{"document":{"slug":"rec-20250422-5166","title":"Joint Comments and Motion to Stay Proceedings and Request to Establish Settlement Judge Procedures of the Electric Power Supply Association et al","issued":"2025-04-22","accession":"20250422-5166","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Electric Power Supply AssociationPJM Power Providers GroupCalpine Corporation ,Cogentrix Energy Power Management, LLC ,Constellation Energy Generation, LLC ,LS Power Development, LLC ,","kind":"comments","file":"sources/filings/text/20250422-5166_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250422-5166","tier":"record","sha256":"87f4014fb62d7b28be84b78cc7729527ba05702eea95ee2071550998552a4bab","pages":10,"tokens":2992,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":332,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Interconnection, L.L.C. et al. \n) \n) \n) \n \nDocket No. EL25-49-000 \n \n \nLarge Loads Co-Located at Generating Facilities \n) \n) \n) \n \nDocket No. AD24-11-000 \n \nConstellation Energy Generation, LLC \nComplainant, \n     v. \nPJM Interconnection, L.L.C. \nRespondent. \n)\n)\n)\n)\n)\n) \n \nDocket No. EL25-20-000 \n                 (Consolidated) \n \n \nJOINT COMMENTS AND MOTION TO STAY PROCEEDINGS AND REQUEST TO \nESTABLISH SETTLEMENT JUDGE PROCEDURES OF  \nTHE ELECTRIC POWER SUPPLY ASSOCIATION, THE PJM POWER PROVIDERS \nGROUP, CALPINE CORPORATION, COGENTRIX ENERGY POWER \nMANAGEMENT, LLC, CONSTELLATION ENERGY GENERATION, LLC AND LS \nPOWER DEVELOPMENT, LLC \n \nPursuant to Rules 212 and 603 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission,1 the Electric Power Supply Association;2 the PJM Power Providers \nGroup;3 Calpine Corporation; Cogentrix Energy Power Management, LLC; Constellation Energy \nGeneration, LLC; and LS Power Development, LLC (collectively the “Joint Parties”) respectfully \n \n1 18 C.F.R. §§ 385.212, 385.603. \n2 The Electric Power Supply Association (“EPSA”) is the national trade association representing competitive power \nsuppliers in the U.S.  EPSA members provide reliable and competitively priced electricity from environmentally \nresponsible facilities using a diverse mix of fuels and technologies.  EPSA seeks to bring the benefits of competition \nto all power customers.  This pleading represents the position of EPSA as an organization, but not necessarily the \nviews of any particular member with respect to any issue.  EPSA filed a timely document-less Motion to Intervene in \nthis proceeding on November 25, 2024. \n3 The PJM Power Providers Group (“P3”) is a non-profit organization dedicated to advancing federal, state and \nregional policies that promote properly designed and well-functioning electricity markets in the PJM Interconnection, \nL.L.C. (“PJM”) region.  Combined, P3 members own over 88,000 MWs of generation assets and produce enough \npower to supply over 63 million homes in the PJM region covering 13 states and the District of Columbia.  These \ncomments represent the position of P3 as an organization but not necessarily the views of any particular member with \nrespect to any issue."},{"page":2,"startToken":332,"endToken":616,"text":"2 \nrequest that the Commission find the PJM Open Access Transmission Tariff (“PJM Tariff”) to be \nunjust, unreasonable and unduly discriminatory and preferential given its unclear and inadequate \nprovisions supporting the co-location of load with generating resources.  Joint Parties also request \nthat the Commission stay these consolidated proceedings for 90 days and establish settlement \njudge procedures to provide an opportunity for parties to develop a replacement rate to address the \nissues raised in these consolidated proceedings.  Specifically, the PJM Tariff lacks provisions \naddressing with sufficient clarity or consistency the rates, terms or conditions of service that apply \nto co-location, and no party has meaningfully demonstrated otherwise.4  As a result, the \nCommission should issue a finding as expeditiously as possible that the PJM Tarff is unjust and \nunreasonable and unduly discriminatory and preferential.  In addition to making this finding, the \nCommission should appoint a settlement facilitator and/or settlement judge to actively engage, \nthrough publicly-noticed settlement conferences, with PJM, the Transmission Owners, and any \nother interested intervenors in a concerted, focused, and good faith effort to resolve this proceeding \nwithin a 90 day period.  The Commission should direct parties to this settlement process to identify \nan acceptable replacement rate that reasonably establishes the services, if any, used by co-located \nloads, and allocates any costs to such loads (or the generator serving them) consistent with cost \ncausation principles.  \n \n4 See, e.g., PJM Interconnection, L.L.C., Answer, Docket Nos. EL25-49-000 et al. at 4, 5, 8, 32, 33, 55 (filed Mar. 24, \n2025) (while PJM argues that the PJM Tariff “remains just and reasonable,” it provides no meaningful evidence or \nother support for this argument, repeatedly requesting guidance from the Commission instead) (“PJM Answer”)."},{"page":3,"startToken":616,"endToken":930,"text":"3 \nI. \nPJM’S \nTARIFF \nIS \nUNJUST, \nUNREASONABLE \nAND \nUNDULY \nDISCRIMINATORY AND PREFERENTIAL \nThe Commission explained in its Co-Location Show Cause Order that the PJM Tariff \nappears unjust, unreasonable and unduly discriminatory and preferential for numerous reasons.5  \nThe Joint Parties do not disagree with these preliminary Commission findings.  As explained \nabove, the Commission should now conclusively find the PJM Tariff to be unjust, unreasonable \nand unduly discriminatory and preferential, and the Commission can make such a finding for these \nprime reasons:  \n1. It lacks clarity in the way it applies to a variety of co-location arrangements;   \n2. This lack of clarity has enabled the Indicated Transmission Owners and PJM to take \nthe position that the PJM Tariff precludes options other than full Network Integration \nTransmission Service (“NITS”) billed on a gross load basis (or other than a few \n“preferred” NITS-based options) for every load in the PJM footprint regardless of \nconfiguration.  Adopting this position, as urged by the Indicated Transmission owners, \nfurther renders the PJM Tariff unjust and unreasonable, and unduly discriminatory and \npreferential by: \na.   imposing a one-size-fits-all solution on customers that are not similarly-situated;  \n \n5 See, e.g., PJM Interconnection, L.L.C., 190 FERC ¶ 61,115, at P 74 (2025) (“Co-Location Show Cause Order”) \n(finding the PJM Tariff may lack provisions addressing with sufficient clarity the rates, terms, and conditions of \nservice for co-location arrangements); id. P 78 (finding the PJM Tariff may fail to provide a process that ensures co-\nlocation arrangements pay for the benefits they receive from the transmission system consistent with the cost causation \nprinciple); id. P 82 (finding the PJM Tariff lacked provisions governing the use and sale of ancillary services and \nblack start services); id. P 83 (finding the PJM Tariff lacked ules necessary to provide PJM with sufficient information \nto perform appropriate analysis to ensure reliable system operations given the characteristics of co-location \narrangements)."},{"page":4,"startToken":930,"endToken":1274,"text":"4 \nb.  such a one-size-fits-all solution as urged by the Indicated Transmission Owners \nencourages economically inefficient outcomes and mutes the signal for efficient siting, \nleading to potentially costly, time-consuming and avoidable transmission build-out; \nand \nc.  such a one-size-fits-all, NITS-only approach for co-location intrudes upon the \njurisdiction of the states to decide what options should be available for co-located load.  \nAs described above, no party responding to the Co-Location Show Cause Order has \ndemonstrated that the PJM Tariff is just, reasonable and not unduly discriminatory or preferential, \nor even made a meaningful effort to do so.  As such, the Commission should issue a decision in \nthe Co-Location Show Cause proceeding that the PJM Tariff is indeed unjust, unreasonable and \nunduly discriminatory and preferential.  Based on the extensive record in this proceeding, the \nCommission has more than sufficient evidence to support such a finding, can issue an order \nexpeditiously and should do so.6          \nII. \nMOTION TO STAY PROCEEDINGS AND REQUEST TO ESTABLISH \nSETTLEMENT JUDGE PROCEDURES  \nAfter finding that the current PJM Tariff is unjust and unreasonable and unduly \ndiscriminatory and preferential, the Commission should defer to the parties in this proceeding to \ndevelop a new replacement rate through a Commission-supported settlement process.7  Such a \n \n6 As discussed, the Joint Parties believe the Commission should and can find that the PJM Tariff is unjust, \nunreasonable, and unduly discriminatory and preferential based on the record and set the matter for the settlement \nproceeding described below.  Such a predicate finding will helpfully motivate settlement conversations.  Nonetheless, \nshould the Commission prefer not to make such a conclusive finding that the PJM Tariff is unjust and unreasonable \nand unduly discriminatory and preferential at this time, it should still set the matter for the settlement proceedings \ndescribed herein to develop a replacement rate as if it had made such a finding. \n7 The Commission has successfully provided guidance and a forum for interested parties to resolve differences and \nsettle complicated issues related to PJM in the past.  See, e.g., PJM Interconnection, L.L.C., 115 FERC ¶ 61,079 \n(2006)."},{"page":5,"startToken":1274,"endToken":1661,"text":"5 \ndirective from the Commission is consistent with the responses filed by PJM and the Indicated \nTOs, which appear to anticipate the opportunity for settlement discussions.8  Thus, Joint Parties \nrequest that the Commission stay the Co-Location Show Cause proceeding for a limited period of \n90 days and establish settlement judge proceedings as expeditiously as possible.   \nThe guidance provided by the Commission through an unjust and unreasonable and unduly \ndiscriminatory and preferential finding will provide a clear signal for the parties to engage in \nmeaningful discussions towards resolving their concerns.  The short duration of the discussions \n(which is consistent with prior settlement proceedings ordered by the Commission that resulted in \nCommission-accepted resolution)9 will ensure that a co-location replacement rate in PJM can be \nresolved quickly – either the parties will do so through the settlement process or the matter will be \nreturned to the Commission to resolve on its own.  To the extent the parties (or a significant subset \nof them) agree on a replacement rate, that can be submitted in the record in the Co-Location Show \nCause proceeding for the Commission to consider in determining the just and reasonable \nreplacement rate.  Granting the requested settlement judge proceedings would facilitate such a \nresolution.  If no such resolution is reached in the allotted time, then the Commission can proceed \nwith the Co-Location Show Cause proceeding to establish a replacement rate of its own design.    \n \n8 See, e.g., PJM Answer at 5 (explaining that “Each new [PJM] option outlined herein is conceptual and would benefit \nfrom continued input from stakeholders, Commission guidance, and a deadline for submission of any such proposals \neither in the context of a section 205 filing or in this docket.”).  See also, Indicated PJM Transmission Owners, Answer, \nDocket Nos. EL25-49-000 et al. at 13 (filed Mar. 24, 2025) (explaining that “Indicated [Transmission Owners] remain \nopen to and anticipate the potential for further discussion regarding possible changes to tariffs”) (emphasis added). \n9 See, e.g., Essential Power OPP, LLC v. PJM Interconnection, L.L.C., 183 FERC ¶ 61,163, at PP 19-20 (2023) \n(establishing 60-day settlement procedures, with an option to extend an additional 30 days, to address complaints \nstemming from Winter Storm Elliott); PJM Interconnection, L.L.C., 167 FERC ¶ 61,209, at PP 28-29 (2019) \n(establishing 90-day settlement procedures in the Greenhat matter)."},{"page":6,"startToken":1661,"endToken":2205,"text":"6 \nThe Commission has repeatedly acknowledged the benefits of settlement.10  The \nCommission also has successfully granted motions for immediate appointment of a settlement \njudge or facilitator in prior proceedings involving PJM11 and other entities.12  Joint Parties’ request \nhere is consistent with the Commission’s regulations which specify that an available and \nindependent “complaint resolution path,” is for the Commission to “order the appointment of a \nsettlement judge.”13 \nMoreover, several parties have already called for the use of settlement procedures, or some \nother form of alternative dispute resolution, in one or more of these consolidated proceedings.14  \nAt a minimum, an attempt to settle these disputes is clearly worth the effort.  There is value to a \n \n10 See, e.g., Certification of Uncontested Settlements by Settlement Judges, Order No. 883, 179 FERC ¶ 61,130, at P 2 \n(2022) (“The Commission has long recognized the importance of settlements among the participants to litigated \nproceedings as a tool to efficiently and expeditiously resolve those contested proceedings set for trial-type evidentiary \nhearing, as well as other contested proceedings.” (footnote omitted)); Ariz. Pub. Serv. Co., 97 FERC ¶ 61,315, at \n62,449 (2001) (“[I]t has been Commission policy to promote voluntary settlements as an important tool in the \nadministration of our jurisdictional responsibilities.”); Tex. Gas Transmission Corp., 28 FERC ¶ 61,372, at 61,665-66 \n(1984) (encouraging settlements, as they can play an important part in resolving issues without prolonged and \ncontentious litigation); cf. Tex. E. Transmission Corp. v. FPC, 306 F.2d 345, 347-48 (5th Cir. 1962) (“For Commission \napproved voluntary settlements are an important and desirable mechanism as the Commission undertakes the \nstaggering burden of dealing with the ceaseless flow of the ever-more complicated problems….  Consequently \nsettlements should be encouraged, not discouraged.” (footnotes omitted)). \n11 See, e.g., Energy Storage Ass’n v. PJM Interconnection, L.L.C., 163 FERC ¶ 61,157 (2018) (granting joint motion \nfor appointment of settlement judge in ongoing complaint proceedings); PJM Interconnection, L.L.C., 113 FERC \n¶ 61,227 (2005) (granting PJM’s motion for immediate appointment of a settlement judge in a contested rate case). \n12 See, e.g., Sw. Power Pool, Inc., 143 FERC ¶ 61,219 (2013) (granting motion for immediate appointment of a \nsettlement judge in a proceeding concerning the integration of grandfathered agreements into a newly implemented \nregional market structure). \n13 See 18 C.F.R. § 385.206(g)(1). \n14 See Constellation Energy Generation, LLC, Complaint, Docket No. EL25-20-000, at 2-3 (filed Nov 22, 2024); \nComments of Calpine Corporation in Support of Complaint, Docket No. EL25-20-000, at 1 (filed Dec. 12, 2024); \nComments of the Electric Power Supply Association and the PJM Power Providers Group, Docket No. EL25-20-000, \nat 2 (filed Dec. 12, 2024); Protest of Old Dominion Electric Cooperative, Docket No. EL25-20-000, at 7 (filed Dec. \n12, 2024); Motion for Leave to Answer and Answer of Talen Energy Corporation to PJM Interconnection, L.L.C. \nAnswer and Motion to Dismiss, Docket No. EL25-20-000, at 1 (filed Dec. 23, 2024); Post-Conference Comments of \nthe Electric Power Supply Association, Docket No. AD24-11-000, at 7 (filed Dec. 9, 2024); Post-Conference \nComments of Constellation Energy Generation, LLC, Docket No. AD24-11-000, at 4, 6 (filed Dec. 9, 2024); \nComments of Calpine Corporation, Docket No. AD24-11-000, at 3 (filed Dec. 9, 2024)."},{"page":7,"startToken":2205,"endToken":2615,"text":"7 \nprompt resolution of these heavily contested co-location issues to ensure that the United States \ndoes not fall behind in the Artificial Intelligence revolution. \nThe Commission need not set a case for evidentiary hearing to establish settlement judge \nprocedures.  The Commission’s Settlement Judge rule15 applies to any proceeding set for an \nevidentiary hearing under part 385, subpart E16 “and to any other proceeding in which the \nCommission has ordered the appointment of a settlement judge.”17  The Commission accordingly \nhas established settlement judge procedures in other high-profile matters that were not set for a \nsubpart E evidentiary hearing.18  Rule 603 broadly contemplates that “[t]he Commission, may, on \nmotion or otherwise, order the Chief Administrative Law Judge to appoint a settlement judge.”19  \nThe Commission may act upon such a motion without awaiting an answer,20 and decisions \nconcerning appointments of settlement judges are not subject to review.21  \n \n15 See 18 C.F.R. § 385.603. \n16 18 C.F.R. part 385, subpart E. \n17 18 C.F.R. § 385.603(a) (emphasis added). \n18 See, e.g., Essential Power OPP, LLC v. PJM Interconnection, L.L.C., 183 FERC ¶ 61,163 (establishing settlement \njudge procedures to resolve multiple complaints regarding penalty assessments during Winter Storm Elliott); \nConstellation Mystic Power, LLC, 179 FERC ¶ 61,081, at P 26 (2022) (appointing a Settlement Judge to help resolve \na dispute regarding the capital structure and cost of debt that should be used in an agreement); Pac. Gas & Elec. Co., \n177 FERC ¶ 61,213 (2021) (appointing a Settlement Judge to help resolve a dispute among multiple parties regarding \nthe amount of interconnection service that should be reflected in an agreement); PJM Interconnection, L.L.C., 167 \nFERC ¶ 61,209, at PP 27-28 (appointing a Settlement Judge to help resolve disputes over “multiple complexities” \nsurrounding possible changes to Financial Transmission Right auction rules to ameliorate auction impacts of large \nMarket Participant default); Allegheny Elec. Coop., Inc. v. PJM Interconnection, L.L.C., 122 FERC ¶ 61,257 (2008) \nat P 7 & n.8 (discussing appointment of John S. Moot, Commission Chief of Staff, as “facilitator in the settlement \nproceedings” to resolve issues with respect to the role and independence of the external market monitor with respect \nto PJM) (citing Allegheny Elec. Coop., 121 FERC ¶ 61,021 (2007)).   \n19 18 C.F.R. § 385.603(d). \n20 18 C.F.R. § 385.603(c)(3). \n21 18 C.F.R. § 385.603(i)."},{"page":8,"startToken":2615,"endToken":2804,"text":"8 \nThe Joint Parties also request that the settlement judge proceedings be limited in time to \n90 days to foster prompt resolution.  The Joint Parties also move for a 90-day stay of further action \non this complaint pending the outcome of settlement judge proceedings. \n  \nRespectfully submitted, \n /s/ Nancy Bagot  \nGlen Thomas \nLaura Chappelle \nGT Power Group, LLC \n101 Lindenwood Drive, Suite 225 \nMalvern, PA 19355 \n(610) 768-8080 (o) \n(610) 724-0659 (c) \ngthomas@gtpowergroup.com \n \nPJM Power Providers Group \nNancy E. Bagot \nSenior Vice President \nSharon Royka Theodore \nVice President, Regulatory Affairs \nElectric Power Supply Association \n1401 New York Ave., NW, Suite 950 \nWashington, DC 20005 \nnbagot@epsa.org \n  \nElectric Power Supply Association \n \n \nSarah G. Novosel  \nSenior Vice President, Government Affairs, and \nAssociate General Counsel  \nRachael N. Marsh  \nVice President, Government Affairs,  \nand Managing Counsel  \nCalpine Corporation  \n717 Texas Avenue, Suite 1000  \nHouston, TX 77002  \n(202) 744-6320  \nsnovosel@calpine.com  \nrachael.marsh@calpine.com \n \n Calpine Corporation \n \n[Signatures continue on next page] \n \n \n \n \n \n \n \nChristopher P. Sherman \nSenior Vice President, Regulatory Affairs \nCogentrix Energy Power Management, LLC \n3 Mill Street \nArlington, MA 02476 \n(781) 643-0607 \nchrissherman@cogentrix.com \n  \nCogentrix Energy Power Management, LLC"},{"page":9,"startToken":2804,"endToken":2902,"text":"9 \nCarrie Hill Allen  \nSr. Vice President & Deputy General Counsel  \nSeth Lucia  \nAssistant General Counsel   \nConstellation Energy Generation, LLC   \n250 Massachusetts Ave., NW, Suite 760  \nWashington, DC 20001 \ncarrie.allen@constellation.com    \nseth.lucia@constellation.com   \n  \nChristopher A. Wilson   \nManaging Director, Federal Regulatory Affairs  \nConstellation Energy Generation, LLC   \n250 Massachusetts Ave., NW, Suite 760  \nWashington, DC 20001   \n(202) 347-7500   \nFERCe-filings1@constellation.com  \n \nConstellation Energy Generation, LLC   \n \nMarjorie Rosenbluth Philips  \nSenior Vice President, Wholesale Market \nPolicy  \nDaniel Pierpont  \nVice President, Wholesale Market Policy  \n1700 Broadway, 35th Floor  \nNew York, NY 10019  \n \nLS Power Development, LLC \n \nDate: April 22, 2025"},{"page":10,"startToken":2902,"endToken":2992,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have on this 22nd day of April, 2025, caused to be served a copy of \nthe foregoing upon all parties on the service lists in these proceedings in accordance with the \nrequirements of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. \n§ 385.2010 (2024). \n/s/ Rachael N. Marsh  \n \nRachael N. Marsh  \nVice President, Government Affairs,  \nand Managing Counsel  \nCalpine Corporation  \n717 Texas Avenue, Suite 1000  \nHouston, TX 77002  \n(202) 744-6320  \nrachael.marsh@calpine.com \n \nCalpine Corporation"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":3,"startToken":0,"endToken":617},{"p":3,"at":3,"title":"I. PJM’S","method":"printed heading","endPage":4,"endAt":1047,"startToken":617,"endToken":1082},{"p":4,"at":1047,"title":"II. MOTION TO STAY PROCEEDINGS AND REQUEST TO ESTABLISH","method":"printed heading","endPage":10,"endAt":0,"startToken":1082,"endToken":2902},{"p":10,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":10,"endAt":567,"startToken":2902,"endToken":2992}]}