{"document":{"slug":"rec-20250411-5020","title":"Comments of the Union of Concerned Scientists in support of the filings dated 03/24/2025 of PJM Interconnection, L.L.C. et al","issued":"2025-04-11","accession":"20250411-5020","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"UNION OF CONCERNED SCIENTISTS","kind":"comments","file":"sources/filings/text/20250411-5020_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250411-5020","tier":"record","sha256":"756e71ebc5b9e72008bf89c4c2f5633beede24a8825edef8eb702c6bb4714069","pages":18,"tokens":4964,"emptyPages":[],"textThemes":["colo","registry"]},"pages":[{"page":1,"startToken":0,"endToken":187,"text":"UNITED STATES OF AMERICA  \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. AEP \nKentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nDocket Nos. EL25-49-000"},{"page":2,"startToken":187,"endToken":397,"text":"City of Cleveland, Department of Public Utilities, Division \nof Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \n \nLarge Loads Co-Located at Generating Facilities  \n \n \nConstellation Energy Generation, LLC \n \nv.  \n \nPJM Interconnection, L.L.C. \n \n \n \n \n \n \n \n \n \n \n \n \n \nAD24-11-000 \n \n \nEL25-20-000 \n(Consolidated) \n \n \n \n \n \nORDER INSTITUTING PROCEEDING UNDER SECTION 206 OF THE FEDERAL POWER \nACT AND CONSOLIDATING WITH OTHER PROCEEDINGS \n \nCOMMENTS OF THE UNION OF CONCERNED SCIENTISTS \n \nPursuant to Rule 211 of the Federal Energy Regulatory Commission’s (“Commission”) \nRules of Practice and Procedure, 18 C.F.R. § 385.211, the Union of Concerned Scientists \n(“UCS”), respectfully submits these comments in support of the filings dated March 24, 2025 of \nPJM Interconnection, L.L.C. (“PJM”), the Indicated PJM Transmission Owners, and Public \nService Gas & Electric made in response to Commission’s February 20, 2025 Order Instituting \nProceeding under Section 206 of the Federal Power Act and Consolidating with Other \nProceedings (the “Show Cause Order”).1  In these filings, these utilities base their conclusions \nand recommendations on the fact that large loads connecting to existing generation are \n \n1 PJM Interconnection, L.L.C., et al., 190 FERC ¶ 61,115 (2025)."},{"page":3,"startToken":397,"endToken":661,"text":"synchronized to the transmission system, use the transmission system, and rely on the \ntransmission system. UCS provides support for this set of assertions. \nThe Union of Concerned Scientists is a national nonprofit organization that has been \nparticipating in PJM stakeholder processes and Commission dockets for over 10 years, \nrepresenting our members and the public interest in advancing responsible public policies in \nareas where science and technologies play a critical role. Established in 1969, UCS has created a \nunique alliance between many of the nation’s leading scientists and thousands of committed \ncitizens. The UCS Climate & Energy Program focuses on developing a sustainable energy \nsystem—one that is affordable and nondepletable, and that does not degrade natural systems or \npublic health. UCS is headquartered in Cambridge, MA and has offices in Berkeley, CA, \nChicago, IL and Washington, D.C. \nUCS thanks the Commission for initiating this inquiry and consolidating the disparate \nproceedings that have examined filings that sought to inappropriately narrow the scope for \nCommission review. The swift and proper resolution of the central questions in this inquiry will \nprotect consumers from costs and society from substantial reliability risks that have not been \nseen or addressed in the past. \nI. \nINTRODUCTION \nThese comments support PJM’s conclusion that  “all co-located load be served from the \nPJM Transmission System as PJM Network Load with applicable firm transmission service.”2  \nUCS also supports the Indicated PJM Transmission Owners view that “consider all the \narrangements being contemplated or requested as being interconnected with and synchronized \n \n2 Show Cause Order para 4, citing PJM Guidance on Co-Located Load (March 22, 2024)."},{"page":4,"startToken":661,"endToken":1042,"text":"with the transmission and/or distribution grid and thus not “fully isolated.”3 Lastly, UCS supports \nPublic Service Gas & Electric assertion that co-located loads “use or impact the transmission.”4 \n While UCS makes these comments with a focus on data centers, which are sufficiently \ncommon to establish experience in the utility sector and are also the overwhelming majority of \nnew large loads proposed in PJM, the same conclusions should be applied to any large \nhomogeneous new load added to a generator interconnection. \nReliance on a single generator exclusively to serve loads and addition of loads in size \nrange of 100 MW to 1,000 MW are practices generally not seen in the U.S. power system since \nthe bulk power system allowed consolidation of utility company service territories and the \nsynchronization of multiple generators to serve interconnected loads more than a century ago. \nThe Commission should reject the proposition that loads of this size will be synchronized and yet \nhave no clarity as to how they interact with the regulated power system. Under the proposed \narrangements that claim “fully isolated”, there would be no planning or capacity to serve the load \nin the event of the closure of the host generator. In such an event, the system will have two holes \nto fill, one from the retirement of the generator and the other due to the appearance of the load \nsuddenly ready and willing to take service from the network.5 As a threshold matter, the claim \nthese loads are “fully isolated” is refuted by their normal operation requiring system generation \n \n3 Answer of the Indicated PJM Transmission Owners to the Order Instituting the Proceeding \nUnder Section 206 of the Federal Power Act and Consolidating with Other Proceedings (“TO \nfiling”) at page 9. \n4 Response of Public Service Electric and Gas Company to the Order to Show Cause at page 14. \n5  See Technical Conference Transcript (Bresler) at 40:11-21 (“[C]an I really plan the system on \nthat basis? In other words, if that generator is unavailable,” given “the potential criticality of the \nloads that we are talking about,” then “[i]s it going to be an acceptable answer” to not serve that \nload based on its contractual commitments “to not be on the system if that generator is \nunavailable”?)"},{"page":5,"startToken":1042,"endToken":1355,"text":"reserves and transmission capacity when the output of the co-located generator does not match \ntheir consumption.  \nBecause the operation of a data center is not supported solely by a single generator, the \npremise that there isn’t electricity from the grid flowing to the data center is simply unsupported \nand false. There may be a contract, but the laws of physics and the observed behavior of \nnumerous data centers refute the claim that electrical separation is accomplished by placing the \ngenerator and load behind a single meter and observing that “the load is not receiving electricity \nfrom the grid.” In short, there is Network Load, requiring Network Integrated Transmission \nService (or Point-to-Point Service), and Ancillary Services, in all the proposed configurations. \n \nII. \nBACKGROUND \nThe construction and operation of data centers in the U.S. has doubled in the past four to five \nyears.6 Developers of data centers, as well as other large loads and fleet electrification facilities, \nhave experienced delays, constraints and expense due to the limited physical capacity of both \ntransmission and distribution systems around the country. The constraining nature of existing \ninfrastructure and the costs to plan and construct new transmission and distribution capability is \nnot unique to data centers, new loads or even the electric power industry.7  \n \n6 Hyperscale Data Center Count Hits 1,136; Average Size Increases; US Accounts for 54% of \nTotal Capacity. Synergy Research Group. March 19, 2025 \nhttps://www.srgresearch.com/articles/hyperscale-data-center-count-hits-1136-average-size-\nincreases-us-accounts-for-54-of-total-capacity  \n7 Delays in generation interconnection on both distribution and transmission circuits are more \nvisible than delays attaching load. However, they are similar, requiring similar equipment and \ncoordination with the same entities. See for example Rand, Joseph, Nick Manderlink, Will \nGorman, Ryan H Wiser, Joachim Seel, Julie Mulvaney Kemp, Seongeun Jeong, and Fritz \nKahrl.\"Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission \nInterconnection As of the End of 2023.\" (2024)."},{"page":6,"startToken":1355,"endToken":1709,"text":"In recent months the Commission has opened six dockets relating to the treatment and cost \nallocation of large loads co-located, i.e. interconnected on the generation side of a generator’s \npoint of interconnection. This debate about the services required first appeared at the \nCommission as a modification of an existing generator’s interconnection agreement. In \nNovember 2024, the Commission rejected one FPA Section 205 filing that sets forth a proposal \nunder which the “fully isolated co-located load” would have paid no transmission or ancillary \ncharges.8 Also in November, Constellation Energy Generation, LLC (Constellation) filed a \ncomplaint against PJM in Docket No. EL25-20-000. Constellation argues that the PJM Open \nAccess Transmission Tariff (OATT) is unjust, unreasonable and unduly discriminatory because it \ndoes not contain rules for interconnected generators to follow when seeking to serve a co-located \nload configuration that Constellation argues is fully isolated from the grid.9  Constellation builds \nits argument on the premise that it can provide service to end-use load co-located behind the \nmeter in a configuration with protective relays to prevent the load from receiving electricity from \nthe grid, a configuration that Constellation refers to as “Fully Isolated Co-Located Load.”10  \nIn response to the Constellation complaint, several parties dispute Constellation’s \ncharacterization of “Fully Isolated Co-Located Load” and argue that the arrangement requires \nwholesale services.11 In addition, load-serving entities argue that PJM’s transmission rates are \n \n8 PJM Interconnection, L.L.C., 189 FERC ¶ 61,078 (2024) (rejecting the amended ISA for failing \nto meet the requisite burden of proof).   \n9 Show Cause Order para 1. \n10 Id. para 50. \n11 “PJM argues that grid-connected resources and load cannot follow only certain electrons along \na contract path. NOVEC states that the Guidance Document provides that co-located load \n“benefits from the use of the Transmission System and Ancillary Services.” Exelon argues that a \nnuclear facility serving co-located load must remain interconnected to the grid. Several parties \nargue that the arrangement relies upon services from the grid, such as load following, voltage \nsupport, black start, uplift, backup power, and certain ancillary services, because a nuclear \nfacility cannot provide them.” Id. at para 58."},{"page":7,"startToken":1709,"endToken":1989,"text":"designed to recover the embedded costs of the existing grid, and that Constellation’s approach \nwould shift grid costs onto others, or harm other customers by increasing transmission rates due \nto co-located data centers not paying their fair share for new transmission lines, substations, or \nvoltage devices needed to maintain reliability, as well as network upgrades resulting from \nremoving existing generation from the grid to serve a co-located load.12 Exelon argues that \nConstellation seeks a new service where there is no Network Customer, and thus no entity \nresponsible for Commission-jurisdictional service charges.13 \nPrior to the Constellation complaint, on November 1, 2024, the Commission convened a \ntechnical conference in Docket No. AD24-11-000 to examine issues related to large loads co-\nlocated at generating facilities. Subsequently, the Commission issued the Show Cause Order, \ninitiating a proceeding under section 206 of the Federal Power Act seeking answers from PJM, \nthe Transmission Owners and the public regarding several relevant aspects of state and federal \njurisdiction, transmission service, load and generation interconnection designs, resource \nadequacy, and cost allocation. \nIII. \nCOMMENTS AND REPLIES TO ORDER \nThroughout this inquiry and the preceding dockets, parties make arguments that begin with a \npresumption regarding the use of the transmission system by the co-located loads. The Show \nCause Order includes briefing questions that explore the nature and implications of the \ntransmission system use. In response to some of the briefing questions, we will document how \nthe rapid changes in energy demand from data centers cause impacts on the transmission system. \nTo mitigate these impacts, the connected utility system, (i.e. interconnected generators and the \ntransmission system) requires ancillary services and transmission. \n \n12 Id. para 59. \n13 Id. para 61."},{"page":8,"startToken":1989,"endToken":2188,"text":"A. Transmission Service reliance \n  \nPlease explain whether and to what extent different configurations of co-located load rely \non or otherwise use the transmission system to receive power, directly or indirectly, from the co-\nlocated generator. \nUCS agrees with the Indicated PJM Transmission Owners that “all the arrangements \nbeing contemplated or requested as being interconnected with and synchronized with the \ntransmission and/or distribution grid and thus not “fully isolated.”14 The co-located load, the co-\nlocated generator and the transmission system are physically connected to allow power to flow \ncontinuously amongst them.15 Because there are recurring and unpredictable changes in the \npower flows to the co-located load, the proposed arrangements for co-located load are dependent \non the transmission system to both receive power from the co-located generator and supply \n \n14 TO filing at page 9. \n15 Parties have described the load as “directly connected” to the co-located generator, which has \nan interconnection with the transmission system. See Complaint Requesting Fast Track \nProcessing of Constellation Energy Generation, LLC. EL25-20 page 3-4. Included there is \nreference to Michael Kormos, The Co-Located Load Solution, (Nuclear Energy Inst. July 2024), \nwhich provides this illustration of connection between transmission, generation and co-located \nload."},{"page":9,"startToken":2188,"endToken":2457,"text":"power to the co-located load. The descriptions of the interaction between the load and the \ntransmission system in the following paragraphs rely on observations by North American \nElectric Reliability Corporation (“NERC”), Electric Power Research Institute (“EPRI”), PJM, \ntransmission owners, industry vendors, and researchers. \n \nNERC describes the simplest driver of varying power flows: the load’s consumption \npatterns differing from the generator’s production.16 In explicitly advising the Commission about \nreliability risks to the grid, NERC refers to circumstances when the co-located generation is not \nproviding the same level of power as the co-located load is consuming.17 That is, when the co-\nlocated load has demand which is greater than the output of the co-located generator, energy \nflows from the transmission system to the co-located load. When the co-located load is operating \nwith energy demand less than the output of the co-located generator, energy flows from the \ngenerator to the transmission system. When the co-located load has demand that is the same as \nthe production by the co-located generator, real energy does not flow to the transmission system. \nAn illustration provided in comments shows power flows determined by the relative \nconsumption and production of the facilities “behind a meter.” 18 \n \n16 Howard Gugel. Statement of the North American Electric Reliability Corporation. \nTechnical Conference on Large Loads Co-Located at Generating Facilities Docket No. AD24-11-\n000 November 1, 2024 \n17 Id. “i.e., partial generation or no generation with the load connected.” \n18 See Response of Public Service Electric and Gas Company to the Order to Show Cause. See \ndiagram created for two different hypothetical installations, which illustrate the power flows are"},{"page":10,"startToken":2457,"endToken":2776,"text":"Broadly, the power sector operates within an environment of  routine patterns of power \nconsumption changes across each hour and day, known as the “load ramp”. The “load ramp rate” \nis the change in power demand over time. The change in aggregated load on a utility system is \nmostly predictable, with patterns for the “morning ramp,” a peak in demand at the end of the day \nand a ramp down at night.19 Maintaining the balance between supply of electricity and demand \nfor electricity is a central function for PJM20 and requires various responses drawing on the \nflexibility of supplies throughout a control area.21 When the load ramps at very high rate, or in \nunexpected ways, the challenges of matching of supply and demand become visible on the power \nsystem. \n \ndetermined by the relative size of the generator and the load at any moment in time.  \n \n19  Energy Information Administration. “Demand for electricity changes through the day”  \nhttps://www.eia.gov/todayinenergy/detail.php?id=830 \n20   PJM Operating Agreement  10.4 Duties and Responsibilities.  “Direct the operation and \ncoordinate the maintenance of the facilities of the PJM Region used for both load and reactive \nsupply, so as to maintain reliability of service and obtain the benefits of pooling and interchange \nconsistent with this Agreement, and the Reliability Assurance Agreement.  \n21 Id. Definitions. ““Control Area” shall mean an electric power system or combination of \nelectric power systems bounded by interconnection metering and telemetry to which a common \nautomatic generation control scheme is applied in order to: (a) match the power output of the \ngenerators within the electric power system(s) and energy purchased from entities outside the \nelectric power system(s), with the load within the electric power system(s)… (d) maintain power \nflows on transmission facilities within appropriate limits to preserve reliability; and(e) provide \nsufficient generating capacity to maintain operating reserves in accordance with Good Utility \nPractice.”"},{"page":11,"startToken":2776,"endToken":3089,"text":"EPRI reports that the utility industry has already seen variations in demand from existing \ndata center operations affecting the power system. EPRI surveyed electric utilities about their \nexperience serving data centers and EPRI reported utilities have already experienced operational \nimpacts from connected data centers. The most common impact being reported is increased load \nramp rates (26% of responding utilities).22 In addition, PJM uses the NERC Data Center Load \nInformation Survey to assess data center load ramps.23 \n \nThe observation of data center load variability is widespread. PJM mentions them briefly. \n“These include unplanned generator run-backs or reductions in output, generator MW output \noscillations, and co-located load utilization fluctuations. When these conditions occur, they result \nin brief, but routine, imbalances between the load and the generation that would need to rely on \nthe grid to balance.”24 Reports from two regions with large amounts of data center load already \nconnected to the power system, ERCOT25 and Virginia26, note substantial variability in demand \nin short time periods (e.g. less than one minute). These reports describe “imbalances between \nenergy supply and demand [which] requires immediate action by our system operators.”27 \n \n22 Utility Experiences and Trends Regarding Data Centers: 2024 Survey.  EPRI, Palo Alto, CA: \n2024. 3002030643. https://www.epri.com/research/products/000000003002030643  \n23 Answer of PJM Interconnection, L.L.C., Page 53. “Since 2024, PJM has been also collecting \nmore granular data using the NERC Data Center Load Information Survey template to evaluate \nthe impact of large data center co-located load ramping behaviors.  \n24 Id. pages 44-45.  \n25 ERCOT Stakeholder presentation - March 4, 2025. \nhttps://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.ercot.com%2Ffiles\n%2Fdocs%2F2025%2F02%2F28%2FLL-\nOscillation_LFLTF_Mar2025_Final.pptx&wdOrigin=BROWSELINK  \n26 Pre-Technical Conference Statement of Kyle Hannah, Director of Electric Transmission \nStrategic Initiatives, Dominion Energy Inc. Docket  AD24-11-000 . \n27 Id."},{"page":12,"startToken":3089,"endToken":3468,"text":"The utility industry is only beginning to understand and categorize the variability of data \ncenter loads. At the same time, data centers’ energy use is increasing for processing larger and \nmore complex individual tasks, increasing the amplitude of energy demand variations.28  \nERCOT’s recent discussion with stakeholders included a 300 MW drop in data center \ndemand in 24 seconds, and oscillations of 25 MW repeatedly up and down in under one second, \nrecurring again with 50 MW oscillations three days later.29 In academic and research efforts, \nmeasurements made inside computer facilities have provided illustrative measurements of data \ncenter demand ramping and oscillations when researchers examined behavior of various data \nprocessing tasks and tools.30,31  These researchers made direct measurements of energy demand \npatterns using varied software and computation instructions. The graphs below demonstrate high \nrates of change in electricity use while performing tasks, and the differences between earlier \n \n28 Forbes Business Insight. High Performance Computing Market Size, Growth Report [2032]. \nSee also P. Patel, E. Choukse, C. Zhang, I. n. Goiri, B. Warrier, N. Mahalingam, and R. \nBianchini, “Characterizing Power Management Opportunities for LLMs in the Cloud,” in \nProceedings of the 29th ACM International Conference on Architectural Support for \nProgramming Languages and Operating Systems, Volume 3, ser. ASPLOS ’24, vol. 3. New York, \nNY, USA: Association for Computing Machinery, Apr. 2024, pp. 207–222. “In larger-scale \ntraining, such power swings are correlated across thousands of GPUs running the training job, \nwhich could cause challenges in the power delivery infrastructure.” \n29 ERCOT Stakeholder presentation  - March 4, 2025. \n30 Govind, S. Bhalachandra, Z. Zhao, E. Rrapaj, B. Austin, and H. A. Nam, “Comparing Power \nSignatures of HPC Workloads: Machine Learning vs Simulation,” in Proceedings of the SC ’23 \nWorkshops of The International Conference on High Performance Computing, Network, \nStorage, and Analysis, ser. SC-W ’23. New York, NY, USA: Association for Computing \nMachinery, Nov. 2023, pp. 1890–1893.  https://doi.org/10.1145/3624062.3624274 \n31 Grant L. Stewart, Gregory A. Koenig, Jingjing Liu, Anders Clausen, Sonja Klingert, and \nNatalie Bates. 2019. “Grid Accommodation of Dynamic HPC Demand”. Workshop Proceedings \nof the 48th International Conference on Parallel Processing (ICPP Workshops '19). Association \nfor Computing Machinery, New York, NY, USA, Article 9, 1–4. \nhttps://doi.org/10.1145/3339186.3339214"},{"page":13,"startToken":3468,"endToken":3638,"text":"workloads and now-common machine-learning computation.32 Note the steep ramp up in demand \nat the start of the tasks, followed by the oscillations such as were described by ERCOT, above. \n \nIn recent information-sharing workshops, practitioners from industry have advised of \n“potential for forced oscillations in system due to periodic changes in active power” and “system \nvoltage fluctuations is a concern if the load profile is variable”.33 Another spoke of active power \nchanges in data center demand that can be expected to impact the required amount of automatic \ngenerator control, i.e. output from the generator supply.34 These sorts of load variability create \n \n32 Govind, S. Bhalachandra, Z. Zhao, E. Rrapaj, B. Austin, and H. A. Nam. \n33  Pooja Shah, Harish Sharma. Southern Company.  Interconnection and Integration of Large \nLoads ESIG Fall Workshop 2024,  slide 10. https://www.esig.energy/download/session-4a-\ninterconnection-and-integration-of-large-loads-pooja-shah-and-harish-\nsharma/?wpdmdl=12221&refresh=671fa4964876b1730126998  \n34 Julieta Giraldez, Ahmed Rashwan. Electric Power Engineers. Large Loads: Interconnection, \nPlanning and Reliability Considerations. ESIG Fall Workshop 2024, slide 15."},{"page":14,"startToken":3638,"endToken":3990,"text":"imbalances more quickly than generators can correct, resulting in the voltage disturbances, \nthermal overloads and stability issues described by grid operators and NERC.35 The capability of \nindividual generators to keep is measured in megawatts (MW) per minute, with steam units (coal \nor nuclear) in the range of 3-20 MW per minute at the slow end of the spectrum, and combustion \nturbines and pumped hydro capable of 50 MW per minute.36 The management of load ramp rates \ngreater than the capability of single generators to match those ramps is achieved through \nancillary services. \n \nB. Ancillary or other wholesale services reliance \nPlease explain whether and to what extent different configurations of co-location \narrangements rely on or benefit from ancillary services or black start services and, if so, provide \nspecific details about the type of service and how the co-location arrangement relies on it. To \nwhat extent are these benefits distinct from the benefits that other Network Integration \nTransmission Service Point-to-Point Transmission Service customers derive from ancillary \nservices? \n \nUCS agrees with PJM that “the load and generator are connected to and synchronized \nwith the multi-state bulk power system. The load and generator are benefiting from ancillary \nservices (including but not limited to black start).”37 The interaction between load, generation, \nand transmission in the connected and synchronized system involves a range of responses to \nmaintain the balance between supply and demand that itself defines reliability.38 There are \n \nhttps://www.esig.energy/download/session-4a-large-loads-interconnection-planning-and-\nreliability-considerations-julieta-giraldez-and-ahmed-\nrashwan/?wpdmdl=12224&refresh=671fa495d3a361730126997  \n35 Howard Gugel. Statement of the North American Electric Reliability Corporation. \nTechnical Conference on Large Loads Co-Located at Generating Facilities Docket No. AD24-11-\n000 November 1, 2024. \n36   University of Wisconsin-Madison. Active Power Ramp Rates. 2013. https://neos-\nguide.org/wp-content/uploads/2022/04/ramp_rates.pdf \n37 Answer of PJM Interconnection, L.L.C., page 42. \n38  E. Ela, M. Milligan, A. Bloom, A. Botterud, A. Townsend, and T. Levin. Evolution of \nWholesale Electricity Market Design with Increasing Levels of Renewable Generation National \nRenewable Energy Laboratory  NREL/TP-5D00-61765. 2014. “Three fundamental components \ncomprise the wholesale electricity supply: generation, transmission, and coordination services."},{"page":15,"startToken":3990,"endToken":4326,"text":"numerous measurements of this balance over differing time horizons, and several ancillary \nservices that define the cost of providing the service to maintain reliability.39 Further, these \nbalancing services are distinct from the connection of the load and transport of energy to the load \nthat occurs through the use of the transmission system. \n \nThe above description of the variability of co-located loads and the mismatch with \nslower-ramping co-located generation forces the question of how this imposes costs for the \nancillary services required to re-establish and maintain the balance and reliability of the system. \nIn the technical conference proceeding, NERC noted the impact of data center energy \nconsumption changing rapidly affecting “thermal overloads, voltage issues, or stability issues.”40 \nAdditional narrative from Dominion Energy41 describes the range of services maintaining \nreliability, serving differing time-frames and vulnerabilities of the electric power system \n“anytime a grid connection is maintained, even if reverse-power protection systems are in place \nto prevent the co-located load from drawing real power (MW) from the grid.”42 These numerous \nservices stemming from system operation and securing reliability through scheduling and \n \nEach of these has a financial and physical component that must accommodate for the lack of a \nconsumer response inherent to electricity markets while ensuring the constant balance of \ngeneration and load.” Page 4. \n39 See California ISO. https://www.caiso.com/market-operations/products-services/ancillary-\nservices  \n40  Howard Gugel. Statement of the North American Electric Reliability Corporation. \n41 Pre-Technical Conference Statement of Kyle Hannah, Director of Electric Transmission \nStrategic Initiatives, Dominion Energy Inc. “Dominion Energy serves more data centers today \nthan the next five domestic markets combined.” \n42 Id. “Both the load and generator benefit from the essential reliability services provided by the \ntransmission grid. These benefits include load balancing, primary frequency response, reactive \ncompensation, voltage control, short-circuit fault current, and system inertia. Essential reliability \nservices are provided anytime a grid connection is maintained, even if reverse-power protection \nsystems are in place to prevent the co-located load from drawing real power (MW) from the \ngrid.”"},{"page":16,"startToken":4326,"endToken":4611,"text":"dispatching of generation resources43 are ancillary services separate from transmission service. \nThe variable co-located loads rely on both the transmissions system to deliver the ancillary \nservices and those ancillary services to mitigate the impacts to the transmission system caused by \nthat co-located load. \nC.    Transmission Service Requirements \nPlease explain whether co-location arrangements are or should be required to take \nNetwork Integration Transmission Service or Point-to-Point Transmission Service; or whether a \nmore tailored new category of transmission service is warranted. \n  \nCo-location arrangements should be required to take either Network Integration \nTransmission Service or Point-to-Point Transmission Service. The existing terms and conditions \nof these services are sufficient.  As noted in the Show Cause Order, the Commission has defined \ntransmission service as the provision of “electric transmission, network or point-to-point service, \nancillary services or other methods of electric transmission, or the interconnection with \njurisdictional transmission facilities.”44 The co-location arrangements all include one or more \npieces of equipment (conductors, breakers, and or substations) between the co-located load and \nthe co-located generator. 45 These are attached to the generator’s own Interconnection Facilities \n(specifically the Interconnection Customer’s Interconnection Facilities) which are \njurisdictional.46 By the definition cited, there is Commission-defined transmission service \nseparate and prior to the initiation of operations and the variable flow of energy to serve the load. \n \nOnce the co-located load begins to operate, the varying consumption described above is a \n \n43 See PJM Operating Agreement, Schedule 1, Section 1.6.  \n44 Show Cause Order para 76. \n45   Affidavit of Steven R. Herling. October 2, 2024. Docket Nos. ER24-2888-000, ER24-2889-\n000, ER24-2890-000. Page 5. \n46 LGIA 5.10 “Interconnection Customer's Interconnection Facilities ('ICIF'). Interconnection \nCustomer shall, at its expense, design, procure, construct, own and install the ICIF.”"},{"page":17,"startToken":4611,"endToken":4934,"text":"factor affecting PJM’s transmission capacity for errors in short-term load forecasting.  PJM must \nmaintain a margin of transmission capacity separate from providing reserves in generation to \nmeet supply shortfalls. PJM, as the Transmission Provider and Transmission Operator, calculates \navailable transmission capacity with a reserve known as the Transmission Reliability Margin \nwhich is set “to represent historical load forecast error” in the day-ahead time horizon. 47 In this \nway, PJM uses the transmission system to manage reliability impacts from unforeseen changes in \nload. New variability in the load not previously included in calculating this margin will quite \npossibly require new Transmission Reliability Margin levels in some or all of PJM. \nIV. \nConclusion \nIn these comments we explain what it means to be “electrically connected and synchronized \nto the PJM Transmission System when consuming power” and how that implicates the use of \nboth ancillary services and transmission service. We illustrate how the fully isolated load idea is \na fiction, supported only by a private contract that does not establish different physical facts. The \nloads require transmission and ancillary services because the host generators are unable to \noperate without the grid. The host generators are unable to provide all the required capabilities to   \nmatch the variable load. There is evidence enough to conclude there are no fully isolated loads in \nthese cases of existing generators proposals. “In order for a co-location arrangement (i.e., the \ngenerator plus data center) to obtain these services, the grid itself must exist. Ancillary services \npass through transmission lines, not the air.”48 \n \n47 PJM Transmission Reliability Margin TRM Implementation Document. “PJM includes TRM \nin the AFC/ATC process to provide a reasonable level of assurance that the interconnected \ntransmission network will be secure. PJM applies a default value of 2% of the flowgate rating to \nrepresent historical load forecast error.” \nhttps://connect.pjm.com/sites/ftp/ftppjmcom/oasis/TRMID.pdf  \n48 Answer of PJM Interconnection, L.L.C. page 36"},{"page":18,"startToken":4934,"endToken":4964,"text":"Respectfully submitted on this 10th day of April 2025. \n \n \n \nMichael Jacobs \nMichael Jacobs \nUnion of Concerned Scientists \n2 Brattle Square, Suite 600 \nCambridge, MA 02138 \n(617) 301-8057 \nmjacobs@ucs.org"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":1323,"startToken":0,"endToken":594},{"p":3,"at":1323,"title":"I. INTRODUCTION","method":"printed heading","endPage":5,"endAt":788,"startToken":594,"endToken":1162},{"p":5,"at":788,"title":"II. BACKGROUND","method":"printed heading","endPage":7,"endAt":1215,"startToken":1162,"endToken":1883},{"p":7,"at":1215,"title":"III. COMMENTS AND REPLIES TO ORDER","method":"printed heading","endPage":8,"endAt":0,"startToken":1883,"endToken":1989},{"p":8,"at":0,"title":"A. Transmission Service reliance","method":"printed heading","endPage":14,"endAt":589,"startToken":1989,"endToken":3732},{"p":14,"at":589,"title":"B. Ancillary or other wholesale services reliance","method":"printed heading","endPage":16,"endAt":315,"startToken":3732,"endToken":4369},{"p":16,"at":315,"title":"C. Transmission Service Requirements","method":"printed heading","endPage":17,"endAt":762,"startToken":4369,"endToken":4720},{"p":17,"at":762,"title":"IV. Conclusion","method":"printed heading","endPage":18,"endAt":206,"startToken":4720,"endToken":4964}]}