{"document":{"slug":"rec-20250219-4002","title":"Comments of U.S. Senator Chris Van Hollen et al. urging the Commission to host a technical conference to provide recommendations and to address resource…","issued":"2025-02-19","accession":"20250219-4002","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"US SENATOR","kind":"comments","file":"sources/filings/text/20250219-4002_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250219-4002","tier":"record","sha256":"ef8fb56b0e6925b0ada2687695d9a18c00c6f36e2d8ffb82d550643d54f5910c","pages":2,"tokens":698,"emptyPages":[],"textThemes":["adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":459,"text":"February 14, 2025\nThe Honorable Mark Christie, Chairman\nThe Honorable Willie L. Phillips, Commissioner\nThe Honorable David Rosner, Commissioner \nThe Honorable Lindsay See, Commissioner \nThe Honorable Judy Chang, Commissioner\nFederal Energy Regulatory Commission \n888 First Street, NE Washington, DC 20426 \nDear Chairman Christie and Commissioners Phillips, Rosner, See, and Chang:\nData centers are fueling a rapid increase in electricity demand in the United States; by \n2028, data centers will account for up to 12% of national electricity consumption, up from 4.4% \nin 2023.1 While the development of critical data center assets and next generation technologies, \nsuch as artificial intelligence, provides significant economic and national security benefits for the\ncountry, we believe that state and federal policies must also ensure the reliable, affordable, and \nclean delivery of electricity during this time of growing demand. Innovative, durable solutions \nare needed to ensure that the data center boom does not result in unjust and unreasonable \nelectricity bills for ratepayers, disruptions to electric service, or increased pollution from fossil \nfuel power plants (both from delaying previously slated retirements of old, inefficient fossil \nplants, as well as the buildout of new gas plants). To explore such solutions, we request that the \nCommission host a technical conference to provide recommendations to ensure sufficient new \ngeneration becomes available to meet the need while maintaining just and reasonable rates and \nmeeting the mandates of state energy policies. Such a technical conference would build on the \ntechnical conference FERC hosted last year exploring large loads co-located at generating \nfacilities (Docket No. AD24-11), but would not be limited to the topic of colocation.\nGrid operators are hastily responding to the increasing demand for electricity by putting \nforth proposals such as PJM’s Reliability Resource Initiative (Docket No. ER25-712) and the \nMISO’s and SPP’s forthcoming Expedited Resource Adequacy Study proposals. These proposals\ndo not offer comprehensive or long-term fixes and may undermine market certainty. Indeed, in \nreference to the Reliability Resource Initiative and other recent PJM filings aimed at increasing \navailable capacity, the PJM Board of Managers stated that they “do not expect that these filings, \ntaken in aggregate, will fully resolve the resource adequacy challenge that we are facing.”2 Given\nthe importance of maintaining a reliable supply of electricity while simultaneously supporting \nburgeoning industries, we encourage the Commission to host a technical conference as an \nopportunity to bring together diverse stakeholders, foster interregional collaboration, build a \n1 “DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers.” Department \nof Energy. December 24, 2024. https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-\nelectricity-demand-data-centers \n2 PJM Board to Stakeholders, December 9, 2024. https://www.pjm.com/-/media/DotCom/about-pjm/who-\nwe-are/public-disclosures/2024/20241209-board-letter-outlining-action-on-capacity-market-adjustments-rri-and-\nsis.ashx \nBy The Federal Energy Regulatory Commission at 12:24 pm, Feb 18, 2025"},{"page":2,"startToken":459,"endToken":698,"text":"further record, and identify options for holistic and durable solutions to address the increase in \nelectricity demand from data centers and other large new loads.\nFurthermore, we urge the Commission to, as a part of this technical conference, consider \nthe range of policy options available to address resource adequacy challenges as part of a \ncomprehensive effort to ensure reliability and comply with state energy mandates. There are \nmany potential options to bring new capacity online in the near term, including leveraging \nsurplus interconnection service, using or establishing generator replacement processes, \nwinterizing the existing gas fleet, reforming storage interconnection, and expediting holistic \ntransmission planning, and insisting on full and prompt compliance with, and then building upon \nthe Commission’s reforms in FERC Order No. 2023, which required transmission providers to \nadopt comprehensive interconnection reforms to expedite queue processing and decrease \nbacklogs.3 The Commission should give careful consideration to proposed changes to regional \ninterconnection processes in a technical conference to ensure they do not interfere with that \ncritical rule, undermine open access, or derail projects currently in the interconnection queue that\nare needed for resource adequacy. \nThank you for your thoughtful attention to this important matter. \nSincerely,\nChris Van Hollen\nUnited States Senator\nCory A. Booker\nUnited States Senator\nMark Kelly\nUnited States Senator\nTim Kaine\nUnited States Senator\n3 Protest of Sierra Club and Appalachian Voices under ER25-712. January 8, 2025. \nhttps://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250108-5184"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 2","method":"page range","endPage":2,"endAt":1690,"startToken":0,"endToken":698}]}