{"document":{"slug":"rec-20250423-5246","title":"Comments of BrightNight Power Marketing, LLC in response to FERC’s Order Instituting Proceeding Under Section 206 of the Federal Power Act etc. and Answers…","issued":"2025-04-23","accession":"20250423-5246","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"BrightNight Power Marketing, LLC","kind":"comments","file":"sources/filings/text/20250423-5246_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5246","tier":"record","sha256":"99b9d86b6fb4ce97bcc3cc6d5c24a1ab9b51311a08f112a9ec4e2ebc94aeab28","pages":11,"tokens":2840,"emptyPages":[],"textThemes":["colo","flex","study"]},"pages":[{"page":1,"startToken":0,"endToken":187,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated  \nAtlantic City Electric Company  \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc.  \nDuke Energy Kentucky, Inc.  \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC  \nJersey Central Power & Light Company  \nMid-Atlantic Interstate Transmission, LLC  \nNeptune Regional Transmission System, LLC  \nOld Dominion Electric Cooperative  \nPECO Energy Company  \nPPL Electric Utilities Corporation  \nPotomac Electric Power Company  \nPublic Service Electric and Gas Company  \nRockland Electric Company  \nTrans-Allegheny Interstate Line Company  \nTransource West Virginia, LLC  \nUGI Utilities, Inc.  \nMonongahela Power Company  \nThe Potomac Edison Company  \nCommonwealth Edison Company  \nCommonwealth Edison Company of Indiana, Inc.  \nThe Dayton Power and Light Company \nAEP Appalachian Transmission Company, Inc.  \nAEP Indiana Michigan Transmission Company, \nInc.  \nAEP Kentucky Transmission Company, Inc.  \nAEP Ohio Transmission Company, Inc.  \nAEP West Virginia Transmission Company, Inc.  \nAppalachian Power Company  \nIndiana Michigan Power Company  \nKentucky Power Company  \nKingsport Power Company  \nOhio Power Company  \nWheeling Power Company  \nDuquesne Light Company  \nVirginia Electric and Power Company  \n               Docket Nos. EL25-49-000"},{"page":2,"startToken":187,"endToken":497,"text":"2 \n \nLinden VFT, LLC  \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power  \nCity of Hamilton, OH  \nSouthern Maryland Electric Cooperative, Inc.  \nOhio Valley Electric Corporation  \nAMP Transmission, LLC  \nSilver Run Electric, LLC  \nNextEra Energy Transmission MidAtlantic Indiana, \nInc.  \nWabash Valley Power Association, Inc.  \nKeystone Appalachian Transmission Company  \n \nLarge Loads Co-Located at Generating Facilities \n \nConstellation Energy Generation, LLC \n \nv. \n \nPJM Interconnection, L.L.C. \n \n \n \n \n \n \n \n \n \n \n \n \n \nAD24-11-000 \n \nEL25-20-000 \n(Consolidated) \n \n \n \n \nCOMMENTS OF BRIGHTNIGHT POWER MARKETING, LLC \n \nBrightNight Power Marketing, LLC (“BrightNight”)1 submits these Comments in \nresponse to the Commission’s Order Instituting Proceeding Under Section 206 of the Federal \nPower Act (“FPA”) and Consolidating with Other Proceedings2 and the answers filed by PJM \nInterconnection, L.L.C. (“PJM”) and individual and groups of PJM Transmission Owners (“PJM \nTOs”).3  BrightNight appreciates the opportunity to share its on-the-ground perspective on co-\n \n1  \nBrightNight is filing these comments pursuant to Rule 211 of the Rules of Practice and Procedure of the \nFederal Energy Regulatory Commission (“Commission”), 18 C.F.R. § 385.211, having intervened in \nDocket No. EL25-49-000 on March 12, 2025. \n2  \nPJM Interconnection, L.L.C., et al., 190 FERC ¶ 61,115 (2025) (“Show Cause Order”).  In the Show Cause \nOrder, the Commission directed PJM and the PJM Transmissions to either explain why the existing PJM \ngoverning documents are just and reasonable and not unduly discriminatory or preferential without \nprovisions specifically addressing co-located load arrangements or explain what changes would remedy the \nCommission’s concerns. Id. at P 87. \n3  \nPJM Interconnection, L.L.C., et al., Docket No. EL25-49-000, Answer of PJM Interconnection, L.L.C. \n(Mar. 24, 2025) (“PJM Answer”); PJM Interconnection, L.L.C., et al., Docket No. EL25-49-000, Answer \nof the Indicated PJM Transmission Owners (Mar. 24, 2025) (“Indicated PJM Transmission Owners \nAnswer”); PJM Interconnection, L.L.C., et al., Docket No. EL25-49-000, Response of Public Service"},{"page":3,"startToken":497,"endToken":853,"text":"3 \n \nlocation issues.  BrightNight works with all types of customers around the United States to \ndesign, develop, and operate safe, reliable, large-scale, power projects.  BrightNight is an active \ndeveloper of renewable and other types of generation projects and is in discussions with data \ncenters interested in co-locating with hybrid renewable generation.  There is significant potential \nin the co-location model to (i) meet the ever-increasing energy needs of data centers while (ii) \nsupporting reliability and reducing congestion on the grid and (iii) ensuring that data center load \npays its fair share of costs.  To successfully achieve these interrelated goals, the industry must \nhave regulatory certainty without foreclosing flexible commercial approaches.  Because PJM’s \ncurrent open access transmission tariff is not sufficiently clear about the rules that apply to co-\nlocated load arrangements, BrightNight supports the Commission establishing pro forma rules, \nnot only for PJM but rules that could apply more broadly, for evaluating and serving co-located \nload and generation that provide certainty for participants but include flexibility so as to not \nunnecessarily stifle innovative arrangements.  Any rates or charges applicable to co-located load \nmust be just and reasonable by requiring co-located load to pay only for the grid services that it \nneeds and benefits from, and ensures that co-located load does not directly or indirectly cross-\nsubsidize other customers.  Additionally, BrightNight supports an expedited or fast-tracked study \nprocess for co-located load and generation. \nI. \nBACKGROUND \n \nAs technology has advanced to seamlessly connect people and systems across industries, \nthe need for large, external facilities that store and process large amounts of digital data, e.g., \n \nElectric and Gas Company (“PSEG”) (Mar. 24, 2025) (“PSEG Answer”); PJM Interconnection, L.L.C., et \nal., Docket No. EL25-49-000, Answer of the Dayton Power and Light Company D/B/A AES Ohio (Mar. \n24, 2025); PJM Interconnection, L.L.C., et al., Docket No. EL25-49-000, Answer of Allegheny Electric \nCooperative, Inc. (Mar. 24, 2025); PJM Interconnection, L.L.C., et al., Docket No. EL25-49-000, Answer \nof NextEra Energy Transmission MidAtlantic, Inc. (Mar. 24, 2025); PJM Interconnection, L.L.C., et al., \nDocket No. EL25-49-000, Answer of Silver Run Electric, LLC (Mar. 24, 2025)."},{"page":4,"startToken":853,"endToken":1182,"text":"4 \n \ndata centers, has increased.  Data centers require a significant amount of electricity to operate \nservers and cooling systems.  The dramatic increase in data center demand is expected to result \nin significant load growth on an electric system that had been forecasting flat load growth.  The \nDepartment of Energy’s 2024 Report on U.S. Data Center Energy Use estimates that data center \nload growth has tripled over the past decade and will double or triple again by 2028.4  In \nresponse to long wait periods to interconnect and obtain service from the grid, data center \ndevelopers are exploring solutions that include co-locating with generation but are running into \nbarriers. \n \nIn response to challenges associated with the co-located load model, the Commission \nconvened a technical conference on November 1, 2024, to examine the issues in Docket NO. \nAD24-11-000 (“Co-location Technical Conference”).5  Later that same month, Constellation \nEnergy Generation, LLC (“Constellation”) filed a complaint under Section 206 of the FPA, \narguing that PJM’s Tariff is unjust and unreasonable and unduly discriminatory because it does \nnot contain rules or guidance for generators to follow when interconnecting to provide service to \na fully isolated co-located load.6  Constellation explained that, while nothing in the PJM Tariff \nprohibits fully isolated co-located load arrangements, utilities have relied upon ambiguities in the \nrules to thwart competition by delaying or significantly increasing the costs of such \n \n4  \nDOE Press Release, DOE Releases New Report Evaluating Increase in Electricity Demand from Data \nCenters (Dec. 20, 2024), available at https://www.energy.gov/articles/doe-releases-new-report-evaluating-\nincrease-electricity-demand-data-centers. \n5  \nLarge Loads Co-Located at Generating Facilities, Docket No. AD24-11-000, Notice of Commissioner-Led \nTechnical Conference (Aug. 2, 2024).  The Commission requested that interested parties file post-technical \nconference comments, but took no further action in the docket until the Show Cause Order. \n6  \nConstellation Energy Generation, LLC v. PJM Interconnection, L.L.C., Docket No. EL25-20-000, \nComplaint Requesting Fast Track Processing of Constellation Energy Generation, LLC at 1 (Nov. 22, \n2024) (“Constellation Complaint”)."},{"page":5,"startToken":1182,"endToken":1467,"text":"5 \n \narrangements.7  Constellation asked the Commission to require PJM to incorporate into its Tariff \nsections from PJM’s Guidance on Co-located Load.8 \n \nOn February 20, 2025, the Commission issued the Show Cause Order opening a new \ndocket, Docket No. EL24-49-000, and consolidated the new docket with the Constellation \nComplaint docket, Docket No. EL25-20-000, and the technical conference docket exploring co-\nlocated large loads and generators, Docket No. AD24-11-000.  Based on the Constellation \nComplaint and Co-location Technical Conference, the Commission found that PJM’s Tariff \nappears to be unjust, unreasonable, unduly discriminatory or preferential, and directed PJM and \nPJM Transmission Owners to either:  \n(1) show cause as to why the [PJM Tariff], the Amended and \nRestated Operating Agreement of PJM, and Reliability Assurance \nAgreement Among Load Serving Entities in the PJM Region . . . \nremains just and reasonable and not unduly discriminatory or \npreferential without provisions addressing with sufficient clarity or \nconsistency the rates, terms, and conditions of service that apply to \nco-location arrangements; or (2) explain what changes to the Tariff \nwould remedy the identified concerns if the Commission were to \ndetermine that the Tariff has in fact become unjust and \nunreasonable or unduly discriminatory or preferential and, \ntherefore, proceeds to establish a replacement Tariff.9 \nPJM and PJM Transmission Owners filed answers and responses.  PJM took the position \nthat the PJM Tariff is just and reasonable, although it conceded that there is room for \nimprovements and clarifications.10  It asked the Commission to provide guidance so that it can \nmove forward.11  PJM included in its answer eight potential co-location arrangements and \n \n7  \nId. \n8  \nId. at 2. \n9  \nShow Cause Order, 190 FERC ¶ 61,115 at P 2. \n10  \nPJM Answer at 4. \n11  \nId."},{"page":6,"startToken":1467,"endToken":1689,"text":"6 \n \nsummarized what it sees as each arrangement’s key attributes, impacts on the grid, necessary \nstudies, rates, operational considerations, and service options.12  PJM expressed a preference for \ncertain options and less of a preference for other options.13    Indicated PJM Transmission \nOwners urged the Commission to find that the existing PJM Tariff is just and reasonable and \ndeclare that all co-located loads should be treated as load in front of the meter and designated as \nNetwork Load.14  PSEG, a transmission owner who filed separately from other transmission \nowners, framed the question before the Commission as defining what benefits a particular co-\nlocated load and generation configuration receives from the grid and setting charges and rates \naccordingly.15 \nII. \nCOMMENTS \nA. \nDevelop Pro Forma Co-location Interconnection Procedures and Agreements \nThe comments across the three dockets show that Commission guidance is needed, and it \nis needed now.  Data center developers, generation developers, and system planners cannot make \nlong-term decisions without understanding what co-location arrangements the Commission will \naccept.  Ideally, Commission guidance would come in the form of pro forma procedures and \nagreements governing co-location arrangements.  Standardizing procedures and agreements \nwould give developers and planners certainty, reduce opportunities for undue discrimination or \n \n12  \nPJM Answer at Exhibit A. \n13  \nId. \n14  \nIndicated PJM Transmission Owners Answers at 2. \n15  \nPSEG Answer at 1-2."},{"page":7,"startToken":1689,"endToken":2148,"text":"7 \n \npreference, reduce disputes, and, hopefully, expedite the development of data centers and needed \ngeneration.16  \nWhile standardization is beneficial, it is equally important that the Commission build into \nany pro forma procedures and agreements flexibility to allow for different co-location \nconfigurations and arrangements.  Not all large loads are the same, so not all co-location \nconfigurations will be the same either.17  This could be accomplished by allowing different paths \nthat lead to different studies and services for different types of co-location configurations.  The \ntype of co-location arrangement can then lead to different charges.18  A pro forma process and \nagreements should allow for at least the following three configurations: (i) load and generation \nare fully islanded from the electric grid, with no service from the grid; (ii) flexible loads or \ndemand response loads; and (iii) loads that will require backup grid service, such as a behind the \nmeter arrangement, with associated studies and costs for each.  Furthermore, the resulting \nservices and charges applicable to each of these configurations should impose charges on load \nand generation based only on the transmission services used and benefits received from the grid.  \n \n16  \nThe benefits of standardized procedures and arrangements for co-located load and generation are similar to \nthose the Commission found for generator interconnection.  See, e.g., Order No. 2003 at PP 8-12. See \nStandardization of Generator Interconnection Agreements & Procs., Order No. 2003,104 FERC ¶ 61,103 \nat PP 8-12 (2003), order on reh’g, Order No. 2003-A, 106 FERC ¶ 61,220, order on reh’g, Order No. \n2003-B, 109 FERC ¶ 61,287 (2004), order on reh’g, Order No. 2003-C, 111 FERC ¶ 61,401 (2005), aff’d \nsub nom. Nat’l Ass’n of Regul. Util. Comm’rs v. FERC, 475 F.3d 1277 (D.C. Cir. 2007). \n17  \nSee Large Loads Co-located at Generating Facilities, Docket No. AD24-11-000, Post-Workshop Comments \nof the Solar Energy Industries Association at 4 (Dec. 9, 2024) (“SEIA Post-Technical Conference \nComments”), citing Kormos Pre-filed Presentation, The Co-Located Load Solution at 2.  PJM identified \neight potential co-location configurations that have different needs and impacts on the grid.  PJM Answer at \nExhibit A. \n18  \nData center developers have agreed that they should pay for the benefits they receive from the grid.  See \nLarge Loads Co-located at Generating Facilities, Docket No. AD24-11-000, Post-Workshop Comments of \nthe Data Center Coalition at 5 (Dec. 9, 2024) (“Consistent with established and sound utility ratemaking \nprinciples, DCC’s co-location principles support all load paying their fair share of costs for benefits and \nservices received from the grid, including transmission, energy, and ancillary services costs.” (citation \nomitted)); Large Loads Co-located at Generating Facilities, Docket No. AD24-11-000, Post-Workshop \nComments of Google LLC at 5 (Dec. 9, 2024) (At Google, we are not seeking to avoid paying our fair \nshare of these costs . . ..”)."},{"page":8,"startToken":2148,"endToken":2403,"text":"8 \n \nIn this respect, BrightNight generally supports the PSEG approach and strongly disagrees with \nthe ‘one-size fits all configurations’ approach put forward by indicated PJM Transmission \nOwners.  Co-located load should be charged just and reasonable rates and not forced to subsidize \nother customers.    \nBrightNight also supports the Co-Location Interconnection Service Agreement concept \nproposed by the Solar Energy Industries Association (“SEIA”) in its post-technical conference \ncomments in Docket No. AD24-11-000.19  SEIA urged the Commission to adopt a pro forma but \nflexible approach for co-location arrangements, particular fully islanded load and generation; \nflexible loads or demand responsive load; and loads that require back-up gride service.20  SEIA \nsuggested that the Commission define the problem and impact of various types of co-location \narrangements and develop a pro forma agreement considering different arrangements.21  As \nstated, “The pro forma agreement would provide flexibility in its terms to accommodate various \ntypes of co-location arrangements, including load receiving firm transmission service or load that \ndoes not receive full transmission service.  Included in the pro forma agreement would be \nprovisions for System Protection Facilities in place to prevent the unexpected withdrawal of \npower from the grid, and penalties for failure of these protection facilities.”22  The Commission \ncan use the record created in this proceeding to establish a pro forma agreement for co-locating \nloads and generation in the PJM region that set the baseline for other regions and transmission \nproviders to use. \n \n19  \nSEIA Post-Technical Conference Comments at 5-6. \n20  \nId. at 4. \n21  \nId. at 3-5. \n22  \nId. at 5-6."},{"page":9,"startToken":2403,"endToken":2662,"text":"9 \n \nB. \nRules Should Incentivize Co-Located Load to Bring Its Own Generation \nIn its answer, PJM recognized that large load bringing its own generation has benefits.23  \nWhile large load should not be required to bring its own generation, BrightNight agrees that \nthere are significant benefits when large load brings new generation with it, particularly if that \ngeneration is co-located with the large load.  Large load bringing new generation promotes \nresource adequacy and avoids new constraints or congestion on the transmission system.   \nIn its answer, PJM discusses ways to incentivize large loads to bring their own \ngeneration, including expedited interconnection studies.24  SEIA outlined a process that \nincentivizes load to bring its own generation in its Post-Technical Conference Comments.25  An \nexpedited or fast-tracked interconnection process appears to be appropriate.  PJM should be \nrequired to net the large load and generation, resulting in faster study time and less impact on the \ntransmission system and load forecast.  It could be handled similarly to the surplus \ninterconnection process, where the load and generation configuration can be screened for \npotential material impacts to the native transmission system or adjoining systems.  If there are \nmaterial impacts that cannot be resolved among the affected systems, then the load and \ngeneration will be shifted to the typical interconnection and transmission service request \nprocesses.  BrightNight encourages the Commission, PJM, and other stakeholders to incorporate \nin the pro forma co-location procedures incentives for large loads to bring co-located generation. \n \n23  \nPJM Answer at 16-18, Exhibit A. \n24  \nId. at 17. \n25  \nSEIA Post-Technical Conference Comments at 6-7."},{"page":10,"startToken":2662,"endToken":2780,"text":"10 \n \nIII. \nCONCLUSION \nBrightNight respectfully requests that the Commission consider these comments as it \ncontemplates how to move forward on co-location issues in PJM. \nApril 23, 2025  \n \n \n \n     Respectfully Submitted, \n \n \n \n \n \n \n \n \nBy: /s/ Radha Soorya \nRadha Soorya, Ph.D. \nSenior Vice President Transmission \nBrightNight Power, LLC \n515 N. Flagler Drive, Suite P200 \nWest Palm Beach, FL 33401 \nTelephone: 850-460-0697 \nE-mail: radha.soorya@brightnightpower.com  \n \nBy: /s/ Duane K. Duclaux \nDuane K. Duclaux \nGeneral Counsel \nBrightNight Power, LLC \n515 N. Flagler Drive, Suite P200 \nWest Palm Beach, FL  33401 \nTelephone: 850-502-6492 \nE-mail:  duane@brightnightpower.com \n \nChristina R. Switzer \nEngleman Fallon, PLLC  \n823 Congress, Ave., Suite 300-67 \nAustin, TX 78701 \nTelephone: 202-464-1334  \nE-mail: cswitzer@efenergylaw.com \n \n \n \n \n \nCounsel for BrightNight Power Marketing, LLC"},{"page":11,"startToken":2780,"endToken":2840,"text":"11 \n \nCERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \n \n Dated at Austin, TX, this 23rd day of April 2025.  \n \n \nBy: /s/ Christina Switzer \n823 Congress, Ave., Suite 300-67 \nAustin, TX 78701 \nTelephone: 202-464-1334  \nE-mail: cswitzer@efenergylaw.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":1617,"startToken":0,"endToken":728},{"p":3,"at":1617,"title":"I. BACKGROUND","method":"printed heading","endPage":6,"endAt":781,"startToken":728,"endToken":1586},{"p":6,"at":781,"title":"II. COMMENTS","method":"printed heading","endPage":6,"endAt":796,"startToken":1586,"endToken":1588},{"p":6,"at":796,"title":"A. Develop Pro Forma Co-location Interconnection Procedures and Agreements","method":"printed heading","endPage":9,"endAt":5,"startToken":1588,"endToken":2404},{"p":9,"at":5,"title":"B. Rules Should Incentivize Co-Located Load to Bring Its Own Generation","method":"printed heading","endPage":10,"endAt":6,"startToken":2404,"endToken":2663},{"p":10,"at":6,"title":"III. CONCLUSION","method":"printed heading","endPage":11,"endAt":6,"startToken":2663,"endToken":2781},{"p":11,"at":6,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":11,"endAt":401,"startToken":2781,"endToken":2840}]}
