{"document":{"slug":"rec-20250423-5243","title":"Comments of Public Interest Organizations in response to PJM Interconnection, L.L.C.’s 03/24/2025 Answer to FERC’s 02/20/2025 Order","issued":"2025-04-23","accession":"20250423-5243","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EARTHJUSTICE","kind":"answer","file":"sources/filings/text/20250423-5243_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5243","tier":"record","sha256":"e9fdc9937aa7678eba76f0d6e6c94eee8e9dff5255340d19f6eb1eac75436cc2","pages":137,"tokens":19967,"emptyPages":[70,77],"textThemes":["colo","registry","study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":23,"text":"UNITED STATES OF AMERICA  \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION  \n  \n  \n  \nPJM Interconnection L.L.C.  \n)  \n)  \n)  \n  \nDocket No. EL25-49-000 \n  \n  \nCOMMENTS OF PUBLIC INTEREST ORGANIZATIONS"},{"page":2,"startToken":23,"endToken":358,"text":"2 \n \nTable of Contents \n \nI. \nIntroduction ............................................................................................................................. 4 \nII. \nPJM’s OATT, the Amended and Restated Operating Agreement of PJM, and the Reliability \nAssurance Agreement Among Load Serving Entities in PJM’s Region are Unjust, Unreasonable, \nand Unduly Discriminatory and Preferential. ................................................................................. 7 \nA. PJM’s Existing Study Processes to Identify and Allocate Costs for Transmission \nUpgrades is Unjust and Unreasonable. ....................................................................................... 8 \n1. \nThe Necessary Study Process for Co-Location Arrangements is Opaque and Not Suited \nfor Co-Location, Causing Unjust and Unreasonable Rates. ................................................... 9 \n2. \nPJM’s Reliance on Transmission Owner Load Integration Studies and Regional \nTransmission Expansion Planning to Identify Upgrades to Resolve Transmission Needs \nAssociated with Co-Located Load Results in Unjust and Unreasonable Rates. ....................11 \nB. \nThe Load Forecasting Provisions in PJM’s Practice Manual 19 Lack Controls and \nStandards to Ensure Accuracy and Protect Against Speculative Forecast Estimates. .............. 15 \n1. \nPJM’s Load Forecast Process Fails to Provide Standard, Comparable Parameters and \nProcesses to Accurately Forecast Large Loads. .................................................................... 16 \n2. \nConsistent with the Commission’s Rule of Reason Doctrine, PJM’s Large Load \nForecast Process Should be in its Tariff. ............................................................................... 19 \n3. \nThe Commission Should Require a Replacement Rate That Considers Principles that \nEncourage Comparability and Accuracy. .............................................................................. 22 \nIII. \nAny Replacement Rate that Enables Co-location Arrangements Involving the Use of \nExisting Generators Requires Careful Planning Processes to Ensure Rates are Just, Reasonable, \nand Not Unduly Discriminatory or Preferential. ........................................................................... 24 \nA. Co-Location Arrangements Must Pay for the Transmission and Ancillary Services from \nWhich They Benefit. ................................................................................................................. 25 \nB. \nThe Commission Must Ensure that Co-Location Arrangements With Existing Capacity \nResources Do Not Unjustly Shift Costs of Maintaining Resource Adequacy. ......................... 26 \nC. \nCo-Location Arrangements Should Not Receive Preferential Interconnection     \nTreatment. ................................................................................................................................. 28 \nD. The Commission Must Ensure that PJM Conducts Rigorous Reliability Review of Co-\nLocation Arrangements. ............................................................................................................ 30 \nE. \nThe Commission Should Fix its Market Power Mitigation Rules to Address the Increased \nIncentive to Exercise Market Power and Commit Manipulation that can Result from Co-\nlocating Load with Existing Generation. .................................................................................. 32 \nIV. Consistent with Precedent, The Commission Should Assert Jurisdiction over Co-Location \nArrangements on PJM’s Transmission System. ............................................................................ 34"},{"page":3,"startToken":358,"endToken":421,"text":"3 \n \nA. The Commission Must Not Disclaim Jurisdiction Over Interconnection of                 \nLarge Loads. ............................................................................................................................. 34 \nB. \nThe Commission Must Plan for Wholesale Sales at Co-Located Facilities. .................... 37 \nC. \nPJM Must Not Limit States’ Authority Over the Co-Located Generation Mix. ............... 40 \nD. The PJM Tariff Should Treat Co-Located Usage As Any Other Consumption. ............... 40 \nV. \nConclusion ............................................................................................................................ 43 \n \n \n \nExhibit A: Collection of 2024 Load Adjustment Requests"},{"page":4,"startToken":421,"endToken":686,"text":"4 \n \nUNITED STATES OF AMERICA  \nBEFORE THE  \nFEDERAL ENERGY REGULATORY COMMISSION  \n  \n  \n  \nPJM Interconnection L.L.C.  \n)  \n)  \n)  \n  \nDocket No. EL25-49-000 \n  \n  \nCOMMENTS OF PUBLIC INTEREST ORGANIZATIONS \n \n  \nPursuant to Rule 211 of the Federal Energy Regulatory Commission’s (FERC or \nCommission) Rules of Practice and Procedure,1 Appalachian Voices, Clean Air Task Force, \nEarthjustice, the Environmental Defense Fund, PennFuture, and the Sierra Club, together Public \nInterest Organizations (PIOs), respectfully submit these comments to respond to PJM \nInterconnection, L.L.C.’s (PJM) answer2 to the Commission’s February 20, 2025 Order \nInstituting Proceeding Under Section 206 of the Federal Power Act and Consolidating with Other \nProceedings (Show Cause Order).3   \nI. \nIntroduction \nBy 2029, PJM’s load growth forecast is expected to top 24.8 GW,4 which is a stark \ncontrast from the flat demand growth that most regions have experienced over the last decade.5  \nMost of the demand increase is attributable to data centers that process Artificial Intelligence \n(AI), cloud services and search algorithms.  Total energy consumption in the United States from \n \n1 18 C.F.R. § 385.211 (2024). \n2 Answer of PJM Interconnection, LLC, Docket No. EL25-49-000 (March 24, 2025), Accession No. 20250324-5313 \n(“PJM Answer”). \n3 PJM Interconnection, L.L.C., Order Instituting Proceeding Under Section 206 of the Federal Power Act and \nConsolidating with Other Proceedings, Docket Nos. EL25-49-000, et al. (“Show Cause Order”). \n4 Grid Strategies, Strategic Industries Surging – Midcontinent Power Sector Collaborative, at 6, (2025). \nhttps://gridstrategiesllc.com/wp-content/uploads/National-Load-Growth-Report-2024-MPSC-Presentation.pdf \n5 Grid Strategies, The Era of Flat Power Demand is Over, (2023). https://gridstrategiesllc.com/wpcontent/ \nuploads/2023/12/National-Load-Growth-Report-2023.pdf"},{"page":5,"startToken":686,"endToken":1033,"text":"5 \n \ndata centers is expected to grow from  4.4 percent of total energy consumption to between 6.7 to \n12 percent by 2028.6  Since the Commission supports providing regulatory “certainty and \nclarity” to data centers seeking to interconnect to the grid,7 and the lead time to construct data \ncenters is shorter than the average time to interconnect new generators and build traditional \ntransmission infrastructure,8 a variety of stakeholders, including data center owners and \nindependent power producers (IPP), are interested in pursuing more co-location arrangements to \npower those facilities. \nOne example is Constellation and its complaint against PJM arguing that PJM should \nrevise its tariff to allow co-location arrangements that do not require load to acquire network \ntransmission service.  Relatedly, Constellation is also pursuing approval to merge with Calpine, a \ntransaction that, if approved, would give Constellation leverage to use its existing nuclear \ngeneration fleet to co-locate with large loads, according to parties who protested the merger \napplication.9  The IPPs will make decisions regarding co-location based on their profit motive, \nwithout accounting for the interests of other ratepayers in reliability and appropriate cost-\nallocation.  Recent improvements to PJM’s ability to interconnect supply obviate the need for \nthese arrangements.  \n  RMI’s 2024 study of PJM’s supply projections concluded that even with 10 GW of \nanticipated generator retirements, PJM is on track to meet or exceed supply needs for 2030 load \nforecasts.10  RMI’s analysis estimates that between 5.2GW and 6.85 GW of new supply will \n \n6 Arman Shehabi et al, Energy Analysis and Environmental Impacts Division, Lawrence Berkeley National \nLaboratory, 2024 United State Data Center Energy Usage Report, at 5-6. \n7 FERC Chairman Issues Statement on Review of Issues Associated with the Co-location of Large Loads at \nGenerating Facilities, issued Febraury 21, 2025. \n8 Grid Strategies, Strategic Industries Surging: Driving U.S. Power Demand, at 5, (2004).  \n9 Protest of Public Citizen et al, Docket No. EC25-43-000, at 36-44, filed on March 25, 2025. \n10 Protest of Sierra Club and Appalachian Voices, Attachment A, Docket No. ER25-712-000, at 3, 11-13, (Jan. 8, \n2025)."},{"page":6,"startToken":1033,"endToken":1331,"text":"6 \n \ncome from interconnection projects in PJM’s “Fast Lane” process.11  And on April 18, 2025, \nPJM announced that its Fast Lane interconnection process cleared for construction \napproximately 19 GW of new supply.  In addition, implementing Grid Enhancing Technologies \n(GETs) within the next few years, an approach that the Commission champions in its Order 2023 \nrule on interconnection reforms,12 could enable PJM to interconnect up to 6.3 GW of new supply \nonce it fully embraces the form and intention of the rule.13 \nConsistent with the need to address these developments, the Commission’s Show Cause \nOrder seeks input on whether PJM’s existing tariff provisions and related agreements governing \nco-location arrangements are just, reasonable, and not unduly discriminatory or preferential.  \nWhile options 1-2 are favorable since they require that load acquire network service, the status \nquo provisions are not sustainable in the face of a huge influx of these arrangements and need for \nsubstantial changes to the study processes, large load forecast process, and cost allocation.14  \nAs discussed below, these options are unjust and unreasonable since they are based on load \nforecasts that lack adequate vetting mechanisms to remove speculative requests and could enable \nco-location arrangements that unlawfully shift resulting network upgrade costs to customers that \ndo not receive benefits that are roughly commensurate with the estimated upgrade costs.   \nInaccurate load forecasts have more definitive consequences for ratepayers: overstating PJM’s \nregional needs for multi-billion-dollar transmission assets and the reserve margin for its capacity \nmarket.   \n \n11 Id. at 6. \n12 Improvements to Generator Interconnection Procedures and Agreements, 184 FERC ¶ 61,054 (2023) (“Order No. \n2023”) \n13 RMI, GETting Interconnected in PJM (Feb. 2024) at 5-7, https://rmi.org/insight/analyzing-gets-as-a-tool-for-\nincreasing-interconnection-throughput-from-pjms-queue/. \n14 We agree with PJM that large load customers should not be eligible for Option 3."},{"page":7,"startToken":1331,"endToken":1636,"text":"7 \n \nSince co-location arrangements provide limited, if any, system-wide benefits, the \nCommission should not authorize the new arrangements that PJM offers in its response (options \n4-8), without substantial safeguards to prevent unlawful cost shifting, reliability shortfalls, \namong other issues.  Options 4 and 5, which allow existing resources to enter into dedicated, co-\nlocation arrangements, could unnecessarily increase PJM’s required reserve margins and could \nrequire reliability upgrades.  And option 6, which could enable expedited interconnection of \ngeneration resources dedicated to large loads, could further exacerbate backlogs in the \ninterconnection queue and, therefore, threaten reliability. Additionally, such expedited \ninterconnection may violate the anti-discrimination provisions of the Federal Power Act. Even \nallowing a co-location generator to take non-firm service has consequences if the data center’s \nbusiness model requires it to run 24/7 (options 7-8) since it will rely on back-up diesel \ngenerators, which are both harmful to communities and pose reliability risks. In sum, for PJM to \nmeet the moment, it must take measures beyond relying on co-location arrangements. The large \nscale and quick pace of load growth in PJM’s projections requires PJM to instead focus on \nimplementing a robust forecasting process to guard against speculation, and fully comply with \nFERC’s rules on transmission planning, generator interconnection, and cost allocation processes \nto ensure that large load customers that will come online can integrate into the grid without \nimposing unjust, unreasonable, and unduly discriminatory or preferential rates, terms, and \nconditions on non-large-load customers.     \nII. \nPJM’s OATT, the Amended and Restated Operating Agreement of PJM, and the \nReliability Assurance Agreement Among Load Serving Entities in PJM’s Region are \nUnjust, Unreasonable, and Unduly Discriminatory and Preferential. \nAt the outset, we reiterate that PJM has a number of tools at its disposal to ensure that \nnew entry can rise to the challenge of new load growth.  Nevertheless, as it pertains specifically"},{"page":8,"startToken":1636,"endToken":1933,"text":"8 \n \nto co-location arrangements between generation and large load customers, we identify two \nprimary issues with PJM’s existing Tariff and current practices.  First, PJM’s use of the \nNecessary Study Process, Supplemental Projects, and Regional Transmission Expansion \nPlanning (“RTEP”) Process allocate the costs of transmission upgrades in an unjust and \nunreasonable manner.  Second, PJM’s load forecasting practices under Practice Manual 19 fail to \nensure accuracy and protect against speculative or duplicative estimates. \nA. PJM’s Existing Study Processes to Identify and Allocate Costs for \nTransmission Upgrades is Unjust and Unreasonable. \nFor co-location arrangement Options 1 and 2, PJM’s current practices assess the \ntransmission upgrades associated with co-location agreements through a combination of three \nprocesses: the Necessary Study, Transmission Owner Load Integration Studies, and RTEP.15  \nThough these studies do result in the co-location arrangement paying for some portion of the \nidentified upgrades, they fail to ensure that the co-location arrangement pays its fair share of \nthese upgrade costs under cost allocation principles.  We note that the cost of transmission \nupgrades related to interconnection-like processes are distinct from broader transmission rates.  \nUnder PJM’s existing co-location options, co-located load is treated as Network Load and thus \ndoes pay for transmission service.16  As explained in greater detail in Section III (A), we believe \nit is appropriate for co-located load to pay for transmission service, and thus support PJM’s \ntreatment of co-located load as Network Load.17  This section focuses solely on the cost-\nallocation for transmission system upgrades caused by the shift to a co-location agreement, not \nthe costs of ongoing delivery of services via the transmission system following the initial shift. \n \n15 See PJM Answer at 47. \n16 PJM Answer at 9-12 (tables of existing options, noting that under each option, load takes NITS service). \n17 See infra at 24."},{"page":9,"startToken":1933,"endToken":2229,"text":"9 \n \n1. The Necessary Study Process for Co-Location Arrangements is \nOpaque and Not Suited for Co-Location, Causing Unjust and \nUnreasonable Rates.  \nAs the Commission finds in the Show Cause Order, inadequate interconnection service \nprovisions for co-location arrangements, “especially regarding studies of the impacts of those \narrangements,” may render PJM’s Tariff unjust and unreasonable.18  We agree that the Necessary \nStudy “may not be fully capturing the transmission system impacts of co-locating load,” and thus \ncould result in co-location arrangements with already-operational generators “not paying the \ncosts of network upgrades that would be caused by the co-location.”19  As Suzanne Glatz and \nAbraham Silverman explained in the Commission’s technical conference docket, while from an \nengineering perspective there is little difference between co-location and other load \ninterconnections with generation behind the meter, from a regulatory and cost allocation \nperspective, they are treated differently—resulting in “similar electrical impacts, but vastly \ndifferent rate impacts.”20 \nThe Necessary Study Process was designed for studying potential impacts from more \nminor, routine changes to the electrical characteristics of existing generating units previously \nstudied by PJM,21 and is a poor fit for the more significant nature of an existing generator \nentering into a co-location arrangement for all or most of its energy production.  As Glatz and \nSilverman’s comments explain, in the standard usage of the Necessary Study Process for routine \nmaintenance type updates, PJM grants no new grid services or rights.22  For example, the \nCommission has accepted Necessary Study Agreements that enable generators to replace wind \n \n18 Show Cause Order at P 79. \n19 Id. \n20 Post-Technical Conference Comments of Suzanne Glatz and Abraham Silverman, Docket No. AD24-11-000 at 1 \n(Dec. 9, 2024), Accession No. 20241209-5149. \n21 See PJM Manual 14G, § 4.5. \n22 Comments of Glatz and Silverman at 5."},{"page":10,"startToken":2229,"endToken":2611,"text":"10 \n \nturbines,23 replace or update transformers and inverters on a solar facility,24 and update \nsoftware.25  In contrast, however, PJM has not allowed the addition of battery storage to existing \ngeneration to go through the Necessary Study Process, in large part because batteries can act as \nload.26  PJM offers no explanation for why co-located load is thus offered preferential treatment.  \nMoreover, unlike the sorts of routine changes to update and maintain the function of a generator \ndescribed above, co-location arrangements both make more significant electrical changes and \neffectively grant the existing generator a new right to serve load directly.  Finally, it’s worth \nnoting that the costs of upgrades that PJM identifies are allocated to the existing generator, rather \nthan the load. This reflects the nature of the Necessary Study Process as originally intended—\nfocused on changes to existing generators. \nPJM’s main defense of the narrowness of the Necessary Study Process for studying co-\nlocation with an existing generator is that other study processes are also used.27  However, each \nof the other studies that PJM identifies pass costs to broader sections of load—not the large load \ncustomer(s) causing the need for the upgrades. These studies include the Transmission Owner \n(TO) load integration study, which identifies needed local transmission upgrades that will be \nproposed to the PJM Transmission Expansion Advisory Committee (TEAC) as Supplemental \nProjects; the PJM do no harm study, which identifies any broader transmission impacts caused \nby the proposed Supplemental Project, which will need to be addressed by an expansion of the \nSupplemental Project; and the RTEP Process, which identifies any regional transmission \n \n23 PJM Interconnection, LLC, Necessary Studies Agreement, Docket No. ER23-189-000, at 11 (Oct. 25, 2022).  \n24 PJM Interconnection, LLC, Necessary Studies Agreement, Docket No. ER23-1706-000, at 10 (Apr. 25, 2023); \nPJM Interconnection, LLC, Necessary Studies Agreement, Docket No. ER23-1059-000, at 10 (Feb. 7, 2023).  \n25 PJM Interconnection, L.L.C., Necessary Studies Agreement, Docket No. ER22-51-000, at 10 (Oct. 6, 2021).   \n26 PJM Interconnection, L.L.C., Answer, Docket No. EL24-8-000, at 12 (Nov. 30, 2023) (explaining that a change to \na generator with an existing Interconnection Service Agreement that “‘involves the addition of storage units that will \ncharge from the grid,’ . . . requires a new Interconnection Request[.]”). \n27 See PJM Answer at 47."},{"page":11,"startToken":2611,"endToken":2917,"text":"11 \n \nupgrades caused by an aggregate of load additions pass costs to broader sections of load.  The \nunjust and unreasonable nature of this treatment will be detailed in the next section, but at base: \nthe Necessary Study Process is the only process that PJM uses to identify the direct \ninterconnection-related cost responsibility of co-locating large load with an existing generator, \nand it fails to do so with appropriate accuracy. \nMoreover, the Necessary Study Process occurs entirely behind closed doors.  The \nCommission should independently find the opaqueness of this process to be unjust and \nunreasonable.  Under the Necessary Study Process, there is no transparency regarding what \nspecific changes to an existing generator that PJM is studying (e.g., what the timeline for the \nload addition may be, or even how much load addition is requested), and no disclosure of the \nresults of the study.  The public can only access this type of information much later in the study \nprocess, when PJM files a revised Interconnection Service Agreement for the existing generator \nat FERC.  As the Organization of PJM States pointed out in their comments to the technical \nconference, this is a much different level of transparency than in other circumstances in which \ngenerator capacity is removed from the system—e.g., retirement.28  \n2. PJM’s Reliance on Transmission Owner Load Integration \nStudies and Regional Transmission Expansion Planning to \nIdentify Upgrades to Resolve Transmission Needs Associated \nwith Co-Located Load Results in Unjust and Unreasonable \nRates. \n \nAs PJM explains, the Necessary Study Process, which identifies generator-level upgrades \nfor existing generators, is followed by a TO Load Integration Study to identify upgrades to \nresolve any local transmission reliability needs that arise as a result of the co-location \n \n28 Post Technical Conference Comments of the Organization of PJM States, Inc., Docket No. AD24-11-000 at 3-4 \n(Dec. 9, 2024), Accession No. 20241209-5086."},{"page":12,"startToken":2917,"endToken":3199,"text":"12 \n \narrangement, and then the RTEP process to identify upgrade needs arising from the aggregation \nof co-location arrangements.29  Yet when the TO Load Integration Study identifies so-called \nSupplemental Projects to resolve the needs, the costs of which are allocated not just to the large \nload customer that triggered the local transmission reliability need, but to the TO’s entire local \nutility footprint in that zone.  And despite this cost allocation, there is no guarantee that these \nprojects provide greater system benefits.  Thus, this process’s failure to allocate a proportional \namount of these costs specifically to large load customers is a straightforward violation of cost \ncausation, and an unjust and unreasonable rate.    \nWe note that the transmission upgrades required to reliably integrate co-location \nagreements are differently situated from transmission upgrades required to reliably deactivate \nuneconomic generation (the costs of which are also socialized to load) and thus should be treated \ndifferently.  Specifically, co-located load will continue to be the beneficiary of a functional grid \ngoing forward—and indeed the principal beneficiary of transmission upgrades specifically \ntriggered by the co-location arrangements—whereas a retiring generator will not derive benefit \nfrom the grid in the future.  Thus, while only the remaining load—not the deactivating \ngenerator—would utilize the transmission upgrades associated with retirements, co-located load \nwill continue to rely on, and benefit greatly from, such upgrades. \n \nThere is no guarantee that Supplemental Projects, nor projects selected through RTEP, \nprovide any system benefits, beyond the circular reasoning that such projects will prevent \nreliability issues associated with co-location.  As demonstrated in the chart below, many early \nexamples of transmission upgrades driven by data center loads have not led to system benefits, \n \n29 PJM Answer at 6-8."},{"page":13,"startToken":3199,"endToken":3639,"text":"13 \n \nbut rather, only provide the benefit of allowing the large load to operate—disproportionately \nbenefiting the co-location arrangement. \nProject / Location \nScope / Cost \nPurpose / \nTrigger \nWhy It Doesn’t \nBenefit the Whole \nSystem \nPlanning Process \nWho Pays \nSource \nWishing Star \nSubstation – \nLoudoun County, \nVA \n$627.6M – New \n500/230 kV \nsubstation with tie-\nins to Mosby and \nBrambleton lines \n7.5 GW of \nprojected load \ngrowth in 'Data \nCenter Alley' \nTailored to serve \nhyperscaler \nreliability needs; \nno evidence of \nCETL or transfer \ncapacity benefit \nRTEP – 2022 \nWindow 3 \nDominion \nZone \n2022 PJM RTEP \nReport, p. 61  \nMarley Neck 115 \nkV Substation – \nBGE Zone \n$107.6M – \nSubstation upgrade \nwith 230/115 kV \ntransformers \nOverloads at \nseven \nBaltimore-area \nfacilities \nPJM explicitly \nstates 'no broader \nsystem benefits' \nRTEP – 2024 \nWindow 1 \n(Baseline Project \nb3906) \nBGE Zone \n(Baseline) \n2024 RTEP Window \n1 Report, Proposal \n295 \nBeaumeade \nSTATCOM – \nNorthern Virginia \n300 MVAR Static \nSynchronous \nCompensator at \nBeaumeade \nSubstation \nReactive power \nsupport for \nclustered \ndatacenter load \nVoltage-only fix; \ndoes not improve \nbulk power flow or \ntransfer capability \nRTEP – 2023 \nBaseline \nDominion \nZone \n2023 PJM TEAC \nWhitepaper, p. 12 \nKraken Loop – \nFredericksburg \nCorridor \n$704M – 500 kV \nloop and new \nKraken substation; \n230 kV upgrades \ndeferred \nLocal overloads \nand data center-\ndriven load \ngrowth near \nNorth Anna \nLocal components \nare deferred to M-3 \nprocess; no broader \nregional impact \nRTEP – 2024 \nWindow 3 \n(Revised Proposal \n967) \nDominion (for \nnow); 230 kV \ndeferred to M-\n3 \n2024 RTEP Window \n3 Summary, \nProposal 967 \nTalen–Amazon \nCo-Located Load – \nSusquehanna \nNuclear \nUp to 960 MW \nbehind-the-meter \nload; capped at 480 \nMW to avoid \nviolations \nCo-located load \nincrease at \nnuclear plant \nPJM confirmed \nupgrades would be \ntriggered above \n480 MW, with no \nbroader system \nbenefit \nFERC \nInterconnection \nFiling – ER24-\n2172 \nUnknown (but \ncustomer \nwould trigger \nupgrades \n>480 MW) \nFERC Order ER24-\n2172 \n \nMoreover, building out the transmission system in response to discrete, emergent needs \nrather than through proactive, forward-looking, system-wide planning fails to identify the most \ncost-effective future transmission portfolio, which would solve the reliability issues associated \nwith co-location agreements and provide broader system benefits.30  The magnitude of estimated \n \n30 See Order No. 1920 at P 136 (“By expanding the transmission planning horizon and considering factors affecting \nLong Term Transmission Needs, as well as considering a broader list of benefits, transmission providers will be able \nto identify, evaluate, and select more efficient or cost-effective transmission solutions to address Long-Term \nTransmission Needs. Such Long-Term Regional Transmission Planning will: (1) reduce reliance on transmission \nsolutions that are relatively inefficient or less cost-effective because they address only short-term transmission \nneeds; (2) unlock the benefits of economies of scale in transmission investment;(3) enable opportunities to “right"},{"page":14,"startToken":3639,"endToken":4023,"text":"14 \n \nload growth necessitates a more systematic approach to addressing these needs to ensure \nreliability and affordability for all transmission system users.  Transmission system upgrades are \nneeded and the cost of some upgrades driven by load growth are appropriately shared by load \nacross the region. But the band-aid approach of Supplemental Projects triggered by each new \nlarge load customer is going to cost all ratepayers more. \nWe recognize that under PJM’s existing options (Options 1 and 2), co-located load is \ntreated as Network Load and thus pays for Network Integration Transmission Service (NITS), \nincluding the costs of Supplemental Projects folded into NITS rates.31  However, this treatment \nstill puts regular residential consumers on the hook for Supplemental Projects they did not \ncause—and from which they often do not meaningfully benefit—in violation of the cost \ncausation principle.  Under PJM’s existing Tariff, there is high risk that co-located load \nunderpays for the upgrades it triggers by only taking sole responsibility for costs arising in the \nNecessary Study Process (to the extent an existing generator passes the costs on to the co-located \nload, that is).  Moreover, this potential cost-dodging is especially concerning given that some \ncommenters argue that co-located load should not be charged for transmission service.32 \nFinally, like the Necessary Study Process, the TO Load Integration Study and the \nSupplemental Projects Process that it triggers are opaque and lack critical regulatory oversight.  \nAs the Commission has previously noted, “the planning for Supplemental Projects is done almost \nentirely by the PJM Transmission Owners, with PJM playing a relatively minor role in which it \n \nsize” replacement transmission facilities; (4) facilitate the selection of regional transmission facilities that could \naddress multiple transmission needs over different time horizons; and (5) provide states, utilities, customers, and \nother stakeholders with greater insight and transparency into the costs and benefits of particular transmission \nsolutions to address Long-Term Transmission Needs. We conclude that these regional transmission planning and \ncost allocation reforms will benefit customers by leading to more efficient or cost-effective transmission investment, \nthereby helping to ensure just and reasonable rates”). \n31 See PJM Answer at 9-12 (tables of existing options, noting that under each option, load takes NITS service). \n32 See Show Cause Order at P 24, n. 45 (citing Post-Technical Conference Comments of Amazon, Constellation, LS \nPower, and Talen)."},{"page":15,"startToken":4023,"endToken":4377,"text":"15 \n \nreviews the proposed Supplemental Projects only to ensure that they do not have adverse \nreliability impacts.”33  This lack of oversight and transparency is particularly concerning since \nSupplemental Projects make up the majority of transmission spending in PJM and are a leading \ncause of cost increases in the region.34  The lack of ready access to information around the TO \nLoad Integration Study and resulting Supplemental Projects perpetuates a paradigm in which \nratepayer advocates cannot effectively challenge the prudency of transmission investments and \ncost allocation at either the federal or the state level.  At a time when affordability of electricity is \nparamount, the Commission should not bless the continuation of this approach to co-location \narrangements. \nB. The Load Forecasting Provisions in PJM’s Practice Manual 19 Lack \nControls and Standards to Ensure Accuracy and Protect Against \nSpeculative Forecast Estimates. \nPJM’s Tariff is unjust and unreasonable because it lacks sufficient controls and standards \nto ensure large load forecast accuracy and to protect against speculative large load forecast \nestimates.  PJM’s large load forecasting process does not substantively account for speculative \nload additions, thus rendering the process and resulting forecast, as well as everything that relies \non that forecast, unjust and unreasonable.  In addition, PJM’s Tariff is unjust and unreasonable \n \n33 Monongahela Power Company, et al., 162 FERC ¶ 61,129 at P 97 (2018); see also Transmission Planning and \nCost Management, Pre-Conference Statement of Gregory J. Poulos, at 2, Docket No. AD22-8 (Oct. 4, 2022), \nAccession No. 20221004-5185 (Attachment 2) (testifying about the Supplemental Project planning process that “the \nreality is simple—the process is fundamentally designed to serve the needs of transmission owners at the expense of \ncustomers” and that due to the lack of regulatory oversight or procedural recourse, “moving forward, consumers and \nother stakeholders, who often lack both the basic information and sophisticated information of the transmission \nowners, need help.”). \n34 See PJM Interconnection, L.L.C., Protest of Advocates, at 7-12, Docket Nos. EL24-119-000 and ER24-2338-000 \n(July 22, 2024) (“Advocates Protest”), Accession No. 20240722-5132 (describing how supplemental projects are \npoorly overseen and are a leading cause of cost increases in the PJM region)."},{"page":16,"startToken":4377,"endToken":4747,"text":"16 \n \nbecause provisions governing large load forecasting are contained in PJM Manual 19 and not in \nthe filed tariff, contrary to the long-standing “rule of reason” (Rule of Reason Doctrine).35  \nIn the Show Cause Order, the Commission asked whether PJM should “consider changes \nto load forecasting methods, informational postings, or the reserve margin study process to better \nplan for and address the resource adequacy and reliability impacts of co-location \narrangements.”36  PJM itself identified that there is a need to “clarify or enhance existing \nplanning processes,” including “addressing risks that arise based on the existing load forecasting \nprocess,” for which PJM has requested “Commission guidance.”37  Below we argue that: (1) \nPJM’s existing large load forecasting process is deficient; (2) the process should be included in \nthe Tariff consistent with the Commission’s Rule of Reason Doctrine; and (3) the Commission \nshould direct PJM to revise its load forecasting process to improve its accuracy. \n1. PJM’s Load Forecast Process Fails to Provide Standard, \nComparable Parameters and Processes to Accurately Forecast \nLarge Loads. \nPJM’s load forecasting process, described in its Manual 19, does not include sufficient \ncontrols or standards to prevent speculative additions of large load from entering PJM’s load \nforecast, which can cause significant costs and result in unjust and unreasonable rates.  PJM’s \nload forecasting procedure can largely be found on three pages in PJM Manual 19, attachment \nB.38   Also, PJM relies on each load serving entity or electric distribution company (LSE/EDC) \nto develop its own internal forecasting criteria, which unsurprisingly leads to widely differing \n \n35 Keyspan-Ravenswood, LLC v. FERC, 474 F.3d 804, 811 (D.C. Cir. 2007) (quoting City of Cleveland, 773 F.2d at \n1376); see also Hecate Energy Greene Cnty. 3 LLC v. FERC, 72 F.4th 1307, 1312 (D.C. Cir. 2023) (“The Federal \nPower Act’s ‘amorphous,’ requirement that tariffs include ‘practices affecting rates’ means that FERC has ‘broad \ndiscretion’ in giving the Act ‘concrete application.’”) (quoting City of Cleveland, 773 F.2d at 1376); City & Cnty. of \nSan Francisco v. FERC, 24 F.4th 652, 661 (D.C. Cir. 2022).  \n36 Show Cause Order at P 88 (e)(v). \n37 PJM Answer at 65. \n38 PJM Manual 19, attachment B, pgs. 26-28."},{"page":17,"startToken":4747,"endToken":5098,"text":"17 \n \nmethodologies and, potentially, widely differing results.  For example, as a threshold requirement \nfor including data center load projects in load adjustment forecasts, Exelon only includes \n“projects with signed engineering agreements/financial deposits.”39 But some LSE/EDCs, like \nAEP appear to use less stringent standards,40 while others, like First Energy, decline to disclose \ntheir criteria for including projects in load adjusted forecasts. 41 42 As a result, all the LSE/EDCs \nin PJM report their large load forecasts in completely different ways, posing a substantial \ngradient in uncertainty based on the standards and criteria each participant uses in submitting its \nforecast to PJM.     \nPerhaps most problematically, PJM’s approach does not, and cannot, account for data \ncenters that have made proposals across LSE/EDCs.  Pursuant to PJM Manual 19, PJM annually \nsolicits information from its member LSE/EDCs for large load shifts, which are known to them \nbut may be unknown to PJM.   In fact, PJM has no way to cross-check whether a data center in, \nfor example, Exelon’s service territory has also made the same proposal in Dominion’s territory, \nand both proposals end up in PJM’s forecast even though only one will be built. Inaccurate load \nforecasting can increase rates by leading to transmission projects that are not genuinely \nnecessary or by artificially inflating the reserve margin in PJM’s capacity market.  \nIt is undisputed that this is currently happening.  Indeed, in a recent presentation at the \nPennsylvania Environmental Law Forum, PJM’s own Senior Manager of Government Services, \nStephen Bennett, stated that data center companies “are pitching the same data centers in \ndifferent locations.”43  And this problem exists in other regions, as the Vice President of System \n \n39 Exhibit A at 2025 Large Load Adjustment Proposal – Exelon, slide 5 (Note that Exelon does not describe what \ntype or form of the engineering or financial agreements). \n40 Id. AEP 2024 Load Forecast Adjustments, slide 3. \n41 Id. First Energy Large Load Adjustment 2024, slide 3. \n42 Id. AEP 2024 Load Forecast Adjustments, slide 3. \n43 2025 Pennsylvania Environmental Law Forum (April 14, 2025), https://www.pbi.org/product/pba-environmental-\nenergy-law-section-annual-dinner/."},{"page":18,"startToken":5098,"endToken":5443,"text":"18 \n \nPlanning and Competitive Transmission at MISO, Aubrey Johnson, provided testimony to FERC \nthat “in many cases, these data centers are showing up in multiple places, so in reality I could \nhave many members submitting loads that are all the same.”44 \nAdditionally, PJM should also scrutinize load forecasts to assess the possibility of \nproposed large loads being cancelled.  For example, several high-profile data center development \nproposals have recently been cancelled.  Last month, Microsoft indicated it is cancelling over \ntwo GW of data center projects.45  Additionally, a research note from TD Cohen indicates that \nthey “continue to believe the lease cancellations and deferrals of capacity points to data center \noversupply relative to its current demand forecast.”46 \nThe Commission has expressed concerns with regard to large load forecasting accuracy \nboth in the technical conference47 and in the Show Cause Order, and PJM has already agreed that \nits forecasting process is “worthy of exploration.”48  Incorporating clearly defined baseline \nreporting requirements would have an immediate effect by significantly increasing the \nconfidence in PJM’s load forecast and reducing the likelihood of unjust and unreasonable rates \nflowing from the forecast.  Moreover, such standards are easily “susceptible of specification,” as \n \n44 Technical Conference Transcript at 26, Docket No.  AD24-11 (Nov. 1, 2024), \nhttps://www.ferc.gov/media/transcript-technical-conference-regarding-large-loads-co-located-generating-facilities \n(emphasis added). \n45 George Butler, Data Center Dynamics, Microsoft Cancels Up to 2GW of Data Center Projects, Says TD Cowen, \n(March 27, 2025), https://www.datacenterdynamics.com/en/news/microsoft-cancels-up-to-2gw-of-data-center-\nprojects-says-td-cowen/. \n46 Wayne Williams, Techradar, Is Microsoft Planning to Eliminate AI-related Data Center Projects Across Europe \nand US?  Bloomberg Report Says So, (March 31, 2025) https://finance.yahoo.com/news/microsoft-planning-\neliminate-ai-related-173300784.html. \n47 See, e.g., Technical Conference Transcript, at 23-26, Docket No.  AD24-11 (Nov. 1, 2024),  \nhttps://www.ferc.gov/media/transcript-technical-conference-regarding-large-loads-co-located-generating-facilities \n(“How do you go about determining what this load will look like? How do you confirm it? Can you give us some \ntransparency behind how you estimate what it will be, and what do you think is driving it in particular?”). \n48 PJM Answer at 66."},{"page":19,"startToken":5443,"endToken":5839,"text":"19 \n \nmany of these proposals have already been provided to the Commission in this consolidated \ndocket.49 \n2. Consistent with the Commission’s Rule of Reason Doctrine, \nPJM’s Large Load Forecast Process Should be in its Tariff.  \nAs a threshold issue, PJM’s large load forecasting process is not codified in the Tariff; \nrather, it is described in PJM Manual 19.  The Federal Power Act requires public utilities to \nmaintain tariffs on file with the Commission that include not only rates for jurisdictional services \nbut also the practices affecting such rates and charges.50  Commission regulations spell this out in \nmore detail, requiring that rate schedules set forth “clearly and specifically,”51 “all . . . practices . \n. . which in any manner affect or relate to . . . service, rates, and charges.”52  “[T]he Commission \nhas often invoked the rule of reason to require additional detail be included in jurisdictional \ntariffs,” and “those directives typically require the addition of methodological or procedural \ndetail . . . .”53 \nThe Commission has stated that it is appropriate to use an FPA Section 206 proceeding to \nrevisit whether a previously approved tariff complies with the Rule of Reason.54  Tariffs that \nomit major details may be revised or rejected, and courts have overturned Commission orders \n \n49 See, e.g., Post Technical Conference Comments of Google LLC, at 7, Docket No. AD24-11 (Dec. 10, 2024) \n(“Requiring load adjustments due to new large load interconnections to be ‘commitment-backed’ through material, \nup-front financial commitments . . . .”). \n50 16 U.S.C. § 824d(c). \n51 18 C.F.R. § 35.1(a) (1985). \n52 Id. at § 35.2(b). \n53 Id. at P 46 (emphasis omitted); see also Am. Elec. Power Serv. Corp. v. Sw. Power Pool, Inc., 184 FERC ¶ 61,207 \nat PP 31–33 (2023). \n54 See Sw. Power Pool, Inc., 136 FERC ¶ 61,050 at P 41 (2011) (An aggrieved party “may bring [a violation of the \nRule of Reason] to our attention by filing a complaint under section 206 of the FPA”); see also Cal. Indep. Sys. \nOperator Corp, 133 FERC ¶ 61,224 at P 159 & n.138 (2010) (“While, presently, we find it acceptable to place the \nmentioned details used to determine policy-driven elements in the Business Practice Manual, if, once drafted, a party \nis concerned that these provisions could significantly affect rates and service, it can bring this issue to the \nCommission's attention under section 206 of the FPA”)."},{"page":20,"startToken":5839,"endToken":6166,"text":"20 \n \nthat approved tariffs with insufficient detail.55  Indeed, the U.S. Court of Appeals for the D.C. \nCircuit concluded that the Rule of Reason required that an unforced capacity accreditation \nmethodology be included in the tariff, resulting in remand.56 \nIn the current proceeding, there is no question that the reporting requirements for PJM’s \nlarge load forecasts are practices that directly and significantly affect rates for jurisdictional \nCommission services.  Inaccurate forecasts create risks that substantial transmission and \ngeneration costs to serve new loads will be shifted to other customers. Inaccurate forecasts can \nalso impact installed reserve margins for the region and influence forward investment signals for \nfuture resource adequacy.  If large loads that are added to PJM’s load forecast fail to materialize, \nor fail to materialize as rapidly as the forecast predicts, PJM’s inaccurate load forecast could \nnevertheless be utilized in forward capacity auctions and the phantom demand could result in \nunnecessary price increases.  In addition, the large load estimates provided by LSE/EDCs to PJM \nare inputs that directly influence the planning and development of transmission upgrades that are \ncost allocated pursuant to the RTEP process.  Many of these additions are proposed to be co-\nlocated with generators.   \nPJM might argue that in response to its proposed revisions to the Reliability Assurance \nAgreement Among Load Serving Entities (“RAA”), the Commission already determined that \nincluding the large load forecasting process in its business process manual is just and \nreasonable.57  There, however, American Municipal Power (AMP) raised a different argument: \nPJM’s large load forecasting process “fails to provide for measurement and verification of \n \n55 See, e.g., City & Cnty. of S.F. v. FERC, 24 F.4th 652, 661 (D.C. Cir. 2022). \n56 Keyspan-Ravenswood, L.L.C. v. FERC, 474 F.3d 804, 811 (D.C. Cir. 2007). \n57 See PJM Interconnection L.L.C., Proposal to Better Account for Large Load Adjustments in Forecasted Capacity \nObligations, Docket No. ER24-2447 (filed July 1, 2024)."},{"page":21,"startToken":6166,"endToken":6481,"text":"21 \n \nforecasted adjustments to ensure accuracy . . . .”58  PJM argued that “housing implementation \ndetails in the PJM Manuals does not demonstrate that PJM is incapable of measuring and \nverifying the accuracy of load data.”59  Ultimately, the Commission agreed with PJM, finding \nthat “[t]he equations [PJM] filed with this proposal specify that load forecasts will be adjusted by \nzone/area and specifically include a variable for Load Adjustments, and we agree with PJM that \nit needs flexibility to implement each such load adjustment.”60  \nHere, however, we are asking for fundamentally different information in the Tariff than \nAMP requested.  We are not asking that PJM include “measurement” equations in the Tariff, with \nthe understanding that such details may need to be adjusted over time.  These types of \nassumptions and methodologies can vary year-by-year and therefore are not “reasonably \nsusceptible to specification.”  In contrast, basic procedures and reporting criteria for large load \naddition requests by LSE/EDCs are reasonably susceptible to specification.   \nAdditionally, circumstances have changed substantially since the Commission’s decision \nin AMP’s case, because PJM has made significant admissions in this docket that merit the \nCommission revisiting the issue of what load-forecasting methods must be included in the Tariff. \nFor example, PJM has recognized the “risks that arise based on the existing load forecasting \nprocess,” including “the risk of overbuilding due to a forecast that is too high or underbuilding \ndue to a forecast that is too low.”61 Moreover, PJM recognizes that the stakes are high: “the \npotential size of these individual, large load additions” means that “uncertainty with respect to \nwhether the large loads are actually added to the system could cause either overbuild or \n \n58 American Municipal Power Protest, Docket No. ER24-2447 (filed July 22, 2024), at 2. \n59 PJM Interconnection, L.L.C., 188 FERC ¶ 61,200, at P 28 (2024). \n60 Id. at P 43. \n61 PJM Answer at 66-67."},{"page":22,"startToken":6481,"endToken":6816,"text":"22 \n \nunderbuild to occur based on a single customer addition.”62  Further, PJM has recognized that \nthe risks associated with inaccurate load forecasting accrue “to all demand” in the form of \n“higher capacity costs” and “transmission cost allocation.”63 Accordingly, PJM has invited \n“Commission guidance” on “opportunities to enhance the load forecasting process.” PJM’s \nadmissions and invitations for Commission action provide an ample basis for the Commission to \ndetermine that it is no longer just and reasonable for critical load-forecasting standards to be \nomitted from PJM’s Tariff.64  \nConsistent with the Rule of Reason, the Commission should require PJM to include in its \nTariff clear direction on the procedure and reporting criteria for the large load addition requests \nthat must be submitted by LSE/EDCs to PJM for review and inclusion in PJM’s planning \nprocesses.65 Absent such direction, PJM’s Tariff will remain unjust and unreasonable. \n3. The Commission Should Require a Replacement Rate That \nConsiders Principles that Encourage Comparability and \nAccuracy.  \nBelow we provide several suggestions and principles for what the Commission could \nrequire PJM to include in its Tariff with regard to large load forecasting.  These suggestions are \nintended to assist the Commission in its development of a replacement rate and provide \nadditional certainty in PJM’s load forecasts.  \n First, as discussed above, the Commission should require that PJM comply with the Rule \nof Reason and include at least a portion of the large load adjustment process in its Tariff.  This \n \n62 Id. at 67.  \n63 Id.  \n64 See, e.g., Louisiana Pub. Serv. Comm’n v. FERC, 184 F.3d 892, 897 (D.C. Cir. 1999) (noting that “the \nCommission has the duty—not the option—to reform rates that by virtue of changed circumstances are no longer \njust and reasonable”).  \n65 Am. Elec. Power Serv. Corp., et al., 184 FERC ¶ 61,207, at P 33 (2023) (requiring details including the methods \nand procedures of setting the Planning Reserve Margin value must be included in the Tariff or otherwise violates the \nRule of Reason)."},{"page":23,"startToken":6816,"endToken":7142,"text":"23 \n \nwill provide both transparency and accountability that is currently lacking.  The entire load \nforecasting process does not need to be prescribed in the Tariff; rather, we ask—and indeed the \nRule of Reason dictates—that PJM include clear standardized baseline forecasting reporting \ncriteria so that all LSE/EDCs use the same baseline when proposing load forecast adjustments.  \nPJM should leave it open for each LSE/EDC to build increased requirements above and beyond \nthose that PJM requires to ensure further accuracy of their adjustment requests. \nAdditionally, the record contains examples of different ways that PJM could increase \nconfidence in its large load forecasting with relatively small changes to its Tariff.  For example, \nPJM could incorporate a requirement that large load adjustments only include requests that are \nbacked by financial commitments.66  Such firm commitments could be similar in structure to the \n“readiness deposits” that the Commission requires in the generator interconnection process.  To \nfurther reduce speculative requests, PJM could also identify a minimum level of financial \ncommitment that is non-refundable if the project sponsor were to cancel its request. \nPJM could collect detailed, facility-level information for early stage large-load projects \nthat demonstrate both substantial financial commitment and achievement of key project \nmilestones.67  By requiring clear evidence of investment, PJM could more accurately distinguish \ngenuine corporate commitments from speculative projects seeking price discovery.  PJM could \ndevelop a protocol to cross-check whether developers have proposed the same project at different \nLSE/EDCs so that the same load does not appear in multiple load adjustment forecasts.  If \nLSE/EDCs are concerned with the disclosure of confidential information, PJM could develop \nsecure data sharing protocols. \n \n66 Post Technical Conference Comments of Google LLC, Docket No. AD24-11 (Dec. 10, 2024) at 7-8. \n67 See, e.g., PJM’s Request for Stakeholder Feedback on Corporate Commitments Order 1920 – Category Factor 7, \navailable at: https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2024/20241210-\nspecial/item-05---ceba---zgi-response-to-pjm-on-corporate-commitments-for-order-1920.ashx, at 3."},{"page":24,"startToken":7142,"endToken":7477,"text":"24 \n \nLastly, the current status quo does not provide the right incentives for forecasting \naccuracy.  It should be a goal of the Commission to shift some of the risk of large load \nforecasting errors and inaccuracies to individual large load customers.  This could be in the form \nof penalties or reimbursements.  \n \nIII. \nAny Replacement Rate that Enables Co-location Arrangements Involving the Use \nof Existing Generators Requires Careful Planning Processes to Ensure Rates are \nJust, Reasonable, and Not Unduly Discriminatory or Preferential.  \n \nIn addition to explaining PJM’s existing options for co-location, PJM’s response to the \nCommission’s Show Cause Order outlines five more potential options.68  In this section, we \nhighlight five potential issues that the Commission should avoid in considering new pathways \nfor co-location arrangements.  First, co-location arrangements must pay their fair share for both \nthe transmission and ancillary services from which they benefit.  Second, we encourage the \nCommission to prevent a broader system-wide issue in which co-location arrangements unjustly \nshift the costs of maintaining resource adequacy to other load.  Third, we oppose creating new \n“fast tracks” for interconnection of co-locating resources, which will come at the expense of the \nsignificantly backlogged interconnection process.  Fourth, the Commission should ensure that \nPJM conducts rigorous reliability studies of co-location arrangements. Fifth, the Commission \nmust take action to prevent market power manipulation. \nBecause PJM’s proposed options remain high-level, we caution that this list is non-\nexhaustive.  Additionally, we reiterate that the unjust and unreasonable practices identified in \n \n68 See PJM Answer at 13-20 (New Option 4: Co-located load with connection to the grid with protections to avoid \ndelivery of system energy to serve the load; New Option 5: Co-located load with connection to the grid with \nprotections to avoid delivery of system energy to load, but with back-up service from PJM with permission; New \nOption 6: Co-located load that elects to be Network Load and bring its own generation; New Option 7: Potential \nnew non-capacity backed service as a Transitional Service; Option 8: Co-located load participating in Demand \nResponse)."},{"page":25,"startToken":7477,"endToken":7827,"text":"25 \n \nSection II (the failure to properly allocate the cost of transmission upgrades, and the lack of \nproper load forecasting provisions) must also be remedied in order to ensure a just and \nreasonable replacement rate. \nA. Co-Location Arrangements Must Pay for the Transmission and Ancillary \nServices from Which They Benefit. \nWe agree with the Commission’s findings in the Show Cause Order that the PJM Tariff \nmay be unjust, unreasonable, unduly discriminatory or preferential insofar as the Tariff fails to \nensure that co-location arrangements follow cost causation principles for transmission and \nancillary services.69  Through the briefing questions, the Commission correctly underscores two \nkey principles of cost allocation: cost causation and beneficiary pays.70  In essence, costs must be \nallocated in a manner that is at least roughly commensurate with the estimated benefits that \nentities receive.71   \nAs applied to this context, co-location arrangements should pay for their share of \ntransmission and ancillary services costs since the transmission system to which co-location \narrangements connect deliver blackstart and other critical services to ensure reliability for these \nco-location arrangements.  We agree with PJM that none of the proposed co-location \narrangements are “wholly isolated,”72 and further uplift and endorse the comments in this docket \nsubmitted by Union of Concerned Scientists detailing the variety of ways that co-location \n \n69 Show Cause Order at PP 78, 82. \n70 See Show Cause Order at P 74, Briefing Question b(iv)(“What changes to the rates, terms, and conditions of \nNetwork Integration Transmission Service or Point-to-Point Transmission Service or, alternatively, what new form \nof transmission service(s) may be necessary for different configurations of co-location to ensure that the Tariff is \nconsistent with cost causation principles and the beneficiary pays principle?”) and c(iv)(“What changes to rates, \nterms, and conditions of ancillary services, including ancillary services procured in PJM’s markets, are necessary for \ndifferent configurations of co-location arrangements to ensure that the Tariff is consistent with cost causation \nprinciples and the beneficiary pays principle?”). \n71 See, e.g., Ill. Com. Comm’n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009). \n72 PJM Answer at 42."},{"page":26,"startToken":7827,"endToken":8140,"text":"26 \n \narrangements rely on grid services.73  As PJM notes, “[a]ncillary services pass through \ntransmission lines, not the air.”74  While PJM concludes that this means that “at a minimum” cost \ncausation principles support assigning ancillary services costs to co-location arrangements, we \nurge the Commission to go one step further: conclude that co-location arrangements are also \nresponsible for transmission service costs.  This stems from both the physical reality, as \ndescribed by PJM, and the resulting economic reality.  The price for ancillary services does not \nreflect the full cost of providing ancillary services, but rather, the price of providing the ancillary \nservices given the existence of transmission service at that electrical location.  It would therefore \nviolate cost causation and beneficiary pays principles to allow co-location arrangements that rely \non ancillary services to avoid paying transmission rates. \nFor clarity, we note that interconnection fees are distinct from transmission service rates, \neven if the current state of affairs—in which certain network upgrades are often paid for in the \ninterconnection process—can blur these lines.75  Indeed, particularly because co-location \narrangements push much of the needed transmission upgrades into Supplemental Projects and the \nRTEP Process, where the costs of solutions are allocated to broader load categories, it is essential \nthat co-location arrangements at least pay for transmission service.  \nB. The Commission Must Ensure that Co-Location Arrangements With \nExisting Capacity Resources Do Not Unjustly Shift Costs of Maintaining \nResource Adequacy. \nWhile the Show Cause Order considers the reliability and resource adequacy implications \nof allowing existing generators to enter into co-location arrangements and notes some parties’ \n \n73 Comments of the Union of Concerned Scientists, Docket No. EL25-49-000, (Apr. 10, 2025), Accession No. \n20250411-5520. \n74 PJM Answer at 36. \n75 See Comments of Suzanne Glatz and Abraham Silverman (quoting Order No. 2003-A at P 12, “neither Energy \nResource Interconnection Service nor Network Resource Interconnection Service guarantees delivery service”)."},{"page":27,"startToken":8140,"endToken":8480,"text":"27 \n \nconcerns regarding the price effects of such arrangements,76 and PJM’s answer contemplates \nsuch an arrangement with Options 4 and 5, the Commission must more thoroughly consider how \nremoving existing capacity from the broader system could shift costs, resulting in unjust and \nunreasonable rates.  As many analysts have warned, steep increases in demand due to load \ngrowth from data centers are likely to increase wholesale market prices.77  Indeed, analysis of \ndata center hotspots, such as Northern Virginia, predict wholesale power price increases of up to \n30% by 2035.78  Of course, these price increases are broadly concerning.  In this proceeding, \nthough, they are more concerning because co-location arrangements that remove existing \ncapacity from PJM’s capacity market would also shift those cost increases away from the co-\nlocated load and onto the other consumers in the PJM region.  The Commission cannot ignore \nthe current realities in PJM: already sky-high capacity prices, as well as an extremely backlogged \ninterconnection queue, supply chain issues for new resources (both generation and transmission), \nand limited available transmission capacity that further drives up the cost of interconnection.  \nEach of these conditions makes new entry challenging, and if left unaddressed, very expensive.  \nAllowing the key drivers of the tight supply margins – large load customers – to avoid and \nexacerbate these challenges and associated costs by sequestering access to existing generation \nwould be a cost shift of extreme magnitude. \n \n76 Show Cause Order at PP 83-86 (citing concerns of the PJM Independent Market Monitor and Illinois Attorney \nGeneral). \n77 See Eliza Martin and Ari Peskoe, Harvard Law School Environmental & Energy Law Program, Extracting Profits \nfrom the Public: How Utility Ratepayers Are Paying for Big Tech’s Power, at 21 (March 2025), \nhttps://eelp.law.harvard.edu/wp-content/uploads/2025/03/Harvard-ELI-Extracting-Profits-from-the-Public.pdf \n(citing, for example, the PJM Independent Market Monitor). \n78 Aurora Energy Research, Impacts of Virginia Data Center Demand Growth on the Power System, at 11 (June \n2024), https://go.auroraer.com/l/885013/2024-06-\n19/n7nbj/885013/1718806706gUvUPURq/Aurora_Jun_2024_PJM_Load_Growth_Report.pdf."},{"page":28,"startToken":8480,"endToken":8849,"text":"28 \n \nThe Commission does nod to some of these concerns in asking about the effects of co-\nlocation of generators that were paid for in base rates prior to restructuring.79  At a minimum, the \nCommission should not allow such a cost shift.  However, it would be appropriate to take a \nbroader system view of all existing generation: even generation that was not paid for in base \nrates was still able to come online at significantly lowered prices because of access to the \nexisting grid, which was paid for by consumers (and the same transmission rates co-location \narrangements seek to avoid).   \nC. Co-Location Arrangements Should Not Receive Preferential \nInterconnection Treatment. \nThe Commission should reject proposals to allow generators seeking co-location \narrangements to access special, expedited interconnection pathways.  Such proposals run counter \nto the Commission’s recent reforms adopted in Order No. 2023, and moreover, would offer \nunduly preferential terms and conditions to a select set of entities.  The Commission has rejected \nproposals that would “create priority access to the generator interconnection process” for certain \ngenerators as unjust and unreasonable.80  Thus, the Commission should similarly reject any \nproposal that would allow generators seeking co-location arrangements to have priority access to \nthe transmission system (as contemplated under PJM’s proposed Option 6).81  One customer \nclass should not be privileged above all others in the interconnection process. \n \n79 Show Cause Order, Briefing Question V(ii) (“Finally, for generation units paid for originally by consumers in \nbase rates prior to restructuring, is it fair and/or just and reasonable if these units are taken out of the system’s \nsupply stack and devoted exclusively to serving co-location arrangements with one or a few large customers?”). \n80 Midcontinent Indep. Sys. Operator, Inc., 186 FERC ¶ 61,054 (2024) at P 176 (also quoting Order No. 888 that \n“[a]n open access tariff that is not unduly discriminatory or anticompetitive should offer third parties access on the \nsame or comparable basis, and under the same or comparable terms and conditions, as the transmission provider's \nuses of its system”). See also Order No. 2003, 104 FERC 61,103 at P 12 (“[i]nterconnection is a critical component \nof open access transmission service”). \n81 See PJM Answer at 16-17."},{"page":29,"startToken":8849,"endToken":9262,"text":"29 \n \nMoreover, granting this privilege to co-location arrangements would directly harm \nconsumers and other generators seeking interconnection, as well as running counter to Order No. \n2023.  The cluster study requirement is the keystone requirement of Order No. 2023 around \nwhich other reforms, such as study deadlines and withdrawal penalties, are oriented.82  In \ndeveloping the record to support this requirement, the Commission examined evidence from a \ndiverse set of stakeholders, finding that cluster studies “increase efficiency because transmission \nproviders can perform larger interconnection studies encompassing many proposed generating \nfacilities, rather than separate studies for each individual interconnection customer.”83  Critically, \nthe Commission specifically denied requests to operate one-off interconnection studies in parallel \nto cluster studies in Order No. 2023, explaining that “a separate interconnection process outside \nthe cluster study process could detract from transmission providers’ efforts to efficiently process \ncluster studies, and would be insufficient to ensure that interconnection customers are able to \ninterconnect to the transmission system in a reliable, efficient, transparent, and timely manner.”84 \nConcerns about detracting resources from the cluster process are particularly poignant in \nPJM given the extent of the backlog and delays in the current queue.85  There have been no \nsignificant developments that have alleviated PJM’s backlog problem since the finalization of \nOrder No. 2023; indeed, PJM has consistently fought Order No. 2023 compliance.86  Notably, \n \n82 See, e.g., Order No. 2023, 184 FERC ¶ 61,0543 at PP 4 (“we adopt reforms to: (1) implement a first-ready, first-\nserved cluster study process”); 5 (“in order to implement a first-ready, first-served cluster study process”). \n83 Order No. 2023, 184 FERC ¶ 61,054 at P 177 (citing Improvements to Generator Interconnection Procs. and \nAgreements, 179 FERC ¶ 61,194, at P 64 (2022)). \n84 Id. at P 178. \n85 See, e.g., Protest of Public Interest Organizations, at 2-4, 6-11, Docket No. ER24-2045 (June 20, 2024), Accession \nNo. 20240620-5242 (documenting PJM’s badly backlogged interconnection queue and substantial delays in \nprocessing interconnection requests). \n86 See, e.g., Final Brief of Respondent-Intervenors Interconnection Reform Advocates, at 39-44, Advanced Energy \nUnited et al. v. FERC, U.S. Court of Appeals, D.C. Circuit, Case No. 23-1282, Document No. 211411 (Apr. 16, \n2025) (opposing PJM’s lawsuit against Order No. 2023 in part by documenting that “PJM had, and still has, one of \nthe longest and most-backlogged interconnection queues of any region” and that “[o]ngoing queue delays are still \ncausing dire challenges for the reliability and affordability of electricity in the region”)."},{"page":30,"startToken":9262,"endToken":9589,"text":"30 \n \ndelays caused by staffing limits isn’t a problem PJM could easily hire themselves out of. \nEngineers who run interconnection studies are highly trained specialists, and there is a shortage \nof people across the country that can do this work.87  To be clear: PJM can and should invest \nmore resources into hiring interconnection engineers and investing in software to accelerate \ninterconnection studies.  However, these investments should be focused on faster processing of \nthe interconnection cluster, not unduly directed towards co-location arrangements at the expense \nof the rest of the system. \nD. The Commission Must Ensure that PJM Conducts Rigorous Reliability \nReview of Co-Location Arrangements. \nWhile the addition of large loads like data centers poses reliability risks whether or not \nthey are co-located, the Commission should not compound this problem by allowing co-located \nload to skip key planning processes and system analysis. This is particularly true where a co-\nlocation arrangement is proposed with an existing generator that is a capacity resource. \nThe sequestering of existing generation resource capacity for the purposes of solely \nserving a co-located load customer could create unique system reliability risks. As noted by \nPJM’s Market Monitor, “[g]iven that PJM’s excess reserves are currently less than 1,000 MW, \nremoving a relatively small amount of MW to serve co-located load would have a significant \nimpact on reliability and could easily result in a shortfall in reserves in PJM.”88  While PJM has \ntools at its disposal to provide enough supply to serve large loads, unless PJM is provided clear \nauthority to plan for meeting co-located large load additions in the same way that PJM plans for \ngeneration additions, the Commission risks exacerbating and/or causing risks to grid reliability. \n \n87 US DOE, Transmission Interconnection Roadmap (Apr. 2024), https://www.energy.gov/sites/default/files/2024-\n04/i2X%20Transmission%20Interconnection%20Roadmap.pdf. \n88 Post Technical Conference Comments of the PJM Market Monitor Comment, Docket No. AD24-11 at 3 ( Dec. 16, \n2024), at 3."},{"page":31,"startToken":9589,"endToken":9953,"text":"31 \n \nOne of the primary reasons large loads are pursuing co-location arrangements is the speed \nto market that those arrangements offer.89  However, this speed to market cannot override the \nCommission’s and PJM’s interests in maintaining the appropriate controls and planning \nprocesses to ensure grid reliability and just and reasonable rates.  For example, generators that \nco-locate with large loads should not be able to preserve their Capacity Interconnection Rights \n(“CIRs”) in such a way that they can recover for capacity twice, once for the capacity supply \nobligation, and again for the backup service they provide to the co-located load in the event of an \noutage.  This creates both reliability and cost allocation problems and was already indirectly \nrejected by the Commission.90  Additionally, allowing existing generators that are co-located \nwith large loads to reduce their CIRs to serve the large loads without any accompanying planning \nstudies to ensure there are no adverse reliability impacts would also expose the grid to significant \nreliability risks.  As noted by the PJM Market Monitor in this docket,  \n[i]t is essential that the addition of significant new loads go through a complete \nPJM analysis and planning process that includes addressing system reliability and \nis not narrowly limited to local transmission issues, even if that process is time \nconsuming. Every new generator and every large load addition should go through \nthis process.91 \nPlanned generators that decide to sequester their new generation to serve large load \ncustomers should use a process that complements overall system needs and existing \ninterconnection and transmission planning efforts.  For example, as suggested by NERC, the \nplanning process should examine the load associated with a co-located facility so planners and \noperators “can assess reliability concerns such as contingencies, power flow changes, and \n \n89 Technical Conference Transcript, Docket No.  AD24-11 at 106 (Nov. 1, 2024),  \nhttps://www.ferc.gov/media/transcript-technical-conference-regarding-large-loads-co-located-generating-facilities. \n90 PJM Interconnection, L.L.C., 189 FERC ¶ 61,078 at PP87-88 (Nov. 1, 2024) (Capacity Interconnection Rights \nissues were raised and argued in this docket, but the Commission rejected the proposal on other grounds). \n91 Post Technical Conference Comments of the PJM Market Monitor Comment, at 3, Docket No. AD24-11 (filed \nDecember 16, 2024)."},{"page":32,"startToken":9953,"endToken":10312,"text":"32 \n \nvoltage that may otherwise be hidden or masked by the generator,” which could cause issues \nwith “voltage support, frequency response, harmonics, stability of neighboring resources, or \nprotection system coordination.”92  The absence of this type of analysis, in particular transient \nstability load models, is currently “a gap that needs to be addressed.”93  Additionally, currently \nbehind the meter co-located loads are “not part of the PJM load forecast” and “not accounted for \nholistically in forward-looking planning processes” because these loads are “off the system \ndespite being in the PJM region.”94  The Commission should not accept any of the options \nproposed by PJM unless this issue is fully addressed and PJM is provided visibility into the full \nload that co-located data centers potentially add to the system. \nE. The Commission Should Fix its Market Power Mitigation Rules to \nAddress the Increased Incentive to Exercise Market Power and Commit \nManipulation that can Result from Co-locating Load with Existing \nGeneration. \nThe Show Cause Order asks for a variety of information on how co-location \narrangements may require changes to the PJM Tariff and the rules governing PJM’s capacity, \nenergy, and ancillary services markets.95  One such area pertains to market power and \nmanipulation.  PJM’s market power mitigation rules are already insufficient to prevent abuses of \nmarket power.96  Co-location arrangements involving existing generators can heighten the \nconcern with the prevailing deficiencies in PJM’s market power mitigations rules by \n \n92 Statement of the North American Electric Reliability Corporation Technical Conference on Large Loads Co-\nLocated at Generating Facilities, at 1, Docket No. AD24-11 (Nov. 1, 2024). \n93 Id. at 2. \n94 Statement of Frederick S. “Stu” Bresler on Behalf of PJM Interconnection, L.L.C., at 4,6, Docket No. AD24-11 \n(filed November 1, 2024). \n95 See Show Cause Order at P 88(e)(i), (f)(i). \n96 See Monitoring Analytics, LLC, 2024 State of the Market Report for PJM, Vol. II at 9–10, 24–25, 30–32 (Mar. 13, \n2025) (“2024 PJM State of the Market”) (explaining that market participants are exercising aggregate market power \nin the energy markets and that market participants can exercise local market power despite mitigation)."},{"page":33,"startToken":10312,"endToken":10611,"text":"33 \n \nexacerbating certain market participants’ incentives to abuse market power and engage in market \nmanipulation, as explained below. \nWithholding supply is one way to exercise market power or commit market \nmanipulation.97  The incentive to withhold supply in energy markets grows as the portions of the \nsupply curve used to meet demand are more inelastic.98  This is because a given amount of \nwithheld supply will tend to have a greater impact on price as that portion of the supply curve \nbecomes more inelastic. \nCo-location arrangements that allow load to co-locate with existing generators have the \npotential to exacerbate the incentive to withhold supply by changing the generators on which \nPJM relies to meet demand.  If existing generators’ co-location causes PJM to more frequently \nrely on more inelastic portions of the supply curve to meet demand, then market participants’ \nincentive to withhold supply is greater. \nTo the extent the incentive to withhold supply is likely to become greater following \nexisting generators co-locating with large loads, the Commission must require changes to the \nPJM market power mitigation rules to adequately address potential abuses of market power.  \nThat effort should begin by addressing the deficiencies in Commission-approved mitigation rules \nin PJM which, among other things, do not provide for aggregate market power mitigation in PJM \nenergy markets and allow for market power in the energy market even when a supplier fails \nPJM’s pivotal supplier test.99 \n \n97 See, e.g., Pub. Citizen v. FERC, 7 F.4th 1177, 1198 (D.C. Cir. 2021); FPA Section 203 Suppl. Pol’y Statement, 120 \nFERC ¶ 61,060, at PP 60, 65 (2007). \n98 See, e.g., Commonwealth Edison Co., 91 FERC ¶ 61,036, at 61,133 & 61,133 n.42 (2000). \n99 2024 PJM State of the Market at 9–10, 24–25, 30–32."},{"page":34,"startToken":10611,"endToken":11060,"text":"34 \n \nIV. \nConsistent with Precedent, The Commission Should Assert Jurisdiction over Co-\nLocation Arrangements on PJM’s Transmission System.   \nThe Commission’s Show Cause Order poses several questions about the extent of federal \njurisdiction over interconnection of customers to the electric grid.  Primarily, the order asks \n“whether the Commission must, should, or can exercise jurisdiction over the interconnection of \nco-location arrangements to the transmission system in interstate commerce as an element of \ntransmission service, including where the purpose is to facilitate a retail sale.”100  PIOs \nappreciate the opportunity to share legal and technical perspectives on this important question. \nA.  The Commission Must Not Disclaim Jurisdiction Over Interconnection \nof Large Loads. \nThe introduction of large loads101 to the electric grid has potential to disrupt transmission \nsystem reliability, as observed recently by multiple grid operators.102  The Commission’s general \nposition on its jurisdiction is that “[FERC] has not historically exercised jurisdiction over any \nand all transmission-level interconnections of retail load.”103  We interpret “any and all” to mean \n \n100 Show Cause Order at P 73. \n101 For context, the data center customer at issue in Docket No. ER24-2172 (regarding Susquehanna Nuclear, LLC) \nwas proposed to utilize up to 960 MW.  Order Rejecting Amendments to Interconnection Service Agreement, 189 \nFERC ¶ 61,078 (Nov. 1, 2024), at P 10. \n102 See Docket No. AD25-10, NERC Activities and Plans to Address Reliability Impacts from Large Load \nIntegration (Apr. 17, 2025), Accession No. 20250418-3017, at 3-4 (an unanticipated 1,500 MW load loss in \nLoudoun County Virginia in July 2024 required “operators [to] have to take action to reduce the voltage to within \nnormal operating levels”); Southern Company presentation to NERC Large Load Task Force (“LLTF”) (Nov. 14, \n2024), https://www.nerc.com/comm/RSTC/LLTF/LLTF_Presentaions_November_14_2024.pdf, at 19 (“Large loads \nsuch as Data Centers could potentially impact Power Quality and System Stability”); Quanta Technology \npresentation to NERC LLTF (Nov. 14, 2024), id. at 38 (“Pulsating Loads in Data Center[s] … are a special type of \nnonlinear load: Large voltage and current signal variations introduce harmonics and potential instability concerns … \nPulsed power loads can cause voltage sag or frequency fluctuations in connected power systems, dynamic \novervoltage, interruption of other devices”); ERCOT presentation to NERC LLTF (Oct. 8, 2024), \nhttps://www.nerc.com/comm/RSTC/LLTF/LLTF_Kickoff_Presentations.pdf, at 34, 39 (“Some load types are \nreducing consumption during voltage disturbance events. When these loads are large, this behavior can cause a \nsignificant and unexpected frequency disturbance”; “In the 12 months ending February 2024, ERCOT experienced \n255 five-minute SCED intervals where the change in Large Load consumption has exceeded the amount of procured \nRegulation[]”)  \n103 Show Cause Order at P 72."},{"page":35,"startToken":11060,"endToken":11610,"text":"35 \n \nFERC has not exercised plenary authority over every transmission-level load interconnection, \nalthough there are cases where FERC and its regulated entities have sought to control \ninterconnections of load. For example, NYISO has a specific interconnection process to manage \nloads that are greater than 10 MW.104 NYISO’s definition of “Eligible Customers”105 appears to \nbe based on language from FERC Order 888-A, which outlined the scope of unbundled \ntransmission service that may be covered in a federally sanctioned transmission tariff.106  \nThe Commission’s historical forbearance, does not, however, establish as a matter of law \nthat FERC lacks jurisdiction over the general field of transmission-level load interconnections \n(contra the arguments107 of Southern California Edison108).  FPA Section 215, enacted109 in \n2005, provides that:  \n \n104 NYISO OATT §§ 3.9.1 and 3.9.2. \n105 Id.  at § 3.9.1 “Any Eligible Customer proposing to interconnect its Load with the NYS Power System shall \nsubmit its interconnection proposal to the ISO. The ISO, in cooperation with the Transmission Owner with whose \nsystem the Eligible Customer proposes to interconnect, shall perform technical studies to determine whether the \nproposed interconnection may degrade system reliability or adversely affect the operation of the NYS Power \nSystem”). \n106 Order No. 888-A, 78 FERC ¶ 61,220 (Mar. 4, 1997), at 119-120 (“We therefore have modified section 1.11 [of \nthe Commission’s pro forma tariff] to clarify that, with respect to service that we are prohibited from ordering by \nsection 212(h) of the FPA (whether direct retail wheeling or ‘sham’ wholesale wheeling), otherwise eligible entities \nmay obtain such service under the tariff only if it is pursuant to a state requirement that such service be provided or \npursuant to a voluntary offer of such service.” \n107 Docket No. EL25-20-000, Comments of Southern California Edison Company (“SoCal Edison”) (Dec. 23, 2024), \nAccession No. 20241223-5105, at 4 (“If FERC has jurisdiction over the interconnection of large (retail) loads, why \nwould it have accepted the restrictive [CAISO tariff] provision [leaving non-wholesale load interconnections to the \nLocal Regulatory Authority]? And, why would numerous state commissions be addressing large load \ninterconnections and other terms of service for large loads?”). \n108 SoCal Edison offers two additional arguments at page 6 of its Comments.  First, SoCal Edison cites S. Cal. \nEdison v. FERC, 603 F.3d 996, 1001 (D.C. Cir. 2010) to make the point that FERC may only regulate within its \nwholesale or transmission authority.  But that by itself does not defeat jurisdiction over transmission-connected load \ninterconnections when the transmission is bundled with power sales, assuming reliability is implicated.  Second, \nSoCal Edison cites Order No. 2003-C, 111 FERC ¶ 61,401, at P 51, for the proposition that “interconnection \njurisdiction is tied to the interconnection customer using OATT service.”  But the cited paragraph of Order No. \n2003-C only addresses the question of interconnections to local distribution facilities, which is unlikely to be salient \nwith respect to co-location arrangements, especially for large loads.  SoCal Edison characterizes the Order No. \n2003-C paragraph as establishing that “interconnection jurisdiction is tied to the interconnection customer using \nOATT service,” but the Commission in that passage was referring to wholesale sellers utilizing the open access \ntransmission tariff.  By definition, load cannot be part of a wholesale transaction.  \n109 Pub. Law 109-58 at § 1211 (creating new 16 U.S.C. § 824o)."},{"page":36,"startToken":11610,"endToken":12094,"text":"36 \n \nOn its own motion or upon complaint, the Commission may order compliance with \na reliability standard and may impose a penalty against a user or owner or operator \nof the bulk-power system if the Commission finds, after notice and opportunity for \na hearing, that the user or owner or operator of the bulk-power system has engaged \nor is about to engage in any acts or practices that constitute or will constitute a \nviolation of a reliability standard.110 \n \nSeveral months after the new legislation, the Commission found PJM’s existing resource \nadequacy measures to be unjust and unreasonable, reasoning that a failure to “set prices adequate \nto ensure energy resources to meet its reliability responsibilities” would “result in multiple \nreliability criteria violations.”111  Similarly here, the Commission’s statutory mandate to ensure \nthat transmission users, owners, or operators satisfy reliability criteria provides ample support for \nregulating the interconnections of large loads that – as discussed above – have usage \ncharacteristics that can cause unacceptable disruption to the bulk power system.  To be clear, at \nminimum, Order 888-A already establishes112 FERC’s jurisdiction over interconnection for retail \ncustomers taking unbundled transmission service – which is true of many co-located customers \nreceiving power at retail from the generator but also utilizing the transmission grid.113  But the \nouter limits of the Commission’s authority over load interconnection extend beyond the scope \n \n110 16 U.S.C. § 824o(d)(3). \n111 Initial Order on Reliability Pricing Model re PJM Interconnection, L.L.C., 115 FERC ¶ 61,079 (April 20, 2006), \nat PP 5, 11; see also Order Denying Rehearing and Approving Settlement Subject to Conditions, 117 FERC ¶ 61,331 \n(December 22, 2006) at PP 11-12 (describing past and projected reliability criteria violations related to resource \ndeficits).   \n112 Cf. SoCal Edison Comments at 6 (admitting the same). \n113 With regard to the Commission’s clarifying question in the Show Cause Order at P 73, “[I]f a co-located load is \nconnected to the interstate transmission system only through the generator or if it is served by the generator at a \ntransmission-level voltage, but using facilities that are not interconnected to the interstate transmission system, does \nthat constitute a transmission interconnection in interstate commerce?”113 We believe the first of these scenarios \nshould be treated as the end user taking unbundled retail transmission service directly from the transmission \nprovider.  For the reasons stated by PJM in its Answer (pp. 42-45), any co-located user connected to a transmission-\nconnected generator is itself almost certainly relying on the availability of transmission service.  As to the second \nscenario, we understand this to mean that the generator is interconnected to the interstate transmission grid, but \nprovides power at transmission voltage to the co-located load facility through circuits that are not interconnected to \nthe transmission grid.  In this case, the load is, again, still taking unbundled retail transmission service, since it is \nnecessarily relying on the availability of transmission system services."},{"page":37,"startToken":12094,"endToken":12380,"text":"37 \n \nasserted in Order 888-A, given the serious reliability implications of integrating large loads.  \nEven where a load (including co-located loads) is taking bundled supply and transmission \nservice from a utility, the Commission is already empowered to regulate the load’s \ninterconnection to the transmission grid, if necessary to ensure reliability.  \nWe share the perspectives above in the spirit of informing the Commission’s deliberations \non these important issues, mindful that this proceeding is focused on co-located loads at the site \nof generators in the PJM system, and that any determinations the Commission renders on a just \nand reasonable transmission rate need only focus on the transmission interconnection of co-\nlocated loads.  Broader questions about interconnection of loads not co-located, or loads outside \nPJM, or loads interconnected to the distribution grid, can be examined more closely and \ndetermined in another proceeding of broader scope.   \n \nB. The Commission Must Plan for Wholesale Sales at Co-Located Facilities. \nThe Commission correctly notes that under the FPA, retail sales of electricity are a matter \nfor exclusive state jurisdiction.114  This important observation is not the end of the legal analysis, \nbecause not all co-location arrangements between a generator and a large load customer will be \ndirect retail sales.  The Commission must carefully consider its responsibilities when a co-\nlocated large load customer is not taking retail service. \nIn several PJM states, a merchant generator (that is, a generator not owned by an \nincumbent, vertically integrated utility) is prohibited by state law from offering retail supply to a \ncustomer.  In Kentucky, for example, incumbent electric utilities are assigned certified territories, \nand no supplier may attempt to furnish retail electric service to a customer inside the certified \n \n114 Show Cause Order at P 60."},{"page":38,"startToken":12380,"endToken":12798,"text":"38 \n \nterritory of another retail electric supplier.115  The same is true in Indiana (wherein incumbent \nutilities’ territories are called “assigned service areas”).116  In West Virginia, a law enacted in \n1998 authorized the Public Service Commission to determine whether deregulating electricity \nsupply was in the public interest, and if so, to submit such a regulatory plan to the Legislature.117  \nAlthough the state commission made certain public interest findings, the West Virginia \nLegislature did not ultimately authorize alternative retail suppliers.118  Finally, in Michigan, only \n10 percent of an electric utility’s retail sales can be open to alternative retail electric suppliers.119  \nWhen the cap is met, customers wishing to take alternative retail supply shall enroll in a queue \nuntil new space for alternative supply is available under the 10 percent calculation.120  In 2024, \nthe 10 percent cap in Michigan was fully subscribed, with thousands of customers representing \nover 2,000 MW waiting in the queue.121 \n \nWhere a direct retail supply contract with a generator is banned, there could be self-\ninterested reasons why a large load customer would wish to locate next to a generator, including \npossible savings (which could be reflected in a special contract with the local utility) from \n \n115 Ky. Rev. Stat. §§ 278.010, 278.016, 278.017, 278.018.  An exception in Kentucky is made where the Public \nService Commission finds that the incumbent electric provider in a certified territory “has failed to render or propose \nto render adequate service,” in which case another supplier may be authorized to furnish retail service if the \nincumbent then fails to meet the need.  § 278.018(3). \n116116 Ind. Code § 8-1-2.3-4. \n117 W. Va. Code § 24-2-18. \n118 It should be noted that a bill passed by both chambers of the West Virginia legislature as of this month (awaiting \naction by the Governor) would authorize merchant generators to provide power to co-located data centers within \n“microgrid districts,” although the bill still contemplates that the data center customer would remain a retail \ncustomer of the incumbent utility.  W. Va. Legislature, 2025 Regular Session, House Bill 2014 as enrolled (passed \nApril 12, 2025), \nhttps://www.wvlegislature.gov/Bill_Text_HTML/2025_SESSIONS/RS/bills/hb2014%20sub1%20enr.pdf. \n119 MCL § 460.10a(1)(a). \n120 MCL §§ 460.10a(1)(g)-(i). \n121 Mich. Pub. Serv. Comm’n, Status of Elec. Competition in Mich. (Feb. 1, 2025), at 5, \nhttps://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/regulatory/reports/elec-\ncomp/2024_Electric_Competition_Status.pdf."},{"page":39,"startToken":12798,"endToken":13153,"text":"39 \n \navoiding congestion costs or line losses, or reducing the chance of weather-based outages.  This \ntype of interest was observed recently in Indiana, where a cryptocurrency mining facility planned \nto locate its facility adjacent to the merchant Merom Generating Station, which would sell power \nat wholesale to a generation and transmission cooperative, while the crypto company would \npurchase power at retail from the first cooperative’s member distribution cooperative.122  \nIn a scenario where the co-located generator is providing power to a utility on a \nwholesale basis but ultimately serving a co-located large load customer, the Commission likely \nhas authority to review the transaction pursuant to its FPA Section 201 authorities (unless \nMarket-Based Rate Authority or some other exception applies).  What’s more, there are scenarios \nwhere a co-location arrangement could be deliberately structured as a wholesale sale, but going \nthrough a special-purpose intermediary rather than the local utility, to avoid state jurisdiction – \nthus leaving a potential regulatory gap.123  The Commission should be clear in any order in this \nproceeding that it will exercise its powers to the fullest extent to review wholesale power \nagreements under the just and reasonable standard. \n \n122 Order Authorizing Disposition of Jurisdictional Facilities re Hallador Power Company, LLC, 181 FERC ¶ 61,016 \n(Oct. 7, 2022); AboutBit to turn portion of Indiana power station into cryptocurrency mining facility, REjournals \n(May 18, 2022), https://rejournals.com/aboutbit-to-turn-portion-of-indiana-power-station-into-cryptocurrency-\nmining-facility.  Subsequently, it is not clear if the co-location arrangement contemplated in 2022 was finalized, but \nin the most recent investor relations call last month, the owner of Merom Generating Station stated that it is in \nnegotiation with a “leading global data center developer.”  \nhttps://s27.q4cdn.com/270326732/files/doc_financials/2024/q4/Hallador-Energy-Company-Q4-FY-2024-Earnings-\nCall-Transcript.pdf (March 17, 2025).   \n123 See PJM Answer at 28-29 (highlighting the O’Brien (Parlin) Cogeneration, Inc. matter from 1996 in Docket No. \nEG96-60 and in New Jersey state regulatory proceedings).  PJM also observed that even a direct retail sale between \na co-located generator and the adjacent end user, if not involving a traditional utility, could fall outside state \njurisdiction depending on the statutory scope of regulatory coverage.  Id. at 27-28."},{"page":40,"startToken":13153,"endToken":13550,"text":"40 \n \nC. PJM Must Not Limit States’ Authority Over the Co-Located Generation \nMix. \nThe Commission also correctly notes that under the FPA,124 states retain authority over \nthe “mix” (that is, the portfolio characteristics) of a state’s generating fleet, as well as the \nlocations and permission to operate for specific generating facilities.125  While generator \ninterconnections to the transmission system are a matter of Commission jurisdiction, and the \nCommission through its FPA Section 215 authority may approve reliability standards for \ngenerators, the Commission has no role to directly dictate, subsidize, discourage, or ban \nparticular generating projects or types of generating projects.  With these jurisdictional contours \nin mind, any FERC-jurisdictional tariff structure that may facilitate co-location arrangements \nmust be neutral to technology type and not favor or disfavor any type of co-located generator, \nlest it encroach on a state’s desire to structure co-location arrangements according to a preferred \nmix, consistent with state authority under the FPA. \nD.  The PJM Tariff Should Treat Co-Located Usage As Any Other \nConsumption. \nRecently, the Commission denied certain transmission owners’ proposal to clarify the \nmeasurement of Network Load, on the grounds that the PJM Transmission Owners lack authority \nto propose those changes.126  Accordingly, the question of whether consumption by a co-located \n \n124 “[S]uch Federal regulation, however, [is] to extend only to those matters which are not subject to regulation by \nthe States.”  16 U.S.C. § 824(a).  “The Commission … shall not have jurisdiction, except as specifically provided in \nthis subchapter and subchapter III of this chapter, over facilities used for the generation of electric energy[.]”  16 \nU.S.C. 824(b)(1).  \n125 Show Cause Order at 70. \n126 Order Rejecting Tariff Revisions, Atlantic City Elec. Co., et al., Docket Nos. ER24-2888 to ER24-2894 (not \ncons.), 190 FERC ¶ 61,109 (Feb. 20, 2025), at PP 33-39.  Specifically, each of the Exelon Utilities, in a separate \nfiling, proposed to add the following (in relevant part) tariff language to its rules on Network Integration \nTransmission Service: “For avoidance of doubt and to ensure compliance with the definition of 'Network Load,' all \nload [] that is electrically connected and synchronized when consuming power, regardless of the location of the \nphysical interconnection to [] Transmission Facilities or whether that connection also uses facilities owned by a third \nparty, shall either (a) be designated as Network Load by a Network Customer [] and subject to all associated charges"},{"page":41,"startToken":13550,"endToken":13917,"text":"41 \n \nend user should be defined as Network Load within the PJM tariff remains unaddressed by the \nCommission.  We recommend that any replacement rate related to co-location arrangements \nsupport the treatment of a co-located end user’s usage as Network Load rather than a special \ncarve out for large loads, for at least two reasons. \n \nFirst, assuming a generator is interconnected to the transmission system – either (1) \ndirectly at transmission voltage or (2) via transformers that step down transmission voltage to \ndistribution level – a co-located end user will be using transmission grid services, including \nfrequency and voltage regulation, in proportion to its usage from the co-located generator, which \nwill rely on the grid.  This is so because, as PJM observed in its Answer to the Show Cause \nOrder, conditions at existing data center co-location arrangements can “result in brief, but \nroutine, imbalances between the load and the generation that would need to rely on the grid to \nbalance.”127  And while “it is possible to develop a special protection scheme that could \ndisconnect the load if the local generator trips […] PJM has observed these protection schemes \ncan fail, and the load has taken service from the grid.”128  These new loads may, accordingly, \ngive rise to a need for transmission upgrades to support the incremental services and energy \nwithdrawals from the transmission system.   \nBecause co-located usage relies on the transmission system,129 a co-located end user’s \nusage should be classified as Network Load to ensure that the costs of the transmission system \n \nand services; or (b) where an Eligible Customer has elected not to designate a particular load at a discrete point of \ndelivery as Network Load, the Eligible Customer is responsible for making separate arrangements [] for Point-To-\nPoint Transmission Service for such non-designated load.” \n127 PJM Answer at 45. \n128 Id. at 44. \n129 PIOs do not object to a proposed policy by PJM in the March 2024 “Guidance on Co-Located Load” \n(https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/pjm-guidance-on-co-located-load.pdf) \nsuggesting that “If the co-located Customer Facility elects to be designated as Behind the Meter Generation \n(BTMG), it will be allowed to net the co-located load directly against the output of the co-located Customer"},{"page":42,"startToken":13917,"endToken":14305,"text":"42 \n \nare properly allocated to LSEs to the extent that a load share basis is used under the cost \nallocation tariff,130 and also so that PJM’s RTEP process131 takes appropriate consideration of \nusage that relies on the transmission grid to model system reliability.  If regional transmission \nplanning fails to consider this consumption, necessary grid upgrades to remedy reliability risks \nmay arise more acutely, requiring inefficiently expensive “piecemeal” upgrades paid for by a \nbroad customer base.132 \nAdditionally, separate from the question of whether co-located usage should count as \nNetwork Load for the PJM tariff, any replacement rate that the Commission may direct must not \nblock utilities from attempting to physically measure co-located usage.  States retain authority \nover whether consumption by a co-located customer should count for purposes of (i) allocating \ntransmission system charges to retail customers, (ii) allocating distribution system charges to \nretail customers, and (iii) charging retail customers for additional special riders that depend on \ncustomer usage.  These questions are squarely within a state’s jurisdiction and have also been the \nsubject of recent state legislative debate.133  Even if the Commission does not agree with PIOs’ \ncontention above that co-located usage should be Network Load within the meaning of PJM \ntariff rules, the tariff rules must not attempt to dictate to transmission owners that co-located \n \nFacility.”  Importantly, Behind the Meter Generation is already defined in the Tariff as “a generation unit that \ndelivers energy to load without using the Transmission System or any distribution facilities [].”  For any such \nengineering arrangement, the concerns described above about reliance on the transmission grid would, by definition, \nnot obtain.  Notably, PJM proposed this as “Existing Option 3” in Exhibit A to its Answer of March 24. \n130 PJM Open Access Transmission Tariff, § 34.1. \n131 PJM Operating Agreement, Sch. 6, § 1.5. \n132 Order 1920, 187 FERC ¶ 61,068 (May 13, 2024), P 128. \n133 See, e.g., 104th Illinois General Assembly, House Bill 3758 (introduced Feb. 18, 2025), \nhttps://ilga.gov/legislation/104/HB/PDF/10400HB3758lv.pdf, at 410-413 (establishing certain requirements for how \nan electric utility shall meter the usage of a co-located customer); 89th Texas Legislature, Senate Bill 6 (introduced \nFeb. 12, 2025), https://capitol.texas.gov/tlodocs/89R/billtext/pdf/SB00006I.pdf#navpanes=0, at 2 (specifying how \nbehind-the-meter retail customers shall pay retail transmission charges)."},{"page":43,"startToken":14305,"endToken":14470,"text":"43 \n \nusage may not be metered.  The Commission must not step outside its jurisdictional boundaries \nand interfere with a State’s valid regulatory authority over electric power consumption. \nV. \nConclusion \nGiven the scale and pace of data center load growth in PJM’s projections and, therefore, \nthe high likelihood that generators and large loads will increasingly seek to implement co-\nlocation arrangements, the Commission should take action to ensure that PJM revises its existing \ntariff and related agreements for co-location arrangements (Options 1 and 2), consistent with our \ncomments, to ensure that rates, terms, and conditions for Commission-jurisdictional services are \njust, reasonable and not unduly discriminatory or preferential.   We agree that large loads should \nremain ineligible for the behind-the-meter option (Option 3).  And, while we see limited to no \nutility with requiring PJM to implement new co-location arrangements (Options 4-8), if the \nCommission disagrees, we request that it require PJM to implement the provisions that mitigate \nthe risks that we discuss above (e.g., unlawful cost shifts)."},{"page":44,"startToken":14470,"endToken":14711,"text":"44 \n \nDated: April 23, 2025  \n \n \n \n \nRespectfully submitted, \n/s/ Christine Powell   \nChristine Powell, Deputy Managing Attorney   \n/s/ Ada Statler   \nAda Statler, Senior Associate Attorney   \nEarthjustice Clean Energy Program  \n50 California Street, #500   \nSan Francisco, CA 94111   \ncpowell@earthjustice.org     \nastatler@earthjustice.org  \n \n \n/s/ Nicholas J. Guidi  \nNicholas J. Guidi, Senior Attorney  \n/s/ Katherine L. Rogers  \nKatherine L. Rogers, Associate Attorney \nSouthern Environmental Law Center  \n122 C Street NW, Suite 325  \nWashington, DC 20001  \nnguidi@selcdc.org  \nkrogers@selcdc.org  \n \nCounsel for Appalachian Voices  \n \n/s/ Aaron Stemplewicz \nAaron Stemplewicz, Senior Attorney \nEarthjustice Clean Energy Program \n1617 John F. Kennedy Blvd., Suite 2020 \nPhiladelphia, PA 19103 \nastemplewicz@earthjustice.org \nastemplewicz@earthjustice.org  \n \n/s/ Ted Kelly \nTed Kelly, Director and Lead Counsel \n/s/ Adam Kurland \nAdam Kurland, Attorney \nEnvironmental Defense Fund,  \nUS Clean Energy \n555 12th Street NW Suite 400 \nWashington, D.C. 20004 \ntekelly@edf.org   \nakurland@edf.org  \n \n/s/Michael Lenoff \nMichael Lenoff, Senior Attorney \n/s/ Nick Lawton  \nNick Lawton, Senior Attorney  \nEarthjustice Clean Energy Program  \n1001 G St. NW, Suite 1000   \nWashington, DC 20001  \nnlawton@earthjustice.org   \n \n \n/s/ Jessica O’Neill \nJessica R. O’Neill, Managing Attorney \nPennFuture Litigation  \n1429 Walnut Street, Suite 701 \nPhiladelphia, PA  19102 \noneill@pennfuture.org \n \n/s/ Megan Wachspress   \nMegan Wachspress   \nSierra Club Environmental Law Program   \n2101 Webster St., Suite 1300   \nOakland, CA 94612   \nmegan.wachspress@sierraclub.org   \n \n \n/s/ Danielle C. Fidler \nSenior Attorney \nClean Air Task Force, Inc. \n114 State Street, 6th Floor  \nBoston MA 02109 \ndfidler@catf.us"},{"page":45,"startToken":14711,"endToken":14774,"text":"46 \n \nCERTIFICATE OF SERVICE   \n \nI hereby certify that the foregoing has been served in accordance with 18 C.F.R. § 385.2010 \nupon each party designated in the official service list compiled by the Secretary in this \nproceeding, by email.    \n \n/s/ Christine Powell   \nChristine Powell, Deputy Managing Attorney   \nEarthjustice Clean Energy Program  \n50 California Street, #500   \nSan Francisco, CA 94111   \ncpowell@earthjustice.org"},{"page":46,"startToken":14774,"endToken":14776,"text":"EXHIBIT A"},{"page":47,"startToken":14776,"endToken":14788,"text":"1\n2024 Load Forecast Adjustments\nPJM Load Analysis Subcommittee – October 25, 2024"},{"page":48,"startToken":14788,"endToken":14869,"text":"2\nForecast Overview\no The era of datacenters has caused load growth to \nbecome:\n▪More concentrated,\n▪More disconnected from underlying economics,\n▪And thus, more unpredictable.\no AEP is proactively addressing this by:\n▪\nMaking our forecasts as transparent as possible,\n▪\nRelying on customer financial commitments more \nthan predictive modeling to plan for new loads,\n▪\nWorking to ensure that system costs for new loads \nare distributed fairly and sustainably.\nIndustrial\nData \nCenter\nCrypto\nSector\nOther\nIndiana\nOhio\nState\n2025 – 2030 Load Adjustment Breakdown:"},{"page":49,"startToken":14869,"endToken":15062,"text":"3 \nLoad Addition Criteria\nYear 6\n(2030)\nYear 20\n(2045)\n1) LOA Necessary\n2) ESA Signed or in Progress\n1) LOA’s or ESA’s as Available\n2) 60% of Interconnection Queue with Land Control \nWhere Capacity is Constrained\nBasis for load to be included in the forecast across time periods:\nYear 0\n(2024)\no In Years 6 and beyond we are outside the range of most signed \nagreements but still see substantial demand from customers awaiting \nsufficient transmission capacity for service.\no Capacity constraints have prevented AEP from signing agreements with \ncustomers, while the lack of signed agreements has prevented us from \nadding the necessary capacity to serve those customers. Including this \nunsigned load in the planning process allows AEP to end this circular \nreference, ultimately increasing the accuracy of the forecast and PJM’s \noverall planning processes.\no Within the first five years of the forecast, a project \nmust, at a minimum, have a signed LOA, and an ESA in \nprogress to be included.\no An ESA becomes all-the-more important if the in-\nservice date falls within a year of the three-year \ncapacity planning window to ensure time to develop a \nsufficient generation plan."},{"page":50,"startToken":15062,"endToken":15150,"text":"4 \nAccounting for Unsigned Demand\n12 GW\n16 GW\n35 GW\nCriteria for including unsigned load additions into the long-term forecast:\no Is an area capacity constrained?\no What loads in the interconnection queue already have land control \nand thus the ability and desire to sign an immediate ESA?\no What are the minimum tariff provisions relevant to the respective \nload?\nOhio Example:\nTotal Interconnection Queue\n35 GW\n% of Queue with Land Control\n11.2 GW\n60% Tariff Provision\n6.7 GW\nPJM Load Interconnection Queues at AEP"},{"page":51,"startToken":15150,"endToken":15241,"text":"5 \nForecast Adjustment Summary\nCumulative Additions (MW)\n2025\n2026\n2027\n2028\n2029\n2030\nAppalachian Power\n41\n421\n421\n421\n421\n421\nIndiana & Michigan Power\n721\n1,489\n2,076\n2,565\n3,265\n6,045\nKentucky Power\n3\n3\n3\n3\n3\n3\nAEP Ohio\n1,509\n2,726\n3,423\n3,969\n4,443\n11,421\nTotal AEP\n2,274\n4,639\n5,924\n6,958\n8,122\n17,890\n0\n5\n10\n15\n20\n2025\n2026\n2027\n2028\n2029\n2030\nLoad Forecast Adjustments, GW\nIndustrial/Other\nCrypto\nData Centers"},{"page":52,"startToken":15241,"endToken":15251,"text":"Dominion \nEnergy\nVirginia \n2024\n20-Year \nData Center\nForecast\nOctober 2024"},{"page":53,"startToken":15251,"endToken":15342,"text":"Dominion Energy Virginia - Market Overview\n\nVirginia is home to the largest data center market in the world\n\n10 out of 53 customers account for 87% of YTD demand\n\nForecasted 2024 billing demand:  3,562 MWs\n\n2026 will experience higher than normal sales and demand growth as \nsignificant transmission infrastructure is energized, eliminating the \ntemporary transmission constraint in Loudoun County, VA\n\nCustomers are expanding beyond the traditional Northern Virginia \nmarket within Dominion Energy Virginia’s retail service territory\n\nNew market entrants are competing for data center demand\n\nCapacity requests continue to increase\n2"},{"page":54,"startToken":15342,"endToken":15503,"text":"Modeling Process\nForecast is based on 10+ years of metered data center customer information\n1.\nStatistically modeled 7 largest or fastest growing customers and an 8th model of all \nremaining customers combined into one segment\n2.\nStatistically model high billing demand forecast three ways for each customer segment (24 \nmodels)\na)\nApproach 1:  linear regression of billing demand\nb)\nApproach 2:  polynomial regression of billing demand\nc)\nApproach 3:  custom fit based on market/customer information\nNote:  One of these three approaches is selected for each of the 8 customer segments\n3.\nValidate/adjust statistical forecasts based on customer provided long-term forecasts (4 \ncloud customers)\n4.\nDevelop low billing demand forecast using industry aggregate statistical models (4 models)\n5.\nAverage high and low forecasts to derive the official billing demand forecast\n6.\nUse load factor to model MWH sales based on high, official, and low forecast scenarios\n7.\nBased on historical ratios, calculate coincident demand forecast from billing demand \nforecast\n3"},{"page":55,"startToken":15503,"endToken":15561,"text":"Modeling Methodology\n4\nForecast Modeling\nStatistical \nAssessments\nSensitivities\nComparison of \nModeling Approaches\nCustomer Intelligence\nSigned Contracts\nCustomer Provided \nForecasts\nCustomer Provided \nGrowth Intelligence\nGeographical Areas of \nFuture Growth\nMarket Research\nLand Purchase \nIntelligence\nIndustry Changes \nComparison of Data \nCenter Markets\nValidation\nCustomer Specific \nLoad Ramps\nCustomer Provided \nForecasts\nSigned Contracts\nDominion LSE\nData Center \nForecast \nSubmission to PJM"},{"page":56,"startToken":15561,"endToken":15614,"text":"5\n462 \n532 \n636 \n753 \n931 \n1,113 \n1,421 \n1,808 \n2,302 \n2,767 \n3,183 \n3,562 \n -\n 500\n 1,000\n 1,500\n 2,000\n 2,500\n 3,000\n 3,500\n 4,000\n2013A\n2014A\n2015A\n2016A\n2017A\n2018A\n2019A\n2020A\n2021A\n2022A\n2023A\n2024F\nBilling Demand (MW)\nHistorical Demand Growth"},{"page":57,"startToken":15614,"endToken":15706,"text":"6\n3,562 3,882 \n4,504 \n5,033 \n5,630 \n6,253 \n6,903 \n7,579 \n8,283 \n9,014 \n9,751 \n10,515 \n11,306 \n12,085 \n12,820 \n13,401 \n14,000 \n14,618 \n15,254 \n15,907 \n16,577 \n17,265 \n -\n 2,000\n 4,000\n 6,000\n 8,000\n 10,000\n 12,000\n 14,000\n 16,000\n 18,000\n2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045\nBilling Demand (MW)\n2024 Data Center Forecast"},{"page":58,"startToken":15706,"endToken":15916,"text":"7\n5,597 \n7,157 \n7,575 \n7,880 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n8,012 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n5,835 \n3,183 3,562 3,882 \n4,504 5,033 5,630 \n6,253 \n6,903 \n7,579 \n8,283 \n9,014 \n9,751 \n10,515 \n11,306 \n12,085 \n12,820 13,401 14,000 \n14,618 \n15,254 \n15,907 \n16,577 \n17,265 \n -\n 2,000\n 4,000\n 6,000\n 8,000\n 10,000\n 12,000\n 14,000\n 16,000\n 18,000\n2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045\nBilling Demand (MW)\nContracts in Hand – July 2024\nElectric Service Agreements (ESA)\nConstruction Letters of Authorization (CLOA)\n2024 Demand Forecast\n7,570 MWs of Substation Engineering Letters of Authorization (SELOA) under contract."},{"page":59,"startToken":15916,"endToken":15918,"text":"Questions?\n8"},{"page":60,"startToken":15918,"endToken":15926,"text":"Approach to Large Load Adjustments\nOct 25, 2024"},{"page":61,"startToken":15926,"endToken":15982,"text":"2\nProcesses\nForecasting vets \npotential load \nexpansions.  \nDetermines amount \nof additional load to \ninclude in the \nforecast\nTeams monitor \ncustomer expansion \nexpectations and/or \nimpacts and adjust \nforecasts if needed\nLarge Account \nManagement group \nworks with \ncustomers to plan \nfor new loads or \nload expansions\nEconomic \nDevelopment \nworks through \nleads on \npotential new \ncustomer growth \nopportunities"},{"page":62,"startToken":15982,"endToken":16060,"text":"3\nSummary\n• Over the last 2 years, Duke Energy Ohio-Kentucky has worked with many prospective customers \nregarding plant expansions and new large loads\n• Economic Development / Large Account Management / Load Forecasting work together to \nidentify these new loads and determine impact on forecast\n• Focus has been on expansions that are >20 MW’s \n• The 4 additions that have been identified are expected to ramp up over the next 5 years\n• Work continues with customers regarding possible additions in the future"},{"page":63,"startToken":16060,"endToken":16084,"text":"4\nAdditions Detail\n§ Large Load Additions in MW’s (at “full load” expectations)\n§ For Comparison purposes:\n§ DEO Peaks ~ 4,300 MW’s\n§ DEK Peaks ~ 850 MW’s"},{"page":64,"startToken":16084,"endToken":16089,"text":"5\nWarehouse Facility Load Shape"},{"page":65,"startToken":16089,"endToken":16097,"text":"6\nFood Processing Load Shape\n \nFood Processing Facility"},{"page":66,"startToken":16097,"endToken":16102,"text":"7\nMetals / Steel Load Shape"},{"page":67,"startToken":16102,"endToken":16116,"text":"Duquesne Light Company 2024 Large Load Adjustment\nOctober 2024 Load Analysis Subcommittee Meeting\n1"},{"page":68,"startToken":16116,"endToken":16193,"text":"Large Load Adjustment Methodology\n• Customers seeking to interconnect new loads or increase their loading submit a request for service to \nDuquesne Light.\n• Duquesne Light analyzes requests for new service and develops estimates to interconnect the customer.\n• Duquesne Light updates its load forecast upon commitment from the customer to proceed with the \ninterconnection project. \n• Duquesne Light submits a load adjustment to PJM for any loads that may not be captured as part of \nPJM’s load forecasting efforts.\n2"},{"page":69,"startToken":16193,"endToken":16234,"text":"Requested Adjustment \n3\n• Duquesne Light is requesting a 20 MW load increase for years 2026-2035.\n−The load increase is for a construction project that is expected to last approximately ten years.\n−The load is forecasted to be a constant 20 MW."},{"page":70,"startToken":16234,"endToken":16234,"text":""},{"page":71,"startToken":16234,"endToken":16246,"text":"October 25, 2024\n2025 Large Load Adjustment \nProposal - Exelon\nExelon Load Forecasting"},{"page":72,"startToken":16246,"endToken":16274,"text":"Agenda\n• Exelon Load Forecasting and Large Load Adjustment process summary (Slide 3)\n• ComEd Data Center Landscape (Slide 4)\n• Large Load Adjustment Assumptions and Forecast Overview (Slide 5)\n2"},{"page":73,"startToken":16274,"endToken":16450,"text":"• Exelon’s Load Forecasting team covers the BGE, ComEd, Peco, ACE, DPL, and PEPCO zones \n• Forecasts are derived from industry standard econometric models and techniques incorporating standard drivers of load\n• Load forecasts have traditionally not included discrete data centers/large load adjustment given steady historical growth\n• Recent rapid growth in in-service customers and growth in new projects (number of requests and request size) drove \ndiscrete adjustments to recent internal forecast\n• Exelon’s forecast data considered in-service data centers (BGE, ComEd), new confirmed data center projects (BGE, \nComEd, PECO) and electric vehicle battery manufacturing (ComEd)\nExelon Load Forecasting Process and Overview\nExelon Load Forecasting and Large Load Adjustment Overview\nKey Teams\n•\nEconomic Development \n•\nTransmission Planning\n•\nLoad Forecasting\nKey Data\n•\nIn-service billed demand\n•\nCapacity requests and ramp \nschedules for new projects\nKey Steps\n•\n2024 PJM Load Report “deep dive”\n•\nLeverage internal best practices\n•\nIncorporate historical data as guide\nKey Result\n•\nForecast assumptions exclude less \ncertain projects\n•\nHistorical trend and economic data \nanalysis\n•\nLoad driver growth evaluation\n•\nM-3 status\nLarge Load Intelligence Gathering\nForecast Assumptions Development\nLarge Load Forecast Evaluations\n3"},{"page":74,"startToken":16450,"endToken":16492,"text":"-\n 100\n 200\n 300\n 400\n 500\n 600\n2015\n2016\n2017\n2018\n2019\n2020\n2021\n2022\n2023\n2024\n(YTD Aug)\nMW\n~9% CAGR\n~20% CAGR\nSignificant but stable growth in data centers historically; recent data highlights emergent growth \ntrends\nComEd Data Center Landscape\n4"},{"page":75,"startToken":16492,"endToken":16670,"text":"• Forecast Criteria: Threshold/requirement for including data center/high-density load projects in load forecast and \nadjustment proposal\n• Forecast includes projects with signed engineering agreements/financial deposits\n• M-3 Status: All transmission projects were submitted through local plan or are anticipated to be submitted by year end\n• Ramp Assumption: incremental load increases to final capacity\n• 8-year ramp new projects from in-service date based on historical experience with large load customer ramps \n• Utilization Rate Assumption: % of requested customer capacity assumed to be realized after ramp period\n• Varies by zone reflecting project specific detail \nKey Forecast Criteria/Assumptions\nLarge Load Adjustment Assumptions and Forecast\nLarge Load Forecast Adjustment Overview\n2029 Load Forecast (2.6 GW)*\n•\nBGE: 0.1 GW\n•\nComEd: 2.2 GW\n•\nPECO: 0.2 GW\nCapacity Requests (8 GW)*\n•\nBGE: 0.5 GW\n•\nComEd: 7.0 GW\n•\nPECO: 0.4 GW\nLarge Load Forecast Request Adjustment of 2.6 GW in 2029\nKey Assumptions\n•\nRamp\n•\nUtilization Rate\n* Includes in-service and new projects meeting forecast criteria; amounts may not sum due to rounding\n* 2029 load forecast adjustment represents year-end GW\n5"},{"page":76,"startToken":16670,"endToken":16672,"text":"Thank you"},{"page":77,"startToken":16672,"endToken":16672,"text":""},{"page":78,"startToken":16672,"endToken":16688,"text":"Large Load Adjustment 2024\nPresented by E. B. Stein\n10/25/2024\nATSI and APS Zones*"},{"page":79,"startToken":16688,"endToken":16700,"text":"Approach\n \n10/25/2024\nLoad Analysis Subcommittee\n2\nLarge Load Adjustment 2024"},{"page":80,"startToken":16700,"endToken":16855,"text":"Process\n■*ATSI and APS Zones only\n– Other FE zones do not have load increases requiring a Large Load Adjustment disclosure at this time\n■Begin with weather normalized peak forecast\n– Based on historical data for FE Electric Companies\n– Use forecast peak data where provided by Municipalities and Cooperatives\n– Effects of economic and societal behavioral changes captured here (for FE electric companies)\n– EV Growth, Electrification, Industrial Output, Customer changes, Energy Efficiency, Distributed Energy \nResources, Etc.\n■Customer interconnection requests are an independent addition to the forecast\n– These become PJM Large Load Adjustments\n– Introduced a scoring system to reduce subjectivity of including in the forecast\n– Based on a series of questions describing where in process project is\n– Score greater than or equal to 5 is included in PJM LLA submittal\n■Continuous Improvement\n– FE has a committed forecasting operation empowered to keep step with industry trends and requirements\n– FERC Order 1920, State requirements \n10/25/2024\nLoad Analysis Subcommittee\n3"},{"page":81,"startToken":16855,"endToken":16867,"text":"ATSI\n \n10/25/2024\nLoad Analysis Subcommittee\n4\nLarge Load Adjustment 2024"},{"page":82,"startToken":16867,"endToken":16931,"text":"ATSI Zone Quick Information\n■The ATSI Zone covers two states – Ohio and Pennsylvania\n■The FirstEnergy Electric Companies\n– Ohio Edison\n– Toledo Edison\n– Cleveland Electric Illuminating Company\n– FE Pennsylvania Electric Company (Penn Power District only)\n– Total retail customers: Roughly 2.2 Million\n■Several Municipalities and Cooperatives are served through the following:\n– American Municipal Power\n– Buckeye Power\n– Cleveland Public Power\n10/25/2024\nLoad Analysis Subcommittee\n5"},{"page":83,"startToken":16931,"endToken":16944,"text":"ATSI Zone Large Load Adjustment Summary\n10/25/2024\nLoad Analysis Subcommittee\n6"},{"page":84,"startToken":16944,"endToken":16960,"text":"ATSI Zone – Summer Peak MW\n10/25/2024\nLoad Analysis Subcommittee\n7\nW/N = Weather Normalized"},{"page":85,"startToken":16960,"endToken":16972,"text":"APS\n \n10/25/2024\nLoad Analysis Subcommittee\n8\nLarge Load Adjustment 2024"},{"page":86,"startToken":16972,"endToken":17052,"text":"APS Zone Quick Information\n■The APS Zone covers four states –Pennsylvania, Maryland, Virginia and West Virginia\n■The FirstEnergy Electric Companies\n– Monongahela Power\n– Potomac Edison (WV & MD)\n– FE Pennsylvania Electric Company (West Penn Power District only)\n– Total retail customers: Roughly 1.5 Million\n■Several Municipalities and Cooperatives are served through the following:\n– Old Dominion Electric Cooperative (VA)\n– Front Royal\n– Chambersburg\n– Letterkenney\n– Mont Alto\n– Tarentum\n– Hagerstown\n– Thurmont\n10/25/2024\nLoad Analysis Subcommittee\n9\n– Williamsport\n– HREA\n– New Martinsville\n– Philippi\n– Allegheny Electric \nCooperative"},{"page":87,"startToken":17052,"endToken":17065,"text":"APS Zone Large Load Adjustment Summary\n10/25/2024\nLoad Analysis Subcommittee\n10"},{"page":88,"startToken":17065,"endToken":17081,"text":"APS Zone – Summer Peak MW\n10/25/2024\nLoad Analysis Subcommittee\n11\nW/N = Weather Normalized"},{"page":89,"startToken":17081,"endToken":17092,"text":"10/25/2024\nLoad Analysis Subcommittee\n12\nLarge Load Adjustment 2024"},{"page":90,"startToken":17092,"endToken":17104,"text":"NOVEC Data Center Load Forecast\nPJM Load Analysis Subcommittee \nOctober 25, 2024"},{"page":91,"startToken":17104,"endToken":17180,"text":"• NOVEC has requested that PJM incorporates an adjustment in the \nupcoming 2025 PJM Load Forecast to reflect data center growth in NOVEC \nservice territory\n• NOVEC 2024 Data Center Forecast Timeline:\n✓Aug 1: \nForecast Finalized\n✓Aug 2: \nDistributed internally \n✓Sep 2: \nSubmitted to Dominion Energy Transmission Planning\n✓Sep 9: \nSubmitted to PJM Load Analysis Team\n✓Sep-Oct: Responded to inquiries from PJM staff\n❑Oct 25: Present at PJM LAS\n❑Nov-Dec: Prepare written document for PJM Load Forecast\nOverview"},{"page":92,"startToken":17180,"endToken":17255,"text":"• Goal: Present on NOVEC’s load forecast adjustment request as required by \nPJM Manual 19 Attachment B\n• Agenda:\n• Brief background on NOVEC\n• Data center activity in Northern Virginia\n• NOVEC’s forecasting methodology\n• NOVEC 2024 Data Center Load Forecast\n• Comparison of 2024 vs 2023 forecasts\n• Q&A\n• Key takeaways:\n• NOVEC has a sound, defensible process for producing data center load forecasts\n• NOVEC’s data center forecast should be incorporated as an adjustment in the 2025 \nPJM Load Forecast\nAgenda"},{"page":93,"startToken":17255,"endToken":17301,"text":"About NOVEC\n• NOVEC: Northern Virginia Electric \nCooperative\n• Largest US electric distribution \ncooperative by KWH sales\n• Service Territory: 651 square miles of \nprimarily suburban/exurban\n• Customer Mix: residential, small \ncommercial, critical government facilities, \ndata centers, and other large power\n• Meters: Approx. 180,000 (~275 per \nsquare mile)"},{"page":94,"startToken":17301,"endToken":17337,"text":"NOVEC Data Centers\n• NOVEC serves 50+ data centers \nwith approx. load of 1000 MW\n• Contribution:\n• Energy: 64% (Oct. 23-Sep. 24)\n• Summer Peak: 51% (Jul. 24) \n• Winter Peak: 51% (Jan. 24)\n• Key hotspots: Loudoun and Prince \nWilliam"},{"page":95,"startToken":17337,"endToken":17343,"text":"Rapid Load Growth for NOVEC\n6"},{"page":96,"startToken":17343,"endToken":17373,"text":"• Key terms:\n• Contracted capacity – nameplate capacity of the building’s electric service\n• Metered demand – building’s actual usage\n• Utilization rate – metered demand as a percentage of contracted capacity\nData Center 101\n7"},{"page":97,"startToken":17373,"endToken":17430,"text":"Data Center Developments\n20 \nMVA\n40 \nMVA\n40 MVA\n40 MVA\n100 \nMVA\n100 \nMVA\n100 \nMVA\nSUB\nSUB\n100 \nMVA\n100 \nMVA\n100 \nMVA\nSUB\n100 \nMVA\n100 \nMVA\n100 \nMVA\nSUB\n100 \nMVA\n100 \nMVA\n100 \nMVA\nBuilding\nCampus\n70 \nMVA\n70 MVA\n70 MVA\nSUB\n70 \nMVA\nCampus + Dedicated \nSubstation\nMega-Campus + Multiple \nDedicated Substations"},{"page":98,"startToken":17430,"endToken":17482,"text":"• Two phases:\n1. Ramping – load increases over time while building is filled out\n2. Maturity – building is fully constructed, load remains relatively stable over time\n• Key features:\n• Daily/weekly/annual seasonal patterns\n• Weather sensitivity (cooling only)\n• Very high load factor\n• Heterogeneity: every customer, campus, and building is unique\nData Center Load Profile"},{"page":99,"startToken":17482,"endToken":17525,"text":"• NOVEC utilizes a bottom-up forecasting approach for data centers\n• Forecast load on individual buildings\n• Aggregate building loads to campus, substation, region, system\n• Phase one: identify all data centers in NOVEC service territory\n• Phase two: produce metered load forecast for each building\nMethodology Overview"},{"page":100,"startToken":17525,"endToken":17571,"text":"• NOVEC identifies all current and upcoming data center projects within our \nservice territory\n• Includes: active, under construction, or planned projects highly likely to be \nsuccessfully developed\n• NOVEC’s analysis includes:\n• Collecting a detailed site plan\n• Identifying the electric infrastructure that will serve each project\nPhase one: Planning"},{"page":101,"startToken":17571,"endToken":17644,"text":"• NOVEC generates a metered load forecast for each building identified in the \nplanning phase\n• Econometric models were developed and are used by NOVEC staff to \npredict building-level utilization rates (metered demand/contracted \ncapacity) conditional on:\n• Calendar factors (day of week/day of year)\n• Weather factors (cooling degree days)\n• Past behavior at the customer, campus, and/or building-level when available\n• Building-level forecasts are aggregated to \ncampus/substation/region/system as needed\nPhase two: Forecasting"},{"page":102,"startToken":17644,"endToken":17688,"text":"• Forecast generated August 2024\n• Incorporates projects identified and vetted through 2024-07-31\n• Econometric models estimated with metered load data through 2024-07-31\n• NOVEC requests PJM incorporate this forecast as an adjustment to the \nupcoming 2025 PJM Load Forecast\nNOVEC Data Center Forecast\nAugust 2024 Forecast Vintage"},{"page":103,"startToken":17688,"endToken":17813,"text":"Actual\nForecast\nJul \n2020\nJul \n2021\nJul \n2022\nJul \n2023\nJul \n2024\nJul \n2025\nJul \n2026\nJul \n2027\nJul \n2028\nJul \n2029\nData Centers (#)\n29\n33\n37\n47\n55\n74\n97\n118\n138\n167\nYr-Yr Change\n5\n4\n4\n10\n8\n19\n23\n21\n20\n29\nContracted \nCapacity (MVA)\n866\n1,131\n1,380\n1,794\n2,347\n3,513\n5,153\n6,784\n8,266\n10,927\nYr-Yr Change\n230\n265\n249\n414\n553\n1,166\n1,640\n1,631\n1,482\n2,661\nCoincident Peak \nLoad (MW)\n298\n432\n545\n808\n1,049\n1,408\n2,204\n3,170\n4,480\n5,861\nYr-Yr Change\n55\n134\n113\n263\n241\n359\n796\n966\n1,310\n1,381\nNear-term Forecast \nAugust 2024 Forecast Vintage"},{"page":104,"startToken":17813,"endToken":17819,"text":"Long-term Forecast \nAugust 2024 Forecast Vintage"},{"page":105,"startToken":17819,"endToken":17874,"text":"• Updates for the 2024 Forecast:\n1. New projects added\n• Net impact: substantial increase in long-term contracted capacity/peak load levels\n2. Updates to existing project timelines\n• Net impact: modest reduction in near-term growth\n3. Re-trained load models with latest metered load readings\n• Net impact: negligible change in projected utilization rates\nForecast Updates: 2023 vs 2024"},{"page":106,"startToken":17874,"endToken":17879,"text":"Forecast Updates: 2023 vs 2024"},{"page":107,"startToken":17879,"endToken":17959,"text":"• Goal: Present on NOVEC’s load forecast adjustment request as required by \nPJM Manual 19 Attachment B\n• Key takeaways:\n• NOVEC has a sound, defensible process for producing data center load forecasts\n• NOVEC’s data center forecast should be incorporated as an adjustment in the 2025 \nPJM Load Forecast\n• NOVEC Forecast Adjustment Timeline:\n✓Sep 9: \n Submitted to PJM Load Analysis Team\n✓Sep-Oct:  Responded to inquiries from PJM staff\n✓Oct 25:  Present at PJM LAS\n❑Nov-Dec: Prepare written document for PJM Load Forecast\nSummary"},{"page":108,"startToken":17959,"endToken":17973,"text":"ODEC Large Load \nAdjustments\nBrandon Newbill – Senior Manager, Power Supply Planning\nOctober 25, 2024"},{"page":109,"startToken":17973,"endToken":18008,"text":"About ODEC\nOld Dominion Electric Cooperative is a member-owned, \nnot-for-profit wholesale generation and transmission electric cooperative. \nODEC supplies power for 11 not-for-profit retail distribution cooperatives \nin Virginia, Maryland and Delaware, serving 1.5 million people."},{"page":110,"startToken":18008,"endToken":18012,"text":"ODEC’s Membership Territories\n3"},{"page":111,"startToken":18012,"endToken":18018,"text":"ODEC Historical \nData Center Load\n4"},{"page":112,"startToken":18018,"endToken":18230,"text":"Historical Data Center Load - Demand (MW)\n5\n -\n 100\n 200\n 300\n 400\n 500\n 600\n 700\n 800\n 900\n 1,000\n1/1/2022\n3/1/2022\n5/1/2022\n7/1/2022\n9/1/2022\n11/1/2022\n1/1/2023\n3/1/2023\n5/1/2023\n7/1/2023\n9/1/2023\n11/1/2023\n1/1/2024\n3/1/2024\n5/1/2024\n7/1/2024\n9/1/2024\n11/1/2024\n1/1/2025\n3/1/2025\n5/1/2025\n7/1/2025\n9/1/2025\n11/1/2025\n1/1/2026\n3/1/2026\n5/1/2026\n7/1/2026\n9/1/2026\n11/1/2026\n1/1/2027\n3/1/2027\n5/1/2027\n7/1/2027\n9/1/2027\n11/1/2027\n1/1/2028\n3/1/2028\n5/1/2028\n7/1/2028\n9/1/2028\n11/1/2028\n1/1/2029\n3/1/2029\n5/1/2029\n7/1/2029\n9/1/2029\n11/1/2029\n1/1/2030\n3/1/2030\n5/1/2030\n7/1/2030\n9/1/2030\n11/1/2030\nMW\nData Center Complex\nForecasted Peak vs. Actual Peak by Month\nForecasted\nActual\n2022 average = 125% actual vs. forecast\n2023 average = 118% actual vs. forecast\n2024 average = 81% actual vs. forecast (YTD)"},{"page":113,"startToken":18230,"endToken":18425,"text":"Historical Data Center Load - Energy (MWh)\n6\n -\n 100,000\n 200,000\n 300,000\n 400,000\n 500,000\n 600,000\n1/1/2022\n3/1/2022\n5/1/2022\n7/1/2022\n9/1/2022\n11/1/2022\n1/1/2023\n3/1/2023\n5/1/2023\n7/1/2023\n9/1/2023\n11/1/2023\n1/1/2024\n3/1/2024\n5/1/2024\n7/1/2024\n9/1/2024\n11/1/2024\n1/1/2025\n3/1/2025\n5/1/2025\n7/1/2025\n9/1/2025\n11/1/2025\n1/1/2026\n3/1/2026\n5/1/2026\n7/1/2026\n9/1/2026\n11/1/2026\n1/1/2027\n3/1/2027\n5/1/2027\n7/1/2027\n9/1/2027\n11/1/2027\n1/1/2028\n3/1/2028\n5/1/2028\n7/1/2028\n9/1/2028\n11/1/2028\n1/1/2029\n3/1/2029\n5/1/2029\n7/1/2029\n9/1/2029\n11/1/2029\n1/1/2030\n3/1/2030\n5/1/2030\n7/1/2030\n9/1/2030\n11/1/2030\nEnergy (MWh)\nData Center Complex\nForecasted Load vs. Actual Load by Month\nForecasted\nActual"},{"page":114,"startToken":18425,"endToken":18430,"text":"ODEC Large Load Forecast\n7"},{"page":115,"startToken":18430,"endToken":18487,"text":"ODEC Large Load Forecast (3,212 MWs) – Project Status\n8\n -\n 500\n 1,000\n 1,500\n 2,000\n 2,500\n 3,000\n 3,500\n2024\n2025\n2026\n2027\n2028\n2029\n2030\n2031\n2032\n2033\n2034\n2035\n2036\n2037\n2038\n2039\n2040\n2041\n2042\n2043\n2044\n2045\nLoad (MW)\nODEC Large Load Forecast - Project Status\nIn-Service\nConstruction\nDesign\nStudy"},{"page":116,"startToken":18487,"endToken":18545,"text":"ODEC Large Load Forecast – Type of Data Center\n9\n -\n 500\n 1,000\n 1,500\n 2,000\n 2,500\n 3,000\n 3,500\n2024\n2025\n2026\n2027\n2028\n2029\n2030\n2031\n2032\n2033\n2034\n2035\n2036\n2037\n2038\n2039\n2040\n2041\n2042\n2043\n2044\n2045\nLoad (MW)\nODEC Large Load Forecast - Type of Data Center\nHyperscale\nCo-Locator\nTBD - Developer"},{"page":117,"startToken":18545,"endToken":18619,"text":"ODEC Large Load Forecast – Contract Agreements\n10\n -\n 500\n 1,000\n 1,500\n 2,000\n 2,500\n 3,000\n 3,500\n2025\n2026\n2027\n2028\n2029\n2030\n2031\n2032\n2033\n2034\n2035\n2036\n2037\n2038\n2039\n2040\n2041\n2042\n2043\n2044\n2045\nLoad (MW)\nODEC Large Load Forecast - Contracts in Place\nLOA + ED&C + ESA\nLOA + ED&C\nLOA Only\nLOA = Letter of Agreement\nED&C = Engineering, Design, and Construction (Procurement)\nESA = Electric Service Agreement"},{"page":118,"startToken":18619,"endToken":18625,"text":"ODEC Large Load Forecast\nMethodology\n11"},{"page":119,"startToken":18625,"endToken":18803,"text":"ODEC Large Load Forecast Methodology\n1.\nODEC reviews delivery point load requests monthly \n2.\nTo prepare for the annual PJM large load adjustment submission, ODEC meets with its \nmember distribution cooperatives to review each individual delivery point request to discuss \nproject specifics\n▪Determine financial commitments made by the end use customer\n▪Identify contracts that are in place\n▪Discuss other quantitative/qualitative factors to forecast the likelihood of the project\n3.\nUsing the information identified in step 2, ODEC selects the projects to include in the \nsubmission to PJM\n▪30% (~950 MW) of ODEC’s total submission are projects currently in-service or under \nconstruction \n▪Additional projects were included that met the qualifications outlined in PJM Manual 19b\n▪ODEC’s submission to PJM represents approximately 25% (in terms of MWs) of the delivery \npoint requests already submitted or are anticipated to be submitted soon\n4.\nODEC uses the load ramp provided by the member (by way of the end use customer) and \nassumes monthly smoothing\n5.\nODEC meets with member cooperatives and TOs to verify that projects are not double counted \n12"},{"page":120,"startToken":18803,"endToken":18820,"text":"1\nPPL Service Territory\nData Center Load Growth\nPJM Load Analysis Subcommittee\nOctober 25, 2024\nGeorge Khoury"},{"page":121,"startToken":18820,"endToken":18900,"text":"2\nCompany Profile \nPPL Electric Utilities\n•\nHeadquartered in \nAllentown, PA\n•\nServes 1.5 million \ncustomers in 29 \nPennsylvania counties\n•\nOperates 50,000 miles of \npower lines\nLouisville Gas and Electric \nand Kentucky Utilities\n•\nHeadquartered in \nLouisville, KY\n•\nServes 1.3 million customers \nin almost 100 counties \nacross Kentucky and Virginia\n•\nMore than 8,000 megawatts \nof generation capacity\nRhode Island Energy\n•\nHeadquartered in \nProvidence, RI\n•\nServes 770,000 \ncustomers across RI\n•\nOver 9,000 miles of \npower and gas lines"},{"page":122,"startToken":18900,"endToken":19016,"text":"3\nCompany Profile\n• More than 6,700 employees\n• Serve more than 3.5 million customers in the U.S. \n• Operate and maintain over 90,000 miles of electric and gas lines \n• 36 billion kilowatt-hours of electricity delivered in 2021 (LG&E and KU and PPL EU)\n• PPL’s service area in Pennsylvania and Kentucky covers nearly 20,000 square miles\n• Over the past decade, we have invested more than $20 billion in new infrastructure and technology to \ncreate a smarter, more reliable and resilient energy grid.\n• Thanks to our investments in smart grid technology, >1M outages avoided since 2015\n• Company goal to reach net-zero carbon emissions by 2050\n• Consistently recognized as an industry leader in customer satisfaction"},{"page":123,"startToken":19016,"endToken":19022,"text":"4\nPPL Historical and Forecasted Loads"},{"page":124,"startToken":19022,"endToken":19075,"text":"5\nPPL Interconnection Process\nINITIAL STUDY\nSIGNED \nAGREEMENT\nDEVELOPMENT \nPHASE\nCONSTRUCTION\n•\nSince Aug 2023, PPL has received over 35,000 MW of large load interconnection requests\n•\nApproximately 20% of the requested load developed into a Signed Agreement.\n•\nAll Signed Agreements are presented at the TEAC as soon as the contractual agreement was completed."},{"page":125,"startToken":19075,"endToken":19196,"text":"6\nMethodology & Process\n• To ensure an accurate representation of datacenter load within PPL territory, only \nthose with a Signed Agreement are typically included in the Load Forecast.\n• Majority of the requested loads with a Signed Agreement have been presented at the \nprevious TEAC meetings.\n• The solutions presented for the requested loads ensure the ability to meet the load \nramp schedule and to reuse or uprate the facilities based on additional loads being \nadded to the area.\n• It is our goal to have accurate and realistic load projections that reflect the locations \nof the load and high probability of execution.\n• PPL continues to engage with PJM to ensure that all our customers have sufficient \ncapacity to meet their energy and reliability needs."},{"page":126,"startToken":19196,"endToken":19224,"text":"7\nLoad Ramp Schedule\n0\n1000\n2000\n3000\n4000\n5000\n6000\n7000\n8000\n9000\n2025\n2026\n2027\n2028\n2029\n2030\n2031\n2032-2045\nCumulative Load (MW)\nYear\nLoad Ramp"},{"page":127,"startToken":19224,"endToken":19250,"text":"8\nGeorge Khoury -  Transmission Planning\nLGKhoury@pplweb.com\nSean Zimmerman – Load and Settlement Specialist \nSZimmerman@pplweb.com\nColleen Kester – Interconnection Affairs\nCKester@pplweb.com\nContact Information"},{"page":128,"startToken":19250,"endToken":19266,"text":"PSE&G Load Forecast \nAdjustment Request\n10/25/2024\nPresentation for the PJM Load Analysis Subcommittee"},{"page":129,"startToken":19266,"endToken":19377,"text":"2 2\n2025 Load Adjustment request\nPSE&G Requests Adjustment to the \n2025 PJM Load Forecast for PS Zone\n\nAn accurate load forecast is crucial to ensuring grid reliability in the near-term and long-term.\n\nPSE&G requests adjustments to PJM’s 2025 load forecast to improve the accuracy of the \nload forecast.\n\nPJM’s forecast must reflect evolving energy demand trends driven by New Jersey data \ncenters growth and ports electrification/expansion.\nData Center Load Growth: Significant increases are being experienced due to \nexpansion of the existing data centers, new data center load requests, and the \nfeasibility study requests. \nPort Electrification: Major projects to electrify operations at ports will drive new \nenergy demands."},{"page":130,"startToken":19377,"endToken":19514,"text":"3 3\n2025 Load Adjustment request\nData Centers Load Forecast\nPSE&G currently has 39 data center sites with a summer peak demand of 343MW.\nData centers are significant users of on-peak electricity, since they are more energy intensive \nthan the average commercial activity, data centers are not captured by the PJM econometric \nbased load forecast model framework.  \nExpansions of existing data centers, new data center load requests, and feasibility study \nrequests from data center customers, are driving an increase in load forecast. \nFor each new load and feasibility study request, PSE&G assessed a likelihood percentage \n(confidence level: 0% to 100%) using the factors below:  \nThis approach factors in the likelihood of realization of Data Center projects.\no\nCustomer readiness                     \no\nConstruction complexity\no\nEquipment lead time / availability \no\nSite control\no\nOverall customer commitment, etc."},{"page":131,"startToken":19514,"endToken":19641,"text":"4 4\nExisting and Projected Data Center Load \n2025 Load Adjustment request\nPSE&G developed a 20-year forecast through 2045 comprised of:\n\nExpansion and New Data Center load requests: At various stages of completion. The analysis assumes an \naverage completion likelihood of 95% for new data centers.\n\nFeasibility Study requests: Assumes an average completion likelihood of 40%.\n\nEstimate: An extrapolation of continued Data Center growth from 2035-2045.\nExisting  \n(MW)\nExpansions of \nExisting (MW)\nNew Load \nRequests \n(MW)\nFeasibility \nStudy Requests  \n(MW)\n Estimate \n(MW)\nTotal \n(MW)\n2024\n343\n343\n2025\n343\n29\n10\n8\n390\n2026\n343\n65\n70\n78\n556\n2030\n343\n145\n330\n377\n1196\n2035\n343\n168\n330\n456\n39\n1337\n2040\n343\n168\n330\n456\n143\n1441\n2045\n343\n168\n330\n456\n247\n1545"},{"page":132,"startToken":19641,"endToken":19799,"text":"5 5\nPort Electrification\n2025 Load Adjustment request\nThe Clean Ports Program in the Inflation Reduction Act includes $3 billion in funding to plan, \npurchase or install zero-emission port equipment or technology at the nation’s ports1. The \nelectrification of ports is seen as a key way to reduce air pollutants and address public \nhealth and environmental impacts on surrounding communities.\n\nThe Port Authority of New York and New Jersey (PANYNJ) has begun planning to electrify \nthe Ports of Newark, Elizabeth and Bayonne to achieve the goal of net zero carbon \nemissions by 20502.\n\nThis load increase is not captured by the PJM Load Forecasting Model’s economic drivers.\n1: United States Environmental Protection Agency, “Clean Ports Program”, https://www.epa.gov/inflation-reduction-act/clean-ports-program\n2: Squires, Anna,” NREL Leads the Charge to Electric Trucks at Port of New York and New Jersey”, National Renewable Energy Laboratory, January 30, 2023\n3: Includes requests from South Jersey Port in Camden, NJ \n3"},{"page":133,"startToken":19799,"endToken":19802,"text":"6\nyou\nThank"},{"page":134,"startToken":19802,"endToken":19811,"text":"Rappahannock Electric \nCooperative (REC)\n2024 Data Center Forecast\n1"},{"page":135,"startToken":19811,"endToken":19879,"text":"Modeling Methodology\nConsiderations:\n•\nThere is no currently no metered data center load in REC’s service territory\n•\nREC requested Dominion Energy Virginia’s assistance with the forecast\n•\nThe forecast does not assume continued growth in the long-term given the \nnewness of the market.  This assumption will be revisited annually.\nModeling Process:\n•\nModeled demand curve based on Dominion’s aggregate load shape.\n•\nApplied REC and customer provided information to validate curve.\n2"},{"page":136,"startToken":19879,"endToken":19965,"text":"3\n0\n61\n169\n300\n454\n631\n830\n1,052\n1,297\n1,564\n1,854\n2,167\n2,502\n2,762\n2,963\n3,119\n3,240 3,333 3,333 3,333 3,333 3,333\n0\n500\n1,000\n1,500\n2,000\n2,500\n3,000\n3,500\n4,000\n2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045\nBilling Demand (MW)\nRappahannock Electric Cooperative\n2024 Data Center Forecast"},{"page":137,"startToken":19965,"endToken":19967,"text":"Questions?\n4"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":5,"startToken":0,"endToken":24},{"p":2,"at":5,"title":"Table of Contents","method":"printed heading","endPage":2,"endAt":172,"startToken":24,"endToken":30},{"p":2,"at":172,"title":"II. PJM’s OATT, the Amended and Restated Operating Agreement of PJM, and the Reliability","method":"printed heading","endPage":2,"endAt":483,"startToken":30,"endToken":62},{"p":2,"at":483,"title":"A. PJM’s Existing Study Processes to Identify and Allocate Costs for Transmission","method":"printed heading","endPage":2,"endAt":1154,"startToken":62,"endToken":133},{"p":2,"at":1154,"title":"B. The Load Forecasting Provisions in PJM’s Practice Manual 19 Lack Controls and","method":"printed heading","endPage":2,"endAt":1954,"startToken":133,"endToken":213},{"p":2,"at":1954,"title":"III. Any Replacement Rate that Enables Co-location Arrangements Involving the Use of","method":"printed heading","endPage":2,"endAt":2263,"startToken":213,"endToken":244},{"p":2,"at":2263,"title":"A. Co-Location Arrangements Must Pay for the Transmission and Ancillary Services from","method":"printed heading","endPage":2,"endAt":2488,"startToken":244,"endToken":260},{"p":2,"at":2488,"title":"B. The Commission Must Ensure that Co-Location Arrangements With Existing Capacity","method":"printed heading","endPage":2,"endAt":2675,"startToken":260,"endToken":282},{"p":2,"at":2675,"title":"C. Co-Location Arrangements Should Not Receive Preferential Interconnection","method":"printed heading","endPage":2,"endAt":2902,"startToken":282,"endToken":292},{"p":2,"at":2902,"title":"D. The Commission Must Ensure that PJM Conducts Rigorous Reliability Review of Co-","method":"printed heading","endPage":2,"endAt":3121,"startToken":292,"endToken":308},{"p":2,"at":3121,"title":"E. The Commission Should Fix its Market Power Mitigation Rules to Address the Increased","method":"printed heading","endPage":2,"endAt":3422,"startToken":308,"endToken":341},{"p":2,"at":3422,"title":"IV. Consistent with Precedent, The Commission Should Assert Jurisdiction over Co-Location","method":"printed heading","endPage":3,"endAt":5,"startToken":341,"endToken":359},{"p":3,"at":5,"title":"A. The Commission Must Not Disclaim Jurisdiction Over Interconnection of","method":"printed heading","endPage":4,"endAt":779,"startToken":359,"endToken":526},{"p":4,"at":779,"title":"I. Introduction","method":"printed heading","endPage":7,"endAt":1735,"startToken":526,"endToken":1571},{"p":7,"at":1735,"title":"II. PJM’s OATT, the Amended and Restated Operating Agreement of PJM, and the","method":"printed heading","endPage":8,"endAt":531,"startToken":1571,"endToken":1707},{"p":8,"at":531,"title":"A. PJM’s Existing Study Processes to Identify and Allocate Costs for","method":"printed heading","endPage":15,"endAt":787,"startToken":1707,"endToken":4139},{"p":15,"at":787,"title":"B. The Load Forecasting Provisions in PJM’s Practice Manual 19 Lack","method":"printed heading","endPage":24,"endAt":318,"startToken":4139,"endToken":7193},{"p":24,"at":318,"title":"III. Any Replacement Rate that Enables Co-location Arrangements Involving the Use","method":"printed heading","endPage":25,"endAt":222,"startToken":7193,"endToken":7512},{"p":25,"at":222,"title":"A. Co-Location Arrangements Must Pay for the Transmission and Ancillary","method":"printed heading","endPage":26,"endAt":1492,"startToken":7512,"endToken":8043},{"p":26,"at":1492,"title":"B. The Commission Must Ensure that Co-Location Arrangements With","method":"printed heading","endPage":28,"endAt":599,"startToken":8043,"endToken":8581},{"p":28,"at":599,"title":"C. Co-Location Arrangements Should Not Receive Preferential","method":"printed heading","endPage":30,"endAt":607,"startToken":8581,"endToken":9353},{"p":30,"at":607,"title":"D. The Commission Must Ensure that PJM Conducts Rigorous Reliability","method":"printed heading","endPage":32,"endAt":837,"startToken":9353,"endToken":10081},{"p":32,"at":837,"title":"E. The Commission Should Fix its Market Power Mitigation Rules to","method":"printed heading","endPage":34,"endAt":6,"startToken":10081,"endToken":10612},{"p":34,"at":6,"title":"IV. Consistent with Precedent, The Commission Should Assert Jurisdiction over Co-","method":"printed heading","endPage":34,"endAt":708,"startToken":10612,"endToken":10708},{"p":34,"at":708,"title":"A. The Commission Must Not Disclaim Jurisdiction Over Interconnection","method":"printed heading","endPage":37,"endAt":980,"startToken":10708,"endToken":12236},{"p":37,"at":980,"title":"B. The Commission Must Plan for Wholesale Sales at Co-Located Facilities.","method":"printed heading","endPage":40,"endAt":6,"startToken":12236,"endToken":13154},{"p":40,"at":6,"title":"C. PJM Must Not Limit States’ Authority Over the Co-Located Generation","method":"printed heading","endPage":40,"endAt":1084,"startToken":13154,"endToken":13308},{"p":40,"at":1084,"title":"D. The PJM Tariff Should Treat Co-Located Usage As Any Other","method":"printed heading","endPage":43,"endAt":191,"startToken":13308,"endToken":14332},{"p":43,"at":191,"title":"V. Conclusion","method":"printed heading","endPage":45,"endAt":6,"startToken":14332,"endToken":14712},{"p":45,"at":6,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":62,"endAt":2,"startToken":14712,"endToken":15983},{"p":62,"at":2,"title":"Summary","method":"printed heading","endPage":107,"endAt":522,"startToken":15983,"endToken":17958},{"p":107,"at":522,"title":"Summary","method":"printed heading","endPage":137,"endAt":12,"startToken":17958,"endToken":19967}]}