{"document":{"slug":"rec-20250423-5193","title":"Comments of Northeastern Rural Electric Membership Corporation on the Order Instituting Proceeding Under Section 206 of the Federal Power Act and…","issued":"2025-04-23","accession":"20250423-5193","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"NORTHEASTERN REMC","kind":"comments","file":"sources/filings/text/20250423-5193_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5193","tier":"record","sha256":"7c4f5d260c6842c9e7c43902c05405329b6e32f601b5cbad0b91c2faff811f87","pages":9,"tokens":2047,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":181,"text":"UNITED STATES OF AMERICA  \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nPJM Interconnection, L.L.C.  \n \n \n) \nDocket Nos. EL25-49-000 \nAllegheny Electric Cooperative, Inc.  \n \n) \nAmerican Transmission Systems, Incorporated \n) \nAtlantic City Electric Company \n \n \n) \nBaltimore Gas and Electric Company \n \n) \nDelmarva Power & Light Company  \n \n) \nDuke Energy Ohio, Inc. \n \n \n \n) \nDuke Energy Kentucky, Inc  \n \n \n) \nEast Kentucky Power Cooperative, Inc. \n \n) \nEssential Power Rock Springs, LLC  \n \n) \nHudson Transmission Partners, LLC  \n \n) \nJersey Central Power & Light Company \n \n) \nMid-Atlantic Interstate Transmission, LLC  \n) \nNeptune Regional Transmission System, LLC \n) \nOld Dominion Electric Cooperative  \n \n) \nPECO Energy Company \n \n \n \n) \nPPL Electric Utilities Corporation \n \n \n) \nPotomac Electric Power Company \n \n \n) \nPublic Service Electric and Gas Company \n \n) \nRockland Electric Company  \n \n \n) \nTrans-Allegheny Interstate Line Company \n \n) \nTransource West Virginia, LLC \n \n \n) \nUGI Utilities, Inc. \n \n \n \n \n) \nMonongahela Power Company \n \n \n) \nThe Potomac Edison Company \n \n \n) \nCommonwealth Edison Company \n \n \n) \nCommonwealth Edison Company of  Indiana, Inc. ) \nThe Dayton Power and Light Company \n \n) \nAEP Appalachian Transmission Company, Inc. \n) \nAEP Indiana Michigan Transmission Company, Inc. ) \nAEP Kentucky Transmission Company, Inc.  \n) \nAEP Ohio Transmission Company, Inc. \n \n) \nAEP West Virginia Transmission Company, Inc.  \n) \nAppalachian Power Company \n \n \n) \nIndiana Michigan Power Company  \n \n) \nKentucky Power Company \n \n \n \n) \nKingsport Power Company \n \n \n \n) \nOhio Power Company \n \n \n \n) \nWheeling Power Company \n \n \n \n) \nDuquesne Light Company \n \n \n \n)"},{"page":2,"startToken":181,"endToken":371,"text":"Virginia Electric and Power Company \n \n) \nLinden VFT, LLC \n \n \n \n \n) \nCity of Cleveland, Department of Public \n \n) \nUtilities, Division of Cleveland Public Power \n) \nCity of Hamilton, OH  \n \n \n \n) \nSouthern Maryland Electric Cooperative, Inc. \n) \nOhio Valley Electric Corporation \n \n \n) \nAMP Transmission, LLC \n \n \n \n) \nSilver Run Electric, LLC \n \n \n \n) \nNextEra Energy Transmission MidAtlantic  \n) \nIndiana, Inc.  \n \n \n \n \n) \nWabash Valley Power Association, Inc. \n \n) \nKeystone Appalachian Transmission Company \n) \n \n \n \n \n \n \n \n) \nLarge Loads Co-Located at Generating  \n \n) \nAD24-11-000 \nFacilities \n \n \n \n \n \n) \n \n \n \n \n \n \n \n) \n \n \n \n \n \n \n \n) \nConstellation Energy Generation, LLC \n \n) \nEL25-20-000 \n \n \n \n \n \n \n \n) \n(Consolidated) \nv. \n \n \n \n \n \n \n) \n \n \n \n \n \n \n \n) \nPJM Interconnection, L.L.C.  \n \n \n) \n \n \n \n \n \n \n \n) \n \n \nCOMMENTS OF NORTHEASTERN REMC  \nON THE ORDER INSTITUTING THE PROCEEDING  \nUNDER SECTION 206 OF THE FEDERAL POWER ACT  \nAND CONSOLIDATING WITH OTHER PROCEEDINGS \n \nPursuant to Rule 212 of the Federal Energy Regulatory Commission’s (“Commission”) \nRules of Practice and Procedure1,  Northeastern Rural Electric Membership Corporation \n(“NREMC”) respectfully submits these comments to the Order Instituting Proceeding Under \nSection 206 of the Federal Power Act and Consolidating with Other Proceedings2 issued in the \nabove-captioned proceeding on February 20, 2025.  \n \n1 18 C.F.R § 385.212. \n2 PJM Interconnection, L.L.C., Order Instituting Proceeding Under Section 206 of the Federal Power Act and \nConsolidating with Other Proceedings, Docket Nos. EL25-49-000, et al. (Feb. 20, 2025) (“Show Cause Order”)."},{"page":3,"startToken":371,"endToken":662,"text":"NREMC appreciates the Commission’s initiative in launching this inquiry and commends \nits leadership in addressing this important matter. Establishing clear guidelines for interconnection, \nservice, and cost allocation for co-located arrangements is essential to supporting grid reliability \nand safeguarding consumers from unfair cost implications.   \n \nI. \nINTRODUCTION AND BACKGROUND \nThe Show Cause Order is the culmination of multiple proceedings focused on the issue of \nco-location. The Commission consolidated this new proceeding, Docket No. EL25-49-000, with \nDocket Nos. AD 24-11-000 and EL25-20-000.3 Notably, the Show Cause Order is specific and \nlimited to PJM. In its Show Cause Order, the Commission directed the respondents to:  \n(1) show cause as to why the [Open Access Transmission Tariff], the Amended \nand Restated Operating Agreement of PJM, and Reliability Assurance Agreement \nAmong Load Serving Entities in the PJM Region [(collectively, the “PJM \nTariff”)] remains just and reasonable and not unduly discriminatory or preferential \nwithout provisions addressing with sufficient clarity or consistency the rates, \nterms, and conditions of service that apply to co-location arrangements; or  \n \n(2) explain what changes to the Tariff would remedy the identified concerns if the \nCommission were to determine that the Tariff has in fact become unjust and \nunreasonable or unduly discriminatory or preferential and, therefore, proceeds to \nestablish a replacement Tariff.4 \n \nThe Commission then invited interested entities to address either or both of: “(1) whether the \nTariff remains just and reasonable and not unduly discriminatory or preferential; and (2) if not, \nwhat changes to the Tariff should be implemented as a replacement rate.”5 \nNREMC provides these comments from the perspective of a non-profit, member-owned \nelectric distribution utility organized and existing pursuant to the laws of the State of Indiana \n \n3 Id. at 56. \n4 Id. at 3. \n5 Id. at 57."},{"page":4,"startToken":662,"endToken":1019,"text":"within the PJM region. NREMC supplies electric power to more than 30,000 residential, \ncommercial, and industrial member-consumers. NREMC does so through behind the meter \ngeneration and participation in the PJM energy, capacity, and ancillary services markets as a Load-\nServing Entity. NREMC agrees with the Indicated Transmission Operators (“TOs”) and PJM that \nthe existing Tariff remains just and reasonable and not unduly discriminatory or preferential.6 \nNREMC also agrees with PJM and the Indicated TOs that co-located end-use loads should be \ntreated as load in front of the meter and designated as Network Load.7  \n \nII. \nCOMMENTS \nA. Existing Tariff Framework is Sufficient \nNREMC agrees with PJM the Indicated TOs that co-location can be effectively \naccommodated within the existing PJM Tariff through established transmission service structures \n– as Network Load or Point to Point Service.8 PJM outlined three options currently available \nunder the Tariff for serving co-located load: (1) Option 1 – Load with a separate point of \ninterconnection that is Network Load; (2) Option 2 – Co-located load that is at the same point of \ninterconnection but separately metered that is Network Load; and (3) Option 3 – Existing Behind \nthe Meter Generation where load is the customer.9 Under both existing Options 1 and 2, the load \nuses and pays for transmission services, ancillary services, energy, and capacity.10  \n \n6 Answer of PJM Interconnection, L.L.C. (“PJM Answer”) at 4; Answer of the Indicated PJM Transmission Owners \nto the Order Instituting the Proceeding Under Section 206 of the Federal Power Act and Consolidating with Other \nProceedings (“TO Answer”) at 2. \n7 See PJM, PJM Guidance on Co-Located Load, at 1 (originally issued Mar. 22, 2024 and updated Apr. 17, 2024), \nhttps://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/pjm-guidance-on-co-located-load.ashx \n(“PJM continues to recommend that all co-located load be served from the PJM Transmission System as PJM \nNetwork Load with applicable firm transmission service (e.g., Regional Network Integration Transmission Service \n(NITS) under PJM Tariff, Part III).”) (“PJM Guidance on Co-Located Load”); TO Answer at 3. \n8 TO Answer at 10; PJM Answer at 9. \n9 PJM Answer at 9-11.  \n10  Id. at 9 -10."},{"page":5,"startToken":1019,"endToken":1318,"text":"However, Option 3 was not designed to accommodate large-scale loads. The existing \nNon-Retail Behind the Meter Generation (“BTMG”) rules are capped annually, as these \nresources do not maintain reserves equivalent to the installed reserve margin.11 Large co-located \nloads, such as data centers paired with behind the meter generation, present significantly greater \noperational risks than traditional BTMG arrangements because they lack adequate reserves.12 \nFurthermore, this arrangement would require these loads to co-locate with generation through the \nsame point of interconnection (unless an EDC consented to serve) thereby concentrating large \namounts of risk from both the load and generation sides of the meter.13  In emergencies or \noutages, their reliance on the grid could severely impact resource adequacy and system \nreliability.14 PJM correctly noted that the BTMG model does not apply well to co-location \nscenarios involving large loads.15 It was originally developed for much smaller and distributed \ninstallations – not for high consumption, single point facilities like data centers.16 Additionally, \nsimple netting of generation against load could allow these facilities to avoid most, if not all, \ncosts by netting out to zero as the entire load is supplied by the co-located generator, despite the \nco-located loads reliance and benefit from the grid.17 This would shift costs and burdens unfairly \nto other users, violating core principles of just and reasonable ratemaking. \nNevertheless, viable and fair options exist under the current Tariff for co-located load as \nNetwork Load in Options 1 or 2 and Point to Point Service. The PJM Tariff continues to be just \nand reasonable as it requires all load – regardless of usage consistency – to pay for grid access \n \n11 Id. at 11.  \n12 Id. at 36. \n13 Id. at 12. \n14 Id. at 36. \n15 Id. at 13, 34. \n16 Id.  \n17 Id. at 36."},{"page":6,"startToken":1318,"endToken":1611,"text":"and services, in accordance with Order No. 888 and the Federal Power Act.18 A fundamental \nratemaking principle establishes that “the costs assessed against a party must bear some \nresemblance ‘to the burdens imposed or benefits drawn by that party.’”19 Maintaining the \nexisting Tariff provisions for co-located load to interconnect as Network Load or Point to Point \nService ensures that costs are equitably shared in line with this principle.20 Creating carve-outs \nthat exempt co-located load from standard transmission charges would undermine this principle \nand unlawfully shift costs onto other users – an outcome that would be unjust and \nunreasonable.21  \nNREMC fully supports the Indicated TOs’ position that the PJM Tariff should apply to all \nwho seek transmission service within the region.22 This ensures that every customer contributes \nfairly to the shared infrastructure and services from which they benefit.23 Co-location \narrangements can be readily accommodated within the existing Tariff framework—either through \nretail service from a local distribution company or by registering as a Network Customer in PJM \n(where permitted by state jurisdiction).24 In either case, the co-located load is treated like all \nother users and pays its fair share.25 \nB. Co-located Load Interconnects with and Benefits from the Grid \nWhile co-located load may be situated behind the point of interconnection, it remains \nelectrically connected and synchronized with the PJM Transmission System, as noted by both \n \n18 TO Answer at 18. \n19  Pub. Serv. Elec. & Gas Co. v. FERC, 989 F.3d 10, 13 (D.C. Cir. 2021) (“PSE&G”) (quoting Midwest ISO \nTransmission Owners v. FERC, 373 F.3d 1361, 1368–69 (D.C. Cir. 2004)). \n20 TO Answer at 18. \n21 Id. at 18-19. \n22 Id. at 19. \n23 Id.  \n24 Id. at 19-20. \n25 Id."},{"page":7,"startToken":1611,"endToken":1885,"text":"PJM and the Indicated Transmission Owners.26 As a result, co-located load benefits from the full \nrange of Transmission and Ancillary Services. This remains true even when the load is only \nconnected via the distribution system, since both transmission and distribution operators depend \non ancillary services to maintain grid reliability, stability, and power quality.27 Essential services \nthat co-located loads rely on—such as voltage support and black start capabilities—require a \nphysical and synchronous connection to the grid.28 Given this reliance, NREMC co-located load \nshould be designated as Network Load and be responsible for its share of transmission and \nancillary service costs. The current PJM Tariff appropriately reflects this framework and remains \njust and reasonable. \nC. Co-located Load Should be Treated as Network Load & Pay Fair Share \nEven if a load connects to the grid indirectly—such as through facilities connecting a \ngenerator to the grid—it still requires the ability to be served from the transmission network, as \nstated by the Indicated TOs.29 As a result, the transmission system must be planned, built, and \nmaintained to accommodate and support that load.30 The intermittent nature of co-located load \ndoes not lessen the need for ongoing investment in infrastructure or the operational costs \nincurred by transmission owners to ensure reliability.31 Because co-located load is interconnected \nand relies on the transmission system—it both uses and benefits from it, NREMC agrees with \nPJM that co-located load must contribute its appropriate share of the associated costs.32 \n \n \n \n26 Id. at 12. \n27 Id. \n28 Id. at 12-13. \n29 Id. at 8. \n30 Id. \n31 Id. at 17. \n32 PJM Answer at 5."},{"page":8,"startToken":1885,"endToken":1976,"text":"III. \nCONCLUSION \nFor the reasons stated above, NREMC respectfully requests that the Commission find the \ncurrent PJM Tariff is just, reasonable, and non-discriminatory or preferential as it already \naccommodates co-location arrangements through Network Service and Point to Point Service, \nwhich uphold equitable cost allocation for the transmission and grid services co-location \narrangements benefit from.  \n \n \nRespectfully submitted, \n \n \n \n \nAlexandra L. Jones  \nVice-President & Senior Counsel  \nof Energy and Regulatory Affairs \nNortheastern REMC \n4901 East Park 30 Drive \nColumbia City IN 46725 \nTelephone: (317) 964-1752 \nFax: (260) 625-3407 \na_jones@nremc.com \n \nApril 23, 2025"},{"page":9,"startToken":1976,"endToken":2047,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in the above captioned dockets.  \nDated at Indianapolis, Indiana, this 23rd day of April 2025.   \n \n \n \n \n \n \n/s/ Alexandra L. Jones \nAlexandra L. Jones  \nNortheastern REMC \n4901 East Park 30 Drive \nColumbia City IN 46725 \nTelephone: (317) 964-1752 \nFax: (260) 625-3407 \na_jones@nremc.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":355,"startToken":0,"endToken":414},{"p":3,"at":355,"title":"I. INTRODUCTION AND BACKGROUND","method":"printed heading","endPage":4,"endAt":627,"startToken":414,"endToken":758},{"p":4,"at":627,"title":"II. COMMENTS","method":"printed heading","endPage":4,"endAt":642,"startToken":758,"endToken":760},{"p":4,"at":642,"title":"A. Existing Tariff Framework is Sufficient","method":"printed heading","endPage":6,"endAt":1272,"startToken":760,"endToken":1513},{"p":6,"at":1272,"title":"B. Co-located Load Interconnects with and Benefits from the Grid","method":"printed heading","endPage":7,"endAt":793,"startToken":1513,"endToken":1728},{"p":7,"at":793,"title":"C. Co-located Load Should be Treated as Network Load & Pay Fair Share","method":"printed heading","endPage":8,"endAt":0,"startToken":1728,"endToken":1885},{"p":8,"at":0,"title":"III. CONCLUSION","method":"printed heading","endPage":9,"endAt":0,"startToken":1885,"endToken":1976},{"p":9,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":9,"endAt":464,"startToken":1976,"endToken":2047}]}