{"document":{"slug":"rec-20250324-5313-3","title":"AD24-11 Stu Bresler Statement (Exh B)","issued":"2025-03-24","accession":"20250324-5313","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"attachment","file":"sources/filings/text/20250324-5313_003.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250324-5313","tier":"record","parent":"rec-20250324-5313","sha256":"5a89f96eb488a1219bd9741d89f7867cafc509decb32759b2ab2f1ce1bcef5db","pages":11,"tokens":4697,"emptyPages":[],"textThemes":["colo","study","adequacy","cost"]},"pages":[{"page":1,"startToken":0,"endToken":29,"text":"Exhibit B \n \n \n \nStatement of Frederick S. “Stu” Bresler \non Behalf of PJM Interconnection, L.L.C. \n \n \nFiled in the Co-Located Load Technical Conference \nDocket No. AD24-11-000 \nNovember 1, 2024"},{"page":2,"startToken":29,"endToken":50,"text":"For Public Use \nUNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \nCo-Located Load Technical Conference  \nDocket No. AD24-11-000 \nNovember 1, 2024"},{"page":3,"startToken":50,"endToken":537,"text":"Overview of Large Co-Located Load Issues, Docket No. AD24-11-000 \n \nPJM © 2024 \nhttps://www.pjm.com | For Public Use \n1 | P a g e  \nOverview of Large Co-Located Load Issues \nDocket No. AD24-11-000 \nStatement of Frederick S. “Stu” Bresler on Behalf of PJM Interconnection, L.L.C. \n \nI am pleased to present this statement on behalf of PJM Interconnection, L.L.C. (PJM).  This technical \nconference offers a specific case study that continues the Reliability Technical Conference’s discussion on managing \nreliability risks and challenges, and resource adequacy and expected load growth.1   \nAs Executive Vice President – Market Services and Strategy for PJM, I oversee all aspects of PJM’s market \nfunctions and corporate strategy.  My responsibilities cover all of the markets operated by PJM, including those for \nCapacity, Day-Ahead and Real-Time Energy, Ancillary Services, Financial Transmission Rights, and Demand \nResponse operations.  I am also responsible for the continued evolution of the PJM markets.  In addition, I am \nresponsible for establishing and maintaining PJM’s forward-looking strategic objectives and initiatives, and driving \ntheir progress across the organization.  I have worked at PJM since 1994, previously holding other leadership and \nmanagement positions within the Markets Division, as well as engineering positions in the Operations Division. \nI hold a bachelor’s degree in electrical engineering and a Master of Management degree, both from Penn \nState University.      \nIntroduction \nDevelopers have requested that PJM study nearly 8.5 GW of large loads to be co-located with existing \ngenerator interconnections.  Absent regulatory guidance to the contrary from the Commission or the states, it is \nreasonable to assume some amount of this load will appear on the system in the configurations proposed – although \nthe precise amount is uncertain.   \nPJM has been working with its stakeholders on co-located load issues since at least 2022,2 but those efforts \nhave resulted in no governing document revisions.  Given the impasse, PJM issued a guidance document3 that \nexplains processes and optionality for co-located load under PJM’s existing governing documents.  Under the \nexisting regulatory regime, PJM has been analyzing each proposed generator interconnection modification on a \ncase-by-case basis, informed by the necessary study process contemplated by the interconnection service \nagreement.4  Pursuant to this process, PJM has been filing for Commission review terms and conditions addressing \n                                                          \n1 Reliability Technical Conference, Second Supplemental Notice of Commissioner-Led Technical Conference on October 16, \n2024, Docket No. AD24-10-000 (Oct. 7, 2024). \n2 See Capacity Offer Opportunities for Generation with Co-Located Load (initiated January 12, 2022; completed August 9, 2023), \nmaterials available at:  https://www.pjm.com/committees-and-groups/issue-tracking/issue-tracking-details.aspx?Issue=6897c7e7-\nd8b7-438e-9e3f-b6099f9dd7ec.   \n3 PJM Guidance on Co-Located Load (posted Mar. 22, 2024; updated Apr. 17, 2024), available at:  https://www.pjm.com/-\n/media/markets-ops/rpm/rpm-auction-info/pjm-guidance-on-co-located-load.ashx.  \n4  Some are seeking clarity on the proper process parties should follow.  See Baltimore Gas & Elec. Co. & PECO Energy Co., \nPetition for Declaratory Order, Docket No. EL24-149-000, at page 15 (Sept. 30, 2024) (contending that the necessary study"},{"page":4,"startToken":537,"endToken":1079,"text":"Overview of Large Co-Located Load Issues, Docket No. AD24-11-000 \n \nPJM © 2024 \nhttps://www.pjm.com | For Public Use \n2 | P a g e  \nreliability concerns, novel legal issues, and/or other unique factors to the interconnection.  The procedural history in \nat least one pending docket raises questions about the efficiency and manageability of this approach going forward \ngiven the diversity of interests, electrical configurations, and federal and state regulatory constructs involved.5  The \nCommission should explore the development of a uniform approach to this issue that promotes certainty and clarity \nto entities interested in pursuing co-located load configurations and those entities potentially impacted by such \nconfigurations.        \nTo assist the Commission’s efforts in this regard, PJM continues to strategically approach co-located load \nby focusing on three primary domains:  resource adequacy, reliable system operations, and equitable alignment of \ntransmission system usage and compensation.  PJM reiterates its prior recommendation that large co-located loads \nshould be in front of the meter and designated as PJM Network Load.  Network Load status offers the most robust \nreliability benefits and holistic planning efficiencies, minimizes the need for one-off operational procedures (both \ninterim and longer term), and offers a cost allocation framework that assesses charges for use of and reliance on the \ntransmission system.   \nGiven impacts on wholesale electricity rates on account of the rise in behind the meter co-located load as \ndiscussed in this statement, there is an opportunity for the Commission to clarify its jurisdiction over such \nconfigurations in light of existing precedent recognizing the Commission’s authority under the Federal Power Act to \nregulate the interstate wholesale electricity market by implementing rules and practices that directly affect wholesale \nelectricity rates, terms, and conditions. \nPJM remains committed to working with the Commission, the states, and stakeholders on exploring existing \nand novel paradigms in light of continued industry innovation and evolving regulatory constructs.   \nBackground and Terminology \n \nClear definitions and mutual understanding about the meaning of terms like “Network Load” and “co-located \nload” will promote consistency and understanding across the industry.  In PJM, load has traditionally been added by \nthe local transmission owner/electric distribution company on an annual basis as Network Load.6  This load is \n                                                          \nprovision in Appendix 2, section 3.1 of the interconnection service agreement “is inapplicable to requests to interconnect end-use \nload facilities at the interconnection sites of existing generators”). \n5  In some jurisdictions, there may be disputes under state law about what entities may provide service and what service they \nmay be authorized to provide.  Compare Public Conference 61:  Senate Bill 1 Co-location Study, Additional Comments of \nSouthern Maryland Electric Cooperative, Inc. on Co-Located Load Configuration, Docket No. PC61, Docket Entry 42, at 3-5 (Md. \nPSC) (Oct. 16, 2024) (asserting only an “electric company” is authorized to serve “retail electric customers” in Maryland), and \nPublic Conference 61:  Senate Bill 1 Co-location Study, Response Comments of Constellation Energy Generation, LLC and \nConstellation NewEnergy, Inc., Docket No. PC61, Docket Entry 41, at 23-28  (Md. PSC) (Oct. 16, 2024) (asserting neither \nMaryland case law nor the Maryland Code support PSC regulation of private sales to co-located entities). \n6 The PJM Open Access Transmission Tariff (“Tariff”), Part I, Definition of “Network Load” means “the load that a Network \nCustomer designates for Network Integration Transmission Service under Tariff, Part III.”"},{"page":5,"startToken":1079,"endToken":1558,"text":"Overview of Large Co-Located Load Issues, Docket No. AD24-11-000 \n \nPJM © 2024 \nhttps://www.pjm.com | For Public Use \n3 | P a g e  \nincorporated into the PJM Load forecast, studied, and identified system enhancements are constructed pursuant to a \ntransparent planning process, including transmission services and energy and ancillary services.   \nFront of the Meter Network Load:  PJM Network Load is considered in front of the meter and may or \nmay not be co-located with a generator.  In the left illustration of Figure 1, the traditional PJM Network Load is \nserved from the broader PJM system.  However, PJM Network load may also be co-located on the same physical \nsite as a generator as in the right diagram of Figure 1.  In either of these configurations, there can be a financial \nbilateral contract to facilitate the exchange of funds between the load and a generation supplier.  As represented in \nFigure 1, as a matter of physics, the load’s needs are met without preference to whether the actual physical power is \ncoming from the co-located generator or the broader PJM system.    Importantly, if the co-located generator is out of \nservice, the load will not be interrupted because the load will continue to be served by the broader PJM system.  Both \nconfigurations in Figure 1 result in the load being served reliably, included in future planning forecasts, and \naccounted for holistically in forward-looking planning processes.  As a result, this configuration is best differentiated \nas “front of the meter load” even though a generator may physically be “co-located” on the same site as a generator.  \n \nFigure 1: Front of Meter: Load fully served by grid and therefore pays transmission services and energy and ancillary service \ncharges while being incorporated into and accounted for in future planning processes.  \nBehind the Meter, Off System Load Served from a Specific Generator:  In contrast to the configuration \nrepresented in Figure 1, the emerging configuration for large co-located load integrations assumes a behind \nthe meter, off system construct.  In this configuration, the load is not designated PJM Network Load and is co-\nlocated with the generation and served exclusively by that generation as is shown in Figure 2.7  The left illustration of \nFigure 2 shows the behind the meter configuration with co-located load that is presenting some of the biggest \nchallenges discussed in greater detail in this statement.  In the left illustration of Figure 2, the load is fully off-system \nand protection mechanisms are installed to avoid the load being served from the grid.  If the generator is out of \nservice, as shown on the right illustration of Figure 2, the load will not be served from the broader system.  \n                                                          \n7 There could be behind the meter co-located load configurations where part of the load is in front of the meter and part is behind \nthe meter.  For sake of simplicity, this scenario will not be specifically discussed."},{"page":6,"startToken":1558,"endToken":1899,"text":"Overview of Large Co-Located Load Issues, Docket No. AD24-11-000 \n \nPJM © 2024 \nhttps://www.pjm.com | For Public Use \n4 | P a g e  \nPractically, this means that the load will not be served at all unless the load has a sufficient back-up generator on-\nsite.  The load would at least theoretically be curtailed if the serving generator or generators fail to supply the load as \nPJM would not be obligated to serve that load from other resources in the PJM region.   \nIn the Figure 2 configuration, any financial arrangement between the generator and the load is conducted \noutside of the PJM settlements system.  Under existing governing document rules, for purposes of the Figure 2 \nconfiguration, neither the generator nor the co-located load is assessed charges for transmission services or energy \nand ancillary services.  The load is not included in future planning forecasts, and is not accounted for holistically in \nforward-looking planning processes.  If the load is desired to be served by the PJM system at some point in the \nfuture, additional studies would be necessary to identify potential system upgrades on the transmission system.  \nThere appears to be an industry perception that pursuit of the Figure 2 configuration may offer a faster path to \ncommercial operation for the large co-located loads when compared to the Figure 1 configuration.   \n \nFigure 2:  Behind the Meter: Load served by a dedicated generator.  Load cannot be served by the broader network and under \nexisting governing document rules, neither the co-located generator or load pay transmission or energy and ancillary service \ncharges. \nIn an effort to promote clarity, as noted above, there are variations within the overall description of “co-\nlocated load” that have different impacts which is why it is important to clarify if a configuration is “in front of the \nmeter” or “behind the meter, off system.”    \nCo-Located Load and Resource Adequacy \nNERC CEO Jim Robb recently framed the present resource adequacy challenges facing regions across the \ncountry in terms of a math problem:  unprecedented growth in electric demand is outpacing available capacity to"},{"page":7,"startToken":1899,"endToken":2404,"text":"Overview of Large Co-Located Load Issues, Docket No. AD24-11-000 \n \nPJM © 2024 \nhttps://www.pjm.com | For Public Use \n5 | P a g e  \nmeet that demand.8  PJM is projecting a potential shortfall in generation supply by the end of this decade.9  PJM’s \nmost recent base residual auction results reflect the market’s recognition of these tighter system conditions.10  The \nfactors giving rise to these projections and auction results are described in greater detail elsewhere, and I will focus \nhere on how the explosive growth of large load co-location could impact resource adequacy.   \nThe arrival of large load co-location configurations is emblematic of exploding load growth largely due to \nrapid technological innovation.11  Putting aside cost allocation issues, PJM anticipates that large loads’ demand for \nservice (and its impact on resource adequacy) will exist regardless of whether a large load is behind the meter (i.e., \noff system) or in front of meter (i.e., Network Load) although the obligations to serve that load may differ as noted \nabove.  While load growth in itself is not particularly novel, the speed with which these types of loads may be \nemerging, whether in front of or behind the meter, marks a change in recent trends.   \nPJM continues to emphasize its expectation that generation capacity resources, including those intending to \nserve behind the meter, off system load, must satisfy their obligations until duly excused of them.  PJM and Network \nLoad are relying on these resources, and PJM’s models for planning purposes and auctions are constructed \naccording to strict timelines based on available capacity.  For these reasons, generators must provide advanced \nnotice of an intent to change capacity resource status consistent with tariffed processes.12   \nPJM encourages configurations where the load, co-located or not, is in front of the meter and brings with it \nthe interconnection of new generation.  When new load brings with it new generation, the supply and demand sides \nof the equation remain more balanced and do not necessarily exacerbate resource adequacy concerns.  \nFurthermore, this coordinated approach to load integration may allow for an expedited load integration process \nsubject to appropriate study and construction of necessary system enhancements. \nCo-Located Load and Reliable System Operations \n \nReliable system operations remains PJM’s highest priority.  PJM’s reliability imperative drove enhancements \nto a pending interconnection service agreement involving a large co-located load.  Participants in that proceeding \nhave not sought to impede the reliability enhancements proposed in the revised agreement, and I will not repeat the \n                                                          \n8 Reliability Technical Conference, Speaker Materials of Jim Robb, President and Chief Executive Officer, North American \nElectric Reliability Corporation, Docket No. AD24-10-000 (Oct. 15, 2024). \n9 See, e.g., Reliability Technical Conference, Speaker Materials of Aftab Khan, Executive Vice President – Operations, Planning \n& Security, PJM Interconnection, L.L.C. Docket No. AD24-10-000 (Oct. 15, 2024) (“Aftab Statement”). \n10 PJM Interconnection, L.L.C., 2025/2026 Base Residual Auction Report (July 30, 2024), available at:  https://pjm.com/-\n/media/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.ashx.   \n11 Aftab Statement at 2. \n12 Tariff, Attachment DD, section 6.6."},{"page":8,"startToken":2404,"endToken":2999,"text":"Overview of Large Co-Located Load Issues, Docket No. AD24-11-000 \n \nPJM © 2024 \nhttps://www.pjm.com | For Public Use \n6 | P a g e  \njustifications offered for those operational provisions here.13  I will discuss several observations about reliability \nconsiderations unique to the Figure 2 behind the meter co-located load configuration. \nA growth in large behind the meter, off system co-located load is likely to be served by dedicated \ntraditional base-load generation capacity resources (nuclear, gas-fired, landfill gas, and coal) no longer \navailable to serve PJM Network Load, and operational protocols and impacts should be assessed.14  The \nCommission, PJM, and stakeholders should continue to explore what operational principles and protocols are \nnecessary if traditional base-load generation capacity resources do, in fact, leave the supply stack at an expedited \nrate to exclusively serve behind the meter, off system co-located load.15  Equitable and practical impacts to service \ninterruption and curtailment should also be explored as these behind the meter, off system configurations may impact \nservice reliability for Network Load and co-located load in different ways.   \nBehind the meter co-located, off system loads are not holistically planned for and may not be \ncapable of receiving reliable service from the grid in the event the co-located generation is not available.  \nBehind the meter co-located loads are not part of the PJM load forecast because these loads are off the system \ndespite being in the PJM Region.  These loads are electrically connected to the grid via the co-located generator, but \nshould never withdraw power from the PJM system (see Figure 2).  Therefore, the PJM planning models will not \nrecognize this load and the grid as a whole will not be planned and enhanced to serve it.  Although the initial \nintegration of the load may require system reinforcements, the PJM load forecast and resource adequacy models will \nnot include this load for purposes of service obligations.   \nIf behind the meter co-located loads integrate faster than what can be reliably planned for, the \nindustry should appreciate the potential future risks to reliable system operations.  If a co-located generator \nretires (or has a failure – temporary or otherwise) and this generator was exclusively serving off system, behind the \nmeter load, then PJM will likely be unable to allow the load to be served from the PJM system until the system is \nproperly planned and enhanced with necessary reinforcements (though some exceptions could exist if there is a \npotential for specifically tailored interim operational procedures and close coordination between the involved entities).  \nIt could take a significant amount of time for the off system load to become PJM Network Load based on the system \nimpacts.  But think of a scenario where there are large behind the meter loads supporting artificial intelligence that \nsome may deem important for reasons like national security or internet access.  Given the significant social and \neconomic impacts if certain large loads were not able to receive service, it is foreseeable that political, regulatory, \nand other social forces could exert pressure to attempt to secure service to such behind the meter load without \ninterruption even if the exclusively-dedicated co-located generator were to become unavailable.   \n                                                          \n13 See PJM Interconnection, L.L.C., Response to Deficiency Letter by PJM Interconnection, L.L.C., Docket No. ER24-2172-001, \nat 3, 12, 20, 22-23 (Sept. 3, 2024). \n14 Aftab Statement at 2. \n15 Operations Road Map, PJM Interconnection, L.L.C. (Aug. 8, 2024) (discussing various actions PJM is pursuing given the \ntransition from traditional fuel secure generation to intermittent resources), available at:  https://www.pjm.com/-\n/media/committees-groups/committees/oc/2024/20240808/20240808-item-06---2-external-operations-roadmap-document.ashx."},{"page":9,"startToken":2999,"endToken":3571,"text":"Overview of Large Co-Located Load Issues, Docket No. AD24-11-000 \n \nPJM © 2024 \nhttps://www.pjm.com | For Public Use \n7 | P a g e  \nBut providing service to that co-located load in the absence of appropriate long-term planning and \nconstruction of upgrades poses potential real time operational risks and challenges to reliability that may not be \nsupportable or sustainable.  These risks to the service of behind the meter load are mitigated if the load integrations \nare accompanied by holistic long-term planning.  The Commission could explore clarifying service obligations to \nbehind the meter co-located loads in scenarios like the one discussed here.   \nRegardless of the existence of protection facilities, if permitted by the Commission, any request to \nleverage the use of a back-up unit that is a generation capacity resource to support behind the meter, off \nsystem co-located load should be subject to coordination, terms and conditions, and advanced \nauthorization.  Such back-up units may also be subject to recall due to conditions that may threaten the integrity or \nreliability of the PJM Region or the regional power system.   \nDepending upon case-specific circumstances and grid conditions, the operation of studied behind \nthe meter, off system co-located load may nevertheless be subject to specifically-defined interim operational \nprocedures.  For example, certain studied co-located load configurations may require the construction and \nenergization of transmission planning solutions identified as part of the Regional Transmission Expansion Planning \nprocess.  If such solutions are not yet operational, it may be necessary for the studied co-located load to operate \nsubject to interim operational procedures until the solutions are in service.  \n \nThere are other ongoing reliability considerations relating to large behind the meter co-located loads that \nPJM will continue to explore in partnership with Reliability First, transmission owners, and project developers.  For \nexample, in addition to compliance, legal/jurisdictional, and financial implications, reliability concerns can \nmaterialize if generation with co-located load trips off-line and co-located load inadvertently continues to pull \nfrom the grid and intended breakers do not open.  The addition of co-located load at the generating site increases \nthe complexity of associated relaying designed for normal fault clearing and load disconnection that would need to be \nevaluated on an individual basis as these designs can range widely.  If not properly designed and evaluated, power \nswings and other unintended consequences could occur.  Therefore, it is imperative that any and all relay \nspecifications are shared with the local utility and PJM for analysis and evaluation.  Additionally, the relaying \nequipment must be maintained and any degradation in status communicated promptly to all affected parties \n(generation owner, transmission owner, grid operator). \nBehind the meter co-located load tripping due to an internal fault or in response to a grid \ndisturbance could also cause power swings and operational challenges.  For example, if there was a local fault \non the transmission system, the transient impacts to voltage and frequency may result in a relay action to disconnect \nthe load and swap to back-up power, which would then have direct impacts to the dynamic response of the co-\nlocated generator.  Again, these relaying settings and timings would all need to be closely coordinated with the \ngeneration owner, transmission owner, and grid operator for proper studies analysis and evaluation. \nIn addition, PJM is aware of the potential cybersecurity concerns raised by Reliability First at a \nrecent Maryland technical conference on co-located load issues.  Cybersecurity is very important to PJM, and \nPJM will continue to work with RF and stakeholders on this issue."},{"page":10,"startToken":3571,"endToken":4218,"text":"Overview of Large Co-Located Load Issues, Docket No. AD24-11-000 \n \nPJM © 2024 \nhttps://www.pjm.com | For Public Use \n8 | P a g e  \nAnd finally, efforts should be made to promote enhanced situational awareness and communication \nby and among PJM, the local transmission owner, a co-located generator, and a large co-located load.  These \nefforts would help clarify and assign responsibility and liability to the entities actually operating any behind the meter \nfacilities that have the potential to impact the PJM system.  While the existing interconnection service agreement \nmakes the generator the primary point of contact, the Commission should explore whether this construct is sufficient \nor if more is required from generators and the co-located load.  PJM will continue to engage with its stakeholders, \nreliability organizations, and regulators since generators with co-located load may be assuming certain operational \nresponsibilities as an intermediary between the transmission provider and transmission owner and a co-located load.     \nCo-Located Load and Equitable Alignment of Transmission System Usage and Compensation \n \nThe equitable usage and compensation issue centers on the Commission deciding if there is an appropriate \nlevel of compensation for ancillary services and transmission services that would be paid for by a generator and/or \nbehind the meter co-located load.  PJM attempted to work with its stakeholders to establish an appropriate rate for \ntransmission or ancillary services charges associated with behind the meter co-located loads.  Those efforts resulted \nin no proposed governing agreement changes, and the issue remains an open one subject to ongoing litigation in a \nnumber of pending Commission dockets.  PJM has emphasized that any interconnection service agreements \nreflecting co-located load arrangements are subject to revision under the ordinary just and reasonable standard \npursuant to Section 205 of the Federal Power Act in the event such rates (or other changes) are determined \nappropriate.   \n \nTransmission cost allocation is not within the purview of PJM, but rather in that of the Transmission Owners.  \nClarification of the issues highlighted above, such as whether the transmission system needs to be planned to be \nable to serve these large loads even if they are co-located and operate behind the meter of a generator, will be \ninstructive as to the question of transmission cost allocation.  A load connected behind the meter of a generating unit \nthat remains interconnected with the transmission grid benefits from the ancillary services necessary to maintain the \nreliability of the transmission grid because the load could not be served from the generator unless transmission grid \nreliability is maintained.  As such, it seems appropriate that the load should pay its ratio share of the costs of ancillary \nservices just like any other load that is interconnected to the transmission grid, even if it is not withdrawing power \nfrom the grid, due to the benefit it derives from dependence on grid reliability. \nAs discussed above, preserving reliable system operations necessarily entails coordination between a \ntransmission provider like PJM, transmission owners, and a generator (and possibly the large co-located behind the \nmeter load) when there are changes in the availability and operations of large, synchronized generators (including \nback-up units) and large co-located loads.  Even with protection facilities in place, this coordination is necessary and \nessential because the operations of generators with co-located load rely on the grid and impact the grid.   \nThese observations raise an opportunity for the Commission to offer guidance on the appropriate approach \nto cost allocation involving generators with large co-located load.  Historically, use of the transmission system has \nbeen measured by taking MW off the system.  But does that construct hold under the novel and innovative co-located \nload configurations under study and discussion today?  Should unit specific operational coordination with a \ntransmission owner and a transmission provider like PJM be assessed a charge, and if so, what is a just and \nreasonable rate?  If there is any use of any services, what entity is using those services and should bear the cost of"},{"page":11,"startToken":4218,"endToken":4697,"text":"Overview of Large Co-Located Load Issues, Docket No. AD24-11-000 \n \nPJM © 2024 \nhttps://www.pjm.com | For Public Use \n9 | P a g e  \nthem:  the generator or the behind the meter co-located load?  If one unit of a generator is serving as a generation \ncapacity resource and Network Load is paying for it as such, and the Commission permits such a generator to serve \nin a back-up capacity to potentially dedicate itself to serving a single large, co-located load, is there an impact and \ncost to the transmission system that should be assessed? \nOpportunities for Generic Guidance \nUpon consideration of the record developed in this technical conference docket and other related \nproceedings relating to behind the meter co-located load, the Commission should consider exploring opportunities to \nprovide the industry with generic guidance that addresses issues raised above and, in particular: \n \nthe anticipated pace of large behind the meter co-located load development, including an \nexploration of whether any conditions can or should be placed on the obligation of a transmission \nprovider to serve such load given grid impacts; \n \nthe potential responsibility of generators with behind the meter co-located loads or the co-located \nloads themselves to pay for ancillary services and transmission services, and principles as to how \nsuch rates should be designed given the nature and impacts of behind the meter co-located load \nadditions (as discussed above);  \n \nthe project-specific details and markets, operations, and planning particulars that should be \nembodied in any implementing interconnection service agreement or other related agreements — \nany preconditions to modifying Commission-jurisdictional agreements or permitting the taking of \ncertain Commission-jurisdictional, and terms addressing things like the type of generator, the \ncapacity factor of the generation, the nature of the load, the potential for back-up supply, the \nlocation of the load and related facilities, and other similar matters; and \n \nthe extent, if any, to which behind the meter co-located load configurations are subject on the one \nhand to Commission jurisdiction because they involve Commission-jurisdictional agreements and \nservices, and otherwise affect wholesale rates, and on the other hand to state jurisdiction because \nthey may involve state law questions about what entities may provide certain services to behind the \nmeter co-located loads and what services may be provided. \nThese are complex issues and generic guidance (as opposed to case-by-case determinations) will facilitate \nefficiency and predictability for developers advancing emerging and evolving technologies in fields like artificial \nintelligence and data computing and the electric industry being called upon to facilitate and serve this innovation.  \nMore work remains to be done.  The discussion in this docket could be followed by further examination of questions \nlisted above and posed by others in this docket.  PJM is prepared to work with the Commission, its staff, and all \naffected stakeholders to support the needs of developing technological innovation in a manner that is fair and \nequitable and enhances reliability for all users of the grid."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":1505,"startToken":0,"endToken":269},{"p":3,"at":1505,"title":"Introduction","method":"printed heading","endPage":11,"endAt":3236,"startToken":269,"endToken":4697}]}