{"document":{"slug":"rec-20250423-5159","title":"Comments of the Organization of PJM States, Inc. in response to PJM Interconnection, L.L.C.'s 03/24/2025 Answer","issued":"2025-04-23","accession":"20250423-5159","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Organization of PJM States, Inc.","kind":"answer","file":"sources/filings/text/20250423-5159_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5159","tier":"record","sha256":"8d8529a5b5b26aa9ccea44f14a06bb4e4bc42e0b81d24ec91975ff9f6d7ebcdd","pages":8,"tokens":1804,"emptyPages":[],"textThemes":["colo","study","retail","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":278,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al.  \n)  \nDocket No. EL25-49-000 \n \n) \nLarge Loads Co-Located at  \n) \nGenerating Facilities \n) \nDocket No. AD24-11-000 \n \n) \nConstellation Energy Generation, LLC \n) \n \n) \nv.  \n) \n \n) \nPJM Interconnection, L.L.C.  \n)  \nDocket No. EL25-20-000  \n \n) \n(consolidated) \n \n \nCOMMENTS OF THE \nORGANIZATION OF PJM STATES, INC. \n \nPursuant to the Order Instituting Proceeding Under Section 206 of the Federal Power Act \nand Consolidating with Other Proceedings1 issued by the Federal Energy Regulatory Commission \n(“FERC” or “Commission”) on February 20, 2025, and in response to PJM’s Answer filed on \nMarch 24, 2025,2 the Organization of PJM States, Inc. (“OPSI”) submits the following comments.3  \nOPSI appreciates the Commission’s detailed investigation to determine whether PJM’s \ncurrent rules ensure regional resource adequacy and grid reliability, accurately assess the extent to \nwhich large, co-located load arrangements use grid services, fairly allocate the costs these \narrangements may impose on existing customers, and respect existing jurisdictional boundaries. \nOPSI discusses each of these topics in more detail below. \n \n1 PJM Interconnection L.L.C., 190 FERC ¶ 61,115 (2025) (“Show Cause Order”). \n2PJM Interconnection L.L.C., Answer of PJM Interconnection, L.L.C. (March 24, 2025) (“PJM Answer”). \n3 OPSI’s following members support these Comments: Delaware Public Service Commission, Public Service \nCommission of the District of Columbia, Illinois Commerce Commission, Indiana Utility Regulatory Commission, \nKentucky Public Service Commission, Maryland Public Service Commission, Michigan Public Service Commission, \nNew Jersey Board of Public Utilities, Public Utilities Commission of Ohio, Pennsylvania Public Utility Commission, \nTennessee Public Utility Commission, Virginia State Corporation Commission and Public Service Commission of \nWest Virginia. The North Carolina Utilities Commission abstained in the vote on these comments."},{"page":2,"startToken":278,"endToken":579,"text":"2 \n \nI. \nCOMMENTS \nPJM’s stated approach to large load expansion—co-located or not—focuses on: “(1) \nmaintaining resource adequacy; (2) enabling reliable system operations; (3) facilitating the states’ \nand stakeholders’ efforts to timely and effectively integrate large loads in a manner that meets their \nunique needs; and (4) providing information and analysis that supports the equitable alignment of \ntransmission system usage and compensation.”4 OPSI appreciates this focus, recognizing that in \norder to facilitate these arrangements quickly and efficiently, the Commission must first ensure \nthat these arrangements do not negatively impact regional resource adequacy and grid reliability \nin the PJM region and that existing customers are not otherwise harmed by these arrangements. In \nits previous comments, OPSI urged FERC to require long-term scenario planning, mandate \ntransparent reviews of these arrangements, establish fair cost allocation for these arrangements \nwhen they use grid services, and affirm state jurisdiction over co-located retail sales.5 OPSI \nreiterates these points in response to both the Show Cause Order and PJM’s Answer. \nA. \nRESOURCE ADEQUACY, RELIABILITY, AND TRANSPARENCY \nThe Commission asks a series of questions about what interconnection modification and \ndeactivation studies PJM should conduct in reviewing co-location arrangements to ensure resource \nadequacy and protect the reliability of the bulk power system.6 OPSI appreciates that the first \ncomponent of PJM’s approach to the co-location of large loads is focused on maintaining resource \nadequacy and believes that PJM and the Commission should promote the development of \ncomprehensive and transparent processes to evaluate the impacts, both individual and cumulative, \nof these arrangements. PJM’s position is that any portion of a generation resource intending to \n \n4 PJM Answer at 3. \n5 OPSI, Post-Technical Conference Comments of the Organization of PJM States, Inc., Docket No. AD24-11-000 \n(Dec. 9, 2024) (“OPSI Comments”). \n6 Show Cause Order at Briefing Question e.iv."},{"page":3,"startToken":579,"endToken":854,"text":"3 \n \nserve co-located load outside the PJM system must first request and obtain removal of its Capacity \nResource status under section 6.6(g) of Attachment DD to the PJM Tariff, with approval from both \nthe Market Monitor and PJM or via Commission order.7 PJM emphasizes that capacity resources \ncannot prioritize serving non-PJM load, even as backup, without undermining system reliability \nand that sellers should not be allowed to choose between fulfilling PJM obligations or facing \npenalties.8 OPSI agrees. \nThe Commission also asks if the necessary study process used for generator \ninterconnection modifications adequately addresses the impacts of co-located load arrangements \nor whether other studies like generator deactivation studies are warranted.9 OPSI has emphasized \nthat PJM’s current process of using interconnection modifications to accommodate behind the \nmeter co-located load arrangements lacks transparency and public oversight noting these \nmodifications are privately negotiated and under non-disclosure agreements.10 Because of this, \nthese arrangements are not subject to stakeholder review and avoid a comprehensive reliability \nanalysis.11 The necessary studies process was developed to study modifications to existing \ngenerating units, not the addition of large co-located loads that are sometimes as large as \nmetropolitan areas. OPSI continues to call on the Commission to require that transmission \nproviders conduct transparent, publicly reviewable reliability studies pursuant to a PJM tariff for \nlarge co-located load arrangements to preserve system reliability.  \nFurther, in addition to simply evaluating the reliability impacts of individual arrangements, \nthe Commission should also promote processes that allow states to understand the cumulative \n \n7 PJM Answer at 57-59. \n8 Id. \n9 Show Cause Order at Briefing Question d.i. \n10 OPSI Comments at 3.  \n11 Id."},{"page":4,"startToken":854,"endToken":1133,"text":"4 \n \nresource adequacy impacts of these arrangements within individual states and across the PJM \nregion. OPSI has previously called for long-term scenario analyses of these arrangements and \ncalled on FERC to review whether these arrangements negatively impact regional reliability.12 \nNeither the current necessary study process nor PJM’s deactivation study process produces this \ntype of information as it pertains to these arrangements. \nOnce PJM has conducted appropriate studies to identify the impacts of co-located load \narrangements, it should also comprehensively evaluate potential solutions and provide the \ninformation necessary for states and stakeholders to understand whether transmission, generation, \ngrid enhancing technologies, or some combination is the most cost-effective response to any \nreliability violations identified.  \nB. \nCONSUMER PROTECTION AND COST ALLOCATION \nBeyond ensuring that large, co-located load arrangements do not degrade regional resource \nadequacy or the reliability of the bulk power system for existing customers, the Commission must \nalso determine the extent to which large, co-located load arrangements rely on the bulk power \nsystem as it determines how to allocate transmission costs appropriately and the extent to which \nthese arrangements impact rates for other customers. To that end, the Commission asks how \ndifferent co-location configurations impose costs on other customers and whether large, co-located \nload should be required to take Network Integration Transmission Service, among other things.13  \nIt is important that the Commission accurately determine the extent to which these \narrangements use ancillary services. PJM objects to the concept of fully or wholly isolated load \n“as it is contrary to engineering and economic principles.”14 OPSI agrees and discourages the \n \n12 Id. at 2. \n13 Show Cause Order at Briefing Questions b.ii – b.v. \n14 PJM Answer at 42."},{"page":5,"startToken":1133,"endToken":1424,"text":"5 \n \nCommission from accepting the premise that load can be wholly isolated from the grid without a \ncomprehensive and conclusive showing that it is impossible for the load to ever receive grid \nservices or impact transmission rates for existing customers. \nThe Commission asks a series of questions about how co-location arrangements can create \ncosts, including transmission, energy, capacity, and ancillary services charges, for all customers \nand affect the allocation of those costs when these arrangements come online before PJM’s markets \nand transmission planning processes are able to respond efficiently.15 OPSI has previously written \nthat the scale of the co-location agreements being negotiated “demands that appropriate cost \nallocation tariffs be developed that recognize the benefits and services received by the generator \nand its customer in behind the meter co-location arrangements.”16 Without a framework that \nstudies the individual and cumulative impacts of these arrangements on the bulk power system, it \nwill be difficult to assure stakeholders that large loads co-locating with generation are being \naccurately assigned the costs of the grid services they use, recognizing these arrangements may \nalso create or shift costs for existing customers.  \nC. \nJURISDICTION \nIn its Post Technical Conference Comments, OPSI asked that the Commission “confirm \nthat the sale between co-located generation and load is a retail transaction subject to state \njurisdiction.”17 OPSI further stated “There is no regulatory gap. Sales of electricity from a \ngenerator to an end use customer in intrastate commerce are subject to state jurisdiction.”18 PJM \nchallenges this assertion by stating that it is unclear that this is true across the PJM region.19 OPSI’s \n \n15 Show Cause Order at d.iv, v, and ix.  \n16 OPSI Comments at 4. \n17 Id. \n18 Id. at 5. \n19 PJM Answer at 22-23."},{"page":6,"startToken":1424,"endToken":1677,"text":"6 \n \nMember States have processes by which jurisdictional issues can be resolved. Interested parties \ncan file a petition for declaratory order seeking a determination from any State Commission \nregarding the extent to which such service is state jurisdictional. State Commissions allow for \nformal due process to all affected parties. \nOPSI continues to assert that there is no regulatory gap regarding jurisdiction over retail \nsales. Section 201(b)(1) of the Federal Power Act states that “The provisions of this Part shall \napply to the transmission of electric energy in interstate commerce and to the sale of electric energy \nat wholesale in interstate commerce.”20 However, it specifically states that it “shall not apply to \nany other sale of electric energy.”21 The Commission is correct when it states, “First and foremost, \nstates retain exclusive jurisdiction over the terms of retail sales.”22 And the Commission goes on \nto assert its jurisdiction “If [the sales from generating resources used to serve co-located loads] are \nnot sales for resale—that is, if they are made directly to the end-use consumer—or if they are not \nin interstate commerce then the co-located generator’s sales are under state jurisdiction.”23 OPSI \nagrees with this assertion. \nII. \nCONCLUSION \nOPSI appreciates the opportunity to comment on the many important topics the \nCommission has raised in this Show Cause proceeding. \n \n \n20 16 U.S.C. § 824(b) (emphasis added) (A wholesale sale is a sale for resale, not end-use.). \n21 Id. \n22 Show Cause Order at P 68-69. \n23 Id."},{"page":7,"startToken":1677,"endToken":1732,"text":"7 \n \nRespectfully Submitted,  \nGregory V. Carmean \nExecutive Director  \nOrganization of PJM States, Inc.  \n700 Barksdale Road, Suite 1 \nNewark, DE 19711  \n302-266-0914  \ngreg@opsi.us  \nBenjamin B. Sloan \nDirector of Legal and Regulatory Affairs  \nOrganization of PJM States, Inc.  \n700 Barksdale Road, Suite 1 \nNewark, DE 19711  \n601-214-8481  \nben@opsi.us  \nDated: April 23, 2025"},{"page":8,"startToken":1732,"endToken":1804,"text":"8 \n \nCERTIFICA TE OF SERVICE \nI hereby certify that the foregoing has been served in accordance with 18 C.F.R. Section \n385.2010 upon each person designated on the official service list compiled by the Secretary in this \nproceeding.  \n \n/s/ Gregory V. Carmean \nGregory V. Carmean \nExecutive Director  \nOrganization of PJM States, Inc.  \n700 Barksdale Road, Suite 1  \nNewark, DE 19711  \nTel: 302-266-0914  \n \n \nDated at Newark, Delaware this April 23, 2025."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":5,"startToken":0,"endToken":279},{"p":2,"at":5,"title":"I. COMMENTS","method":"printed heading","endPage":2,"endAt":1162,"startToken":279,"endToken":444},{"p":2,"at":1162,"title":"A. RESOURCE ADEQUACY, RELIABILITY, AND TRANSPARENCY","method":"printed heading","endPage":4,"endAt":849,"startToken":444,"endToken":967},{"p":4,"at":849,"title":"B. CONSUMER PROTECTION AND COST ALLOCATION","method":"printed heading","endPage":5,"endAt":1277,"startToken":967,"endToken":1319},{"p":5,"at":1277,"title":"C. JURISDICTION","method":"printed heading","endPage":6,"endAt":1269,"startToken":1319,"endToken":1625},{"p":6,"at":1269,"title":"II. CONCLUSION","method":"printed heading","endPage":8,"endAt":456,"startToken":1625,"endToken":1804}]}