{"document":{"slug":"rec-20250423-5247","title":"Comments of Northern Virginia Electric Cooperative, Inc","issued":"2025-04-23","accession":"20250423-5247","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Northern Virginia Electric Cooperative, Inc.","kind":"comments","file":"sources/filings/text/20250423-5247_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5247","tier":"record","sha256":"23e30613ddbee55fc330d3940665b99f8dc99578bbedb0e9b4890a77dee8d8af","pages":21,"tokens":6760,"emptyPages":[],"textThemes":["colo","adequacy","retail"]},"pages":[{"page":1,"startToken":0,"endToken":186,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n) \n \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. \nAEP Kentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \nDocket Nos. EL25-49-000"},{"page":2,"startToken":186,"endToken":471,"text":"2 \n \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc.\nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \n \nLarge Loads Co-Located at Generating Facilities  \n \n \nConstellation Energy Generation, LLC \n \nv.  \n \nPJM Interconnection, L.L.C. \n \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n) \n \n \n \n \n \n \n \n \n \n \n \nAD24-11-000\n \n \nEL25-20-000\n(Consolidated)\n \n \n \n \nCOMMENTS OF NORTHERN VIRGINIA ELECTRIC COOPERATIVE, INC. \nPursuant to paragraph 87 of the Federal Energy Regulatory Commission’s (“FERC” or \nthe “Commission”) February 20, 2025 Order Instituting Proceeding Under Section 206 of the \nFederal Power Act and Consolidating with Other Proceedings (“Show Cause Order”), Northern \nVirginia Electric Cooperative, Inc. (“NOVEC”)1 respectfully submits these comments \naddressing: “(1) whether the existing Tariff remains just and reasonable and not unduly \ndiscriminatory or preferential; and (2) if not, what changes to the Tariff should be implemented \nas replacement rates.”2 PJM Interconnection, L.L.C.’s (“PJM”) existing Open Access \n \n1 NOVEC filed its intervention in Docket No. EL25-49-000 on March 4, 2025. NOVEC, Motion to Intervene, Docket \nNo. EL25-49-000 (filed March 4, 2025) (Accession No. 20250304-5077). \n2 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115, P 87 (2025) (“Show Cause Order”) (“Interested entities may \nrespond within 30 days of PJM’s and the Transmission Owners’ filings, addressing either or both of: (1) whether the \nexisting Tariff remains just and reasonable and not unduly discriminatory or preferential; and (2) if not, what changes \nto the Tariff should be implemented as replacement rates.”). PJM and the Indicated PJM Transmission Owners filed \ntheir responses on March 24, 2025. Because NOVEC has filed these comments on April 23, 2025, it is timely."},{"page":3,"startToken":471,"endToken":808,"text":"3 \n \nTransmission Tariff (“OATT” or “Tariff”) is just and reasonable, and not unduly discriminatory. \nCo-located load is addressed by the Tariff, which allows co-located load to acquire transmission \nservice consistent with the Commission’s cost-causation principle. No Tariff changes are needed.  \nI. \nBACKGROUND \nOn March 22, 2024, PJM posted its since-rescinded Guidance on Co-Located Load \n(“Guidance Document”).3 The Guidance Document defines, and the Show Cause Order accepts \nfor its purposes, co-located load as “end-use customer load that is physically connected to the \nfacilities of an existing or planned Customer Facility on the Interconnection Customer’s side of \nthe Point of Interconnection (‘POI’) to the PJM Transmission System (co-located Customer \nFacility).”4 Although the Guidance Document recommended that all co-located load be served \nby PJM transmission service, the Guidance Document also contemplated that a co-location \narrangement could proceed without procuring firm transmission service, in which case the co-\nlocated generator would have to reduce its Capacity Interconnection Rights (“CIR”) to reflect the \ncapacity designated to the co-located load.5 The implication of the removal of the CIR for the co-\nlocated load is that those megawatts (“MW”) would not be available to the capacity market.6  \nIn Docket No. ER24-2172-000, PJM submitted an amended Interconnection Service \nAgreement (“ISA”) between PJM, Susquehanna Nuclear LLC (“Susquehanna”), and PPL \nElectric Utilities Corporation.7 The amended Susquehanna ISA would have implemented the \nGuidance Document’s option to proceed without firm transmission service as non-Network \n \n3 PJM, PJM Guidance on Co-Located Load (March 22, 2024) (updated April 17, 2024), https://www.pjm.com/-\n/media/DotCom/markets-ops/rpm/rpm-auction-info/pjm-guidance-on-co-located-load.pdf (“Guidance Document”).  \n4 Guidance Document at 1; Show Cause Order at P 3 n.4.  \n5 Show Cause Order at P 4; Guidance Document at 2-3.  \n6 See Independent Market Monitor for PJM, Answer and Motion for Leave to Answer, Docket No. ER24-2172-000 at \n4 (filed July 10, 2024) (Accession No. 20240710-5036) (“IMM Susquehanna Answer”).  \n7 PJM, Amendment to Susquehanna ISA, Docket No. ER24-2172-000 (filed June 3, 2024) (Accession No. 20240603-\n5012) (“Susquehanna ISA Filing”)."},{"page":4,"startToken":808,"endToken":1122,"text":"4 \n \nLoad, relieving the co-located load of having to obtain transmission service. Although several \ncommenters filed pleadings raising questions about the propriety of the filing,8 the Commission \nrejected the Susquehanna ISA because “PJM has not demonstrated that the proposed non-\nconforming provisions in the Amended ISA are necessary deviations from the pro forma ISA \ndue to specific reliability concerns, novel legal issues, or other unique factors.”9  \nOn November 1, 2024, the Commission convened a technical conference in Docket No. \nAD24-11-000 “to discuss generic issues related to the co-location of large loads at generating \nfacilities.”10 Contemporaneously with that effort, Constellation Energy Generation, LLC \n(“Constellation”) filed a complaint seeking to have PJM’s Tariff amended to incorporate the \nGuidance Document’s option to have a co-location arrangement without firm transmission \nservice.11 The general thrust of Constellation’s complaint was that what Constellation calls \n“Fully Isolated Co-Located Load,” which it defines as “generation and end-use load co-located \nbehind-the-meter in a configuration that includes protective relays to prevent the load from \nreceiving power from the grid,”12 was not being served due to an asserted “gap” in the Tariff  \nwhich allegedly renders the Tariff unjust and unreasonable.13  \nNOVEC, among many others that reacted to Constellation’s complaint, protested the \ncomplaint, explaining that it should be denied because: (1) it would relieve co-located loads of \nhaving to pay any transmission costs even though they rely on and benefit from the transmission \nsystem; (2) granting the complaint would facilitate the withdrawal of generation from PJM’s \n \n8 See, e.g., Exelon Corporation, Protest, Docket No. ER24-2172-000 (filed June 24, 2024) (Accession No. 20240624-\n5207); IMM Susquehanna Answer. \n9 PJM Interconnection, L.L.C., 189 FERC ¶ 61,078, P 85 (2024).  \n10 Show Cause Order at P 5.  \n11 Constellation, Complaint, Docket No. EL25-20-000 (filed Nov. 22, 2024) (Accession No. 20241122-5285) \n(“Constellation Complaint”).  \n12 Id. at 1.  \n13 Id. at 9."},{"page":5,"startToken":1122,"endToken":1425,"text":"5 \n \nenergy and capacity markets, undermining both markets; and (3) the subject matter of co-located \nload has broad industry-wide implications that should be addressed in a general Commission \nrulemaking, not in a company-specific complaint proceeding (if any changes to the Tariff to \naddress co-located load are going to be considered at all).14  \nIn the Show Cause Order, the Commission observed that there had been a “surge” of \ninterest in co-location arrangements which has presented “significant and novel issues.”15 The \nCommission consolidated the Constellation Complaint and the Commission’s technical \nconference with the Show Cause Order proceeding so that the records from those proceedings \nwould form a part of the Show Cause Order’s proceeding’s record. The Commission first \naddressed the jurisdictional issues.16 Turning to the PJM Tariff, the Commission determined that \nit may be “unjust and unreasonable or unduly discriminatory or preferential because it does not \ncontain provisions addressing with sufficient clarity or consistency the rates, terms, and \nconditions of service that apply to co-location arrangements,” explaining that “[t]he absence of \nsuch provisions may leave entities unable to determine what steps they can or must take to \neffectuate co-location arrangements of various configurations and how to do so in a manner that \nis just and reasonable.”17 The Commission expressed concern that without a common \nunderstanding of how co-location arrangements in various configurations will be effectuated, \n“participants in a co-location arrangement may not be required to pay for wholesale services that \nthey receive, as required by the cost causation principle, which provides that all Commission-\njurisdictional rates and charges must ‘reflect to some degree the costs actually caused by the \n \n14 See NOVEC, Protest, Docket No. EL25-20-000 (filed Dec. 18, 2024) (Accession No. 20241218-5285) (“NOVEC \nProtest”). \n15 Show Cause Order at P 65. \n16 Id. PP 66-73.  \n17 Id. P 74."},{"page":6,"startToken":1425,"endToken":1736,"text":"6 \n \ncustomer who must pay for them,’ and that costs must be allocated in a manner that is at least \nroughly commensurate with the benefits that entity receives.”18 The Commission also raised \nquestions regarding the reliability and resource adequacy implications of co-location \narrangements.19 The Commission posed a series of briefing questions to help it address the \nquestion as to whether the Tariff remains just and reasonable and, if not, what revisions to the \nTariff would remedy those concerns.20 \nII. \nCOMMENTS \n \nNOVEC appreciates the Commission’s thoughtful approach to the question of co-location \narrangements and respectfully submits these comments to supplement its protest in Docket No. \nEL25-20-000. NOVEC has no particular objection to co-location arrangements in principle \nprovided: (a) that the co-located load obtains and pays for Network Integration Transmission \nService (“NITS”) or firm Point-to-Point Transmission Service (“PTP Service”); or (b) neither the \nco-located load nor the generator to which it is tied are in any manner connected to the bulk \nelectric system, either directly or via interconnection to distribution-level facilities that in turn \ninterconnect with the bulk electric system. \n \nTo summarize NOVEC’s comments below, NOVEC first addresses the question of \njurisdiction. Next NOVEC explains why the specific configuration of the co-located load and the \ngenerator upon which that load is relying are of paramount importance to the Commission’s \nquestions. Although there may be a variety of potential configurations, in the end the \ndetermination of whether co-located load or the supplier to such load should be required to \nobtain and pay for transmission service turns on whether the load and the generation serving it \n \n18 Id. P 74 (quoting Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1368 (D.C. Cir. 2004); citing Ill. \nCom. Comm’n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009)). \n19 See Show Cause Order at PP 83-86.  \n20 Id. PP 87-88."},{"page":7,"startToken":1736,"endToken":2068,"text":"7 \n \nare both physically unconnected with either the bulk electric system or distribution facilities that \nconnect to the bulk electric system. A co-location arrangement like the one advanced in the \nSusquehanna ISA or the Constellation Complaint did not involve such physically islanded load \nor generation and thus is not just and reasonable and is not permissible under the PJM Tariff. \nSuch a configuration violates the Commission’s cost causation principles, undermines the \nCommission-approved PJM market structure, and is not fair to consumers. Third, given the \nhistorical cost-of-service arrangements for nuclear power plants that now, in part, make them \nattractive for these bilateral contracts, it would be unfair to dedicate such legacy generation to a \nsingle private customer after customers at large paid for such facilities and took the risks of \nconstruction since the time such resources were built. It is particularly troubling given the \nproposal and expectation that such units would remain interconnected to mitigate their \nweaknesses that require grid connection to operate -- thus deriving benefit from the grid -- but \nthen be allowed to avoid paying for the benefits of grid interconnection. Fourth, NOVEC \ndistinguishes behind the meter generation from co-location arrangements. Finally, NOVEC \nexplains how the Commission may choose to integrate national security concerns into its \ndecision-making processes.  \nA. \nThe Commission’s Jurisdictional Statement is Generally Correct, With Some \nSpecifics as Applied to Virginia That Bear Consideration \n \n \nNOVEC generally agrees with the Commission’s statement on jurisdiction. Whether and \nto what extent a co-location arrangement falls under state or federal jurisdiction depends on the \naspect of the physical configuration of the co-located load being considered, as well as the \ncontractual and tariff arrangements and the laws of the state in which it is located.21 Under \n \n21 Id. P 68 (“As the comments described above illustrate, the boundaries between federal and state jurisdiction are not \nhermetically sealed. The application of these principles to the issue of co-location will often depend heavily on the \nspecific facts and circumstances presented in particular situations.”) (internal citations omitted)."},{"page":8,"startToken":2068,"endToken":2371,"text":"8 \n \nNOVEC’s understanding of relevant state law, the co-location arrangements sought by \nConstellation in Docket No. EL25-20 would not be permissible in Virginia unless the supplier to \nthe co-located load is authorized under state law to be a retail supplier in the geographic area in \nwhich the co-located load is located. Questions regarding the co-located load’s obligation or the \nsupplying generator’s obligation to take and pay for transmission service in connection with their \nco-located arrangement is a matter of Commission jurisdiction.  \n \nNOVEC respectfully requests that the Commission take care not to intrude on matters of \nstate jurisdiction in the event that, notwithstanding these comments to the contrary, the \nCommission decides that some modification of PJM’s Tariff is warranted. FERC has jurisdiction \nto address PJM’s Tariff and transmission service generally, but matters such as the authority to \nprovide retail service are within each state’s jurisdiction. Any modification of PJM’s Tariff must \nnot infringe on the states’ jurisdiction over retail service. Further, NOVEC submits that given the \ncomplications presented by these jurisdictional concerns, the Commission should not create a \nnovel contractual arrangement in the PJM Tariff that allows co-located arrangements to bypass \ntransmission service, local distribution utilities, and the capacity market. If it does, the \nCommission risks creating an uneven patchwork of co-location rules across PJM as some \njurisdictions permit it and others do not. \nB. \nPJM’s Existing Tariff is Just and Reasonable \n \n \nImplicit in the Commission’s question as to whether the PJM Tariff is just and reasonable \nis whether the Tariff should permit co-located arrangements in configurations that relieve co-\nlocated load of transmission service costs or remove generation from the capacity and energy \nmarkets. On the contrary, the PJM Tariff is just and reasonable precisely because it does not \npermit that result. As discussed below, there are three reasons that support NOVEC’s position."},{"page":9,"startToken":2371,"endToken":2751,"text":"9 \n \n1. Co-located load relies on the transmission system and should pay the \nsame costs as other transmission customers unless it and the supplying \ngenerator are physically islanded. \n \n  \n“Fully Isolated Co-Located Load” is not fully isolated if any physical connection to the \ndistribution or transmission grid exists with the co-located load or with the generator to which \nthe co-located load is connected. If there is any physical tie at all, even if there is switchgear in \nplace to isolate it, the co-location arrangement benefits from and relies upon the transmission \nsystem. The benefits of, and the need for, the transmission system is the very reason co-located \nloads seek to maintain that connection to the transmission system and do not island themselves.22 \n \nWith respect to large generation assets interconnected to the grid, regardless of whether \nthe unit is nuclear, fossil-fueled, or renewable, the grid necessarily responds to all power-quality \nissues caused by the generator or any load behind the generator, including but not limited to \nfrequency response, reactive needs, transient issues, and voltage control.  Co-located load is akin \nto parasitic load because the transmission grid cannot differentiate between energy that is \ninjected into the market and energy that is injected to serve co-located load. Additionally, nuclear \npowered generation units are not operated as flexible or partially loaded assets but instead \noperate at full load between fueling cycles to maximize the value of their fuel rods. As such, \nnuclear powered generation assets depend upon other generators on the grid to provide all \nancillary service and other power-quality needs.  \nThe reliance is clear from the proposed configurations. As the Indicated PJM \nTransmission Owners (“Indicated PJM TOs”) explained in their answer to the Commission’s \n \n22 See, e.g., NOVEC Protest at 10 n.35 (citing Large Loads Co-Located at General Facilities, Transcript, Docket No. \nAD24-11-000, at 113:11-17 (Dec. 3, 2024) (Accession No. 20241203-4000) (“And the final point that I would add is \njust that the grid has an immense reliability benefit that we are simply not interested in walking away from, and so we \nhave every interest in getting the grid to be that reliability resource, and in that vein, at least from our perspective, we \nhave no interest in diverting existing reliability grid connected resources away from the grid, thank you.”))."},{"page":10,"startToken":2751,"endToken":3255,"text":"10 \n \nShow Cause Order, “all the arrangements being contemplated or requested as being \ninterconnected with and synchronized with the transmission and/or distribution grid and thus \n[are] not ‘fully isolated.’”23 Because of this reliance, it is just and reasonable to treat co-located \nload as Network Load or require it to procure PTP Service. PJM charges transmission customers \non a formulary basis without regard for the distance between load and generation.24 Thus, \ndistance does not relieve one of the need to procure transmission service. \n \nPJM itself recognized that the co-location arrangement is still electrically connected and \nsynchronized to the PJM Transmission System.25 It still uses various ancillary services at times \nto provide power quality products as identified in PJM’s response, including black start service.26 \nIt is problematic to NOVEC that certain co-location arrangements would still require black start \nservice but are proposing to avoid paying for it — the availability of black start service to co-\nlocation arrangements is indicative of the broader benefits provided by the transmission system \nduring crisis. To the extent that a co-location arrangement is using the grid as a backup power \nsupply, ancillary services, or other benefits, that is another way co-location arrangement relies on \nthe transmission system. As the Indicated PJM TOs observed: \n \n23 Indicated PJM Transmission Owners, Answer, Docket Nos. EL25-49-000, et al. at 9 (filed March 24, 2025) \n(Accession No. 20250324-5298) (“Indicated PJM TOs Answer”).  \n24 Id. at 10.  \n25 Id. at 12.  \n26 Id. at 12; see also Exelon, Comments, Docket No. EL25-20-000, Attachment 1, at P 14 (“For example, there is no \nreason to believe that the data center load will be immutably fixed and, indeed, all load typically varies over time to \nsome degree. To the extent the load varies from second to second, minute to minute, or hour to hour, it will require \nload following services.”) (Dec. 12, 2024) (Accession No. 20241212-5263) (“Weaver Declaration”); id. at P 15 \n(“Likewise, the system needs to maintain adequate Operating Reserves (e.g., Spinning and Supplemental Reserves). \nCo-located load arrangements make no mention of how this configuration will maintain or provide such reserves from \nthe nuclear units serving the data center should those nuclear units not be available for some duration—those reserves \nwill instead be provided by generators somewhere elsewhere on the system to not only supply the location but to \nprevent the grid from collapse.”); id. at P 17 (“In addition, if the surrounding system was ever in a position of restoring \nthe grid after a black out, it must rely on black start resources to support the restoration process. Nuclear units are \nincapable of providing black start services, so the co-located load must rely on black start services from other PJM \nresources on the grid to come back online.”); see also IMM Susquehanna Answer at 6 (“The co-located load will \ncontinue to rely on the grid for a range of ancillary services including frequency control, reactive, spinning reserves, \nreserves in general, black start, and PJM administrative functions.”); NOVEC Protest at 4-5."},{"page":11,"startToken":3255,"endToken":3592,"text":"11 \n \nMoreover, in a recently submitted co-location arrangement and in the arrangements \nproposed and discussed in the Complaint, the co-located load depended upon \nanother nuclear unit at the same facility for its backup supply of real power—which \nis to say, a PJM capacity resource that is interconnected with, serves, and relies \nentirely upon the grid. The proposed backup arrangement, including any \n“replacement capacity” mechanism, depends upon the delivery of energy from \nother locations on the network through PJM’s transmission system.27 \n \n \nCo-location arrangements indisputably rely on the transmission system and its benefits. \nAnd, as the Indicated PJM TOs point out, all load, including co-located load, is used to plan the \ntransmission system under the PJM Tariff.28 Co-location proposals that exempt co-located load \nfrom the costs of transmission service effectively give them free use of the transmission system \nand cause other load to subsidize that use. This is inconsistent with the Commission’s cost-\ncausation principle; the Commission should not approve free-ridership. The existing PJM Tariff, \nwhich requires co-located load to procure transmission service, is just and reasonable because it \nmatches the cost of the transmission system with the co-location arrangements’ benefit from and \nuse of the transmission system. The Commission should not order changes to the PJM Tariff, or \nif it does to clarify the provision of co-location services, it should still require co-located load to \nacquire firm transmission service. \n2. Certain of the proposed co-location arrangements have involved the \nremoval of significant generation from PJM’s markets, which would \ncause an unreasonable and unsustainable increase in costs for customers \neven as the load causing those cost increases benefits from the markets’ \nplanning functions. \n \n \nThe Commission should be very concerned about the potential impacts to reliability and \nresource adequacy of certain types of co-location arrangements. If co-location arrangements like \nthe configuration advanced by the Constellation Complaint are permitted, they will present \nreliability challenges. The Indicated PJM TOs explained that a Reliability, Availability and \n \n27 Indicated PJM TOs Answer at 14 (internal citations omitted).  \n28 Id. at 14-17."},{"page":12,"startToken":3592,"endToken":3918,"text":"12 \n \nServiceability (“RAS”) system operation “may fail, thrusting the full burden of the co-located \nload onto the grid to continue operating if the co-located generation is offline for any reason.”29 \nThe Commission recognized the possibility that “if the generator were to trip offline, then load \ncould appear instantaneously on the grid and cause serious grid level events at the scale of a data \ncenter.”30 The potential size of the co-located load only emphasizes the reliability risk — the \nSusquehanna ISA contemplated 480 MW being withdrawn from the grid which, under \nemergency conditions, could appear on the grid.31 Not only will 480 MW of generating capacity \nbe withheld from the market as a result of dedicating that capacity to a single customer (the co-\nlocated load), in the event of an outage of the supplying generation, the PJM system could be \ncalled upon to now serve that load even though it now has 480 MW less capacity in its arsenal to \nhelp it do so. If the Commission were to adopt a regime that significantly subsidizes co-location \narrangements by relieving such load or their suppliers of the obligation to procure firm \ntransmission service, there is every reason to believe that they would increase in both size and \nfrequency.  \nAny increase in frequency, if it means a withdrawal from the supply stack PJM can call \nupon, also presents a reliability concern. Reliability is assured by having adequate generation. In \nthe event of a weather event like Winter Storm Elliott, where some generation becomes unable to \noperate, will co-location arrangements evoke Animal Farm, where some load, specifically co-\nlocated, is “more equal” than other load? NOVEC recognizes that the Commission considered \nthis question in its briefing questions when it asked: “Under what circumstances can PJM direct \nthe operators of co-location arrangements to shed such load if deemed necessary to preserve \n \n29 Id. at 10. \n30 Show Cause Order at P 83. \n31 Susquehanna ISA Filing at 1-2."},{"page":13,"startToken":3918,"endToken":4369,"text":"13 \n \nsystem reliability during a declared emergency?”32 If required to take NITS or firm PTP Service, \nthe question will be answered — the susceptibility to cutoff for the co-located load would be the \nsame as that of any other NITS or firm PTP Service customer. \n \nWith respect to resource adequacy, NOVEC is gratified that PJM has rescinded the \nGuidance Document.33 Co-location arrangements organized along those lines present real \nresource-adequacy risks,34 and as PJM notes, is not permissible under the PJM Tariff without \nauthorization.35 As NOVEC explained in its protest, “[t]he latest clearing prices for capacity in \nthe Dominion Zone marked a 15-fold increase from the prior delivery year.”36 The capacity \nmarket has been constrained by lack of supply, which has already hindered its operation.37 PJM \nneeds greater supply — as NOVEC’s Vice President – Power Supply, Mr. Jaramillo, remarked to \nthe Virginia State Corporation Commission: “trends towards increasing levels of non-\ndispatchable generation…may leave PJM wholesale electricity markets unable to provide the \nmarket-based generation NOVEC currently utilizes to meet the needs of its [data center] \ncustomers” and, even if generation is available, “increased costs in power markets may adversely \nimpact all customers.”38 The capacity market sets prices based in part on supply: less supply \n \n32 Show Cause Order at Briefing Questions, (e)(vi). \n33 PJM Interconnection, L.L.C., Answer, Docket Nos. EL25-49-000, et al. at 33-34 (March 24, 2025) (Accession No. \n20250324-5313) (“PJM Answer”). \n34 See, e.g., NOVEC Protest at 7-9; PJM Answer at 57 (“Depending on the configuration, co-location has the same \nimplications for resource adequacy as load that is not co-located. These implications then impact the quantities of \nresources available to clear in the market and the resulting prices paid by customers.”) (emphasis added). \n35 PJM Answer at 57-58 (“All Generation Capacity Resources must offer their full Accredited Unforced Capacity into \nthe capacity market, unless PJM has granted an exception to the must-offer requirement pursuant to the existing rules \nin Tariff, Attachment DD, section 6.6. While there is an exception from the must-offer requirement where the Capacity \nMarket Seller ‘has entered into a unit-specific bilateral transaction for service to load located outside the PJM Region,’ \nthere is no exception allowing Capacity Resources to not offer capacity bilaterally committed to serve load in the PJM \nRegion.”) (internal citations omitted). \n36 NOVEC Protest at 8 (citing NOVEC, Opening Remarks of Gilbert D. Jaramillo, Case No. PUR-2024-00144 at 5:3-\n6 (Dec. 9, 2024) (available at: https://www.scc.virginia.gov/docketsearch#caseDocs/145480) (“Jaramillo Remarks”).  \n37 See Governor Josh Shapiro and the Commonwealth of Pennsylvania, Complaint, Docket No. EL25-46-000 (filed \nDec. 30, 2024) (Accession No. 20241230-5225). \n38 Jaramillo Remarks at 5:3-9."},{"page":14,"startToken":4369,"endToken":4670,"text":"14 \n \nmeans the price increases. Co-location arrangements premised on generators removing \nthemselves from the capacity market will only exacerbate the long-standing structural problems \naffecting PJM’s markets, as well as looming supply shortages.  \nMoreover, it seems to NOVEC that, in significant part, the lack of supply arising from \ncongestion in the interconnection queue, as-yet unresolved failures to act on existing \ninterconnection approvals, and retiring thermal generation is the impetus for the interest in co-\nlocation arrangements. Those supply problems affect all load, and it is discriminatory to afford \nsome load a lifeboat in the form of co-location while the remaining load must address the \nconsequences made worse by that lifeboat. \n \nHowever, there are co-location configurations that can maintain the integrity of the \ncapacity market and are thus just and reasonable. The Indicated PJM TOs have already explained \nthat co-location is permitted under the PJM Tariff so long as the co-location arrangement \nprocures the necessary firm transmission service. In its answer, PJM discussed various co-\nlocation configurations that are already permitted by the PJM Tariff and observed that “the \ncapacity market was designed with such bilateral intra-PJM arrangements in mind, allowing \nsellers to offer such contracted capacity as ‘self supply’ into RPM Auctions.”39 Thus, generation \nassociated with co-location arrangements is able to enter into bilateral agreements with co-\nlocated load even as it satisfies its obligation to offer into the capacity market. \n3. It is unfair, and thus not just and reasonable, to consecrate legacy \ngeneration units funded by ratepayers to the exclusive service of private \nentities to the detriment of the public served by PJM’s markets. \n \n \nThe Commission asked for comments on its question: “Finally, for generation units paid \nfor originally by consumers in base rates prior to restructuring, is it fair and/or just and \n \n39 PJM Answer at 58."},{"page":15,"startToken":4670,"endToken":5101,"text":"15 \n \nreasonable if these units are taken out of the system’s supply stack and devoted exclusively to \nserving co-location arrangements with one or a few large customers?”40 This is a legitimate \nquestion for the Commission to ask, one that neither PJM nor the Indicated PJM TOs chose to \naddress in detail.41 As Chairman Christie emphasized in his comments at the February 2025 \nOpen Meeting, large load customers should be served, but it has to be done in a way that is fair.42 \n \nThe Susquehanna ISA and many other potential targets for co-location are nuclear power \nplants. They serve an important role in PJM’s energy and capacity markets and the PJM’s \nIndependent Market Monitor (“IMM”) has described them as “baseload power.”43 For the most \npart, nuclear power plants have the distinction of mostly having been built between 1970 and \n1990, prior to the restructuring of the electric industry in the PJM region. Thus, the plants were \nlargely constructed by or for vertically integrated utilities who funded the projects from cost-of-\nservice rates collected by captive retail customers. This meant that it was retail customers who \nbore the enormous risks associated with the construction of nuclear power plants, where billions \ncan be spent with nothing to show for it in the end. For an example, the Commission can refer to \nthe expansion of the V.C. Summer nuclear plant which foundered after billions of ratepayer \ndollars were spent.44 Even a successful construction of a nuclear power plant can generate \n \n40 Show Cause Order at Briefing questions, (f)(vii).  \n41 PJM Answer at 72 (“This question goes further and asks about whether customers have an ongoing entitlement to \nunits remaining as capacity resources based on their previous regulatory status prior to restructuring. Whether a \nspecific cost is eligible for recovery is for stakeholders, the Commission, and/or appropriate state or local entities to \ndecide.”); Indicated PJM TOs Answer at 21-22.  \n42 See February 20, 2025 Open Meeting, https://www.ferc.gov/news-events/events/february-20-2025-open-meeting-\n10022024 at 9:07-9:50. \n43 IMM Susquehanna Answer at 6; see also id. at 2 (“How will load be met if multiple base load generators are \neffectively removed from the market? What will the impact be on power flows given that the grid is built in significant \npart to deliver nuclear energy to load? What will be the impact on energy prices and capacity prices?”). \n44 Peter Maloney, Death of a nuke build: Summer abandonment leaves ratepayers holding the bag, UtilityDive (Aug. \n4, 2017) (Available at: https://www.utilitydive.com/news/death-of-a-nuke-build-summer-abandonment-leaves-\nratepayers-holding-the-bag/448597/)."},{"page":16,"startToken":5101,"endToken":5527,"text":"16 \n \nenormous cost overruns.45 The risk to retail customers was real, and the inability to assign that \nrisk to retail customers in many areas of the country because of organized wholesale markets \ncorresponds to the general end of the construction of utility-scale nuclear power plants in the \nUnited States. \n \nSince the restructuring of the electric industry, most nuclear power plants have largely \nbeen depreciated.46 Prior to restructuring, this would have benefited customers through lower \nrates, because depreciation is a significant contribution to rate base and thus the cost of service. \nIf the Constellation Complaint were to be granted and co-location arrangements were to be \nallowed under that or a similar paradigm, it would shift all of the remaining benefit of that \ngeneration to the co-located load and away from other load that paid for that facility, all while \nalso shifting transmission costs away from co-located load and onto the remaining load.47 \nAlthough NOVEC agrees in principle that owners of generation assets should be able to seek to \nmaximize the beneficial ownership of those assets, the Commission has the responsibility to \nreject proposals that are not just and reasonable because the Federal Power Act is a consumer-\nprotection statute.48 This is why NOVEC’s comments here are focused on incumbent generation, \nas distinct from new generation that is being or was developed to serve the co-located load and \nhas not been participating in the market. NOVEC supports the development of new generation. \n \n45 Jeff Amy, Georgia nuclear rebirth arrives 7 years late, $17B over cost, Associated Press (May 25, 2023) \n(Available at: https://apnews.com/article/georgia-nuclear-power-plant-vogtle-rates-costs-\n75c7a413cda3935dd551be9115e88a64). \n46 As an example of customers having already paid for nuclear power plants, many nuclear plant owners were provided \naccelerated recovery of the nuclear plants through a stranded cost mechanism.  While this process and the methodology \nfor calculating the amount of accelerated cost recovery varied among the states, the result was that retail customers \npaid higher rates to fund such stranded cost recovery. \n47 NOVEC will also note that, to the extent that the nuclear generators received subsidies from federal or state \ngovernments, those were also borne by retail customers in the form of taxes.  \n48 Xcel Energy Services, Inc. v. FERC, 815 F.3d 947, 952 (D.C. Cir. 2016) (“It is long-established that the ‘primary \naim [of the FPA] is the protection of consumers from excessive rates and charges.’” (quoting Mun. Light Bds. of \nReading & Wakefield v. FPC, 450 F.2d 1341, 1348 (D.C. Cir. 1971), cert. denied, 405 U.S. 989 (1972)))."},{"page":17,"startToken":5527,"endToken":5903,"text":"17 \n \n \nIt is to the Commission’s credit that it appreciates the potential unfairness of the situation \nand asked the question. The Commission has periodically observed how the legacy of the pre-\nrestructuring period has created inequities and the possibility of unjust and unreasonable results. \nFor example, in Opinion No. 494, the Commission found that the costs of legacy transmission \nfacilities which were built to serve the transmission systems of individual companies and their \ncustomers could not be allocated to the entire PJM region under the Commission’s cost-\ncausation principles.49 The instant situation is the inverse, but it implicates the same principle. In \nthis case, customers paid for the benefits of these legacy units, but the approval of certain co-\nlocation arrangements that allow generation to withdraw from the capacity market would have \nthe effect of shifting the benefits to private entities. Cost causation considers both costs and \nbenefits of the service involved.50  \n \nNOVEC respectfully urges the Commission to consider the legacy costs that retail \ncustomers bore before allowing private parties to dedicate the remaining benefits of existing \ngeneration to co-located load. The Commission should not permit any co-location paradigm that \nremoves nuclear generation from the capacity market because it is not just and reasonable given \ncustomers’ investments and risk-bearing that helped make those plants now attractive to load that \nwould now like to co-locate.  \nC. \nThere are Characteristics of Behind-the-Meter Generation That Distinguish It \nFrom Co-Location Arrangements That Warrant Distinct Treatment \n \n \nThe Commission asked commenters to address how co-located loads are disparate from \nBehind The Meter Generation (“BTMG”) as defined in PJM’s Tariff or Non-Retail Behind The \n \n49 PJM Interconnection, L.L.C., Opinion No. 494, 119 FERC ¶ 61,063, P 42 (2007).  \n50 Old Dominion Electric Cooperative v. FERC, 898 F.3d 1254, 1255 (D.C. Cir. 2018) (“For decades, the Commission \nand the courts have understood this requirement to incorporate a ‘cost-causation principle’—the rates charged for \nelectricity should reflect the costs of providing it…We often frame this principle as one that ensures ‘burden is \nmatched with benefit,’ so that FERC ‘generally may not single out a party for the full cost of a project, or even most \nof it, when the benefits of the project are diffuse.’”) (internal citations omitted)."},{"page":18,"startToken":5903,"endToken":6294,"text":"18 \n \nMeter Generation (“NRBTMG”).51 There are differences that merit the distinct treatment. Unlike \nthe co-located load which has been proposed up until now, BTMG and NRBTMG had or \ndeveloped generation to supply the behind-the-meter load. In contrast, the co-located proposal \nhere would not be relying on generation already dedicated to or that is built specifically to serve \nthat load, but would instead repurpose existing generation from the capacity supply stack. The \nadditional generation provides greater flexibility to customers and PJM, not less.  \n \nIn addition, the scale and subsequent impact to PJM of co-located load (which consists of \nenergy intensive customers) relative to the scale and impact of BTMG should be taken into \naccount. The Susquehanna ISA alone involved 480 MW. In fact, NRBTMG is currently capped \nunder the PJM Tariff at 3,000 MW to ensure that it “does not detrimentally affect system \noperations.”52 NRBTMG is designed to make contributions to grid reliability during emergency \nconditions as well, whereas certain co-location arrangements would remove any obligation of the \ngeneration to support the grid as well as potentially exacerbate the emergency conditions or their \nunderlying causes.53 Moreover NRBTMG fails to operate as required to support the grid during \nthose occasions, the NRBTMG’s netting eligibility is reduced, which incentivizes efficient \noperation and availability.54 \n \n \n51 Show Cause Order at Briefing Questions, (a)(iv). \n52 American Municipal Power, Inc., Limited Answer, Docket No. ER24-2889-000, et al., at 6 (filed Oct. 18, 2024) \n(Accession No. 20241018-5201); see also PJM Tariff, § 34.3; PJM Manual 14D: Generator Operational Requirements, \nat Appendix A, PP 56, 66. \n53 PJM Tariff, Schedule 15 (“A Non-Retail Behind The Meter Generation resource that has output that is netted from \nload for the purposes of determining the DCPZ of a Network Customer pursuant to Tariff, Part III, section 34 shall be \nrequired to operate at its full output the first ten times between November 1 and October 31, that Maximum Generation \nEmergency conditions occur in the zone in which the Non-Retail Behind The Meter Generation resource is located.”). \n54 Id. (“… for each instance a Non-Retail Behind The Meter Generation resource fails to operate, in whole or in part, \nas required in section 1 above, the amount of operating Non-Retail Behind The Meter Generation from such resource \nthat is eligible for netting will be reduced pursuant to the following formula….”)."},{"page":19,"startToken":6294,"endToken":6600,"text":"19 \n \nD. \nIf the Commission is Going to Incorporate Any National Security Concerns Into \nIts Analysis, It Needs to Explicitly Define National Security and Consider \nCountervailing National Security Interests \n \n \nThe Commission encouraged “parties to address any national security implications \nassociated with co-location arrangements, including with respect to the specific issues discussed \nin this show cause order, and what actions, if any, the Commission should take in response.”55 \nNOVEC has several observations to offer. As a concept, “national security” has not been well \ndefined in this proceeding. As Constellation used it in its complaint, national security is \nimplicated because the failure to speedily adopt co-located loads will delay the development of \nartificial intelligence (“AI”) because data center generation will not be able to interconnect fast \nenough otherwise. But national security in the general sense is broader than AI: other industries \nare vital to national security — in particular, large industrial concerns. The price increases that \nco-located load could cause have the potential to harm their interests. Could that constitute a \ncountervailing national security interest? One would think. One would also wonder about the \nexisting data centers: they serve a vital function — does a cost increase to their operation harm \ntheir long-term viability and threaten national security? In an even broader sense, does the \nincrease in costs to customers harm the general prosperity of the United States? If the \nCommission chooses to consider national security, it should consider it more systematically. \nMoreover, the Federal Power Act, in the context of sections 205 and 206, casts the \nCommission’s role as the arbiter of what is “just and reasonable.” Any consideration the \nCommission gives to national security must be as a component of a just and reasonable rate, and \nit cannot be a prime mover for the Commission in assessing rates. \n \n \n55 Show Cause Order at Briefing Questions, (f)(vi)."},{"page":20,"startToken":6600,"endToken":6679,"text":"20 \n \nIII. \nCONCLUSION \nWHEREFORE, for the foregoing reasons, NOVEC respectfully requests that the \nCommission find that PJM’s existing Tariff is just and reasonable. \n \nRespectfully submitted, \n \n  //s// Alan I. Robbins \n \nAlan I. Robbins \nDebra D. Roby \nThomas B. Steiger III \nWashington Energy Law LLP \n900 17th Street. N.W., Suite 500-A  \nWashington, D.C. 20006 \nTel: (202) 326-9313 \nEmail: arobbins@washingtonenergylaw.com \ndroby@washingtonenergylaw.com \ntsteiger@washingtonenergylaw.com \n \nCounsel to the Northern Virginia Electric \nCooperative, Inc.  \n \nDated: April 23, 2025."},{"page":21,"startToken":6679,"endToken":6760,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary of the Federal Energy \nRegulatory Commission in this consolidated proceeding. \nDated at Washington, D.C. this 23rd day of April, 2025. \n \n  //s// Jessika D. Dziechciowska \n \n \nJessika D. Dziechciowska \nEnergy Practice Analyst \nWashington Energy Law LLP \n900 17th Street, N.W., Suite 500-A \nWashington, D.C. 20006 \nTel: (202) 326-9308 \nEmail: jdziechciowska@washingtonenergylaw.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":299,"startToken":0,"endToken":511},{"p":3,"at":299,"title":"I. BACKGROUND","method":"printed heading","endPage":6,"endAt":509,"startToken":511,"endToken":1506},{"p":6,"at":509,"title":"II. COMMENTS","method":"printed heading","endPage":7,"endAt":1441,"startToken":1506,"endToken":1944},{"p":7,"at":1441,"title":"A. The Commission’s Jurisdictional Statement is Generally Correct, With Some","method":"printed heading","endPage":8,"endAt":1541,"startToken":1944,"endToken":2291},{"p":8,"at":1541,"title":"B. PJM’s Existing Tariff is Just and Reasonable","method":"printed heading","endPage":17,"endAt":1506,"startToken":2291,"endToken":5753},{"p":17,"at":1506,"title":"C. There are Characteristics of Behind-the-Meter Generation That Distinguish It","method":"printed heading","endPage":19,"endAt":6,"startToken":5753,"endToken":6295},{"p":19,"at":6,"title":"D. If the Commission is Going to Incorporate Any National Security Concerns Into","method":"printed heading","endPage":20,"endAt":6,"startToken":6295,"endToken":6601},{"p":20,"at":6,"title":"III. CONCLUSION","method":"printed heading","endPage":21,"endAt":0,"startToken":6601,"endToken":6679},{"p":21,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":21,"endAt":556,"startToken":6679,"endToken":6760}]}