{"document":{"slug":"rec-20250423-5188","title":"Comments of the American Council on Renewable Energy on the 03/24/2025 Answer of PJM Interconnection, L.L.C","issued":"2025-04-23","accession":"20250423-5188","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"American Council on Renewable Energy","kind":"answer","file":"sources/filings/text/20250423-5188_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5188","tier":"record","sha256":"e4fb220239c983b8a4d0a26fc1286866e4c4cf03806ffcb432d98146416daa1c","pages":7,"tokens":1499,"emptyPages":[],"textThemes":["study","colo"]},"pages":[{"page":1,"startToken":0,"endToken":210,"text":"1 \n \n \n UNITED STATES OF AMERICA \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n PJM Interconnection, L.L.C., et al.)  \n \n \n \nDocket No. ER25-49 \n \nCOMMENTS OF THE AMERICAN COUNCIL ON RENEWABLE ENERGY \n Pursuant to Rule 211 of the Federal Energy Regulatory Commission (“Commission”) \nRules of Practice and Procedure,1 the American Council on Renewable Energy (“ACORE”) \nsubmits these comments on the March 24, 2025 Answer of PJM Interconnection, L.L.C. (“PJM \nAnswer”) to the Commission’s Order Instituting Proceeding Under Section 206 of the Federal \nPower Act and Consolidating with Other Proceedings (“Show Cause Order”) issued in the \nabove-captioned proceeding on February 20, 2025.  \nI. COMMENTS \nA.  Further Guidance from the Commission is Warranted.  \nACORE supports PJM’s request “that the Commission issue detailed guiding principles \nsuch as those PJM proposes in this filing that PJM can promptly operationalize in a section 205 \nfiling.”2 As described later in these comments, such guidance is especially warranted for Option \n6 (Co-located load that elects to be Network Load and bring its own generation.) Such guidelines \nshould provide additional clarity for parties entering into colocation agreements and greater \ncertainty for other stakeholders, as well as minimize overall costs and risks. To achieve these \n \n1 18 C.F.R. § 385.211 (2024).   \n2 PJM Answer at 4."},{"page":2,"startToken":210,"endToken":464,"text":"2 \n \ngoals, the guidelines could specify the following to the extent applicable to any tariff changes \nproposed by PJM. \n1. Colocation arrangements must be incorporated into long-range transmission \nplanning scenarios.  \nRelevant information required for the transmission planning process will include factors \nestablished by PJM in the various Options, such as the extent to which the load is isolated \n(Option 4), requires some level of backup service (Option 5) or is brings new generation that is \neither physically collocated or delivers power from another location through a bilateral \nagreement (Option 6). All  these arrangements will have different implications for future \ntransmission needs, and the inclusion of these data is already required by Order 1920.3 For \nexample, in that Order, the Commission required load-serving entities “to provide transmission \nproviders with information on the load-serving entities’ projected loads and resources over the \nplanning horizon.”4 This information, as part of Factor 3, is one of the factors that the \nCommission determined should not be discounted when determining the long-term scenarios.5  \n \nThe North American Electric Reliability Corporation (NERC) April 17 presentation to \nthe Commission emphasized the need for better data on future large loads, recommending that: \n“Grid operators and planners should collect data from load developers, owners, and operators \nthat will help them understand the unique risks associated with each emerging large load \n \n3 Bldg. for the Future Through Elec. Reg’l Transmission Planning & Cost Allocation (Order No. 1920), \n187 FERC ¶ 61,068. \n4 Order No. 1920 at P 449.  \n5 Order No. 1920 at P 507."},{"page":3,"startToken":464,"endToken":768,"text":"3 \n \nconnecting to their system.”6 While NERC’s focus is on the use of these data to mitigate the \npotential risks from the large loads, as described in their presentation, such data can also feed \ninto the long-term transmission planning scenarios. As the Brattle Group recently noted, \n“scenario-based long-term planning will enable transmission planners to identify least-regrets \ntransmission expansions that will enable load interconnections in a variety of futures. That can \ninclude creating more flexible (scalable) plans, initiating orders and development of necessary \nlong-lead-time facilities, and leveraging economies of scale where appropriate. Compliance with \nFERC Orders 1920 and 2023 should naturally lead to these approaches.”7 \nGiven the contrast between the near-term load increases and the length of time it takes for \ntransmission to be planned, permitted, and built, the Commission and PJM must ensure that grid-\nenhancing technologies and high-performance conductors are fully incorporated in process for \nselecting transmission facilities to meet identified needs, as both technologies are essential for \nmaximizing the capabilities of the existing grid. A recently released Brattle Group report, \nprepared for ACORE, shows how these technologies provide all seven benefits delineated by \nFERC in Order 1920, and additional benefits of addressing transmission needs faster, and \nproviding greater cost and schedule certainty.8 \n \n6 Presentation: NERC Seeks to Address Reliability Impacts from Large Load Integration, Slide 7, \nRecommendation #7, Presenter Notes (Apr. 17, 2025). \n7 Samuel Newell, Ryan Hledik Johannes, Pfeifenberger, The Brattle Group, Meeting Unprecedented Load \nGrowth: Challenges & Opportunities (April 2025), available at: https://www.brattle.com/wp-\ncontent/uploads/2025/04/Meeting-Unprecedented-Load-Growth-Challenges-Opportunities.pdf  \n8 T. Bruce Tsuchida, Linquan Bai, S. Ziyi Tang, The Brattle Group; Jay Caspary, Grid Strategies, \nIncorporating GETs and HPCs into Transmission Planning Under FERC Order 1920, prepared for the \nAmerican Council on Renewable Energy (April 2025), available at: \nhttps://acore.org/resources/incorporating-gets-and-hpcs-into-transmission-planning-under-ferc-order-\n1920/"},{"page":4,"startToken":768,"endToken":1003,"text":"4 \n \n2. Prioritization of collocated resources should not impede the queue processes for \nother interconnection customers.  \nAs discussed below regarding Option 6, further guidelines will be needed on any queue \nprioritization included in colocation proposals to balance the need for the interconnection of new \ngeneration collocated with large loads and avoid disrupting the interconnection of other needed \nresources. \nB. Option 6 Requires Specific and Targeted Guidelines  \nIn describing Option 6, PJM explains that “[i]ncentives could be explored to offer faster \nprocessing of generation that enters the queue through this option,” which could include \naccelerating interconnection studies for this new generation, enhancing existing provisional \ninterconnection service options, and the use of a State Agreement Approach whereby states \nassume cost responsibility for transmission upgrades.9 Option 6 appears to be intended for both \ncollocated and non-collocated resources. PJM explains that “a physical co-located configuration \ncan still be utilized, but there is an additional opportunity for the new generation to enter into a \nbilateral agreement with the load for financial and contractual purposes.”10 This “additional \nopportunity” seems to imply that the generation would not need to be physically co-located. Also \nworth noting is that PJM appears to be contemplating putting this option in place without tariff \nchanges.11 \n \n9 PJM Answer at 17. \n10 PJM Answer at 16. \n11 See “Maybe” as the entry under “Tariff Modifications” for Option 6 in Attachment A to PJM’s Answer."},{"page":5,"startToken":1003,"endToken":1285,"text":"5 \n \n \nFor these reasons, ACORE recommends that guidelines are especially relevant for Option \n6, and any other queue prioritization Section 205 proposals by PJM. The Commission’s Order \napproving PJM’s Reliability Resource Initiative (RRI) established important parameters for such \nprioritizations.12 Such guidelines should at a minimum: \n• Ensure that any incentives provided are non-discriminatory and do not disrupt or delay \nother resources in the queue process. Although ACORE filed a protest to the RRI \nproposal, the Commission found it to be non-discriminatory and just and reasonable. \nCommissioners Phillips and Rosner, however, did provide a number of parameters for \nthis finding in their concurrence, including the fact that it was a “one-time emergency \nrequest” and that it ensures that projects are “shovel ready.”13 Therefore, the Commission \nhas a basis for establishing clear guidelines for future prioritization projects. \n• Recognize the benefits for all grid participants, including interconnection customers, \nlarge loads and other end-use customers, of a queue process that brings resources on-line \nin a timely manner. As noted above, any prioritization process must incorporate the \ntimeline for the development of new resources.14 \n• Include additional guidelines for additional beneficial queue reforms to avoid \noverreliance on queue prioritizations, as was discussed extensively in the Commission’s \nSeptember 2024 Workshop on Innovations and Efficiencies in Interconnection, including \nmore cost certainty for interconnection customers, such as through the use of an “entry \n \n12 Order Accepting Tariff Revisions, Docket No. ER25-712-000, 190 FERC ¶ 61,084 (Feb. 11, 2025). \n13  Commissioners Phillips and Rosner, Concurring, Order Accepting Tariff Revisions, Docket No. ER25-\n712-000, at P 7 (Feb. 11, 2025). \n14 See Newell et al., at 7 recommending “a fast track for ‘shovel-ready new plants in a competitive, non-\ndiscriminatory fashion.”"},{"page":6,"startToken":1285,"endToken":1453,"text":"6 \n \nfee”; greater transparency and consistency for the study methodologies and \ninterconnection data; a more viable Energy Resource Interconnection Service (ERIS) \noption; greater use of resource replacement; incorporation of planned colocations of large \nloads and generating resources into the interconnection study process; and opportunities \nfor customer self-funding or interconnection studies.15  \nII. CONCLUSION \nACORE appreciates the careful consideration being given by the Commission and PJM \nto the need for clear policies on the co-location of large loads and generating resources. \nCommission guidelines on these policies should be established to achieve clarity and balance the \ninterests of large loads, interconnection customers, retail customers and other stakeholders. \nRespectfully submitted, \n/s/ Elise Caplan  \nElise Caplan  \nVice President, Regulatory Affairs \nAmerican Council on Renewable Energy  \n1150 Connecticut Ave NW, Suite 401  \nWashington, D.C. 20036  \n(301) 646-7130 \ncaplan@acore.org  \n \nApril 23, 2025 \n \n \n \n15  See Comments of the American Council on Renewable Energy, Innovations and Efficiencies in \nGenerator Interconnection, Docket No. AD24-9-000 (November 14, 2024), available at: \nhttps://acore.org/resources/acore-comments-on-ferc-interconnection-workshops/"},{"page":7,"startToken":1453,"endToken":1499,"text":"7 \n \nCERTIFICATE OF SERVICE \nThe undersigned certifies that a copy of this pleading has been served this day upon each \nperson designated on the official service list compiled by the Secretary in this proceeding.  \nDated this 23th day of April, 2025.  \n/s/ Elise Caplan  \nElise Caplan"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":699,"startToken":0,"endToken":101},{"p":1,"at":699,"title":"I. COMMENTS","method":"printed heading","endPage":1,"endAt":712,"startToken":101,"endToken":103},{"p":1,"at":712,"title":"A. Further Guidance from the Commission is Warranted.","method":"printed heading","endPage":4,"endAt":421,"startToken":103,"endToken":826},{"p":4,"at":421,"title":"B. Option 6 Requires Specific and Targeted Guidelines","method":"printed heading","endPage":6,"endAt":405,"startToken":826,"endToken":1336},{"p":6,"at":405,"title":"II. CONCLUSION","method":"printed heading","endPage":7,"endAt":5,"startToken":1336,"endToken":1454},{"p":7,"at":5,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":7,"endAt":284,"startToken":1454,"endToken":1499}]}
