{"document":{"slug":"rec-20250423-5161","title":"Comments of Solar Energy Industries Association in response to FERC's 02/20/2025 Order Instituting Proceeding under Section 206 of the Federal Power Act et al","issued":"2025-04-23","accession":"20250423-5161","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Solar Energy Industries Association","kind":"comments","file":"sources/filings/text/20250423-5161_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5161","tier":"record","sha256":"1b3238b058eac8f79c0eab929a9a679c1a50fbb82ad80a7982771b9c02cf5247","pages":13,"tokens":3868,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":268,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n  \nPJM Interconnection, L.L.C. et al.  \n \n \n \n Docket Nos. EL25-49-000 \n \n \nLarge Loads Co-Located at Generating Facilities   \n \n \n            AD24-11-000  \n \n \nConstellation Energy Generation, L.L.C.   \n \n \n \n \nEL25-20-000 \n \n          v.  \n \n \n \n \n \n \n \n \n          (consolidated) \n \nPJM Interconnection, L.L.C. \n \nCOMMENTS OF THE SOLAR ENERGY INDUSTRIES ASSOCIATION \nMaintaining U.S. leadership in Artificial Intelligence (AI) is essential for our national \nsecurity and economic growth.1 To maintain leadership in the industry though, the U.S. needs to \nprovide for the rapid development of the data center infrastructure necessary to support AI \ngrowth. Hyper scalers, utilities, Regional Transmission Organizations, developers, state \nregulators, and the Commission each play a critical role in supporting that infrastructure and its \nsignificant power demands. And each one of these stakeholders must work expeditiously to \nremove the barriers to that development and provide regulatory certainty.2 \nSEIA submits these comments in response to the Commission’s February 20, 2025 Order \nInstituting Proceeding under Section 206 of the Federal Power Act and Consolidating with Other \nProceedings and PJM Interconnection, L.L.C.’s March 24, 2025 Answer to that Show Cause \n \n1 PJM Interconnection, L.L.C., 189 FERC ¶ 61,078, Phillips Dissenting, at P 3 (2024) (“Susquehanna ISA Order”); \nExecutive Order 14179, “Removing Barriers to American Leadership in Artificial Intelligence” (Jan. 23, 2025).  \n2 PJM Interconnection, L.L.C., 191 FERC ¶ 61,025 at P 30, n.106 (2025) (“Susquehanna ISA Rehearing Order”) \n(“We fully intend to act as expeditiously as possible to address those issues, as we know how important it is to \ninvestors, utilities, and all interested parties to have regulatory certainty.”)."},{"page":2,"startToken":268,"endToken":594,"text":"2 \n \nOrder.3 In the Show Cause Order, the Commission seeks comment on whether the PJM Tariff \naddresses, with sufficient clarity or consistency, the rates, terms, and conditions of service that \napply to co-location arrangements between large loads and generating facilities. Co-located load \narrangements are increasingly common in PJM,4 because they help address the large power \ndemands of AI infrastructure and new manufacturing.5 However, the PJM Tariff lacks the clarity \nnecessary to allow for these kinds of arrangements. In its response to the Show Cause Order, \nPJM presents eight options, three of which are currently in its Tariff. PJM’s answer provides the \nframework for the Commission to direct Tariff changes that will clearly provide for the rates, \nterms, and conditions of co-location agreements.  \nSEIA urges the Commission to direct PJM to develop Tariff language implementing the \nfive new options for co-location arrangement. As PJM already notes, its options are not mutually \nexclusive.6 Nor should they be. PJM, and the Commission, should provide clear rules for co-\nlocation and provide flexibility and regulatory certainty to accommodate different arrangements. \nAdditionally, with respect to PJM’s Option 6, the Bring-your-own Generation option, the \nCommission should direct PJM to create a process by which it would expedite the \ninterconnection of generation being used exclusively to serve large load customers through a co-\nlocation arrangement. \n \n3 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115 (2025) (“Show Cause Order”); Answer of PJM Interconnection, \nL.L.C., Docket No. EL25-49 et al. (March 24, 2025) (“PJM Answer”). \n4 See, e.g., Docket No. ER24-2172, et al.; EL24-149-000. \n5 Commissioner Led Technical Conference Regarding Large Loads Co-Located at Generating Facilities, Docket No. \nAD24-11, Transcript at 7-9 (Nov. 1, 2024) (“Technical Conference Transcript”) (opening statements of then-Chair \nPhillips); Id. at 16-17 (opening statements of Commissioner See). \n6 PJM Answer at 5 (“Further, identified options are not mutually exclusive, as it is possible several of the options \nmay be used seriatim or concurrently.”)."},{"page":3,"startToken":594,"endToken":906,"text":"3 \n \nI. \nCOMMENTS  \nA. \nThe Commission must base costs on grid use and should accommodate both \nfront of the meter and behind the meter load arrangements when setting \nthose costs. \nThe transmission and ancillary service costs must reflect the benefits the co-located load \narrangement receives from the grid.7 The type of benefits received will depend on the specific \nco-location arrangement.8 As SEIA noted in our post-technical conference comments, some \narrangements can be completely islanded from the grid and bear the risk of going offline.9 Others \ncannot take such a risk. Some large loads are flexible and can respond to utility price signals and \ndemand response programs. Each arrangement “is going to be a snowflake . . . they are going to \nhave their own design, their own concerns, their own issues, their own configurations that they \nwould like to meet.”10  \nDespite the variety of potential arrangements, PJM’s Tariff lacks any mechanism to \ndetermine which transmission service classification—and corresponding cost allocation—applies \nto each co-location arrangement. Although PJM prefers large loads to be considered network \nload, in front of the meter,11 two of the options would allow for load to be considered behind the \nmeter.12 \n \n7 See Show Cause Order at P 77 (questioning whether Network Integration Transmission Service is the appropriate \ntransmission service for all co-location arrangements or that such service would be consistent with cost causation \nprinciple.). \n8 Clean Energy Buyers Association Pre-filed comments at 5, Docket No. AD24-11; Talen Energy Pre-filed \nComments at 1-3, Docket No. AD24-11 (“Talen has been . . . safely operating co-located loads for over 18 \nmonths.”).   \n9 See Post-Workshop Comments of the Solar Energy Industries Association, at 4, Docket No. AD24-11 (Dec. 9, \n2024). \n10 Technical Conference Transcript at 61 (statement of Aubrey Johnson, Vice President, System & Resource \nPlanning, Midcontinent Independent System Operator).   \n11 PJM Answer at 38. \n12 See PJM Answer at 13-15."},{"page":4,"startToken":906,"endToken":1229,"text":"4 \n \nSEIA does not take a position on whether the large load should be considered front of the \nmeter or behind the meter and urges the Commission to refrain from mandating one network \nconfiguration over the other. As the Commission itself recognized, “[t]he record demonstrates \nthat different co-location arrangements are likely to use or benefit from the transmission system \nin different ways depending on how they are configured and, moreover, that those different \nconfigurations will themselves likely have different impacts on the transmission system.”13 There \nare trade-offs in each model and no single model can address the full spectrum of technical \nconsiderations across the variety of co-location proposals. The Commission should maintain both \npathways so that each project can select the configuration best suited to its commercial structure \nand reliability needs. As the Commission observes, “there is no clear record before us that \nNetwork Integration Transmission Service is the appropriate transmission service for all co-\nlocation arrangements or that such service would be consistent with the cost causation principle \n… for such arrangements.”14  \nThe Commission should refrain from preferencing a particular Network configuration. \nBeyond technical and market considerations, the importance of data-center growth to U.S. \neconomic competitiveness and national security reinforces the need for regulatory neutrality. As \nthen-Chairman Phillips observed, “data centers…are national resources, with generational \nsignificance, and vast national security and national economic consequences. They belong in the \nUnited States, and…this agency should be doing [its] very best to nurture and foster their \ndevelopment.”15 Preferential treatment of one network configuration would constrict, rather than \n \n13 Show Cause Order at P 76; see also Atlantic City Electric Co., et al., 190 FERC ¶ 61,109 (2025) (rejecting Tariff \nrevisions proposing to charge all co-located load based on a gross load basis). \n14 Show Cause Order at P 77. \n15 Large Loads Co-Located at Generating Facilities, Docket No. AD24-11, November 1, 2024, Technical \nConference, Tr. at 8. (Technical Conference)."},{"page":5,"startToken":1229,"endToken":1595,"text":"5 \n \nfoster, domestic development. Policymakers across the spectrum agree that data-center \nexpansion is too vital to be hamstrung by rigid Network mandates. The Commission should \naffirm that each customer can select the configuration that best meets its needs.  \nB. \nThe Commission should direct PJM to create processes in its Tariff to \neffectuate Options 4, 5, 6, 7, and 8. \n1. \nThe PJM Tariff lacks provisions to address the co-location of large loads \nand generation. \nIn the Show Cause Order, the Commission found that the PJM Tariff  “appears to be \nunjust and unreasonable or unduly discriminatory or preferential because it does not contain \nprovisions addressing with sufficient clarity or consistency the rates, terms, and conditions of \nservice that apply to co-location arrangements.”16 Despite statements from PJM,17 and the PJM \nIndicated Transmission Owners,18 the PJM Tariff does not address with “clarity or consistency \nthe rates, terms, and conditions of service that apply to co-location arrangements.”19  \nWhile PJM presents three options that are currently in its Tariff, only one of those options \nexplicitly provides for co-location. Option 1, Load with a separate Point of Interconnection that \nis Network Load, explicitly provides that the load and generation are not co-located.20 Though \npresented as a large load co-location option for the Commission to consider,21 it does not meet \nPJM’s definition of co-located load because the load and generation are behind separate Points of \nInterconnection.22 Similarly, Option 2, Co-located load that is at the same Point of \n \n16 Show Cause Order at P 74. \n17 PJM Answer at 4, 32. \n18 Answer of the Indicated PJM Transmission Owners to the Order Instituting the Proceeding Under Section 206 of \nthe Federal Power Act at 12 (March 24, 2025) (“Indicated TOs Answer”). \n19 Show Cause Order at 87. \n20 PJM Answer at 9 (“This option is where the load is network load and generation is a capacity resource and they \nare not electrically co-located.”). \n21 PJM Answer at 5. \n22 See PJM, PJM Guidance on Co-Located Load at 1 (March 22, 2024) (updated April 17, 2024), \nhttps://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/pjm-guidance-on-co-located-load.pdf \n(Guidance Document); see also Show Cause Order at P 3."},{"page":6,"startToken":1595,"endToken":1884,"text":"6 \n \nInterconnection but separately metered, allows the load and generation to be behind the same \npoint of interconnection, but each is metered separately.23 Effectively, this treats the load and \ngeneration as distinct from each other. \nOption 3, Existing Behind the Meter Generation (BTMG) where the load is the customer, \nreflects PJM’s existing BTMG rules where the load is the primary customer and nets with \nBTMG.24 Many of the existing co-location arrangements in PJM operate under this arrangement. \nIt is an option under the existing Tariff, but as PJM admits, it was not designed for the co-\nlocation needs of hyper-scalers.25  The use of this option is limited to 2,000 megawatts (MW), of \nwhich about 1,300 MW are already used.26 This is far short of the 40 GWs of data center \ncontracts announced in just the Dominion service territory alone.27 \nThe existing options under the PJM Tariff do not provide for rates, terms, and conditions \nof service that apply to the co-location arrangements at issue in this proceeding, the \narrangements needed to serve large loads. While Options 1 and 2 may work for some large loads \nand generation and should remain available, neither one qualifies as a co-location arrangement. \nWithout a clear set of rules to interconnect and allocate the transmission and ancillary services \ncosts of co-location arrangements between large load and generation, the PJM Tariff is unjust, \nunreasonable, and unduly discriminatory.28  \n \n23 PJM Answer at 11. \n24 Id. \n25 PJM Answer at 13, n. 5. \n26 Id. \n27 See Around the Corner: The Promise, Uncertainty and Unparalleled Risk of Data Center Load, RTO Insider, April \n20, 2025, https://www.rtoinsider.com/103016-around-the-corner-promise-uncertainty-unparalleled-risk-data-center-\nload/. \n28 See Show Cause Order at P 75."},{"page":7,"startToken":1884,"endToken":2244,"text":"7 \n \n2. \nThe new options provided in PJM’s Answer would result in just and \nreasonable rates, terms, and conditions for co-location of large load and \ngeneration. \nIn its Answer, PJM presented five “potential options that have been proposed by others or \ndeveloped by PJM in response to issues raised in the various predecessor co-located load \nproceedings.”29 The Commission should direct PJM to develop and file Tariff revisions to \nimplement each of these five options. \nThe November Technical Conference demonstrated that large loads come in different \nshapes and sizes.30 In the Show Cause Order, the Commission recognized that “The record \ndemonstrates that different co-location arrangements are likely to use or benefit from the \ntransmission system in different ways depending on how they are configured and, moreover, that \nthose different configurations will themselves likely have different impacts on the transmission \nsystem.”31 As the Indicated Transmission Owners recognized, there is an “evolving co-location \nconfiguration.”32  \nThis proceeding has only just scratched the surface of the technical capabilities of data \ncenters when it comes to energy needs, load flexibility, and demand reduction. This is, in part, \nbecause the market does not yet “know yet what types of load flexibility we're going to fully see \nfrom data centers.”33 The technology is constantly evolving and may result in significant power \nsavings for both new and existing data centers.34 Researchers from the Nicholas Institute at Duke \n \n29 PJM Answer at 5. \n30 See November Technical Conference Transcript, supra note 11.  \n31 Show Cause Order at P 76. \n32 Indicated TOs Answer at 12; see also Technical Conference Transcript at 57, statement of Commissioner See \n(“…but as so many of you have said, this is an area where details matter, and we're seeing fast innovation and \nchanges here.”). \n33 Technical Conference Transcript at 149. \n34 How liquid cooling can address AI's water crisis in data centers, Data Center Dynamics (Nov. 4, 2024), \nhttps://www.datacenterdynamics.com/en/opinions/how-liquid-cooling-can-address-ais-water-crisis-in-data-centers/ \n(“In addition to reducing water usage, liquid cooling offers a major boost to energy efficiency. … Many existing \ndata centers are also working on liquid cooling retrofits for at least parts of their data centers.”)."},{"page":8,"startToken":2244,"endToken":2630,"text":"8 \n \nUniversity recently stated that “A variety of recent developments in computational load profiles, \noperational capabilities, and broader market conditions, however, suggest that a new phase of \nopportunity and necessity is emerging.”35 The training of the neural networks used to power large \nlanguage models and other machine learning algorithms is deferrable, meaning that these \nprocesses could shift to periods of lower grid demand.36 These processes could also be shifted to \nother data centers on the grid, to areas where there is less grid demand or more renewable energy \navailable.37 These emerging capabilities, as well as the ability for a large load customer to bring \nits own generation in an expedited manner, make it so that certain customers may not need the \nfull suite of grid services, or may accept the risk of not having that full suite of services available \nto them. And, to support these solutions, the underlying rate designs should encourage “flexible \nload customers to be able to . . . move consumption away from peak periods.”38  \nThe potential for load flexibility necessitates “regulatory flexibility.”39 Regulatory \nflexibility, in this context, means that the Commission requires PJM to implement “optionality so \nthat customers have the ability to select the best configuration for their particular circumstances \nand needs.”40 Co-located loads with the ability to curtail or shift demand in coordination with \ngenerator output or grid constraints should be treated differently than firm grid-dependent load, \nas these loads would be capable of reducing their demand on the grid. This is a fact that PJM’s \nearlier guidance on co-location recognized.41 The Commission must do all it can to ensure the \n \n35 Duke University’s Nicholas Institute for Energy, Environment & Sustainability, Rethinking Load Growth: \nAssessing the Potential for Integration of Large Flexible Loads at 11, Feb. 2025, \nwww.nicholasinstitute.duke.edu/publications (emphasis added).  \n36 Id. \n37 Id. \n38 Technical Conference Transcript, at 125, comments of Pallas LeeVanSchaick. \n39 Susquehanna ISA Order, Phillips, Chairman, dissenting statement at P 3. \n40 Response of Public Service Electric and Gas Company at 20; see also Technical Conference Transcript at 90, 124. \n41 Show Cause Order at P 4 (citing Guidance Document at 2) (“certain parties may wish to pursue a co-location \narrangement without procuring applicable firm transmission service, in which case the load is not designated as \nNetwork Load.”)."},{"page":9,"startToken":2630,"endToken":2996,"text":"9 \n \nUnited States “nurture and foster” the development of AI infrastructure.42 Regulatory flexibility \nis critical to “support that development.”43  \nThe five new options presented by PJM in its answer provide a path for the Commission \nto exercise that “regulatory flexibility.” The Commission should direct PJM to develop and file \nthe necessary Tariff language to implement each of these options.44  \nC. \nThe Commission should direct PJM to fast-track new generation that would \ncome online via co-location agreements. \nWhile making progress, PJM is still in the process of transitioning its backlogged serial \nqueue to the new cluster study process. It has been well established throughout this proceeding, \nand several other proceedings, that the addition of large loads to the PJM system is outpacing the \naddition of the new resources needed to serve that new load.45 Several comments in this \nproceeding have noted that when new large loads sought to co-locate behind the meter of \nexisting generation, there could be resource adequacy issues.46 The Commission echoed these \npotential concerns in the Show Cause Order.47 \n \n42 Technical Conference Transcript at 8. \n43 Technical Conference Transcript at 20. \n44 See PJM Answer at 5 (“Each new option outlined herein is conceptual and would benefit from continued input \nfrom stakeholders, Commission guidance, and a deadline for submission of any such proposals either in the context \nof a section 205 filing or in this docket.”). \n45 Technical Conference Transcript at 165 (statements of D.C. Public Service Commission Chairman Emile C. \nThompson); NERC 2024 Long-Term Reliability Assessment, at 24 (Dec. 2024) (“The added resource capacity on \nthe BPS over the past year fell short of industry’s projections, raising concerns that demand growth has the potential \nto outpace supply resources.”); PJM Interconnection, L.L.C., Tariff Revisions for Reliability Resource Initiative, at \n2, Docket No. ER25-712 (Dec. 13, 2025); PJM Interconnection, L.L.C., Proposed Tariff Amendments for Surplus \nInterconnection Service, at 5, Docket No. ER26-778 (Dec. 20, 2024) (PJM Surplus Filing). \n46 See Show Cause Order at PP 62-64 (summarizing the resource adequacy concerns in the proceedings); Technical \nConference Transcript at 111 (statement of PJM Independent Market Monitor, Joe Bowering). \n47 Show Cause Order at P 84."},{"page":10,"startToken":2996,"endToken":3396,"text":"10 \n \n One way to address these concerns is to “figure out ways to bring new gen[eration] \nonline.”48 PJM’s Option 6 provides the basis to do exactly that.49 Option 6 “offers a potentially \nfaster interconnection path for generation resources supporting co-located loads.”50 The \nCommission should direct PJM to modify this option to implement an expedited co-located \ninterconnection process, separate from the queue, to determine whether the interconnection \nrequest for the co-located generation would require new Network Upgrades.  \nUnder this model, PJM would study the generator, whether utility owned or owned by an \nindependent power producer, similar to how it would study surplus service requests, in order to \ndetermine whether any new Network Upgrades would be needed to facilitate the interconnection \nrequest.51 One assumption of this co-location interconnection study would be that the resources \nusing this interconnection option would supply their entire output to the co-located load, and \nwould not be exporting to the grid and therefore these arrangements should be exempt from \ntraditional Network Upgrade triggers or full deliverability requirements.  \nThis process would be analogous to the widely-supported surplus interconnection \nservice.52 In Order No. 845, the Commission stated that “surplus interconnection service is \ncreated because generating facilities may not operate at full capacity at all times.”53 Under a co-\nlocated interconnection process, the generating facility may be operating at full capacity, \nhowever, that capacity would never exceed the requirements of the co-located load, and therefore \n \n48 Technical Conference Transcript at 112 (statement of PJM Independent Market Monitor, Joe Bowering); see also \nSEIA Comments in Docket No. AD24-11. \n49 SEIA recognizes that this option would also “be open for existing generation that could serve the energy needs of \nthe large loads so long as the generator would still be available to PJM as a Capacity Resource if it clears in the \ncapacity market.” The discussion here is focused solely on the ability to bring new resources onto the grid. \n50 PJM Answer at 17. \n51 See PJM Tariff, Subpart E, Section 414(B), Surplus Interconnection Study. \n52 See Reform of Generator Interconnection Procedures and Agreements, Order No. 845, 163 FERC ¶ 61,043 at P \n467 (2018) (“Order No. 845”), reh’g denied & clarification granted, Order No. 845-A, 166 FERC ¶ 61,137 at P 138 \n(“Order No. 845-A”), order on reh’g & clarification, Order No. 845-B, 168 FERC ¶ 61,092 (2019).  \n53 Order No. 845 at P 468."},{"page":11,"startToken":3396,"endToken":3732,"text":"11 \n \nwould not require transmission service to export to the grid.54 Similar to surplus interconnection \nservice, co-located interconnection service would not be queue jumping because the co-located \nresources would not be competing for Network Upgrades.55 \nThe purpose of co-located interconnection service is twofold. First, this service would \nhelp address the “rapid tightening of supply and demand” that PJM has highlighted in several \nfilings.56 Bringing new supply online faster will alleviate some of the demand pressures on the \nPJM system. Second, fast tracking new generation may also help prevent transmission system \noverbuild. Utilities include planned data centers in their load projections and transmission \nplanning. The utility may begin incurring transmission costs to accommodate that load and those \ncosts may end up stranded if the data center project is cancelled and the load does not show up.57 \nBy allowing co-located generation to come online along with the large loads, the grid impact of \nthe large load would likely be reduced, which would reduce the need to plan for Network \nUpgrades. The Commission should direct PJM to create a fast-track co-location interconnection \nprocess to ensure that new generation is timely, reliable, and avoids unnecessary transmission \noverbuild.  \n \nII. \nCONCLUSION \nThe Commission finds itself in a critical position with respect to how the U.S. will \nmaintain its leadership in AI technology. Power, and lots of it, is needed to supply AI \n \n54 It may still be possible under a co-location interconnection process for the load to require transmission service. \n55 See Order No. 845 at P 487. If the co-located interconnection study reveals that network upgrades are necessary, \nthen the co-located interconnection request would be deemed ineligible for this interconnection service. \n56 See PJM Surplus Filing at 5. \n57 See Post-Technical Conference Comments of Buckeye Power, Inc. at 5-6, Docket No. AD24-11 (Dec. 9, 2024); \nPost-Technical Conference Comments of the National Rural Electric Cooperative Association at 3, Docket No. \nAD24-11 (Dec. 9, 2024); Technical Conference Transcript at 51 (statement of Aaron Tinjum, the Data Center \nCoalition)."},{"page":12,"startToken":3732,"endToken":3826,"text":"12 \n \ninfrastructure. But to provide that power, market participants need clear, and flexible rules \nregarding the co-location of large load generation. PJM has provided the Commission with a \nframework for doing that. SEIA urges the Commission to act expeditiously in directing PJM to \nfurther define and develop that framework into workable Tariff provisions. \n \n \n \n \n \n \n \nRespectfully submitted,  \n \nMelissa Alfano   \nSenior Director of Energy Markets and Counsel   \nGreg Giunta   \nManager of Regulatory Affairs and Counsel  \nSolar Energy Industries Association   \n1425 K St NW Ste. 1000   \nWashington, D.C. 20005   \n(202) 566-2873  \nmalfano@seia.org  \nggiunta@seia.org"},{"page":13,"startToken":3826,"endToken":3868,"text":"CERTIFICATE OF SERVICE  \nI hereby certify that on this day I have served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding.  \nDated the 23rd day of April, 2025.  \n  \n \n \n \n \n \n/s/ \nMelissa Alfano"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":5,"startToken":0,"endToken":595},{"p":3,"at":5,"title":"I. COMMENTS","method":"printed heading","endPage":3,"endAt":20,"startToken":595,"endToken":597},{"p":3,"at":20,"title":"A. The Commission must base costs on grid use and should accommodate both","method":"printed heading","endPage":5,"endAt":265,"startToken":597,"endToken":1267},{"p":5,"at":265,"title":"B. The Commission should direct PJM to create processes in its Tariff to","method":"printed heading","endPage":9,"endAt":405,"startToken":1267,"endToken":2692},{"p":9,"at":405,"title":"C. The Commission should direct PJM to fast-track new generation that would","method":"printed heading","endPage":11,"endAt":1314,"startToken":2692,"endToken":3593},{"p":11,"at":1314,"title":"II. CONCLUSION","method":"printed heading","endPage":13,"endAt":0,"startToken":3593,"endToken":3826},{"p":13,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":13,"endAt":271,"startToken":3826,"endToken":3868}]}
