{"document":{"slug":"rec-20250423-5020","title":"Comments of ENGIE North America Inc. in response to PJM Interconnection, L.L.C.'s et al. 03/24/2025 filing","issued":"2025-04-23","accession":"20250423-5020","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"ENGIE North America Inc.","kind":"comments","file":"sources/filings/text/20250423-5020_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5020","tier":"record","sha256":"6a4c24d8d8e8d10fa250284cf5c9bfe28258de447e65b101e2947633b002aa27","pages":10,"tokens":2131,"emptyPages":[],"textThemes":["colo","flex"]},"pages":[{"page":1,"startToken":0,"endToken":186,"text":"1\nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Interconnection, L.L.C.                                                   \nAmerican Transmission Systems, Incorporated                      \nAtlantic City Electric Company                                               \nBaltimore Gas and Electric Company                                       \nDelmarva Power & Light Company  \nDuke Energy Ohio, Inc.  \nDuke Energy Kentucky, Inc.  \nEast Kentucky Power Cooperative, Inc.  \nEssential Power Rock Springs, LLC  \nHudson Transmission Partners, LLC  \nJersey Central Power & Light Company  \nMid-Atlantic Interstate Transmission, LLC  \nNeptune Regional Transmission System, LLC  \nOld Dominion Electric Cooperative  \nPECO Energy Company  \nPPL Electric Utilities Corporation  \nPotomac Electric Power Company  \nPublic Service Electric and Gas Company  \nRockland Electric Company  \nTrans-Allegheny Interstate Line Company  \nTransource West Virginia, LLC  \nUGI Utilities, Inc.  \nMonongahela Power Company  \nThe Potomac Edison Company  \nCommonwealth Edison Company  \nCommonwealth Edison Company of Indiana, Inc.  \nThe Dayton Power and Light Company   \nAEP Appalachian Transmission Company, Inc.  \nAEP Indiana Michigan Transmission Company, Inc.  \nAEP Kentucky Transmission Company, Inc.  \nAEP Ohio Transmission Company, Inc.  \nAEP West Virginia Transmission Company, Inc.  \nAppalachian Power Company  \nIndiana Michigan Power Company  \nKentucky Power Company  \nKingsport Power Company  \nOhio Power Company  \nWheeling Power Company  \nDuquesne Light Company  \nVirginia Electric and Power Company  \nLinden VFT, LLC  \nDocket Nos.  \nEL25-49-000  \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n)"},{"page":2,"startToken":186,"endToken":407,"text":"2\nCity of Cleveland, Department of Public Utilities,    ) \nDivision of Cleveland Public Power                          ) \nCity of Hamilton, OH                                                 ) \nSouthern Maryland Electric Cooperative, Inc.           )  \nOhio Valley Electric Corporation                               ) \nAMP Transmission, LLC                                            ) \nSilver Run Electric, LLC                                            ) \nNextEra Energy Transmission MidAtlantic Indiana, ) \nInc.                                                                              ) \nWabash Valley Power Association, Inc.                     ) \nKeystone Appalachian Transmission Company         ) \n                                                                                   ) \nLarge Loads Co-Located at Generating Facilities      ) \n                                                                                   ) \n                                                                                   ) \nConstellation Energy Generation, LLC                      ) \nv.                                                                                 ) \nPJM Interconnection, L.L.C.                                      )   \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nAD24-11-000  \n \n \nEL25-20-000  \n(Consolidated)  \n \n \n \n \n \n \nCOMMENTS OF ENGIE NORTH AMERICA INC.  \n \nPursuant to Rule 211 of the Federal Energy Regulatory Commission’s (“Commission”) \nRules of Practice and Procedure, 18 C.F.R. § 385.211, ENGIE North America Inc., (“ENGIE”), \nrespectfully submits these comments in response to the filings dated March 24, 2025 of PJM \nInterconnection, L.L.C. (“PJM”) (“PJM Filing”), the Indicated PJM Transmission Owners, and \nPublic Service Gas & Electric made in response to the Commission’s February 20, 2025 Order \nInstituting Proceeding under Section 206 of the Federal Power Act and Consolidating with Other \nProceedings (the “Show Cause Order”).1 ENGIE’s comments recognize the significant efforts by \nPJM in its filing while also emphasizing the acute need for clear Commission guidance on co-\nlocation arrangements, the need to safeguard flexibility in PJM’s tariff, and that fairness dictates \ncompensating co-location arrangements for benefits provided to the grid.  \n \n1  PJM Interconnexion, L.L.C., et al., 190 FERC ¶ 61,115 (2025)."},{"page":3,"startToken":407,"endToken":667,"text":"3\nI. \nCOMMUNICATIONS \nAll correspondence and communication concerning this filing should be directed to: \nSarah Bresolin Silver \nVice President, Government and Regulatory Affairs \nENGIE North America Inc. \n1360 Post Oak Blvd., Suite 400 \nHouston, TX 77056 \nsarah.bresolin@engie.com  \n \nII. \nINTRODUCTION \nENGIE North America is a subsidiary of ENGIE SA, based in Paris, France. Globally, \nENGIE SA is a leading independent power producer, operating 106 GW of installed generation \ncapacity, including 38 GW of renewable energy generation throughout 31 countries. ENGIE also \noperates the largest natural gas distribution network in Europe, owns 2,485 miles of transmission \nlines, and is a leading energy supplier globally to commercial and industrial customers.  \nWith over 2,000 employees in the United States, ENGIE has been actively engaged in the \ndomestic power industry for decades. ENGIE operates 12 GW of power generation, primarily \nsolar and wind power, and battery energy storage. ENGIE has several major partnerships with \nuniversities and medical campuses to manage their energy usage and decarbonization efforts and \noperates a large electricity and natural gas supply business for large commercial and industrial \ncustomers. ENGIE’s retail electricity business leads the way with innovative and integrated \nrenewable energy and risk management solutions in 14 retail electric choice markets to \ncommercial and industrial customers. ENGIE is also engaged in developing hydrogen projects in \nthe Gulf Coast region. ENGIE SA is a partner in the Ocean Winds global joint venture with EDP \nRenewables which is developing offshore wind projects in the United States off the coasts of \nMassachusetts, New York and New Jersey, and California."},{"page":4,"startToken":667,"endToken":944,"text":"4\nENGIE thanks the Commission for initiating the inquiry. Commission perspective and \ndirection will provide PJM, market participants and stakeholders with the much-needed certainty \nto pursue and benefit from co-located generation and large load arrangements.  \nIII. \nCOMMENTS \nA. PJM’s filing appropriately acknowledges the acute need for new co-located large \nload and generating facility participation models. \n \nThe significant growth of data center, and other large load development, is reshaping the \nenergy landscape, driving the need for changes to existing laws and regulations, infrastructure \ndevelopment and planning, and electricity market participation arrangements. Although in PJM \ncertain frameworks already exist to enable the co-location of large loads and generation, PJM \ncorrectly recognizes that “clarifications and enhancements could well be in order given that this \nis an evolving area and Tariff provisions did not contemplate the type of arrangements at issue in \nthis docket or their implications.”2 \nENGIE agrees. The magnitude and pace at which large loads are seeking to interconnect, \nand the need for new commercial and technical arrangements to satisfy the parties’ diverse \nrequirements, portend the creation of new co-location frameworks.  \nIn addition to confirming PJM’s three existing co-location market participation models, \nPJM’s filing to the Commission’s Show Cause Order includes several potential new options for \npairing generation with large loads.3 Specifically, new Options 4 through 8 address some key \naspects of co-location arrangements beyond what is specifically permitted in PJM’s tariff.  \nENGIE appreciates the significant effort that PJM has undergone into conceptualizing \nNew Options 4 through 8. ENGIE believes that it is unlikely that meaningful progress can be \n \n2 PJM Interconnection, FERC Case No. EL25-49, at 32, filed March 24, 2025. \n3Id. at 9-20, Att. A."},{"page":5,"startToken":944,"endToken":1201,"text":"5\nmade in meeting the demand for co-locating large loads with generation by leveraging the \ncurrent tools in PJM’s existing tariff. To address the significant increase in requests to \ninterconnect large loads co-located with generation, the Commission, PJM and stakeholders must \nexplore new and innovative market solutions.  \nB. The Commission should provide clear guidance on co-location arrangements.  \nIn its filing, PJM acknowledges that its efforts “would be greatly assisted by Commission \nguidance.”4  ENGIE agrees and believes that it is essential for the Commission to provide \nguidance on co-location arrangements. Commission guidance would assist PJM market \nparticipants and stakeholders in obtaining certainty and clarity about available pathways for \nintegration of large loads consistent with PJM’s principles. Commission guidance would not just \nprovide increased certainty, but it would assist in garnering stakeholder consensus.  \nFurther, ENGIE recommends that the Commission also investigate and support additional \nco-location arrangements beyond PJM’s options 1 through 8. ENGIE believes that the record \nsupports consideration of additional participation options beyond those that already exist and \nthose newly proposed. Therefore, ENGIE recommends that the Commission sanction further \nexploration of additional options proposed by stakeholders in comments to the docket. \nC. The Commission must safeguard flexibility in the PJM tariff. \nPJM’s filing outlines eight options for integrating large loads with generating facilities. \nENGIE acknowledges that these options aim to provide flexibility, clarity and capture multiple \nco-location use cases while ensuring fairness in cost implications and maintaining grid reliability. \nFlexibility in tariff design for meeting the various existing and future co-located configurations is \n \n4 Id. at 32."},{"page":6,"startToken":1201,"endToken":1480,"text":"6\ncrucial in the context of co-locating large loads and generating facilities especially in a dynamic \nand rapidly evolving environment. \nFirst, flexibility will ensure adaptability to changing needs. As data centers, and other \nlarge loads, grow and their energy needs change, flexible arrangements will help stakeholders \nadapt to evolving demands and technological advancements without major disruptions. For \nexample, when needs change, it is foreseeable that shifting between configuration options may \nbe more beneficial and efficient. Further, PJM should expect that proposed new options, beyond \nwhat was conceived in the PJM Proposal, will develop, and must be recognized or enabled by the \ntariff.  \nSecond, flexibility can also enhance system reliability as configuration design can provide \nmultiple pathways for power delivery. Flexibility also allows stakeholders to choose the most \ncost-effective solutions by optimizing the use of, or not, of the electric grid.  \nFinally, flexibility in the tariff can help to mitigate future legal and regulatory changes. In \nits submittal, PJM emphasizes that co-located arrangements must comply with state laws and \nregulations.5 Also, that no configuration can be used if it does not comply with state law by \nvirtue of it being one of the options.6 Therefore, building flexibility into the tariff language can \nhelp to navigate the complex regulatory landscapes by offering multiple ways to interconnect.  \nD. The Commission must ensure that PJM’s participation options capture and \nrecognize the system and ratepayer benefits of co-location. \n \nENGIE believes that co-location arrangements offer multiple benefits that are shared \nacross the co-located load and generating facility, ratepayers, and the electric grid. Such benefits \nshould be acknowledged, captured, and where appropriate, compensated in PJM’s tariff.  \n \n5 Id. at 3.  \n6 Id. at 3-4."},{"page":7,"startToken":1480,"endToken":1705,"text":"7\nWhile PJM’s submittal states that “participants involved in co-location arrangements \nshould pay the costs of any grid services they consume”, PJM does not comment on \ncompensating services provided by co-located arrangements to the grid except to express that \nfurther stakeholder engagement is needed.7 Co-located arrangements can provide cost savings by \nreducing overall system costs which can result in the reduction of costs to ratepayers of \notherwise interconnecting the load in a non-co-location arrangement. These arrangements can \nalso make efficient use of existing transmission and generation resources which can forestall the \nneed for new infrastructure investments. Such arrangements may also encourage the \ndevelopment of new generating resources which can contribute to increased capacity and grid \nreliability. \nFurther, co-located arrangements can offer environmental benefits by encouraging the use \nof renewable energy sources and energy-efficient technologies that will deliver cleaner power to \nthe load than the load could draw from the grid.  \nFinally, co-located arrangements can offer improved grid reliability and stability. PJM \naddresses the ability of these arrangements to provide back-up service and promises to continue \nto engage with stakeholders to capture potential opportunities.8 Arrangements that provide \nbenefits to the grid such as ancillary services, frequency regulation, voltage support, back-up \nservice or blackstart capability, should be compensated for providing those benefits like any \nother market participant.  \n \n \n \n \n7 Id. at 68. \n8 Id. at 69-70."},{"page":8,"startToken":1705,"endToken":1971,"text":"8\nE. The Commission should address several outstanding issues to ensure \nimplementation of co-location options.  \n \nAlthough PJM’s Proposal touches on interconnection of co-located arrangements, PJM’s \nresponse is brief and does not capture some of the outstanding stakeholder questions or \nconcerns.9 For example, currently the load and generation interconnection study processes are \nbifurcated. Entities wishing to take advantage of colocation require clarity as to how the \narrangements will be studied. ENGIE recommends that the Commission and PJM explore \nwhether efficiencies can be gained by studying co-location arrangements in an alternative \nmanner, such as evaluating the net impact on the grid, which recognizes the co-located nature of \nthe interconnection request.  \nENGIE also notes the complexity of this type of study including potential mismatching of \nthe time when the load and the generation come online or the lifetime of the load versus the \nlifetime of the generation or the variances of operational characteristics of co-located load and \ngeneration. ENGIE encourages the Commission and PJM to address these difficult but critical \nquestions and concepts to enable the rapid integration of co-located arrangements.  \nFurther, ENGIE notes that the Commission requested information from PJM on how co-\nlocation arrangements may provide benefits.10  While PJM did not respond substantively to this \nrequest, PJM acknowledges that further engagement is needed. ENGIE recommends that the \nCommission require that PJM evaluate the benefits of co-located arrangements and design a joint \nand expedited interconnection review process for large load and generation as well as a \ncompensation framework that fairly compensates the facilities for the services they provide.  \n \n \n9 Id. at 32-34. \n10 Id. at 70."},{"page":9,"startToken":1971,"endToken":2061,"text":"9\nIV. \nCONCLUSION \nENGIE commends the Commission for its continued interest and inquiry into co-located \narrangements. We also recognize and appreciate the significant work that PJM has accomplished  \nin its filing to the Commission. ENGIE encourages the Commission to consider and take action \non our recommendations. We look forward to engaging further with the Commission, PJM and \nstakeholders as the opportunity arises.  \n \n \nRespectfully Submitted, \n \n/s/ Sarah Bresolin Silver \nSarah Bresolin Silver \nENGIE North America Inc. \n1360 Post Oak Blvd. \nHouston, TX 77056 \nsarah.bresolin@engie.com   \n \nDated: April 22, 2025"},{"page":10,"startToken":2061,"endToken":2131,"text":"10\nCERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. Dated at \nTamarindo, Costa Rica, this 22 day of April 2025. \n/s/ Sarah Bresolin Silver \nSarah Bresolin Silver \nVice President, Government and Regulatory  \nENGIE North America Inc. \n1360 Post Oak Blvd. \nHouston, TX 77056 \nsarah.bresolin@engie.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":2,"startToken":0,"endToken":408},{"p":3,"at":2,"title":"I. COMMUNICATIONS","method":"printed heading","endPage":3,"endAt":286,"startToken":408,"endToken":447},{"p":3,"at":286,"title":"II. INTRODUCTION","method":"printed heading","endPage":4,"endAt":263,"startToken":447,"endToken":702},{"p":4,"at":263,"title":"III. COMMENTS","method":"printed heading","endPage":4,"endAt":279,"startToken":702,"endToken":704},{"p":4,"at":279,"title":"A. PJM’s filing appropriately acknowledges the acute need for new co-located large","method":"printed heading","endPage":5,"endAt":327,"startToken":704,"endToken":991},{"p":5,"at":327,"title":"B. The Commission should provide clear guidance on co-location arrangements.","method":"printed heading","endPage":5,"endAt":1399,"startToken":991,"endToken":1135},{"p":5,"at":1399,"title":"C. The Commission must safeguard flexibility in the PJM tariff.","method":"printed heading","endPage":6,"endAt":1463,"startToken":1135,"endToken":1417},{"p":6,"at":1463,"title":"D. The Commission must ensure that PJM’s participation options capture and","method":"printed heading","endPage":8,"endAt":2,"startToken":1417,"endToken":1706},{"p":8,"at":2,"title":"E. The Commission should address several outstanding issues to ensure","method":"printed heading","endPage":9,"endAt":2,"startToken":1706,"endToken":1972},{"p":9,"at":2,"title":"IV. CONCLUSION","method":"printed heading","endPage":10,"endAt":3,"startToken":1972,"endToken":2062},{"p":10,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":10,"endAt":444,"startToken":2062,"endToken":2131}]}