{"document":{"slug":"rec-20250423-5244","title":"Comments of Data Center Coalition","issued":"2025-04-23","accession":"20250423-5244","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Data Center Coalition","kind":"comments","file":"sources/filings/text/20250423-5244_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5244","tier":"record","sha256":"8597bb9646c5ca18a77f7f9476799673d66dab192948dca751c8de05342804cc","pages":15,"tokens":4335,"emptyPages":[],"textThemes":["colo","registry","flex","cost"]},"pages":[{"page":1,"startToken":0,"endToken":249,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n          )  \nDocket Nos. EL25-49-000 \n \n \n \n \n \n          )  \n \nLarge Loads Co-Located at Generating            )               Docket No. AD24-11-000 \nFacilities \n \n \n \n          )             \n \n \n \n \n \n          )                  \nConstellation Energy Generation, LLC           )  \nDocket No. EL 25-20-000 \n \n \n \n \n \n          )  \n(Consolidated) \n \nCOMMENTS OF THE DATA CENTER COALITION \nPursuant to Rule 211 of the Federal Energy Regulatory Commission’s (Commission) Rules of \nPractice and Procedure, 18 C.F.R. § 385.211, the Data Center Coalition (DCC), respectfully submits these \nformal comments in response to the Commission’s February 20, 2025 Order Instituting Proceeding under \nSection 206 of the Federal Power Act and Consolidating with Other Proceedings (Show Cause Order).1 \nI. \nCOMMUNICATIONS \nCorrespondence and communications regarding this filing should be directed to the following: \nAaron Tinjum  \n \n \n \nVice President, Energy \nData Center Coalition \n525-K East Market Street #253  \nLeesburg, VA 20176 \naaron@datacentercoalition.org  \n \nMorgan A. Johnson \nSenior Energy Policy Manager \nData Center Coalition \n525-K East Market Street #253  \nLeesburg, VA 20176  \nmorgan@datacentercoalition.org \nII. \nINTRODUCTION \nDCC submits these comments in response to the Commission’s consolidated show cause order in \nthe above-captioned dockets, which address the appropriate regulatory treatment of large loads—\nincluding data centers—that seek to co-locate with generation in the PJM footprint. This proceeding \narises at a pivotal moment for the nation’s energy grid and digital infrastructure, as regional grid operators \nface rising demand, constrained transmission capacity, increased local opposition to infrastructure \ndevelopment, and growing uncertainty around supply adequacy. \n \n1 PJM Interconnection, L.L.C., et al., 190 FERC ¶ 61,115 (2025)."},{"page":2,"startToken":249,"endToken":573,"text":"Data centers are foundational to the modern economy and digital society. They support essential \nservices across nearly every sector, including finance, healthcare, education, communications, \nmanufacturing, defense, and government. As the backbone of the nation’s digital infrastructure, data \ncenters host the computing platforms that power artificial intelligence and machine learning workloads, \ncybersecurity systems that protect critical institutions, and data processing capabilities relied upon by \nfederal agencies and national security entities. These facilities support real-time digital operations that are \nnow inseparable from the functioning of core public and private systems. \nIn recent years, energy demand has accelerated—driven by AI development, cloud computing, \nelectrification of buildings, industry and transportation, hydrogen fuel production, and the reshoring of \nU.S. advanced manufacturing. This has created a step change in electricity needs, particularly in regions \nlike PJM, where demand is outpacing outdated planning frameworks. Data center operators are \nresponding with urgency—but face growing constraints from generator interconnection delays, opaque \ninfrastructure planning, and limited transparency into available capacity. \nIn this context, co-location of load with generation—whether front-of-the-meter or behind-the-\nmeter—is a pragmatic, common, and commercially legitimate strategy to secure timely access to power as \nmarkets grapple with years-long interconnection queue backlogs. These arrangements provide critical \nflexibility and efficiency, enabling data center developers to meet emerging needs on faster timelines and \nwithout undue reliance on already-congested grid infrastructure. \nAt the same time, it is clear that the current regulatory focus on co-location stems less from the \nstructure of these arrangements themselves and more from broader system concerns—specifically, \nwhether there will be sufficient capacity to meet demand in the years ahead. In a more balanced resource \nenvironment, co-location would likely be viewed as a beneficial tool, not a policy concern. Indeed, co-\nlocation can reduce transmission congestion, avoid costly infrastructure buildouts, and enable the more \nefficient interconnection of new resources. But amid tightening margins, it has become a stand-in for \ndeeper anxiety about supply adequacy and planning accuracy."},{"page":3,"startToken":573,"endToken":1041,"text":"These underlying concerns deserve attention. Rather than restricting or reclassifying \ncommercially valuable arrangements like co-location, the Commission should focus on strengthening the \nplanning and forecasting tools that drive regional infrastructure decisions. Getting this right requires \nbetter visibility into both expected load growth and anticipated supply—and a regulatory framework that \nevolves with changing market dynamics. \nDCC strongly believes that this proceeding can and should be resolved through constructive, \ntimely dialogue among affected stakeholders. To that end, and consistent with the Commission’s \nlongstanding preference for settlement where feasible,2 DCC joins other parties in this proceeding seeking \nthat the Commission establish settlement judge procedures and stay these proceedings for a 90-day \nperiod.3 The requested process would facilitate focused, good faith negotiations under Commission \noversight, with the aim of achieving clarity, preserving reliability, and supporting just and reasonable \noutcomes for all parties. \nThe Commission now has the opportunity to modernize its approach in a manner that reinforces \nreliability, preserves commercial flexibility, and supports efficient investment. To assist in that effort, \nthese comments: (1) reaffirm DCC’s co-location principles previously submitted into the record;4 (2) \n \n2 See, e.g., Certification of Uncontested Settlements by Settlement Judges, Order No. 883, 179 FERC ¶ \n61,130, at P 2 (2022) (“The Commission has long recognized the importance of settlements among the participants \nto litigated proceedings as a tool to efficiently and expeditiously resolve those contested proceedings set for trial-\ntype evidentiary hearing, as well as other contested proceedings.” (footnote omitted)); Ariz. Pub. Serv. Co., 97 \nFERC ¶ 61,315, at 62,449 (2001) (“[I]t has been Commission policy to promote voluntary settlements as an \nimportant tool in the administration of our jurisdictional responsibilities.”); Tex. Gas Transmission Corp., 28 FERC \n¶ 61,372, at 61,665-66 (1984) (encouraging settlements, as they can play an important part in resolving issues \nwithout prolonged and contentious litigation); cf. Tex. E. Transmission Corp. v. FPC, 306 F.2d 345, 347-48 (5th Cir. \n1962) (“For Commission approved voluntary settlements are an important and desirable mechanism as the \nCommission undertakes the staggering burden of dealing with the ceaseless flow of the ever-more complicated \nproblems….Consequently settlements should be encouraged, not discouraged.” (footnotes omitted)). \n \n3 See, e.g., Joint Comments and Motion to Stay Proceedings and Request to Establish Settlement Judge \nProcedures of the Electric Power Supply Association, the PJM Power Providers Group, Calpine Corporation, \nCogentrix Energy Power Management, LLC, Constellation Energy Generation, LLC, and LS Power Development, \nLLC, Docket Nos. EL25-49-000, EL25-20-000, and AD24-11-000 (Apr. 22, 2025), Accession No. 20250422-5166 \n(requesting that the Commission find the PJM Tariff unjust and unreasonable, stay the consolidated proceedings, \nand initiate a 90-day settlement judge process to develop a replacement rate). \n4 Statement of Aaron Tinjum on Behalf of the Data Center Coalition, Docket No. AD24-11-000, at Panel 1 \n(Nov. 4, 2024), Accession No. 20241104-4011."},{"page":4,"startToken":1041,"endToken":1340,"text":"clarify the nature and benefits of co-located arrangements; (3) respond to stakeholder concerns raised in \nthis proceeding; and (4) offer targeted recommendations to improve forecasting, tariff clarity, and \nplanning alignment. \nTogether, these actions will help ensure that emerging load arrangements are addressed in a \nmanner that is fair, transparent, and aligned with the long-term public interest. \nII. REINFORCING DCC’S ESTABLISHED CO-LOCATION PRINCIPLES \nDCC has previously submitted testimony identifying six core principles that should guide the \nregulatory treatment of co-located load arrangements.5 These principles reflect the realities of current \nmarket conditions and the commercial, technical, and operational drivers behind co-location. As the \nCommission considers whether and how to clarify the application of open access and cost allocation rules \nto these arrangements, it is critical that any resulting framework remain consistent with the following \ntenets: \n● Preserving Open Access and Commercial Flexibility: \nLarge Loads, particularly data center operators, must retain the ability to pursue behind-the-meter \n(BTM) and other innovative configurations consistent with applicable rules and operational \nrequirements. Regulatory frameworks that eliminate or disincentivize these options will reduce \nmarket efficiency, delay investment, and risk distorting otherwise beneficial commercial \narrangements. \n \n● Ensuring Grid Reliability and Fair Cost Allocation: \nCo-location should be subject to appropriate grid impact assessments and planning oversight. \nWhere transmission or distribution upgrades are required to accommodate a co-located \narrangement, cost responsibility should be allocated to the parties that benefit—consistent with \ncost causation principles. Avoiding cost shifts to other customers is both feasible and necessary to \nmaintain confidence in these arrangements. \n \n● Maintaining Consistency with Prior Commission Guidance: \nCo-location arrangements are not new. Commission precedent supports flexibility in load-serving \narrangements and does not impose a single configuration or cost allocation methodology. DCC \nurges the Commission to reinforce that principle while allowing for further clarity where \noperational questions arise. \n \n \n5 Id at 4."},{"page":5,"startToken":1340,"endToken":1655,"text":"● Recognizing Co-location as a Legitimate Response to Infrastructure Constraints: \nThese arrangements are not a means of avoiding planning processes or cost responsibility. Rather, \nthey reflect the practical need for large new loads—such as data centers—to access power in a \ntimely manner amid system congestion and long interconnection timelines. That commercial \nmotivation should be acknowledged and appropriately integrated into regulatory expectations. \n \n● Aligning Regulatory Treatment with Grid and Market Realities: \nAs PJM and other regions experience rapid load growth and limited infrastructure headroom, \nenabling flexible, efficient service arrangements like co-location can help alleviate pressure on \nthe broader system. Regulatory approaches that support, rather than restrict, these configurations \nwill better serve both reliability and affordability objectives. \nDCC respectfully refers the Commission to its technical conference testimony6 for the full \narticulation of these principles, including additional discussion of community engagement, environmental \nconsiderations, and innovation. These principles are not theoretical—they are grounded in the real-world \noperational experience of data center developers, owners, and operators seeking to support digital \ninfrastructure while maintaining compliance with evolving grid requirements. \nAs this proceeding moves forward, DCC urges the Commission to use these principles as \nguideposts for evaluating tariff language, assessing stakeholder proposals, and crafting regulatory clarity \nthat is durable, consistent, and adaptable to continued growth. \nIII. CLARIFYING THE NATURE OF CO-LOCATION \nCo-location is a commercial arrangement—not a system problem. It enables load and generation \nto be sited together in ways that facilitate timely power delivery, reduce dependence on constrained \ntransmission systems, and enhance investment certainty. These arrangements involve sophisticated \nengineering, contractual, and regulatory compliance components. When properly structured, they can \npreserve and improve overall grid reliability while expanding the set of viable options available to new \nlarge loads. \nThe increased scrutiny of co-located load in the PJM footprint is not primarily about the nature of \nthe arrangement itself. Rather, it reflects growing concern about tightening resource adequacy margins, \n \n6 Id."},{"page":6,"startToken":1655,"endToken":1973,"text":"interconnection queue delays, an increasingly congested transmission grid, and the adequacy of grid \noperators’ planning tools in the face of rapid demand growth. In a more balanced supply environment, co-\nlocation would likely be viewed as a beneficial market response to reduce expensive transmission \nupgrades. However, against the backdrop of constrained capacity and delayed infrastructure development, \nco-location has become a focal point for concerns about whether the grid can meet emerging load \nrequirements at all, rather than being seen as a possible solution in PJM’s toolbox. \nThis misdirected focus risks clouding policy decisions. Renewed interest in co-location is not the \ncause of planning strain—it is a symptom of it. The urgency surrounding this docket is not because co-\nlocation arrangements evade responsibility or undermine grid operations, but because they are advancing \nmore quickly and visibly than the traditional processes for bringing on new generation or transmission \ninfrastructure. That visibility has made co-location a convenient—yet misplaced—target for broader \nanxieties about system adequacy. \nDCC urges the Commission to avoid adopting prescriptive or overly restrictive frameworks that \nwrongly conflate co-location with systemic risk. Instead, the Commission should focus on strengthening \nthe underlying tools that support sound system planning—improved transmission planning, timely \ngenerator interconnection, and the accuracy and transparency of load forecasting processes. \nUltimately, the challenge before the Commission is not whether co-location should be \nallowed—it should—but how to ensure that planning frameworks are modernized to reflect new \nload patterns and enable timely response of new generation to meet new load. \nAs discussed in the next section, improving the transparency and accuracy of load forecasting—\nparticularly around large, non-traditional load additions—is critical to aligning infrastructure investment \nwith real-world demand. Mischaracterizing co-location as a mere workaround risks obscuring the actual \nplanning failure: the inability to systematically and reliably forecast what load is coming, when, and how \nand enable the marketplace and transmission planners to respond effectively."},{"page":7,"startToken":1973,"endToken":2262,"text":"IV. RESPONSE TO FERC’S SHOW CAUSE ORDER AND STAKEHOLDER POSITIONS \nDCC appreciates the Commission’s attention to the complex issues raised in this proceeding and \nsupports the development of a regulatory framework that provides clarity, preserves commercial \nflexibility, and protects reliability. The Commission’s February 20, 2025, show cause order—alongside \nstakeholder comments and PJM’s subsequent filings—underscores the need for a coherent, transparent, \nand durable approach to co-location arrangements, especially as they become more prevalent across the \nPJM footprint. \nDCC acknowledges PJM’s recognition, in its Answer and Exhibit A, that multiple viable \nconfigurations of co-located load and generation exist today, including both front-of-meter and behind-\nthe-meter designs. However, DCC emphasizes that these configurations must not only be \nacknowledged—they must be explicitly supported in PJM’s tariff to provide developers and large \ncustomers with the certainty necessary to proceed with time-sensitive projects. Regulatory silence or \nambiguity creates risks for all parties involved and invites inconsistent application by Transmission \nOwners (TOs). \nTo that end, the Commission should direct PJM to develop clear, enforceable tariff language that \naffirms the permissibility of multiple co-location configurations, including those where load is served \ndirectly from a generation resource located on or near the same site. Tariff clarity is essential to reduce \nunnecessary disputes, avoid case-by-case confusion, and enable transmission providers to process \ninterconnection and load addition requests efficiently and predictably. \nDCC also responds to arguments advanced by certain TOs advocating for the universal \nclassification of co-located load as Network Load, regardless of configuration or actual reliance on the \ngrid. This categorical approach is both overbroad and unworkable. It risks undermining legitimate \ncommercial arrangements, misaligning cost allocation, and chilling innovation. Rather than applying a \none-size-fits-all label, the Commission should instead require PJM to adopt a criteria-based framework"},{"page":8,"startToken":2262,"endToken":2554,"text":"that evaluates co-located load based on specific, fact-driven indicators—such as the nature of grid \nreliance, services taken, and metering configuration. \nSuch a framework can preserve open access and nondiscrimination while reflecting the physical \nand operational distinctions among co-location designs. It would also reduce the likelihood of cost-\nshifting and ensure that grid services are paid for by those who use them, consistent with long-standing \ncost causation principles. \nFinally, given the contested nature of the issues raised and the diversity of views among \nstakeholders, DCC strongly supports the initiation of expedited settlement procedures. The Commission \nshould place these consolidated proceedings into a structured, 90-day settlement process overseen by a \nCommission-appointed settlement facilitator or settlement judge. This would allow PJM, TOs, large load \ncustomers, and other interested parties to engage in a focused and facilitated dialogue aimed at \nexpeditiously resolving the most contentious issues, including tariff clarity, network service classification, \nand the integration of co-located load into planning processes. \nStructured settlement procedures have proven effective in prior PJM-related proceedings and \noffer the best chance of achieving a workable and broadly supported resolution in a timely manner. DCC \nis actively participating in a joint motion requesting the establishment of such procedures and encourages \nthe Commission to grant that request. \nV. RECOMMENDATIONS FOR IMPROVED LOAD FORECASTING \nAs emphasized throughout these comments, many of the concerns raised in this proceeding—\nparticularly around co-location—are rooted not in the technical structure of load-generation arrangements, \nbut in broader questions of resource adequacy. The current sense of urgency around how load is served \nreflects a deeper and more consequential challenge: planning frameworks have not kept pace with \naccelerating demand, and current load forecasting practices are failing to provide the transparency, \nconsistency, and reliability needed to support sound infrastructure investment."},{"page":9,"startToken":2554,"endToken":2916,"text":"Effective load forecasting is not merely a technical input—it is a foundational requirement for \nensuring long-term grid reliability, resource adequacy, and cost-effective transmission development. \nWhen forecasts are too high, they can lead to inflated capacity prices, trigger unnecessary transmission \nbuildouts, and result in stranded or underutilized assets. When forecasts are too low, the consequences are \neven more severe: insufficient capacity procurement, underinvestment in transmission, and a persistent \ncycle of short-term emergency responses rather than long-term strategic planning. \nWhile no forecast will ever be perfect, the Commission must take steps to modernize load \nforecasting practices across all levels of the system and hold PJM accountable for ensuring its forecasts \nreflect the best available data and methods. \nPJM currently builds its long-term forecast using an in-house econometric model but supplements \nthis forecast with large load additions reported by TOs and electric distribution companies. These \nsupplemental values—presented annually in Table B-9—often reflect inconsistent assumptions, are not \nsubject to standardized validation, and lack meaningful transparency. Yet they are incorporated directly \ninto forecasts that drive capacity procurement and transmission planning outcomes. \nAlthough PJM cannot control how load is interconnected at the distribution level—a process \ngoverned by state jurisdiction—it is responsible for the integrity of its forecast. This includes ensuring \nthat reported large load additions are vetted for commercial viability and reasonably reflect actual \ndevelopment timelines. That responsibility cannot be delegated, nor excused by reference to differing \nutility practices. \nTo that end, DCC urges the Commission to require the following forecasting reforms: \n1. Commercial Readiness Verification for Large Load Additions: \nFor any load adjustment of 50 MW or greater submitted for inclusion in PJM’s forecast, the \nsubmitting entity should demonstrate indicators of commercial viability. These could include \nattestations to executed service agreements, site control, permitting progress, or other objective \nmilestones.7 Criteria should be firm enough to exclude purely speculative additions, but not so \ninflexible such as to exclude genuine proposals reaching commercial readiness. This approach \nmirrors the readiness criteria applied in generator interconnection processes and ensures the \n \n7 PJM, PUCs and the TOs may be best suited to identify objective milestones but these should be \ntransparent and effective indicators of commercial viability."},{"page":10,"startToken":2916,"endToken":3262,"text":"forecast reflects realistic development trajectories. This would not impose such structures within \nthe TO and EDC load interconnection process–instead it would provide discipline and \nconsistency to what PJM does with the request for the large load adjustment.  \n \n2. Transparency of Forecast Assumptions: \nPJM should be required to publicly disclose the key assumptions, data sources, and validation \nprocesses underlying both its base forecast and supplemental inputs. This would enable \nstakeholders to engage more effectively and improve accountability in planning processes. \n \n3. Reporting Standardization Across TOs and EDCs: \nThe Commission should direct PJM to develop clear and enforceable standards for how member \nutilities report anticipated load additions, including data quality, documentation, information \nabout associated transmission needs, including supplemental projects, and regular revalidation. A \ncommon framework would reduce uncertainties and improve the comparability of load inputs \nacross PJM’s footprint. \n \n4. Regular Forecast Review and Backcasting Analysis: \nPJM should conduct annual assessments comparing past forecasts to actual outcomes \n(backcasting) to identify sources of error and improve future performance. These assessments \nshould be shared with stakeholders and posted for public review.  \nThese reforms would significantly improve the accuracy and integrity of PJM’s load forecast \nwhile preserving flexibility for utilities and customers. They would also ensure that co-located \narrangements—whether grid-connected or BTM—are integrated into forecasts in a manner that reflects \nactual system impacts rather than assumption-driven speculation.  \nImportantly, these changes would simply refine the process that PJM currently uses to verify \nlarge load adjustments before adding them to its annual load forecast. PJM would only accept large load \nadditions into its forecast that the EDC demonstrates verifiable commercial viability. This approach to \nload forecasting is a non-arbitrary, non-discriminatory way to inject discipline into PJM’s load forecast \nby ensuring that requesting customers are commercially ready. It also incentivizes participation from \nend use customers and the EDCs because PJM’s transmission planning processes will accurately reflect \nthe appropriate level of investment to reliably meet expected demand.  \nPJM has the authority today to implement this approach through its load forecasting business \npractice manual without changes to its current tariff and other governing documents."},{"page":11,"startToken":3262,"endToken":3612,"text":"Under PJM’s Manual 19, PJM must verify that proposed load adjustments are “real and \nsignificant.”8 To manage the near term risk of significant capacity and transmission-driven cost increases \nover the next 5-8 years, PJM should only include in the load forecast requested load adjustments due to \nnew large load requests (50 MW or greater) when the requesting EDC/LSE demonstrates that the large \nload interconnections are backed by stringent financial commitments.  \nUltimately, strengthening load forecasting is a prerequisite to resolving not just the questions \nraised in this docket, but the broader resource adequacy and infrastructure planning challenges PJM now \nfaces. The Commission has an opportunity—and a responsibility—to lead this reform. \nVI. ENHANCED VISIBILITY INTO SUPPLEMENTAL PROJECTS AND REGIONAL LOAD \nDEVELOPMENT \nAs PJM continues to experience significant growth in large load additions it is essential that \nplanning processes reflect how infrastructure is evolving to serve this demand. While many of the \nupgrades necessary to support new load are pursued through supplemental projects initiated by TOs, \nadditional transparency can improve alignment between infrastructure development and PJM’s system-\nlevel forecasts and planning efforts. \nSpecifically, DCC recommends that the Commission direct PJM to enhance visibility into the \nrelationship between new large loads and the transmission upgrades that support them, by requiring the \nfollowing: \n1. Disclosure of Load Linkages for Supplemental Projects: \nFor any supplemental project developed primarily to support new large load, the responsible \nentity should indicate whether the project is associated with a specific customer load addition. \nThis disclosure should include the general location of the load, the expected service date, and a \nqualitative description of the anticipated ramp-up schedule. This information would help PJM and \nstakeholders understand emerging demand patterns without compromising commercially \nsensitive data. \n \n2. Confirmation of Forecast Inclusion: \nWhen a supplemental project is identified as being load-driven, PJM should confirm whether the \nassociated load has already been incorporated into its system-level forecast, including Table B-9. \n \n8 See PJM Manual 19: Load Forecasting and Analysis, Attachment B at 26 (Rev. 37, effective Dec. 18, \n2024) (requiring PJM to verify that any proposed load adjustment is “real and significant”)."},{"page":12,"startToken":3612,"endToken":3918,"text":"If the load is not reflected in the forecast, PJM should indicate whether it expects it to be \nincorporated in the next forecast update and on what basis. \nThese modest improvements would help ensure that infrastructure decisions made at the local \nlevel are visible within broader planning discussions and appropriately reflected in resource adequacy and \ntransmission assessments. They would also support more accurate forecasting and reinforce stakeholder \nconfidence in the alignment between load growth and infrastructure investment. \nVII. SPECIFIC RECOMMENDATIONS TO THE COMMISSION \nIn light of the issues raised in this proceeding and the recommendations outlined in the sections \nabove, the Data Center Coalition respectfully urges the Commission to take the following actions to \nsupport a durable, transparent, and flexible framework for co-located load: \n1. Affirm the Legitimacy of Co-location: \nConfirm that co-location—whether behind-the-meter or front-of-meter—is a commercially \nlegitimate and operationally viable arrangement, consistent with open access principles and not \ninherently inconsistent with reliability or cost causation. \n \n2. Direct PJM to Provide Tariff Clarity: \nRequire PJM to develop and file clear, enforceable tariff language that supports multiple viable \nco-location configurations and avoids default classifications that mischaracterize grid usage or \nconstrain commercial flexibility. \n \n3. Reject One-Size-Fits-All Treatment of Network Load: \nDecline to endorse stakeholder proposals that would universally categorize all co-located load as \nNetwork Load. Instead, require PJM to establish criteria that evaluate grid reliance and service \ncharacteristics on a fact-specific basis. \n \n4. Initiate Expedited Settlement Procedures: \nPlace these consolidated proceedings into a 90-day settlement process supervised by a \nCommission-appointed settlement judge, with the goal of resolving outstanding disputes related \nto co-location configurations, tariff treatment, and cost allocation. \n \n5. Improve Large Load Forecasting Practices: \nDirect PJM to implement commercial readiness criteria for all forecasted load additions of 50 \nMW or greater, ensure consistency across TOs and EDCs, and increase transparency around \nforecasting assumptions and methodologies."},{"page":13,"startToken":3918,"endToken":4205,"text":"These recommendations are designed to help the Commission provide needed regulatory clarity, \navoid unnecessary market disruptions, and ensure the planning process is aligned with current and \nemerging system needs. \nVIII. CONCLUSION AND SUMMARY OF KEY REQUESTS \nThe issues raised in this proceeding lie at the intersection of rapidly evolving load growth, \nstrained infrastructure, and regulatory frameworks that must adapt to new market realities. Co-location \narrangements are not the cause of grid stress—they are a rational, flexible, and increasingly necessary \nresponse to it. Rather than restricting these arrangements, the Commission should seize this opportunity \nto clarify their legitimacy, reinforce open access principles, and ensure that planning tools are modernized \nto reflect the scale and pace of change in electricity demand. \nTo that end, the Data Center Coalition respectfully urges the Commission to: \n● Affirm the legitimacy of co-location arrangements and the right of large customers to pursue \nservice through behind-the-meter and other commercially viable configurations; \n \n● Direct PJM to develop clear tariff language supporting multiple co-location models and avoid \nprescriptive classifications that reduce flexibility; \n \n● Reject proposals to universally classify co-located load as Network Load, and instead require \nPJM to apply criteria that reflect actual grid reliance; \n \n● Initiate a 90-day settlement process, appointing a settlement judge to assist parties in resolving \ncontested issues around tariff language, service classification, and cost allocation; \n \n● Improve large load forecasting processes by requiring readiness criteria, increased \ntransparency, and standardized inputs across utilities; and \n \n● Enhance visibility into large load additions and associated infrastructure, including \nconfirmation of whether new loads tied to supplemental projects are reflected in PJM’s official \nforecast. \nThese steps are essential to ensuring that regulatory treatment of co-located load is fair, \ntransparent, and aligned with long-term grid reliability and economic growth. DCC appreciates the"},{"page":14,"startToken":4205,"endToken":4269,"text":"Commission’s attention to these comments and respectfully requests timely and decisive action consistent \nwith the recommendations set forth herein. \n \n \n \n \n \n \n \nRespectfully Submitted, \n/s/ Aaron Tinjum \nAaron Tinjum \nVice President, Energy \nData Center Coalition \n525-K East Market Street #253  \nLeesburg, VA 20176 \naaron@datacentercoalition.org \n \nMorgan A. Johnson \nSenior Energy Policy Manager \nData Center Coalition \n525-K East Market Street #253  \nLeesburg, VA 20176  \nmorgan@datacentercoalition.org"},{"page":15,"startToken":4269,"endToken":4335,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person designated \non the official service list compiled by the Secretary in this proceeding. Dated at Herndon, VA this 23 day \nof April 2025.  \n \n/s/ Morgan A. Johnson \nMorgan A. Johnson \nSenior Energy Policy Manager \nData Center Coalition \n525-K East Market Street #253  \nLeesburg, VA 20176  \nmorgan@datacentercoalition.org"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":906,"startToken":0,"endToken":104},{"p":1,"at":906,"title":"I. COMMUNICATIONS","method":"printed heading","endPage":1,"endAt":1331,"startToken":104,"endToken":158},{"p":1,"at":1331,"title":"II. INTRODUCTION","method":"printed heading","endPage":4,"endAt":405,"startToken":158,"endToken":1097},{"p":4,"at":405,"title":"II. REINFORCING DCC’S ESTABLISHED CO-LOCATION PRINCIPLES","method":"printed heading","endPage":5,"endAt":1628,"startToken":1097,"endToken":1549},{"p":5,"at":1628,"title":"III. CLARIFYING THE NATURE OF CO-LOCATION","method":"printed heading","endPage":7,"endAt":0,"startToken":1549,"endToken":1973},{"p":7,"at":0,"title":"IV. RESPONSE TO FERC’S SHOW CAUSE ORDER AND STAKEHOLDER POSITIONS","method":"printed heading","endPage":8,"endAt":1507,"startToken":1973,"endToken":2469},{"p":8,"at":1507,"title":"V. RECOMMENDATIONS FOR IMPROVED LOAD FORECASTING","method":"printed heading","endPage":11,"endAt":756,"startToken":2469,"endToken":3375},{"p":11,"at":756,"title":"VI. ENHANCED VISIBILITY INTO SUPPLEMENTAL PROJECTS AND REGIONAL LOAD","method":"printed heading","endPage":12,"endAt":540,"startToken":3375,"endToken":3689},{"p":12,"at":540,"title":"VII. SPECIFIC RECOMMENDATIONS TO THE COMMISSION","method":"printed heading","endPage":13,"endAt":217,"startToken":3689,"endToken":3947},{"p":13,"at":217,"title":"VIII. CONCLUSION AND SUMMARY OF KEY REQUESTS","method":"printed heading","endPage":15,"endAt":0,"startToken":3947,"endToken":4269},{"p":15,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":15,"endAt":429,"startToken":4269,"endToken":4335}]}