{"document":{"slug":"rec-20250324-5183","title":"Answer of NextEra Energy Transmission MidAtlantic, Inc. to the Order Instituting Proceeding Under Section 206 of the Federal Power Act and Consolidating…","issued":"2025-03-24","accession":"20250324-5183","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"NextEra Energy Transmission MidAtlantic, Inc.","kind":"answer","file":"sources/filings/text/20250324-5183_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5183","tier":"record","sha256":"2351fd8ad28327411e287cd52ffae9c05934339ee5b71d8a14d34f32da3c62b8","pages":6,"tokens":1425,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":189,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. AEP \nKentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. Appalachian \nPower Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nDocket Nos. \nEL25-49-000"},{"page":2,"startToken":189,"endToken":529,"text":"2 \n \nCity of Cleveland, Department of Public Utilities, Division \nof Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \n \nLarge Loads Co-Located at Generating Facilities  \n \n \nConstellation Energy Generation, LLC \n \nv.  \n \nPJM Interconnection, L.L.C. \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nAD24-11-000 \n \n \nEL25-20-000 \n(Consolidated) \n \n \n \n \n \nANSWER OF NEXTERA ENERGY TRANSMISSION MIDATLANTIC, INC. TO THE \nORDER INSTITUTING PROCEEDING UNDER SECTION 206 OF THE FEDERAL \nPOWER ACT AND CONSOLIDATING WITH OTHER PROCEEDINGS \n \nPursuant to Rule 2131 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (“Commission”), NextEra Energy Transmission MidAtlantic, Inc. \n(“NEET MidAtlantic”) hereby submits this answer (“Answer”) to the Commission Order \nInstituting Proceeding Under Section 206 of the Federal Power Act (“FPA”) and Consolidating \nwith Other Proceedings (“Show Cause Order”) directing PJM Interconnection, L.L.C. (“PJM”) \nand PJM Transmission Owners (collectively, “TOs,” and individually, each a “TO”) to either:  \n(1) show why the existing PJM Open Access Transmission Tariff, the PJM Amended and \nRestated Operating Agreement, and the Reliability and Assurance Agreement Among Load \nServing Entities in PJM (“Tariff”) remains just and reasonable and not unduly discriminatory or \npreferential without provisions addressing with sufficient clarity or consistency the rates, terms, \nand conditions of service that apply to co-located load arrangements; or (2) explain what changes \nto the Tariff would remedy the identified concerns if the Commission were to determine that the \nTariff has become unjust and unreasonable or unduly discriminatory or preferential and, \ntherefore, proceeds to establish a replacement Tariff.2  Specifically, NEET MidAtlantic submits \nthis Answer to show why NEET MidAtlantic presently takes no position on the issue of whether \nthe PJM Tariff is just and reasonable and not unduly discriminatory or preferential as it relates to \nprovisions addressing with sufficient clarity or consistency the rates, terms, and conditions of \n \n1 18 C.F.R. §§ 385.213 (2024).   \n2 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115, at PP 2, 87 (2025)."},{"page":3,"startToken":529,"endToken":895,"text":"3 \n \nservice that apply to co-location arrangements in the FPA section 206 proceeding instituted in the \nabove-captioned dockets.   \n \nI. \nCOMMUNICATIONS \n \nCommunications regarding this Answer should be addressed to the following individuals: \n \nEvan Yager \nPresident \nNextEra Energy Transmission MidAtlantic, \nInc. \n700 Universe Blvd \nJuno Beach, FL 33408 \n(607) 221-8223 \nevan.yager@nexteraenergy.com \nElizabeth Ramey \nSenior Attorney \nNextEra Energy, Inc. \n801 Pennsylvania Avenue NW, Suite 220 \nWashington, DC 20004 \n(202) 909-5696 \nelizabeth.ramey@nexteraenergy.com  \n \nII. \nBACKGROUND \n \nNEET MidAtlantic was formed on July 8, 2015, as a Delaware limited liability company \nunder the name NextEra Energy Transmission MidAtlantic, LLC.3  NEET MidAtlantic is a \nwholly owned subsidiary of NextEra Energy Transmission Holdings, LLC, and an indirect, \nwholly owned subsidiary of NextEra Energy Transmission, LLC.   \n \n \nNEET MidAtlantic was formed to develop, construct, finance, own, operate, and \nmaintain high-voltage electric transmission facilities within the PJM region.  On October 29, \n2020, NEET MidAtlantic acquired certain limited transmission facilities, consisting of \napproximately 40 circuit miles (or approximately 20 line miles) of 345 kV electric power \ntransmission lines and related power line poles from Commonwealth Edison Company of \nIndiana, Inc.4  NEET MidAtlantic Indiana and PJM subsequently made an FPA section 205 filing \nto incorporate NEET MidAtlantic Indiana’s formula rate into the PJM Tariff as Attachment H-\n \n3 NEET MidAtlantic Indiana converted to an Illinois corporation on September 14, 2018.  Subsequently, on \nDecember 18, 2019, NEET MidAtlantic Indiana, which is domesticated in Indiana, changed its name to NextEra \nEnergy Transmission MidAtlantic Indiana, Inc.  On March 13, 2024, NEET MidAtlantic Indiana, Inc. submitted \nrevised tariff records and a notice of succession to change its name from NEET MidAtlantic Indiana to NextEra \nEnergy MidAtlantic, Inc.  See NextEra Energy Transmission MidAtlantic Indiana, Inc., Docket No. ER24-1471-000 \n(Apr. 12, 2024) (delegated letter order).   \n4 No prior approval by the Commission under FPA section 203 was necessary for this transaction because \nthe market value of these transmission assets was less than $1 million.  The transaction was, however, subject to \nregulatory approval of the Indiana Utility Regulatory Commission.  Verified Joint Petition of Commonwealth Edison \nCompany of Indiana, Inc., NextEra Energy Transmission MidAtlantic Indiana, Inc., and Commonwealth Edison \nCompany, Cause No. 45335 (Ind. U.R.C. Jan. 24, 2020)."},{"page":4,"startToken":895,"endToken":1268,"text":"4 \n \n33A and H-33B and to establish NEET MidAtlantic Indiana as a PJM TO.5  To date, NEET \nMidAtlantic does not own substantial transmission in PJM.6   \n \nIII. \nANSWER \n \nAs detailed in the Background section, NEET MidAtlantic currently owns a limited \nsegment of transmission facilities within the PJM region, comprising only approximately 40 \ncircuit miles (20 line miles) of 345 kV electric power transmission lines and related \ninfrastructure.  NEET MidAtlantic does not serve retail load, nor does it presently have any \noperational or planned co-located load arrangements within PJM that would necessitate revisions \nto or clarifications within the PJM Tariff. \n \nThe Commission’s Show Cause Order specifically seeks explanations from PJM and the \nPJM TOs regarding the adequacy, clarity, consistency, and justness and reasonableness of \nprovisions within the PJM Tariff addressing co-located load arrangements.  These provisions \ninherently pertain to TOs or market participants directly involved in or contemplating co-located \nload configurations.  Given NEET MidAtlantic neither currently participates in nor plans to \nestablish such arrangements, the tariff provisions under scrutiny do not apply to its transmission \nfacilities or operations. \n \nConsequently, any substantive commentary or proposed modifications by NEET \nMidAtlantic on the Tariff provisions concerning co-located load arrangements would not \nmeaningfully assist the Commission in addressing the specific issues identified in the Show \nCause Order.7   \n \nAccordingly, NEET MidAtlantic takes no position on the issue of whether the PJM Tariff \nis just and reasonable and not unduly discriminatory or preferential as it relates to provisions \naddressing with sufficient clarity or consistency the rates, terms, and conditions of service that \napply to co-location arrangements.   \n \n \n \n \n \n \n \n \n \n \n5 See PJM Interconnection, L.L.C., 173 FERC ¶ 61,033 (2020) (accepting NEET MidAtlantic Indiana’s \nformula rate and revisions to the PJM Consolidated Transmission Owners Agreement, effective October 29, 2020).   \n6 NEET MidAtlantic is a Designated Entity pursuant to section 1.5.8(a) of the PJM Operating Agreement, \nand it was recently selected to construct the MidAtlantic Resiliency Link Project.  See Amended and Restated \nOperating Agreement of PJM Interconnection, L.L.C., Schedule 6, Section 1.5.8(a).   \n7 While NEET MidAtlantic does not take an official position on these issues, NEET MidAtlantic does not \npurport to speak on behalf of any NextEra Energy, Inc. affiliates in the PJM region."},{"page":5,"startToken":1268,"endToken":1343,"text":"5 \n \nIV. \nCONCLUSION \n \nFor the foregoing reasons, NEET MidAtlantic respectfully requests that the Commission \naccept this Answer as NEET MidAtlantic’s formal response to the Show Cause Order and the \nquestions directed to PJM and PJM TOs therein.   \n \n \n \nRespectfully submitted, \n \n \n/s/ Elizabeth Ramey \n \n \n \n \n \nElizabeth Ramey \n \nSenior Attorney \n \nNextEra Energy, Inc. \n \n801 Pennsylvania Avenue NW, Suite 220 \n \nWashington, DC 20004 \n \n(202) 909-5696 \n \nelizabeth.ramey@nexteraenergy.com \n \nCounsel for NextEra Energy Transmission \nMidAtlantic, Inc. \n \nDated:  March 24, 2025"},{"page":6,"startToken":1343,"endToken":1425,"text":"CERTIFICATE OF SERVICE \nPursuant to Rule 210 of the Commission’s Rules of Practice and Procedure, I hereby \ncertify that I, on this day, have served the foregoing document upon each person designated on \nthe official service lists compiled by the Secretary of the Commission in these proceedings.   \nDated at Washington, DC, this 24th day of March 2025.  \n/s/ Elizabeth Ramey \nElizabeth Ramey \nSenior Attorney \nNextEra Energy, Inc. \n801 Pennsylvania Avenue NW, Suite 220 \nWashington, DC 20004 \n(202) 909-5696\nelizabeth.ramey@nexteraenergy.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":135,"startToken":0,"endToken":547},{"p":3,"at":135,"title":"I. COMMUNICATIONS","method":"printed heading","endPage":3,"endAt":576,"startToken":547,"endToken":603},{"p":3,"at":576,"title":"II. BACKGROUND","method":"printed heading","endPage":4,"endAt":155,"startToken":603,"endToken":922},{"p":4,"at":155,"title":"III. ANSWER","method":"printed heading","endPage":5,"endAt":5,"startToken":922,"endToken":1269},{"p":5,"at":5,"title":"IV. CONCLUSION","method":"printed heading","endPage":6,"endAt":0,"startToken":1269,"endToken":1343},{"p":6,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":6,"endAt":542,"startToken":1343,"endToken":1425}]}