{"document":{"slug":"motion-el26-71-valley-electric-rescind","title":"Valley Electric asks FERC to rescind the CAISO show cause order as to it","issued":"2026-11-13","accession":"20261113-5103","docket":"EL26-71-000","group":"CAISO filings","filer":"Valley Electric Association, Inc.","kind":"motion","file":"sources/originals/20261113-5103_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261113-5103","sha256":"d1ca6d9459e78db0cc2e6914dc59b24cb8fe9fd8405db1eadd8271f8b103ee49","pages":43,"tokens":8902,"emptyPages":[]},"pages":[{"page":1,"startToken":0,"endToken":216,"text":"TEL (503) 241-7242     ●     FAX (503) 241-8160     ●     bvc@dvclaw.com\n107 SE Washington Street, Suite 430 \nPortland, OR 97214 \nNovember 13, 2026 \nVia Electronic Submission \nMs. Kimberly D. Bose, Secretary \nFederal Energy Regulatory Commission \nRoom 1A East \n888 First Street NE \nWashington, DC 20426 \nRe: \nCalifornia Independent System Operator Corporation, et al. \nDOCKET NO.  EL26-71-000 \nDear Secretary Bose: \nValley Electric Association, Inc. (“VEA”) hereby submits its Motion to Rescind Show \nCause Order and Conditional Request for Extension of Time (“Motion”). VEA is a non-public \nutility under Section 201(f) of the Federal Power Act and asks the Commission to rescind its June \n18, 2026 show cause order as to VEA, as the Commission has said it will do at a non-public utility’s \nrequest.1 If the Commission has not acted by November 16, 2026, VEA asks that its time to respond \nbe extended. In addition to this filing letter, VEA submits the Motion and a Certificate of Service. \nRespectfully submitted, \n/s/ Brad Van Cleve \nBrad Van Cleve \nDavison Van Cleve, P.C. \nAttorney for Valley Electric Association, Inc. \n1\nCal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214, at P 2 n.9 (2026) (“If a non-public utility wishes to \nbe removed from this proceeding, we will rescind the show cause order against them at their request.”)."},{"page":2,"startToken":216,"endToken":439,"text":"- 1 - \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nCalifornia Independent System Operator \n   Corporation \nCitizen S-Line Transmission LLC \nCitizens Sunrise Transmission LLC \nCitizens Sycamore-Penasquitos \n   Transmission LLC \nDCR Transmission, L.L.C. \nDesertLink, LLC \nGridLiance West LLC \nHorizon West Transmission, LLC \nLS Power Grid California, LLC \nMorongo Transmission LLC \nPacific Gas and Electric Company \nSan Diego Gas & Electric Company \nSouthern California Edison Company \nStartrans IO, L.L.C. \nSunZia Transmission, LLC \nTrans Bay Cable LLC \nValley Electric Association, Inc. \nViridon Path 15, LLC \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \n \n \n \n \n \n \n \nDocket No. EL26-71-000 \n \nMOTION TO RESCIND SHOW CAUSE ORDER AND \nCONDITIONAL REQUEST FOR EXTENSION OF TIME \nON BEHALF OF VALLEY ELECTRIC ASSOCIATION, INC. \n \nPursuant to Rule 212 of the Commission’s Rules of Practice and Procedure,1 Valley \nElectric Association, Inc. (“VEA”) moves the Commission to rescind the show cause order issued \nin this proceeding on June 18, 2026,2 as directed to VEA as a Participating Transmission Owner \n(“TO”) in the California Independent System Operator Corporation (“CAISO”). VEA is an electric \ncooperative that is not a public utility under Section 201(f) of the Federal Power Act (“FPA”). The \nCommission has stated that it will rescind the Show Cause Order as to any non-public utility at its \n \n1 18 C.F.R. § 385.212 (2026). \n2 Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214 (2026) (“Show Cause Order”)."},{"page":3,"startToken":439,"endToken":641,"text":"- 2 - \nrequest,3 and it granted that relief to the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, \nand Riverside, California (“Six Cities”) and the Western Area Power Administration (“WAPA”) \non August 14, 2026.4 VEA’s continued participation is also unnecessary. Any large load seeking \nservice in VEA’s territory would, either directly or through VEA, interconnect to the 230 kV \nsystem of GridLiance West LLC (“GLW”), a public utility that remains a respondent in this \nproceeding, rather than to VEA’s 138 kV facilities. If the Commission has not acted on this motion \nby November 16, 2026, VEA conditionally requests, pursuant to Rule 2008, a brief extension of \nits time to respond to the Show Cause Order until the Commission rules. \nI. \nCOMMUNICATIONS \nPursuant to Rule 203(b)(3), VEA requests that all communications and service in this \nproceeding be directed to the following persons:5 \nBrad Van Cleve \nDavison Van Cleve, P.C. \n4675 W. Teco Ave.; Suite 230 \nLas Vegas, NV 89118 \nbvc@dvclaw.com \n \n \n3 Show Cause Order at P 2 n.9. \n4 Cal. Indep. Sys. Operator Corp., 196 FERC ¶ 61,131, at PP 5, 7 (2026) (“August 14 Order”). \n5 18 C.F.R. § 385.203(b)(3) (2026)."},{"page":4,"startToken":641,"endToken":905,"text":"- 3 - \nGabe DeGuzman \nDirector of Transmission Services and Load Management \nValley Electric Association, Inc. \n800 E Nevada Highway 372 \nPahrump, NV 89048  \n(775) 469-0868 \ngdeguzman@vea.coop \n \nII. \nDESCRIPTION OF VEA \nVEA is a rural electric distribution cooperative based in Pahrump, Nevada, with a service \nterritory in southern Nevada and a small portion in California.  VEA is generally not regulated by \nthe Commission because it is a rural electric cooperative that sells fewer than 4 million megawatt \nhours of electricity per year.   In 2011, the Commission accepted a Transition Agreement between \nVEA and the CAISO that established the process for VEA to join the CAISO as a Participating \nTO.6   \nVEA became a Participating TO and a signatory to the Transmission Control Agreement \n(“TCA”) in 2013, placing its 230 kV and 138 kV facilities under the CAISO’s Operational Control. \nIn 2017, the Commission approved the acquisition of VEA’s 230 kV system by GLW, a Non-\nLoad-Serving Participating TO and a respondent in this proceeding.7 VEA’s only remaining \nfacilities under CAISO Operational Control are its 138 kV facilities, which are Low Voltage \nTransmission Facilities whose costs are recovered from VEA’s own members.  Interest from large \nloads in VEA’s territory has focused on GLW’s 230 kV system. \nIII. \nBACKGROUND \nThe Show Cause Order directed the CAISO and its Participating TOs to show cause why \ntheir tariffs remain just and reasonable without provisions addressing large and co-located loads, \n \n6 Cal. Indep. Sys. Operator Corp., 137 FERC ¶ 61,194, at PP 1-2 (2011). \n7 GridLiance West Transco LLC, 160 FERC ¶ 61,002, at PP 1, 7 (2017)."},{"page":5,"startToken":905,"endToken":1285,"text":"- 4 - \nor to explain what changes would remedy the Commission’s concerns.8 The Commission \nrecognized that the Participating TOs “include entities that are not subject to the Commission’s \njurisdiction because they are not public utilities pursuant to section 201(f),” explained that it \nincluded them because their TO Tariffs on file describe the wholesale load interconnection \nprocess, and stated that “[i]f a non-public utility wishes to be removed from this proceeding, we \nwill rescind the show cause order against them at their request.”9 \nThe Six Cities and WAPA moved for rescission of the Show Cause Order on July 31 and \nAugust 3, 2026. On August 3, VEA joined fourteen other CAISO Participating TOs (collectively, \nthe “Joint PTOs”) in a Request for Abeyance asking the Commission to extend each Joint PTO’s \ndeadline to respond to the Show Cause Order to November 16, 2026.10 The Commission’s August \n14 Order granted both forms of relief: it rescinded the Show Cause Order as to the Six Cities and \nWAPA as utilities exempt under Section 201(f), and it held the proceeding in abeyance through \nNovember 16, 2026, suspending the response obligation of any respondent that submits an FPA \nSection 205 filing by that date.11 The CAISO Board of Governors approved the CAISO’s large \nload proposal on October 28, 2026. That proposal preserves the existing allocation of \nresponsibilities under which the Participating TOs primarily manage load interconnection studies \nand financing under their own TO Tariffs, and the CAISO expects complementary filings from the \nParticipating TOs.12 \n \n8 Show Cause Order at PP 3, 31. \n9 Id. at P 2 n.9 (citing Sw. Power Pool, Inc., 180 FERC ¶ 61,022, at P 40 (2022)). \n10 Request for Abeyance of Southern California Edison Company, et al., Docket No. EL26-71-000 (filed Aug. 3, \n2026) (Accession No. 20260803-5166) (“Request for Abeyance”); August 14 Order at P 3 & n.6 (listing VEA \namong the Joint PTOs). The CAISO filed its own motion for abeyance the same day. \n11 August 14 Order at PP 2-3 & n.6, 7, 13-15. \n12 Memorandum from Neil Millar to CAISO Board of Governors, Re: Response to FERC Large Loads Order to \nShow Cause, at 1-2, 6 (Oct. 22, 2026); see also Motion for Abeyance of the California Independent System Operator"},{"page":6,"startToken":1285,"endToken":1638,"text":"- 5 - \nIV. \nJUSTIFICATION FOR RESCISSION \nA. \nVEA Is Exempt From the Commission’s Jurisdiction Under FPA Section 201(f) \nSection 201(f) excludes from Part II of the FPA “an electric cooperative that receives \nfinancing under the Rural Electrification Act of 1936 . . . or that sells less than 4,000,000 megawatt \nhours of electricity per year.”13 VEA sells approximately 577,130 MWh’s of electricity per year; \ntherefore, it is exempt from Part II of the FPA pursuant to Section 201(f). As the Six Cities did, \nVEA acknowledges the Commission’s authority to review VEA’s Transmission Revenue \nRequirement to ensure that the CAISO’s rates remain just and reasonable.14 \nVEA stands in the same position as the Six Cities and WAPA. Each is a non-public utility \nParticipating TO with a TO Tariff on file with the Commission, each asked to be removed from \nthis proceeding while committing to continue coordinating with the CAISO, and the Commission \ngranted each request.15 The same result is appropriate for VEA. The timing of this motion is also \nno obstacle. The Show Cause Order places no deadline on a non-public utility’s request; it provides \nthat the Commission will rescind the order “[i]f a non-public utility wishes to be removed from \nthis proceeding.”16 \nB. \nVEA Will Continue to Coordinate with the CAISO and Remains Subject to the \nCAISO Tariff \nVEA makes the same commitments on which the Commission relied in the August 14 \nOrder. VEA has coordinated and will continue to coordinate and cooperate with the CAISO in \n \nCorporation, Docket No. EL26-71-000, at 5 (filed Aug. 3, 2026) (anticipating “simultaneous Section 205 filings \nfrom the Participating Transmission Owners”). \n13 16 U.S.C. § 824(f); see City of Anaheim, 171 FERC ¶ 61,263, at PP 19-22 (2020) (cited in Show Cause Order at P \n2 n.9). \n14 Motion to Rescind Show Cause Order on Behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, \nand Riverside, California, Docket No. EL26-71-000, at 4 (filed July 31, 2026) (“Six Cities Motion”). \n15 August 14 Order at PP 5, 7. \n16 Show Cause Order at P 2 n.9."},{"page":7,"startToken":1638,"endToken":1946,"text":"- 6 - \nresponding to the Show Cause Order, to the extent the CAISO requests its assistance and with \nrespect to the load interconnection provisions of its TO Tariff. VEA has conferred with the CAISO \nin advance of this filing and is authorized to state that the CAISO supports this motion. VEA is \nalso coordinating with GLW on the respective roles of GLW and VEA in processing large load \nrequests in VEA’s territory.   If VEA determines that changes to its TO Tariff are needed to address \nthe issues in the Show Cause Order, VEA will file proposed revisions with the Commission. \nRescission will not diminish the CAISO’s visibility into or authority over large loads in \nVEA’s territory. VEA remains a party to the TCA and will be subject to the large load provisions \nof the CAISO Tariff applicable to Participating TOs. VEA is also the Load Serving Entity and \nUtility Distribution Company for its territory and, through its Scheduling Coordinator, will be \nsubject to the forecasting, telemetry, and scheduling requirements that the CAISO Tariff imposes \nfor any large load in its territory, wherever that load interconnects.  \nC. \nVEA’s Participation in the Joint PTOs’ Request for Abeyance Does Not Alter Its \nSection 201(f) Status \nVEA joined the Joint PTOs’ Request for Abeyance to preserve its ability to coordinate with \nthe CAISO and the other Participating TOs and to participate in the CAISO large load stakeholder \nprocess to develop a common approach to responding to the Show Cause Order. The Joint PTOs \nexplained that many of the Commission’s concerns “can only be resolved with complementary or, \nat a minimum, non-conflicting tariff provisions among the CAISO Tariff and the various TO \nTariffs,” and that their requests “reflect a coordinated regional effort consistent with Commission \ndirection.”17 VEA supported that effort and continues to support it. \n \n17 Request for Abeyance at 4, 6."},{"page":8,"startToken":1946,"endToken":2243,"text":"- 7 - \nThe Request for Abeyance stated that each Joint PTO planned to develop an FPA Section \n205 filing to amend its TO Tariff.18 It also recognized, however, that “there are significant \ndifferences among the California PTOs (some PTOs serve load while others do not, for example) \nsuch that the appropriate TO Tariff changes to implement the OSC will also likely vary from PTO \nto PTO,” and it described the anticipated filings as matters that “remain under development and \nmay evolve through coordination with CAISO and stakeholders.”19 The CAISO large load \nstakeholder process is now complete. The CAISO Board of Governors approved the CAISO’s \nproposal on October 28, 2026, and the Participating TOs will make individual filings tailored to \ntheir own systems rather than a single joint filing. VEA’s 138 kV facilities neither host nor are \nlikely to host a large load, as explained in Section IV.D below. VEA has therefore concluded that \na Section 205 filing is not warranted and seeks the relief the Commission has already extended to \nthe other non-public utility respondents. \n Nothing in the Joint PTOs’ Request for Abeyance waived VEA’s status under Section \n201(f) or the option the Commission offered non-public utilities in the Show Cause Order. Nor \ndoes VEA’s participation in the Request for Abeyance foreclose rescission. The Six Cities paired \ntheir motion to rescind with a conditional request for abeyance, and the Commission granted \nrescission without needing to reach the abeyance request.20 \n \n18 Id. at 3-4. \n19 Id. at 3, 7; see also id. at 6 n.8 (noting that LS Power Grid California, LLC and DesertLink, LLC would limit any \nFPA Section 205 filing “to matters that implicate its own TO Tariff or a PTO-administered agreement”). \n20 August 14 Order at P 2 n.5."},{"page":9,"startToken":2243,"endToken":2554,"text":"- 8 - \nD. \nLarge Loads in VEA’s Territory Would Interconnect to GLW’s 230 kV System, \nWhich Remains Before the Commission \nThe Show Cause Order addresses large loads, which the Commission described as new \ncommercial or industrial customers with a peak load of 50 MW or greater that interconnect to the \ntransmission system at a voltage above 69 kV.21 Large loads seeking service in VEA’s territory \nlikely would not interconnect to VEA’s 138 kV facilities, given the option to interconnect with \nGLW’s more robust 230 kV system. \nService over those 230 kV facilities is governed by GLW’s TO Tariff, not VEA’s. GLW \nis a public utility, and remains a respondent in this proceeding, The rates, terms, and conditions \nthe Show Cause Order addresses for large loads in VEA’s territory will therefore remain before \nthe Commission through GLW and the CAISO. Rescinding the Show Cause Order as to VEA \nleaves no gap in the Commission’s review, and the Commission has already stated that it expects \nthe CAISO to respond regarding a non-public utility’s CAISO Tariff provisions on file with the \nCommission.22 \nV. \nCONDITIONAL REQUEST FOR EXTENSION OF TIME AND WAIVER OF \nANSWER PERIOD \nResponses to the Show Cause Order are due November 16, 2026, unless the respondent \nhas submitted a Section 205 filing by that date.23 Rule 2008(a) provides that the time by which any \nperson is required to act under any order may be extended by the decisional authority “for good \ncause, upon a motion made before the expiration of the period prescribed.”24 Good cause exists \nhere. The Commission has committed to grant rescission to non-public utilities on request and \n \n21 Show Cause Order at P 1 n.2; see also id. at P 57. \n22 Id. at P 2 n.9. \n23 August 14 Order at PP 14-15. \n24 18 C.F.R. § 385.2008(a) (2026)."},{"page":10,"startToken":2554,"endToken":2842,"text":"- 9 - \nacted on the Six Cities and WAPA motions within approximately two weeks; if it does the same \nhere, VEA’s response obligation will be moot. Requiring VEA to prepare a response to a Section \n206 order from which the Commission has said it will remove VEA would serve no purpose. \nAccordingly, if the Commission has not acted on this motion by November 16, 2026, VEA \nrequests that its time to respond to the Show Cause Order be extended until thirty days after the \nCommission acts on this motion. This request is of the same character as the conditional abeyance \nmotion the Six Cities filed on August 3, 2026, which was expressly conditioned on the \nCommission’s disposition of their motion to rescind and which the Commission found unnecessary \nto address once it granted rescission.25 VEA further requests that the Commission waive or shorten \nany answer period applicable to this motion, as it did for the Six Cities and WAPA motions, so \nthat the Commission may act before November 16, 2026.26 \n/ / / \n/ / /  \n/ / / \n/ / / \n/ / / \n/ / / \n/ / / \n/ /  \n/ / / \n \n25 See August 14 Order at P 2 n.5 (“On August 3, 2026, Six Cities filed a conditional request for a 90-day abeyance \nof the Show Cause Order in the event the Commission denies their request for rescission. Because we are granting \nSix Cities Motion for Rescission, as discussed below, we need not address their conditional request for abeyance.”). \n26 See Notice Establishing Answer Period, Docket No. EL26-71-000 (Aug. 4, 2026), 91 Fed. Reg. 51,171 (Aug. 7, \n2026) (setting an August 7, 2026 answer deadline for the motions for abeyance filed August 3, 2026); August 14 \nOrder at P 6 (noting that answers to the Six Cities and WAPA motions were due August 7, 2026)."},{"page":11,"startToken":2842,"endToken":2944,"text":"- 10 - \nVI. \nCONCLUSION \nWHEREFORE, VEA respectfully requests that the Commission (1) rescind the Show \nCause Order as against VEA as a non-public utility and amend the caption accordingly; (2) if the \nCommission has not acted by November 16, 2026, extend VEA’s time to respond to the Show \nCause Order as requested above; and (3) waive or shorten any answer period applicable to this \nmotion. \n \nRespectfully submitted, \n \n/s/ Brad Van Cleve \nBrad Van Cleve \nDakota Councilman \nDavison Van Cleve, P.C. \n4675 W. Teco Ave.; Suite 230 \nLas Vegas, NV 89118  \nbvc@dvclaw.com \n \nAttorney for Valley Electric Association, Inc. \n \nNovember 13, 2026"},{"page":12,"startToken":2944,"endToken":3045,"text":"- 1 - \n \nCERTIFICATE OF SERVICE \n \nI hereby certify that I have on this 13th day of November, 2026, caused a copy of the \nforegoing document to be sent to all parties on the list compiled by the Secretary of the \nCommission in this proceeding, by electronic mail or such other means as may have been specified \nby such party, pursuant to Rule 2010 of the Commission’s Rules of Practice and Procedure. \n \n/s/ Brad Van Cleve \nBrad Van Cleve \nDavison Van Cleve, P.C. \n4675 W. Teco Ave.; Suite 230 \nLas Vegas, NV 89118  \n \nbvc@dvclaw.com \n \nAttorney for Valley Electric Association, Inc."},{"page":13,"startToken":3045,"endToken":3235,"text":"- 2 - \nSERVICE LIST \nDocket No. EL26-71-000 \n \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nLisa Melton \nLisa Melton \n1833 Lucile Ave \nLos Angeles, CALIFORNIA 90026 \nlM.marlowe@pm.me \n \nAdvanced Energy \nManagement Alliance \nFrank Lacey \nPrincipal \nElectric Advisors Consulting \n3 Traylor Drive \nWest Chester, PENNSYLVANIA 19382 \nfrank@eacpower.com \n \nAdvanced Energy \nUnited \nKelsey Koenig \nSolar Energy Industries Associ \nSolar Energy Industries Association \n1425 K ST NW STE 1000 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nkkoenig@seia.org \nMichael P Haugh \nPolicy Director \nAdvanced Energy United \n1010 VERMONT AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 200 \nmhaugh@advancedenergyunited.org \nCaitlin Marquis \nManaging Director \nAdvanced Energy United \n1801 Pennsylvania Ave. N.W \nWashington, DISTRICT OF COLUMBIA \n20006 \ncmarquis@advancedenergyunited.org \nAmazon Energy LLC \nWilliam Friedman \nAmazon Web Services, Inc. \n410 TERRY AVE N \nSEATTLE, WASHINGTON 98109 \nwfried@amazon.com \n \nAmerican Chemistry \nCouncil \nCharles Franklin \nSenior Director, Energy, Clima \n700 2ND ST NE \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20002 \ncharles_franklin@americanchemistry.com \n \nAmerican Clean Power \nAssociation \nBrett White \nDeputy General Counsel \nAmerican Clean Power Association \n1299 Pennsylvania Avenue, N.W. \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nbwhite@cleanpower.org"},{"page":14,"startToken":3235,"endToken":3414,"text":"- 3 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nAmerican Council on \nRenewable Energy \nElise Caplan \nDirector of Electricity Policy \nAmerican Council on Renewable Energy \n1150 CONNECTICUT AVE NW STE \n401 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \ncaplan@acore.org \n \nAmerican Electric \nPower Service \nCorporation \nJohn Crespo \nDeputy General Counsel \nAmerican Electric Power Company, Inc. \n1 Riverside Plaza \n29th Floor \nColumbus, OHIO 43215 \njccrespo@aep.com \nCarrie L. Bumgarner \nSenior Counsel \nAmerican Electric Power Company \n1 Riverside Plaza \nColumbus, OHIO 43215-2373 \nclbumgarner@aep.com \nKate Daley \n1 Riverside Plaza \nColumbus, OHIO 43215 \nkbdaley@aep.com \nJustin Stewart \njcstewart@aep.com \nTakis Laios \nDirector, Transmission Asset S \n1 Riverside Plaza \nColumbus, OHIO 43215 \ntlaios@aep.com \nFERC Service List \n801 Pennsylvania Avenue \nSuite 735 \nWashington, DISTRICT OF COLUMBIA \n20004 \nferc_service_list@aep.com \nLaChon Turner \nAEP COMPANIES \n801 PENNSYLVANIA AVE NW STE \n735 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 200 \nlturner@aep.com \nAMERICAN \nPETROLEUM \nINSTITUTE \nGrace Soderberg \nSenior Counsel \nAMERICAN PETROLEUM INSTITUTE \n200 MASSACHUSETTS AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nsoderbergg@api.org"},{"page":15,"startToken":3414,"endToken":3651,"text":"- 4 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nAmericans for a Clean \nEnergy Grid \nJared Nachmias \nAmericans for a Clean Energy G \nAmericans for a Clean Energy Grid \n10 G ST NE STE 440 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20002 \njared.nachmias@cleanenergygrid.org \n \nAnthropic, PBC \nAriel Horowitz \nEnergy \nAnthropic, PBC \n500 HOWARD ST \nSAN FRANCISCO, CALIFORNIA \n94105 \narielhorowitz@anthropic.com \n \nAntora Energy, Inc. \nNoah Long \nDirector, State & Regulatory P \nAntora Energy LLC \n200 W DE VARGAS ST STE 200 \nSANTA FE, NEW MEXICO 87501 \nnoah.long@antora.com \nEric Smith \nAntora Energy, Inc. \n604 N Vermont St \nArlington, VIRGINIA 22203 \neric.smith@antora.com \nUjvalla Gupta \nujvalla.gupta@antora.energy \nAva Community Energy Dominic Faria \nSenior Policy Coordinator \nAva Community Energy \n1999 HARRISON ST STE 2300 \nOAKLAND, CALIFORNIA 94612 \ndfaria@avaenergy.org \nJohn Newton \nPrincipal Regulatory Senior Ma \nAva Community Energy \n1999 HARRISON ST STE 2300 \nOAKLAND, CALIFORNIA 94612 \njnewton@avaenergy.org \n \nAvangrid Networks, \nInc. \nNoelle Kinsch \nVP, Gen.Counsel & Corp Sec. \n80 State Street \nAlbany, NEW YORK 12207 \nnoelle.kinsch@avangrid.com \nAlan Trotta \nUnited Illuminating Company, The \n157 Church Street \nNew Haven, CONNECTICUT 06510 \nalan.trotta@uinet.com \nAvangrid Power, LLC \nLeonard Rodriguez \nVP & GC \nAvangrid Renewables, LLC \n180 Marsh Hill Rd \nOrange, CONNECTICUT 06477 \nleonard.rodriguez@avangrid.com \nKevin Kilgallen \nDirector, Market Structure & P \nAvangrid, Inc. \n411 OAKLAND DR \nDOWNINGTOWN, PENNSYLVANIA \n19335 \nkevin.kilgallen@avangrid.com"},{"page":16,"startToken":3651,"endToken":3874,"text":"- 5 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nAvista Corporation \nLisa Hairston \nFERC Compliance Manager \nAvista Corporation \n1411 E Mission Ave \nMSC-4 \nSpokane, WASHINGTON 99252 \nlisa.hairston@avistacorp.com \nTravis R. Lindsey \nSenior Counsel \nAvista Corporation \n1141 E. Mission Ave. \nMSC-33 \nSpokane, WASHINGTON 99202 \ntravis.lindsey@avistacorp.com \nBalancing Authority of \nNorthern California \nC. Anthony Braun \nBraun Blaising & Wynne, P.C. \n555 Capitol Mall \nSuite 570 \nSacramento, CALIFORNIA 95814 \nbraun@braunlegal.com \nJessica Melms \nBraun Blaising & Wynne, P.C. \n2600 Capitol Avenue \nSuite 400 \nSacramento, CALIFORNIA 95816 \nmelms@braunlegal.com \nBase Power Company \nAndrew Hosea \nAssociate General Counsel \nBase Power Company \n205 E RIVERSIDE DR STE 100 \nAUSTIN, TEXAS 78704 \nahosea@basepowercompany.com \nTori R Villarreal \nBase Power Company \n205 E RIVERSIDE DR \nAUSTIN, TEXAS 78704 \ntori@basepowercompany.com \nBear Valley Electric \nService, Inc. \nRandolph Elliott \nMcCarter & English, LLP \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF COLUMBIA \n20005 \nrelliott@mccarter.com \n \nBloom Energy \nCorporation \nJoel Newton \nVP, Regulatory Law \nBloom Energy Corporation \n6611 Dearborn Dr \nFalls Church, VIRGINIA 22044 \njoel.newton@bloomenergy.com \n \nCalibrant Energy \nJudith Judson \nExecutive Vice President, Regu \nCalibrant Energy \n1 FINANCIAL CTR STE 1500 \nBOSTON, MASSACHUSETTS 02111 \njudith.judson@calibrantenergy.com \nJoe Macklin \nDirector, Regulatory Strategy \nCalibrant Energy \n536 PIEDMONT RD \nCOLUMBUS, OHIO 43214 \njoe.macklin@calibrantenergy.com"},{"page":17,"startToken":3874,"endToken":4052,"text":"- 6 - \nCalifornia Department \nof Water Resources \nState Water Project \nLisa Dowden \nSenior Counsel \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nLisa.Dowden@spiegelmcd.com \nStephen C. Pearson \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nsteve.pearson@spiegelmcd.com \nAmanda C. Drennen \nAttorney \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \namanda.drennen@spiegelmcd.com \nSamuel B. Whillans \nSpiegel & McDiarmid LLP \n1818 N ST NW \n8TH Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nsamuel.whillans@spiegelmcd.com \nE Service \nSpiegel & McDiarmid LLP \n1818 N Street NW \n8th Floor \nWashington, DISTRICT OF COLUMBIA \n20036 \neservice@spiegelmcd.com \nNhu Nguyen \nDeputy Attorney General \n1300 I Street \nSacramento, CALIFORNIA 95814 \nnhu.nguyen@doj.ca.gov \nRegina Tochterman \nSenior Legal Analyst \n1300 I Street \nSacramento, CALIFORNIA 95814 \nRegina.Tochterman@doj.ca.gov \nRobert S Hedrick \nOffice of the General Counsel \nPO Box 899 \nSACRAMENTO, \nRobert.Hedrick@water.ca.gov \nRobin M. Hennessy \nOffice of the General Counsel \nDepartment of Water Resources \nPO Box 899"},{"page":18,"startToken":4052,"endToken":4173,"text":"- 7 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nSACRAMENTO, \nrobin.hennessy@water.ca.gov \nTrong Bui \nPO Box 899 \nSacramento, \nTrong.Bui@water.ca.gov \nMasoud Shafa \nCalifornia Department of Water \nResources \nPO Box 889 \nSacramento, 94236 \nMasoud.Shafa@water.ca.gov \nCalifornia Independent \nSystem Operator \nCorporation \nHeather Curlee \nSenior Counsel \n250 Outcropping Way \nINC000000445898 \nFolsom, CALIFORNIA 95630 \nhcurlee@caiso.com \nJacqueline Meredith \n250 Outcropping Way \nFolsom, CALIFORNIA 95630 \ncaisotariff@caiso.com \nCalifornia Municipal \nUtilities Association \nC. Anthony Braun \nBraun Blaising & Wynne, P.C. \n555 Capitol Mall \nSuite 570 \nSacramento, CALIFORNIA 95814 \nbraun@braunlegal.com \nJessica Melms \nBraun Blaising & Wynne, P.C. \n2600 Capitol Avenue \nSuite 400 \nSacramento, CALIFORNIA 95816 \nmelms@braunlegal.com"},{"page":19,"startToken":4173,"endToken":4433,"text":"- 8 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nCalifornia Public \nUtilities Commission \nInna Vinogradov \nCalifornia Public Utilities Commission \n505 Van Ness Avenue \nSAN FRANCISCO, CALIFORNIA \n94102 \ninna.vinogradov@cpuc.ca.gov \nAaron Jacobs-Smith \nCalifornia Public Utilities Commission \n505 VAN NESS AVE \nSAN FRANCISCO, CALIFORNIA \n94102 \naaron.jacobs-smith@cpuc.ca.gov \nPaula Gruendling \nProgram Manager \nCalifornia Public Utilities Commission \n505 VAN NESS AVE \nSAN FRANCISCO, CALIFORNIA \n94102 \npaula.gruendling@cpuc.ca.gov \nLe-Quyen Nguyen \nCalifornia Public Utilities Commission \n505 Van Ness Avenue \nSan Francisco, CALIFORNIA 94102 \nLe-Quyen.Nguyen@cpuc.ca.gov \nLeuwam Tesfai \nCalifornia Public Utilities Commission \n505 Van Ness Avenue \nSan Francisco, CALIFORNIA 94102 \nleuwam.tesfai@cpuc.ca.gov \nSimon Hurd \nProgram and Project Supervisor \nCalifornia Public Utilities Commission \n505 Van Ness Avenue \nSan Francisco, CALIFORNIA 94102 \nSimon.Hurd@cpuc.ca.gov \nPhilip Voris \n505 Van Ness Avenue \nSan Francisco, CALIFORNIA 94102 \nphilip.voris@cpuc.ca.gov \nAaron Bloom \nCalifornia Public Utilities Commission \n505 Van Ness Avenue \nSan Francisco, CALIFORNIA 94102 \naaron.bloom@cpuc.ca.gov \nChristine J. Hammond \nCalifornia Public Utilities Commission \n505 Van Ness Avenue \nSan Francisco, CALIFORNIA 94102 \nchristine.hammond@cpuc.ca.gov \nCamus Energy \n \nAnthony Harrison \nVP,Policy & Strategic Partners \nCamus Energy \n1821 S Bascom Ave \nSuite 515 \nCampbell, CALIFORNIA 95008 \nanthony@camus.energy \nCapital Power \nCorporation \nThomas Millar \nMr. Thomas Millar \nSidley Austin LLP \n1501 K Street, N.W. \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \ntmillar@sidley.com \nDarsh Singh \nSenior Legal Counsel \nCapital Power Corporation \n2398 E Camelback Road, Suite 940 \nPhoenix, ALBERTA 85016 \ndasingh@capitalpower.com"},{"page":20,"startToken":4433,"endToken":4704,"text":"- 9 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nChevron U.S.A. Inc. \nVanessa Colon \nSenior Counsel \nChevron U.S.A. Inc. \n1400 SMITH ST RM 31158 \nHOUSTON, TEXAS 77002 \nvanessa.colon@chevron.com \n \nCitizen S-Line \nTransmission LLC \nAshley Bond \n1730 Rhode Island Avenue, N.W. \nSuite 700 \nWashington, DISTRICT OF COLUMBIA \n20036-3155 \namb@duncanallen.com \nPeter F. Smith \nChief Executive Officer \n2 Seaport East \nSuite 5C \nBoston, MASSACHUSETTS 02210 \npsmith@citizensenergy.com \nCitizens Sunrise \nTransmission LLC \nPaul Breakman \nAttorney \n1575 Eye Street, NW \nSuite 300 \nWashington, DISTRICT OF COLUMBIA \n20005 \npaul.breakman@nreca.coop \nErnest Panos \nChief Financial Officer \n2 SEAPORT LN STE 5C \nBOSTON, MASSACHUSETTS 02210 \nepanos@citizensenergy.com \nCitizens Sycamore-\nPenasquitos \nTransmission LLC \nPeter Smith \nChief Executive Officer \n2 Seaport East \nSuite 5C \nBoston, MASSACHUSETTS 02210 \npsmith@citizensenergy.com \nErnest Panos \nChief Financial Officer \n2 SEAPORT LN STE 5C \nBOSTON, MASSACHUSETTS 02210 \nepanos@citizensenergy.com \nCity of Anaheim, \nCalifornia \nElden Krause \nIntegrated Resources Manager \n201 S ANAHEIM BLVD STE 802 \nANAHEIM, CALIFORNIA 92805 \nekrause@anaheim.net \nMargaret Elizabeth McNaul \nAttorney \n1909 K Street, N.W. \nSuite 600 \nWashington, DISTRICT OF COLUMBIA \n20006 \nmmcnaul@thompsoncoburn.com \nCity of Azusa, \nCalifornia \nRichard Torres \n729 N. Azusa Avenue \nAzusa, CALIFORNIA 91702 \nrtorres@azusaca.gov \nMargaret Elizabeth McNaul \nAttorney \n1909 K Street, N.W. \nSuite 600 \nWashington, DISTRICT OF COLUMBIA \n20006 \nmmcnaul@thompsoncoburn.com \nCity of Banning, \nCalifornia \nRebecca Shelton \nAttorney \n1909 K Street NW \nSuite 600 \nWashington, DISTRICT OF COLUMBIA \n20006 \nrshelton@thompsoncoburn.com \nMargaret Elizabeth McNaul \nAttorney \n1909 K Street, N.W. \nSuite 600 \nWashington, DISTRICT OF COLUMBIA \n20006 \nmmcnaul@thompsoncoburn.com"},{"page":21,"startToken":4704,"endToken":4917,"text":"- 10 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nCity of Colton, \nCalifornia \nKinda Salloum \n650 N. La Cadena Blvd \nColton, CALIFORNIA 92324 \nksalloum@coltonca.gov \nMargaret Elizabeth McNaul \nAttorney \n1909 K Street, N.W. \nSuite 600 \nWashington, DISTRICT OF COLUMBIA \n20006 \nmmcnaul@thompsoncoburn.com \nCity of Pasadena, \nCalifornia \nHerman Leung \n150 Los Robles #200 \nPasadena, ALBERTA 91101 \nCANADA \nhleung@cityofpasadena.net \nMargaret Elizabeth McNaul \nAttorney \n1909 K Street, N.W. \nSuite 600 \nWashington, DISTRICT OF COLUMBIA \n20006 \nmmcnaul@thompsoncoburn.com \nCity of Riverside, \nCalifornia \nRuthann Salera \nrsalera@riversideca.gov \nMargaret Elizabeth McNaul \nAttorney \n1909 K Street, N.W. \nSuite 600 \nWashington, DISTRICT OF COLUMBIA \n20006 \nmmcnaul@thompsoncoburn.com \nCity of Santa Clara, CA \nd/b/a Silicon Valley \nPower \nLisa Gast \nAttorney \nDuncan, Weinberg, Genzer & Pembroke \nPC \n1667 K Street NW \nSuite 700 \nWashington, DISTRICT OF COLUMBIA \n20006 \nlsg@dwgp.com \nPeter Scanlon \nPartner \nDuncan, Weinberg, Genzer & Pembroke \nPC \n1667 K ST NW STE 700 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \npjs@dwgp.com \nPaige Punzalan \nDuncan Weinberg Genzer & Pembroke, \nPC \n915 L Street, Suite 1410 \nSACRAMENTO, CALIFORNIA 95814 \nplp@dwgp.com \nRebekah G Chikuni \nLegal Assistant \nDuncan Weinberg Genzer & Pembroke, \nPC \n1667 K ST NW STE 700 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nrgc@dwgp.com"},{"page":22,"startToken":4917,"endToken":5136,"text":"- 11 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nClearway Energy Group \nLLC \nGretchen Schott \nAssistant General Counsel, Reg \nClearway Energy Group LLC \n1200 SMITH ST STE 600 \nHOUSTON, TEXAS 77002 \ngretchen.schott@clearwayenergy.com \nJulia Zuckerman \nSenior Direc., Exter. & Mark. \nClearway Energy Group LLC \n100 California Street \nSuite 650 \nSan Francisco, CALIFORNIA 94111 \njulia.zuckerman@clearwayenergy.com \nConstellation Energy \nGeneration, LLC \nChristopher Wilson \nDirector, Fed. Regulatory A \nConstellation Energy Generation, LLC \n250 Massachusetts Avenue NW \nSuite 760 \nWashington, DISTRICT OF COLUMBIA \n20001 \nFERCe-filings1@Constellation.com \nCarrie Allen \nSVP & Deputy General Counsel \nConstellation Energy Corporation \n101 Constitution Ave. NW Suite 400 East \nWashington, DISTRICT OF COLUMBIA \n20001 \ncarrie.allen@constellation.com \nTodd Brecher \nVP and Managing Counsel \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW \nSuite 700 \nWashington, DISTRICT OF COLUMBIA \n20001 \ntodd.brecher@constellation.com \n \nCorporate Energy \nBuyers Association \nJohn Miller \nDirector, Transmission Policy \nCorporate Energy Buyers Association \n1501 M ST NW STE 900 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \njmiller@ceba.org \nBryn Baker \nCorporate Energy Buyers Associ \nCorporate Energy Buyers Association \n1501 M ST NW STE 900 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nbbaker@ceba.org \nKyle L. Davis \nSenior Director, Policy Resear \nCorporate Energy Buyers Association \n1501 M ST NW STE 900 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nkdavis@ceba.org"},{"page":23,"startToken":5136,"endToken":5395,"text":"- 12 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nData Center Coalition \nMorgan Sipple \nData Center Coalition \n1250 H ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nmorgan@datacentercoalition.org \n \nDCR Transmission, \nL.L.C. \nJoseph Hall \n700 Sixth Street, NW \nSte. 700 \nWashington, DISTRICT OF COLUMBIA \n20001-3980 \njoehall@eversheds-sutherland.com \nJeffrey S Levy Esq \nGeneral Counsel \nFive Greenwich Office Park \n2nd Floor \nGREENWICH, CONNECTICUT 06831 \njlevy@LotusPartners.com \nDesertLink, LLC \nDaniel Arzola \nDirector, Transmission Rates \n16150 Main Circle Drive, Suite 310 \nChesterfield, MISSOURI 63017-4689 \nearzola@lspower.com \nMark Milburn \nVice President \n400 Chesterfield Center \nSuite 110 \nChesterfield, MISSOURI 63017 \nmmilburn@lspower.com \nDigital Realty Trust, \nL.P. \nZach O’Farrell Huber \n601 W 2ND ST FL 32 \nAUSTIN, TEXAS 78701 \nzofarrellhuber@digitalrealty.com \n \nEDF Power Solutions, \nInc. \nLinda Walsh \nHusch Blackwell LLP \n1801 Pennsylvania Ave. NW, Suite 1000 \nWashington, DISTRICT OF COLUMBIA \n20006 \nlinda.walsh@huschblackwell.com \nEmily B Starobin \nAttorney \nHusch Blackwell LLP \n914 VEIRS MILL RD \nROCKVILLE, MARYLAND 20851 \nemily.starobin@huschblackwell.com \nTemujin J Roach \nSenior Director - Transmission \nEDF Renewables, Inc. \n3600 American Blvd., W, Suite 400 \nMinneapolis, MINNESOTA 55413 \ntemujin.roach@edf-re.com \nEmma Simon \nDirector, Transmission Policy \nEDF Renewables Development, Inc. \n15445 Innovation Dr \nSan Diego, CALIFORNIA 92128 \nemmanix.simon@edf-re.com \nEdison Electric Institute \nKevin Huyler \nManaging Director, Edison Elec \nEdison Electric Institute \n701 PENNSYLVANIA AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nkhuyler@eei.org \nLeet W Wood \nManager, Federal Regulatory Af \nEdison Electric Institute \n701 PENNSYLVANIA AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nleetwood@eei.org"},{"page":24,"startToken":5395,"endToken":5545,"text":"- 13 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nEDP Renewables North \nAmerica LLC \nCarla Jones \nDirector of Legal \nEDP Renewables North America LLC \n1501 McKinney Street \nSuite 1300 \nHouston, TEXAS 77010 \ncarla.jones@edp.com \nMeredith Chambers \nVan Ness Feldman \n825 TOWN AND COUNTRY LN STE \n1200 \nHOUSTON, TEXAS 77024 \nmchambers@vnf.com \nElectric Power Supply \nAssociation \nNancy Bagot \n1401 NEW YORK AVE NW STE 950 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nnbagot@epsa.org \n \nElectricity Consumers \nResource Council \nKaren Onaran \nVice President \nELCON \n1101 K Street NW \nSuite 700 \nWashington, DISTRICT OF COLUMBIA \n20005 \nKOnaran@elcon.org \n \nElectricity Customer \nAlliance \nJeffery Dennis \nElectricity Customer Alliance \n1001 PENNSYLVANIA AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nDennis@co2efficient.com \n \nEmerald AI \nSwasti Jain \nswasti.jain@emeraldai.co \nMichael Panfil \nEmerald AI \n4535 Westhall Dr NW \nWashington, DISTRICT OF COLUMBIA \n20007 \nmichael.panfil@emeraldai.co"},{"page":25,"startToken":5545,"endToken":5753,"text":"- 14 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nEnchanted Rock, LLC \nSteven Shparber \nMintz, Levin, Cohn, Ferris, Glovsky and \nPopeo, \nP.C. \n555 12TH ST NW STE 1100 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nsshparber@mintz.com \nOmar Bustami \nMintz, Levin, Cohn, Ferris, Glovsky and \nPopeo, \nP.C. \n3580 Carmel Mountain Road \nSuite 300 \nSan Diego, CALIFORNIA 92130 \nOBustami@mintz.com \n \nEnel North America, \nInc. \nJessica Greenberg \nEnel Green Power North America, Inc. \n10 Mill Pond Drive \nGeorgetown, ONTARIO L7G 4S6 \nCANADA \njessica.greenberg@enel.com \nMona Tierney-Lloyd \nHead, Regulatory & Institution \nEnel North America, Inc. \n2071 ALTAIR LN \nRENO, NEVADA 89521 \nmona.tierney-lloyd@enel.com \nJuan Diaz \nDirector RA and IA \nEnel Companies (Enel Green Power North \nAm \nand EnerNOC, Inc.) \n100 BRICKSTONE SQ STE 300 \nANDOVER, MASSACHUSETTS 01810 \njuan.diaz9@enel.com \nEnergy Trading Institute Noha Sidhom \nExecutive Director \n64 Bryant Street, N.W. \nWashington, DISTRICT OF COLUMBIA \n20001 \nnoha@energytradinginstitute.org \n \nEnvironmental Defense \nFund \nPhelps Turner \nSenior Attorney, U.S. Clean En \nEnvironmental Defense Fund \n257 PARK AVE S \nENVIRONMENTAL DEFENSE FUND \nNEW YORK, NEW YORK 10010 \npturner@edf.org \n \nEolian, L.P. \nEric Stoutenburg \nEolian, L.P. \n988 Howard Ave Ste \nBurlingame, CALIFORNIA 94010 \neric.stoutenburg@eolianenergy.com"},{"page":26,"startToken":5753,"endToken":5998,"text":"- 15 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nEQUINIX, INC. \nArthur Haubenstock \nSr. Counsel \nEQUINIX INC. \n700 K ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nahaubenstock@equinix.com \nCy K McGeady \ncmcgeady@equinix.com \nFuelCell Energy, Inc. \nAlexandrea Isaac \n3 GREAT PASTURE RD \nDANBURY, CONNECTICUT 06810 \naisaac@fce.com \n \nGlobal Capacity \nAlliance \nJesse Gossett \nInterim Executive Director \n3909 Petes Path \nAustin, TEXAS 78731 \njesse@globalcapacityalliance.org \n \nGoogle LLC \nChimera Thompson \nAttorney \nWhite & Case LLP \n701 13th St NW \nWashington, DISTRICT OF COLUMBIA \n20005 \nchimera.thompson@whitecase.com \nRebecca Kennedy \nAttorney \n701 13th St NW \nWashington, DISTRICT OF COLUMBIA \n20005 \nkennedyre@google.com \nGridLiance West LLC \nElizabeth Ramey \nSenior Attorney \n801 Pennsylvania Avenue NW \nSuite 220 \nWashington, DISTRICT OF COLUMBIA \n20004 \nelizabeth.ramey@nexteraenergy.com \nJaime Hoffman \n330 W Canon Perdido St \nSanta Barbara, CALIFORNIA 93101 \nJaime.Hoffman@nexteraenergy.com \nGridStor LLC \nJason Burwen \nGridStor LLC \n7 SE STARK ST STE 850 \nPORTLAND, OREGON 97214 \njason.burwen@gridstor.com \nWilliam B Lackey \nGridStor LLC \n7 SE STARK ST STE 850 \nPORTLAND, OREGON 97214 \nben.lackey@gridstor.com \nHoneywell International \nInc. \nDane Farrell \nHoneywell International Inc. \n101 CONSTITUTION AVE NW STE \n500W \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nDane.farrell@honeywell.com \n \nHorizon West \nTransmission, LLC \nJaime Hoffman \n330 W Canon Perdido St \nSanta Barbara, CALIFORNIA 93101 \nJaime.Hoffman@nexteraenergy.com \nElizabeth Ramey \nSenior Attorney \n801 Pennsylvania Avenue NW \nSuite 220 \nWashington, DISTRICT OF COLUMBIA \n20004 \nelizabeth.ramey@nexteraenergy.com"},{"page":27,"startToken":5998,"endToken":6163,"text":"- 16 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nImperial Irrigation \nDistrict \nJamie Asbury \nGeneral Manager \nImperial Irrigation District \n333 E. Barioni Boulevard \nImperial, CALIFORNIA 92251 \njlasbury@IID.com \nSean Neal \nAttorney \nDuncan, Weinberg, Genzer & Pembroke \nPC \n915 L Street \nSuite 1410 \nSacramento, CALIFORNIA 95814 \nsmn@dwgp.com \nAndrea Sarmentero Garzon \nDuncan, Weinberg, Genzer & Pembroke, \nP.C. \n1667 K Street, N.W. \nSuite 700 \nWashington, DISTRICT OF COLUMBIA \n20006 \nasg@dwgp.com \nPaige Punzalan \nDuncan Weinberg Genzer & Pembroke, \nPC \n915 L Street, Suite 1410 \nSACRAMENTO, CALIFORNIA 95814 \nplp@dwgp.com \nSalena R Garcia \nAdministrative Support Special \nDuncan Weinberg Genzer & Pembroke, \nPC \n915 L ST STE 1410 \nSACRAMENTO, CALIFORNIA 95814 \nsrg@dwgp.com \nIndependent Energy \nProducers Association \nBrian Cragg \nAttorney \nDowney Brand LLP \n455 Market Street \nSuite 1500 \nSan Francisco, CALIFORNIA 94105 \nbcragg@downeybrand.com \n \nInformation Technology \nIndustry Council \nRachel Ross \nVice President, Energy Policy \n700 K ST NW FL 6 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nrross@itic.org"},{"page":28,"startToken":6163,"endToken":6317,"text":"- 17 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nInfrastructure Masons, \nInc. \nSteven Shparber \nMintz, Levin, Cohn, Ferris, Glovsky and \nPopeo, \nP.C. \n555 12TH ST NW STE 1100 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nsshparber@mintz.com \nOmar Bustami \nMintz, Levin, Cohn, Ferris, Glovsky and \nPopeo, \nP.C. \n3580 Carmel Mountain Road \nSuite 300 \nSan Diego, CALIFORNIA 92130 \nOBustami@mintz.com \n \nInstitute for Progress \nBen Schifman \nInstitute for Progress \nInstitute for Progress \n1255 Union St NE \nWashington, DISTRICT OF COLUMBIA \n20002 \nben@ifp.org \n \nInvenergy Solar \nDevelopment North \nAmerica LLC \nTyler O'Connor \nCrowell & Moring LLP \n600 5TH ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \ntoconnor@crowell.com \nNicole Luckey \nSenior Vice President, Regulat \nInvenergy LLC \n1 S WACKER DR STE 1800 \nCHICAGO, ILLINOIS 60606 \nnluckey@invenergy.com \nWilliam Borders, ESQ \nChief Compliance Officer \nInvenergy LLC \nOne South Wacker Drive \nSuite 1500 \nChicago, ILLINOIS 60606 \nferccompliance@invenergy.com"},{"page":29,"startToken":6317,"endToken":6570,"text":"- 18 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nInvenergy Thermal \nDevelopment Holdings \nLLC \nTyler O'Connor \nCrowell & Moring LLP \n600 5TH ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \ntoconnor@crowell.com \nNicole Luckey \nSenior Vice President, Regulat \nInvenergy LLC \n1 S WACKER DR STE 1800 \nCHICAGO, ILLINOIS 60606 \nnluckey@invenergy.com \nWilliam Borders, ESQ \nChief Compliance Officer \nInvenergy LLC \nOne South Wacker Drive \nSuite 1500 \nChicago, ILLINOIS 60606 \nferccompliance@invenergy.com \nInvenergy Wind \nDevelopment North \nAmerica LLC \nTyler O'Connor \nCrowell & Moring LLP \n600 5TH ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \ntoconnor@crowell.com \nNicole Luckey \nSenior Vice President, Regulat \nInvenergy LLC \n1 S WACKER DR STE 1800 \nCHICAGO, ILLINOIS 60606 \nnluckey@invenergy.com \nWilliam Borders, ESQ \nChief Compliance Officer \nInvenergy LLC \nOne South Wacker Drive \nSuite 1500 \nChicago, ILLINOIS 60606 \nferccompliance@invenergy.com \nLS Power Development, \nLLC \nMarjorie Philips \nVP, Wholesale Market Policy \nLS Power Development, LLC \n250 W 55TH ST FL 31 \nNEW YORK, NEW YORK 10019 \nmphilips@lspower.com \nDaniel Pierpont \nVice President \nLS Power Development, LLC \n250 W 55TH ST FL 31 \nNEW YORK, NEW YORK 10019 \ndpierpont@lspower.com \nLS Power Grid \nCalifornia, LLC \nTerry Harvill \nVice President, Transmission R \n16150 MAIN CIRCLE DR STE 310 \nCHESTERFIELD, MISSOURI 63017 \nTharvill@lspower.com \nMark Milburn \nVice President \n400 Chesterfield Center \nSuite 110 \nChesterfield, MISSOURI 63017 \nmmilburn@lspower.com \nLuminary Strategies, \nLLC \nArushi Sharma Frank \nFounder & Principal, Luminary \nLuminary Strategies, LLC \n3 TINGEY SQ SE \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20003 \narushisharmafrank@gmail.com"},{"page":30,"startToken":6570,"endToken":6733,"text":"- 19 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nMainspring Energy \nBrian Kauffman \nDirector, Wholesale Market Dev \nMainspring Energy \n3601 HAVEN AVE \nMENLO PARK, CALIFORNIA 94025 \nbrian.kauffman@mainspringenergy.com \n \nMicrosoft Corporation \nJeffery Riles \nDirector of Energy Markets \nOne Microsoft Way \nRedmond, WASHINGTON 98052 \njeffriles@microsoft.com \nJordan Weiszhaar \nRegulatory Strategy \nMicrosoft Corporation \n1 MICROSOFT WAY \nREDMOND, WASHINGTON 98052 \njordanw@microsoft.com \nReese Rogers \nMicrosoft Corporation \n1 MICROSOFT WAY \nREDMOND, WASHINGTON 98052 \nreeserogers@microsoft.com \nNeelesh Nerurkar \nDirector, AI and Energy Policy \nMicrosoft Corporation \n901 K ST NW FL 5 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nnnerurkar@microsoft.com \n \nMiddle River Power \nLLC \nTina Chase \n4350 EXECUTIVE DR STE 320 \nSAN DIEGO, CALIFORNIA 92121 \ntchase@mrpgenco.com \nJoseph Dubinski \n1 North Franklin Street \nSuite 2600 \nChicago, ILLINOIS 60606 \njdubinski@mrpgenco.com \nMadison Hernandez-Barber \nMiddle River Power \nMiddle River Power LLC \n1 N FRANKLIN ST STE 2600 \nCHICAGO, ILLINOIS 60606 \nmhernandez-barber@mrpgenco.com \nNuo Tang \nntang@mrpgenco.com"},{"page":31,"startToken":6733,"endToken":6928,"text":"- 20 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nModernElectric Inc. \nChino Lex \nFounder/ Chief Executive Offi \nModernElectric Inc. \n43 Dore Street \nSan Francisco, CALIFORNIA 94103 \nchino@modernelectric.co \n \nModesto Irrigation \nDistrict \nMartin Caballero \nModesto Irrigation District \nP.O. Box 4060 \nModesto, CALIFORNIA 95352 \nmartin.caballero@mid.org \nSean Neal \nAttorney \nDuncan, Weinberg, Genzer & Pembroke \nPC \n915 L Street \nSuite 1410 \nSacramento, CALIFORNIA 95814 \nsmn@dwgp.com \nPaige Punzalan \nDuncan Weinberg Genzer & Pembroke, \nPC \n915 L Street, Suite 1410 \nSACRAMENTO, CALIFORNIA 95814 \nplp@dwgp.com \nSalena R Garcia \nAdministrative Support Special \nDuncan Weinberg Genzer & Pembroke, \nPC \n915 L ST STE 1410 \nSACRAMENTO, CALIFORNIA 95814 \nsrg@dwgp.com \nMorongo Transmission \nLLC \nKris Salmon \nCFO \n12700 PUMARRA RD \nBANNING, CALIFORNIA 92220 \nksalmon@morongo-nsn.gov \nSteven Hunt \n1850 Parkway Place \nSuite 800 \nMarietta, GEORGIA 30067 \nsteven.hunt@gdsassociates.com \nNational Association of \nRegulatory Utility \nCommissioners \nKimberly Duffley \nSenior Dir. of Energy Policy a \nNational Association of Regulatory Utility \nCommissioners \n1101 Vermont Ave, NW \nSuite 200 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nkduffley@naruc.org \nJames Ramsay \nGeneral Counsel \n1101 Vermont Ave NW \nSuite 200 \nWashington, DISTRICT OF COLUMBIA \n20005 \njramsay@naruc.org"},{"page":32,"startToken":6928,"endToken":7038,"text":"- 21 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nNational Grid Plc \nAmber Thornhill \nDirector, FERC, ISO Relations \nNational Grid \n801 Pennsylvania Ave., N.W \nSuite 801 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nAmber.Thornhill@nationalgrid.com \n \nNATURAL GAS \nSUPPLY \nASSOCIATION \nPatricia Jagtiani \nExecutive Vice President \nNATURAL GAS SUPPLY \nASSOCIATION \n1620 I Street NW, Suite 700 \nWashington, DISTRICT OF COLUMBIA \n20006 \npjagtiani@ngsa.org \nCasey Gold \nRegulatory Coordinator \nNGSA \n1620 I Street NW \nSuite 700 \nWashington, DISTRICT OF COLUMBIA \n20006 \ncasey.gold@ngsa.org \nNatural Resources \nDefense Council \nHilary Firestone \nNatural Resources Defense Council \n1314 2ND ST \nSANTA MONICA, CALIFORNIA 90401 \nhfirestone@nrdc.org"},{"page":33,"startToken":7038,"endToken":7199,"text":"- 22 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nNorthern California \nPower Agency \nLisa Dowden \nSenior Counsel \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nLisa.Dowden@spiegelmcd.com \nJeffrey M. Bayne \nSpiegel & McDiarmid LLP \n1818 N Street, NW, 8th Floor \nWashington, DISTRICT OF COLUMBIA \n20036 \njeffrey.bayne@spiegelmcd.com \nAmanda C. Drennen \nAttorney \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \namanda.drennen@spiegelmcd.com \nSamuel B. Whillans \nSpiegel & McDiarmid LLP \n1818 N ST NW \n8TH Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nsamuel.whillans@spiegelmcd.com \nE Service \nSpiegel & McDiarmid LLP \n1818 N Street NW \n8th Floor \nWashington, DISTRICT OF COLUMBIA \n20036 \neservice@spiegelmcd.com \nTony Zimmer \nGeneral Manager \nNorthern California Power Agency \n651 COMMERCE DR \nROSEVILLE, CALIFORNIA 95678 \ntony.zimmer@ncpa.com \nJane Luckhardt \nGeneral Counsel \nNorthern California Power Agency \n651 Commerce Drive \nRoseville, CALIFORNIA 95678 \njane.luckhardt@ncpa.com"},{"page":34,"startToken":7199,"endToken":7419,"text":"- 23 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nNRG Business \nMarketing LLC \nNeal Fitch \nSr. Director, Regulatory Affai \nNRG Energy, Inc. \n804 CARNEGIE CTR \nPRINCETON, NEW JERSEY 08540 \nneal.fitch@nrg.com \nCortney Slager \nVP & Assistant General Counsel \nNRG Companies \n804 Carnegie Center \nPrinceton, NEW JERSEY 08540 \ncortney.slager@nrg.com \nJennifer Hsia \nAssistant General Counsel \nNRG Energy \n804 Carnegie Center Dr. \nPrinceton, NEW JERSEY 08540 \nJennifer.Hsia@nrg.com \nBrianna Anderson \nRegulatory Counsel \nNRG Energy, Inc. \n804 CARNEGIE CTR \nPRINCETON, NEW JERSEY 08540 \nBRIANNA.ANDERSON@NRG.COM \n \nNVIDIA Corporation \nMario Loyola \nDirector of Government Affairs \nNVIDIA Corporation \n2788 SAN TOMAS EXPY \nSANTA CLARA, CALIFORNIA 95051 \nmloyola@nvidia.com \n \nOracle America, Inc. \nMadeline Fleisher \nOracle America, Inc. \n2300 Oracle Way \nAustin, TEXAS 78741 \nmadeline.fleisher@oracle.com \n \nPacific Gas and Electric \nCompany \nIgor Grinberg \nPrincipal Regulatory Analyst \n3301 CROW CANYON RD \nSAN RAMON, CALIFORNIA 94583 \nigor.grinberg@pge.com \nKeith T Sampson, ESQ \nSenior Counsel \nLaw Department \nPost Office Box 1018 \nOakland, CALIFORNIA 94604-1018 \nkeith.sampson@pge.com \nPattern Renewables 2 \nLP \nRobert Daileader \nNixon Peabody LLP \n799 9th Street NW \nSuite 500 \nWashington, DISTRICT OF COLUMBIA \n20001 \nrdaileader@nixonpeabody.com \nCameron Yourkowski \nDir., Regulatory & Market Affa \nPattern Energy Group Inc. \n1088 Sansome Street \nSAN FRANCISCO, CALIFORNIA \n94111 \ncameron.yourkowski@patternenergy.com"},{"page":35,"startToken":7419,"endToken":7608,"text":"- 24 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nPUBLIC CITIZEN, INC Tyson Slocum \nEnergy Program Director \nPUBLIC CITIZEN, INC \n215 PENNSYLVANIA AVE SE \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20003 \ntslocum@citizen.org \n \nQuantum HPC \nInfrastructure, LLC \nStephen Snyder \nAttorney \nWomble Bond Dickinson (US) LLP \n2001 K ST NW \nSUITE 400 SOUTH \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nsteve.snyder@wbd-us.com \n \nRowan Digital \nInfrastructure \n \nTyler Petersen \nRowan Digital Infrastructure \n1400 16TH ST STE 330 \nDENVER, COLORADO 80202 \ntpetersen@rowan.digital \nRWE Americas, LLC \nPaul Varnado \nAssistant General Counsel \nRWE Americas, LLC \n353 N. Clark Street \n30th Floor \nChicago, ILLINOIS 60614 \npaul.varnado@rwe.com \nTomas J Rodriguez \nCounsel II \nRWE Clean Energy, LLC \n353 N CLARK ST FL 30 \nCHICAGO, ILLINOIS 60654 \ntomas.rodriguez@rwe.com \nSan Diego Gas & \nElectric Company \nAdam Currey \n8315 CENTURY PARK CT BLDG 3 \nSAN DIEGO, CALIFORNIA 92123 \nacurrey@sdge.com \nRoss R Fulton \nSenior Counsel \n8330 Century Park Court \nSan Diego, CALIFORNIA 92123 \nrfulton@sdge.com \nSierra Club \nJonah Baskin \nSierra Club \n50 F ST NW FL 8 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \njonah.baskin@sierraclub.org"},{"page":36,"startToken":7608,"endToken":7778,"text":"- 25 - \nSix Cities CA \nMargaret McNaul \nAttorney \nThompson Coburn LLP \n1909 K Street, N.W. \nSuite 600 \nWashington, DISTRICT OF COLUMBIA \n20006 \nmmcnaul@thompsoncoburn.com \nRebecca L. Shelton \nAttorney \nThompson Coburn LLP \n1909 K Street NW \nSuite 600 \nWashington, DISTRICT OF COLUMBIA \n20006 \nrshelton@thompsoncoburn.com \nJenna E. Cliatt \nAttorney \nThompson Coburn LLP \n1909 K Street NW \nSuite 600 \nWashington, DISTRICT OF COLUMBIA \n20006 \njcliatt@thompsoncoburn.com \nCarrie A Thompson \nPrincipal Integrated Resources \nCity of Anaheim, California \n201 S ANAHEIM BLVD STE 802 \nANAHEIM, CALIFORNIA 92805 \ncathompson@anaheim.net \nNicholas T Burki \nIntegrated Resources Planner I \nANAHEIM PUBLIC UTILITIES \n201 S. Anaheim Blvd. \nSuite 802 \nAnaheim, CALIFORNIA 92805 \nNburki@anaheim.net \nRichard Torres \n729 N. Azusa Avenue \nAzusa, CALIFORNIA 91702 \nrtorres@azusaca.gov \nJim Steffens \nCity of Banning, California \n176 East Lincoln \nBANNING, CALIFORNIA 92220 \njsteffens@banningca.gov \nKinda Salloum \n650 N. La Cadena Blvd \nColton, CALIFORNIA 92324 \nksalloum@coltonca.gov \nKelly Nguyen \nCity of Pasadena Water and Power \nDepartme \n100 N. Garfield Avenue \nPASADENA, CALIFORNIA 91101 \nkellynguyen@cityofpasadena.net"},{"page":37,"startToken":7778,"endToken":7902,"text":"- 26 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nSusan Wilson \nAssistant City Attorney \nCity of Riverside, California \n3901 ORANGE ST \nRIVERSIDE, CALIFORNIA 92501 \nswilson@riversideca.gov \nScott Lesch \n3901 Orange Street \nRiverside, CALIFORNIA 92501 \nslesch@riversideca.gov \nCindi Cohen \nCITY OF RIVERSIDE PUBLIC UTIL \nDEPT \n3901 Orange Street \nRiverside, CALIFORNIA 92501 \nccohen@riversideca.gov \nSolar Energy Industries \nAssociation \nMelissa Alfano \nManager of Regulatory Affairs \nSolar Energy Industries Association \n1425 K Street, N.W., Suite 1000 \nWashington, DISTRICT OF COLUMBIA \n20005 \nmalfano@seia.org \n \nSouthern California \nEdison Company \nFERC Case Administration \n2244 WALNUT GROVE AVE \nROSEMEAD, CALIFORNIA 91770 \nferccaseadmin@sce.com \nAndrea Tozer \nDirector and Managing Attorney \nPO Box 800 \nRosemead, CALIFORNIA 91770 \nAndrea.Tozer@sce.com"},{"page":38,"startToken":7902,"endToken":8078,"text":"- 27 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nSouthwest Public Power \nAgency, Inc. \nStephen Pearson \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nsteve.pearson@spiegelmcd.com \nLisa Dowden \nSenior Counsel \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nLisa.Dowden@spiegelmcd.com \nLauren L. Springett \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nlauren.springett@spiegelmcd.com \nE Service \nSpiegel & McDiarmid LLP \n1818 N Street NW \n8th Floor \nWashington, DISTRICT OF COLUMBIA \n20036 \neservice@spiegelmcd.com \nFrank A McRae \nGeneral Manager \nSouthwest Public Power Agency (SPPA) \n160 N PASADENA STE 101 \nMESA, ARIZONA 85201 \ngeneralmanager@sppa.biz \nDennis L Delaney \nINDIVIDUAL \n160 North Pasadena \nMesa, ARIZONA 85201 \ndld@krsaline.com \nStartrans IO, L.L.C. \nEdwin Kichline \n700 6TH ST NW STE 700 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nedwinkichline@eversheds-sutherland.com \nJoseph C. Hall, ESQ \n700 Sixth Street, NW \nSte. 700 \nWashington, DISTRICT OF COLUMBIA \n20001 \njoehall@eversheds-sutherland.com"},{"page":39,"startToken":8078,"endToken":8292,"text":"- 28 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nState Water Contractors \nJonathan Young \n1121 L ST STE 1050 \nSACRAMENTO, CALIFORNIA 95814 \njyoung@swc.org \nBhaveeta Mody \nDuncan, Weinberg, Genzer & Pembroke \nPC \n1667 K Street, N.W. \nSuite 700 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nbkm@dwgp.com \nSean Neal \nAttorney \nDuncan, Weinberg, Genzer & Pembroke \nPC \n915 L Street \nSuite 1410 \nSacramento, CALIFORNIA 95814 \nsmn@dwgp.com \nSylwia Dakowicz \nDuncan Weinberg Genzer & Pembroke, \nPC \n915 L Street \nSuite 1410 \nSacramento, CALIFORNIA 95814 \nsd@dwgp.com \nKimberly Letran \nLegal Assistant \nDuncan Weinberg Genzer & Pembroke, \nPC \n1667 K ST NW STE 700 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nkml@dwgp.com \nStream U.S. Data \nCenters, L.L.C. \nKent Watson \n2001 ROSS AVE \nDALLAS, TEXAS 75201 \nkwatson@stream-dc.com \n \nSunZia Transmission, \nLLC \nRobert Daileader \nNixon Peabody LLP \n799 9th Street NW \nSuite 500 \nWashington, DISTRICT OF COLUMBIA \n20001 \nrdaileader@nixonpeabody.com \nAngela Leon \nManager, Regulatory Compliance \n1088 Sansome Street \nSan Francisco, CALIFORNIA 94111 \nRegulatory@patternenergy.com \nSunZia Wind North \nLLC \nRobert Daileader \nNixon Peabody LLP \n799 9th Street NW \nSuite 500 \nWashington, DISTRICT OF COLUMBIA \n20001 \nrdaileader@nixonpeabody.com \nCameron Yourkowski \nDir., Regulatory & Market Affa \nPattern Energy Group Inc. \n1088 Sansome Street \nSAN FRANCISCO, CALIFORNIA \n94111 \ncameron.yourkowski@patternenergy.com"},{"page":40,"startToken":8292,"endToken":8411,"text":"- 29 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nSunZia Wind South \nLLC \nRobert Daileader \nNixon Peabody LLP \n799 9th Street NW \nSuite 500 \nWashington, DISTRICT OF COLUMBIA \n20001 \nrdaileader@nixonpeabody.com \nCameron Yourkowski \nDir., Regulatory & Market Affa \nPattern Energy Group Inc. \n1088 Sansome Street \nSAN FRANCISCO, CALIFORNIA \n94111 \ncameron.yourkowski@patternenergy.com \nSustainable FERC \nProject \nKelsie Gomanie \nNRDC/FERC Project \n1300 MONROE ST APT 202 \nDENVER, COLORADO 80206 \nkgomanie@nrdc.org \n \nTrans Bay Cable LLC \nWilliam Lavarco \nSenior FERC Counsel \n801 Pennsylvania Ave., NW \nSuite 220 \nWashington, DISTRICT OF COLUMBIA \n20004 \nwilliam.lavarco@nee.com \nLenneal Gardner \nRegulatory and Business Manage \nPO BOX 666 \nPITTSBURG, CALIFORNIA 94565 \nlenneal.gardner@transbaycable.com"},{"page":41,"startToken":8411,"endToken":8625,"text":"- 30 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nTransmission Agency of \nNorthern California \nMichael Postar \nAttorney \nDuncan, Weinberg, Genzer & Pembroke \nPC \n1667 K Street, NW \nSuite 700 \nWashington, DISTRICT OF COLUMBIA \n20006 \nmrp@dwgp.com \nBhaveeta Mody \nDuncan, Weinberg, Genzer & Pembroke \nPC \n1667 K Street, N.W. \nSuite 700 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nbkm@dwgp.com \nSylwia Dakowicz \nDuncan Weinberg Genzer & Pembroke, \nPC \n915 L Street \nSuite 1410 \nSacramento, CALIFORNIA 95814 \nsd@dwgp.com \nNina Wu \nDuncan, Weinberg, Genzer & Pembroke, \nP.C. \n1667 K Street, NW \nSuite 700 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nnzw@dwgp.com \nJulie L Smith \nLegal Assistant \nDuncan, Weinberg, Genzer & Pembroke, \nP.C. \n1667 K Street, N.W., Suite 700 \nWashington, DISTRICT OF COLUMBIA \n20006 \nJLS@dwgp.com \nValley Electric \nAssociation, Inc. \nGabriel De Guzman \nPO Box 237 \nPahrump, NEVADA 89041 \ngdeguzman@vea.coop \nStephan Brad Van Cleve \n2321 Fairview Avenue East, #3 \nSeattle, WASHINGTON 98102 \nMultnomah \nbvc@dvclaw.com \nVerrus LLC \nGabriel Tabak \nHead of Energy Policy \nVerrus LLC \n918 N RENGSTORFF AVE \nMOUNTAIN VIEW, CALIFORNIA \n94043 \ngabe@verrusdata.com \n \nViridon Path 15 LLC \nChad Newhouse \n208 E EUCLID AVE \nPROSPECT HEIGHTS, ILLINOIS 60070 \nchad@viridon.com \nVeronica Gomez \n208 E EUCLID AVE \nPROSPECT HEIGHTS, ILLINOIS 60070 \nveronica@viridon.com"},{"page":42,"startToken":8625,"endToken":8848,"text":"- 31 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nVistra Corp. \nJ. Arnold Quinn \nINDIVIDUAL \n325 7th Street, N.W \nSuite 520 \nWashington, DISTRICT OF COLUMBIA \n20004 \narnie.quinn@vistracorp.com \nAndrew Weinstein \nDirector of ISO-NE Markets \nVistra Corp. \n325 7th Street, NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nandrew.weinstein@vistracorp.com \nNicholas Gladd \nWilson Sonsini Goodrich & Rosati, P.C. \n201 Washington St. \nSuite 2000 \nBoston, MASSACHUSETTS 02108 \nngladd@wsgr.com \nSarah Greenberg \nWilson Sonsini Goodrich & Rosati \n1700 K ST NW FL 5 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 200 \nsgreenberg@wsgr.com \nRachel Neuburger \nWilson Sonsini Goodrich & Rosati \n1700 K ST NW FL 5 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 200 \nrneuburger@wsgr.com \nVoltus, Inc. \nKimaya Abreu \nVoltus \nVoltus, Inc. \n2443 Fillmore Street \n#380-3427 \nSan Francisco, CALIFORNIA 94115 \nkabreu@voltus.co \n \nWATT Coalition \nJulia Selker \nGrid Strategies LLC \nWATT Coalition \n9207 KIRKDALE RD \nBETHESDA, MARYLAND 20817 \njselker@gridstrategiesllc.com \n \nWestern Area Power \nAdministration \nSteven Sanders \nStrategic Electric Industry \nUpper Great Plains Region \n2900 4th Ave North, Room 600 \nBillings, MONTANA 59101-5800 \nsanders@wapa.gov \nEvan B. Bekkedahl \nAttorney \nOffice of General Counsel \n12155 W. Alameda Parkway \nLakewood, COLORADO 80228 \nbekkedahl@wapa.gov \nWilliams Companies, \nThe \nDanielle Bertoldi \nDirector, Government Affairs \nWilliams Companies, The \n555 13TH ST NW STE 440W \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \ndanielle.bertoldi@williams.com"},{"page":43,"startToken":8848,"endToken":8902,"text":"- 32 - \nParty \nPrimary Person or Counsel of Record \nto be Served \nOther Contact to be Served \nWIRES \nLarry Gasteiger \nExecutive Director \n529 14TH ST NW STE 1280 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20045 \nlgasteiger@exec.wiresgroup.com \nPauline Foley \nContractor \nWIRES \n529 14TH ST NW STE 1280 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20045 \npfoley@wiresgroup.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":747,"startToken":0,"endToken":558},{"p":3,"at":747,"title":"I. COMMUNICATIONS","method":"printed heading","endPage":4,"endAt":196,"startToken":558,"endToken":668},{"p":4,"at":196,"title":"II. DESCRIPTION OF VEA","method":"printed heading","endPage":4,"endAt":1322,"startToken":668,"endToken":847},{"p":4,"at":1322,"title":"III. BACKGROUND","method":"printed heading","endPage":6,"endAt":7,"startToken":847,"endToken":1286},{"p":6,"at":7,"title":"IV. JUSTIFICATION FOR RESCISSION","method":"printed heading","endPage":6,"endAt":42,"startToken":1286,"endToken":1290},{"p":6,"at":42,"title":"A. VEA Is Exempt From the Commission’s Jurisdiction Under FPA Section 201(f)","method":"printed heading","endPage":6,"endAt":1265,"startToken":1290,"endToken":1494},{"p":6,"at":1265,"title":"B. VEA Will Continue to Coordinate with the CAISO and Remains Subject to the","method":"printed heading","endPage":7,"endAt":1134,"startToken":1494,"endToken":1822},{"p":7,"at":1134,"title":"C. VEA’s Participation in the Joint PTOs’ Request for Abeyance Does Not Alter Its","method":"printed heading","endPage":9,"endAt":7,"startToken":1822,"endToken":2244},{"p":9,"at":7,"title":"D. Large Loads in VEA’s Territory Would Interconnect to GLW’s 230 kV System,","method":"printed heading","endPage":9,"endAt":1105,"startToken":2244,"endToken":2423},{"p":9,"at":1105,"title":"V. CONDITIONAL REQUEST FOR EXTENSION OF TIME AND WAIVER OF","method":"printed heading","endPage":11,"endAt":8,"startToken":2423,"endToken":2843},{"p":11,"at":8,"title":"VI. CONCLUSION","method":"printed heading","endPage":12,"endAt":9,"startToken":2843,"endToken":2945},{"p":12,"at":9,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":16,"endAt":445,"startToken":2945,"endToken":3712},{"p":16,"at":445,"title":"C. Anthony Braun","method":"printed heading","endPage":18,"endAt":615,"startToken":3712,"endToken":4136},{"p":18,"at":615,"title":"C. Anthony Braun","method":"printed heading","endPage":43,"endAt":357,"startToken":4136,"endToken":8902}]}