{"document":{"slug":"rec-20250423-5162-2","title":"Mainspring article_byop_2024-03-18_v01","issued":"2025-04-23","accession":"20250423-5162","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Mainspring Energy","kind":"attachment","file":"sources/filings/text/20250423-5162_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5162","tier":"record","parent":"rec-20250423-5162","sha256":"1ba89a7717c9bfb2d47057ffc2ba9c71955f871c3c69001620e7a6c58a6a0b82","pages":8,"tokens":3763,"emptyPages":[],"textThemes":["flex"]},"pages":[{"page":1,"startToken":0,"endToken":53,"text":"Advances in On-Premise Power Generation \nAllow the Future of Data Centers in the \nAI Era to Meet Capacity Constraints and \nAchieve Their Sustainability Targets  \nBring Your Own Power \n(BYOP)\nCo-authors\nSusanna Kass \nEnergy Fellow, Stanford University\nData Center Advisor, UNSDG-EP\nOperating Partner, Digital Gravity Infrastructure Partners\nShannon Miller \nFounder and CEO, Mainspring Energy"},{"page":2,"startToken":53,"endToken":567,"text":"Bring Your Own Power (BYOP)\n1\nIntroduction\nIn the data center world, action revolves around energy – \npower is critical to operation and key to efforts to improve \nthe sector’s environmental footprint. As a sector, data centers \nare engaged in a just transition from fossil fuels to the clean \nenergy economy. Meanwhile, rocketing growth from AI, cloud \ncomputing, and digitization is driving unprecedented demand \nfor power. The IEA 2024 Electricity Forecast predicts that \nglobal electricity consumption from data centers will double, \nfrom 460 TWh in 2022, to 1,000 TWh in 2026 – roughly \nequivalent to the power consumption of Japan.1\nSimilarly, McKinsey’s forecast in the US shows more than 15 \nGW getting added over the next decade, a near doubling, just \ndue to data centers.2\nCompounding this challenge, electric grids have experienced \nrelatively stagnant growth for nearly two decades. The 2024 \nGrid Strategies report forecasts a 38 gigawatt increase in peak \nelectricity demand in the U.S.by 2028 and concludes that “The \nU.S. electric grid is not prepared for significant load growth.”\nFigure 1: Data center power consumption forecast from \nMcKinsey where gray represents enterprise customers, \nlight blue represents co-location providers, and dark blue \nrepresents hyperscalers.\nIn some regions, data center availability is low while demand \nfor capacity is still high. Figure 2 shows that current available \ndata center capacity in two of the largest U.S. data center \nmarkets, Silicon Valley/Bay Area and Northern Virginia, are just \n.5% and .2%, respectively. Power constraints add significant \nrisk to growth in these regions. \nFigure 2: Power constraints in growing data center markets \ncontribute to single digit availability (Newmark Report 2023)4\nThere is keen awareness of a lack of power availability in key \nregions, pressure to meet timing of market requirements, and \nrecognition of the need for access to a renewable energy supply \nto power data centers throughout the lifecycle and in the \nsupply chain.\nBYOP: What it means and how it works\nPower capacity drives business growth. For data center \ndevelopers, flexibility and control of power systems has \nbecome essential. Deploying highly flexible, onsite power, also \nknown as “Bring Your Own Power” (BYOP), can significantly \nspeed expansion, control costs, open new siting options, and \nprovide the agility needed to adapt to energy system changes. \nIt also can enable a faster and more predictable path to \ndecarbonization and allow data centers to partner with utilities \non solutions. Figure 3 shows a basic BYOP configuration where \nonsite power generation can fill in for both utility and backup \ngeneration and then remain onsite after the utility is connected \nto provide additional value discussed below.\n2024 availability 0.2%\n1.9%\n3.8%\n0.5%\n1.6%\n5000\n4000\n3000\n2000\n1000\n0\nNorthern Virginia\nDallas/Fort Worth\nPhoenix\nChicago\nSilicon Valley/Bay Area\n41%\nincrease\n28%\nincrease\n45%\nincrease\n43%\nincrease\n30%\nincrease\nProjected market size in 2027 (MW)\nMarket size in 2024 (MW)\nData center power consumption, by providers / enterprises 1, gigawatts\n2014\n2020\n2030\n35—\n25—\n10—\n30—\n15—\n20—\n5—\n0—\nCAGR\n+13.0%\n+11.9%\n+9.6%\n+8.7%"},{"page":3,"startToken":567,"endToken":1233,"text":"Time to Market: Accelerating time to commission \nwith faster deployment\n\nA 2023 Lawrence Berkeley National Laboratory analysis states \nthat the average utility interconnection timeline for new grid \ngeneration resources is 35 months in many parts of North \nAmerica.5 New load interconnection also faces significant \ndelays. Some data center customers report that they’re \nbeing given 3-5 year estimates for grid delivery of data center \npower. For a 100 MW data center, assuming US$150,000/MW \nof revenue per month (~US$150/month/kW), three years of \ndelay translates to over US$500M in lost revenue.6 BYOP can \naccelerate data center commissioning to less than one year, \nwhich can be paired with the overall data center development \nand construction. This directly reduces time to customer \ndelivery and accelerates revenue and growth. \nFlexible onsite power also supports additional benefits such \nas incremental campus/site expansion, adaptivity to market \nfluctuations, backup needs and the ability to replace diesel \ngenerators, and partnering with local utilities by participating \nin wholesale markets during periods of high demand. Data \ncenter assets can sometimes grow in a modular way. BYOP \ncan enable that growth, where power is added modularly with \nthe expanding site, regardless of grid availability. This modular \napproach provides data center developers better use of capital.\nBesides scalability, modular power can also achieve high \navailability targets with redundancy and can even eliminate \nthe need for generators solely used for backup power onsite, \nreplacing diesel generators with cleaner options that pay for \nthemselves by improving time to commission. \nLastly, BYOP with low-emissions power gives developers \ngreater flexibility over where they site their data centers, not \njust at sites that have existing utility power. In many cases, \nthe locations that need the capacity most are those where \ngrid availability is already significantly constrained or delayed.7 \nGreater location flexibility opens up new possibilities for site \nselection – as long as the onsite power is low emissions \n(and thus easily permitted) and scalable in size to match \ndata center needs. \nAdaptivity: Flexible dispatch enables additional revenue \nin a changing environment\n\nIn a time of transformational change, the flexibility to be more \n“future-proof” to the evolving environment becomes critical. \nKey factors like grid pricing, server load profile, the cost of \ndifferent fuels, rack power density, requirements in carbon \nmanagement, and total build size all can change over the \nlifetime of a data center. BYOP gives developers and owners a \ntool to manage and respond to these changes. \nOver the last three years, grid pricing has increased 5% in \nthe U.S. after being flat for the prior two years.8 Given the \nextensive need for new capacity and new transmission and \ndistribution, these growth rates are not expected to drop. \nThese increased grid costs not only result in increases in the \nbase cost of energy, but can also lead to higher demand \ncharges or pricing based on usage during peak loads. Even if \nthe grid is ultimately connected to the data center, flexible \nonsite power generation allows the operator to dispatch when \nneeded, increasing power generation when rates are high and \ndropping power production when rates are low. Depending on \nthe location, commercial grid power customers can save 10-\n30% of their electric bill by just reducing their peak loads.9 \nThis serves to reduce both costs for the data center operator \nand strain on the local power grid, supporting the local \ncommunity and reducing the need for the grid operator \nto overbuild capacity.\nData centers will transition over time from being energy \ncustomers to being contributors to the local grid. When data \ncenter and utility grid operators both contribute to clean \nenergy generation, a green grid is possible.\nBring Your Own Power (BYOP) \n2\nFigure 3: BYOP data center illustration single line diagram\nInverter\nInverter\nOptional\nOptional\nUtility\n13.8kV\nMV \nCollector\nBus\nCollector\nBus\nOnsite power generation\nLV \nCollector\nBus\nServer\nRack\nServer\nRack\nServer\nRack\nServer\nRack\nUPS\nUPS\nUPS\nUPS\nATS\nOptional\nBackup\nGeneration\nSolar\nStep \nDown\nStep Down\nISO TX"},{"page":4,"startToken":1233,"endToken":1534,"text":"Bring Your Own Power (BYOP) \n3\nAdvanced power generation technologies, enabled by \nadvances in power electronics and software, have made \nBYOP a viable alternative for data center developers. \nOne such technology is the linear generator, recently \nfeatured in IEEE Spectrum.10 \n\nDistinct from an engine, microturbine, or fuel cell, a linear \ngenerator directly converts motion along a straight line \ninto electricity using chemical energy. The outcome is high \nefficiency, near-zero NOx emissions, full dispatchability \n(0-100% load acceptance/rejection) for firming renewables, \nhigh availability via modular buildout, and switching between \nfuels – including zero carbon fuels like green hydrogen \nand ammonia.11\n\nThe unique combination of linear generator capabilities \naddresses data center power challenges by providing local, \ndispatchable, and fuel flexible prime power with low total cost \nof ownership, at any scale. \nFor developers, this can offer a fast track to bringing facilities \nonline to address grid constraints. Later, when grid power \neventually becomes available, the technology can transition to \nserve as clean, resilient backup power generation. \nMainspring Project Showcase \nThe Linear Generator \nby Shannon Miller\nDecarbonization: Getting to zero carbon power and \nzero carbon backup \nBuilding sustainably powered data centers requires a transition \naway from the use of fossil fuels. Data centers invest heavily in \nrenewables, but achieving zero carbon 100% of the time cannot \nbe done with renewables and batteries alone. Zero carbon \nfuels such as green ammonia and green hydrogen have a role \nto play. Onsite power that is fuel-flexible – meaning that it can \nswitch between fuel types without retrofit – gives developers \nand operators greater optionality and control on the path to \ndecarbonization. Fuel-flexible power enables them to build \nboth prime and backup capacity today with solutions that \nare equivalent or cleaner than today’s grid, and transition to \nincreasingly lower carbon fuel use over time.\nThe Mainspring Linear Generator core"},{"page":5,"startToken":1534,"endToken":1958,"text":"Bring Your Own Power (BYOP) \nDeploy 50MW of prime power \nlinear generators running on \nnatural gas or directed biogas. \nModular design and high \nreliability can support 99.99% \nof uptime. Option to replace \ndiesel generators with linear \ngenerators in the design.\nGrid connection becomes \navailable. The dispatchable linear \ngenerators provide peak-shaving, \nwholesale market participation, \nand continue to replace the need \nfor diesel backup. The linear \ngenerator can also be combined \nwith the grid to increase the \ndata center’s capacity. \nCustomer installs onsite H2 or \nNH3 storage tanks. In some \nregions, an H2 or NH3 pipeline \ncould be accessible. Linear \ngenerators provide zero carbon \nbackup for the data center and \na zero carbon peaking resource \nthat supports the data center and \ncan be exported to support the \nlocal utility.\nAs zero carbon fuels reach parity \nwith traditional fuels, Mainspring \nand the grid combine to provide \nzero carbon power, 100% of the \ntime. Flexible dispatch enables \nthe best optimization of cost, \nsustainability, and resilience. \nClean fuels and shared dispatch \nwith the utility eliminate the \nneed for diesel generators.\nStep 1\nPrime power\nStep 2\nPeak load shaving or \nmodular expansion\nStep 3\nZero-carbon backup with \neconomic or sustainable dispatch\nStep 4\n100% zero-carbon power and \nzero-carbon backup\nMainspring BYOP Scenario \nA data center colocation provider needs access to 50MW power \nto fulfill market demand. The utility has shared that they could \nnot meet this for four years. The data center provider has \nsustainability goals around reducing carbon and water usage. \nThe site has access to natural gas. \nThe following is one potential pathway that the data \ncenter provider could pursue with linear generator assets \n– recognizing that the flexibility of the product provides \noptionality for a number of other scenarios based on market \nconditions and what would generate the greatest value for the \ndata center, utility, and local community.\nPre-Interconnection\nFast, flexible power\nPost-Interconnection\nOnsite capacity to support backup and economic or sustainable dispatch \nIslanded, black start capability\nFully dispatchable to shave \npeaks or meet demand \nunderserved by utility power\nZero carbon backup\n24/7/365 zero carbon\nand/or\nor\nAdd grid to increase total \ncapacity and expand facility\nZero carbon peaking resource \nfor utility\nNatural gas \nor biogas\nNatural gas \nor biogas\nElectricity\nElectricity\nElectricity\nElectricity\nElectricity\nElectricity\nElectricity\nClean fuels\nMSE\nGrid\nZero carbon power\nResults: Data center online 3 years early resulting in $270M revenue assuming $150k/MW/month. Over the \nfirst 10 years of operation, BYOP saved 350 Million lbs of CO2 and 670 million gallons of water vs local grid.12"},{"page":6,"startToken":1958,"endToken":2376,"text":"Bring Your Own Power (BYOP) \n5\nSummary and recommendations\nMany promising developments of data center new builds \nare facing the headwinds of grid power constraints across \nglobal energy markets. There is a new imperative for data \ncenter cloud and AI developers to consider onsite energy \ngeneration, to build more robust and resilient power \nsystems, and to establish energy policy with regulatory \npolicymakers to embrace the future of data center builds \nwith clean energy digital infrastructure. Developers also must \nquantify the energy mix in a just clean energy transition and \npivot their roles from solely energy consumers to energy \ncontributors, collaborating with grid providers to green the \ngrid. The authors recommend that developers capitalize on \nthe advantages of BYOP on the path to a just, green energy \ntransition such that:\n•\t Data center colocation providers can accelerate the \ndeployment of new power capacity and create competitive \nadvantage.\n•\t Energy procurement can move beyond conventional power \npurchase agreements, as data center developers take \ncontrol of their energy needs, participate in energy markets, \nand contribute to the green grid.\n•\t Energy management systems can be optimized by shifting \nto a model that provides both primary power and backup \npower that are grid-interactive ready and sustainable.\nDevelopers no longer need to choose between adding power \nand meeting sustainability goals. It is time to think differently \nabout how data centers design for and use power.\n1\t IEA 2024 Electricity Forecast\n2\t Investing in the rising data center economy, McKinsey, Jan 2023\n3\t The Era of Flat Demand is Over, Grid Strategies, Dec 2023\n4,7\t 2023 U.S. Data Center Market Overview & Market Clusters\n5\t Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022\n6\t CBRE North America Data Center Trends H1 2023\n8\t EIA Electricity Data Browser\n9\t Based on a sample of business case analyses performed for commercial customers in states with high demand charges \n\t\n(e.g., California, Massachusetts, New York, etc). Demand charges can typically be reduced by 50% to 65%, depending on the load curve and \t\n\n\t\napplicable tariff – resulting in a 10-30% savings to the overall customer utility bill.\n10\t This New Breed of Generator Can Run on Almost Any Fuel, Mainspring’s linear generator may speed the transition to a zero-carbon electrical grid \n11\t Mainspring product specifications\n12\t Assumes Mainspring’s linear generators running at 90% capacity factor for 3 years, then operating at 25% for peak shaving applications \n\t\nfor 7 years. CO2 and water savings compared with ERCOT subregion.\nRendering with Mainspring Linear Generators \ncourtesy of Overwatch Capital"},{"page":7,"startToken":2376,"endToken":3017,"text":"The Future of Data Centers Absolute Zero Design \nby Susanna Kass\nSustainability in The AI Data Center Era\n\nSince the introduction of ChatGPT in November 2022, AI or/\nand Generative AI have become part of our daily language. \nSome are enamored with the potential for artificial intelligence, \nwhile others are determining its implications for our present \nand future operations. For the Data Center ICT sector, AI has \nshown great potential. \nUntil the introduction of large language models (LLMs), \ntraining applications relied on analyzed data and made \npredictions based on learnings from data sets. They often \nrequired a large volume of data sets to be useful for \napplications, such as quality system control, chatbots, natural \nlanguage processing risk analysis, security surveillance, or \nautonomous vehicle maneuvering navigation systems. LLMs \nare a new breed of AI Machine Learning with the ability to \nrecognize, summarize, predict, and generate large volumes of \ndatasets containing text, audio, images, video, and metaverse \ncontent beyond human and traditional cloud computing. \nFurthermore, the initial push for Generative AI is in content \ncreation. In text form, this can be as an email or new articles, \nblog post, or poem; in audio format as a voice response, a \nseries of sounds, or a complete song; in image format as a \npicture or a series of images; and in video format as a movie, \ngame, or one or more metaverse scenes. These AI assets \nare stored in data centers and retrieved by the requests \nof IIoT devices for entertainment, education, and work \npurposes. The potential of AI content creation is endless. \nThe consumerization of this new content will grow at a fast \npace as AI digital assistants become more personalized with \nbehavioral learning and the proliferation of AI devices coming \nto market. According to Nvidia, AI bucks the conventional \nbelief that humans must become programmers who study \ncomputer science in order to compete in the information \nage. AI shows promise that human language is optimal for \ninteracting with AI systems via text, audio, and touch. The \ninteractions of the human interface are adapted by AI systems \nwhich generate programming language for AI systems to \ncomplete tasks for humans. \nIn 2024, we are seeing the advent of Generative AI applications \nadoption in the form of AI digital assistants. This deployment \ntrend will have a significant societal impact by quickly driving \nthe growth of AI to the edge; new edge data centers at urban \ncommunities will serve new content generation, providing \ncontextual awareness of these digital assistants with location \nproximity. AI digital assistants will demonstrate productivity \nimprovements in AI devices for entertainment, education, home, \nand work. The proliferation of autonomous vehicles aims to \nimprove efficiency and human productivity. \nDevelopers are using Generative AI in the creation of new code, \ntherefore eliminating millions of programmer hours, ensuring \nconsistency in code quality, and improving overall development \nperformance, given that code is increasing in complexity and \nsize beyond human comprehension. Moreover, generative AI \ncan be versatile in different languages, unlike humans who are \nlimited to several languages and in their accuracy. \n \nGenerative AI is making a definitive impact in research, and \nas the use of generative AI continues, we can expect future \nscientific breakthroughs. \nSustainability Impact with AI on Efficiency and \nPerformance have Unlimited Possibilities \nAs with any revolutionary technology, Generative AI models will \nbe refined and optimized with regards to improving their impact \non sustainability. The sustainability capabilities of resource usage \neffectiveness can be improved and measured by using multiple \nmodalities of machine learning, so that multiple tasks are trained \nsimultaneously to improve accuracy and efficiency. The total \nresources will be thus reduced. Additionally, the personalization \nof AI digital assistants in ever increasing and personalized \nversions of multimodal modes on various platforms will help to \neliminate waste and redundancy. The use of AI in AIDC shows \nthe promise of new realms of sustainability, with regards to \n6"},{"page":8,"startToken":3017,"endToken":3763,"text":"The Future of Data Centers BYOP Absolute Zero Design\nby Susanna Kass (Continued)\n7\nresource usage effectiveness by efficiency and performance \nimprovements using the foundations of AI scalarization of \nmulti-tasks and multi-domains learning in machine learning and \ninference – in comparison to the traditional computation mode of \nusing resources to process each model of LLM set. \nThe diffusion of AI models and the use of more advanced AI \nalgorithms can further increase performance significantly, with \nspecific designs that will reduce the latency of computing and \nnetworking resources over traditional cloud computing models \nin an AI accelerated Data Centers. Diffusion approach and AI \nquantization methods such as pruning and allotting zero resources \nto attention heads and in using advanced AI algorithms increase \naccuracy, therefore extending the reduction of idle resources \nand eliminating zombie requests for compute, network and data \nstorage. Energy Efficiency Usage Effectiveness (EEUE) will be a key \nsustainability metric for the AI era in measuring the effectiveness \nof energy efficiency gains of resource usage consumption. \nIn 2024, AI is experiencing intensive workload demands. The AI \nmodel starts at 1 Gigabyte and rapidly scales to hundreds of \nGigabytes. Data Models are at the 300,000 range for Generative \nAI, and they are expected to drastically increase in size with the \nuse of video and in metaverse settings. \nNew GPUs, NPU, and MPU using the next generation of AI chips \nare expected to come to market. The AI chips are expected to be \nmore energy efficient with ultra-high density per rack and to be \nchip cooled ready. \nIt is an opportune time to explore linear generator technology as \nwe embrace BYOP approach. AI at the Edge can operate reliably \nwithout connecting to the grid 24/7. It can commission without \nany delay in power constraints to energy markets, hence achieving \nhigh uptime performance and sustainability with resiliency. \nBYOP: Net Zero Availability Zone Future Proof \nResilience Grid Power System \nCurrently, it is a conventional design that each data center has \na primary power system and a backup power system unit to \nmaintain uninterrupted operation. Many power assets are \ndesigned for primary function, and the backup power assets take \ninstantaneous action to provide power to the data center for a \nduration of time such as 4-8 hours or up to 24 hours – when the \nfault is being identified of the primary power systems until it can \nassume its normal operation. Otherwise, the backup systems \nare not used. \nWe need to examine if the concept of primary and backup \nsystems is sustainable, in comparison to a resilient system that can \noperate as both to maintain uninterrupted operation for the data \ncenter. Net Zero Utility Availability Zones provide flexible, resilient \nsystems at Grid scale, consequently eliminating the need for \nconventional backup systems for data centers. \nBYOP: Empowerment as Energy Contributor \nto promote Sustainability \nThe impact of a carbon free future is paramount for our \ngeneration. We must take action to pave the way for future \ngenerations. The planet itself is resilient; meanwhile, humans \nare depleting our natural ecosystems at a fast pace in a linear \neconomy. \nThe design of the Future of Data Centers is to be connected \nwith the grid; rather, it becomes grid interactive to ensure cloud \nand AI services are resilient, sustainable and affordable, and in so \ndoing, futureproof their growth potential for primary and backup \npower. The result is a triple bottom line of much lower Capex \nfor redundant assets, much higher utilization through multiple \nuses of common assets (e.g., energy infrastructure), maximized \ninvestment efficiency for renewable power investments, clean \nenergy generation, and the elimination of need for backup assets. \nData centers transition from an energy customer to a contributor \nto the local grid. When data centers and utility grid operators \ncontribute to clean energy generation, a green grid is made \npossible. The design concept of availability zones, which originated \nin the data center sector, may be applied to the utility grid. The \nelectric grid assets operate to maximize power availability for \nall stakeholders in order to reach the full potential of power \navailability and concurrently deliver cost efficiency at utility scale \nat Utility Net Zero Availability Zones by regions. \nAI Data Centers are designed to be a sustainable contributor to \nthe clean energy economy. We need to take a novel approach, \nutilizing net zero availability zones, linear generators with clean \nfuel for clean energy generation in place of on-premise prime \npower systems and a separate backup power system exemplifies \nthe Sustainable Development Goals and impactful results."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":30,"startToken":0,"endToken":59},{"p":2,"at":30,"title":"Introduction","method":"printed heading","endPage":8,"endAt":4824,"startToken":59,"endToken":3763}]}