{"document":{"slug":"rec-20250423-5196","title":"Response of American Municipal Power, Inc","issued":"2025-04-23","accession":"20250423-5196","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"American Municipal Power, Inc.","kind":"filing","file":"sources/filings/text/20250423-5196_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5196","tier":"record","sha256":"017c7581adccec2568e4e61943affbc9c582634c70c7ccd4d32c233c9c959bfc","pages":15,"tokens":4204,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":238,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n) \nDocket No. EL25-49-000 \n \n) \n \nLarge Loads Co-Located at \n  Generating Facilities \n) \n) \nDocket No. AD24-11-000 \n \n) \n \nConstellation Energy Generation, LLC \n \n  v. \n \n) \n) \n) \n) \nDocket No. EL25-20-000 \n   (Consolidated) \nPJM Interconnection, L.L.C. \n) \n \n \nRESPONSE OF \nAMERICAN MUNICIPAL POWER, INC. \n \nPursuant to the procedures established in the Federal Energy Regulatory \nCommission’s (“Commission” or “FERC”) February 20, 2025 order in the above-captioned \nproceedings,1 American Municipal Power, Inc. (“AMP”) hereby addresses the issues \nraised in the Show Cause Order and responds to the filings submitted by PJM \nInterconnection, L.L.C. (“PJM”) and certain PJM Transmission Owners on those matters.2 \nI. \nINTRODUCTION AND SUMMARY OF POSITION \nIn response to a complaint filed by Constellation Energy Generation, LLC \n(“Constellation”)3 and the record developed in connection with the Commission’s \nNovember 1, 2024 technical conference on large loads co-located at generating facilities,4 \n                                            \n1  PJM Interconnection, L.L.C., 190 FERC ¶ 61,115 (2025) (“Show Cause Order”). \n2  See Indicated PJM Transmission Owners, Answer, Docket Nos. EL25-49-000, et al. (March 24, 2025) \n(“Indicated PJM TOs Answer”); PJM, Answer, Docket Nos. EL25-49-000, et al. (March 24, 2025) (“PJM \nAnswer”); Public Service Electric and Gas Co., Response, Docket Nos. EL25-49-000, et al. (March 24, \n2025) (“PSE&G Response”). \n3  Constellation, Complaint, Docket No. EL25-20-000 (Nov. 22, 2024) (“Constellation Complaint”). \n4  Large Loads Co-Located at Generating Facilities, Docket No. AD24-11-000 (“Co-Located Load \nTechnical Conference”)."},{"page":2,"startToken":238,"endToken":550,"text":"2 \nthe Commission’s Show Cause Order found that PJM’s Open Access Transmission Tariff \n(“Tariff”) “appears to be unjust and unreasonable or unduly discriminatory or preferential \nbecause it does not contain provisions addressing with sufficient clarity or consistency \nthe rates, terms, and conditions of service that apply to co-location arrangements.”5 The \nCommission accordingly initiated a new proceeding under section 206 of the Federal \nPower Act (“FPA”), consolidated the new proceeding with the Constellation Complaint \nand Co-Located Load Technical Conference dockets, and directed PJM and the PJM \nTransmission Owners: (1) to show cause as to why the PJM Tariff remains just and \nreasonable and not unduly discriminatory or preferential; or (2) explain what Tariff \nchanges “would remedy the Commission’s identified concerns if the Commission were to \ndetermine that the Tariff has in fact become unjust and unreasonable or unduly \ndiscriminatory or preferential.”6 The Commission identified a number questions that PJM \nand Transmission Owners should address in responding to the order.7  \nPJM, while maintaining that its Tariff remains just and reasonable, identified eight \n“options” for the treatment of large load co-location.8 In addition to the answer filed by \nPJM, most PJM Transmission Owners submitted a joint answer to the Show Cause Order, \nwhile other Transmission Owners, including PSE&G, filed individual responses. \nAMP supports the answer filed by the Indicated PJM Transmission Owners. AMP \nagrees that the existing PJM Tariff is just and reasonable, although additional clarification \n                                            \n5  Show Cause Order at P 74. For purposes of the Show Cause Order, the Commission defines co-located \nload as “a configuration through which end-use customer load is physically connected to the facilities of \nan existing or planned generation unit on the interconnection customer’s side of the point of \ninterconnection to the PJM transmission system.” Id. P 3. \n6  Id. P 87.  \n7  Id. P 88. \n8  See PJM Answer at 9-20 & Exh. A."},{"page":3,"startToken":550,"endToken":897,"text":"3 \nconcerning the treatment of co-located load may be beneficial.9 As the Indicated PJM \nTransmission Owners explain, it is important that load co-located behind the \ninterconnection point of an adjacent generator in PJM is considered Network Load (or \nload taking Point-to-Point Transmission Service) to avoid unjust and unreasonable cost-\nshifting and to promote reliable transmission planning and resource adequacy. \nWhile AMP supports the answer of the Indicated PJM Transmission Owners, AMP \nis filing this response to emphasize the continuing reasonableness of the PJM Tariff’s \ntreatment of load served by Behind the Meter Generation (“BTMG”) and Non-Retail \nBTMG, as those terms are defined in the Tariff.10 Specifically, the PJM Tariff allows \ncertain Network Load served by BTMG to be netted for purposes of calculating \ntransmission, and certain other charges.11 These Tariff provisions conform to cost \ncausation principles – as the Commission found in approving them12 – and provide \nmeaningful benefits to electric consumers. Even if the Commission agrees with PJM that \n“[t]he extent to which netting could or should apply to co-located data center load is not \nclear at this time,”13 there is no reason to revisit the existing Tariff framework allowing \nBTMG netting. Indeed, PJM correctly asserts that its existing Tariff remains just and \nreasonable.14 Any action taken by the Commission in this proceeding should avoid \n                                            \n9  See, e.g., Indicated PJM TOs Answer at 2. \n10  In this response, AMP’s references to BTMG should be read to include Non-Retail BTMG unless \notherwise indicated. \n11  See PJM Tariff, §§ 34.2 and 34.3; see also, e.g., PJM Manual 14D, Appendix A at p. 179 (“The purpose \nof these rules is to permit market participants operating Behind-the-Meter Generation (BTMG) to receive \nthe associated benefits. These benefits are recognized by allowing such generation to net for the \npurposes of calculating transmission, capacity, ancillary services, and administrative fee charges.”); \nPJM Answer at 11-12, 34-37. \n12  See PJM Interconnection, L.L.C., 107 FERC ¶ 61,113, at P 28, reh’g denied, 108 FERC ¶ 61,302 (2004). \n13  PJM Answer at 35. \n14  Id. at 4, 32."},{"page":4,"startToken":897,"endToken":1181,"text":"4 \nprejudice to entities that have relied on the longstanding provisions allowing for netting of \nNetwork Load served by BTMG. \nAlthough PSE&G’s response persuasively documents the benefits of the PJM \nTariff’s existing BTMG netting provisions,15 PSE&G incorrectly suggests (as have other \nparties in these consolidated proceedings) that treating large loads that co-locate behind \nan adjacent generator’s point of interconnection differently than loads eligible for netting \nunder the BTMG provisions of the Tariff would necessarily raise undue discrimination \nconcerns.16 The record does not support a finding that co-location arrangements for large \nloads (such as data centers) that appear to be the focus of PSE&G’s discrimination \nconcerns17 would meet the existing requirements for BTMG and/or Non-Retail BTMG \nnetting, or that co-located load is otherwise similarly situated to load served by BTMG \nand eligible for netting under the PJM Tariff. \nII. \nINTEREST OF AMP \nAMP is a nonprofit Ohio corporation with members in Delaware, Indiana, Kentucky, \nMaryland, Michigan, Ohio, Pennsylvania, Virginia, and West Virginia, the majority of \nwhich are load-serving entities within the PJM region. To meet those members’ load \nservice responsibilities, AMP purchases transmission and related services from PJM and \nalso purchases and sells electricity products in the markets operated by PJM.18 \n                                            \n15  See PSE&G Response at 18 & Exh. 1. \n16  See, e.g., id. at 13-14. \n17  See, e.g., id. at 2 (arguing for an approach that, inter alia, “preserves co-location as a viable option to \nsupport data center development in New Jersey and elsewhere in PJM”). \n18  AMP Transmission LLC (“AMP Transmission”), a wholly owned subsidiary of AMP, is a PJM \nTransmission Owner. AMP Transmission is a signatory to the Indicated PJM Transmission Owners’ \nAnswer."},{"page":5,"startToken":1181,"endToken":1444,"text":"5 \nIII. \nRESPONSE \nA. \nAMP supports the answer of the Indicated PJM Transmission Owners. \nThe Indicated PJM Transmission Owners correctly assert that the current PJM \nTariff remains just and reasonable19 – a position that is echoed by PJM itself.20 As the \nTransmission Owners observe, “[c]o-located load can and does fit within the current \nconstructs for providing transmission service” under the pro forma open access \ntransmission tariff and the PJM Tariff.21 In particular, load served under co-location \narrangements should be treated as Network Load (or load served by Point-to-Point \nService). Treating co-located load as Network Load or load served by Point-to-Point \nService avoids unjust and unreasonable transmission cost-shifting,22 while promoting \nreliable transmission planning and resource adequacy.23 \nThe responses filed by PJM and the Indicated PJM Transmission Owners do not \nsupport a finding that the existing PJM Tariff is unjust and unreasonable (they assert the \nopposite), and, thus, they provide no basis to modify the Tariff under FPA section 206.24 \nLike the Indicated PJM Transmission Owners, however, AMP is amenable to further \ndiscussion and guidance regarding possible Tariff changes to clarify the treatment of co-\nlocated load. The Indicated PJM Transmission Owners, for example, suggest a \nreasonable definition of “Co-located Load” that would appropriately clarify how co-located \n                                            \n19  Indicated PJM TOs Answer at 2. \n20  PJM Answer at 4, 32. \n21  Indicated PJM TOs Answer at 2. \n22  See id. at 3. \n23  See id. at 3-4. \n24  16 U.S.C. § 824e; see also, e.g., Emera Maine v. FERC, 854 F.3d 9, 24-25 (D.C. Cir. 2017)."},{"page":6,"startToken":1444,"endToken":1859,"text":"6 \narrangements fit within the existing PJM Tariff framework.25 The definition suggested by \nthe Indicated PJM Transmission Owners would appropriately preserve the current \ntreatment of load served by BTMG and Non-Retail BTMG.26  \nRegardless of whether the Commission concludes that the PJM Tariff should be \nmodified to address co-located arrangements, however, there is no basis to modify the \ncurrent BTMG netting provisions in the PJM Tariff, as discussed below.27 \nB. \nThe existing PJM Tariff provisions addressing BTMG netting should \nbe retained. \n1. \nThe BTMG netting provisions were adopted in conformance \nwith cost causation principles. \nUnder sections 34.2 and 34.3 of the PJM Tariff, load served by BTMG is, subject \nto certain requirements and limitations, eligible to be excluded – or netted – from a \nNetwork Customer’s daily load for purposes of calculating charges for Network Service \nand other PJM charges.28 This does not mean that load served by BTMG and Non-Retail \n                                            \n25  See Indicated PJM TOs Answer at 9. \n26  Specifically, the suggested definition of Co-located Load would distinguish between the generation \nresources adjacent to load in a co-located load arrangement and generation resources that meet the \ndefinition of BTMG. See id. \n27  See Show Cause Order at P 88, question a.iv (“Parties may also address how co-located loads are \nsimilar to or disparate from other types of arrangements where load and generation share the same \npoint of interconnection (such as Behind the Meter Generation as defined in PJM’s Tariff or non-retail \nbehind the meter generation) and should consider how any proposed replacement rate would interact \nwith these other arrangements.”). \n28  The PJM Tariff defines Behind the Meter Generation as:  \na generation unit that delivers energy to load without using the Transmission \nSystem or any distribution facilities (unless the entity that owns or leases the \ndistribution facilities has consented to such use of the distribution facilities and \nsuch consent has been demonstrated to the satisfaction of the Office of the \nInterconnection); provided, however, that Behind The Meter Generation does not \ninclude (i) at any time, any portion of such generating unit’s capacity that is \ndesignated as a Generation Capacity Resource; or (ii) in an hour, any portion of \nthe output of such generating unit that is sold to another entity for consumption at \nanother electrical location or into the PJM Interchange Energy Market. \n \nThe Tariff, in turn, defines Non-Retail BTMG as “Behind the Meter Generation that is used by municipal \nelectric systems, electric cooperatives, or electric distribution companies to serve load.”"},{"page":7,"startToken":1859,"endToken":2139,"text":"7 \nBTMG is not considered Network Load; the relevant netting provisions are only available \nto Network Customers, and as PJM explains, “all load served by BTM Generation must \nbe designated Network Load.”29 \nNetting of Network Load served by BTMG conforms to cost causation principles. \nLoad eligible for netting under sections 34.2 and 34.3 of the PJM Tariff is served by \ngeneration that, by definition, delivers energy to load without using the transmission \nsystem.30 In accepting the original BTMG netting provisions in the PJM Tariff, the \nCommission specifically observed that PJM’s “charges for the use of PJM’s transmission \nsystem should be allocated to network customers based on a network customer’s actual \nuse of PJM's system, consistent with the principle of cost causation.”31 The Commission \nalso agreed that the BTMG netting provisions were consistent with its policy of \nencouraging demand response programs,32 as PJM observed that its proposal would \n“encourage the use of behind the meter generation during times of scarcity and high \nprices.”33 \nThe PJM Tariff provisions addressing netting of load served by Non-Retail BTMG \nwere adopted in a 2005 settlement agreement,34 reached after the Commission found \nthat “PJM’s current tariff that excludes from the BTM program all generation that is \nconnected to load through a distribution system may not be just and reasonable, and may \n                                            \n29  PJM Answer at 35. \n30  See supra note 28. \n31  PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at P 28 (quoting Occidental Chem. Corp. v. PJM, 102 \nFERC ¶ 61,275 (2003) (internal quotes omitted)). \n32  Id. P 27. \n33  Id. P 6. \n34  See PJM Interconnection, L.L.C., 113 FERC ¶ 61,279 (2005)."},{"page":8,"startToken":2139,"endToken":2413,"text":"8 \nbe unjust, unreasonable, unduly discriminatory or preferential or otherwise unlawful.”35 \nSection 34.3 of the Tariff thus extends the same netting availability, subject to certain \nconditions, to BTMG used by municipal electric systems, electric cooperatives, or electric \ndistribution companies to serve load, consistent with the cost causation principles \nrecognized by the Commission in accepting the original BTMG netting provisions. \n2. \nThe BTMG Tariff provisions provide benefits while protecting \nagainst adverse impacts. \nAMP and a number of its load-serving utility members rely on generating units that \nqualify as Non-Retail BTMG. These resources, while generally small, provide significant \nbenefits to the consumers of AMP’s member utilities. Consistent with the original \npurposes of the BTMG netting approach, the PJM Tariff allows consumers to avoid costs \nthat do not reflect their actual use of the transmission system. The transmission cost \nmitigation impacts of Non-Retail BTMG netting are extremely important to AMP’s \nmembers at a time of sharply increasing transmission expenses in the PJM region. The \nanswer filed by PSE&G documents similar benefits for customers in New Jersey, \nincluding universities, government agencies, manufacturers, and other consumers.36 \nOther technical conference commenters cited similar benefits.37 \nContinuing to facilitate BTMG resources is also likely to provide reliability benefits. \nAs noted above, one of PJM’s original justifications in proposing BTMG netting was that \nit would “encourage the use of behind the meter generation during times of scarcity and \n                                            \n35  PJM Interconnection, L.L.C., 112 FERC ¶ 61,034, at P 18 (2005). \n36  PSE&G Response at 18 & Exh. 1. \n37  See, e.g., Northeastern Rural Electric Membership Corporation, Post-Technical Conference Comments, \nDocket No. AD24-11-000 (Dec. 9, 2024)."},{"page":9,"startToken":2413,"endToken":2720,"text":"9 \nhigh prices.”38 Tariff provisions that encourage the operation of BTMG generation as a \nform of demand response at times of scarcity are likely to enhance reliability. Indeed, in \nits answer, PJM describes current efforts to facilitate increased use of small generators \nto promote resource adequacy, explaining that “PJM is also exploring with regulators and \ngenerators opportunities to leverage at least 50 hours (or more) of diesel back-up \ngenerator service to enhance the available demand response portfolio.”39 In addition to \ndemand response benefits, BTMG installations can provide a source of emergency \nbackup generation for some customers should a major outage occur. \nThe PJM Tariff, moreover, includes a number of conditions on Non-Retail BTMG \nnetting specifically designed to address initial PJM reservations that adverse reliability \nimpacts could result from greater levels of BTMG if the netting rules were extended to \nmunicipals and cooperatives.40 Specifically, even though the definition of BTMG (and by \nextension Non-Retail BTMG), excludes any portion of “the generating unit’s capacity that \nis designated as a Generation Capacity Resource,” Non-Retail BTMG must operate \nduring the first ten occurrences of Maximum Generation Emergency conditions each year \nin the zone where the unit is located.41 Further, section 34.3 of the Tariff caps the total \namount of Non-Retail BTMG in the PJM Region in any specific year, and sets a maximum \nceiling of 3,000 MW absent a filing by PJM to expand the cap or modify the netting rules.42 \n                                            \n38  PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at P 6. \n39  PJM Answer at 9. \n40  See PJM, Offer of Settlement, Docket No. EL05-127-000, Explanatory Statement at 9-10 (Oct. 24, \n2005); see also PJM Answer at 13 n.5. \n41  PJM Tariff, Schedule 15. \n42  PJM Tariff, § 34.3; PJM, Offer of Settlement, Docket No. EL05-127-000, Explanatory Statement at 6-7."},{"page":10,"startToken":2720,"endToken":3016,"text":"10 \n3. \nThe record provides no basis to revisit the current PJM Tariff \nprovisions addressing BTMG. \nAMP strongly agrees with PSE&G’s admonition that the Commission “should allow \nexisting BTMG customers to continue to net and should take no action that would \ndisadvantage these existing customers.”43 Indeed, as discussed above, the PJM and \nTransmission Owner responses do not provide any basis for finding that the existing \nBTMG netting provisions are subject to modification under FPA section 206 as unjust and \nunreasonable, or unduly discriminatory or preferential.   \nWhile maintaining that its Tariff remains just and reasonable, PJM discordantly \nsuggests that “discussions in the record regarding PJM’s BTM Generation rules raise \nquestions about the status of those rules,”44 and PJM states that it is “open to exploring . \n. . whether the 20-year-old method of allocating costs pursuant to the BTM Generation \nnetting rules remains consistent with cost causation principles.”45 PJM does not provide \nany citations to the “discussions in the record” that supposedly call the existing netting \nprovisions into question, nor does it identify any reason why the longstanding practice of \nnetting loads served by BTMG might no longer be “consistent with cost causation \nprinciples.”46 As the Commission found in originally approving the BTMG netting \nprovisions in the PJM Tariff, those provisions allocate transmission system costs to \nNetwork Customers based on their actual use of PJM’s system, “consistent with the \nprinciple of cost causation.”47 That observation is as true today as it was in 2004. If \n                                            \n43  PSE&G Response at 6; see also, e.g., Northeastern Rural Electric Membership Corporation, Post-\nTechnical Conference Comments, Docket No. AD24-11-000 (Dec. 9, 2024). \n44  PJM Answer at 36. \n45  Id. at 36-37. \n46  Id. \n47  PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at P 28."},{"page":11,"startToken":3016,"endToken":3404,"text":"11 \nanything, the longstanding nature of the netting provisions is a reason to retain, not revisit \nthem, given the reliance interests of PJM market participants in the existing rules.48  \nPJM suggests that large load co-location arrangements might fall within the Tariff’s \nexisting BTMG netting provisions, and PJM’s “Option 3” is based on this premise.49 PJM \nnonetheless expresses concern that “the BTM Generation paradigm does not fit co-\nlocation arrangements particularly well because it was not designed with large load co-\nlocation in mind,”50 and PJM ultimately observes that “[t]he extent to which netting could \nor should apply to co-located data center load is not clear at this time.”51 AMP agrees that \nthe existing BTMG provisions were not designed with large co-located loads in mind, but \nconcerns about whether and how large loads co-locating at existing generation units fit \nwithin the existing BTMG netting framework is not a reason to upset the existing \nframework, which was adopted in conformance with cost causation principles, and which \nis reflected in a Tariff that PJM insists remains just and reasonable. \nPSE&G correctly argues that the Commission should avoid adversely impacting \nentities that rely on the existing BTMG provisions of the PJM Tariff, but goes on to suggest \nthat it would be unduly discriminatory to treat co-located “behind the meter load” \ndifferently than load served by BTMG for netting purposes.52 The Commission has \n                                            \n48  See, e.g., Dep’t of Homeland Sec. v. Regents of the Univ. of Cal., 591 U.S. 1, 30 (2020) (explaining that \nan agency “must be cognizant that longstanding policies may have engendered serious reliance \ninterests that must be taken into account.” (cleaned up)). \n49  See, e.g., PJM Answer at 11-13; see also id. at 34 (“The co-located load arrangements at issue here, \nlarge data centers, could be viewed as similar to BTM Generation that currently exists under PJM’s Tariff \n(as reflected in Exhibit A, Option 3).”). \n50  Id. at 34; see also id. at 13 (discussing PJM’s Option 3 and noting that “[w]hile this option is already \navailable under the Tariff, it was conceived for, and has been implemented for, substantially smaller \nloads (like a large warehouse with solar panels) and not on the scale of large data centers.”). \n51  Id. at 35. \n52  PSE&G Response at 13-14."},{"page":12,"startToken":3404,"endToken":3772,"text":"12 \nobserved, however, that “different co-location arrangements are likely to use or benefit \nfrom the transmission system in different ways depending on how they are configured \nand, moreover, that those different configurations will themselves likely have different \nimpacts on the transmission system.”53 PSE&G has not demonstrated that large co-\nlocated data center loads that appear to be the focus of its discrimination concerns54 \nwould be able to comply with the existing requirements for BTMG or that these loads \nwould otherwise be similarly situated to load served by BTMG behind the load’s point of \ninterconnection, particularly given PSE&G’s acknowledgement that there may be a \nvariety of co-located load configurations.55 \nAs a threshold matter, any co-located load claiming to be similarly situated to load \nserved by BTMG must, at a minimum, be designated Network Load, as only Network \nLoad is eligible for BTMG netting.56 The PJM Tariff also specifically defines BTMG as “a \ngeneration unit that delivers energy to load without using the Transmission System.”57 \nWhile PSE&G asserts that “[f]rom a technical perspective, there is no material distinction \nbetween a BTM load arrangement relative to a BTMG arrangement,”58 generating plants \ninterconnected to the transmission system and serving large co-located loads rely on the \ntransmission system to deliver energy to load in a manner that BTMG connected behind \na load meter does not. For example, as Indicated PJM Transmission Owners observe, \n                                            \n53  Show Cause Order at P 76. \n54  See, e.g., PSE&G Response at 2 (arguing for an approach that, inter alia, “preserves co-location as a \nviable option to support data center development in New Jersey and elsewhere in PJM”). \n55  See, e.g., id. at 5. To the extent that participants in a co-located load arrangement believe it is eligible \nfor netting under sections 34.2 and 34.3 of the PJM Tariff, they can seek to qualify under those provisions \nby meeting all the criteria. See Indicated PJM TOs Response, Attachment A at 4 n.6. \n56  See, e.g., PJM Answer at 35 (“all load served by BTM Generation must be designated Network Load.”). \n57  PJM, Tariff, Definitions A-B (emphasis added). \n58  PSE&G Response at 15."},{"page":13,"startToken":3772,"endToken":4060,"text":"13 \nnuclear units are required to be interconnected to the transmission grid, and, thus would \nnecessarily rely directly on the transmission grid to serve co-located load.59 In contrast, \nas PJM notes, BTMG netting “was conceived for, and has been implemented for, \nsubstantially smaller loads (like a large warehouse with solar panels) and not on the scale \nof large data centers.”60 These on-site generators, the Commission agreed, do not rely \non the integrated transmission system (or even the distribution system) to deliver energy \nto load.61 The Non-Retail BTMG provisions of the PJM Tariff were later adopted, as \ndiscussed above, in response to Commission concerns about treating distribution-\nconnected generation differently than on-site generation, given that such generators also \nmay not rely on the integrated transmission system to serve load.62 Indeed, BTMG may \neven be able to serve as a source of emergency backup generation during a grid outage. \nThus, while, as Commissioner Rosner noted, new co-located load proposals may \nbe the “inverse” of traditional BTMG arrangements,63 the Commissioner’s observation \nonly serves to highlight that the arrangements are not the same, and, thus, may warrant \ndifferent treatment.64 Regardless of whether the Commission agrees that co-located load \narrangements should be entitled to some form of netting, however, the Commission \nshould preserve the current BTMG and Non-Retail BTMG netting provisions in the PJM \nTariff. \n                                            \n59  See Indicated PJM TOs Answer at 13. \n60  PJM Answer at 13.  \n61  See, e.g., PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at P 4. \n62  PJM Interconnection, L.L.C., 112 FERC ¶ 61,034 at PP 15-19. \n63  See PSE&G Response at 16 (citing Technical Conference Transcript at 14). \n64  See also PJM Answer at 36."},{"page":14,"startToken":4060,"endToken":4140,"text":"14 \nIV. \nCONCLUSION \nWHEREFORE, for the foregoing reasons, American Municipal Power, Inc. \nrespectfully asks the Commission to consider these comments in these dockets. \nRespectfully submitted, \n \n/s/ John McCaffrey             \nJohn McCaffrey \nStinson LLP  \n1775 Pennsylvania Avenue NW  \nSuite 800  \nWashington, DC 20006  \n(202) 728-3026  \njohn.mccaffrey@stinson.com \n \n/s/ Gerit F. Hull                          \nGerit F. Hull                                                  \nDeputy General Counsel for                       \n  Regulatory Affairs                                      \nAmerican Municipal Power, Inc.                   \n1111 Schrock Road, Suite 100  \nColumbus, OH 43229                                  \n(614) 540-1111 \nghull@amppartners.org \n \n \nApril 23, 2025"},{"page":15,"startToken":4140,"endToken":4204,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each \nperson designated on the official service lists compiled by the Secretary in these \nproceedings. \nDated at Washington, D.C., this 23rd day of April, 2025. \n \n \n \n \n \n \n \n/s/ John McCaffrey                  \nJohn McCaffrey \nStinson LLP  \n1775 Pennsylvania Avenue NW  \nSuite 800  \nWashington, DC 20006  \n(202) 728-3026  \njohn.mccaffrey@stinson.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":830,"startToken":0,"endToken":109},{"p":1,"at":830,"title":"I. INTRODUCTION AND SUMMARY OF POSITION","method":"printed heading","endPage":4,"endAt":955,"startToken":109,"endToken":1040},{"p":4,"at":955,"title":"II. INTEREST OF AMP","method":"printed heading","endPage":5,"endAt":3,"startToken":1040,"endToken":1182},{"p":5,"at":3,"title":"III. RESPONSE","method":"printed heading","endPage":5,"endAt":19,"startToken":1182,"endToken":1184},{"p":5,"at":19,"title":"A. AMP supports the answer of the Indicated PJM Transmission Owners.","method":"printed heading","endPage":6,"endAt":470,"startToken":1184,"endToken":1515},{"p":6,"at":470,"title":"B. The existing PJM Tariff provisions addressing BTMG netting should","method":"printed heading","endPage":14,"endAt":4,"startToken":1515,"endToken":4061},{"p":14,"at":4,"title":"IV. CONCLUSION","method":"printed heading","endPage":15,"endAt":0,"startToken":4061,"endToken":4140},{"p":15,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":15,"endAt":450,"startToken":4140,"endToken":4204}]}