{"document":{"slug":"rec-20250423-5245","title":"Comments of Invenergy Renewables LLC and Invenergy Thermal LLC","issued":"2025-04-23","accession":"20250423-5245","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Invenergy Renewables LLCInvenergy Thermal LLC","kind":"comments","file":"sources/filings/text/20250423-5245_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5245","tier":"record","sha256":"7a38aa79576d5a7dcc4e05215e58a9382bb7afad83e7d4bf28223dffe0839d89","pages":9,"tokens":2377,"emptyPages":[],"textThemes":["study","colo","cost","registry"]},"pages":[{"page":1,"startToken":0,"endToken":259,"text":"DCACTIVE-79938279.1 \n \n \n \n \n \n \n1 \n \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \nPJM Interconnection, L.L.C., et al. \n \n) \nDocket No. EL25-49-000 \n \n \n \n) \nLarge Loads Co-Located at Generating Facilities \n) \nDocket No. AD24-11-000 \n \n \n \n) \nConstellation Energy Generation, LLC \n \n) \nDocket No. EL25-20-000 \nv. \n \n \n) \nPJM Interconnection, L.L.C. \n \n) \n(Consolidated) \n \n \n \n \n \n \n \nCOMMENTS OF INVENERGY RENEWABLES LLC AND INVENERGY THERMAL \nLLC \n \nInvenergy Renewables LLC and Invenergy Thermal LLC (collectively, “Invenergy”) \nrespectfully submit these comments in response to the Federal Energy Regulatory Commission’s \n(“FERC” or “Commission”) February 20, 2025, Order to Show Cause1 and PJM Interconnection, \nL.L.C.’s (“PJM”) March 24, 2025, answer in the above-captioned proceeding.2 \nAs the Commission has acknowledged, data centers, advanced manufacturing, and \nelectrification are spurring significant load growth. By 2028, data centers alone will account for \nup to 12% of national electricity consumption, exceeding even relatively recent load forecasts.3 \nAs a result, the Commission and regional transmission organizations are reexamining existing \npolicies to ensure they can satisfy these new demands. PJM, the Midcontinent Independent \n \n1 PJM Interconnection, L.L.C. et al, 190 FERC ¶ 61,115 (2025) (“Show Cause Order”). \n2 PJM Interconnection, L.L.C., Docket Nos. EL25-49-000, et al., Answer oof PJM Interconnection, L.L.C. (Mar. 24. \n2025).  \n3 2024 United States Data Center Energy Usage Report at 52, Lawrence Berkeley National Laboratory (Dec. 2024), \navailable at https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-electricity-demand-data-\ncenters; Mooney, M., 2025 Preliminary PJM Load Forecast, Load Analysis Subcommittee (Dec. 9, 2024), available \nat https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2024/20241209/20241209-item-\n03---2025-preliminary-pjm-load-forecast.ashx;"},{"page":2,"startToken":259,"endToken":585,"text":"DCACTIVE-79938279.1 \n \n \n \n \n \n \n2 \n \n \nSystem Operator, Inc. (“MISO”), and the Southwest Power Pool, Inc. (“SPP”), for instance, have \nall proposed upending long-standing interconnection procedures for short-term, and Invenergy \nwould argue sometimes illusory, benefits.4 But regardless of the merits of those individual \nproposals, they share a common feature: they are reactive, rather than proactive. They do not \nimprove load forecasting, facilitate needed transmission deployment, or establish generally-\napplicable market rules that facilitate long-term investment to accommodate new, large loads.  \nThis Show Cause proceeding is a needed first step to address these broader issues, but as \nInvenergy sets forth below, the Commission should not stop upon adopting rules for co-located \nlarge loads. Rather, it should seize this opportunity to articulate a new, proactive paradigm for \njointly studying large-load interconnection requests as part of the generator interconnection \nqueue, thereby ensuring that RTOs/ISOs engage in coordinated load, interconnection, and \ntransmission planning that enhances resource adequacy and reliability, while efficiently \ndeploying generation and allocating scarce transmission where it is most needed.  \nThe Commission should also consider other, economical alternatives for addressing load \ngrowth. Therefore, in addition to adopting an integrated planning process, the Commission \nshould ensure that RTOs/ISOs properly value and compensate merchant transmission for its \nreliability and economic benefits.5 While Invenergy acknowledges this issue is outside the scope \nof this proceeding, it encourages the Commission to adopt policies that better facilitate merchant \ntransmission as part of its holistic consideration of how to address large load growth.  \nWith regard to this Show Cause proceeding, Invenergy offers the following high-level \n \n4 See, e.g., PJM’s Reliability Resource Initiative and MISO’s Expedited Resource Adequacy Study, a version of \nwhich SPP is also considering.  PJM Interconnection, L.L.C., 190 FERC ¶ 61,084 (2025); Midcontinent Indep. Sys. \nOperator, Inc., Expedited Resource Addition Study Filing, Docket No. ER25-1674-000 (filed Mar. 17, 2025). \n5 See Invenergy Transmission LLC, Request for Technical Conference Concerning Interregional HVDC Merchant \nTransmission, Docket No. AD22-13-000 (July 19, 2022)."},{"page":3,"startToken":585,"endToken":884,"text":"DCACTIVE-79938279.1 \n \n \n \n \n \n \n3 \n \n \nprinciples that should guide co-location policy.  \nI.   COMMENTS \n \nA. Large Loads Should be Studied in a Combined Queue with Generation and \nTransmission Interconnection. \n \nPJM, in its response to the Show Cause Order,6 proposes to continue its bifurcated \napproach to studying co-located loads and generation, wherein network load interconnection \nrequests are studied under Attachment M-3 and co-located generator modifications are studied in \nthe generator interconnection and necessary study process,7 while non-network loads will only \nemploy the necessary study used for generator interconnections. Invenergy respectfully \nencourages the Commission and PJM to dispense with this bifurcated process and to instead \njointly study large load and generator interconnection requests. Doing so would more efficiently \nuse the transmission system and decrease ratepayer costs.  \nUnder PJM’s existing rules, PJM’s standardized interconnection procedures only apply to \ngeneration and transmission interconnection, but PJM uses the Attachment M-3 process for load \ninterconnections. Attachment M-3 establishes a local planning process in which PJM and \ntransmission owners process load interconnection requests and plan local upgrades and \nsupplemental projects in response to identified load needs.8  While Attachment M-3 has been \nused to incorporate large load additions into the PJM system, it was originally intended as a \ntransmission planning process for supplemental projects, not as a process to interconnect large \nloads. As a result, it has several characteristics that make it unsuitable for large load \n \n6 Show Cause Order at P 88, subsection d. \n7 PJM Answer at 8, 48-49. \n8 PJM Open Access Transmission Tariff (“PJM Tariff”), Attachment M-3.  See also PJM Answer at 6-7 (explaining \nthe “traditional load interconnection processes” includes the “Transmission Owner retail load integration study” to \nidentify local upgrades based on local transmission owner planning criteria and PJM’s “Do No Harm study” to \nevaluate supplemental project’s impact on the transmission system)."},{"page":4,"startToken":884,"endToken":1164,"text":"DCACTIVE-79938279.1 \n \n \n \n \n \n \n4 \n \n \ninterconnection.  \nFirst, Attachment M-3 does not consider transmission solutions outside of a particular \ntransmission owner’s footprint, artificially excluding potentially less-expensive solutions. \nSecond, because load additions are primarily studied under local transmission owner study \nprocesses using a different set of study assumptions, models and timelines, than generator \ninterconnection studies, the load and generator study processes may each identify network \nupgrades that would not be necessary were these processes combined, resulting in overbuilding \nof the PJM system at significant expense. Third, because of the independent study processes, \nlarge load additions may not get factored into generator interconnection studies in a timely \nmanner, or could be factored in but then never materialize. This creates significant opacity and \nrisk for generators, thereby stifling development that might occur were generation developers \nprovided more clarity on planned load interconnections.   \nFinally, there is little, if any, transparency on how M-3 studies are conducted, or the \ntimeline for completing such studies.  Large load interconnection customers are already facing \ninterconnection delays as a result of this uncertainty, and the lack of transparency is creating \nopportunities for undue discrimination that will decrease competition and raise systemwide costs.  \nThese defects, however, can be remedied by adopting a joint study process that requires \nlarge loads – those over 50 MW or interconnecting to facilities at voltages greater than 115kV –\nbe studied along with generation and transmission interconnection requests. Combining load \ninterconnection with generation and transmission into a standardized study process would \npromote transparency and ensure that network upgrades identified and allocated to \ninterconnection customers correctly reflect the expected topology of the system.  It would also \naddress a number of concerns raised in the Show Cause Order because transmission use, co-"},{"page":5,"startToken":1164,"endToken":1488,"text":"DCACTIVE-79938279.1 \n \n \n \n \n \n \n5 \n \n \nlocation impacts on the transmission system, and cost allocation would be addressed in a single \nstudy process.9  \nMoreover, if load and generation have not already identified one another, a common \ninterconnection queue can match appropriate generation to the load, mitigating the uncertainty \nthat can result from uncertain load forecasting. While PJM notes that large load aggregations \ncould be included in regional transmission planning as part of the yearly load-forecasting \nprocess,10 it is unclear how often this occurs or what aggregation would trigger planning for large \nload additions in regional planning.  Load forecasts also are just that, a forecast, and may never \nmaterialize. Folding large load requests into the interconnection queue will reduce guesswork \nand reduce speculative load interconnection requests. \nInvenergy recognizes that incorporating large load interconnections into the generation \nqueue across the PJM footprint will involve stakeholder and state engagement.  In crafting these \nrules, Invenergy makes the following suggestions: \n• Large load interconnection requests should be part of the standard interconnection \nqueue with assigned queue positions. This will increase transparency for load and \ndevelopers, while also ensuring equitable treatment of load and generation as they \ninterconnect to the transmission system.  \n• PJM could establish commercial readiness criteria or security deposits for large \nload interconnection requests akin to those required for generator interconnection \nrequests, thereby reducing speculative large load interconnection requests and \nincentivizing large loads to materialize.  \n• Like generator interconnection requests, large load interconnection requests could \nwithdraw from the queue if they are no longer viable, with appropriate penalties \nto offset the harm to other interconnection customers. \nGiven that PJM is currently completing its interconnection queue transition process, these \n \n9 E.g., Show Cause Order at P 88, subsection d (questioning whether PJM’s existing queue processing and study \nprocesses address the impacts of co-location, including whether PJM adequately considers reliability impacts on the \ntransmission system, and whether cost allocation changes are needed to mitigate transmission system impacts).  \n10 PJM Answer at 7-8."},{"page":6,"startToken":1488,"endToken":1831,"text":"DCACTIVE-79938279.1 \n \n \n \n \n \n \n6 \n \n \nnew rules could reasonably commence with New Cycle # 1, which is projected to begin April \n2026.  In the interim, PJM’s Tariff should be amended to include at least co-located loads in the \nstandard generator interconnection procedures. Studying co-located load and generators together \nwill reduce the chance of overbuilding the system and ensure costs for network upgrades are \nassigned consistent with the Commission’s cost allocation policies. \nB. Co-Location Arrangements Must Include Safeguards to Ensure Other \nInterconnection Customers are Not Harmed. \n \nPJM in its Answer identifies numerous avenues for adding large co-located loads. One of \nthose proposals, “New Option 6,” would permit large loads interconnecting as Network Load to \nbring its own generation to PJM. PJM explains that it might consider mechanisms to process \nthese types of interconnection requests more quickly.11 While Invenergy welcomes \nimprovements that expedite the interconnection process, any such changes must be adopted on a \nnon-discriminatory, queue-wide basis, and not only for preferenced generators. Moreover, to the \nextent the Commission approves New Option 6, it should adopt reasonable safeguards to ensure \nthat other interconnection customers are not harmed by co-location arrangements, for instance by \nmaintaining queue priority on a first-ready, first-served basis; preventing co-located load from \ngetting priority access to available transmission system headroom; and ensuring that PJM’s \nprocessing of co-location interconnection requests does not deprive PJM of the resources needed \nto process the interconnection queue. Such limitations would be in keeping with the \nCommission’s long-standing policy against queue jumping.12 \n \n11 PJM Answer at 17 (explaining that PJM could accelerate interconnection studies of new generation, enhance \nprovisional interconnection service options at discrete study points to accelerate generation’s ability to reach \ncommercial operation, and that states could remove barriers to entry by assuming cost responsibility for \ntransmission upgrades pursuant to the State Agreement Approach to encourage large load development in their \njurisdictions). \n12 See, e.g., Standardization of Generator Interconnection Agreements and Procedures, Order No. 2003, 104 FERC \n¶ 61,103, at P 35 (2003), reh’g, Order No. 2003-A, 106 FERC ¶ 61,220, reh’g, Order No. 2003-B, 109 FERC ¶"},{"page":7,"startToken":1831,"endToken":2224,"text":"DCACTIVE-79938279.1 \n \n \n \n \n \n \n7 \n \n \nC. PJM Should Include a Transition Process Until its New Co-Location Rules are \nEffective. \n \nWhile this Show Cause proceeding could result in new rules accommodating additional \nco-location configurations and should include a combined interconnection process for load and \ngeneration, properly issuing new rules takes time and benefits from a robust stakeholder process.   \nTherefore, while new comprehensive rules are developed, PJM should implement a \ntransition process so that large loads customers can move forward with co-location arrangements \nin the short-term if they so choose. To reduce study timelines and avoid significant modifications \nto the PJM system while new rules are being fashioned, large-load customers should be allowed \nto pursue behind-the-meter configurations with new generating facilities in development and \nwithout being considered network load, and protections should be required to prevent that load \nfrom accessing the grid.  To the extent such protections are not available, behind-the-meter load \nshould be charged commensurate with its expected transmission system use, but less than fully \nnetwork load.  \n \n \n \n \n61,287 (2004), reh’g, Order No. 2003-C, 111 FERC ¶ 61,401 (2005), aff’d sub nom. Nat’l Ass’n of Regulatory Util. \nComm’rs v. FERC, 475 F.3d 1277 (D.C. Cir. 2007); Reform of Generator Interconnection Procs. & Agreements, \nOrder No. 845, 163 FERC ¶ 61,043 at P 487 (2018) (explaining that SIS does not constitute queue jumping because \nSIS “does not compete for the same potential network upgrades that may be at issue in the normal interconnection \nqueue.”), order on reh'g, Order No. 845-A, 166 FERC ¶ 61,137, order on reh'g, Order No. 845-B, 168 FERC ¶ \n61,092 (2019); Southwest Power Pool, Inc. 181 FERC ⁋ 61,269 at P 17 (2022) (accepting a proposal that “prevent[s] \na [SIS] customer from using any interconnection service capacity that might otherwise go to a different \ninterconnection customer in the queue.”); Southwest Power Pool, Inc., 147 FERC ⁋ 61,201 at P 124 (2014) (finding \nthat SPP’s proposal could “increase the level of uncertainty” faced by an interconnection customer, “change the \nnature of the available capacity at a given time,” and potentially “induce multiple restudies of lower-queued \ninterconnection requests.”); Xcel Energy Operating Co., 107 FERC ¶ 61,313, at PP 2, 22, 26 (2004) (finding that \nvariations to the pro forma LGIP and LGIA proposed to accommodate a state resource planning process “must not \ndisadvantage or delay other Interconnection Requests not involved in the solicitation”)."},{"page":8,"startToken":2224,"endToken":2320,"text":"DCACTIVE-79938279.1 \n \n \n \n \n \n \n8 \n \n \nII. CONCLUSION \n \nInvenergy respectfully requests that PJM and the Commission consider these comments \nin determining how PJM’s tariff could be amended to include just and reasonable rules for co-\nlocated load and generation. \n \n \nRespectfully submitted, \n \n \n  \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nApril 23, 2025 \n/s/ Tyler O’Connor  \nTyler O’Connor \nKathryn Douglass \nCrowell & Moring LLP \n1001 Pennsylvania Avenue, NW \nWashington, DC  20004 \n202-624-2500 \ntoconnor@crowell.com \nkdouglass@crowell.com \n \nWilliam Borders \nExecutive Vice President, Legal & Chief \nCompliance Officer \nInvenergy \nOne South Wacker Drive, Ste. 1500 \nChicago, IL 60606 \nwborders@invenergy.com \n \nCounsel for Invenergy Renewables LLC \nand Invenergy Thermal LLC"},{"page":9,"startToken":2320,"endToken":2377,"text":"DCACTIVE-79938279.1 \nCERTIFICATE OF SERVICE \nI hereby certify that on this 23rd day of April, 2025, a copy of the foregoing document \nhas been electronically served upon each person designated on the official service list in this \nproceeding. \n/s/ Kathryn Douglass \nKathryn Douglass \nCrowell & Moring LLP \n1601 Wewatta Street, Ste. 815 \nDenver, CO 80202 \nkdouglass@crowell.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":91,"startToken":0,"endToken":594},{"p":3,"at":91,"title":"I. COMMENTS","method":"printed heading","endPage":3,"endAt":108,"startToken":594,"endToken":596},{"p":3,"at":108,"title":"A. Large Loads Should be Studied in a Combined Queue with Generation and","method":"printed heading","endPage":6,"endAt":489,"startToken":596,"endToken":1556},{"p":6,"at":489,"title":"B. Co-Location Arrangements Must Include Safeguards to Ensure Other","method":"printed heading","endPage":7,"endAt":40,"startToken":1556,"endToken":1834},{"p":7,"at":40,"title":"C. PJM Should Include a Transition Process Until its New Co-Location Rules are","method":"printed heading","endPage":8,"endAt":40,"startToken":1834,"endToken":2227},{"p":8,"at":40,"title":"II. CONCLUSION","method":"printed heading","endPage":9,"endAt":21,"startToken":2227,"endToken":2322},{"p":9,"at":21,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":9,"endAt":376,"startToken":2322,"endToken":2377}]}
