kind":"comments","file":"sources/filings/text/20260821-5196_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5196","tier":"record","sha256":"5d700e15391c9b14e803b5381fa5f4672996362cfce9837d12ed4f38d0e50054","pages":14,"tokens":3221,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5197","title":"Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate re PJM Interconnection, L.L.C.'s 07/31/2026 revisions to the…","issued":"2026-08-21","accession":"20260821-5197","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Ohio Federal Energy Advocate","kind":"comments","file":"sources/filings/text/20260821-5197_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5197","tier":"record","sha256":"69c95c1cdc3266471d16ff30b2d53de30ed504c3700a23bde9058b4c38f818a1","pages":7,"tokens":1803,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5198","title":"Post-Conference Comments of the Financial Marketers Coalition and DC Energy, LLC re PJM Governance and Stakeholder Reform","issued":"2026-08-21","accession":"20260821-5198","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Financial Marketers CoalitionDC Energy, LLC","kind":"comments","file":"sources/filings/text/20260821-5198_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5198","tier":"record","sha256":"93a5c1447d5645875858a096fa56ef8c170ecf0376f9d742307bfc29dcc70744","pages":10,"tokens":3024,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5201","title":"Post-Technical Conference Comments of PPL Electric Utilities Corporation re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5201","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PPL Electric Utilities Corporation","kind":"comments","file":"sources/filings/text/20260821-5201_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5201","tier":"record","sha256":"7e77c17775a1aaac72ef16607382da77860fa1ae8662b9835c29a3d99aaec18d","pages":18,"tokens":5800,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5203","title":"Comments of FirstEnergy Service Company re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5203","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"FirstEnergy Service Company","kind":"comments","file":"sources/filings/text/20260821-5203_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5203","tier":"record","sha256":"463437c19289bcb0b3c6460778c42201f88c1a6a4e97df1a379359f72cd58dc3","pages":14,"tokens":3507,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5206","title":"Comments of Google LLC re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement Proposal","issued":"2026-08-21","accession":"20260821-5206","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Google LLC","kind":"comments","file":"sources/filings/text/20260821-5206_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5206","tier":"record","sha256":"c7048f2a68af2b1211dd13c9f1e9ed0ee00d1d06143601843c9447745cb2034c","pages":13,"tokens":3641,"emptyPages":[],"textThemes":["adequacy","cost","flex"]},{"slug":"rec-20260821-5210","title":"Comments of the Center for Progressive Reform re the 07/23/2026 Commission-led technical conference on PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5210","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"CENTER FOR PROGRESSIVE REFORM","kind":"comments","file":"sources/filings/text/20260821-5210_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5210","tier":"record","sha256":"c88a3cbcaf6ed8607bad2e0d6af94998ef9f1bcda93daedf2351b3f642060b55","pages":null,"tokens":965,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5211","title":"Motion to Intervene and Comments of CPV Power Holdings, LP re PJM Interconnection, L.L.C.’s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5211","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"CPV Power Holdings, LP","kind":"comments","file":"sources/filings/text/20260821-5211_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5211","tier":"record","sha256":"b578bffe34df708f488313314d064bd01099e7029b814ae86c076569b1e35ba4","pages":7,"tokens":1971,"emptyPages":[],"textThemes":["study","adequacy"]},{"slug":"rec-20260821-5214","title":"Post-Technical Conference Comments of Rockland Electric Company re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5214","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Rockland Electric Company","kind":"comments","file":"sources/filings/text/20260821-5214_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5214","tier":"record","sha256":"c9af1a3156653d3ff4079e5850a5d9b85a2c453823caab12b72fc24d9d28b551","pages":6,"tokens":1161,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5215","title":"Comments of American Municipal Power, Inc. re PJM Interconnection, L.L.C.’s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5215","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"American Municipal Power, Inc.","kind":"comments","file":"sources/filings/text/20260821-5215_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5215","tier":"record","sha256":"9f464a52a820ddada249f9507079e966452110f0d24d52582e8f985723275c5d","pages":15,"tokens":2797,"emptyPages":[],"textThemes":["adequacy","registry"]},{"slug":"rec-20260821-5216","title":"Post-Conference Comments of Advanced Energy United re the technical discussion of Governance and Stakeholder Reforms in the PJM Interconnection region on…","issued":"2026-08-21","accession":"20260821-5216","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Advanced Energy United","kind":"comments","file":"sources/filings/text/20260821-5216_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5216","tier":"record","sha256":"754ef4f4cc29db5fa40ce4084d0f085c086c45bdc5b81d55f89622e189dbce1b","pages":14,"tokens":5100,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5218","title":"Comments of the Office of the Ohio Consumers’ Counsel re the reforms to the governance of PJM Interconnection, L.L.C","issued":"2026-08-21","accession":"20260821-5218","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Office of the Ohio Consumers' Counsel","kind":"comments","file":"sources/filings/text/20260821-5218_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5218","tier":"record","sha256":"6baac5380242939cfc606fc94db3b66372ad89643f02d902f9abeb231b13a435","pages":40,"tokens":10888,"emptyPages":[],"textThemes":["cost","adequacy","flex"]},{"slug":"rec-20260821-5219","title":"Post-Conference Comments of CTC Global Corporation re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5219","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"CTC Global Corporation","kind":"comments","file":"sources/filings/text/20260821-5219_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5219","tier":"record","sha256":"aab9e671374869012b752421efe03fb5aade5c3a053d230be89a724eaecfbbf7","pages":7,"tokens":1784,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5220","title":"Comments of Advanced Energy United in response to PJM Interconnection, L.L.C.’s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5220","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Advanced Energy United","kind":"comments","file":"sources/filings/text/20260821-5220_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5220","tier":"record","sha256":"49711740e92162c6097a3010716ac9d2788197f3219ead2dc64f9a2f5cf2e642","pages":30,"tokens":8650,"emptyPages":[],"textThemes":["adequacy","flex","cost","colo"]},{"slug":"rec-20260821-5226","title":"Post-Conference Comments of American Municipal Power, Inc. on the issues addressed at the 07/23/2026 technical conference re PJM Governance and Stakeholder…","issued":"2026-08-21","accession":"20260821-5226","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"American Municipal Power, Inc.","kind":"comments","file":"sources/filings/text/20260821-5226_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5226","tier":"record","sha256":"99f5af13fe89b50e599e6ad7d2e1e7a80c5b24b864ed38b08ac1042080cf1bfa","pages":17,"tokens":5382,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5227","title":"Comment of Andy Wall in Docket(s)/Project(s) AD26-7-000 Submission Date: 8/21/2026","issued":"2026-08-21","accession":"20260821-5227","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260821-5227_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5227","tier":"record","sha256":"7cbabaa2d832db25b3e7b313e7808882b4ee4c92efb022d03efecdeaa695c8e9","pages":null,"tokens":984,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5229","title":"Motion to Intervene and Request for Clarification of Talen Energy Corporation re the Reliability Backstop Procurement filing","issued":"2026-08-21","accession":"20260821-5229","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Talen Energy Corporation","kind":"rehearing request","file":"sources/filings/text/20260821-5229_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5229","tier":"record","sha256":"1c887c5e39a2fde458d7c910201bf16073ece89c1ba9f2d34e572ee9830c89df","pages":8,"tokens":2194,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5231","title":"Post-Technical Conference Comments of American Electric Power Company, Inc. re the Commission’s technical conference on governance and stakeholder reforms…","issued":"2026-08-21","accession":"20260821-5231","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"American Electric Power Service Corporation","kind":"comments","file":"sources/filings/text/20260821-5231_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5231","tier":"record","sha256":"e9fdd0f1eca471fabde715cc32724e47c9c31859923fa489c5db6e6572f0bd11","pages":32,"tokens":9489,"emptyPages":[],"textThemes":["adequacy","cost","study"]},{"slug":"rec-20260821-5233","title":"Post-Conference Comments of Southern Maryland Electric Cooperative, Inc. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5233","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Southern Maryland Electric Cooperative, Inc.","kind":"comments","file":"sources/filings/text/20260821-5233_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5233","tier":"record","sha256":"5552f95346c356f154fd5285ab0b85060a16e376f5f02b8af907e42e522822f6","pages":5,"tokens":1337,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5235","title":"Post-Technical Conference Comments of Dominion Energy Services, Inc. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5235","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Dominion Energy Services, Inc.","kind":"comments","file":"sources/filings/text/20260821-5235_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5235","tier":"record","sha256":"90f43db4a312bdebd73a3041c97b9554eef17b3fcc78001cd75a775ab305f25b","pages":12,"tokens":4076,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5236","title":"Post-Technical Conference Comments of The PJM Industrial Customer Coalition in response to FERC's 07/30/2026 supplemental notice re PJM Governance and…","issued":"2026-08-21","accession":"20260821-5236","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM Industrial Customer Coalition","kind":"comments","file":"sources/filings/text/20260821-5236_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5236","tier":"record","sha256":"a86ed864faf1f94359d8385bc6919b992a7f4d2f839e9fd3cd7eb4a59f410525","pages":15,"tokens":3463,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5238","title":"Post-Technical Conference Comments of NRG Energy, Inc. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5238","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"NRG Energy, Inc.","kind":"comments","file":"sources/filings/text/20260821-5238_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5238","tier":"record","sha256":"d08f27815479f1d3f44c7df5cda68f9404f327d0dd3b0b0c6719f6229358b3ef","pages":6,"tokens":1875,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5241","title":"Post-Conference Comments of The Dayton Power and Light Company d/b/a AES Ohio re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5241","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Dayton Power and Light Company, The","kind":"comments","file":"sources/filings/text/20260821-5241_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5241","tier":"record","sha256":"198a51998c6670792ae44de52f9b9b93afa4b1bad2d23d5f84503f1301100849","pages":6,"tokens":1274,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5243","title":"Comments of Equinix Inc. on the PJM Interconnection, LLC filing re Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from…","issued":"2026-08-21","accession":"20260821-5243","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"EQUINIX INC.","kind":"comments","file":"sources/filings/text/20260821-5243_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5243","tier":"record","sha256":"907abeb182beec32585ebd6e4a939c0b996c5eacbf5538ab649a1f7f120c9c67","pages":20,"tokens":6502,"emptyPages":[],"textThemes":["credit","adequacy","cost","flex"]},{"slug":"rec-20260821-5251","title":"Post-Conference Comments of ENGIE North America, Inc. re FERC's technical discussion of Governance and Stakeholder Reforms in the PJM Interconnection LLC…","issued":"2026-08-21","accession":"20260821-5251","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"ENGIE North America Inc.","kind":"comments","file":"sources/filings/text/20260821-5251_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5251","tier":"record","sha256":"94ffba876885864396aeddcf5baf284c731fc201d48552507d223110c0758432","pages":12,"tokens":2980,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5258","title":"Post-Technical Conference Comments of Capital Power Corporation supplementing the previously filed comments re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5258","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Capital Power Corporation","kind":"comments","file":"sources/filings/text/20260821-5258_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5258","tier":"record","sha256":"e5b7393f46c5bc79fe8488c3edf1bf65a1f53b58813e102c3df4890dfa3d77a7","pages":15,"tokens":3779,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5258-2","title":"FINAL 8.21 Post-Tech Conference Comments(23205026.1)","issued":"2026-08-21","accession":"20260821-5258","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Capital Power Corporation","kind":"attachment","file":"sources/filings/text/20260821-5258_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5258","tier":"record","parent":"rec-20260821-5258","sha256":"4db647458b196dc45bdf952f5e8191674c1b42bd822eda79939a8a8d3f870593","pages":null,"tokens":3771,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5259","title":"Post-Conference Comments of National Grid plc o/b/o National Grid Ventures re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5259","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"National Grid Plc","kind":"comments","file":"sources/filings/text/20260821-5259_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5259","tier":"record","sha256":"dc49498934bcdd7b8c86a348386baeca822f8cf27be81a09b24f2b55ce89ce67","pages":6,"tokens":1553,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5263","title":"Comments of Southern Maryland Electric Cooperative, Inc. re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing","issued":"2026-08-21","accession":"20260821-5263","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Southern Maryland Electric Cooperative, Inc.","kind":"comments","file":"sources/filings/text/20260821-5263_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5263","tier":"record","sha256":"efd4eb7e2497d8f1638a9410479487b5404b8d91892bfc03f5619762cc671137","pages":10,"tokens":3229,"emptyPages":[],"textThemes":["credit","cost","adequacy","registry"]},{"slug":"rec-20260821-5264","title":"Comments of Exelon Corporation in response to FERC's Notice re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5264","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Exelon Corporation","kind":"comments","file":"sources/filings/text/20260821-5264_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5264","tier":"record","sha256":"d56a72c3fa25c4941cb7816bc9bf727cb35a705a3d9fb69523c66ed4e3f633d5","pages":29,"tokens":6474,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5266","title":"Limited Protest of Constellation Energy Generation, LLC re PJM Interconnection, L.L.C.’s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5266","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Constellation Energy Generation, LLC","kind":"protest","file":"sources/filings/text/20260821-5266_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5266","tier":"record","sha256":"b435d43e3cac6d68ca5d2b1049a2a3ef604bdf8022b75a0fe38117d90dae280e","pages":71,"tokens":18939,"emptyPages":[33,34],"textThemes":["adequacy","cost","credit","colo"]},{"slug":"rec-20260821-5270","title":"Post-Conference Statement of Constellation Energy Generation, LLC addressing issues raised at the Commissioner-led technical conference held on 07/23/2026…","issued":"2026-08-21","accession":"20260821-5270","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Constellation Energy Generation, LLC","kind":"testimony","file":"sources/filings/text/20260821-5270_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5270","tier":"record","sha256":"22be024ef2d91a4d6ec4aa34f963164859978278b9a8f3a44a4ecc2fa340cc10","pages":22,"tokens":7016,"emptyPages":[],"textThemes":["adequacy","retail"]},{"slug":"rec-20260821-5273","title":"Limited Protest of the NRG Companies re PJM Interconnection, L.L.C.’s 07/31/2026 filing proposing a Reliability Backstop Procurement","issued":"2026-08-21","accession":"20260821-5273","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"NRG Business Marketing LLCAspen Gen Funding, LLCDirect Energy Business, LLC ,Doswell, LLC ,Energy Plus Holdings LLC ,Enerwise Global Technologies, LLC dba CPower ,Green Mountain Energy Company ,Helix Ironwood, LLC ,Independence Energy Group LLC ,LSP University Park, LLC ,Midwest Generation LLC ,NRG Curtailment Solutions, Inc. ,Reliant Energy Northeast LLC ,Riverside Generating Company, LLC ,Stream Energy Pennsylvania, LLC ,University Park Energy, LLC ,XOOM Energy, LLC ,","kind":"protest","file":"sources/filings/text/20260821-5273_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5273","tier":"record","sha256":"9b9cb875485a1836c6c32f32c6c750aaa080fad9fea9f825009a040d25e06139","pages":50,"tokens":14460,"emptyPages":[50],"textThemes":["adequacy","study"]},{"slug":"rec-20260821-5274","title":"Protest of the Indicated PJM Transmission Owners re PJM Interconnection, L.L.C.’s proposed tariff amendment","issued":"2026-08-21","accession":"20260821-5274","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"American Transmission Systems, Inc.Mid-Atlantic Interstate Transmission LLCTrans-Allegheny Interstate Line Company ,Keystone Appalachian Transmission Company ,Jersey Central Power & Light Company ,Monongahela Power Company ,The Potomac Edison Company ,Duquesne Light Company ,","kind":"protest","file":"sources/filings/text/20260821-5274_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5274","tier":"record","sha256":"fe1f142927f76c2814066e1b138126fdf28433c85e4ea6056f37a2f90c98ae64","pages":11,"tokens":3047,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5276","title":"Comments and Protest of FirstEnergy Service Company re PJM Interconnection, L.L.C.'s 07/31/2026 filing proposing to establish a Reliability Backstop…","issued":"2026-08-21","accession":"20260821-5276","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"FirstEnergy Service Company","kind":"protest","file":"sources/filings/text/20260821-5276_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5276","tier":"record","sha256":"7b550dfa48ee3eca7cebd50530e622fe80bbe9af697a6094f0859e632604d117","pages":23,"tokens":6533,"emptyPages":[],"textThemes":["credit","cost","adequacy","retail"]},{"slug":"rec-20260821-5280","title":"Comments of Buckeye Power, Inc. in response to FERC's 07/30/2026 Notice re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5280","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Buckeye Power, Inc.","kind":"comments","file":"sources/filings/text/20260821-5280_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5280","tier":"record","sha256":"ad145111d0de4788231162fa089014fdf88a9f499638a27127ea097a2da21328","pages":7,"tokens":1172,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5283","title":"Limited Protest of American Electric Power Service Corporation to PJM Interconnection, LLC’s proposed revisions to the Open Access Transmission Tariff and…","issued":"2026-08-21","accession":"20260821-5283","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"American Electric Power Service Corporation","kind":"protest","file":"sources/filings/text/20260821-5283_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5283","tier":"record","sha256":"584b5448d461bac011b096c27068a211fcd1665cfce7b1fe0bb103f79169ec11","pages":38,"tokens":11408,"emptyPages":[],"textThemes":["credit","cost","adequacy","registry"]},{"slug":"rec-20260821-5289","title":"Motion to Intervene and Protest of the Retail Energy Supply Association re PJM Interconnection, LLC's proposed revisions to the Open Access Transmission Tariff","issued":"2026-08-21","accession":"20260821-5289","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"The Retail Energy Supply Association","kind":"protest","file":"sources/filings/text/20260821-5289_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5289","tier":"record","sha256":"354bbae6e30592f1fa2b77052ec3ca118a566a8a990461fb612b2166bb529041","pages":11,"tokens":2913,"emptyPages":[],"textThemes":["cost","adequacy","credit"]},{"slug":"rec-20260821-5292","title":"Post-Technical Conference Comments of Energy Artisans, LLC re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5292","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Energy Artisans, LLC","kind":"comments","file":"sources/filings/text/20260821-5292_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5292","tier":"record","sha256":"c6f350bba491b852de0730b7961437341903082bb1c1794bc2e572237154e614","pages":4,"tokens":1624,"emptyPages":[],"textThemes":["study"]},{"slug":"rec-20260821-5293","title":"Motion to Intervene and Initial Comments of Amazon Energy LLC re PJM Interconnection, L.L.C.'s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5293","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Amazon Energy LLC","kind":"comments","file":"sources/filings/text/20260821-5293_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5293","tier":"record","sha256":"cfc536598ac06c7cf4fd9ff995c17f869ed1858081a981688a9f9408dfd9a342","pages":9,"tokens":2110,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5294","title":"Motion to Intervene and Comments of Talen Energy Corporation re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5294","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Talen Energy Corporation","kind":"comments","file":"sources/filings/text/20260821-5294_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5294","tier":"record","sha256":"1e8f0f874b67b50c6d2df6daa782b5e55aa745207c4f4d18c199b0ae49150af3","pages":14,"tokens":3818,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5295","title":"Post-Technical Conference Comments of Vistra Corp. re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5295","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Vistra Corp.","kind":"comments","file":"sources/filings/text/20260821-5295_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5295","tier":"record","sha256":"c96d6a8f18abc7ad478a3d69f5ce55bec646887579568f510b959f9b294284a1","pages":8,"tokens":2679,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5296","title":"Comments of Ohio Energy Leadership Council on the Reliability Backstop Procurement proposed by PJM Interconnection, L.L.C","issued":"2026-08-21","accession":"20260821-5296","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Ohio Energy Leadership Council","kind":"comments","file":"sources/filings/text/20260821-5296_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5296","tier":"record","sha256":"bbe2c2df1823e8a68da0b1bc7b50786ab9436749d83cb7294617531f4e9cf882","pages":13,"tokens":3447,"emptyPages":[],"textThemes":["adequacy","retail"]},{"slug":"rec-20260821-5297","title":"Comments of North Carolina Electric Membership Corporation re PJM Interconnection, L.L.C.'s 07/31/2026 filing","issued":"2026-08-21","accession":"20260821-5297","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"North Carolina Electric Membership Corporation","kind":"comments","file":"sources/filings/text/20260821-5297_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5297","tier":"record","sha256":"760a118a2d290fd4eeabedb87a686d132bedfe787463d1c1b280f47237890a2b","pages":6,"tokens":1180,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5298","title":"Post-Technical Conference Comments and Responses to Commission Questions of LS Power Development, LLC re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5298","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"LS Power Development, LLC","kind":"comments","file":"sources/filings/text/20260821-5298_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5298","tier":"record","sha256":"4ead7146d4851d9778a259a2486638388b00f102571bad9045070ae09cb42795","pages":10,"tokens":4581,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20260821-5299","title":"Limited Protest of Vistra Corp. re PJM Interconnection, L.L.C.’s proposed Reliability Backstop Procurement mechanism","issued":"2026-08-21","accession":"20260821-5299","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Vistra Corp.","kind":"protest","file":"sources/filings/text/20260821-5299_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5299","tier":"record","sha256":"6195277c3dd4d4c0a855ac54708107308884c7da4de864c787b932a28bb3a940","pages":8,"tokens":2379,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5300","title":"Comments of Calibrant Energy requesting clarification re the PJM Interconnection, LLC’s proposed revisions to the Open Access Transmission Tariff and the…","issued":"2026-08-21","accession":"20260821-5300","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Calibrant Energy","kind":"rehearing request","file":"sources/filings/text/20260821-5300_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5300","tier":"record","sha256":"bcd10e4fccba0a04b95bf37b0c5b6041011c61c7653c156e44b7aec694575a7c","pages":6,"tokens":1408,"emptyPages":[],"textThemes":["colo","flex","adequacy"]},{"slug":"rec-20260821-5303","title":"Post-Conference Comments of the Electric Power Supply Association re the Chairman- and Commissioner-led technical conference held on 07/23/2026 re PJM…","issued":"2026-08-21","accession":"20260821-5303","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Electric Power Supply Association","kind":"comments","file":"sources/filings/text/20260821-5303_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5303","tier":"record","sha256":"5323479872357db74b9b36315802d2a4ee47ae3565b9374a873b7dcfdf12bd64","pages":25,"tokens":7278,"emptyPages":[25],"textThemes":["retail"]},{"slug":"rec-20260821-5304","title":"Comments of Blue Ridge Power Agency re PJM Interconnection, L.L.C.'s Reliability Backstop Procurement proposal","issued":"2026-08-21","accession":"20260821-5304","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"BLUE RIDGE POWER AGENCY","kind":"comments","file":"sources/filings/text/20260821-5304_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5304","tier":"record","sha256":"4d19bbc478671a01cb911eddb944c4a4201fe0d489e6c2bf91e05434f4be0b20","pages":5,"tokens":857,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5307","title":"Protest of Northern Virginia Electric Cooperative, Inc. to the PJM Reliability Backstop Procurement Proposal","issued":"2026-08-21","accession":"20260821-5307","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"protest","file":"sources/filings/text/20260821-5307_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5307","tier":"record","sha256":"26b0d3d0a6397eb5fe3d701212f03ad28d947a8b753987ae16ba448dd4cee528","pages":28,"tokens":8871,"emptyPages":[],"textThemes":["credit","adequacy","cost","registry"]},{"slug":"rec-20260821-5307-2","title":"Affidavit of Cosica_NOVEC Protest ER26-3380","issued":"2026-08-21","accession":"20260821-5307","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"attachment","file":"sources/filings/text/20260821-5307_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5307","tier":"record","parent":"rec-20260821-5307","sha256":"38dd2039ada5930c6639780434b9ae210b0ebea4fc4f70c852828ef22295d579","pages":12,"tokens":6576,"emptyPages":[],"textThemes":["credit","adequacy","registry"]},{"slug":"rec-20260821-5307-3","title":"Affidavit of Rollins_NOVEC Protest ER26-3380","issued":"2026-08-21","accession":"20260821-5307","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"attachment","file":"sources/filings/text/20260821-5307_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5307","tier":"record","parent":"rec-20260821-5307","sha256":"c81c0d6df2caead1e3b3864928dc994bb68d9226ba2a49b7294a2e884651cf77","pages":6,"tokens":986,"emptyPages":[],"textThemes":["credit","retail"]},{"slug":"rec-20260821-5308","title":"Post-Technical Conference Comments of Geronimo Power, LLC urging PJM Interconnection, L.L.C. et al. to adopt reforms to the PJM Governance and Stakeholder…","issued":"2026-08-21","accession":"20260821-5308","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"GERONIMO POWER, LLC","kind":"comments","file":"sources/filings/text/20260821-5308_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5308","tier":"record","sha256":"27f3be4331f428935092464678c2571ebb9d2d9b9deca1560861843a7c483140","pages":22,"tokens":6850,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260821-5313","title":"Motion to Intervene and Request for Clarification, or in the Alternative, Limited Protest of Tract Holding Company I, LLC re PJM Interconnection, L.L.C.’s…","issued":"2026-08-21","accession":"20260821-5313","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Tract Holding Company I, LLC","kind":"protest","file":"sources/filings/text/20260821-5313_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5313","tier":"record","sha256":"268ea02e5deadf2772640a05fe017f3ca86e74748fb4c26d45a6100016ae230f","pages":12,"tokens":3458,"emptyPages":[],"textThemes":["flex","adequacy"]},{"slug":"rec-20260821-5314","title":"Comments of Old Dominion Electric Cooperative re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing","issued":"2026-08-21","accession":"20260821-5314","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Old Dominion Electric Cooperative","kind":"comments","file":"sources/filings/text/20260821-5314_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5314","tier":"record","sha256":"490090c36f58dd0a0db9b89f337a915fe81f2f3d2b105f34de24574067b24d06","pages":18,"tokens":5042,"emptyPages":[],"textThemes":["credit","adequacy","cost","registry"]},{"slug":"rec-20260821-5315","title":"Post-Technical Conference Joint Statement of Current and Former Sector Representatives at the PJM Nominating Committee","issued":"2026-08-21","accession":"20260821-5315","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"testimony","file":"sources/filings/text/20260821-5315_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5315","tier":"record","sha256":"63658730781ae9d2b618a164cfb65f0414dff6fd04d7a2cf23ef5972ce7476d6","pages":7,"tokens":1997,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260821-5316","title":"Comments of the PJM Cities and Communities Coalition on the PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5316","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"PJM Cities and Communities Coalition","kind":"comments","file":"sources/filings/text/20260821-5316_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5316","tier":"record","sha256":"4b6700b6451ed91f93fd130886144ccc875156478d708662aba8a44cf3a0223e","pages":null,"tokens":3257,"emptyPages":[],"textThemes":["cost","adequacy"]},{"slug":"rec-20260821-5318","title":"Comments of Voltus, Inc. on the PJM Interconnection LLC’s Federal Power Act Section 205 filing requesting the approval of tariff amendments to establish a…","issued":"2026-08-21","accession":"20260821-5318","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Voltus, Inc.","kind":"comments","file":"sources/filings/text/20260821-5318_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5318","tier":"record","sha256":"c9ee9fb851acbad0db618501a19c4bc827f390e3d88db0ef6a4b383df3ac57a2","pages":15,"tokens":4484,"emptyPages":[],"textThemes":["adequacy","flex"]},{"slug":"rec-20260821-5320","title":"Comments of Old Dominion Electric Cooperative in response to FERC's 07/30/2026 Notice re PJM Governance and Stakeholder Reforms","issued":"2026-08-21","accession":"20260821-5320","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Old Dominion Electric Cooperative","kind":"comments","file":"sources/filings/text/20260821-5320_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5320","tier":"record","sha256":"ce2b2c9b8d15d02b4712514e9a7e6230029f941bc766368a87d213eb9aecea9b","pages":15,"tokens":3919,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260821-5322","title":"Protest of East Kentucky Power Cooperative, Inc. to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal","issued":"2026-08-21","accession":"20260821-5322","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"East Kentucky Power Cooperative, Inc.","kind":"protest","file":"sources/filings/text/20260821-5322_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5322","tier":"record","sha256":"1bfba97402f4c05e9a4374241249d3fb28a59bc25ef99abc7a48f6f9dd75d04a","pages":120,"tokens":51089,"emptyPages":[],"textThemes":["credit","adequacy","cost","registry"]},{"slug":"rec-20260824-5004","title":"Comment of Leatrice Bantum in Docket(s)/Project(s) AD26-7-000 Submission Date: 8/22/2026","issued":"2026-08-24","accession":"20260824-5004","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260824-5004_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260824-5004","tier":"record","sha256":"0200ad2bed899290181c732d6f179c659c9c5cdaf75aed9e6aa5937f1c780d38","pages":null,"tokens":163,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260824-5017","title":"Comment, Protest, and Motion for Leave to File One Day Out of Time of E-Cubed Policy Associates, LLC in response to PJM Interconnection, L.L.C.’s 07/31/2026…","issued":"2026-08-24","accession":"20260824-5017","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"E-Cubed Policy Associates, LLC","kind":"protest","file":"sources/filings/text/20260824-5017_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260824-5017","tier":"record","sha256":"7e0d74ef60e3b4bf6c5cd7c794599adb6ff2a25c3c65d4a51a1fd270ddf5c6c0","pages":null,"tokens":6665,"emptyPages":[],"textThemes":["study","adequacy"]},{"slug":"rec-20260824-5126","title":"Post-Technical Conference Comments of Google LLC to address FERC's 07/30/2026 Notice re PJM Governance and Stakeholder Reforms","issued":"2026-08-24","accession":"20260824-5126","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Google LLC","kind":"comments","file":"sources/filings/text/20260824-5126_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260824-5126","tier":"record","sha256":"1c35e68611367c5a06f676b48410d6ace1bfb062177a0e27206c1457edb64beb","pages":9,"tokens":2437,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260826-4000","title":"Transcript of the 07/23/2025 Meeting held in Washington DC re the PJM Governance and Stakeholder Reforms","issued":"2026-08-26","accession":"20260826-4000","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"FEDERAL ENERGY REGULATORY COMMISSION","kind":"testimony","file":"sources/filings/text/20260826-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260826-4000","tier":"record","sha256":"126271c00af7731222be9e7f273fd767a1a5aa13f115ac68634603e616d55d79","pages":null,"tokens":65959,"emptyPages":[],"textThemes":["adequacy","cost","flex","retail"]},{"slug":"rec-20260826-5137","title":"PJM Interconnection, L.L.C. submits notice of Compliance Filing submitted on 08/17/2026 in compliance with the directives in the 06/18/2026 Order","issued":"2026-08-26","accession":"20260826-5137","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"notice","file":"sources/filings/text/20260826-5137_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260826-5137","tier":"record","sha256":"9c51cb967b605f89e517291c8ad98a6a41b05e0e1edd7b2f212393327c42d3d6","pages":3,"tokens":423,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260826-5199","title":"Comments of the Independent Market Monitor for PJM re PJM Governance and Stakeholder Reforms","issued":"2026-08-26","accession":"20260826-5199","docket":"AD26-7-000","group":"PJM governance and stakeholder reform vote","filer":"Monitoring Analytics, LLC","kind":"comments","file":"sources/filings/text/20260826-5199_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260826-5199","tier":"record","sha256":"b0c0b840b6d4b0613ebb0639bd3cd3237c3f422b26570b3661618d9e8020d0bd","pages":13,"tokens":4008,"emptyPages":[],"textThemes":["adequacy","cost"]},{"slug":"rec-20260828-5273","title":"Motion for Leave to Answer and Answer of Northern Virginia Electric Cooperative, Inc. to the 08/18/2026 Answer et al. of Vistra Corp","issued":"2026-08-28","accession":"20260828-5273","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"answer","file":"sources/filings/text/20260828-5273_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260828-5273","tier":"record","sha256":"898ce3a94fa81b650456106625a6328bb30cd4acf46ad0d7cb0be0a9e9c2601c","pages":5,"tokens":1068,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260828-5285","title":"Motion of Michigan Environmental Justice Coalition, et al. for Extension of Time to Submit Comments on the 08/18/2026 filing by the Midcontinent Independent…","issued":"2026-08-28","accession":"20260828-5285","docket":"ER26-3552-000","group":"MISO zero-injection generator interconnection agreement","filer":"Michigan Environmental Justice CoalitionCommunity Collaboration on Climate ChangeNatural Resources Defense Council ,Sustainable FERC Project ,","kind":"comments","file":"sources/filings/text/20260828-5285_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260828-5285","tier":"record","sha256":"9ac5442477fe6ba4673f40061c72241ad630b91a366383b5114ade8cb1115fc5","pages":5,"tokens":944,"emptyPages":[],"textThemes":["procedure"]},{"slug":"rec-20260831-3082","title":"Notice Shortening Answer Period re PJM Interconnection, L.L.C","issued":"2026-08-31","accession":"20260831-3082","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"answer","file":"sources/filings/text/20260831-3082_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260831-3082","tier":"record","sha256":"2a70690444fd2678054f8e81f2c8bfe4171e7d2ea05367827a68c0a799e7d0a5","pages":null,"tokens":185,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260831-5121","title":"Answer of Google LLC in Support of the Organization of PJM States, Inc.’s 08/28/2026 Motion for Extension of Time","issued":"2026-08-31","accession":"20260831-5121","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Google LLC","kind":"answer","file":"sources/filings/text/20260831-5121_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260831-5121","tier":"record","sha256":"fda34b1d7aff1b4834ec2f2ad785c351773d2462a5a47c7e49c1c1ab6407117c","pages":3,"tokens":354,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260901-5250","title":"Answer of East Kentucky Power Cooperative, Inc. in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in…","issued":"2026-09-01","accession":"20260901-5250","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"East Kentucky Power Cooperative, Inc.","kind":"answer","file":"sources/filings/text/20260901-5250_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260901-5250","tier":"record","sha256":"223ede6a6f1dfeefbc4b6477ec7d9e6541c4d96061eaa991ff7def27621308af","pages":3,"tokens":480,"emptyPages":[],"textThemes":["procedure"]},{"slug":"rec-20260902-3019","title":"Notice Denying Extension of Time re PJM Interconnection, L.L.C","issued":"2026-09-02","accession":"20260902-3019","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"notice","file":"sources/filings/text/20260902-3019_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-3019","tier":"record","sha256":"21eefc909ba3d20977eb2c9991786a505da8dc203902e01647c57541516761d7","pages":null,"tokens":235,"emptyPages":[],"textThemes":["procedure"]},{"slug":"rec-20260902-5055","title":"Supplemental Comments of Persistence Analytics Group LLC re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C","issued":"2026-09-02","accession":"20260902-5055","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260902-5055_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5055","tier":"record","sha256":"4e130c4c81107e8b916c8442dc12215bd948bb3c4560be61b83b5a13218d851a","pages":6,"tokens":1354,"emptyPages":[],"textThemes":["flex","registry"]},{"slug":"rec-20260902-5075","title":"Motion for Leave to Answer and Answer of the Attorney General of the Commonwealth of Kentucky to the comments and protests of PJM Interconnections, L.L.C.’s…","issued":"2026-09-02","accession":"20260902-5075","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Kentucky Attorney General","kind":"protest","file":"sources/filings/text/20260902-5075_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5075","tier":"record","sha256":"68fdb98af2b5463dee549c916cef244aeb97c2cbadc913f9c553593f705495a0","pages":3,"tokens":813,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20260902-5087","title":"Supplemental Comments of Persistence Analytics Group LLC re Cost-Causation Revalidation related to PJM Interconnection, L.L.C.’s proposed Reliability…","issued":"2026-09-02","accession":"20260902-5087","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"PERSISTENCE ANALYTICS GROUP LLC","kind":"comments","file":"sources/filings/text/20260902-5087_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5087","tier":"record","sha256":"ded355354ed9236000a51cb64cf93f46f97c6a665e2927a9b769252d291cdf1e","pages":5,"tokens":1050,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260903-3033","title":"Notice Denying Extension of Time re Midcontinent Independent System Operator, Inc","issued":"2026-09-03","accession":"20260903-3033","docket":"ER26-3552-000","group":"MISO zero-injection generator interconnection agreement","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"notice","file":"sources/filings/text/20260903-3033_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-3033","tier":"record","sha256":"387cc5034f323b73d62aba2f0acebecf1928816d0d291a32297a7fafe6ab21ad","pages":null,"tokens":271,"emptyPages":[],"textThemes":["procedure"]},{"slug":"rec-20260903-5020","title":"Comments of Hans Royal re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C","issued":"2026-09-03","accession":"20260903-5020","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260903-5020_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5020","tier":"record","sha256":"72e333f9a52e3a01a4f906dceaf4fdab7aef9a16bff2d52d289ace8fb72b2e3f","pages":5,"tokens":2082,"emptyPages":[],"textThemes":["registry","flex","adequacy"]},{"slug":"rec-20260903-5023","title":"Motion to Intervene and Protest of Nicholas Max Neal and David Neal, Delaware Standard Offer Service Ratepayers to PJM Interconnection, L.L.C.'s 08/13/2026…","issued":"2026-09-03","accession":"20260903-5023","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"protest","file":"sources/filings/text/20260903-5023_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5023","tier":"record","sha256":"4246bbe71c9155c272934ed903da4845c207ddb49ba9a7758b84d7a9b30ba4bf","pages":17,"tokens":4561,"emptyPages":[],"textThemes":["retail","registry","adequacy","procedure"]},{"slug":"rec-20260903-5060","title":"Comments of the Solar Energy Industries Association in response to PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service","issued":"2026-09-03","accession":"20260903-5060","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Solar Energy Industries Association","kind":"comments","file":"sources/filings/text/20260903-5060_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5060","tier":"record","sha256":"56461b7cb7864e63c32ef016998162818ace9dbcfda815981c5b16261225fcb9","pages":9,"tokens":2605,"emptyPages":[],"textThemes":["adequacy","colo"]},{"slug":"rec-20260903-5125","title":"Limited Comments of Buckeye Power, Inc. on PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026","issued":"2026-09-03","accession":"20260903-5125","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Buckeye Power, Inc.","kind":"comments","file":"sources/filings/text/20260903-5125_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5125","tier":"record","sha256":"cac0aa5a8e482956c1b30e9ac85236a11940d374c767841fa34cd598ba633ec9","pages":10,"tokens":2711,"emptyPages":[],"textThemes":["flex","adequacy","registry"]},{"slug":"rec-20260903-5133","title":"Comments of the Public Service Commission of West Virginia re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service","issued":"2026-09-03","accession":"20260903-5133","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Public Service Commission of West Virginia","kind":"comments","file":"sources/filings/text/20260903-5133_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5133","tier":"record","sha256":"7f531628cae8ef1ea8ffd69e33dffc997869d9932e99b993fe66458ae8cfc2d8","pages":7,"tokens":1527,"emptyPages":[],"textThemes":["retail","flex"]},{"slug":"rec-20260903-5134","title":"Comments of Dominion Energy Services, Inc. o/b/o its affiliate, Virginia Electric and Power Company d/b/a Dominion Energy Virginia re PJM Interconnection,…","issued":"2026-09-03","accession":"20260903-5134","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Dominion Energy Services, Inc.","kind":"comments","file":"sources/filings/text/20260903-5134_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5134","tier":"record","sha256":"fdbd4cac5c88907a3b4138b3a7135295f978c96df435dabb0c4da42b9efbf00a","pages":11,"tokens":3113,"emptyPages":[],"textThemes":["adequacy","retail","registry"]},{"slug":"rec-20260903-5148","title":"Motion of Ohio Energy Leadership Council to Intervene","issued":"2026-09-03","accession":"20260903-5148","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Ohio Energy Leadership Council","kind":"motion","file":"sources/filings/text/20260903-5148_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5148","tier":"record","sha256":"03b93b319aa8fa6c8cb3b9f5c27767ac7f9484227398ed8fb28e216b2120c057","pages":11,"tokens":1840,"emptyPages":[],"textThemes":["registry"]},{"slug":"rec-20260903-5156","title":"Comments and Limited Protest of NRG Business Marketing LLC, et. al. re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C","issued":"2026-09-03","accession":"20260903-5156","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"NRG Business Marketing LLCNRG Energy, Inc.Aspen Gen Funding, LLC ,Direct Energy Business, LLC ,Doswell, LLC ,Energy Plus Holdings LLC ,Enerwise Global Technologies, LLC ,Green Mountain Energy Company ,Helix Ironwood LLC ,Independence Energy Group LLC ,LSP University Park, LLC ,Midwest Generation LLC ,NRG Curtailment Solutions, Inc. ,Reliant Energy Northeast LLC ,Riverside Generating Company, LLC ,Stream Energy Pennsylvania, LLC ,University Park Energy, LLC ,XOOM Energy, LLC ,","kind":"protest","file":"sources/filings/text/20260903-5156_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5156","tier":"record","sha256":"62da697077062d57740512fe8e2b5e29532afca01e79823acd656ea418a7f632","pages":22,"tokens":6093,"emptyPages":[],"textThemes":["flex","adequacy"]},{"slug":"rec-20260903-5157","title":"Protest of PJM Power Providers Group re the Interim Resource Adequacy Service","issued":"2026-09-03","accession":"20260903-5157","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"PJM Power Providers Group","kind":"protest","file":"sources/filings/text/20260903-5157_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5157","tier":"record","sha256":"65a05304422b49ca221ccf75ffa191489d7b2c25aa3199e144e168b32a4c9952","pages":106,"tokens":39494,"emptyPages":[],"textThemes":["adequacy","flex","registry","study"]},{"slug":"rec-20260903-5159","title":"Limited Protest of Public Interest Organizations requesting narrow modifications of the proposed Interim Resource Adequacy Service by PJM Interconnection, L.L.C","issued":"2026-09-03","accession":"20260903-5159","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Sierra ClubNatural Resources Defense CouncilAppalachian Voices ,Environmental Law and Policy Center ,Center for Progressive Reform ,","kind":"protest","file":"sources/filings/text/20260903-5159_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5159","tier":"record","sha256":"59e27b263e9e2f37d01b9d96b7af962e9b4d3ebfd8f28f6e1ac8be164b607f27","pages":63,"tokens":17922,"emptyPages":[],"textThemes":["flex","adequacy","registry","cost"]},{"slug":"rec-20260903-5167","title":"Comments of Tesla, Inc. re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service","issued":"2026-09-03","accession":"20260903-5167","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Tesla, Inc.","kind":"comments","file":"sources/filings/text/20260903-5167_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5167","tier":"record","sha256":"42b6a57cce88b3528dbe5416b1e9ca0b9654c2f7e23fc29cde3a49c8ef38f640","pages":10,"tokens":3280,"emptyPages":[],"textThemes":["adequacy","flex","registry"]},{"slug":"rec-20260903-5170","title":"Supportive Comments and Limited Protest of the New Jersey Board of Public Utilities re PJM Interconnection, L.L.C.’s filing to establish Interim Resource…","issued":"2026-09-03","accession":"20260903-5170","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"New Jersey Board of Public Utilities","kind":"protest","file":"sources/filings/text/20260903-5170_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5170","tier":"record","sha256":"1c850a066b8233a5f7b43f93382d51323403cc10e5867588030b6cf0900d0441","pages":18,"tokens":5457,"emptyPages":[],"textThemes":["adequacy","registry","flex"]},{"slug":"rec-20260903-5176","title":"Limited Protest of American Municipal Power, Inc. to PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026","issued":"2026-09-03","accession":"20260903-5176","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"American Municipal Power, Inc.","kind":"protest","file":"sources/filings/text/20260903-5176_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5176","tier":"record","sha256":"0394c9aaaefc0f0f965d0513b36329bf8e8510679a703be3e29d1f9c12db45c4","pages":11,"tokens":3228,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260903-5183","title":"Motion to Intervene, Protest, and Request for Clarification of PPL Electric Utilities Corporation regarding PJM Interconnection L.L.C.’s Interim Resource…","issued":"2026-09-03","accession":"20260903-5183","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"PPL Electric Utilities Corporation","kind":"protest","file":"sources/filings/text/20260903-5183_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5183","tier":"record","sha256":"2dba3b8f84e416ed15bb6c04282d2eccee5c87650ff49dac81bb369f5eface69","pages":25,"tokens":7823,"emptyPages":[],"textThemes":["adequacy","retail","registry","flex"]},{"slug":"rec-20260903-5185","title":"Motion to Intervene and Comments of The Retail Energy Supply Association re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service","issued":"2026-09-03","accession":"20260903-5185","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"The Retail Energy Supply Association","kind":"comments","file":"sources/filings/text/20260903-5185_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5185","tier":"record","sha256":"86ac81e0920d9259dd11d1e515faa953ad3d54bfe4f5c7ca40785c06a7e41c39","pages":9,"tokens":2374,"emptyPages":[],"textThemes":["flex"]},{"slug":"rec-20260903-5189","title":"Protest of Office of the Ohio Consumers' Counsel to PJM Interconnection, L.L.C.'s 08/13/2026 Interim Resource Adequacy Service Filing","issued":"2026-09-03","accession":"20260903-5189","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Office of the Ohio Consumers' Counsel","kind":"protest","file":"sources/filings/text/20260903-5189_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5189","tier":"record","sha256":"d54bb7f9aa9f048ee31e82aed5f55be08b8c9dfef3abac53cf5612e2927f0093","pages":39,"tokens":10975,"emptyPages":[],"textThemes":["flex","registry","adequacy","cost"]},{"slug":"rec-20260903-5190","title":"Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate on PJM Interconnection, L.L.C.’s filing to establish Interim…","issued":"2026-09-03","accession":"20260903-5190","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Ohio Federal Energy Advocate","kind":"comments","file":"sources/filings/text/20260903-5190_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5190","tier":"record","sha256":"1b2f5f8e7b20a8ea3391bf632d7bae488094e24ba9a0bde5dce301d3c9a4c309","pages":11,"tokens":2820,"emptyPages":[],"textThemes":["flex","adequacy","registry","retail"]},{"slug":"rec-20260903-5193","title":"Motion to Intervene and Comments of Sunrun Inc. in response to PJM Interconnection, L.L.C.’s 08/13/2026 filing to establish Interim Resource Adequacy…","issued":"2026-09-03","accession":"20260903-5193","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Sunrun Inc.","kind":"comments","file":"sources/filings/text/20260903-5193_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5193","tier":"record","sha256":"d61a398adbf05da09bfb8df375574c04b971aa4815b5c20dc5acc19c7f01f732","pages":15,"tokens":3283,"emptyPages":[],"textThemes":["adequacy","registry"]},{"slug":"rec-20260903-5195","title":"Comments of the Chief Energy Officer Josephus M. Allmond et al. of the Commonwealth of Virginia re the PJM Interconnection, L.L.C.'s proposed Interim…","issued":"2026-09-03","accession":"20260903-5195","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20260903-5195_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5195","tier":"record","sha256":"cac5e2eeef7d91110c35d21864ce9d6777c0c9f747c34bae33ff972f25589da6","pages":5,"tokens":1096,"emptyPages":[],"textThemes":["flex","adequacy"]},{"slug":"rec-20260903-5197","title":"Comments of ACORE on PJM Interconnection, L.L.C.'s 08/13/2026 proposal to establish Interim Resource Adequacy Service and a large load registry","issued":"2026-09-03","accession":"20260903-5197","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"American Council on Renewable Energy","kind":"comments","file":"sources/filings/text/20260903-5197_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5197","tier":"record","sha256":"09c36cb556fc42083331fa8963196d57f4e66ae385eb6a551b6a3e6496a0e71b","pages":4,"tokens":846,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260903-5200","title":"Motion to Intervene and Protest of Talen Energy Corporation re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service","issued":"2026-09-03","accession":"20260903-5200","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Talen Energy Corporation","kind":"protest","file":"sources/filings/text/20260903-5200_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5200","tier":"record","sha256":"648dfb54d1885379ed030536eb8ee7a6e851db3dc375b72a50fdba811c809c9f","pages":52,"tokens":12452,"emptyPages":[],"textThemes":["adequacy","flex","registry"]},{"slug":"rec-20260903-5201","title":"Protest and Comments of Constellation Energy Generation, LLC addressing PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service…","issued":"2026-09-03","accession":"20260903-5201","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Constellation Energy Generation, LLC","kind":"protest","file":"sources/filings/text/20260903-5201_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5201","tier":"record","sha256":"46dab5860d3a164ebe01f6a96816184e76e49aeeb1eff3107c4f7cf60433ed70","pages":90,"tokens":30255,"emptyPages":[87],"textThemes":["flex","adequacy","retail","registry"]},{"slug":"rec-20260903-5204","title":"Comments and Limited Protest of Southern Maryland Electric Cooperative, Inc. regarding PJM Interconnection, L.L.C.’s 08/13/2026 filing","issued":"2026-09-03","accession":"20260903-5204","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Southern Maryland Electric Cooperative, Inc.","kind":"protest","file":"sources/filings/text/20260903-5204_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5204","tier":"record","sha256":"18555bdf4e3ab0598a0a4e1968a1405d15b2a9d54ff76c842341d37a87219949","pages":15,"tokens":4119,"emptyPages":[],"textThemes":["registry","adequacy","flex","retail"]},{"slug":"rec-20260903-5207","title":"Limited Protest and Comments of FirstEnergy Service Company et al. in response to PJM Interconnection, L.L.C.’s 08/13/2026 filing to establish Interim…","issued":"2026-09-03","accession":"20260903-5207","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"FirstEnergy Service CompanyOhio Edison CompanyThe Cleveland Electric Illuminating Company ,The Toledo Edison Company ,FirstEnergy Pennsylvania Electric Company ,Jersey Central Power & Light Company ,Monongahela Power Company ,The Potomac Edison Company ,","kind":"protest","file":"sources/filings/text/20260903-5207_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5207","tier":"record","sha256":"9c13eea24f1e3d9e860394c3c555bc0b2da1da57a025cd6b64871e666cc1163b","pages":18,"tokens":5618,"emptyPages":[],"textThemes":["flex","retail","adequacy","registry"]},{"slug":"rec-20260903-5209","title":"Comments of Calibrant Energy requesting clarifications of PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026","issued":"2026-09-03","accession":"20260903-5209","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Calibrant Energy","kind":"rehearing request","file":"sources/filings/text/20260903-5209_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5209","tier":"record","sha256":"a84228e4004e6a8e512b52f2a9ccabe5f0856b9c887a931554e1d49983afc097","pages":13,"tokens":3640,"emptyPages":[],"textThemes":["colo","adequacy","flex"]},{"slug":"rec-20260903-5217","title":"Motion to Intervene and Protest of Corporate Energy Buyers Association urging Commission to reject PJM Interconnection, L.L.C.'s proposal to revise the…","issued":"2026-09-03","accession":"20260903-5217","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Corporate Energy Buyers Association","kind":"protest","file":"sources/filings/text/20260903-5217_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5217","tier":"record","sha256":"58ba0ae4c63bcdfe84588f324f174260b6bf57ff5e9795d60e8966bcb47cbf0c","pages":16,"tokens":3867,"emptyPages":[],"textThemes":["flex","retail","adequacy"]},{"slug":"rec-20260903-5218","title":"Limited Comments of North Carolina Electric Membership Corporation on PJM Interconnection, L.L.C.’s filing proposing revisions to the Open Access…","issued":"2026-09-03","accession":"20260903-5218","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"North Carolina Electric Membership Corporation","kind":"comments","file":"sources/filings/text/20260903-5218_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5218","tier":"record","sha256":"0be499787b3118486b4edb609dad080e4221f68663af933844c0cdd648dfb09f","pages":6,"tokens":1484,"emptyPages":[],"textThemes":["adequacy","flex"]},{"slug":"rec-20260903-5219","title":"Protest of America's Power re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service","issued":"2026-09-03","accession":"20260903-5219","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"America's Power","kind":"protest","file":"sources/filings/text/20260903-5219_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5219","tier":"record","sha256":"3200942b73b9634537d2bbc39f9d1ebe605008e3b5c07927c9f9db6fa67d98ec","pages":22,"tokens":5770,"emptyPages":[],"textThemes":["adequacy","flex"]},{"slug":"rec-20260903-5221","title":"Protest of Vistra Corp. regarding PJM Interconnection, L.L.C.’s proposed Interim Resource Adequacy Service filing","issued":"2026-09-03","accession":"20260903-5221","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Vistra Corp.","kind":"protest","file":"sources/filings/text/20260903-5221_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5221","tier":"record","sha256":"0db4237f10ede37eaf501ca75cd8cca88b13cd08c9c221a0b46efbb907e118bf","pages":24,"tokens":8432,"emptyPages":[],"textThemes":["flex","adequacy","retail","colo"]},{"slug":"rec-20260903-5222","title":"Protest of the Electric Power Supply Association to PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service","issued":"2026-09-03","accession":"20260903-5222","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Electric Power Supply Association","kind":"protest","file":"sources/filings/text/20260903-5222_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5222","tier":"record","sha256":"ede2899f6b17e652883179f8877d1e0dd17ca7a694c6215523fb25bee4ba32ff","pages":72,"tokens":25896,"emptyPages":[],"textThemes":["adequacy","flex","study","registry"]},{"slug":"rec-20260903-5224","title":"Comments and Limited Protests of Ohio Energy Leadership Council in response to the Interim Resource Adequacy Service and Large Load Registry proposed by PJM…","issued":"2026-09-03","accession":"20260903-5224","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Ohio Energy Leadership Council","kind":"protest","file":"sources/filings/text/20260903-5224_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5224","tier":"record","sha256":"c11081e82db91eda9ba5349a42c9640caf7d9ddcd287458ef5070aa0b01c11ae","pages":19,"tokens":4428,"emptyPages":[],"textThemes":["flex","retail"]},{"slug":"rec-20260903-5229","title":"Limited Protest of East Kentucky Power Cooperative, Inc. to PJM Interconnection, L.L.C.’s 08/13/2026 proposed revisions to the Open Access Transmission…","issued":"2026-09-03","accession":"20260903-5229","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"East Kentucky Power Cooperative, Inc.","kind":"protest","file":"sources/filings/text/20260903-5229_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5229","tier":"record","sha256":"db798fa4f084c5255161fd50d2fd65d3fccfcc1819d0ae7fce3b5679e8af9696","pages":71,"tokens":20861,"emptyPages":[],"textThemes":["flex","adequacy","registry","study"]},{"slug":"rec-20260903-5230","title":"Comments and Request for Clarification of American Electric Power Service Corporation re PJM Interconnection, LLC’s proposed revisions to the PJM Open…","issued":"2026-09-03","accession":"20260903-5230","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"American Electric Power Corporation","kind":"rehearing request","file":"sources/filings/text/20260903-5230_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5230","tier":"record","sha256":"52564462eb45671889fcaaeb461deec17e01dc2951c5f5c5e9e9acb0ed3b2596","pages":19,"tokens":5125,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260903-5231","title":"Comments of the PJM Industrial Customer Coalition in response to the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service…","issued":"2026-09-03","accession":"20260903-5231","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"PJM Industrial Customer Coalition","kind":"comments","file":"sources/filings/text/20260903-5231_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5231","tier":"record","sha256":"3ba7c5f8041b27cd0aa1cce98ea18d38ec81563fd01580f442dfca657c84815b","pages":16,"tokens":4550,"emptyPages":[],"textThemes":["registry","retail","adequacy","flex"]},{"slug":"rec-20260903-5232","title":"Motion to Intervene and Comments of Appalachian Voices in support of PJM Interconnection, L.L.C.’s proposed revisions to Reliability Assurance Agreement…","issued":"2026-09-03","accession":"20260903-5232","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Appalachian Voices","kind":"comments","file":"sources/filings/text/20260903-5232_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5232","tier":"record","sha256":"18281543087275f4ef767582111200b766e5cf26fdce6a662a1cd45dbaca8753","pages":14,"tokens":4187,"emptyPages":[],"textThemes":["adequacy","retail","registry"]},{"slug":"rec-20260903-5233","title":"Protest of Google LLC regarding PJM Interconnection, L.L.C.’s Interim Resource Adequacy Service and Large Load Registry proposal","issued":"2026-09-03","accession":"20260903-5233","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Google LLC","kind":"protest","file":"sources/filings/text/20260903-5233_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5233","tier":"record","sha256":"81292f60c4a218be51cc9be8bb53b8e88ce1efb7355c33bf5aa76b3738c5e9a1","pages":27,"tokens":8313,"emptyPages":[],"textThemes":["flex","retail","adequacy","registry"]},{"slug":"rec-20260903-5236","title":"Comments of Advanced Energy United in response to PJM Interconnection, L.L.C.’s 08/13/2026 filing to establish Interim Resource Adequacy Service et al","issued":"2026-09-03","accession":"20260903-5236","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Advanced Energy United","kind":"comments","file":"sources/filings/text/20260903-5236_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5236","tier":"record","sha256":"b7406e043a5b4d5ae280955aa8b6a44d80fc8708adf611e900bb27a75fc8aba4","pages":13,"tokens":3636,"emptyPages":[],"textThemes":["flex","adequacy","registry","cost"]},{"slug":"rec-20260903-5240","title":"Comments of Microsoft Corporation to the proposal of PJM Interconnection, L.L.C. to establish Interim Resource Adequacy Service and Large Load Registry","issued":"2026-09-03","accession":"20260903-5240","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Microsoft Corporation","kind":"comments","file":"sources/filings/text/20260903-5240_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5240","tier":"record","sha256":"6d4055d798782ef5ab61c95fc4acee16d6beab1b88e9f4d3f3bd95413420d501","pages":11,"tokens":2434,"emptyPages":[],"textThemes":["retail","registry","adequacy","flex"]},{"slug":"rec-20260903-5241","title":"Comments of Old Dominion Electric Cooperative re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service","issued":"2026-09-03","accession":"20260903-5241","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Old Dominion Electric Cooperative","kind":"comments","file":"sources/filings/text/20260903-5241_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5241","tier":"record","sha256":"8bf33f8788442ac5d5e12febe2a4d55f065ee53210452bbf368533b068c90868","pages":11,"tokens":2943,"emptyPages":[],"textThemes":["registry","adequacy"]},{"slug":"rec-20260903-5243","title":"Protest of the Independent Market Monitor for PJM to the 08/13/2026 filing by PJM Interconnection, L.L.C. proposing to establish Interim Resource Adequacy…","issued":"2026-09-03","accession":"20260903-5243","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Monitoring Analytics, LLC","kind":"protest","file":"sources/filings/text/20260903-5243_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5243","tier":"record","sha256":"aad0e9543eb2a2a6e769f0fb2e8172e89d665628edf0341875d045f1e70dc72a","pages":47,"tokens":15493,"emptyPages":[],"textThemes":["flex","adequacy","registry","retail"]},{"slug":"rec-20260904-5003","title":"Comments, Request for Clarification, and in the Alternative, Request to Sever of the Organization of PJM States, Inc. re PJM Interconnection, L.L.C.’s…","issued":"2026-09-04","accession":"20260904-5003","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Organization of PJM States, Inc.","kind":"rehearing request","file":"sources/filings/text/20260904-5003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5003","tier":"record","sha256":"ca5f1ac293fbb5337384eff35b7f740e5fec94d5ea655c2ef3c93ad4439f96a5","pages":12,"tokens":3171,"emptyPages":[],"textThemes":["flex","adequacy","registry","retail"]},{"slug":"rec-20260904-5010","title":"Comments of Voltus, Inc. on PJM Interconnection LLC’s Federal Power Act Section 205 filing requesting the approval of tariff amendments to establish an…","issued":"2026-09-04","accession":"20260904-5010","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Voltus, Inc.","kind":"comments","file":"sources/filings/text/20260904-5010_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5010","tier":"record","sha256":"a4c3d375116dbcd47bc9c61bb24491d72f5ab2c09168cf4bdc72591b17cd3b65","pages":41,"tokens":12540,"emptyPages":[],"textThemes":["adequacy","registry","flex","retail"]},{"slug":"rec-20260904-5013","title":"Protest, Request for Clarification, and Comments of Equinix Inc. on the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy…","issued":"2026-09-04","accession":"20260904-5013","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"EQUINIX INC.","kind":"protest","file":"sources/filings/text/20260904-5013_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5013","tier":"record","sha256":"6afd61af80b4d5871544cccdc0db063b913e44173e3257a2c664a3f60a410020","pages":3,"tokens":804,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260904-5013-2","title":"2026-09-03 Final EQIX IRAS Comments","issued":"2026-09-04","accession":"20260904-5013","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"EQUINIX INC.","kind":"attachment","file":"sources/filings/text/20260904-5013_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5013","tier":"record","parent":"rec-20260904-5013","sha256":"6f09b9a08a70133ed740dd7d5de221993c73a6f0af7d301de79e8847fd9f15ad","pages":18,"tokens":5452,"emptyPages":[],"textThemes":["registry","flex","retail","adequacy"]},{"slug":"rec-20260904-5056","title":"Motion for Leave to File Limited Answer, and Limited Answer, of East Kentucky Power Cooperative, Inc. in support of Protest filed by American Electric Power…","issued":"2026-09-04","accession":"20260904-5056","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"East Kentucky Power Cooperative, Inc.","kind":"protest","file":"sources/filings/text/20260904-5056_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5056","tier":"record","sha256":"c41adf4b4b3691a49274eac1f7e4e4084c3e20778cf494e14a81da9641d4ac07","pages":9,"tokens":2441,"emptyPages":[],"textThemes":["adequacy","credit"]},{"slug":"rec-20260904-5197","title":"Motion of Equinix Inc. for Leave to Protest, Seek Clarification on and Comment Out-of-Time on the Proposal of PJM Interconnection, L.L.C. to Establish…","issued":"2026-09-04","accession":"20260904-5197","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"EQUINIX INC.","kind":"protest","file":"sources/filings/text/20260904-5197_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5197","tier":"record","sha256":"fa099ab22ae31a8d993b199d61d71665cabd94a4a79b1f8a4426a6106059012c","pages":2,"tokens":539,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260904-5197-2","title":"2026-09-04 FERC Acceptance for Filing in ER26-3515-000","issued":"2026-09-04","accession":"20260904-5197","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"EQUINIX INC.","kind":"attachment","file":"sources/filings/text/20260904-5197_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5197","tier":"record","parent":"rec-20260904-5197","sha256":"e2e007792c6ab7547fb30ce4c3fd862ef7e36a2aee44c16017b5b7bfe7772da3","pages":2,"tokens":354,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260904-5197-3","title":"2026-09-03 Letter re Inadvertent Incorrect File Upload","issued":"2026-09-04","accession":"20260904-5197","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"EQUINIX INC.","kind":"attachment","file":"sources/filings/text/20260904-5197_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5197","tier":"record","parent":"rec-20260904-5197","sha256":"6afd61af80b4d5871544cccdc0db063b913e44173e3257a2c664a3f60a410020","pages":3,"tokens":804,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260904-5197-4","title":"2026-09-03 Final EQIX IRAS Comments","issued":"2026-09-04","accession":"20260904-5197","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"EQUINIX INC.","kind":"attachment","file":"sources/filings/text/20260904-5197_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5197","tier":"record","parent":"rec-20260904-5197","sha256":"6f09b9a08a70133ed740dd7d5de221993c73a6f0af7d301de79e8847fd9f15ad","pages":18,"tokens":5452,"emptyPages":[],"textThemes":["registry","flex","retail","adequacy"]},{"slug":"rec-20260908-5257","title":"Comments of the Solar Energy Industries Association in Support of Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish…","issued":"2026-09-08","accession":"20260908-5257","docket":"ER26-3552-000","group":"MISO zero-injection generator interconnection agreement","filer":"Solar Energy Industries Association","kind":"comments","file":"sources/filings/text/20260908-5257_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5257","tier":"record","sha256":"ecca38f59dd9a7e9da6ec0d50f18eb81f142a0b1a3abfd90c8989b135f31b427","pages":7,"tokens":1969,"emptyPages":[],"textThemes":["study","colo","adequacy","cost"]},{"slug":"rec-20260908-5260","title":"Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to certain comments and protests re the PJM Reliability Backstop Procurement…","issued":"2026-09-08","accession":"20260908-5260","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Constellation Energy Generation, LLC","kind":"protest","file":"sources/filings/text/20260908-5260_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5260","tier":"record","sha256":"5c0f992eaa3b8eb15d9a443363f7f73ea5c79f451d1a6bdb898202801038cbe6","pages":12,"tokens":3614,"emptyPages":[],"textThemes":["credit","adequacy"]},{"slug":"rec-20260908-5266","title":"Comments of Google LLC on Midcontinent Independent System Operator Inc.’s Zero Injection Generator Interconnection Agreement proposal","issued":"2026-09-08","accession":"20260908-5266","docket":"ER26-3552-000","group":"MISO zero-injection generator interconnection agreement","filer":"Google LLC","kind":"comments","file":"sources/filings/text/20260908-5266_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5266","tier":"record","sha256":"ac9329da980b2107ca55834c7362ef3202de13f8b9493605b1a1612ad9ed63e7","pages":7,"tokens":1815,"emptyPages":[],"textThemes":["study","proximate"]},{"slug":"rec-20260908-5273","title":"Motion for Acceptance of Late-Filed Comments and Comments of the Virginia State Corporation Commission on the proposal of PJM Interconnection, L.L.C. to…","issued":"2026-09-08","accession":"20260908-5273","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Virginia State Corporation Commission","kind":"comments","file":"sources/filings/text/20260908-5273_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5273","tier":"record","sha256":"bfaf79d91cf324f09f121addf48401d4e92d03a57a34465cbbffade1ab71bb1a","pages":6,"tokens":1189,"emptyPages":[],"textThemes":["flex","retail"]},{"slug":"rec-20260908-5320","title":"Protest of Microsoft Corporation re American Transmission Company LLC's 08/17/2026 tariff filing","issued":"2026-09-08","accession":"20260908-5320","docket":"ER26-3531-000","group":"ATC large-load planning revisions (Attachment FF-ATCLLC)","filer":"Microsoft Corporation","kind":"protest","file":"sources/filings/text/20260908-5320_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5320","tier":"record","sha256":"3fc2c3cd0ae41f8e4dee85822733f9c755e6608b691ac4e9c6a583bcd5354d7f","pages":14,"tokens":3979,"emptyPages":[],"textThemes":["retail","study"]},{"slug":"rec-20260908-5321","title":"Motion to Intervene and Comments of MISO Transmission Owners in support of the 08/18/2026 filing by Midcontinent Independent System Operator, Inc","issued":"2026-09-08","accession":"20260908-5321","docket":"ER26-3552-000","group":"MISO zero-injection generator interconnection agreement","filer":"MISO Transmission Owners","kind":"comments","file":"sources/filings/text/20260908-5321_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5321","tier":"record","sha256":"00cb74bd35b72245112591e766b22297282453a5558fafac3c5c09dffe01945c","pages":13,"tokens":3127,"emptyPages":[],"textThemes":["study","colo","cost","adequacy"]},{"slug":"rec-20260908-5326","title":"Limited Protest and Comments of Constellation Energy Generation, LLC in response to PJM Interconnection, L.L.C.'s 08/17/2026 Compliance Filing","issued":"2026-09-08","accession":"20260908-5326","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"protest","file":"sources/filings/text/20260908-5326_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5326","tier":"record","sha256":"7e427e4752eb0f83d5d07e7e8ac27bebd1914198ae1e905ef33dadc9559cd41e","pages":11,"tokens":2974,"emptyPages":[],"textThemes":["study","colo","adequacy","flex"]},{"slug":"rec-20260908-5328","title":"Limited Protest of American Municipal Power, Inc. to PJM Interconnection, L.L.C.'s 08/17/2026 Compliance Filing","issued":"2026-09-08","accession":"20260908-5328","docket":"ER26-1479-002","group":"PJM co-location compliance","filer":"American Municipal Power, Inc.","kind":"protest","file":"sources/filings/text/20260908-5328_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5328","tier":"record","sha256":"cf7017db03f9e8b0e59149faa7fbf283318c372d2f3572dd2c72642d9f0d4982","pages":9,"tokens":2362,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20260908-5332","title":"Comments of Advanced Energy United in response to the Midcontinent Independent System Operator’s proposal to establish a Zero Injection Generator…","issued":"2026-09-08","accession":"20260908-5332","docket":"ER26-3552-000","group":"MISO zero-injection generator interconnection agreement","filer":"Advanced Energy United","kind":"comments","file":"sources/filings/text/20260908-5332_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5332","tier":"record","sha256":"d560b04146f87179e8934188cc2d0929b4370ccacc8cbf11229b821820d99adf","pages":null,"tokens":3642,"emptyPages":[],"textThemes":["study","colo","cost"]},{"slug":"rec-20260908-5340","title":"Comments and Protest of Midcontinent Independent System Operator Inc. in response to American Transmission Company LLC’s tariff filing","issued":"2026-09-08","accession":"20260908-5340","docket":"ER26-3531-000","group":"ATC large-load planning revisions (Attachment FF-ATCLLC)","filer":"Midcontinent Independent System Operator Inc.","kind":"protest","file":"sources/filings/text/20260908-5340_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5340","tier":"record","sha256":"3a3f1a71e476fb80c39f45146f570869ea28488de106a08a16da8f1696c179f5","pages":16,"tokens":4489,"emptyPages":[],"textThemes":["procedure","study","registry"]},{"slug":"rec-20260908-5364","title":"Joint Comments and Limited Protest of PJM Industrial Customer Coalition et al. to PJM Interconnection, L.L.C.'s 08/17/2026 Compliance Filing","issued":"2026-09-08","accession":"20260908-5364","docket":"ER26-1479-000","group":"PJM co-location compliance","filer":"PJMICC, IECA, AF&PA, and Amtrak","kind":"protest","file":"sources/filings/text/20260908-5364_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5364","tier":"record","sha256":"55b796953a1d1edfd459e95ab8afa0835eb0c1bc3621fcc499abd8c49c6cd033","pages":12,"tokens":3433,"emptyPages":[],"textThemes":["colo","retail","study"]},{"slug":"rec-20260911-5298","title":"Motion for Leave to File Comments Out-of-Time and Comments of CyrusOne, LP on the proposal of PJM Interconnection, L.L.C. to Establish Interim Resource…","issued":"2026-09-11","accession":"20260911-5298","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"CyrusOne LP","kind":"comments","file":"sources/filings/text/20260911-5298_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260911-5298","tier":"record","sha256":"d497a424eb9092cd430b14b4866bc9a63847be4d9310afcf748f17f3b0e3b372","pages":11,"tokens":2793,"emptyPages":[],"textThemes":["registry","retail"]},{"slug":"rec-20260915-5111","title":"Comments of the Industrial Energy Consumers of America in response to PJM Interconnection, L.L.C.’s proposal to Establish Interim Resources Adequacy, et al","issued":"2026-09-15","accession":"20260915-5111","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Industrial Energy Consumers of America","kind":"comments","file":"sources/filings/text/20260915-5111_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260915-5111","tier":"record","sha256":"8e750ec84ff110e4165b72465c5ebcdd135640ae77e4300174c94b720a122ff8","pages":3,"tokens":668,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260915-5145","title":"Motion for Leave to Answer and Answer of PPL Electric Utilities Corporation to the 09/10/2026 Motion for Leave to Answer and Answer of PJM Interconnection,…","issued":"2026-09-15","accession":"20260915-5145","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"PPL Electric Utilities Corporation","kind":"answer","file":"sources/filings/text/20260915-5145_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260915-5145","tier":"record","sha256":"437882bcc71754e314141ebcf99e0a1f41aa1608c8bf15993501c4e1f9327ed1","pages":5,"tokens":1055,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260916-5131","title":"Motion for Leave to Answer and Answer of Josh Shapiro, Governor of the Commonwealth of Pennsylvania in Support of PJM Interconnection, LLC’s proposal to…","issued":"2026-09-16","accession":"20260916-5131","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Josh Shapiro, Governor of the Commonwealth of Pennsylvania","kind":"answer","file":"sources/filings/text/20260916-5131_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260916-5131","tier":"record","sha256":"8fb083bda2d922fe775aa6762e6d1e5e760d89a8cb411f4b1784745a8033a8b1","pages":26,"tokens":8559,"emptyPages":[],"textThemes":["flex","retail","adequacy","study"]},{"slug":"rec-20260917-5316","title":"Answer of PJM Power Providers Group in response to PJM Interconnection, L.L.C.'s 09/10/2026 Motion for Leave to Answer and Answer","issued":"2026-09-17","accession":"20260917-5316","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"PJM Power Providers Group","kind":"answer","file":"sources/filings/text/20260917-5316_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260917-5316","tier":"record","sha256":"7e709f60ad3c63d17091f3a04eba402ef116b83465a60c6b989271e359ceb47c","pages":11,"tokens":3078,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260918-5119","title":"Motion to Intervene and Comments of North American Electric Reliability Corporation et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5119","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"North American Electric Reliability CorporationMidwest Reliability OrganizationReliability First Corporation ,SERC Reliability Corporation ,","kind":"comments","file":"sources/filings/text/20260918-5119_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5119","tier":"record","sha256":"e5387b95b95581769dd1fd058c13c1eaf6e2fd4f2aacd9fe3f13f396b564464c","pages":10,"tokens":2563,"emptyPages":[],"textThemes":["registry"]},{"slug":"rec-20260918-5224","title":"Motion to Intervene and Comments of the MISO Transmission Owners re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5224","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"MISO Transmission Owners","kind":"comments","file":"sources/filings/text/20260918-5224_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5224","tier":"record","sha256":"7ebfd62d3ad318b70261e3845ccb84ee89d48d894cce7b9912bf173f18039f62","pages":10,"tokens":2336,"emptyPages":[],"textThemes":["study"]},{"slug":"rec-20260918-5262","title":"Motion for Leave to Answer and Answer of Buckeye Power, Inc. to certain Comments and Protests re PJM Interconnection, LLC’s proposal to Establish Interim…","issued":"2026-09-18","accession":"20260918-5262","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Buckeye Power, Inc.","kind":"protest","file":"sources/filings/text/20260918-5262_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5262","tier":"record","sha256":"b63bccb09d0ccbe06de9c40c5be62193c03d4a3a7730dcecb8e4a7603c86ea4d","pages":11,"tokens":3302,"emptyPages":[],"textThemes":["adequacy","flex"]},{"slug":"rec-20260918-5286","title":"Limited Protest of Entergy Services, LLC re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing","issued":"2026-09-18","accession":"20260918-5286","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"Entergy Services, LLC","kind":"protest","file":"sources/filings/text/20260918-5286_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5286","tier":"record","sha256":"1b2a5044bc1e148d718cffbdbe3908980572d00bd5550e933c9c038ec4f6869a","pages":58,"tokens":10965,"emptyPages":[21,22,23,24],"textThemes":["registry","study"]},{"slug":"rec-20260918-5346","title":"Joint Comments, Request for Clarification and Limited Protest of Coalition of MISO Transmission Customers et al. to Midcontinent Independent System…","issued":"2026-09-18","accession":"20260918-5346","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"CMTC et al.","kind":"protest","file":"sources/filings/text/20260918-5346_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5346","tier":"record","ocr":true,"sha256":"48ecf0be58966e64238e9e5fc99e323aca65821ad43ca87f6f743644fee83cec","pages":23,"tokens":12774,"emptyPages":[],"textThemes":["registry","study"]},{"slug":"rec-20260918-5364","title":"Motion For Leave to File Second Limited Answer and Second Limited Answer of East Kentucky Power Cooperative, Inc","issued":"2026-09-18","accession":"20260918-5364","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"East Kentucky Power Cooperative, Inc.","kind":"answer","file":"sources/filings/text/20260918-5364_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5364","tier":"record","sha256":"273b34f2e918b91b431e50ed052c2915c1c744b9276e37b2900386fbc2fcc9e3","pages":35,"tokens":13254,"emptyPages":[],"textThemes":["credit","adequacy","cost","registry"]},{"slug":"rec-20260918-5365","title":"Motion for Leave to Answer and Answer of the New Jersey Board of Public Utilities to the protests and comments of Buckeye Power, Inc., et al","issued":"2026-09-18","accession":"20260918-5365","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"New Jersey Board of Public Utilities","kind":"protest","file":"sources/filings/text/20260918-5365_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5365","tier":"record","sha256":"3fc0151882c04c04011924129674b6ae6ec40596b0c90fedd656ec601cd9a87b","pages":8,"tokens":1802,"emptyPages":[],"textThemes":["adequacy","flex","registry"]},{"slug":"rec-20260918-5386","title":"Comments of Google LLC on Midcontinent Independent System Operator Inc.’s Interconnection Reliability Requirements for Large Loads Proposal","issued":"2026-09-18","accession":"20260918-5386","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"Google LLC","kind":"comments","file":"sources/filings/text/20260918-5386_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5386","tier":"record","sha256":"1b6d80166d1eb1068264c64888fd50b05a344c7286cca5c56c99878c21a94acf","pages":10,"tokens":2663,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260918-5391","title":"Comments of Verrus LLC in Support of Midcontinent Independent System Operator, Inc.'s proposed Interconnection Reliability Requirements for Large Loads","issued":"2026-09-18","accession":"20260918-5391","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"Verrus LLC","kind":"comments","file":"sources/filings/text/20260918-5391_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5391","tier":"record","sha256":"816a9da2c772e8ec5e9072d4902da8b477b9a112322e4e0852dcc68b9a2da92c","pages":21,"tokens":4082,"emptyPages":[],"textThemes":["flex"]},{"slug":"rec-20260918-5413","title":"Motion for Leave to Answer and Answer of American Electric Power Service Corporation to PJM Interconnection, L.L.C.'s 09/10/2026 Answer","issued":"2026-09-18","accession":"20260918-5413","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"American Electric Power Service Corporation","kind":"answer","file":"sources/filings/text/20260918-5413_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5413","tier":"record","sha256":"fdc0420a1ce5d22e50a6ac3d545c0560951e1e8eba7e76fc80b4765832e6ece2","pages":8,"tokens":2389,"emptyPages":[],"textThemes":["credit","adequacy"]},{"slug":"rec-20260921-5084","title":"Comments of Rowan Digital Infrastructure, LLC re the 08/28/2026 filing by Midcontinent Independent System Operator, Inc. proposing Interconnection…","issued":"2026-09-21","accession":"20260921-5084","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"Rowan Digital Infrastructure","kind":"comments","file":"sources/filings/text/20260921-5084_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-5084","tier":"record","sha256":"b67f1ad0fbd8e177e38976ada38cbd254b5756926405a3b76dc256cf95dbb8bd","pages":3,"tokens":1223,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260921-5148","title":"Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C.…","issued":"2026-09-21","accession":"20260921-5148","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20260921-5148_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-5148","tier":"record","sha256":"8054375f937de2a0efccbfabf1f5eb9360dea15d54c10ee2e34f96387e974bdf","pages":11,"tokens":3181,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260922-5110","title":"Motion for Leave to Answer and Answer of Indicated PJM Transmission Owners to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed…","issued":"2026-09-22","accession":"20260922-5110","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"American Transmission Systems, Inc.Mid-Atlantic Interstate Transmission, LLCTrans-Allegheny Interstate Line Company ,Keystone Appalachian Transmission Company ,Jersey Central Power & Light ,Potomac Edison Company ,Duquesne Light Company ,Monongahela Power Company ,","kind":"answer","file":"sources/filings/text/20260922-5110_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260922-5110","tier":"record","sha256":"5dc0cd41282d1e5bf26d6fe3a1fc91f0d5d73abc08497673e40e9b82a4647138","pages":5,"tokens":1018,"emptyPages":[],"textThemes":["credit"]},{"slug":"rec-20260923-5060","title":"Motion for Leave to Answer and Limited Answer of FirstEnergy Service Company to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C.…","issued":"2026-09-23","accession":"20260923-5060","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"FirstEnergy Service Company","kind":"answer","file":"sources/filings/text/20260923-5060_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5060","tier":"record","sha256":"166116e587d028a9c22b2085763af4af1373d03cf338e09a50ebbe8c9ce63f5d","pages":4,"tokens":756,"emptyPages":[],"textThemes":[]},{"slug":"rec-20260923-5114","title":"Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C","issued":"2026-09-23","accession":"20260923-5114","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"PJM Interconnection, L.L.C.","kind":"answer","file":"sources/filings/text/20260923-5114_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5114","tier":"record","sha256":"8bd4894dfdf13fa431eeb8904441a504a0f739c4357b213af6471ace5fb0f8cf","pages":71,"tokens":24667,"emptyPages":[],"textThemes":["adequacy","registry","retail","flex"]},{"slug":"rec-20260923-5140","title":"Motion for Leave to Answer and Answer of American Transmission Company LLC to the Comments and Protests filed by Midcontinent Independent System Operator,…","issued":"2026-09-23","accession":"20260923-5140","docket":"ER26-3531-000","group":"ATC large-load planning revisions (Attachment FF-ATCLLC)","filer":"American Transmission Company LLC (ATC)","kind":"protest","file":"sources/filings/text/20260923-5140_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5140","tier":"record","sha256":"8df4a6d529fbdc08a97ead70b06d9336332b8f854675d5c8f88c3b3f8a83f5d4","pages":17,"tokens":4945,"emptyPages":[],"textThemes":["cost","study","retail"]},{"slug":"rec-20260923-5148","title":"Motion for Leave to Answer and Answer of Midcontinent Independent System Operator Inc. to the comments and protests in response to the 08/18/2026 proposed…","issued":"2026-09-23","accession":"20260923-5148","docket":"ER26-3552-000","group":"MISO zero-injection generator interconnection agreement","filer":"Midcontinent Independent System Operator Inc.","kind":"protest","file":"sources/filings/text/20260923-5148_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5148","tier":"record","sha256":"9bb7937a229f214d6ce9d3cb199116bab0650752fee8bb962fc94d274a7e5b79","pages":27,"tokens":7395,"emptyPages":[],"textThemes":["study","cost","retail","proximate"]},{"slug":"rec-20260923-5149","title":"Motion for Leave to Answer and Answer of Northern Virginia Electric Cooperative, Inc. to the Answer et al. of PJM Interconnection, L.L.C. filed on 09/10/2026","issued":"2026-09-23","accession":"20260923-5149","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"answer","file":"sources/filings/text/20260923-5149_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5149","tier":"record","sha256":"e73143e6cbd3e1d405819db40936752cc705298aacea66ae2311c97a1a55daf8","pages":24,"tokens":8396,"emptyPages":[],"textThemes":["credit","adequacy","flex"]},{"slug":"rec-20260923-5149-2","title":"NOVEC_Coscia Supplemental Affidavit","issued":"2026-09-23","accession":"20260923-5149","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"attachment","file":"sources/filings/text/20260923-5149_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5149","tier":"record","parent":"rec-20260923-5149","sha256":"86e5ba2159a70bc95a930cbcf6313949c960f15dacfa5c131c760d45f2d9c6b4","pages":12,"tokens":4456,"emptyPages":[],"textThemes":["credit","adequacy"]},{"slug":"rec-20260924-5153","title":"Motion for Leave to Answer and Limited Answer of ON Energy Storage, Inc. in response to comments and protests re Midcontinent Independent System Operator,…","issued":"2026-09-24","accession":"20260924-5153","docket":"ER26-3650-000","group":"MISO interconnection reliability requirements for large loads","filer":"ON Energy Storage, Inc.","kind":"protest","file":"sources/filings/text/20260924-5153_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260924-5153","tier":"record","sha256":"fcd1c66b536adbc4f495e99330448b63767da63997499de6b1782a5fd1dded30","pages":16,"tokens":4496,"emptyPages":[],"textThemes":["study"]},{"slug":"rec-20260924-5183","title":"Motion for Leave to Answer and Answer of the New Jersey Board of Public Utilities to the Answer et al. of PJM Interconnection, L.L.C. filed on 09/10/2026","issued":"2026-09-24","accession":"20260924-5183","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"New Jersey Board of Public Utilities","kind":"answer","file":"sources/filings/text/20260924-5183_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260924-5183","tier":"record","sha256":"d7f5d0f0ffbbed5dcfdb9861e3764fb4295dd767abfc18d4697ff71c4bbb5358","pages":8,"tokens":1881,"emptyPages":[],"textThemes":["cost","adequacy"]},{"slug":"rec-20260925-5186","title":"Motion for Leave to Reply and Reply Comments of American Electric Power Service Corporation","issued":"2026-09-25","accession":"20260925-5186","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"American Electric Power Service Corporation","kind":"comments","file":"sources/filings/text/20260925-5186_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260925-5186","tier":"record","sha256":"a984892de73cea84a2f4abc9e33325f84c01a5238dab0227d6e2528632374b12","pages":11,"tokens":2787,"emptyPages":[],"textThemes":["flex","adequacy","retail"]},{"slug":"rec-20260928-5172","title":"Motion for Leave to Answer and Answer of Corporate Energy Buyers Association to PJM Interconnection, L.L.C.'s 09/23/2026 Answer re the Proposal to Establish…","issued":"2026-09-28","accession":"20260928-5172","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Corporate Energy Buyers Association","kind":"answer","file":"sources/filings/text/20260928-5172_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260928-5172","tier":"record","sha256":"c48aa82fbb975ba84b85c73e6be0139e865e7c0965344cc777364c70cc8c7553","pages":9,"tokens":2036,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260928-5175","title":"Motion for Leave to Answer and Answer of Vistra Corp. in response to certain pleadings and answers filed","issued":"2026-09-28","accession":"20260928-5175","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Vistra Corp.","kind":"answer","file":"sources/filings/text/20260928-5175_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260928-5175","tier":"record","sha256":"285f851e7fe99fcd6019836d1933e4f7bf799ea9c0992c6ba6e9f030928c6e9f","pages":29,"tokens":8864,"emptyPages":[],"textThemes":["flex","adequacy","retail","registry"]},{"slug":"rec-20260929-5071","title":"Supplemental Comments of Voltus, Inc. in response to PJM Interconnection, L.L.C.'s 09/23/2026 et al. Answers re the Proposal to Establish Interim Resource…","issued":"2026-09-29","accession":"20260929-5071","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"Voltus, Inc.","kind":"comments","file":"sources/filings/text/20260929-5071_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-5071","tier":"record","sha256":"cdcb03791121397af3089be21d750ac5326a2fc9f4068ed4feedb808b57b6c3d","pages":7,"tokens":2082,"emptyPages":[],"textThemes":["adequacy"]},{"slug":"rec-20260929-5145","title":"Motion for Leave to Answer and Answer of Advanced Energy United to PJM Interconnection, L.L.C.'s 09/23/2026 Answer re the Proposal to Establish Interim…","issued":"2026-09-29","accession":"20260929-5145","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Advanced Energy United","kind":"answer","file":"sources/filings/text/20260929-5145_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-5145","tier":"record","sha256":"67c43a3378c1635bd27755dacbbc52ba1757f8bf2ced8901fbb0c11d4805d133","pages":9,"tokens":2323,"emptyPages":[],"textThemes":["adequacy","registry"]},{"slug":"rec-20260929-5169","title":"Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Answers filed by Pennsylvania Governor Josh Shapiro et al. re the…","issued":"2026-09-29","accession":"20260929-5169","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20260929-5169_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-5169","tier":"record","sha256":"123be9d8ce8a54701984ab6fcacc4a09441f05a9a5f51852b7c9e55c33f13f16","pages":23,"tokens":7201,"emptyPages":[],"textThemes":["flex","retail","adequacy"]},{"slug":"rec-20260930-5211","title":"Answer of Google LLC in response to pleadings re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service","issued":"2026-09-30","accession":"20260930-5211","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Google LLC","kind":"answer","file":"sources/filings/text/20260930-5211_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260930-5211","tier":"record","sha256":"5a5aa30fff868f2013904ad7da0fc7dc39bcc8bfc0a101a57aedddee6bfb17a8","pages":36,"tokens":11873,"emptyPages":[],"textThemes":["flex","retail","adequacy","registry"]},{"slug":"rec-20261001-5356","title":"Motion for Leave to Answer and Answer of Data Center Coalition to the answer of PJM Interconnection, L.L.C. and certain other comments and answers re the…","issued":"2026-10-01","accession":"20261001-5356","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Data Center Coalition","kind":"answer","file":"sources/filings/text/20261001-5356_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261001-5356","tier":"record","sha256":"0d85887afe814cd6198a8a67bc2b5eb4513f38c21d62d5050e4c20fecfced065","pages":28,"tokens":9454,"emptyPages":[],"textThemes":["flex","retail","adequacy","registry"]},{"slug":"rec-20261002-5153","title":"Motion for Leave to Answer and Limited Answer of FirstEnergy Service Company to PJM Interconnection, L.L.C.’s 09/23/2026 Answer re Interim Resource Adequacy…","issued":"2026-10-02","accession":"20261002-5153","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"FirstEnergy Service Company","kind":"answer","file":"sources/filings/text/20261002-5153_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261002-5153","tier":"record","sha256":"c032561e30f191f8b3ce7f56d4809b31b349cf5dad69a77d361ff10a71a76caf","pages":7,"tokens":1663,"emptyPages":[],"textThemes":["flex"]},{"slug":"rec-20261006-5150","title":"Motion for Leave to Answer and Limited Answer of PPL Electric Utilities Corporation to the 09/23/2026 Answer et al. of PJM Interconnection, L.L.C","issued":"2026-10-06","accession":"20261006-5150","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"PPL Electric Utilities Corporation","kind":"answer","file":"sources/filings/text/20261006-5150_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261006-5150","tier":"record","sha256":"5ab03a19a2edd28ccbb2fb72a413b1dc58e00cbe4e0e09bca9a17d901d9ca42b","pages":9,"tokens":2617,"emptyPages":[],"textThemes":["retail","flex"]},{"slug":"rec-20261007-5161","title":"Motion for Leave to File Limited Answer and Answer of Southern Maryland Electric Cooperative, Inc. to PJM Interconnection, L.L.C.'s 09/23/2026 Answer","issued":"2026-10-07","accession":"20261007-5161","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Southern Maryland Electric Cooperative, Inc.","kind":"answer","file":"sources/filings/text/20261007-5161_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261007-5161","tier":"record","sha256":"de6c56e30de5e2a68e6c73d1a0ad6b7153f51bbef7b6a15e6a385e51b03906d6","pages":9,"tokens":2393,"emptyPages":[],"textThemes":["registry","flex"]},{"slug":"rec-20261007-5190","title":"Motion for Leave to File Answer, and Answer, of East Kentucky Power Cooperative, Inc. to the 09/23/2026 Answer of PJM Interconnection, L.L.C","issued":"2026-10-07","accession":"20261007-5190","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"East Kentucky Power Cooperative, Inc.","kind":"answer","file":"sources/filings/text/20261007-5190_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261007-5190","tier":"record","sha256":"df0c17a00575f7dcbc52391f00a8d625136dc675b46db8dc4a47165a134d7547","pages":15,"tokens":4250,"emptyPages":[],"textThemes":["flex","adequacy"]},{"slug":"rec-20261008-5058","title":"Motion for Leave to File Supplemental Comments and Supplemental Comments of Persistence Analytics Group LLC re Validated Project State, Evidentiary…","issued":"2026-10-08","accession":"20261008-5058","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20261008-5058_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261008-5058","tier":"record","sha256":"ef1f4fd94656ce70f223c0cc32604b9413cf85d74491b507683e66c7e134021e","pages":4,"tokens":1725,"emptyPages":[],"textThemes":["registry"]},{"slug":"rec-20261008-5058-2","title":"PAG_ER26-3515_Supplemental_Cover_Letter_2026-10-08","issued":"2026-10-08","accession":"20261008-5058","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Individual No Affiliation","kind":"attachment","file":"sources/filings/text/20261008-5058_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261008-5058","tier":"record","parent":"rec-20261008-5058","sha256":"99971ffdec86682f7c1fd6861a44a93d08f8b4fa4ea20cbb1a8574131a75ec96","pages":1,"tokens":168,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261008-5211","title":"Answer and Motion for Leave to Answer of the Independent Market Monitor for PJM to the 09/23/2026 Answer of PJM Interconnection, L.L.C","issued":"2026-10-08","accession":"20261008-5211","docket":"ER26-3515-000","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Monitoring Analytics, LLC","kind":"answer","file":"sources/filings/text/20261008-5211_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261008-5211","tier":"record","sha256":"7bff4d30ee476f5cf0c8f501b506a097f39dbafdd6c0ed6c6fa6d87f48703690","pages":26,"tokens":8161,"emptyPages":[],"textThemes":["adequacy","flex","cost","retail"]},{"slug":"rec-20261009-5158","title":"Motion for Leave to Answer and Answer of Midcontinent Independent System Operator Inc. to the Motion for Leave to Answer and Answer filed by American…","issued":"2026-10-09","accession":"20261009-5158","docket":"ER26-3531-000","group":"ATC large-load planning revisions (Attachment FF-ATCLLC)","filer":"Midcontinent Independent System Operator Inc.","kind":"answer","file":"sources/filings/text/20261009-5158_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261009-5158","tier":"record","sha256":"028d6af855e5b390d42fea0928244243434bf1993b0e90d1537fc7f07e7d6401","pages":10,"tokens":2613,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20261013-5331","title":"Motion for Reply and Reply of American Transmission Company LLC to Midcontinent Independent System Operator, Inc.'s 10/09/2026 Motion for Leave to Answer…","issued":"2026-10-13","accession":"20261013-5331","docket":"ER26-3531-000","group":"ATC large-load planning revisions (Attachment FF-ATCLLC)","filer":"American Transmission Company LLC","kind":"answer","file":"sources/filings/text/20261013-5331_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261013-5331","tier":"record","sha256":"6d12a7ea519a9f93a9e91b608627f03d9b4499e3d63d703a351cb97999495f2b","pages":10,"tokens":3056,"emptyPages":[],"textThemes":["study","cost","registry"]},{"slug":"rec-20261014-5184","title":"Answer of Northern Virginia Electric Cooperative, Inc. in Support of PJM Interconnection, L.L.C.’s Motion for Abeyance filed on 10/13/2026","issued":"2026-10-14","accession":"20261014-5184","docket":"EL26-108-000","group":"PJM Reliability Backstop Procurement","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"answer","file":"sources/filings/text/20261014-5184_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261014-5184","tier":"record","sha256":"06909a8a38c1bce592d4646532e418cc9c69d20e77e96629645cddf061c4fbe1","pages":3,"tokens":541,"emptyPages":[],"textThemes":["procedure"]},{"slug":"rec-20261015-3058","title":"Letter informing American Transmission Company LLC that the 08/17/2026 filing is deficient and requesting additional information within 60 days","issued":"2026-10-15","accession":"20261015-3058","docket":"ER26-3531-000","group":"ATC large-load planning revisions (Attachment FF-ATCLLC)","filer":"OFFICE OF ENERGY MARKET REGULATION","kind":"filing","file":"sources/filings/text/20261015-3058_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261015-3058","tier":"record","sha256":"90632f64ab8b3c6a846ad81ea892dbffb28d125ee51a1be9c60d647376fc46a5","pages":null,"tokens":2948,"emptyPages":[],"textThemes":["study"]},{"slug":"rec-20261020-5159","title":"Motion to Intervene and Protest of Tesla, Inc. et al. re the Section 206 investigation re PJM Interconnection’s Reliability Backstop Procurement framework","issued":"2026-10-20","accession":"20261020-5159","docket":"EL26-108-000","group":"PJM Reliability Backstop Procurement","filer":"Tesla, Inc.Sunrun, Inc.Renew Home VPP, LLC ,","kind":"protest","file":"sources/filings/text/20261020-5159_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261020-5159","tier":"record","sha256":"4a0a86c51a7d2c75f4b57674f557699811c8c1dfe9499b2eb4fe1149dd7b50a7","pages":7,"tokens":1261,"emptyPages":[],"textThemes":["registry","colo","flex","retail"]},{"slug":"rec-20261022-5130","title":"Motion to Intervene and Comments of Northern Indiana Public Service Company in support of the Midcontinent Independent System Operator, Inc’s Large Load…","issued":"2026-10-22","accession":"20261022-5130","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Northern Indiana Public Service Company","kind":"comments","file":"sources/filings/text/20261022-5130_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261022-5130","tier":"record","sha256":"0b9664575292604a44b75047deb30db1b0391b8b38ecb72ffcf7a18480af099a","pages":10,"tokens":2382,"emptyPages":[],"textThemes":["study","adequacy"]},{"slug":"rec-20261022-5214","title":"Petition for Review filed in the U.S. Court of Appeals for the Third Circuit of Vistra Corp. re 12/18/2025, 02/20/2026, 06/18/2026, and 08/20/2026 Orders,","issued":"2026-10-22","accession":"20261022-5214","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Vistra Corp.","kind":"filing","file":"sources/filings/text/20261022-5214_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261022-5214","tier":"record","sha256":"76c09b385d83608372dbd4ae783f1bf52a295aeeeb8e74be6867fb47a816b51b","pages":501,"tokens":186296,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20261023-5088","title":"Motion to Intervene and Comments of Base Electron, Corp. re Midcontinent Independent System Operator, Inc’s filing to establish the Large Load Addition…","issued":"2026-10-23","accession":"20261023-5088","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Base Electron, Corp.","kind":"comments","file":"sources/filings/text/20261023-5088_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5088","tier":"record","sha256":"536e8463ffb2d573b7db5259ca0abff91c17cba9c247ed1dc25478b78ebd74c0","pages":6,"tokens":1292,"emptyPages":[],"textThemes":["study"]},{"slug":"rec-20261023-5143","title":"Motion to Intervene and Comments of MISO Transmission Owners in support of the 10/02/2026 filing by the Midcontinent Independent System Operator, Inc","issued":"2026-10-23","accession":"20261023-5143","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"MISO Transmission Owners","kind":"comments","file":"sources/filings/text/20261023-5143_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5143","tier":"record","sha256":"43db776f7f4454adf526be68d45ed71975f4d3aab3c80d78d3c1a8d412b3adb5","pages":11,"tokens":2542,"emptyPages":[],"textThemes":["study","adequacy","proximate"]},{"slug":"rec-20261023-5164","title":"Protest of Anna Farrar re Midcontinent Independent System Operator, Inc’s filing to establish the Large Load Addition Resource Study","issued":"2026-10-23","accession":"20261023-5164","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Individual No Affiliation","kind":"protest","file":"sources/filings/text/20261023-5164_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5164","tier":"record","sha256":"19ec541c44ce6dc008ff7af9eab110631c5947e339d1676bb21fd981824e4c69","pages":9,"tokens":2089,"emptyPages":[],"textThemes":["study","cost"]},{"slug":"rec-20261023-5183","title":"Motion to Intervene and Comments of Data Center Coalition on Midcontinent Independent System Operator, Inc.’s proposal to establish the Large Load…","issued":"2026-10-23","accession":"20261023-5183","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Data Center Coalition","kind":"comments","file":"sources/filings/text/20261023-5183_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5183","tier":"record","sha256":"1207250253bc43cbe6e72d22a266793edbfce843d9ed09747af755720d4ac00e","pages":10,"tokens":2249,"emptyPages":[],"textThemes":["study","cost"]},{"slug":"rec-20261023-5191","title":"Motion to Intervene and Limited Protest of Southern Minnesota Municipal Power Agency and WPPI Energy re Midcontinent Independent System Operator, Inc.’s…","issued":"2026-10-23","accession":"20261023-5191","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"WPPI EnergySouthern Minnesota Municipal Power Agency","kind":"protest","file":"sources/filings/text/20261023-5191_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5191","tier":"record","sha256":"8aaf04935a9a4ec6435ed2c7900d582fb3f0709d06087fcf29ac04b500dab61a","pages":15,"tokens":3014,"emptyPages":[],"textThemes":["proximate","study","cost","adequacy"]},{"slug":"rec-20261023-5198","title":"Motion to Intervene and Comments of Geronimo Power, LLC concerning the Midcontinent Independent System Operator, Inc.’s Large Load Addition Resource Study…","issued":"2026-10-23","accession":"20261023-5198","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"GERONIMO POWER, LLC","kind":"comments","file":"sources/filings/text/20261023-5198_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5198","tier":"record","sha256":"4c6b18680a40bb9de14970fc33e0e324cd19942c9fb9573f53f8cef544fa0eee","pages":21,"tokens":6939,"emptyPages":[],"textThemes":["study","colo","adequacy","proximate"]},{"slug":"rec-20261023-5200","title":"Motion to Intervene and Comments of Invenergy Transmission LLC on the Midcontinent Independent System Operator, Inc.’s Large Load Addition Resource Study filing","issued":"2026-10-23","accession":"20261023-5200","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Invenergy Transmission LLC","kind":"comments","file":"sources/filings/text/20261023-5200_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261023-5200","tier":"record","sha256":"a2d35665f0a7803b3e3e093b110024e6a044b64d3624a858818a9fe908c1f407","pages":19,"tokens":5762,"emptyPages":[],"textThemes":["study","cost","proximate"]},{"slug":"rec-20261027-0003","title":"Petition for Review filed in the U.S. Court of Appeals for the Third Circuit of Exelon Corp., et al. re 12/18/2025, 02/20/2026, 06/18/2026, and 08/20/2026…","issued":"2026-10-27","accession":"20261027-0003","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EXELON CORPORATIONAMERICAN TRANSMISSION SYSTEMS, INCORPORATEDJERSEY CENTRAL POWER & LIGHT COMPANY ,KEYSTONE APPALACHIAN TRANSMISSION COMPANY ,MID-ATLANTIC INTERSTATE TRANSMISSION LLC ,MONONGAHELA POWER COMPANY ,THE POTOMAC EDISON COMPANY ,TRANS-ALLEGHENY INTERSTATE LINE COMPANY ,APPALACHIAN POWER COMPANY ,INDIANA MICHIGAN POWER COMPANY ,KENTUCKY POWER COMPANY ,KINGSPORT POWER COMPANY ,OHIO POWER COMPANY ,WHEELING POWER COMPANY ,AEP APPALACHIAN TRANSMISSION COMPANY INC ,AEP INDIANA MICHIGAN TRANSMISSION COMPANY, INC. ,AEP KENTUCKY TRANSMISSION COMPANY INC ,AEP OHIO TRANSMISSION COMPANY INC ,AEP WEST VIRGINIA TRANSMISSION COMPANY INC ,THE DAYTON POWER AND LIGHT COMPANY DBA AES OHIO ,VIRGINIA ELECTRIC AND POWER COMPANY D/B/A DOMINION ENERGY VI ,DUQUESNE LIGHT COMPANY ,EAST KENTUCKY POWER COOPERATIVE, INC. ,PPL ELECTRIC UTILITIES CORPORATION ,ROCKLAND ELECTRIC COMPANY ,","kind":"filing","file":"sources/filings/text/20261027-0003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261027-0003","tier":"record","sha256":"c9366937e16f1b34585b384f205ca9ef2aa09dd1bb80e09773fe65073f4883e4","pages":224,"tokens":72774,"emptyPages":[],"textThemes":["colo","study","flex","cost"]},{"slug":"rec-20261027-0003-2","title":"20261027-0003_Part1 (1)","issued":"2026-10-27","accession":"20261027-0003","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EXELON CORPORATIONAMERICAN TRANSMISSION SYSTEMS, INCORPORATEDJERSEY CENTRAL POWER & LIGHT COMPANY ,KEYSTONE APPALACHIAN TRANSMISSION COMPANY ,MID-ATLANTIC INTERSTATE TRANSMISSION LLC ,MONONGAHELA POWER COMPANY ,THE POTOMAC EDISON COMPANY ,TRANS-ALLEGHENY INTERSTATE LINE COMPANY ,APPALACHIAN POWER COMPANY ,INDIANA MICHIGAN POWER COMPANY ,KENTUCKY POWER COMPANY ,KINGSPORT POWER COMPANY ,OHIO POWER COMPANY ,WHEELING POWER COMPANY ,AEP APPALACHIAN TRANSMISSION COMPANY INC ,AEP INDIANA MICHIGAN TRANSMISSION COMPANY, INC. ,AEP KENTUCKY TRANSMISSION COMPANY INC ,AEP OHIO TRANSMISSION COMPANY INC ,AEP WEST VIRGINIA TRANSMISSION COMPANY INC ,THE DAYTON POWER AND LIGHT COMPANY DBA AES OHIO ,VIRGINIA ELECTRIC AND POWER COMPANY D/B/A DOMINION ENERGY VI ,DUQUESNE LIGHT COMPANY ,EAST KENTUCKY POWER COOPERATIVE, INC. ,PPL ELECTRIC UTILITIES CORPORATION ,ROCKLAND ELECTRIC COMPANY ,","kind":"attachment","file":"sources/filings/text/20261027-0003_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261027-0003","tier":"record","parent":"rec-20261027-0003","sha256":"b6dff68475569ac1531d24ce36654468c277584a498a01d46539a5e49547dc92","pages":292,"tokens":113740,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},{"slug":"rec-20261029-5295","title":"East Kentucky Power Cooperative, Inc. submits Request for Rehearing of the 09/29/2026 Order","issued":"2026-10-29","accession":"20261029-5295","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"East Kentucky Power Cooperative, Inc.","kind":"rehearing request","file":"sources/filings/text/20261029-5295_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5295","tier":"record","sha256":"e72b50ee12dbf29205eb6a9f43be69ab9c907adf9e73fdb296e7dbc65437b902","pages":31,"tokens":10000,"emptyPages":[],"textThemes":["credit","cost","adequacy"]},{"slug":"rec-20261104-5209","title":"Preliminary Answer of PJM Interconnection L.L.C. Opposing Fast-Track Processing and Motion for Extension of Time to Answer Exelon Corporation’s 11/03/2026…","issued":"2026-11-04","accession":"20261104-5209","docket":"EL27-11-000","group":"Exelon complaint seeking a prompt PJM capacity auction","filer":"PJM Interconnection, L.L.C.","kind":"answer","file":"sources/filings/text/20261104-5209_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261104-5209","tier":"record","sha256":"2e2b979b70cd5051e005718a9c705960650bb17be488786084a235ed8f36ad91","pages":13,"tokens":3395,"emptyPages":[],"textThemes":["adequacy","procedure"]},{"slug":"rec-20261116-5105","title":"Tariff Revisions to Address Commission's EL26-71 Order to Show Cause","issued":"2026-11-16","accession":"20261116-5105","docket":"ER27-499-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Citizens Sunrise Transmission LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5105_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5105","tier":"record","sha256":"837ee55209e15cd1f765f54083b5dd14e8837dd364af53c58aaae77b9ddb7d21","pages":5,"tokens":1369,"emptyPages":[],"textThemes":["study"]},{"slug":"rec-20261116-5109","title":"Tariff Revisions to Address Commission's ER26-71 Order to Show Cause","issued":"2026-11-16","accession":"20261116-5109","docket":"ER27-500-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Citizens Sycamore-Penasquitos Transmission LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5109_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5109","tier":"record","sha256":"a1e051552cf64261aeb9bd5885fd0afaeb99c4d08d0dadab04c579ab248eba76","pages":6,"tokens":1373,"emptyPages":[],"textThemes":["study"]},{"slug":"rec-20261116-5110","title":"Tariff Revisions to Address Commission's EL26-71 Order to Show Cause","issued":"2026-11-16","accession":"20261116-5110","docket":"ER27-501-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Citizens S-Line Transmission LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5110_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5110","tier":"record","sha256":"3d0dc86a8807f738e37305b782d5a921dc13b8d3c09417a605dfc620275216d5","pages":6,"tokens":1489,"emptyPages":[],"textThemes":["study"]},{"slug":"rec-20261116-5210","title":"SCE OSC - Large Load, TOT Revisions","issued":"2026-11-16","accession":"20261116-5210","docket":"ER27-508-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Southern California Edison Company","kind":"tariff filing","file":"sources/filings/text/20261116-5210_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5210","tier":"record","sha256":"f5d7ac378d4dff75714cebbca3d204e03c8dc84d535d093491e178972e5b4777","pages":294,"tokens":86427,"emptyPages":[],"textThemes":["study","cost","colo","flex"]},{"slug":"rec-20261116-5210-2","title":"SCE TO Tariff Revisions-New LLIP_Sect205-OSC LL_CLEAN","issued":"2026-11-16","accession":"20261116-5210","docket":"ER27-508-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Southern California Edison Company","kind":"attachment","file":"sources/filings/text/20261116-5210_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5210","tier":"record","parent":"rec-20261116-5210","sha256":"0150523b07b5f9bd20f6cd4fc0ebe5e4ef29ae67069a19abb01457520af3fa17","pages":199,"tokens":60589,"emptyPages":[],"textThemes":["study","cost","colo","credit"]},{"slug":"rec-20261116-5210-3","title":"SCE TO Tariff Revisions_Sect205-OSC LL_MARKED","issued":"2026-11-16","accession":"20261116-5210","docket":"ER27-508-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Southern California Edison Company","kind":"attachment","file":"sources/filings/text/20261116-5210_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5210","tier":"record","parent":"rec-20261116-5210","sha256":"c9feea20cfafe47f17304810831585e52fdb9fe8f6062b8ee3d0e021107ad052","pages":58,"tokens":14309,"emptyPages":[],"textThemes":["study","cost","flex"]},{"slug":"rec-20261116-5249","title":"Proposed TO Tariff Revisions","issued":"2026-11-16","accession":"20261116-5249","docket":"ER27-512-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"DCR Transmission, L.L.C.","kind":"tariff filing","file":"sources/filings/text/20261116-5249_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5249","tier":"record","sha256":"b116947ffb9036139313d20dbc2fc835aca99c9ccb1bfb06fe18f925680dcb51","pages":307,"tokens":112872,"emptyPages":[],"textThemes":["study","cost","credit","colo"]},{"slug":"rec-20261116-5250","title":"Motion to Withdraw Filing and Terminate Docket in Deference to New Proceeding","issued":"2026-11-16","accession":"20261116-5250","docket":"ER26-1479-002","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"motion","file":"sources/filings/text/20261116-5250_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5250","tier":"record","sha256":"5756503814e03a6bdee11b2e77e7840560c54fbfb2d60030173939aacee5d54f","pages":4,"tokens":783,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20261116-5257","title":"TO: Response to Large Load Order to Show Cause in EL26-71-000","issued":"2026-11-16","accession":"20261116-5257","docket":"ER27-513-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Pacific Gas and Electric Company","kind":"tariff filing","file":"sources/filings/text/20261116-5257_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5257","tier":"record","sha256":"26f1e93cfbb843d25e6de86490f52d40c8dfc153e0dd242fdb9c1650c80da184","pages":53,"tokens":24354,"emptyPages":[],"textThemes":["study","cost","flex","credit"]},{"slug":"rec-20261116-5257-2","title":"Exhibit No. PGE-0001 - Application Process Virani","issued":"2026-11-16","accession":"20261116-5257","docket":"ER27-513-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Pacific Gas and Electric Company","kind":"attachment","file":"sources/filings/text/20261116-5257_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5257","tier":"record","parent":"rec-20261116-5257","sha256":"8df1f54c932b56e1f61fcfc1fe80b9dbb569cf23a7b31b3483feb3919134d179","pages":21,"tokens":4722,"emptyPages":[],"textThemes":["study","colo","retail"]},{"slug":"rec-20261116-5257-3","title":"Exhibit No. PGE-0002 - Study Process Nedrud","issued":"2026-11-16","accession":"20261116-5257","docket":"ER27-513-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Pacific Gas and Electric Company","kind":"attachment","file":"sources/filings/text/20261116-5257_005.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5257","tier":"record","parent":"rec-20261116-5257","sha256":"13643e5fe968c862f3810248ba0aed7118f58f7e00c49c10aa6bb111a7bde75b","pages":37,"tokens":9080,"emptyPages":[],"textThemes":["study","cost","colo","flex"]},{"slug":"rec-20261116-5274","title":"SunZia Transmission - Trans. Owner Tariff Response to Show Cause Order EL26-71-","issued":"2026-11-16","accession":"20261116-5274","docket":"ER27-515-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"SunZia Transmission, LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5274_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5274","tier":"record","sha256":"96ae06c3d15bacf7f3c0439774e651e070a8c7b4caf7c6c30909e7af896a28fa","pages":7,"tokens":2976,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20261116-5274-2","title":"SunZia Trans. Large Load Compliance Filing","issued":"2026-11-16","accession":"20261116-5274","docket":"ER27-515-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"SunZia Transmission, LLC","kind":"attachment","file":"sources/filings/text/20261116-5274_006.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5274","tier":"record","parent":"rec-20261116-5274","sha256":"e40db66eb90a5f255a84dcbf80b64d8fc14edfe4c8fe457b076d87036bcbd04c","pages":47,"tokens":18504,"emptyPages":[],"textThemes":["study","cost","colo","flex"]},{"slug":"rec-20261116-5286","title":"LSPGNY 205: Proposed Revisions re: RS10 Large Load-Driven Upgrade Cost Recovery","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"tariff filing","file":"sources/filings/text/20261116-5286_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","sha256":"5066b78c9fce11ad7bc4a27d95dbf2a73febc0eee583b1743b7a796dabac0e16","pages":13,"tokens":4338,"emptyPages":[],"textThemes":["cost","credit","study"]},{"slug":"rec-20261116-5286-2","title":"Hayes Testimony (Exhibit No. GNY-100)","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"2c05f52efd032a1ffe9ac459b36c76b2f01079b4ae69f9a26dcd5bd4fa7bf8b8","pages":34,"tokens":8689,"emptyPages":[],"textThemes":["cost","study","credit","procedure"]},{"slug":"rec-20261116-5286-3","title":"Exhibit No. GNY-102 to Hayes Testimony","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_006.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"756a2186b8451c9e17628a697bbe914e3556c7d2a455957a952677c3f5213bfc","pages":2,"tokens":882,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261116-5286-4","title":"Exhibit No. GNY-103 to Hayes Testimony","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_007.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"88ffacaa878e84c90851f1a926a95e1e3fb519e466250dca18b016f9c0807e82","pages":4,"tokens":710,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261116-5286-5","title":"Arzola Testimony (Exhibit No. GNY-200)","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_008.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"c6f9f7207a8369626e4b3174ce106e23be7bec8a3bc7a961f5e8d3d931ce67ff","pages":21,"tokens":5542,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20261116-5286-6","title":"Exhibit No. GNY-201 to Arzola Testimony","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_009.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"8e38dd5b0a4ba819cc77b26dccdfe88b2e823352242aeaec48f0759088cf8a73","pages":36,"tokens":14231,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20261116-5286-7","title":"Exhibit No. GNY-202 to Arzola Testimony","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_010.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"ad868f4c4c0add75f66003542f58f96679ac2e13d51519c99012782e29d65bcc","pages":36,"tokens":14330,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20261116-5286-8","title":"Exhibit No. GNY-206 to Arzola Testimony","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_014.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"adf49cb5baa3984e422a0d2a0edda7f167375cd54497f25383e7d5ac05c46bfb","pages":22,"tokens":5921,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20261116-5286-9","title":"Exhibit No. GNY-207 to Arzola Testimony","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_015.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"5666d99fbd8bdce4ff7b56b3c4c38129a58b56a3121947478d0a81b9f526c951","pages":22,"tokens":5927,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20261116-5311","title":"ER26-71 Order to Show Cause Tariff Revisions","issued":"2026-11-16","accession":"20261116-5311","docket":"ER27-521-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"San Diego Gas & Electric","kind":"tariff filing","file":"sources/filings/text/20261116-5311_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5311","tier":"record","sha256":"ba53fcd334660c18a045b25c33254b770838a019faeb155b0be2e0eed1f34883","pages":108,"tokens":28549,"emptyPages":[],"textThemes":["study","cost","flex","colo"]},{"slug":"rec-20261116-5312","title":"Viridon Path 15 - Trans. Owner Tariff Response to Show Cause Order EL26-71","issued":"2026-11-16","accession":"20261116-5312","docket":"ER27-523-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Viridon Path 15 LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5312_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5312","tier":"record","sha256":"14924880bdf547312eef93fe885c0333aa3ea1ccc96055257f2577823ae2e359","pages":23,"tokens":8307,"emptyPages":[],"textThemes":["study","cost","flex","colo"]},{"slug":"rec-20261116-5329","title":"Revisions to TO Tariff to Provide for Large Load Interconnection","issued":"2026-11-16","accession":"20261116-5329","docket":"ER27-528-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"LS Power Grid California, LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5329_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5329","tier":"record","sha256":"2d3d454def2e95c1881f0bd05f5077ca113f8066651bad80a224b03e1d9a99f4","pages":387,"tokens":132691,"emptyPages":[],"textThemes":["study","cost","credit","flex"]},{"slug":"rec-20261116-5335","title":"NYTOs 205: Proposed Revisions re: Integration of Large Loads","issued":"2026-11-16","accession":"20261116-5335","docket":"ER27-529-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"New York Independent System Operator, Inc.Central Hudson Gas & Electric CorporationNew York State Electric & Gas Corporation ,Rochester Gas and Electric Corporation ,Niagara Mohawk Power Corporation ,Consolidated Edison Company of New York, Inc. ,Orange and Rockland Utilities, Inc. ,","kind":"tariff filing","file":"sources/filings/text/20261116-5335_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5335","tier":"record","sha256":"3bc694244184205757ded4e406dafe09a6ee8f60239a1396279aece4c5906cc2","pages":37,"tokens":17268,"emptyPages":[],"textThemes":["study","cost","flex","retail"]},{"slug":"rec-20261116-5335-2","title":"Att E Pro Forma LL CRA","issued":"2026-11-16","accession":"20261116-5335","docket":"ER27-529-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"New York Independent System Operator, Inc.Central Hudson Gas & Electric CorporationNew York State Electric & Gas Corporation ,Rochester Gas and Electric Corporation ,Niagara Mohawk Power Corporation ,Consolidated Edison Company of New York, Inc. ,Orange and Rockland Utilities, Inc. ,","kind":"attachment","file":"sources/filings/text/20261116-5335_006.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5335","tier":"record","parent":"rec-20261116-5335","sha256":"89d0812cfba6bbe2f59edd2946bd4c611cf138aa1de7be377852885e7d906a68","pages":26,"tokens":9426,"emptyPages":[],"textThemes":["cost","credit","study"]},{"slug":"rec-20261116-5335-3","title":"Att F Pro Forma LL Security Agreement","issued":"2026-11-16","accession":"20261116-5335","docket":"ER27-529-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"New York Independent System Operator, Inc.Central Hudson Gas & Electric CorporationNew York State Electric & Gas Corporation ,Rochester Gas and Electric Corporation ,Niagara Mohawk Power Corporation ,Consolidated Edison Company of New York, Inc. ,Orange and Rockland Utilities, Inc. ,","kind":"attachment","file":"sources/filings/text/20261116-5335_007.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5335","tier":"record","parent":"rec-20261116-5335","sha256":"c8f74d1478cfacecbb20b87c0e315666b4004f701b68634218d4ca2589342c87","pages":18,"tokens":5524,"emptyPages":[],"textThemes":["credit","cost","study"]},{"slug":"rec-20261116-5335-4","title":"Att G Pro Forma Facilities Study Agreement","issued":"2026-11-16","accession":"20261116-5335","docket":"ER27-529-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"New York Independent System Operator, Inc.Central Hudson Gas & Electric CorporationNew York State Electric & Gas Corporation ,Rochester Gas and Electric Corporation ,Niagara Mohawk Power Corporation ,Consolidated Edison Company of New York, Inc. ,Orange and Rockland Utilities, Inc. ,","kind":"attachment","file":"sources/filings/text/20261116-5335_008.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5335","tier":"record","parent":"rec-20261116-5335","sha256":"ca1287ba75deeb35f2b9493b2e79a5bd9f60c28cbcefa0d724d8808ecbf0dbed","pages":17,"tokens":5474,"emptyPages":[],"textThemes":["study","cost"]},{"slug":"rec-20261116-5335-5","title":"Att H Pro Forma LL Interconnection Agreement","issued":"2026-11-16","accession":"20261116-5335","docket":"ER27-529-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"New York Independent System Operator, Inc.Central Hudson Gas & Electric CorporationNew York State Electric & Gas Corporation ,Rochester Gas and Electric Corporation ,Niagara Mohawk Power Corporation ,Consolidated Edison Company of New York, Inc. ,Orange and Rockland Utilities, Inc. ,","kind":"attachment","file":"sources/filings/text/20261116-5335_009.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5335","tier":"record","parent":"rec-20261116-5335","sha256":"88f1688e44b0d75c5fba2ac7d3e4b550e2fa38ecc607c9a6f09baefda2024988","pages":44,"tokens":14362,"emptyPages":[],"textThemes":["cost","study","registry","credit"]},{"slug":"rec-20261116-5335-6","title":"Att I Panel Testimony","issued":"2026-11-16","accession":"20261116-5335","docket":"ER27-529-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"New York Independent System Operator, Inc.Central Hudson Gas & Electric CorporationNew York State Electric & Gas Corporation ,Rochester Gas and Electric Corporation ,Niagara Mohawk Power Corporation ,Consolidated Edison Company of New York, Inc. ,Orange and Rockland Utilities, Inc. ,","kind":"attachment","file":"sources/filings/text/20261116-5335_010.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5335","tier":"record","parent":"rec-20261116-5335","sha256":"78f1a9a30f61de304a5f2a7e9d812cf614ff9d4f58f0fcbb15b9aa3eca1db630","pages":451,"tokens":98530,"emptyPages":[34,112,113,114,115,117,118,119,120,121,122,123,124,125,126,127,128,129,130,131,132,350,351,352,353,354,355,356,358,359,360,361,362,363,364,365,366],"textThemes":["flex","cost","study","retail"]},{"slug":"rec-20261116-5337","title":"Horizon West Transmission - Response to Show Cause Order EL26-71-","issued":"2026-11-16","accession":"20261116-5337","docket":"ER27-530-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Horizon West Transmission, LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5337_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5337","tier":"record","sha256":"85d45a1e0ee32c6d39d63a7c37410c2460834bf8007c1523c1b5caeced266fc7","pages":24,"tokens":10938,"emptyPages":[],"textThemes":["study","cost","colo","flex"]},{"slug":"rec-20261116-5337-2","title":"Appendix C - Attachment A, Horizon West CRA","issued":"2026-11-16","accession":"20261116-5337","docket":"ER27-530-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Horizon West Transmission, LLC","kind":"attachment","file":"sources/filings/text/20261116-5337_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5337","tier":"record","parent":"rec-20261116-5337","sha256":"f9b6856ccc3dcba265efc6b29ce5103cf29c906f884b7921105186b39d29e7f6","pages":21,"tokens":6702,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20261116-5343","title":"2026-11-16 Large Load Tariff Amendment: Resubmission under different filing code","issued":"2026-11-16","accession":"20261116-5343","docket":"ER27-532-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"California Independent System Operator Corporation","kind":"tariff filing","file":"sources/filings/text/20261116-5343_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5343","tier":"record","sha256":"ca3237a5dfe7cff2a87445b260e851588c138a31b8dbc567f7b489557ee91571","pages":48,"tokens":20166,"emptyPages":[],"textThemes":["colo","study","cost","flex"]},{"slug":"rec-20261116-5343-2","title":"Att-A_Large-Loads_Clean-Tariff","issued":"2026-11-16","accession":"20261116-5343","docket":"ER27-532-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"California Independent System Operator Corporation","kind":"attachment","file":"sources/filings/text/20261116-5343_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5343","tier":"record","parent":"rec-20261116-5343","sha256":"b9dda850de7019d7fa1be9fe7c7767c8b3d35119fe3862c3bfa3f9f785fba6df","pages":19,"tokens":5167,"emptyPages":[],"textThemes":["study","colo","cost","flex"]},{"slug":"rec-20261116-5343-3","title":"Att-B_Large-Loads_Redlines","issued":"2026-11-16","accession":"20261116-5343","docket":"ER27-532-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"California Independent System Operator Corporation","kind":"attachment","file":"sources/filings/text/20261116-5343_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5343","tier":"record","parent":"rec-20261116-5343","sha256":"1d55486cbb3cc014df7aa3cabe1fb1176b7b35654855201c2120106cd6dab291","pages":19,"tokens":5170,"emptyPages":[],"textThemes":["study","colo","cost","flex"]},{"slug":"rec-20261116-5343-4","title":"Att-C_Draft-Final-Proposal-Large-Load","issued":"2026-11-16","accession":"20261116-5343","docket":"ER27-532-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"California Independent System Operator Corporation","kind":"attachment","file":"sources/filings/text/20261116-5343_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5343","tier":"record","parent":"rec-20261116-5343","sha256":"7e4bf4d2acd236a801ff311a0a4be6a668d37025287a18a74b6b31609f6e16f8","pages":72,"tokens":27395,"emptyPages":[],"textThemes":["study","colo","cost","flex"]},{"slug":"rec-20261116-5343-5","title":"Att-D_Large-Load-Straw-Proposal","issued":"2026-11-16","accession":"20261116-5343","docket":"ER27-532-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"California Independent System Operator Corporation","kind":"attachment","file":"sources/filings/text/20261116-5343_005.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5343","tier":"record","parent":"rec-20261116-5343","sha256":"1239690bc860eb78ae7b987c607386a62370abec3d7f1aa42e33d7e9adc43270","pages":39,"tokens":7358,"emptyPages":[],"textThemes":["study","registry","flex"]},{"slug":"rec-20261116-5343-6","title":"Att-E_Board-Memo_Large-Load","issued":"2026-11-16","accession":"20261116-5343","docket":"ER27-532-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"California Independent System Operator Corporation","kind":"attachment","file":"sources/filings/text/20261116-5343_006.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5343","tier":"record","parent":"rec-20261116-5343","sha256":"47279bbed51f0113eb5a23f7f0c44e6c59463389e52cd012f63fe44a6711a9b8","pages":7,"tokens":1273,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261116-5345","title":"GridLiance West - Response to Show Cause Order EL26-71","issued":"2026-11-16","accession":"20261116-5345","docket":"ER27-533-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"GridLiance West LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5345_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5345","tier":"record","sha256":"4721be916383d5ae05a9b6ff911ea3b7bacbb76b380935b9c3600fee936030a8","pages":25,"tokens":10831,"emptyPages":[],"textThemes":["study","cost","colo","credit"]},{"slug":"rec-20261116-5345-2","title":"Appendix C - Attachment A - GridLiance West CRA FINAL","issued":"2026-11-16","accession":"20261116-5345","docket":"ER27-533-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"GridLiance West LLC","kind":"attachment","file":"sources/filings/text/20261116-5345_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5345","tier":"record","parent":"rec-20261116-5345","sha256":"846a6a23c5f0578820c72f107b8cf919ada9e8d5272b3d493a46f83c560cf033","pages":21,"tokens":6699,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20261116-5346","title":"Revisions to TO Tariff to Provide for Large Load Interconnection","issued":"2026-11-16","accession":"20261116-5346","docket":"ER27-534-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"DesertLink, LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5346_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5346","tier":"record","sha256":"a9ba306729926eaf370b4a3b56b1caea333262f262c4b17b5a602191637801ec","pages":529,"tokens":187664,"emptyPages":[],"textThemes":["study","cost","credit","flex"]},{"slug":"rec-20261116-5348","title":"Trans Bay Cable - Respsonse to Show Cause Order EL26-71-","issued":"2026-11-16","accession":"20261116-5348","docket":"ER27-535-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Trans Bay Cable LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5348_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5348","tier":"record","sha256":"4cd8850d11b3338d89ebda9646386ff60eb4dbd1685c109318729d694ed2c348","pages":25,"tokens":10950,"emptyPages":[],"textThemes":["study","cost","colo","credit"]},{"slug":"rec-20261116-5348-2","title":"Appendix A - Trans Bay Revised Tariff CLEAN_2","issued":"2026-11-16","accession":"20261116-5348","docket":"ER27-535-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Trans Bay Cable LLC","kind":"attachment","file":"sources/filings/text/20261116-5348_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5348","tier":"record","parent":"rec-20261116-5348","sha256":"c6b3f9b7d4894b6a4324c5c472b0c3451b35fd70a4a03de597ff703681d5c703","pages":69,"tokens":25560,"emptyPages":[],"textThemes":["study","cost","credit","flex"]},{"slug":"rec-20261116-5348-3","title":"Appendix C - Attachment A Trans Bay CRA","issued":"2026-11-16","accession":"20261116-5348","docket":"ER27-535-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Trans Bay Cable LLC","kind":"attachment","file":"sources/filings/text/20261116-5348_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5348","tier":"record","parent":"rec-20261116-5348","sha256":"ec26260b090dbc7d6f06709599bdbf98301dfc2cf5ebd3ec72b971d0a7eb0237","pages":21,"tokens":6644,"emptyPages":[],"textThemes":["cost"]},{"slug":"rec-20261116-5372","title":"Response to 11/16/2026, Show Cause Order of Pacific Gas and Electric Company","issued":"2026-11-16","accession":"20261116-5372","docket":"ER27-513-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Pacific Gas and Electric Company","kind":"filing","file":"sources/filings/text/20261116-5372_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5372","tier":"record","sha256":"ed3f2babe6590ce75a62fa6be141f25d33364bc3ce8d64b4435b49236fdf0439","pages":2,"tokens":203,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261118-3050","title":"Errata Notice Extending Comment Period re New York Independent System Operator, Inc","issued":"2026-11-18","accession":"20261118-3050","docket":"ER27-517-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"comments","file":"sources/filings/text/20261118-3050_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-3050","tier":"record","sha256":"452cb67442b66f77ce37cc5a774d85ed3150e93a1f1ce24b4a89cb4d49b5c4ca","pages":null,"tokens":91,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261118-3051","title":"Errata Notice Extending Comment Period re PECO Energy Company","issued":"2026-11-18","accession":"20261118-3051","docket":"ER27-520-000","group":"PJM Transmission Owners’ large-load tariff revisions","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"comments","file":"sources/filings/text/20261118-3051_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-3051","tier":"record","sha256":"44a0f73296780341cdc961038990256d7b2e1fb7c3af05b889ff0645fe3c3e11","pages":null,"tokens":88,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261118-3090","title":"Combined Notice of Filings #1, November 18, 2026: This notice contains information concerning multiple filings received by FERC","issued":"2026-11-18","accession":"20261118-3090","docket":"ER27-521-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"filing","file":"sources/filings/text/20261118-3090_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-3090","tier":"record","sha256":"8ec8fdc5e5fc891b8cb759775a60a4897d2be41a66f289851b05ab4abae079fa","pages":null,"tokens":1605,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261118-5011","title":"Motion of Community Organizations and Clean Energy Advocates for a 30-day extension of time to submit comments re Midcontinent Independent System Operator,…","issued":"2026-11-18","accession":"20261118-5011","docket":"ER27-526-000","group":"MISO large-load tariff revisions","filer":"CLEAN ENERGY ADVOCATES","kind":"comments","file":"sources/filings/text/20261118-5011_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-5011","tier":"record","sha256":"2c164f112a35f8f102d1d6351c6933eed505fa296fbe3c3d9d6e6f5088c63637","pages":8,"tokens":1506,"emptyPages":[],"textThemes":["procedure"]},{"slug":"rec-20261118-5238","title":"Motion for Leave to Answer and Answer of Geronimo Power, LLC to the answer of Midcontinent Independent System Operator, Inc. filed on 11/09/2026","issued":"2026-11-18","accession":"20261118-5238","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"GERONIMO POWER, LLC","kind":"answer","file":"sources/filings/text/20261118-5238_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-5238","tier":"record","sha256":"0b429cdcee2bd78d622188c40ba8ef017995e1bc2e38e139b45e734803918105","pages":11,"tokens":3345,"emptyPages":[],"textThemes":["colo","study","proximate"]},{"slug":"rec-20261118-5252","title":"Enhance Transmission Service for HILLs and Non-Transmission Facilities","issued":"2026-11-18","accession":"20261118-5252","docket":"ER27-559-000","group":"SPP large-load tariff revisions","filer":"Southwest Power Pool, Inc.","kind":"tariff filing","file":"sources/filings/text/20261118-5252_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-5252","tier":"record","sha256":"f098c035ca6677e3d6f7454ead1335ba2954559e6dbb0b7325675c804d0095cd","pages":26,"tokens":9144,"emptyPages":[],"textThemes":["study","colo","cost","procedure"]},{"slug":"rec-20261118-5286","title":"PJM Interconnection L.L.C. submits Notice of Filing related to the 11/16/2026 Proposal to Address Operational Requirements for Large Computational Load and…","issued":"2026-11-18","accession":"20261118-5286","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection L.L.C","kind":"notice","file":"sources/filings/text/20261118-5286_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-5286","tier":"record","sha256":"7b718bbd5b04efb0aa369237a3f5b269947bcb26508ea6a8e0fe044f6e198e85","pages":3,"tokens":605,"emptyPages":[],"textThemes":["colo"]},{"slug":"rec-20261119-3138","title":"Combined Notice of Filings #1, November 19, 2026: This notice contains information concerning multiple filings received by FERC","issued":"2026-11-19","accession":"20261119-3138","docket":"ER26-3591-001","group":"SPP conditional large-load service credits (CHILLS)","filer":"SECRETARY OF THE COMMISSION - FERC","kind":"filing","file":"sources/filings/text/20261119-3138_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-3138","tier":"record","sha256":"e9003e51019730f6c9e19e733e1b69baf794f14bc3b6dd5ed8717a027bf658a6","pages":null,"tokens":1117,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261119-5133","title":"Comments of Olabanji John Ogunyemi in response to the 06/18/2026 Show Cause Order","issued":"2026-11-19","accession":"20261119-5133","docket":"EL26-67-000","group":"PJM show cause proceeding (E-7)","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20261119-5133_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5133","tier":"record","sha256":"1472e04642aaa1c39875872ec08a6695693373c06c0b40ddd997650bda889f5f","pages":5,"tokens":1551,"emptyPages":[],"textThemes":["study","flex","cost","colo"]},{"slug":"rec-20261119-5176","title":"Deficiency Response - Modify the CHILL Policy to Accommodate Planned Outages","issued":"2026-11-19","accession":"20261119-5176","docket":"ER26-3591-001","group":"SPP conditional large-load service credits (CHILLS)","filer":"Southwest Power Pool, Inc.","kind":"tariff filing","file":"sources/filings/text/20261119-5176_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5176","tier":"record","sha256":"84c133175b25609d8dbbb16d8084a589ca3b20f2d22ce5dc7e01cdd2f0097841","pages":9,"tokens":2948,"emptyPages":[],"textThemes":["flex"]},{"slug":"rec-20261119-5227","title":"Revisions to Establish Load Safe Harbor Limit for Delivery Point Costs","issued":"2026-11-19","accession":"20261119-5227","docket":"ER27-577-000","group":"SPP large-load tariff revisions","filer":"Southwest Power Pool, Inc.","kind":"tariff filing","file":"sources/filings/text/20261119-5227_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5227","tier":"record","sha256":"a9d06721aaa6c18506f16fdf94be2a484143016f8de7ad23629b192c06fdb244","pages":24,"tokens":9237,"emptyPages":[],"textThemes":["cost","study","credit","procedure"]},{"slug":"rec-20261119-5227-2","title":"Exhibit No. SPP-0001- Affidavit of Natasha Henderson","issued":"2026-11-19","accession":"20261119-5227","docket":"ER27-577-000","group":"SPP large-load tariff revisions","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/filings/text/20261119-5227_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5227","tier":"record","parent":"rec-20261119-5227","sha256":"94447c5280fb16605921fa3a6a6b8305f7ac5dc38085327959ac9438dedbc2f3","pages":4,"tokens":485,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261119-5227-3","title":"Exhibit No. SPP-0002- Affidavit of Don Frerking","issued":"2026-11-19","accession":"20261119-5227","docket":"ER27-577-000","group":"SPP large-load tariff revisions","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/filings/text/20261119-5227_005.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5227","tier":"record","parent":"rec-20261119-5227","sha256":"d795f04d6b99c0aaf5406d83c54d3e225da3b72fafff2918a35d67df71f84dd7","pages":4,"tokens":568,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261119-5243","title":"Revisions to Add Price Adaptive Load Service","issued":"2026-11-19","accession":"20261119-5243","docket":"ER27-578-000","group":"SPP large-load tariff revisions","filer":"Southwest Power Pool, Inc.","kind":"tariff filing","file":"sources/filings/text/20261119-5243_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5243","tier":"record","sha256":"fd746390ce38150a129e6d3cedafdaa59f663094d589efd750b37dedce33c3cc","pages":44,"tokens":16839,"emptyPages":[],"textThemes":["flex","study","colo","cost"]},{"slug":"rec-20261119-5278","title":"Motion for Leave to Answer and Answer of Southern Minnesota Municipal Power Agency et al. to the 11/09/2026 Motion for Leave to Answer filed by the…","issued":"2026-11-19","accession":"20261119-5278","docket":"ER27-25-000","group":"MISO Large Load Addition Resource Study (LARS)","filer":"Southern Minnesota Municipal Power AgencyWPPI Energy","kind":"answer","file":"sources/filings/text/20261119-5278_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5278","tier":"record","sha256":"a0d14fe34419594a906674df6f55ca562f582bc0ea680e04c80d89695d4f5ca9","pages":12,"tokens":3066,"emptyPages":[],"textThemes":["cost","proximate","study","flex"]},{"slug":"rec-20261119-5279","title":"Expedited Motion for a Nine-Day Extension of Comment Deadline of Constellation Energy Generation, LLC","issued":"2026-11-19","accession":"20261119-5279","docket":"ER27-508-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Constellation Energy Generation, LLC","kind":"comments","file":"sources/filings/text/20261119-5279_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5279","tier":"record","sha256":"e1d5c02ce1ce9c0e4ad14b7ce365ec31d2e3804fb0833327a5927fbe5d0ed93c","pages":3,"tokens":560,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261120-3078","title":"Combined Notice of Filings #1, November 20, 2026: This notice contains information concerning multiple filings received by FERC","issued":"2026-11-20","accession":"20261120-3078","docket":"ER27-578-000","group":"SPP large-load tariff revisions","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"filing","file":"sources/filings/text/20261120-3078_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261120-3078","tier":"record","sha256":"47efdd42236efe9f2ff135efbbeda4dc64739acebfa072777b8481bdcfaa82ba","pages":null,"tokens":1504,"emptyPages":[],"textThemes":[]},{"slug":"rec-20261120-5248","title":"Comments of Olabanji John Ogunyemi on the Midcontinent Independent System Operator, Inc.’s 11/16/2026 Large Load filing and the 06/18/2026 Show Cause Order","issued":"2026-11-20","accession":"20261120-5248","docket":"EL26-70-000","group":"MISO show cause proceeding (E-8)","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20261120-5248_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261120-5248","tier":"record","sha256":"61133000c8d5f286067cd44fe0d705f8cd718a8aab226c744432fbed6224e978","pages":5,"tokens":1435,"emptyPages":[],"textThemes":["study","cost"]},{"slug":"refiling-er27-454-pjm-backstop","title":"Proposed Amendments to the Reliability Backstop Procurement; Request for Waiver","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"section 205 refiling","file":"sources/originals/20261109-5216_RBP Revised 205 Transmittal Letter.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5216","sha256":"7f06a47b85ffe2fdc50d3bc970c285ee4be02e6139a3ed09841dde8fafded817","pages":66,"tokens":19694,"emptyPages":[]},{"slug":"refiling-er27-454-pjm-backstop-etariff-rendition","title":"FERC rendition of the electronically filed tariff records","issued":"2026-11-09","accession":"20261109-5216","docket":"ER27-454-000","group":"PJM Reliability Backstop Procurement","filer":"PJM","kind":"attachment","file":"sources/originals/20261109-5216_tariff-rendition.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261109-5216","parent":"refiling-er27-454-pjm-backstop","sha256":"b8319acbb7d0893b4c5993601a19d76050c657316bbdc4ef53f720c16204d5af","pages":79,"tokens":25352,"emptyPages":[]},{"slug":"rehearing-er26-3380-constellation","title":"Request for Rehearing and Clarification of Constellation Energy Generation, LLC","issued":"2026-10-29","accession":"20261029-5261","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"Constellation Energy Generation","kind":"request for rehearing","file":"sources/originals/20261029-5261_Constellation Request for Rehearing (10-29-26).pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5261","sha256":"33743afe054d66f679fe6e668be974d25b0c9980bb7dd075f94cc701198736d1","pages":21,"tokens":5805,"emptyPages":[]},{"slug":"rehearing-er26-3380-firstenergy","title":"Request for Rehearing of FirstEnergy Service Company","issued":"2026-10-29","accession":"20261029-5270","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"FirstEnergy Service Company","kind":"request for rehearing","file":"sources/originals/20261029-5270_FE RBP Request for Rehearing 10.29.2026.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5270","sha256":"4ff9f7e26485e1021643b3cf68775c9f6f14343d698cce4fca7a9f9edbe2569e","pages":18,"tokens":5206,"emptyPages":[]},{"slug":"rehearing-er26-3380-indicated-pjm-tos","title":"Request for Rehearing of the Indicated PJM Transmission Owners of the September 29, 2026 backstop order (TO exit amendment)","issued":"2026-10-29","accession":"20261029-5265","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"Indicated PJM Transmission Owners","kind":"request for rehearing","file":"sources/originals/20261029-5265_Indicated PJM Transmission Owners' Request for Rehearing.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5265","sha256":"eaf4067ca474db69aaa33c7ac8209e64599f3e6823949dff2471cfd5ddb87019","pages":10,"tokens":2502,"emptyPages":[]},{"slug":"rehearing-er26-3380-joint-consumer-advocates","title":"Request for Rehearing of the Joint Consumer Advocates (DE, DC, IL CUB, IL AG, MD, NJ) of the September 29, 2026 backstop order","issued":"2026-10-29","accession":"20261029-5262","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"Joint Consumer Advocates (DE, DC, IL CUB, IL AG, MD, NJ)","kind":"request for rehearing","file":"sources/originals/20261029-5262_ER26-3380 JCA Request for Rehearing.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5262","sha256":"f4c344f0dcde13afdfd88b0ac9781903eb29caa7ac3b69cc49324509416b230c","pages":35,"tokens":11656,"emptyPages":[]},{"slug":"rehearing-er26-3380-novec","title":"Request for Rehearing and Clarification or Alternative Request for Rehearing of Northern Virginia Electric Cooperative, Inc.","issued":"2026-10-29","accession":"20261029-5264","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"Northern Virginia Electric Cooperative","kind":"request for rehearing","file":"sources/originals/20261029-5264_ER26-3380_EL26-108 NOVEC Request for Rehearing.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5264","sha256":"3fa98ca4fddc31c8e7bc5d394499c4751325801298848c0719bb04aeb594a959","pages":19,"tokens":6238,"emptyPages":[]},{"slug":"rehearing-er26-3380-ohio-occ","title":"Request for Rehearing to Protect Consumers from Excessive Transmission Rates by Office of the Ohio Consumers' Counsel","issued":"2026-10-29","accession":"20261029-5263","docket":"ER26-3380-001","group":"Rehearing of FERC's PJM Reliability Backstop Procurement order","filer":"Ohio Consumers' Counsel","kind":"request for rehearing","file":"sources/originals/20261029-5263_FIN Rehearing Request Reliability Backstop Procurement ER26-3380 (002).pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261029-5263","sha256":"74d23855cf0dacee481b4778c33b38a6dbeef7de0461b1af74686b0d6e246c5f","pages":26,"tokens":7748,"emptyPages":[]},{"slug":"rehearing-er26-3515-ohio","title":"Request for Rehearing to Promote Transparency for Ohio Consumers","issued":"2026-11-09","accession":"20261109-5209","docket":"ER26-3515-001","group":"PJM Large Load definition, Registry and Interim Resource Adequacy Service","filer":"Ohio Consumers’ Counsel","kind":"request for rehearing","file":"sources/originals/20261109-5209_FIN Reheairng IRAS filing ER26-3515.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261109-5209","sha256":"20e280a4d362ce7e2167988143fb47ef305a8b4e16ce01e8c81a48b79283b625","pages":21,"tokens":5419,"emptyPages":[]},{"slug":"report-el26-67-pjm","title":"PJM reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5203","docket":"EL26-67-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"informational report","file":"sources/originals/20260720-5203_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5203","sha256":"44f49025b30ce76a0c5c722d9f15ce8d42664f1eb44c381b6f546e3e0713506d","pages":12,"tokens":3633,"emptyPages":[]},{"slug":"report-el26-68-spp","title":"SPP reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5205","docket":"EL26-68-000","group":"SPP filings","filer":"Southwest Power Pool, Inc.","kind":"informational report","file":"sources/originals/20260720-5205_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5205","sha256":"0081403cc87eb228bdea8473b113039d217a2d248311497c489665f65e33d677","pages":29,"tokens":7097,"emptyPages":[]},{"slug":"report-el26-69-nyiso","title":"NYISO reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5217","docket":"EL26-69-000","group":"NYISO filings","filer":"New York Independent System Operator, Inc.","kind":"informational report","file":"sources/originals/20260720-5217_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5217","sha256":"a8d77161c68268e5ddc6b3be3fa72e6b6d1a15b6cd5746ba268b80a01821bffe","pages":15,"tokens":7259,"emptyPages":[]},{"slug":"report-el26-70-miso","title":"MISO reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5204","docket":"EL26-70-000","group":"MISO filings","filer":"Midcontinent Independent System Operator, Inc.","kind":"informational report","file":"sources/originals/20260720-5204_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5204","sha256":"bd3f20e9a427bfa913991fb1ea3a2356285ccea734bad275ad7efb9a8a692dbe","pages":14,"tokens":5560,"emptyPages":[]},{"slug":"report-el26-71-caiso","title":"CAISO reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5202","docket":"EL26-71-000","group":"CAISO filings","filer":"California Independent System Operator Corporation","kind":"informational report","file":"sources/originals/20260720-5202_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5202","sha256":"5b84365a6842ca80acdb8b17bd392f0f3155d2212fda3ed535872f1c97912edc","pages":19,"tokens":6245,"emptyPages":[]},{"slug":"report-el26-72-isone","title":"ISO-NE reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5216","docket":"EL26-72-000","group":"ISO-NE filings","filer":"ISO New England Inc.","kind":"informational report","file":"sources/originals/20260720-5216_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5216","sha256":"2b751d867e08a1b161960af0dced27409fd226b82e35464e51025f94ef21fe89","pages":8,"tokens":3542,"emptyPages":[]},{"slug":"request-er26-3515-pjmicc-clarification","title":"Industrial customers ask FERC to clarify or rehear its Large Load registry order","issued":"2026-11-09","accession":"20261109-5238","docket":"ER26-3515-001","group":"PJM filings","filer":"PJM Industrial Customer Coalition and Steel Producers","kind":"request","file":"sources/originals/20261109-5238_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261109-5238","sha256":"35fce070392d809071a42835587143c1f8de3db7c4aca2d1441bfa5d50587d29","pages":17,"tokens":4879,"emptyPages":[]},{"slug":"senate-ferc-oversight-20260722","filename":"senate-ferc-oversight-20260722.pdf","text_file":"senate-ferc-oversight-20260722.txt","title":"Senate oversight of FERC: testimony and questions for the record","url":"https://www.govinfo.gov/content/pkg/CHRG-119shrg64322/pdf/CHRG-119shrg64322.pdf","issued":"2026-07-22","docket":"S. Hrg. 119-494","file":"sources/videos/hearings/senate-ferc-oversight-20260722.pdf","kind":"hearing transcript","group":"Congressional testimony","sha256":"02f808679f076ff8028daa99c2a1c50d08f574876fc46e9069f2e893bd0dfc1f","pages":117,"tokens":50221,"emptyPages":[]},{"slug":"statement-ad26-8-pjm-pilong","title":"Reliability Technical Conference Comments from PJM Interconnection, L.L.C. (Christopher Pilong, Panel 1)","issued":"2026-10-21","accession":"20261021-4003","docket":"AD26-8-000","group":"2026 FERC reliability technical conference: integrating large loads","filer":"PJM","kind":"pre-conference statement","file":"sources/originals/20261021-4003_Panel 1-PJM -Chris Pilong Testimony.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261021-4003","sha256":"9a23360b830f7f9a47fb3449cfa2819521c88d53d54ad310d0f3482478ab3616","pages":7,"tokens":2204,"emptyPages":[]},{"slug":"statement-er26-3380-doe","title":"U.S. Department of Energy notice of intervention and statement of position supporting the September 29, 2026 backstop order","issued":"2026-10-07","accession":"20261007-5181","docket":"ER26-3380-000","group":"PJM Reliability Backstop Procurement","filer":"U.S. Department of Energy","kind":"notice of intervention and statement of position","file":"sources/originals/20261007-5181_ER26-3380-000 DOE Intervention re PJM Backstop Filing_10072026_.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261007-5181","sha256":"19966a790918e35aba0c621159e001ff6741c3f77daa8e7cc255f7d2d5b86410","pages":9,"tokens":2617,"emptyPages":[]}]
