{"document":{"slug":"rec-20250324-5313-2","title":"Exhibit A","issued":"2025-03-24","accession":"20250324-5313","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/filings/text/20250324-5313_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5313","tier":"record","parent":"rec-20250324-5313","sha256":"4d31bbdebe5ec0f3b3945f888af4094b452fb2b74b9ebeaae57a96967cc18870","pages":3,"tokens":1666,"emptyPages":[],"textThemes":["study","colo","cost","flex"]},"pages":[{"page":1,"startToken":0,"endToken":8,"text":"Exhibit A \n \n \n \nOptions for Service to Large Loads"},{"page":2,"startToken":8,"endToken":594,"text":"PJM Identified Options – Exhibit A \nExisting Option 1 \nExisting Option 2 \nExisting Option 3 \n*note:  each option is subject to state laws \nthat may specifically define and limit when \nand how load in a jurisdiction can be \nserved by a supplier other than a \nfranchised public utility \nLoad with a separate Point of Interconnection (POI) that \nis Network Load  \n(Existing NITS rules) \nCo-located load that is at the same Point of \nInterconnection (POI) but separately metered that is \nNetwork Load  \n(Existing NITS rules) \nExisting Behind The Meter Generation (BTMG) where the \nload is the customer \nDescription \nThis option is where the load is network load and generation \nis a capacity resource and they are not electrically co-located. \nThe load and generation may be physically located at the \nsame location but they are electrically connected to the grid \nseparately. \nThis option is where the load is network load and generation \nis a capacity resource and they are metered separately \nThis option reflects PJM's existing BTMG rules where the \nload is primary customer and nets with BTMG. \nReliability consideration:  Existing Non-Retail BTMG is \nannually capped because it does not carry reserves equal to \nthe installed reserve margin (net is zero during coincident \npeak). \nLarge load behind generation was not intended. \nPJM Preference \nYes - Highest Reliability \nYes - Highest Reliability \nNot for Large Loads \nLoad Status \nNetwork \nNetwork \nNetwork \nGeneration Capacity Status \nYes \nYes \nNo \nPJM obligation to serve \nYes \nYes \nYes \nLoad System Used and Charged NITS (Full load during coincident peak); Energy; Capacity \n(Full load during coincident peak) \nNITS (Full load during coincident peak); Energy; Capacity \n(Full load during coincident peak) \nNITS (Net withdrawal during coincident peak); Energy (Net \nwithdrawal); Capacity (Net withdrawal during coincident peak) \nAncillary Services Used \nReactive, Black Start, Regulation, Sync, Non Sync, Day-\nahead Scheduling Reserves \nReactive, Black Start, Regulation, Sync, Non Sync, Day-\nahead Scheduling Reserves \nReactive, Black Start, Regulation, Sync, Non Sync, Day-\nahead Scheduling Reserves \nAncillary Services Charged \nReactive, Black Start, Regulation, Sync, Non Sync, Day-\nahead Scheduling Reserves (based on entire load) \nReactive, Black Start, Regulation, Sync, Non Sync, Day-\nahead Scheduling Reserves (based on entire load) \nReactive, Black Start, Regulation, Sync, Non Sync, Day-\nahead Scheduling Reserves (Net withdrawal) \nGeneration Revenue  \n• Capacity (based on full CIRs) \n• Energy and Ancillary Services (based on entire gen output) \n• Capacity (based on full CIRs) \n• Energy and Ancillary Services (based on entire gen output) • Capacity (For portion of CIRs retained) \n• Energy and Ancillary Services (net injection only) \nStudies \n• TO Load Integration study \n•PJM Do No Harm study \n•RTEP process inclusive of Load Forecast  \n• TO Load Integration study \n•PJM Do No Harm study \n•RTEP process inclusive of Load Forecast \n•Necessary Study \n• TO Load Integration study \n•PJM Do No Harm study \n•RTEP process inclusive of Load Forecast \n•Necessary Study \nIncluded in Load Forecast \n(RTEP) \nYes \nYes \nOnly if Net Withdrawal >0 during coincident peak \nIncluded in RPM Reliability \nRequirement \nYes \nYes \nOnly if Net Withdrawal >0 during coincident peak \nCost Allocation for \nInterconnection Upgrades \n• Supplemental projects pursuant to local TO methodology \n• RTEP upgrades pursuant to RTEP cost allocation \n• No modification to generation. \n• Supplemental projects pursuant to local TO methodology \n• RTEP upgrades pursuant ot RTEP cost allocation \n• Generator for the changes to its facility to accommodate the \nload \n• Supplemental projects pursuant to local TO methodology \n• RTEP upgrades pursuant ot RTEP cost allocation \n• Generator for the changes to its facility to accommodate the \nload \nSystem Protection \nRequirements \nN/A \nN/A \nN/A \nDemand Response Eligibility \nYes \nYes \nYes if net positive load \nTariff Modifications \nNo \nNo \nNo"},{"page":3,"startToken":594,"endToken":1666,"text":"PJM Identified Options – \nExhibit A \nNew Option 4 \nNew Option 5 \nNew Option 6 \nNew Option 7 \nNew Option 8 \n*note:  each option is subject to state \nlaws that may specifically define and \nlimit when and how load in a \njurisdiction can be served by a supplier \nother than a franchised public utility \nCo-located load with connection to \ngrid with protections to avoid \ndelivery of system energy to serve \nthe load \nCo-located load with connection to \ngrid with protections to avoid \ndelivery of system energy to serve \nthe load or receive back-up service \nfrom PJM with permission \nCo-located load that elects to be \nNetwork Load and bring own \ngeneration \nBYOG \nCo-located load that takes \nInterruptible Service \n(Load willing to curtail in advance \nof Emergency Procedures) \nCo-located Load  that elects to be \nNetwork Load  and that participates \nas Demand Response  \nDescription \nThis option is when the load is located \nbehind the generation and there are \nprotection mechanisms in place to \nprevent delivery of energy from the grid \nto serve the load in the event the \ngeneration is offline. \nThis option is when the load is located \nbehind the generation and there is \nprotection mechanisms in place to \nprevent delivery of energy from the grid \nto serve the load in the event the \ngeneration is offline. It also allows for \nback-up service from the PJM system \nwith permission. \nThis option provides an opportunity for to \nbring your own generation with the \nincentive for faster interconnection when \nthe load is Network Load \nThis option provides an opportunity for \nlarge load to integrate as a non-capacity \nbacked load where it avoids capacity \ncosts if willing to curtail to support \nreliability in advance of emergency \nconditions.   \nThis existing option provides an \nopportunity for the load to be Network \nLoad and participate as a Demand \nResponse resource.  Options to operate \nback-up generation provides a \nmechanism to serve the co-located load \nwhen asked to curtail for DR. This option \nassume the co-located load and \ngeneration share the same POI. \n \nAdditional review of DR rules and \nopportunities for relaxation of federal and \nstate emission restrictions provide more \nincentives. \nPJM Preference \nLess preferred \nLess preferred \nYes - maintains Resource Adequacy \nYes - maintains Resource Adequacy \nYes - maintains Resource Adequacy \nLoad Status \nNot unless designated in a manner \nconsistent with state law \nNot unless designated in a manner \nconsistent with state law \nNetwork \nNetwork (advance curtailment) \nNetwork \nGeneration Capacity Status \nOnly for portion of Generation > Load \nOnly for portion of Generation > Load \nYes \nYes \nYes \nPJM obligation to serve \nNot unless designated in a manner \nconsistent with state law \nNot unless designated in a manner \nconsistent with state law \nYes \nYes but less priority \nYes \nLoad System Used and Charged \nIf not designated Network Load, \nassuming no withdrawal of energy during \ncoincident peak then no traditional NITS \ncharges. However, network is still used to \nsupport co-location and delivery of \nancillary services and should be part of a \nnew rate design. \nIf not designated Network Load, \nassuming no withdrawal of energy during \ncoincident peak then no traditional NITS \ncharges. However, network is still used to \nsupport co-location and delivery of \nancillary services and should be part of a \nnew rate design \nNITS (Full load during coincident peak); \nEnergy; Capacity (Full load during \ncoincident peak) \nNITS (Full load during coincident peak); \nEnergy, Capacity (only for portion that is \nnot non-capacity backed)  \nNITS (Full load during coincident peak); \nEnergy; Capacity (Full load during \ncoincident peak) \nAncillary Services Used \nReactive, Black Start, Regulation, Sync, \nNon Sync, Day-ahead Scheduling \nReserves \nReactive, Black Start, Regulation, Sync, \nNon Sync, Day-ahead Scheduling \nReserves \nReactive, Black Start, Regulation, Sync, \nNon Sync, Day-ahead Scheduling \nReserves \nReactive, Black Start, Regulation, Sync, \nNon Sync, Day-ahead Scheduling \nReserves \nReactive, Black Start, Regulation, Sync, \nNon Sync, Day-ahead Scheduling \nReserves \nAncillary Services Charged \nReactive, Black Start, Regulation, Sync, \nNon Sync, Day-ahead Scheduling \nReserves (based on entire load) \nReactive, Black Start, Regulation, Sync, \nNon Sync, Day-ahead Scheduling \nReserves (based on entire load) \nReactive, Black Start, Regulation, Sync, \nNon Sync, Day-ahead Scheduling \nReserves (based on entire load) \nReactive, Black Start, Regulation, Sync, \nNon Sync, Day-ahead Scheduling \nReserves (based on entire load) \nReactive, Black Start, Regulation, Sync, \nNon Sync, Day-ahead Scheduling \nReserves (based on entire load) \nGeneration Revenue  \n• Capacity (For portion of CIRs retained) \n• Energy and Ancillary Services if \ninjecting onto the PJM Grid \n• Capacity (For portion of CIRs retained) \n• Energy and Ancillary Services if \ninjecting onto the PJM Grid  \n• Capacity (based on full CIRs) \n• Energy and Ancillary Services (based \non entire gen output) \n• Capacity (based on full CIRs) \n• Energy and Ancillary Services (based \non entire gen output) \n• Demand Response Revenue \n• Capacity (based on full CIRs) \n• Energy and Ancillary Services (based \non entire gen output) \nStudies \nPJM Necessary Study, reduced \ngenerator CIRs studied in RTEP \nPJM Necessary Study, reduced \ngenerator CIRs studied in RTEP \n• TO Load Integration study \n•PJM Do No Harm study \n•RTEP process inclusive of Load \nForecast \n•Generator Interconnection Study  \n• TO Load Integration study \n•PJM Do No Harm study \n•RTEP process inclusive of Load \nForecast \n•Necessary Study \n• TO Load Integration study \n•PJM Do No Harm study \n•RTEP process inclusive of Load \nForecast \n•Necessary Study \nIncluded in Load Forecast (RTEP) \nNo for load; only retained CIRs are \nincluded in RTEP \n• Load - Only if Net Withdrawal >0 during \ncoincident peak. \n• Only CIRs retained included in RTEP. \nYes \nYes \nYes \nIncluded in RPM Reliability \nRequirement \nNo for load; only retained CIRs are \nincluded in RTEP \n• Load - Only if Net Withdrawal >0 during \ncoincident peak \n• Only CIRs retained included in RPM \nYes \n• No for non-capacity backed load \n• CIRs included in RPM \nYes \nCost Allocation for \nInterconnection Upgrades \nGenerator for the changes to its facility to \naccommodate the load. \nGenerator also responsible for any \nsystem upgrades to serve the load. \nGenerator for the changes to its facility to \naccommodate the load. \nGenerator also responsible for any \nsystem upgrades to serve the load. \n• Supplemental projects pursuant to local \nTO methodology \n• RTEP upgrades pursuant to RTEP cost \nallocation \n• Generator for the generator \ninterconnection \n• Supplemental projects pursuant to local \nTO methodology \n• RTEP upgrades pursuant ot RTEP cost \nallocation \n• Generator for the changes to its facility \nto accommodate the load \n• Supplemental projects pursuant to local \nTO methodology \n• RTEP upgrades pursuant ot RTEP cost \nallocation \n• Generator for the changes to its facility \nto accommodate the load \nSystem Protection Requirements \nYes \nYes and back-up unit required to take \nforced outage \nN/A \nN/A \nN/A \nDemand Response Eligibility \nNo \nNo \nYes \nNo \nYes \nTariff Modifications \nYes \nYes \nMaybe \nYes \nMaybe"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 3","method":"page range","endPage":3,"endAt":7277,"startToken":0,"endToken":1666}]}