{"document":{"slug":"rec-20250423-5209","title":"Joint Comments of PJM Industrial Customer Coalition and Industrial Energy Consumers of America","issued":"2025-04-23","accession":"20250423-5209","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Industrial Customer Coalition and Industrial Energy Cons","kind":"comments","file":"sources/filings/text/20250423-5209_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5209","tier":"record","sha256":"84d6a3152c7cdd419e66a06844949769fb081d92f95c9b12fd73833fac06489e","pages":17,"tokens":5129,"emptyPages":[],"textThemes":["colo","cost","flex"]},"pages":[{"page":1,"startToken":0,"endToken":242,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Interconnection, L.L.C., et al.  \n) \nDocket Nos. EL25-49-000 \n \n \n \n \n \n \n) \nLarge Loads Co-Located at Generating \n) \n \n \nAD24-11-000 \nFacilities  \n \n \n \n \n) \n \n \n \n \n \n \n) \nConstellation Energy Generation, LLC \n) \n \n \nEL25-20-000 \nv. \n \n \n \n \n \n) \n \n \n(Consolidated) \nPJM Interconnection, L.L.C.  \n \n) \n \nJOINT COMMENTS OF \nPJM INDUSTRIAL CUSTOMER COALITION AND \n \nOrder Instituting Proceeding Under Section 206 of the Federal Power Act (“FPA”) and \nConsolidating with Other Proceedings (“Show Cause Order” or “Order”)\n                 INDUSTRIAL ENERGY CONSUMERS OF AMERICA  \n \nPursuant  to  the  Federal  Energy  Regulatory  Commission’s  (“Commission”  or  “FERC”) \n1, the PJM Industrial \nCustomer Coalition (“PJMICC”)2 and the Industrial Energy Consumers of America (“IECA”) \n(collectively, “Industrials”) hereby file these Joint Comments regarding co-location issues on the \nPJM Interconnection, L.L.C. (“PJM”) grid. \nI. \nBACKGROUND \n \nOn February 20, 2025, the Commission unanimously voted to launch a review of issues \nassociated with the co-location of large loads at generating facilities in PJM, including whether \nthe PJM tariff needs to establish rules to create clarity while ensuring grid reliability. The Order \ninstituted a show cause proceeding involving PJM and the PJM Transmission Owners3 and \n \n1 See, FERC Order Instituting Proceeding Under Section 206 of the Federal Power Act and Consolidating with Other \nProceedings, Docket Nos. EL25-49-000, EL24-55-000, and ER24-42-000 (Feb. 20, 2025).  \n2 PJMICC filed a doc-less Motion to Intervene in Docket Nos. ER25-49 on March 3, 2025. \n3 The PJM Transmission Owners are a group of transmission owners who are named parties in the Show Cause Order."},{"page":2,"startToken":242,"endToken":577,"text":"2 \ncombined the records of two pending proceedings because of the common issues associated with \neach docket.4 In the Order, the Commission found that PJM’s tariff does not appear to sufficiently \naddress the rates, terms, and conditions of service that apply to co-location arrangements.5 The \nOrder directed PJM and the PJM Transmission Owners to, within 30 days of the date of the Order, \nexplain why the PJM tariff remains just and reasonable or, alternatively, what changes to the PJM \ntariff would remedy the Commission’s identified concerns.6 Further, the Order directed that \ninterested entities may respond within 30 days of PJM’s filing, addressing either or both of: \n(1) whether the Tariff remains just and reasonable and not unduly discriminatory or preferential; \nand (2) if not, what changes to the Tariff should be implemented as a replacement rate.7 On \nMarch 24, 2025, answers were filed by PJM, a select group of PJM Transmission Owners \n(“Indicated TOs”), Public Service Electric & Gas (“PSE&G”), and several other parties \n(collectively, Answers).  \nII. \nJOINT COMMENTS  \n \nPJMICC and IECA are both coalitions representing industrial consumers in the PJM \nRegion. The Industrials’ membership includes many large manufacturers and other entities whose \noperations are dependent on sound policies governing the electric grid. The Industrials commend \nthe Commission’s goal of ensuring timely, clear guidance on the issues identified in this \n \n4  The Commission combined FERC’s November 2024 technical conference on large load co-location (Docket \nNo. AD24-11) and a complaint filed on November 22, 2024, by Constellation Energy Generation, LLC against PJM \n(Docket No. EL25-20) to form a consolidated proceeding, identified under Docket EL25-49. \n5 FERC stated in a news release, “The absence of this information may leave generators and load unable to determine \nwhat steps they can take to set up co-location arrangements of various configurations, and how to do so in an \nacceptable way.” FERC News Release (Feb. 20, 2025), https://www.ferc.gov/news-events/news/ferc-orders-action-\nco-location-issues-related-data-centers-running-ai. \n6 Show Cause Order at 56. \n7 Show Cause Order at 57."},{"page":3,"startToken":577,"endToken":991,"text":"3 \nproceeding and offer the following Joint Comments to assist the Commission as it provides \ndirection to PJM and the PJM Transmission Owners on this topic. \nA. \nBilling For Commission-Jurisdictional Services Must Be Based on Actual Use \nof the Transmission System. \n \nIt is well settled that cost causation is the bedrock principle of just and reasonable rates, \nrequiring that rates be aligned with the benefits received and costs imposed by customers, \nconsistent with the “just and reasonable” standard of the Federal Power Act.8 Further, Commission \ndeterminations on tariffs and pricing determine that actual use of the transmission system is the \nappropriate way to measure cost causation. In their Answer, the Indicated TOs reject that principle, \ninstead proposing to require all co-located load to be deemed Network Load and to be billed for \nload irrespective of actual use of the transmission system.9 The Indicated TOs fail to justify their \nposition of radically departing from that well-established precedent. \nMore than 20 years ago, in Occidental Chemical Corp. v. PJM Interconnection, L.L.C., the \nCommission declared that “[network] access charges for use of PJM’s transmission system should \nbe allocated to network customers based on a network customer’s actual use of PJM’s system, \nconsistent with the principle of cost causation.”10  The “actual use” principle is critically important \nto the calculation of billing determinants and the assessment of various Commission-jurisdictional \ncharges for transmission service, and also for capacity service and ancillary services. \n \n8 16 U.S.C. § 824d(a). See Old Dominion Elec. Coop. v. FERC, 898 F.3d 1254, 1255 (D.C. Cir. 2018) (“Under the \nAct, electric utilities must charge ‘just and reasonable’ rates. For decades, the Commission and the courts have \nunderstood this requirement to incorporate a ‘cost-causation principle’—the rates charged for electricity should reflect \nthe costs of providing it.”) The Commission correctly states that the cost causation principle “provides that all \nCommission-jurisdictional rates and charges must ‘reflect to some degree the costs actually caused by the customer \nwho must pay for them,’ and that costs must be allocated in a manner that is at least roughly commensurate with the \nbenefits that entity receives.” Show Cause Order at 39 (quoting Midwest ISO Transmission Owners v. FERC, 373 \nF.3d 1361, 1368 (D.C. Cir. 2004) and citing Ill. Com. Comm’n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009).  \n9 Indicated TOs Answer at 8. \n10 Occidental Chem. Corp. v. PJM Interconnection, 102 FERC ¶ 61,275, 61,852 (emphasis added)."},{"page":4,"startToken":991,"endToken":1283,"text":"4 \nAt issue in Occidental was PJM’s use of a cost-allocation methodology that added the value \nof curtailed load back to a customer’s actual load to determine the customer’s network access \ncharge based on a customer's coincident peak usage.11  The Commission expressed concerns that \nthis “calculation appeared inconsistent with the underlying rationale,” and that such an approach \nwould discourage demand response from customers.12 PJM sought to defend the practice that the \nCommission ultimately found to be unjust and unreasonable13 by arguing that PJM’s infrastructure \nwould still serve the customers.14 The Commission rejected that contention, instead embracing a \nnetting approach. In its order on rehearing, the Commission stated that the netting approach is “in \nthe public interest because it ensures that PJM allocates its transmission charges to those using the \nsystem on peak periods and helps ensure that customers have incentives to curtail load during peak \nperiods.”15 \nIn their Answer, the Indicated TOs propose a gross-load metering approach that is \nanalogous to the gross-load outcome that the Commission rejected in Occidental. Like the original \nPJM approach that was rejected in Occidental, the Indicated TOs’ proposed approach would cause \nsignificant rate increases, are not supported by any evidence demonstrating “how and to what \nextent [the PJM] system is in fact used,”16 and would disincentivize customers from taking steps \nto manage their “actual use” of the electric grid. In the case of behind the meter generation \n(“BTMG”), only the amount of the customer’s load that is not supplied by the BTMG is actually \n \n11 Id. ¶¶ 1, 3-7. The tariff section at issue was Section 34.1 of the PJM Open Access Transmission Tariff (“OATT”). \n12 Id. ¶ 4. \n13 Id. ¶¶ 1, 14. \n14 Id. ¶ 7. \n15 Id. ¶ 2. \n16 Id. ¶ 14."},{"page":5,"startToken":1283,"endToken":1666,"text":"5 \nusing the grid and is assessed transmission charges.17 On a similar theme, the Commission has \nrecently acknowledged that “voluntary demand response decreases the use of the transmission \nsystem at the coincident peak,” and if that load is not present during the hours when billing \ndeterminants are calculated, it will not be assessed transmission charges for load that is not there.18  \nCharging customers on a gross-load basis (that is, charging for all consumption regardless \nof how much of that consumption utilized the grid vs. being generated on-site) is contrary to cost-\ncausation principles and just and reasonable ratemaking. Because the transmission system is \ndesigned to serve customers during the annual peak, or during other relevant peaks, customers' \neffective load management efforts can lower the peak, causing PJM to need less transmission \ncapacity, which in turn leads to the avoidance of network upgrades.19 The corollary of this principle \nis that customers that use more capacity during peak demand conditions contribute more to the \nupgrades that are needed.  As explained by the Commission in Occidental, “[t]he other customers \nare making greater use of the system during the system coincident peak and are therefore justifiably \nassigned a larger percentage of the costs.”20 Customers that have higher loads during the relevant \ncoincident peaks are more responsible for causing the costs, and the principle of cost-causation \nrequires them to pay for their proportion of cost-causation. “Properly designed rates should \nproduce revenues from each class of customers which match, as closely as practicable, the cost to \n \n17 PJM Manual 14d, Appendix A, ¶ 30 (“Once the status change from Generation Capacity Resource and/or Energy \nResource to BTMG status is effective, the generation output from the operating BTMG unit is allowed to reduce the \nactual gross load at a retail end-use customer site or at the wholesale area level (in the case of Non-Retail BTMG) and \na net load (gross load minus operating BTMG, not to be less than zero) is able to be used in the determination of LSE’s \ncharges for energy, ancillary services, capacity, transmission, and administrative fee charges in accordance with \nbusiness rule #40.”). \n18 PJM Interconnection, L.L.C. & Virginia Elec. & Power Co., 172 FERC ¶ 61,054, 61,510 (2020). \n19 Id. at ¶ 61,509. \n20 Occidental, 102 FERC at ¶ 16."},{"page":6,"startToken":1666,"endToken":1992,"text":"6 \nserve each class or individual customer.”21 In fact, the whole point of basing Commission-\njurisdictional charges on “actual use” of the system is “to reduce the cost to market participants \nthat rely to a lesser degree on the PJM integrated transmission system to serve load.”22 The \nCommission has previously recognized this issue when it ruled, “[W]hat is unreasonable is PJM's \ncurrent tariff which charges customers a higher rate on peak than their actual usage would \nsupport.”23  \nIn contrast to the Indicated TOs, transmission owner PSE&G proposes an “actual use” \napproach that is grounded in cost causation. In its Answer, PSE&G notes that “co-located loads \nare very similar to load and generation that share the same point of interconnection, such as large \nload customers with BTMG,” pointing out that they use or impact the transmission in the same \nway.24 PSE&G states, “Because such BTMG customers have reduced their use of the transmission \nsystem, under the PJM Tariff, they have been allocated costs based on their actual use of the \nsystem consistent with cost causation principles…. Both [behind the meter load and BTMG \ncustomers] should pay (and in the case of BTMG customers continue to pay) based only on actual \nusage of the transmission system.”25 \nThe Industrials agree with PSE&G’s statements and urge the Commission to reject the \nIndicated TOs’ approach. Charging customers on a gross-load basis, as the Indicated TOs propose, \nignores the timing and volume of customers’ consumption during the hours that matter. The \nCommission’s long-standing policy embracing cost allocation based on “actual use” has not \n \n21 New Dominion Energy Coop. Old Dominion Elec. Coop., 122 FERC ¶ 61,174, 62,013 (2008), citing Alabama \nElectric Co-op, Inc. v. FERC, 684 F.2d 20, 26 (D.C. Cir. 1982). \n22 PJM Interconnection, L.L.C., 108 FERC ¶ 61,302, 62,520 (2004). \n23 Id. \n24 PSE&G Answer at 14. \n25 Id. at 2 (emphasis added)."},{"page":7,"startToken":1992,"endToken":2303,"text":"7 \nchanged, and the Indicated TOs' proposal fails the cost causation test. As a result, the Indicated \nTOs desired approach to meter the gross load of customers and, ostensibly, charge customers based \non their gross or “potential” loads has not been shown to be just, reasonable, and not unduly \ndiscriminatory. \nB. \nThe Indicated Transmission Owners Have Not Justified Discriminatory \nTreatment of Co-Located Load. \n \nIn addition to failing the test of cost causation, the Indicated TOs’ proposed approach is \nalso unduly discriminatory. The Indicated TOs have not provided adequate justification to \ndemonstrate why co-located load that is not present on the grid during relevant system peaks \nshould be treated in a completely different manner than other load on the system that curtails or is \notherwise not present on the grid during relevant system peaks. The Indicated TOs give lip service \nto cost causation as the governing principle,26 but they explicitly promote a discriminatory \nconstruct in which reductions of system load would significantly favor customers curtailing load \nversus customers who offset their load by building or co-locating with generation. Even further, \nthe Indicated TOs do not explain why co-located load should be treated differently than BTMG \ncustomers, whose configurations are similar or identical to co-located load configurations.27 \nThe Indicated TOs state in their Answer that “if a customer has the option, capability, or is \nrequesting such capability to serve their full load from the PJM Transmission System, then the full \nload amount should be included in the LSE’s total load used to determine its share of total system \ncosts, even if they choose not to use that full suite of services at times.”28 In essence, this approach \nignores all offsetting generation and incorporates a “potential” load approach. The undue \n \n26 Indicated TOs Answer at 10. \n27 See PSE&G Answer, Attachment A at 4. \n28 Indicated TOs Answer at 16."},{"page":8,"startToken":2303,"endToken":2684,"text":"8 \ndiscrimination of this approach can be illustrated by a simple example. For a simple illustration, \nconsider two hypothetical industrial sites: “Factory A” is a large manufacturer without any on-site \ngeneration. It is comprised of four production lines, each with a load of 50 MW when operational. \nRunning at full bore, Factory A draws 200 MW of power from the grid. However, Factory A \nchooses to close two of its lines during the hottest summer days. If done successfully, Factory A’s \nmeasured load for the purposes of peak load calculation will be around 100 MW, not 200 MW.  \nNow consider “Factory B.” Factory B has an identical load structure, but operates a 100 \nMW generator on site, which it uses to manage peak loads. However, if Factory B kept all four \nproduction lines running, but used on-site generation to supply half of its own power, the Indicated \nTOs indicate that Factory B should be charged for 200 MW—double that of Factory A—despite \nthe fact that Factory A and Factory B use the grid identically during applicable peaks. This is \nunduly discriminatory, because it treats two similarly situated customers in different ways without \nadequate justification.29 As aptly stated by PSE&G, “Applying a transmission pricing approach \nthat ignores actual use or impact on the transmission system would violate cost causation principles \nand treat these two classes of customers differently, resulting in harm to both classes of \ncustomers.”30 \nThe undue discrimination of the gross-load approach comes into an even sharper focus \nwhen comparing co-located load with BTMG customers. PJM states in its Answer (concerning \n \n29 See, e.g., Energy Partners, L.P., 120 FERC ¶ 61,086, at 61,485 (“undue discrimination is in essence an unjustified \ndifference in treatment of similarly-situated customers”) (citing Tennessee Gas Pipeline Co. , 77 FERC ¶ 61,215, at \n61,877 (1996)). If it is argued that Factory B “could” draw 200 MW of power from the grid, it should be noted that \nFactory A also “could” draw 200 MW of power from the grid. The logical result of the Indicated TOs argument is \nthat all customers should be charged for the absolute maximum potential load. As addressed in Section II.C, this \napproach works against an economically efficient grid.   \n30 PSE&G Answer at 6."},{"page":9,"startToken":2684,"endToken":3115,"text":"9 \noption 3) that BTMG is already operated with a netting approach, to measure the actual impact to \nthe grid. As PJM explains:  \nOption 3 utilizes PJM’s existing Behind the Meter (“BTM”) Generation rules…. \nPJM’s BTM Generation rules would require the co-located load to be Network \nLoad. The rules charge load for its net use of the grid, after deducting BTM \nGeneration. This option is available in two configurations. Either the load and \ngeneration are co-located at the same Point of Interconnection, or the load is served \nby municipal utilities or EDCs BTM through a distribution system, if the owner or \nlessee of such distribution system has consented (which is called “Non-Retail” \nBTM Generation). The load uses and pays for NITS, Energy, Ancillary Services, \nand Capacity based on the net withdrawal quantity and dependent on if that \nwithdrawal is during the Peak (NITS and Capacity).31 \n \nWhile the Indicated TOs note that there are certain requirements in the current PJM tariff \nto qualify as BTMG, they do not dispute the fact that the configurations between BTMG and co-\nlocated load can be identical. The Indicated TOs seem to allow for continuation of a netting \napproach for BTMG in their Answer, yet advocate for a radically different approach for all \nsimilarly situated customers that are defined as co-located load. This is unduly discriminatory.32 \nPut another way, the Indicated TOs’ argument for deeming all co-located load as Network Load \nand charging on a gross-load basis would create an unreasonable preference for one type of users \nover another. It would create dramatically different costs for different users with identical impact \nto the transmission grid. The Indicated TOs argue that the system needs to be built out to cover \nevery “what if” and consumers should be charged for all load they could draw from the grid; yet \nthe Indicated TOs do not apply this principle equally and this concept cannot and should not be \n \n31 PJM Answer at 12 (emphasis added). \n32 As stated by PSE&G, “There is no reason to treat behind the meter load any differently than BTMG…. [F]rom an \nengineering and physics perspective, there is no difference between behind the meter load and BTMG. Courts and \nCommission precedents teach that that it is unduly discriminatory and unlawful to treat similarly-situated parties \ndifferently.” PSE&G Answer at 13-14. PSE&G argues, “To comply with the requirement under the Federal Power \nAct that rates may not be ‘unjust and unreasonable or unduly discriminatory or preferential,’ the Commission should \ntreat behind the meter load customers and BTMG customers in the same manner.”"},{"page":10,"startToken":3115,"endToken":3438,"text":"10 \nextended to customers that are not co-located with generation facilities.33 This disparate treatment \nviolates the letter and spirit of the Federal Power Act, which requires that rates be just and \nreasonable and not unduly discriminatory or preferential. In the Industrials’ view, the Commission \nshould select a methodology that does not discriminate between or among classes of transmission \ncustomers, but rather consistently measures each customer’s actual use of the transmission grid in \na fair and equitable fashion. \nC. \nAdoption of a “Gross-Load” or “Potential Load” Approach Would \nDisincentivize Efficient Behavior and Incentivize Inefficient Behavior, \nLeading to a More Expensive Grid. \n \nCalculating cost responsibility based on actual use of the transmission system brings a \nsubstantial efficiency benefit to the grid and a substantial cost-management benefit to customers. \nThe structure of PJM’s transmission pricing creates a direct incentive to manage transmission \nusage during system peaks. As a result, many large power consumers reduce transmission usage \nat strategic times in order to manage their costs. Customers employ a variety of strategies, \nincluding reducing operations, synchronizing operations, and employing on-site backup power. \nThe customers individually reap the benefit of reduced costs, but the collective effect is to reduce \nthe actual need for capacity on the grid, limiting excessive build-out of assets, consistent with the \nFederal Power Act’s goal of reliable, economically efficient transmission.34 \nUnfortunately, a gross-load or “potential load” approach, like that proposed by the \nIndicated TOs, would create a “one-two punch” that would neutralize this beneficial incentive \nstructure in two distinct ways. First, a gross-load approach diminishes customers’ incentive to \n \n33 The Indicated TOs’ proposal, taken to its logical outcome, could potentially result in metering of all discreet loads \nbehind a customer’s meter, and charging customers for transmission service based on the combined non-coincident \npeaks of all behind-the-meter operations, rather than based on the actual combined metered load at the point of \ninterconnection during the relevant peak hours.   \n34 16 U.S.C. § 824s."},{"page":11,"startToken":3438,"endToken":3768,"text":"11 \nefficiently manage peaks through co-located generation. If co-located load is measured based on \nits gross consumption, regardless of its actual use of the grid at peak hours, it would eliminate all \nincentives for customers to manage their peak loads, flatten their load profiles, minimize stress on \nthe transmission system during peak periods, and minimize the need for peak-driven transmission \ninvestments using generation-related investments.  Customers would have no incentive to operate \nefficiently because the billing for Commission-jurisdictional services would be divorced from the \ncustomer’s “actual use” of the system. It is striking to note that, with the Indicated TOs’ approach, \nco-located loads would likely be charged substantial transmission rates even if their actual use of \nthe transmission system is zero during relevant peak hours. If that same concept were to be applied \nto an industrial consumer with a large energy profile, the resulting cost increases would \nsignificantly impact operations and likely impair the industrial consumer’s financial well-being. \nSecond, the Indicated TOs’ approach incentivizes construction of transmission facilities \nbeyond what is needed for a reliable and economically efficient grid. The Indicated TOs state that \n“The transmission system must be planned and built to support every MW of load on the system, \nincluding co-located load.”35 The Indicated TOs do not explain how they would apply such a \nprinciple to peak load contribution (“PLC”) and network service peak load (“NSPL”) calculations \nor whether they would limit their application of the principle to co-located load only. Regardless, \nany practice of charging customers for transmission service based on the potential load they could \nplace on the electric transmission system (i.e., on a gross-load basis), rather than based on the \nactual load they do place on the electric transmission system will result in “faux load” that drives \ntransmission investment that is wholly unnecessary to service actual load. The reality is that the \npractice of charging customers on a gross-load basis will lead to a higher perceived level of \n \n35 Indicated TOs Answer at 5."},{"page":12,"startToken":3768,"endToken":4041,"text":"12 \ntransmission demand and more transmission investment, which in turn, will cause the utilities’ \ntransmission revenue requirements to increase, perhaps substantially. By artificially adding \n“system load” that is not actually present, but only exists in “potential,” the Indicated TOs would \ndrive the need for additional transmission investment, generation investment, and distribution \nsystem investment that would be completely unnecessary if customers are billed on their actual \nuse of the system.   \nIn short, the end result of the “one-two punch” proposed by the Indicated TOs is this: high \nimmediate cost increases driven by a step-jump increase in billing determinants and high long-\nterm cost increases driven by a larger-than-necessary expansion of the grid. Rather than \nencouraging creative, innovative solutions that involve co-located generation, and rather than \nencouraging a path to rapid deployment of resources that do not strain the grid (but actually relieve \nthe grid and reduce system load), the Indicated TOs propose a pathway of inefficiency, \nincentivizing extra buildout based on gross or “potential” consumption. This approach defies logic \n(and rational transmission planning) and cuts against the Federal Power Act’s goal to “promote \nreliable and economically efficient transmission.”36  \nD. \nFraming Co-Located Load as Getting a “Free Ride” Distorts the Impact of \nNetting and Ignores the Benefits Co-Located Generation Provides to the Grid.  \n \nIn their Answer, the Indicated TOs argue that co-location customers get a “free ride” by \navoiding fixed costs. The Indicated TOs state that without treating co-located load as Network \nLoad, “a customer that co-locates avoids ‘wires charges’—the fixed costs of the poles, wires, \ntransformers, and substations that comprise the transmission and distribution network. These \n \n36 16 U.S.C. § 824s."},{"page":13,"startToken":4041,"endToken":4376,"text":"13 \navoided costs are then subsidized by other customers, allowing co-location customers a free \nride.”37 Further, the Indicated TOs state:  \nAs long as the load remains connected to the grid, including through facilities also \nconnecting a generator to the grid, the load would still be able to be served from \nthe transmission system, and therefore, the transmission system must be planned \nand built to account for the load. The fact that the load is not constant does not \nreduce the capital investment or operation and maintenance costs that are \nincurred to ensure that the system is available to the customer.38 \n \nThese statements are misleading. The PJM transmission grid has never been built to assume \nall load is running at its maximum point of consumption at the same time. Rather, the system is \ndesigned around actual coincident peaks, to measure the actual coincident maximum use of the \ntransmission system. Every transmission grid must have a methodology of apportioning \nresponsibility for its infrastructure and operations. In PJM, the PLC and NSPL are well-established \nmethodologies to ascertain and apportion this responsibility. Within those methodologies, it is \nalready theoretically possible for any customer to manage its power consumption during peak days \nto apportion the customer’s cost responsibility appropriately for the infrastructure it actually uses \nduring the relevant hours. Yet, as addressed earlier in these Comments, the Indicated TOs single \nout co-located load as always placing full demand on the system and thus assessing its full potential \nload “wires charges.” \nIn addition, the Indicated TOs also fail to mention the distinct benefits of co-location to the \ngrid. If the large load additions are inevitable, co-location can reduce the need for new transmission \ninfrastructure relative to placing such load fully in front of and potentially far from generator \nmeters, making for more efficient transmission investments and resulting in lower rates for all \ncustomers. It leverages the value of proximity and the value of bringing more generation online, \n \n37 Indicated TOs Answer at 3. \n38 Indicated TOs Answer at 8."},{"page":14,"startToken":4376,"endToken":4710,"text":"14 \nboth of which lead to a more reliable and economically efficient grid.39 These benefits are \nimportant to consider as the Commission considers how to direct PJM on this issue. \nE. \nA Focus on “Actual Use” Should Result in Simpler, Not More Complicated, \nTariff Provisions and Processes.  \n \nThe Industrials commend the Commission’s goal of timely, clear tariff provisions that \nprovide sufficient guidance to stakeholders to move forward with projects. The Industrials also \nappreciate PJM’s willingness to take forward steps under the Commission’s direction. However, \nthe Industrials are concerned about the danger of stacking regulation upon regulation, resulting in \na patchwork that ultimately creates more confusion and less clarity and risks upsetting the \nregulatory structure around which manufacturers in the PJM Region have made capital \ninvestments for decades. As the Commission noted in the Show Cause Order, without “a common \nand consistent understanding of entities’ responsibilities relevant to co-location, many of which \nmay significantly affect rates and are realistically susceptible of specification, we are concerned \nthat these arrangements may be developed in a manner that is itself unjust and unreasonable or that \nmay result in unjust and unreasonable rates for other customers.” The Industrials wholeheartedly \nagree and urge the Commission to provide sufficient guidance to PJM to enable a clear, cost-based \nstructure, and understandable study process, and the ability to expedite projects that do not require \ntransmission updates.  \nIn its filing, PJM presented eight different options of how the Commission could treat co-\nlocated loads. The fact that there are multiple configurations that involve both generation and load \nat one location does not necessarily mean a different set of regulations is needed for each \n \n39 See, e.g., PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at P 3 (2004), reh’g denied, 108 FERC ¶ 61,302 (2004) \n(in approving PJM BTMG rules, the Commission found that “PJM's proposed market rules are just and reasonable \nand will encourage qualifying entities with behind the meter generation to reduce their use of the PJM transmission \nsystem”)."},{"page":15,"startToken":4710,"endToken":4943,"text":"15 \nconfiguration. Rather, the common thread of the use of the transmission system can be set \nprimarily by reference to an overarching standard (such as the existing methodologies for PLC and \nNSPL calculations). While PJM must ultimately specify the study process for various \nconfigurations, PJM and many of the PJM Transmission Owners already have structures in place \nto identify actual use of the system (e.g., through PLC and NPSL calculations under Attachment \nM-2s) and existing tariff provisions governing both retail and wholesale BTMG.40  \nWith the explosion of data center development, the increased transmission costs, public \nscrutiny, and other challenges PJM is facing, the Industrials believe that this is a prime opportunity \nfor PJM to bring clarity to what the Commission currently views as a process lacking sufficient \nclarity.  The Commission may order PJM to revise its methodology at any time, including in this \nproceeding. However, rather than a patchwork-like panoply of rules, the Industrials are optimistic \nthat the end result will be a clear, understandable, cost-based structure. Organizations seeking to \ninvest in our communities need clarity and stability to thrive. \n \n \n \n40 PJM OATT, Part III, Section 34.2-34.3; Part IV, Section 36.1A; Part VII, Subpart C, Section 306; Part VII, \nSubpart E, Section 317; Part VIII, Subpart B, Section 403; Part VIII, Subpart E, Section 415; Part VI, Attachment F-\n1; Part VI, Attachment F-2; Schedule 2; Schedule 15."},{"page":16,"startToken":4943,"endToken":5060,"text":"16 \nIII. \nCONCLUSION \nWHEREFORE, the PJM Industrial Customer Coalition and the Industrial Energy \nConsumers of America respectfully request the Commission to consider these Comments \nsupporting an approach to co-located loads aligned with actual use of the transmission system. \n \n \n \n \n \nRespectfully submitted, \n \nBy: \n/s/ Susan E. Bruce \n \n \n \nSusan E. Bruce \nKenneth R. Stark \nMatthew L. Garber \nMcNees Wallace & Nurick LLC  \n100 Pine Street \nHarrisburg, PA  17101 \nTel:  717-232-8000 \nFax:  717-237-5300 \nE-mail: sbruce@mcneeslaw.com \n \n kstark@mcneeslaw.com \n \n mgarber@mcneeslaw.com \n \nRobert A. Weishaar, Jr. \n1200 G Street, NW, Suite 800 \nWashington, DC 20005 \nTel:  202-898-5700 \nFax:  717-260-1765 \nE-mail: bweishaar@mcneeslaw.com \n \nCounsel to the PJM Industrial Customer Coalition \nand the Industrial Energy Consumers of America \n \nDated:  April 23, 2025"},{"page":17,"startToken":5060,"endToken":5129,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served, via first-class mail, electronic transmission or \nhand-delivery the foregoing upon each person designated on the official service list compiled by \nthe Secretary in this proceeding.  \nDated this 23rd day of April, 2025.  \n \n \n     /s/ Matthew L. Garber  \n \n \nMatthew L. Garber \nMcNees Wallace & Nurick LLC  \n100 Pine Street \nHarrisburg, PA  17101 \nTel:  717-232-8000 \nFax:  717-237-5300 \nE-mail: mgarber@mcneeslaw.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1008,"startToken":0,"endToken":119},{"p":1,"at":1008,"title":"I. BACKGROUND","method":"printed heading","endPage":2,"endAt":1071,"startToken":119,"endToken":412},{"p":2,"at":1071,"title":"II. JOINT COMMENTS","method":"printed heading","endPage":3,"endAt":159,"startToken":412,"endToken":603},{"p":3,"at":159,"title":"A. Billing For Commission-Jurisdictional Services Must Be Based on Actual Use","method":"printed heading","endPage":7,"endAt":314,"startToken":603,"endToken":2042},{"p":7,"at":314,"title":"B. The Indicated Transmission Owners Have Not Justified Discriminatory","method":"printed heading","endPage":10,"endAt":530,"startToken":2042,"endToken":3193},{"p":10,"at":530,"title":"C. Adoption of a “Gross-Load” or “Potential Load” Approach Would","method":"printed heading","endPage":12,"endAt":1325,"startToken":3193,"endToken":3956},{"p":12,"at":1325,"title":"D. Framing Co-Located Load as Getting a “Free Ride” Distorts the Impact of","method":"printed heading","endPage":16,"endAt":4,"startToken":3956,"endToken":4944},{"p":16,"at":4,"title":"III. CONCLUSION","method":"printed heading","endPage":17,"endAt":0,"startToken":4944,"endToken":5060},{"p":17,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":17,"endAt":489,"startToken":5060,"endToken":5129}]}