{"document":{"slug":"rec-20250422-5178","title":"Comments of Pennsylvania Public Utility Commission","issued":"2025-04-22","accession":"20250422-5178","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Pennsylvania Public Utility Commission","kind":"comments","file":"sources/filings/text/20250422-5178_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250422-5178","tier":"record","sha256":"5e5f3c82dfe9aa2b3fd605407f386c36e71284bfd290c6516dd1ece486d9a371","pages":11,"tokens":2448,"emptyPages":[],"textThemes":["colo","adequacy","cost","retail"]},"pages":[{"page":1,"startToken":0,"endToken":146,"text":"1 \n \n                        COMMONWEALTH OF PENNSYLVANIA  \n  \n  \nPENNSYLVANIA PUBLIC UTILITY COMMISSION \nCOMMONWEALTH KEYSTONE BUILDING  \n400 NORTH STREET, THIRD FLOOR \n  \nHARRISBURG, PENNSYLVANIA 17120  \n  \nApril 22, 2025 \n  \nVia Electronic Filing  \n  \nHonorable Debbie-Anne A. Reese, Secretary  \nFederal Energy Regulatory Commission  \n888 First Street, N.E.  \nWashington, D.C.  20426  \n  \n  \nRe:  \nComments of the Pennsylvania Public Utility Commission; Docket \nNos. EL25-49-000 et al.  \n  \nDear Secretary Reese:  \n  \nPlease find for e-filing the Pennsylvania Public Utility Commission’s Comments \nto PJM Interconnection, L.L.C., et al. at consolidated Docket Nos. EL25-49-000, et al. \n \nCopies of this document have been served upon all parties designated on the \nCommission’s official service list, in accordance with Rule 2010 of the Commission’s \nRules of Practice and Procedure.  \n  \nIf you have any questions, please do not hesitate to contact me.  \n   \nRespectfully submitted,  \n  \nElizabeth H. Barnes \nElizabeth H. Barnes  \nDeputy Chief Counsel   \nPennsylvania Public Utility  \nCommission   \n(717)772-5408  \nebarnes@pa.gov"},{"page":2,"startToken":146,"endToken":303,"text":"2 \n \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Interconnection, L.L.C., et al. \n \n) \nDocket No. EL25-49-000 \n \n \n \n \n \n \n \n) \n \nLarge Loads Co-Located at Generating  \n) \nDocket No. AD24-11-000 \nFacilities \n \n \n \n \n \n) \n \n \n \n \n \n \n \n) \nConstellation Energy Generation, LLC \n \n) \nDocket No. EL25-20-000 \n \n \n \n \n \n \n \n) \nv. \n \n \n \n \n \n \n) \n \n \n \n \n \n \n \n) \nPJM Interconnection, L.L.C. \n \n \n) \n \n \n \n \nCOMMENTS OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION \n \nPursuant to Ordering Paragraph D of the Commission’s Show Cause Order \nentered on February 20, 2025, at Docket Nos. EL25-49-000, et al. as above-captioned, \nIntervenor Pennsylvania Public Utility Commission (PA PUC) hereby submits the \nfollowing comments addressing: (1) jurisdiction; and (2) whether the PJM Tariff remains \njust and reasonable and not unduly discriminatory or preferential; and if not, what \nchanges to the Tariff should be implemented as a replacement rate.   \nI. \nJurisdiction \nThe PA PUC agrees the Commission’s authority includes jurisdiction over the \nwholesale sale and transmission of electricity in interstate commerce, including the \nfacilities used for such sale and transmission.  However, the Federal Power Act (FPA)"},{"page":3,"startToken":303,"endToken":636,"text":"3 \n \nreserves to states authority over any other sale of electric energy, including retail sales \nand wholesale sales not in interstate commerce, as well as facilities used for the \ngeneration and distribution of electricity.   The states retain authority over those matters \nnot expressly conveyed to the Commission under the FPA.1   \nIn its Answer to the Show Cause Order, PJM overcomplicates the question of a \nregulatory gap involving co-location arrangements.2  Pennsylvania law defines an electric \npublic utility as “[a]ny person or corporations now or hereafter owning or operating in \nthis Commonwealth equipment or facilities for … [p]roducing, generating, transmitting, \ndistributing or furnishing … electricity … for the production of light, heat, or power to or \nfor the public for compensation.”3  The PA PUC agrees, and it is well-established in \nPennsylvania law that when electric service is provided to a “defined, privileged and \nlimited group”4 it is not provided “to or for the public”.5  But FERC should not consider \nthis a failure to regulate; it is a deliberate choice that has been enshrined in Pennsylvania \nlaw for almost a century.6  Since the principle was first set forth in Pennsylvania law, \nwholesale revisions to public utility statutory regulation has occurred twice, once when \nthe Public Utility Commission was created in the 1930s, and again in the 1970s when the \npresent Public Utility Code was codified.7  In both instances, this deliberate policy choice \n \n1 Nat’l Ass’n of Regul. Util. Comm’rs v. FERC, 964 F.3d 1177, 1187 (D.C. Cir. 2020). \n2 PJM Interconnection, L.L.C., et al.,  Answer of PJM Interconnection, L.L.C., Docket No. EL25-49, at 27-28 (Filed \nMarch 24, 2025) (PJM Answer) \n3 66 Pa.C.S. § 102 (emphasis added). \n4 Drexelbrook Assocs. v. Pennsylvania Pub. Util. Comm'n, 212 A.2d 237, 240 (Pa. 1965) \n5 Id. at 241. \n6 See Borough of Ambridge v. Pub. Serv. Comm'n of Pennsylvania, 165 A. 47, 49 (Pa. Super. 1933) \n7 See Title 66 of the Pennsylvania Consolidated Statutes."},{"page":4,"startToken":636,"endToken":940,"text":"4 \n \nwas maintained.  The capability to create private arrangements is a boon, not an \noversight, in Pennsylvania law. \nEven still, if an entity is confused about whether it is offering public utility \nservice, it can ask the PA PUC for a declaratory order.8  To date, PA PUC has not made \nany such determination regarding co-located load arrangements, and the determination \nwould be adjudicated under the unique facts of each case.   \nII. \nServices received in co-located load arrangements. \nDespite the private arrangement of a co-located load and an associated generator \nnot being subject to Pennsylvania Public Utility Commission or FERC jurisdiction9 some \nservices from the grid benefit the co-located load.  The PA PUC agrees with PJM that a \n“Fully Isolated Co-located Load” does not exist if the generator is connected to the grid.10  \nLikewise, the PA PUC agrees with the Indicated Transmission Owners that even if \noperational protection and control technologies such as relay switches are used with co-\nlocated load and generation, the load still benefits from their utilities’ grid services when \nthe load and generator are both connected to the system and when the load is connected \nbut the generator is disconnected from the system.11  Protection schemes can fail,12 and if \nthe grid must be ready and able to accommodate the full burden of the load, that planning \naffects the transmission operators and the other end user customers.  Evidence that a \n \n8 66 Pa.C.S. § 331(f). \n9 It is still subject to state jurisdiction.  The Pennsylvania General Assembly is free to create an applicable statute or \ndirect further regulation. \n10 See PJM Answer at 14, 30.   \n11 PJM Interconnection, L.L.C., et al., EL25-49-000, et al., Answer of the Indicated PJM Transmission \nOwners, Attachment A at 2, 10 (March 24, 2025). \n12 PJM answer at 14."},{"page":5,"startToken":940,"endToken":1210,"text":"5 \n \nretail customer is served by a generator that is connected to the transmission system is \ntherefore at least prima facie evidence that this is network load over which the FERC and \nthe PA PUC have jurisdiction for some services.  That is, because the co-located load \nmay receive some services from the transmission or distribution grids, the respective \ncommissions have jurisdiction over those services provided by the grid to the co-located \nload.    \nPJM’s Independent Market Monitor (IMM) also stated in this consolidated \nproceeding that co-located loads should be directly connected to the grid because they \nrely upon the grid and therefore should pay for energy and capacity.13  In these situations, \nthe generator benefits from interconnection with the grid, and could not arguably provide \nthe required service to the co-located load without the grid.  The benefits accruing to co-\nlocated loads are therefore at the expense of other customers.  \nStates determine which entities are legally permitted to provide electricity to retail \ncustomers in co-location arrangements.  States also determine how the wholesale costs of \nproviding electricity to those retail customers are recovered by a jurisdictional utility \nthrough retail rates. That is true irrespective of where the load interconnects (i.e., to the \ndistribution system, the transmission system, or the generator itself).     \nThe PA PUC favors economic growth in Pennsylvania, but growth where data \ncenters consuming large amounts of electricity pay their equitable share of network \n \n13 See IMM Comments re Co-Located Loads; Large Loads Co-Located at Generating Facilities, Docket \nNo. AD24-11-000 and IMM’s Answer and Motion for Leave to Answer; Constellation Energy \nGeneration, LLC v. PJM Interconnection, LLC, Docket No. EL25-20-000."},{"page":6,"startToken":1210,"endToken":1423,"text":"6 \n \nservices, such as ancillary and transmission costs for the grid and do not negatively \nimpact reliability on the grid causing rate increases to Pennsylvania’s end user customers.   \n \nIII. \nPJM’S Tarriff – Wholesale Grid Services  \n \nFERC is correct that PJM’s current Tariff does not provide sufficient safeguards \nagainst existing ratepayers entirely bearing the costs of transmission service that benefit \nco-located loads.  Co-located load configurations benefit from or contribute to the need \nfor certain ancillary services such as frequency response, voltage control, and regulation \nas well as black-start services.  PJM’s Tariff must be amended to include provisions that \nensure that participants in a co-located load arrangement are held financially responsible \ncommensurate with the extent to which they receive benefits from the transmission grid \naccording to the cost-causation and beneficiary pays principles.   \nIV. \nReliability and Resource Adequacy \nThe PA PUC shares FERC’s concerns that PJM’s current Tariff does not provide \nsufficient visibility into the potential impacts of co-located load arrangements, which may \nsignificantly implicate system reliability and resource adequacy due to the amount of \ngeneration that may be effectively removed from the grid.  The large loads that are \npresently coming on to the grid are far more concentrated and lumpier than past load \ngrowth.  This is particularly true of co-located load arrangements at baseload generation \nfacilities."},{"page":7,"startToken":1423,"endToken":1666,"text":"7 \n \nAccordingly, PA PUC agrees that PJM’s Tariff must be revised to require that \nPJM conduct long-term scenario analyses on the potential cumulative reliability and cost \nimpacts of behind-the-generator-meter co-located load arrangements.  Such analyses will \nensure that co-location load agreements are fully and transparently accounted for in \nexisting resource adequacy planning mechanisms.   \nMoreover, PJM’s Necessary Study process must be revised to provide at least as \nmuch information to regulators as the initial stages of the generator interconnection \nprocess.  When a co-located load proposes to come online, sometimes, the first regulators \nhear about it is when the arrangement is filed at the Commission.  In PJM, retirements \nmust be noticed at least one year in advance of the requested retirement date.14  Generator \ndeactivations are then noticed at the Transmission Expansion Advisory Committee.  Yet, \na co-location can effectively be a retirement, and regulators and the public are kept in the \ndark.  This must be addressed.  These analyses are beneficial for all stakeholders, \nparticularly state regulators, making us aware of co-location load projects so that states \nmay account for them when engaging in generation resource planning within their \nrespective jurisdictions.  \nV. \nCost Allocation  \nWhile the PA PUC appreciates PJM’s thorough breakdown of large load \ntransmission interconnection options, we would observe that PJM assumes in all options \nexcept 4 and 5 that transmission upgrades would be the responsibility of either the RTEP \n \n14 PJM Interconnection, L.L.C., Docket No. ER25-1501 (Letter Order Issued April 15, 2025)."},{"page":8,"startToken":1666,"endToken":1926,"text":"8 \n \nor be built as supplemental projects.  In each case, the cost of transmission upgrades are \npublicly allocated.15  Because of the lumpiness of the load, and the size of network \nupgrades that are driven mostly by these singular load additions, the Commission and \nPJM should revisit the potential direct allocation of transmission network upgrade costs \nto very large loads. \nFurthermore, the Commission and PJM should consider the zonal disparities in \ncongestion and resource adequacy and the implications for network upgrade costs. \nDepending on zonal grid conditions, the retirement of a generation resource to serve a \nsingle co-located customer may necessitate vastly different transmission upgrade plans \nwith significant cost implications for customers to whom those costs may be allocated. \nFor example, the package of transmission upgrades approved by the PJM Board and by \nthe Commission to address violations caused by the planned retirement of the Brandon \nShores plant totaled $785.8 million at the time of approval.16  By comparison, the \nNecessary Study conducted by PJM regarding the co-located load proposed at the \nSusquehanna nuclear power plant suggested negligible network upgrades would be \nrequired. \nThese disparate cost implications depending on the resource position of various \nzones should be considered when evaluating co-location proposals, as those costs will be \nallocated to the public across PJM’s system.  \nVI. \nSpeed of Interconnection is Driving the Demand for Co-location. \n \n15 Options 4 and 5 treat the generator as responsible for transmission upgrades. \n16 PJM Interconnection, L.L.C., Transmission Expansion Advisory Committee (TEAC) Recommendations to the \nPJM Board, July 2023, page 1. (20230711-pjm-teac-board-whitepaper-july-2023-public.ashx)"},{"page":9,"startToken":1926,"endToken":2175,"text":"9 \n \nThe PA PUC agrees with the Commission’s observation that “the potential speed \nwith which co-location arrangements can be implemented—at least relative to in-front-\nof-the-meter arrangements, appears to be one of the principal factors driving interest in \nco-location.”17  Because of substantial advantages (clearer and potentially fairer cost \nallocation, greater transparency), the PA PUC prefers grid-interconnected load.  Despite \nthis, the PA PUC does not take exception to co-located load arrangements.  These are \nbusiness decisions that are made because they are attractive.  Although improvements \nmust be made to the transparency and cost sharing in the co-location process, we must \nalso endeavor to increase the speed of traditional grid interconnection.  The PA PUC is \ndoing its part, starting with an en banc hearing at PA PUC Docket No. M-2025-3054271, \nto be held on April 24, 2025. The intent of the hearing is to educate and inform the PA \nPUC on the prudent design of a large load customer model tariff for electric distribution \ncompanies. \nVII. \nConclusion \nLoad is either connected to transmission grid or it is islanded and fully isolated.  \nImprovements in transparency must be made to the co-location process.  In the event the \ngenerator should retire, the load cannot suddenly appear on the PJM transmission system \nwith little time for PJM to assess the reliability impacts on the transmission system and \nfind solutions to those impacts.  The PJM reliability construct is volatile now; and it \nwould be even more volatile if this situation occurred. \n \n17 Show Cause Order, ¶ 85."},{"page":10,"startToken":2175,"endToken":2366,"text":"10 \n \nFurther, whichever side of the meter load is located, as long as the generator is \nconnected to the transmission grid, that load receives the benefits of PJM network \nservices, such as transmission and ancillary services.  For the reasons stated above, the \nPA PUC respectfully request that the Commission direct PJM to revise its Tariff and \nconduct long-term scenario analyses on the potential cumulative reliability and cost \nimpacts of behind-the-generation-meter co-located load arrangements, and to implement \nthe other suggestions in these comments.  Such analyses will ensure that load co-location \nagreements are fully and transparently accounted for in existing resource adequacy \nplanning mechanisms.  It is beneficial for all stakeholders, particularly state regulators, to \nbe aware of load co-location projects so that states may account for them when engaging \nin generation resource planning within their respective jurisdictions.  \n \nRespectfully submitted, \n \n/s/ Elizabeth H. Barnes \nElizabeth H. Barnes, Deputy Chief Counsel \nKriss E. Brown, Executive Deputy Chief Counsel \nTiffany Tran, Assistant Counsel \nPennsylvania Public Utility Commission \nP.O. Box 3265 \nHarrisburg, PA 17105-3265 \nTelephone: 717-787-5000 \nebarnes@pa.gov \nkribrown@pa.gov  \ntiftran@pa.gov    \n \nCounsel for the Pennsylvania Public Utility Commission \n \n \nDated: April 22, 2025"},{"page":11,"startToken":2366,"endToken":2448,"text":"11 \n \nCERTIFICATE OF SERVICE  \nI HEREBY CERTIFY that I am on this date serving a copy of the \nforegoing document upon each person designated on the official service list \ncompiled by the Federal Energy Regulatory Commission in accordance with \nthe requirements of Rule 2010 of the Commission’s Rules of Practice and \nProcedure.  \n  \n \n  \nRespectfully submitted,  \n \n \nElizabeth H. Barnes  \n \nElizabeth H. Barnes  \nDeputy Chief Counsel  \nPennsylvania Public Utility Commission  \n400 North St., 3rd Floor \nHarrisburg, PA  17120  \nTel: (717) 787-5000  \n  \nDated:  April 22, 2025"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":982,"startToken":0,"endToken":266},{"p":2,"at":982,"title":"I. Jurisdiction","method":"printed heading","endPage":4,"endAt":437,"startToken":266,"endToken":707},{"p":4,"at":437,"title":"II. Services received in co-located load arrangements.","method":"printed heading","endPage":6,"endAt":189,"startToken":707,"endToken":1238},{"p":6,"at":189,"title":"III. PJM’S Tarriff – Wholesale Grid Services","method":"printed heading","endPage":6,"endAt":935,"startToken":1238,"endToken":1339},{"p":6,"at":935,"title":"IV. Reliability and Resource Adequacy","method":"printed heading","endPage":7,"endAt":1306,"startToken":1339,"endToken":1610},{"p":7,"at":1306,"title":"V. Cost Allocation","method":"printed heading","endPage":8,"endAt":1448,"startToken":1610,"endToken":1881},{"p":8,"at":1448,"title":"VI. Speed of Interconnection is Driving the Demand for Co-location.","method":"printed heading","endPage":9,"endAt":1067,"startToken":1881,"endToken":2089},{"p":9,"at":1067,"title":"VII. Conclusion","method":"printed heading","endPage":11,"endAt":6,"startToken":2089,"endToken":2367},{"p":11,"at":6,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":11,"endAt":575,"startToken":2367,"endToken":2448}]}