{"document":{"slug":"rec-20250423-5259","title":"Comments of Vistra Corp","issued":"2025-04-23","accession":"20250423-5259","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Vistra Corp.","kind":"comments","file":"sources/filings/text/20250423-5259_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5259","tier":"record","sha256":"a6500470c421fd3c158f57e61ac5516601d02615aa935b822e31150b9d7973bf","pages":114,"tokens":33359,"emptyPages":[81],"textThemes":["colo","study","adequacy","flex"]},"pages":[{"page":1,"startToken":0,"endToken":176,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company  \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. \nAEP Kentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company\nDocket Nos. EL25-49-000 \nEL25-49-001"},{"page":2,"startToken":176,"endToken":387,"text":"-2- \nWheeling Power Company \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc.\nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \n \nLarge Loads Co-Located at Generating Facilities  \n \n \nConstellation Energy Generation, LLC \n \nv.  \n \nPJM Interconnection, L.L.C. \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nAD24-11-000 \n \n \nEL25-20-000 \n(Consolidated) \n \n \n \n \nCOMMENTS OF VISTRA CORP. \n \nPursuant to Rule 211 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (“Commission”),1 Vistra Corp. (“Vistra”) hereby submits these \ncomments on the Commission’s February 20, 2025 Order (“Show Cause Order”)2 and PJM \nInterconnection, L.L.C.'s (“PJM”) answer (“PJM Answer”)3 filed on March 24, 2025, in the above-\ncaptioned docket.  Vistra appreciates the Commission’s acknowledgement of the urgency of the \nissue, as reflected by its commitment to issue an order within 180 days of the initiation of this \n \n1  \n18 C.F.R. § 385.211 (2024). \n2  \nPJM Interconnection, L.L.C., 190 FERC ¶ 61,115 (2025) (“Show Cause Order”). \n3  \nAnswer of PJM Interconnection, L.L.C., Docket No. EL25-49 (filed Mar. 24, 2025) (“PJM Answer”)."},{"page":3,"startToken":387,"endToken":758,"text":"-3- \nproceeding.4  This proceeding can and must move quickly toward resolution to provide regulatory \ncertainty by remedying the deficiencies in PJM’s tariff.   \nPJM’s Answer provided a list of eight potential options to integrate new loads: \n1. Load with a separate point of interconnection (“POI”) that is network load; \n2. Co-located load that is at the same POI but separately metered that is network \nload; \n3. Existing behind-the-meter generation (“BTMG”) where the load is the \ncustomer; \n4. Co-located load with connection to grid with protections to avoid delivery of \nsystem energy to serve the load; \n5. Co-located load with connection to the grid to avoid delivery of system energy \nto serve the load or receive back-up service from PJM with permission; \n6. Co-located load that elects to be network load and brings own generation; \n7. Co-located load that takes interruptible service (load willing to curtail in \nadvance of emergency procedures); \n8. Co-located load that elects to be network load and that participates as demand \nresponse.5 \nIn evaluating these options, it is critical to recognize that co-location of large loads and \ngeneration facilities is not a new phenomenon in the PJM region.6  Despite accommodating such \narrangements for many decades,7 PJM has pulled an about-face in this proceeding, now asserting \nthat its tariff prohibits behind-the-meter co-located load (what PJM refers to as Options 4 and 5)—\nand that its tariff is nonetheless just and reasonable.8  PJM is wrong on both counts.  PJM’s actions \nin recent years demonstrate that it does not believe its tariff prohibits behind-the-meter co-location \n \n4  \nSee Show Cause Order at PP 87, 91. \n5 \nPJM Answer, Exh. A.  \n6 \nAffidavit of Dr. Roy J. Shanker, PhD on Behalf of Vistra Corp., Attachment A, at PP 13-15 (“Dr. Shanker Aff.”). \n7  \nSee, e.g., Cogeneration Tech. & Dev. Co., 31 FERC ¶ 62,299, 63,449 (1985) (approving certification of a co-\nlocated co-generation facility in 1985); PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 (2004) (accepting BTMG \ntariff provisions).  \n8 \nSee PJM Answer at 13-14 (explaining that fully isolated behind-the-meter co-located load is a “new potential \noption” for which “[t]ariff modifications would be needed based on the Commission’s November 1, 2024 Order in \nDocket No. ER24-2172.”)."},{"page":4,"startToken":758,"endToken":1124,"text":"-4- \narrangements.9  In fact, as PJM’s own filings over the past few years—including as recently as last \nmonth—demonstrate, PJM has repeatedly applied the tariff’s necessary study provisions to \nfacilitate behind-the-meter co-location configurations.10  However, other aspects of the tariff lack \nsufficient clarity on how to accommodate such arrangements on a non-discriminatory basis.11  \nPJM’s tariff, and PJM’s administration thereof, stand as an impediment to behind-the-meter co-\nlocation arrangements.  As a result, PJM’s tariff is unjust and unreasonable and unduly \ndiscriminatory with respect to behind-the-meter co-location arrangements.   \nAlthough PJM asserts that its tariff is just and reasonable because it accommodates front-\nof-the-meter load interconnection (i.e., Options 1 and 2), that assertion further highlights the \ntariff’s unlawfulness.  Requiring new large loads to interconnect through Options 1 and 2 would \ncreate a structural bias in favor of network transmission-served load and against competitive, \nbilateral supply arrangements between sophisticated buyers and market-based rate (“MBR”) \nsellers, depriving MBR sellers of their right to contract.12  The availability of one favored PJM \nalternative for co-location does not resolve the unduly discriminatory treatment that prevents other \nalternatives.  Attached to these comments, Vistra submits an affidavit from Dr. Roy J. Shanker, \nPhD, who provides a thorough evaluation of PJM’s Answer, including a detailed recounting of \nPJM’s BTMG program and a formal analysis of PJM’s Options 4 and 5 against a proper \n \n9 \nSee, e.g., PJM Interconnection, L.L.C., Amendment to ISA, SA No. 1442; Queue No. NQ-123, Docket No. ER24- \n2172-000 (filed Jun. 3, 2024) (“Susquehanna ISA Filing”). \n10 \nSee PJM Interconnection, LG.L.C., Necessary Studies Agreement, Original Service Agreement No. 7476, Queue \nPosition No. AA1-145, Docket No. ER25-1623-000, at Attach. 1 (filed Mar. 14, 2025) (“Doswell NSA”). \n11 \nWhen discussing unduly discriminatory treatment, these comments refer both to (1) the fact that PJM’s Answer \nindicates that it is not allowing Options 4 and 5 at all, and also that (2) PJM’s proposed treatment of Options 4 and 5 \nis unduly discriminatory compared to its treatment of behind-the-meter generation.   \n12 \nSee PJM Interconnection, L.L.C., 190 FERC ¶ 61,117, at P 60 (2025) (explaining that resources may choose to \n“remain outside of the PJM capacity market.”)."},{"page":5,"startToken":1124,"endToken":1400,"text":"-5- \ncomparison case.13  Specifically, Dr. Shanker’s analysis illustrates that Options 4 and 5 produce \neither superior or neutral results compared to PJM’s Option 1 across all relevant evaluation \nfactors.14   \nWhile the Commission’s rehearing order in Docket No. ER24-2172 (“Susquehanna ISA \nRehearing Order”)15 indicates that the tariff permits Options 4 and 5, Vistra agrees with the \nCommission’s preliminary finding that the PJM tariff is unjust and unreasonable and unduly \ndiscriminatory because it does not contain provisions that address behind-the-meter co-located \nload with sufficient clarity or consistency.16  This lack of clarity, in turn, undermines PJM’s ability \nto implement its tariff in a just and reasonable, and nondiscriminatory manner.  Even putting aside \nPJM’s new position that its tariff does not allow behind-the-meter co-located load, the record in \nthis proceeding demonstrates that PJM has recently been implementing, and continues to \nimplement, its tariff in an unduly discriminatory or preferential manner—further highlighting the \nproblems bred by the tariff’s lack of clarity on the rates, terms, and conditions of service associated \nwith behind-the-meter co-location arrangements.   \n \nThe Commission must proceed quickly to remedy the deficiencies in PJM’s tariff and to \neliminate discriminatory treatment.  Vistra submits that the deficiencies in PJM’s tariff can be \nremedied quickly through a few targeted reforms that ensure that the tariff accommodates Option \n4 and 5 configurations.  Alternatively, rather than direct those specific tariff revisions, the \nCommission could take an even more streamlined approach by clarifying that PJM’s existing retail \n \n13 \nSee Dr. Shanker Aff.  \n14 \nId. PP 49-71. \n15 \nPJM Interconnection, L.L.C., 191 FERC ¶ 61,025, at P 60 (2025) (“Susquehanna ISA Rehearing Order”). \n16  Show Cause Order at P 74."},{"page":6,"startToken":1400,"endToken":1703,"text":"-6- \nBTMG netting provisions apply to new large co-located loads, either in front of or behind the \ngenerator.   \nIt is critical for the Commission to direct PJM to accommodate Options 4 and 5 \narrangements quickly to remedy the clear undue discrimination evidenced in the record.  However, \nPJM’s Answer highlighted a number of other issues that warrant further attention.  Beyond Option \n4 and Option 5 configurations, PJM’s Answer identified other co-location configurations that \nPJM’s tariff does not yet accommodate, specifically Options 6-8 configurations.  Vistra supports \nfurther exploration of Options 6-8 to provide additional options and flexibility; there is significant \ninterest in the industry to transact using these configurations.  As with Options 4-5, each of these \nconfigurations also could provide reliability and resource adequacy benefits.  However, they also \nappear likely to require more involved tariff modifications than those needed for Options 4 and 5.  \nA triaging approach can help strike an appropriate balance between (a) resolving this proceeding \nwith utmost speed, and (b) providing the flexibility to accommodate other beneficial co-location \nconfigurations.  Considering the possible outcomes of this proceeding illustrates the need for such \na triaging approach.  On one extreme, PJM’s newfound approach of only allowing new large loads \nto interconnect under Options 1-2 would conclude this proceeding quickly, but it would also leave \nundue discrimination in place and result in significant litigation.  On the other extreme, the \nCommission could require PJM to implement tariff revisions to ensure its tariff accommodates all \nof Options 1-8, which would extend the length of this proceeding significantly.  The right balance \nis somewhere in the middle.  The Commission should act quickly to facilitate Options 4 and 5 in \nthis proceeding, and direct PJM to conduct an expeditious stakeholder process regarding Options \n6-8.  This approach remedies the immediate undue discrimination without sacrificing the benefits \nof accommodating other potential co-location configurations."},{"page":7,"startToken":1703,"endToken":2043,"text":"-7- \nPJM’s Answer also highlighted issues with the current processes for front-of-the-meter \nload interconnections to the transmission system (i.e., Options 1 and 2).  Vistra supports further \nexploration of those issues.  However, in keeping with the triage approach described above, the \nCommission should explore that issue in a separate proceeding.  \nThe Commission need not wait until it has answers to every question raised in this \nproceeding to proceed to implement a replacement rate to remedy the clear undue discrimination \nagainst Options 4 and 5.  This proceeding cannot be expected to address every possible future \nconcern with respect to co-location; this proceeding represents the beginning of the Commission’s \nefforts to adapt its regulatory framework to this growing trend of new large loads, not the end.  The \nevidentiary record before the Commission clearly demonstrates that the tariff is unlawful with \nrespect to Option 4 and Option 5 configurations because PJM is actively hindering market \nparticipants’ ability to implement those configurations in a non-discriminatory fashion after having \nsuccessfully navigated the tariff’s necessary study process.  The goal of this proceeding is to \nremedy the current deficiencies in the PJM tariff and, in doing so, to develop an initial framework \nto enable co-location arrangements to enter the system in a just and reasonable manner.   \nAs a practical matter, it is imperative that the Commission recognize that time is of the \nessence in removing unnecessary regulatory hurdles to deploying data center infrastructure, \nthereby fostering economic growth and national security benefits.  Thus, in deciding on an \nappropriate replacement rate, the Commission should not let the perfect be the enemy of the good.  \nThe Commission must recognize that the replacement rate adopted in this proceeding need not be \nthe most just and reasonable rate.17  As with every aspect of the PJM tariff, the provisions relevant \n \n17  See, e.g., Entergy Arkansas v. FERC, 109 F.4th 583, 594 (2024) (“FERC is not required to choose the best \nsolution, only a reasonable one.”) (citing Petal Gas Storage, L.L.C. v. FERC., 496 F.3d 695, 703 (2007))."},{"page":8,"startToken":2043,"endToken":2403,"text":"-8- \nto co-location and the integration of large loads more broadly should be improved over time to \nenhance the efficiency of the market, maintain just and reasonable rates, and avoid or eliminate \nundue discrimination.  The refinement of any singular issue for co-location is no exception, but \nduring the interim, PJM must not be allowed to prohibit behind-the-meter co-location altogether.  \nThe Commission should spur that process along by quickly resolving this proceeding, directing \nPJM to accommodate Option 4 and 5 configurations, and providing clear policy guidance to PJM \non the topics it should engage with its stakeholders on next.  \nI. \nSummary of Proposal \nIn the below comments, Vistra suggests a specific replacement rate that the Commission \ncould adopt quickly to ensure that the tariff accommodates Option 4 and 5 configurations in a just \nand reasonable and not unduly discriminatory manner.18  This proposal would ensure that co-\nlocation configurations that fit within Options 4 and 5 pay their fair share and that other customers \nare not harmed.  Specifically, Vistra’s proposed solution includes the following components:   \n Clarify that transmission owners must cooperate in the necessary study process. \n Ensure that co-location configurations pay their fair share by (a) allocating the costs \nof upgrades identified in the necessary study process to the generator, (b) creating \na new rate design to ensure that Option 4 and 5 configurations pay for ancillary \nservices that they use, or perhaps benefit from, but do not pay for services that they \ndo not use or benefit from, and (c) when Option 5 configurations draw power from \nthe grid, apply netting provisions consistent with the retail BTMG program. \n Modify the pro forma ISA to include a co-location section that will govern the \napplicable data exchange and coordination requirements and formalize any \nrequirements regarding applicable protective schemes. \n Clarify that a secondary generator that provides occasional, interruptible backup \nservice to a co-located load can also serve as a capacity resource because the \ngenerator will be available to PJM when needed.  \n \n18 \nAs an alternative, Vistra also asserts that the Commission could remedy the current issues by clarifying that PJM’s \nretail BTMG program can apply to new, large loads.  See supra § IV.B."},{"page":9,"startToken":2403,"endToken":2702,"text":"-9- \nThis framework provides a path forward to expeditiously facilitate Options 4 and 5 \nconfigurations in a just and reasonable and not unduly discriminatory way. \nII. \nBackground \nIn March 2024, as later revised in April 2024, PJM posted on its website a guidance \ndocument that explained PJM’s approach to behind-the-meter co-located load.19  On June 3, 2024, \nPJM filed a proposed amendment to the Susquehanna ISA to increase the amount of existing \nbehind-the-meter load co-located with the Susquehanna nuclear facility, which is interconnected \nto PPL Electric Utilities Corporation’s transmission system.20  On September 30, 2024, Exelon \nfiled a petition for declaratory order regarding the scope of the Commission’s jurisdiction over the \ninterconnection of co-located load.21  On November 1, 2024, the Commission issued an order \nrejecting the proposed amendments to the Susquehanna ISA.22  On November 22, 2024, \nConstellation filed a complaint alleging that Exelon refused to review necessary studies to \naccommodate the addition of behind-the-meter co-located load at certain Constellation generating \nfacilities.23   \nOn November 1, 2024, the Commission hosted a technical conference on the co-location \nof large loads at generating facilities.  On February 20, 2025, the Commission issued the Show \nCause Order.  For purposes of this proceeding, the Show Cause Order defined co-location \narrangements to refer to configurations in which load is co-located behind a generator’s point of \n \n19 \nPJM Guidance on Co-Located Load (March 22, 2024) (Updated April 17, 2024), available at \nhttps://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/pjm-guidance-on-co-located-load.ashx.  \n20 \nSee Susquehanna ISA Filing at 3.   \n21 \nPet. for Declaratory Order of Baltimore Gas & Electric Company, et al., Docket No. EL24-149-000 (filed Sept. \n30, 2024). \n22 \nPJM Interconnection, L.L.C., 189 FERC ¶ 61,078 (2024). \n23 \nComplaint of Constellation Energy Generation, LLC, Docket No. EL25-20, at 7-9 (filed Nov. 22, 2024)."},{"page":10,"startToken":2702,"endToken":3019,"text":"-10- \ninterconnection (i.e., behind-the-meter co-located load).24  Specifically, the Commission adopted \nthe PJM guidance document’s definition of co-located load, which “refers to end-use customer \nload that is physically connected to the [generation] facilities of an existing or planned Customer \n[generation] Facility on the Interconnection Customer’s side of the Point of Interconnection to the \nPJM Transmission System.”25  The Commission required PJM to either (1) explain why its tariff \nremains just and reasonable and not unduly discriminatory without provisions addressing behind-\nthe-meter co-location “with sufficient clarity or consistency,” or (2) explain what changes to the \ntariff would remedy the absence of such provisions.26  In other words, the Show Cause Order \nclearly indicated that the PJM tariff must accommodate behind-the-meter co-located load—either \nas currently filed or with revisions necessary to establish a replacement rate.27   \nOn March 24, 2025, PJM filed its answer in this proceeding.  PJM’s Answer asserted that \nits tariff is just and reasonable because it permits what PJM refers to as Options 1 and 2—both of \nwhich contemplate load interconnecting in front-of-the-meter.28  PJM also noted the existence of \nOption 3 in its current tariff, but argued that it is not available to large loads.29  Despite the fact \nthat PJM previously facilitated behind-the-meter load configurations, PJM’s Answer argued that \nthe tariff prohibits behind-the-meter co-located load, which PJM refers to as Options 4 and 5.30  \nHowever, on March 14, 2025—a mere 10 days before PJM filed its Answer in this docket—PJM \n \n24  Show Cause Order at P 3. \n25 \nId. P 3 n.4.   \n26  Id. P 2. \n27  See id. \n28  See PJM Answer at 9-11, 32. \n29 \nId. at 12-13. \n30  See id. at 13-14 (explaining that fully isolated behind-the-meter co-located load is ‘a new potential option’ for \nwhich “[t]ariff modifications would be needed based on the Commission’s November 1, 2024 Order in Docket No. \nER24-2172.”)."},{"page":11,"startToken":3019,"endToken":3345,"text":"-11- \nfiled a necessary study agreement to accommodate a behind-the-meter co-located load \narrangement similar in nature to Option 4.31   \nOn March 4, 2025, Vistra filed a motion for clarification, which asserted that additional \nclarity was needed regarding the implications of the Susquehanna ISA Order.32  On March 10, \n2025, the Commission issued its order on rehearing in Docket No. ER24-2172, clarifying that the \nSusquehanna ISA Order should not be read to prohibit other entities from filing non-conforming \ninterconnection agreements to facilitate behind-the-meter co-located load or to suggest that the \nCommission has prejudged any such filing.33   \nIII. \nPJM’s Tariff is Unjust and Unreasonable and Unduly Discriminatory  \nVistra agrees with the Commission’s preliminary finding that the PJM tariff is unjust and \nunreasonable and unduly discriminatory because it does not contain provisions that address \nbehind-the-meter co-located load “with sufficient clarity or consistency.”34  PJM has effectively \nconceded this point.  Even though there are many existing behind-the-meter co-located load \nfacilities in PJM (such as cogeneration facilities and retail BTMG), and even though PJM \npreviously argued that its tariff permits behind-the-meter co-located load and implemented its \ntariff as if it permits such arrangements,35 PJM now asserts that its tariff does not permit behind-\nthe-meter co-located load.36  To facilitate that litigation position, PJM’s Answer announced that it \n \n31  See Doswell NSA. \n32 \nMot. for Clarification of Vistra Corp., Docket No. EL25-49 (filed Mar. 4, 2025). \n33 \nSusquehanna ISA Rehearing Order at P 60 (“[W]e clarify that the Rejection Order does not prevent entities from \nfiling non-conforming interconnection agreements to address matters related to a generator serving co-located load, \nor prejudge any such future filing.”). \n34  See Show Cause Order at P 74. \n35  See, e.g., Susquehanna ISA Filing. \n36  See PJM Answer at 13-14 (explaining that fully isolated behind-the-meter co-located load is a “new potential \noption” for which “[t]ariff modifications would be needed based on the Commission’s November 1, 2024 Order in \nDocket No. ER24-2172.”)."},{"page":12,"startToken":3345,"endToken":3614,"text":"-12- \n“rescinds its previously issued Guidance Document pending Commission guidance in this \ndocket[.]”37  PJM’s misinterpretation of its tariff to adopt a blanket prohibition on behind-the-\nmeter co-located load is manifestly unjust and unreasonable and unduly discriminatory.   \nFurther, even aside from PJM’s newfound interpretation of its tariff, the record in this \nproceeding clearly demonstrates that PJM has been unable to administer its tariff to accommodate \nbehind-the-meter co-located load in a just and reasonable and not unduly discriminatory manner.38  \nAs a result, in this proceeding, the Commission must ensure that PJM will accommodate behind-\nthe-meter co-location configurations, and will do so in a just and reasonable and not unduly \ndiscriminatory manner. \nMoreover, PJM’s Answer failed to adequately respond to the Show Cause Order’s \ndirectives.  The Show Cause Order required PJM to (1) explain how its tariff is just and reasonable \nand not unduly discriminatory without provisions clearly addressing behind-the-meter co-located \nload, or to (2) propose tariff revisions to remedy that deficiency.  PJM’s Answer did neither.  If \nPJM now believes that its tariff does not accommodate behind-the-meter co-located load, then the \nShow Cause Order required PJM to propose tariff revisions to accommodate behind-the-meter co-\nlocated load.  PJM’s assertion that its tariff only permits front-of-the-meter load interconnection \nsolutions, without providing tariff revisions to accommodate behind-the-meter configurations, is \ninadequate to comply with the Show Cause Order.  Deferring any progress to future stakeholder \nmeetings was not responsive to the Commission’s directives and significantly hinders the urgent \nprogress that is required to facilitate customer choices of co-located load configurations in PJM.  \n \n37 \nSee id. at 33. \n38  See Show Cause Order at P 75."},{"page":13,"startToken":3614,"endToken":3923,"text":"-13- \nA. It Would be Unjust and Unreasonable and Unduly Discriminatory and \nPreferential to Prohibit Behind-the-Meter Co-located Load \nPJM’s Answer asserts that its tariff “remains just and reasonable” because it “permits co-\nlocated loads to interconnect through existing load interconnection processes, albeit processes \nwhere the load is designated Network Load[.]”39  PJM’s Exhibit A makes clear that these \n“existing” options for large loads to interconnect (i.e., Options 1 and 2) both involve front-of-the-\nmeter co-location.40  Vistra strongly disagrees with PJM’s argument that the availability of Options \n1 and 2 would be sufficient to render PJM’s tariff just and reasonable and not unduly \ndiscriminatory.41  As discussed further below, requiring all new large loads to interconnect through \nOptions 1 or 2 increases transmission costs for consumers and creates a structural bias in favor of \ntransmission-served load while disadvantaging competitive, bilateral supply arrangements \nbetween sophisticated buyers and MBR sellers.  As discussed by Dr. Shanker, Option 4 and 5 \nalternatives can avoid some of the delays and potential cost impacts to other consumers that result \nfrom Options 1 and 2 without any adverse impacts to resource adequacy or reliability.42  In fact, \nOptions 4 and 5 can actually accrue benefits to existing load by decreasing costs and enhancing \nreliability.43 \n \nPJM’s contention that Option 3 is not available to new large loads illustrates the undue \ndiscrimination that would occur if PJM failed to accommodate Options 4 and 5.  PJM’s retail \nBTMG program was designed to apply when a load and generator are co-located behind the same \n \n39 \nSee PJM Answer at 32.   \n40 \nSee id., Exh. A.  However, PJM’s Answer does not address why it filed the amended Susquehanna ISA if it \nbelieved only Options 1 and 2 are permissible.  \n41  See PJM Answer at 9-13, 32. \n42 \nSee Dr. Shanker Aff. at PP 43, 54-59, 61-62, 70. \n43 \nId."},{"page":14,"startToken":3923,"endToken":4250,"text":"-14- \nmeter.44  The BTMG netting approach “developed by PJM and its stakeholders reduces the cost to \nthose market participants that rely to a lesser degree on the PJM integrated transmission system to \nserve load because they serve loads that utilize behind the meter generation.  As a result, entities \nthat serve loads with behind the meter generation are allocated a fairer share of the costs associated \nwith the operation of the PJM integrated transmission system, including costs for energy, capacity, \nancillary services, and administrative fees.”45  Under this framework, retail BTMG loads are \ncurrently able to avoid transmission charges by using on-site generation or curtailing load during \nexpected coincident peak events.  In doing so, these loads are permitted to net their usage of NITS \nto zero.  If Option 3 loads are permitted to net in this way, it is unduly discriminatory to prohibit \nbehind-the-meter loads from engaging in exactly the same type of netting.  In fact, Option 4 \nconfigurations actually use the transmission system less than a retail BTMG configuration because \nprotective systems ensure that the load never draws energy from the grid, whereas retail BTMG \narrangements can draw from the grid at the discretion of the customer.46  Providing favorable \nnetting provisions for Option 3 configurations while simultaneously failing to accommodate \nOption 4 and 5 configurations at all is even more unduly discriminatory.   \nFurthermore, PJM’s Answer illustrates how a prohibition on Option 4 and 5 configurations \nwould unlawfully advantage transmission owners over competitive generation suppliers.  Options \n1-3 are all facilitated by transmission owner load integration studies.47  These studies, and the \nprocesses by which they are facilitated, live in a regulatory gap.  Despite the fact that these \n \n44  Dr. Shanker Aff. at PP 30-32. \n45 \nId. (citing PJM Interconnection, L.L.C., Submission of Revisions to Open Access Transmission Tariff, the \nAmended and Restated Operating Agreement, Etc., Docket No. ER04-608-000, at 1 (March 1, 2004)). \n46 \nId. P 37. \n47  See PJM Answer at 6-7, 9-13."},{"page":15,"startToken":4250,"endToken":4569,"text":"-15- \nconfigurations involve interconnections directly to the transmission system, the studies, processes, \nand facilities associated with those interconnections are not currently subject to Commission \nregulation or oversight.48  As PJM’s Answer explained, the network upgrades identified in \ntransmission owner load integration studies are placed in the supplemental projects category.49  \nPJM only reviews these projects under a bare minimum standard to ensure that they “do no harm” \nto the transmission system.50  As OPSI has previously explained, state regulators often do not have \nauthority to review these supplemental projects.51  Stakeholders have little input in the \nsupplemental project process, as “TOs are under no obligation to respond to stakeholder questions \nand comments or even acknowledge their receipt.”52  These projects are not subject to competitive \nbidding;53 rather, as PJM’s Answer explained, these projects are cost allocated to the transmission \nowners’ zone pursuant to the transmission owners’ cost allocation methodology.54  In other words, \nthey go directly into the individual transmission owners’ rate base.  These projects thus receive \ncost recovery after PJM’s “do no harm” analysis, without any consideration of whether they \nrepresent efficient, cost effective, or prudent solutions.  Supplemental projects also constitute an \n \n48  See infra, Section VI.B. \n49  PJM Answer at 7. \n50 \nPJM Answer at 7. \n51  See, e.g., Comments of the Organization of PJM States, Docket No. RM21-17, at 6 (filed Aug. 17, 2020) (“Some \nretail regulators have extensive processes for reviewing [supplemental projects], and others do not. In the latter case, \nretail regulators often lack authority over the vast majority of these local projects, meaning that the local projects being \nproposed simply do not undergo a review at the retail level.”) \n52  Id. \n53  See, e.g., Appalachian Power Company, 170 FERC ¶ 61,196, at P 60 (2020) (“Supplemental Projects are not part \nof the RTEP process and thus are not part of the competitive window process.”). \n54  PJM Answer at 17."},{"page":16,"startToken":4569,"endToken":4908,"text":"-16- \noutsized portion of transmission spending in PJM.55  Permitting front-of-the-meter load \ninterconnections, which include little oversight or process, while simultaneously failing to \naccommodate behind-the-meter co-located load is unduly discriminatory.   \nPJM has provided no grounds that would excuse this discrimination.  Nor can it.  As the \naffidavit of Dr. Roy Shanker explains, neither reliability nor resource adequacy provide a reasoned \nbasis to prohibit behind-the-meter co-located load like Options 4 and 5.  Dr. Roy Shanker explains \nthat PJM’s analysis of the implications of these configurations is fundamentally flawed because \nPJM’s analysis rests on comparisons between the addition of behind-the-meter co-located load to \na world in which the load does not exist.56  However, load growth will not simply disappear \nbecause one configuration is unavailable.57  Rather, the proper comparison case or counterfactual \nto a behind-the-meter co-located load configuration is one in which the load connects in front-of-\nthe-meter in a manner similar to Option 1.  When compared against that counterfactual, behind-\nthe-meter co-location actually provides significant benefits to the grid and to other market \nparticipants.  Dr. Roy Shanker’s affidavit includes a detailed analysis of Option 4 and Option 5 \nconfigurations compared to the appropriate comparison case to determine the actual implications \nof these behind-the-meter load configurations across a range of factors, including reliability, \ntransmission costs for other customers, and capacity and energy prices.58  Across all factors, the \n \n55  See Building for the Future Through Electric Regional Transmission Planning and Cost Allocation, Order No. \n1920, 187 FERC ¶ 61,068, at P 109 (2024) (noting that in 2019, supplemental projects cost $3.75 billion while \nregionally planned projects cost $1.27 billion, and in 2020, supplemental projects cost $4.7 billion, while regionally \nplanned projects cost $413 million). \n56 \nSee Dr. Shanker Aff. at P 43. \n57 \nId. \n58 \nId. at PP 49-72.  This finding is not intended to suggest a regulatory scheme must hold other customers harmless \nto be just and reasonable.  However, the fact that these configurations do hold other customers harmless demonstrates \nthat there are no inappropriate cost shifts."},{"page":17,"startToken":4908,"endToken":5209,"text":"-17- \nimpact of the addition of load in an Option 4 and 5 configuration was actually either neutral or \nbeneficial for other market participants as compared to an Option 1 configuration.59   \nThe Show Cause Order acknowledged that resource adequacy and reliability concerns “are \nnot necessarily unique to co-location arrangements and that significant load growth more generally \nmay raise many of the same concerns.”60  However, the Commission explained that its concern \nwas the potential speed with which behind-the-meter co-located load can be added to the grid, and \nwhether that creates a risk that these loads will not be adequately reflected in resource adequacy \nplanning mechanisms.61  This concern can be alleviated, however, by considering the true \ndevelopment cycle of behind-the-meter co-located load.  These configurations do not appear on \nthe grid overnight.  Entities that seek to develop such a configuration must, among other things, \n(1) negotiate and sign private, bilateral contracts between the load and the generator, (2) submit a \nrequest for a necessary study and sign a necessary study agreement, (3) wait for PJM to conduct \nthe study, (4) negotiate and sign an amended interconnection service agreement, (5) wait until any \nnetwork upgrades needed to accommodate the change to the generator’s interconnection are built, \n(6) obtain other appropriate permits, (7) submit advance orders for necessary equipment such as \ntransformers and other long lead time equipment, and (8) construct the load facility and connect it \nto the generator.   \nEven after all of that, these large loads typically phase in over time rather than all at once.  \nFor instance, PJM recently filed a necessary study agreement that describes a campus that will \ninitially contain two data halls with 60 MW gross demand, which will grow at a rate of one building \n \n59 \nId. \n60  Show Cause Order at P 85. \n61  Id."},{"page":18,"startToken":5209,"endToken":5566,"text":"-18- \nper year and reach a maximum gross peak load of 300 MW in year 5 (the “Doswell NSA”).62  In \nVistra’s experience, this type of phase-in is typical of new large load facilities.  This provides \nample time for the PJM capacity market to calibrate to respond to changes in the balance of supply \nand demand.  Further, as Dr. Shanker notes, the competitive results for capacity pricing and LMPs \nare virtually identical or even lower for the rest of PJM system customers when a configuration \nsuch as PJM Option 4 is compared to the proper counterfactual.63   \nMoreover, the concern that PJM must face the new challenge of ensuring that “a special \nprotection scheme could be designed to never fail and cover all potential operating conditions” \nignores the long history of special protection schemes (“SPS”) in the industry.  These are not new \ntechnologies.  Special protection schemes are often also referred to as remedial action schemes \n(“RAS”).64  In approving a NERC standard that governs these technologies, the Commission \nacknowledged “the diversity among the different types, functions, and placements of remedial \naction schemes across North America.”65  These schemes are commonly used, including in the \ninterconnection context.66   Dr. Shanker references a list of such SPS and RAS already in operation \nby TOs within PJM.67  Moreover, the application of an SPS or RAS in a co-location arrangement \nis fairly simple—to keep the load from purchasing power from the grid—compared to the many \n \n62  See Doswell NSA.   \n63 \nDr. Shanker Aff. at PP 61-62. \n64 \nSee NERC, “Remedial Action Scheme” Definition Development, at 2 (Oct. 2014), available at \nhttps://www.nerc.com/pa/stand/prjct201005_2spclprtctnsstmphs2/faq_ras_definition_11102014_clean.pdf.   \n65 \nRemedial Action Schemes Reliability Standard, Order No. 837, 160 FERC ¶ 61,071, at P 30 (2017). \n66 \nSee, e.g., Midcontinent Independent System Operator, Inc., 177 FERC ¶ 61,233, at P 28 (2021); Southwest Power \nPool, Inc., 177 FERC ¶ 61,091, at P 79 (2021). \n67 \nDr. Shanker Aff. at P 27 (citing PJM Manual 3: Transmission Operations, Attachment A (November 21, 2024), \nhttps://www.pjm.com/-/media/DotCom/documents/manuals/m03.pdf)."},{"page":19,"startToken":5566,"endToken":5839,"text":"-19- \nother SPS and RAS schemes currently in effect.  Given this context, it is difficult to understand \nwhy PJM would view load isolation as atypically risky or unreliable.  \nNeither resource adequacy nor reliability concerns justify the failure to accommodate \nbehind-the-meter co-located load.  Rather, the driving motivation behind the opposition to behind-\nthe-meter co-located load appears to be the avoidance of competition for the financial benefits that \ntransmission owners stand to gain from the increased rate base associated with requiring load to \ninterconnect through Options 1 or 2.  As Dr. Shanker explains, Option 1 configurations result in \ninterconnection upgrade costs going into the transmission owners’ rate base.68  To contrast, under \nan Option 4 configuration, interconnection upgrade costs are borne by the parties to the co-location \narrangement; other customers pay none of these costs, and as a result, other customers’ NITS \ncharges remain the same.69  Requiring all co-location to occur through front-of-the-meter load \ninterconnection is unjust and unreasonable and unduly discriminatory because it creates a \nstructural bias in favor of transmission-served load and against competitive, bilateral supply \narrangements between sophisticated buyers and MBR sellers.   \nB. PJM’s Recent Tariff Administration Demonstrates that the Tariff Lacks \nSufficient Clarity to Accommodate Behind-the-meter Co-located Load \nAs noted above, until PJM filed its Answer in this proceeding, PJM had taken the position \nthat its tariff permitted behind-the-meter co-location.70  However, the record demonstrates that \nPJM has been unable to administer those provisions in a just and reasonable and not unduly \n \n68 \nId. at P 59, Table 5. \n69 \nId. \n70  See Show Cause Order at P 4 (explaining how the PJM Guidance Document addressed behind-the-meter co-\nlocated load)."},{"page":20,"startToken":5839,"endToken":6141,"text":"-20- \ndiscriminatory manner because its tariff did not contain sufficiently clear rates, terms, and \nconditions of service.   \nThe only aspect of the tariff that PJM has (sometimes) been able to administer successfully \nto accommodate behind-the-meter load arrangements over the last several years is the necessary \nstudy process.  As discussed in more detail below, that aspect of the tariff has produced multiple \nnecessary study agreements and corresponding studies in support of co-location configurations \nsimilar to Option 4.  But beyond those limited successes, PJM has utterly failed to administer its \ntariff to successfully accommodate such arrangements.  \nThe general structure of PJM’s process for studying and interconnecting Option 4 and 5 \nconfigurations makes sense.  After executing a necessary study agreement and filing it with the \nCommission, PJM coordinates with the generation owner and the relevant transmission owner to \nstudy the configuration through the necessary study process.  Through the necessary study, PJM \nanalyzes whether any modifications to the transmission system are necessary to accommodate the \nproposed modification and provide a good faith estimate of the costs.  If the generator wishes to \nproceed, the interconnection parties negotiate a revised, non-conforming ISA to reflect the unique \ndetails of the configuration.71  While this general structure is sensible, the available evidence \ndemonstrates that the tariff lacks sufficient detail to ensure that PJM can consistently implement it \nacross the PJM region in a just, reasonable, and not unduly discriminatory manner. \nAcross the recent co-location arrangements that have been pursued, different transmission \nowners “[took] different approaches to performing the steps necessary to accommodate a co-\n \n71  See, e.g., Susquehanna ISA Filing; Susquehanna ISA Rehearing Order at P 60 (“[W]e clarify that the Rejection \nOrder does not prevent entities from filing non-conforming interconnection agreements to address matters related to \na generator serving co-located load, or prejudge any such future filing.”)."},{"page":21,"startToken":6141,"endToken":6441,"text":"-21- \nlocation arrangement and in the transmission service that they are requiring entities to take.”72  For \nexample, as illustrated by the record developed in the Constellation complaint docket, Exelon \nrefused to work on Constellation’s request to co-locate load with its generators under this tariff \nframework.73  Specifically, Exelon refused to review the necessary studies for two Constellation \ngenerating facilities.74  On the other hand, PPL cooperated in both the necessary study process and \nin the amendment of the interconnection agreement for the proposed modification to the \nSusquehanna nuclear plant, both to initially facilitate the addition of behind-the-meter co-load and, \nlater, to increase the amount of such load.75  These troubling dynamics have continued unabated \nduring this proceeding: just ten days before it filed its Answer, arguing that its tariff does not permit \nco-location configurations, PJM submitted a filing with the Commission to accommodate a co-\nlocation configuration that appears to be an Option 4 configuration.76  And these are just the \ndisparities that have seen the light of day through Commission proceedings.  \nUnder these circumstances, it is obvious that the tariff is not being administered in a just, \nreasonable, and not unduly discriminatory manner.  However, as explained below, establishing a \nlawful replacement rate in this proceeding is not a heavy lift; it requires clarifying a small number \nof critical issues, which can be achieved through relatively light tariff revisions.    \n \n72  Show Cause Order at P 75. \n73  Complaint of Constellation Energy Generation, LLC, Docket No. EL25-20, at 7-8 (filed Nov. 22, 2024) \n(explaining that Exelon reviewed a necessary study for one generating facility but later halted planned work on it, and \nExelon refused to review the necessary study for the other two stations).   \n74 \nId. \n75 \nSee Susquehanna ISA Filing. \n76  Compare Doswell NSA with PJM Answer at 13-14."},{"page":22,"startToken":6441,"endToken":6719,"text":"-22- \nIV. \nFERC Must Direct a Replacement Rate to Remedy the Deficiencies in PJM’s Tariff \nWhen FERC finds that PJM’s tariff is unjust and unreasonable and/or unduly \ndiscriminatory or preferential, it must set a replacement rate that would render the tariff just and \nreasonable and not unduly discriminatory or preferential.77  Below, Vistra presents two potential \nreplacement rate options.  The first option involves targeted reforms to clarify four critical issues \nthat must be addressed to allow PJM to effectively accommodate behind-the-meter load \nconfigurations.  In the alternative, the Commission could also remedy the undue discrimination \nconcerns by simply clarifying that PJM’s existing retail BTMG netting rules apply equally to new \nlarge loads co-located with generation.  This approach would also remedy the deficiencies in \nPJM’s tariff and would do so using rules that PJM and the Commission already consider just and \nreasonable.  \nA. Only A Few Narrow Elements of the Tariff Require Further Clarity \nAlthough PJM’s necessary study process effectively establishes the technical feasibility of \na given behind-the-meter co-location arrangement,78 and PJM has applied this process repeatedly \nin recent years, according to PJM there currently is no path forward for such a project after it \ncompletes the necessary study process.  That contention appears inconsistent with the \nCommission’s order on rehearing of the Susquehanna ISA proceeding, which clarified that the \nCommission’s rejection of the Susquehanna ISA should not be read to indicate that other entities \nshould not file non-conforming ISAs to address behind-the-meter co-located load.79  PJM’s \ncontention even more fundamentally inconsistent with the fact that the Commission had already \n \n77  See 16 U.S.C. § 824e. \n78  See infra § V. \n79 \nSusquehanna ISA Rehearing Order at P 30."},{"page":23,"startToken":6719,"endToken":7034,"text":"-23- \napproved the addition of some behind-the-meter co-located load at the Susquehanna facility in \n2023 and 2024.80   \nNonetheless, Vistra submits that, to provide a clear path forward, the tariff need only be \nrevised to address four issues to allow Options 4 and 5 configurations:  (1) to require transmission \nowners to cooperate in the necessary study process, (2) determine the transmission and ancillary \nservice charges that are appropriate for behind-the-meter co-located load, (3) incorporate surgical \nrevisions to the pro forma ISA to address co-located load, and (4) develop a reasonable policy on \nthe capacity treatment of secondary generators that only serve co-located load occasionally on an \ninterruptible, backup basis.  The Commission can swiftly resolve this proceeding by establishing \na replacement rate that addresses those four issues.   \n1. Transmission Owners Must Cooperate in the Necessary Study Process \nAs noted above, some transmission owners have cooperated in the necessary study process \nto allow behind-the-meter co-location configurations to move forward, whereas other transmission \nowners have refused to do so.  This issue can be easily remedied by a surgical tariff revision.  The \ntariff currently requires PJM to provide necessary study results.81  The relevant tariff language \nfrom Attach. O, App’x 2, Section 3.1 could be revised as indicated below: \nThe Interconnection Customer shall notify Transmission Provider \nand Interconnected Transmission Owner of the proposed \nmodifications. and Transmission Provider shall provide, Within \nsixty days of receipt of the relevant drawings and specifications (or \nwithin such other time upon which the Interconnection Parties may \nagree), Transmission Provider, with assistance from the \nInterconnected Transmission Owner, shall provide an estimate \nof any modifications to the Transmission System that would be \nnecessary to accommodate the proposed modification by \n \n80 \nSusquehanna ISA Filing at 1-2 (“The Amended Susquehanna ISA . . . increase[s] from 300 [MWs] to 480 MW \nthe amount of Co-Located Load under the ISA[.]”). \n81 \nPJM Tariff, Attach. O, App’x 2, Section 3.1."},{"page":24,"startToken":7034,"endToken":7368,"text":"-24- \nInterconnection Customer and a good faith estimate of the costs \nthereof.   \n \nThis minor edit would ensure that transmission owners are required to cooperate in the \nnecessary study process. \n2. Co-located Load Should Pay its Fair Share—And No More  \nAny proposed solution to the tariff gaps identified in the Show Cause Order should ensure \nthat co-located load pays its “fair share” for transmission and ancillary services and network \nupgrades.  However, co-located load should not be required to pay more than their “fair share.”  \nAs the Commission has explained, the cost causation principle requires that Commission-\njurisdictional rates “reflect to some degree the costs actually caused by the customer who must pay \nfor them”82 and allocate costs “in a manner that is at least roughly commensurate with the benefits \nthat entity receives.”83  In keeping with the cost causation principle, transmission system charges \nfor load served by co-located generation should be based on actual use of the transmission \nsystem.84  Being charged for services that are not actually received is not a “fair share” and is not \n“roughly commensurate with the benefits that entity receives.” \nAs the Commission acknowledged in the Order to Show Cause, the nature and degree of a \nco-located load’s transmission system use can vary dramatically depending on the details of the \nco-location configuration and how the co-located facilities are operated.85  There are many possible \nco-location arrangements.86  The cost causation principle requires that each of these arrangements \n \n82  Show Cause Order at P 74 (quoting Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1368 (D.C. Cir. \n2004)). \n83  Id. (citing Ill. Com. Comm’n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009)). \n84 \nSee PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at P 28 (2004) (citing Occidental Chem. Corp. v. PJM \nInterconnection, L.L.C., 102 FERC ¶ 61,275 at P 14 (2003)). \n85  Show Cause Order at P 74. \n86  See PJM Answer, Exh. A; Dr. Shanker Aff. at P 41."},{"page":25,"startToken":7368,"endToken":7670,"text":"-25- \nbe charged in a way that is “roughly commensurate” with the benefits that each receives from the \nsystem.87   \n \nIn keeping with the cost causation principle, under an Option 4 or 5 configuration, the \nCommission could require the parties to the co-location arrangement to pay for any network \nupgrades needed to accommodate the addition of the behind-the-meter load.  This cost allocation \nwould be consistent with the cost causation principle because such upgrades are designed to \nfacilitate the co-location arrangement.  It also ensures that transmission costs for other customers \ndo not increase (to contrast, in an Option 1 configuration, costs to other transmission customers \ncould increase because the network upgrade costs are socialized).88 \nIn a fully isolated behind-the-meter co-located load configuration (i.e., Option 4) the \ngenerator remains interconnected to the transmission system, but special protective schemes \nensure that the load cannot draw power from the grid.  As Dr. Roy Shanker explained, this type of \nbehind-the-meter co-located load will not draw power from the grid and therefore should not be \nconsidered network load.89  Applying the cost causation principle’s requirement for charges to be \nroughly commensurate with benefits, the correct charge for transmission service (as distinct from \nancillary services) for a co-located load configuration that does not rely on the delivery of energy \nfrom the transmission system is zero.   \nHowever, it would be reasonable to create a penalty regime to address any unintended grid \nuse in the rare case of a failure of the protective scheme that isolated the load.  Such a case would \nbe rare indeed, given that there are already many significantly more complicated protective \n \n87  Show Cause Order at P 74 (citing Ill. Com. Comm’n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009)). \n88 \nDr. Shanker Aff. at P 59, Table 5. \n89  Id. P 19."},{"page":26,"startToken":7670,"endToken":8031,"text":"-26- \nschemes active on the PJM system.90  Penalties for unintended grid usage are reasonable because \nthey respond to use of the transmission system, rather than impose a baseline rate to configurations \nwhere the utility is providing no transmission service.  These penalties are conceptually similar to \nthe unreserved use penalties that the Commission created in Order No. 890, which subject \ntransmission customers to penalties for using transmission service that they did not reserve.91 \nWith respect to ancillary services (as distinct from transmission service), under the current \ntariff, billing determinants for related ancillary services would be zero.92  However, Vistra \nacknowledges that it may be reasonable to charge a co-location configuration for some ancillary \nservices, but again only to the degree that the co-location configuration benefits from those specific \nservices.93  The rate design should be structured to allocate costs associated with the services that \na particular generator receives from the grid in a way that is consistent with the cost causation \nprinciple.  The key to ensuring that ancillary service charges comport with the cost causation \nprinciple is to ensure that specific grid service charges are based on the extent to which the co-\nlocation arrangement actually contributes to additional costs and receives benefits from the PJM \ngrid.  This matching of services and costs is a core component of the cost causation principle.  \nAlthough the cost causation principle does not require “exacting precision,” it does require that \ncosts be “roughly commensurate” with benefits received.94   \n \n90 \nId. P 27. \n91 \nSee Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, FERC Stats. & \nRegs. ¶ 31,241, at P 834 (2007). \n92 \nSee Dr. Shanker Aff. at P 19. \n93  See Show Cause Order at P 82 (“To the extent that certain co-location configurations benefit from or contribute \nto the need for certain ancillary services and black start services, it may be appropriate to allocation a portion of the \ncosts of those services to those co-location arrangements, consistent with the cost causation principle”). \n94  Sw. Power Pool, Inc., 137 FERC ¶ 61,075 at P 20 (2011) (citing KN Energy, Inc. v. FERC, 968 F.2d 1295, 1300 \n(D.C. Cir. 1992))."},{"page":27,"startToken":8031,"endToken":8360,"text":"-27- \nWhile PJM asserts that Option 4 configurations should pay for ancillary services, it has \nprovided no analysis of which ancillary services benefit such co-location arrangements.  We agree \nthat a case can be made for some ancillary service cost allocation, but it must be supported by \nanalysis that the co-location arrangement benefits or contributes to costs for particular ancillary \nservices.95  For example, variances in the co-located load, which are seen by the grid as changes \nin the co-located generator’s output, could be viewed as related to the need for regulation service.96  \nCo-location configurations with high load variation therefore can be considered to use regulation \nservice.97  Charging the generator in such a configuration for regulation services could be \nreasonable under the cost causation principle.  Similarly, it may be appropriate to allocate such a \nconfiguration the costs of certain other ancillary services consistent with existing cost allocation \nprinciples.  It would be a reasonable exercise going forward to consider this type of question, and \nif necessary, adjust cost recovery.  But, any cost allocation would need to be based on analysis \nPJM has not yet provided.  Vistra urges the Commission to direct PJM to engage expeditiously in \nsuch analysis as part of a future compliance filing.  To effectuate any such identified cost \nresponsibility, PJM could create a grid services rider in the ISA.98   \nCertain ancillary services are not appropriate for a fully isolated co-located load.  Ongoing \ncharges for reactive power supply are not appropriate because, if the addition of the co-located \nload increases reactive supply needs, the network upgrades (like capacitor banks) to provide that \n \n95 \nDr. Shanker Aff. at PP 12, 20-21, Table 5. \n96 \nSee id. PP 12, 20. \n97 \nSee id.   \n98 \nSee Integration of Variable Energy Resources, Order No. 764, 139 FERC ¶ 61,246, at PP 267-269 (2012) \n(declining to adopt proposed generic approach to recovery of generator regulation charges but confirming the rule \n“should not be interpreted as an unwillingness to consider individual proposals[.]”)."},{"page":28,"startToken":8360,"endToken":8649,"text":"-28- \nreactive power would be borne by the parties to the co-location arrangement under this proposal.99  \nOngoing charges for black start services are also likely not appropriate; as Dr. Roy Shanker \nexplains, there has been no technical justification to support the assertion that co-located load \nreceives comparable benefits from black start as network load.100  Rather, “the ability to isolate \nlarge loads so they cannot draw power from the system would act to sectionalize the grid and make \nblack start more manageable.”101   \nAs for a co-location arrangement that can sometimes take backup service from the grid \n(i.e., Option 5), during those periods when the configuration is drawing power from the grid, it \nmay make sense to require such configurations to pay for point to point transmission service, NITS, \nor a new conditional, non-firm transmission service.  A conditional non-firm transmission service \nwould be one in which PJM has no obligation to plan to provide service, nor expend costs in order \nto do so.102  Rather, the load would only take service when specifically permitted by PJM.103  When \nthe load takes any such transmission service, it should be permitted to net against the generator’s \noutput, consistent with the retail BTMG rules.  When the protective scheme is in place, an Option \n5 configuration should be charged similar to an Option 4 configuration. \n3. Surgical Changes to Pro Forma ISA Are Necessary and Sufficient to \nAccommodate Behind-the-Meter Co-located Load \nPJM’s Answer highlighted five items that would need to be added to the pro forma ISA to \naccommodate co-located load.  First, PJM indicated that it would require language formalizing the \n \n99 \nSee Dr. Shanker Aff. at P 64. \n100 Id. P 66. \n101 Id. \n102 Id. P 69. \n103 Id."},{"page":29,"startToken":8649,"endToken":8915,"text":"-29- \nspecial protection scheme or remedial action scheme that prevents the co-located load from \ndrawing power from the grid.104  Second, the ISA may also need to include new data exchange \nrequirements to ensure that appropriate communication and coordination occur.105  Third, the ISA \nshould also specify the entity that owns the co-located load and contact information for the \nappropriate personnel.106  Fourth, the ISA may also specify whether the generator now functions \nas an electric distributor.107  Finally, PJM indicated that it would require the generator to affirm its \ncontinued rights, duties, and obligations under the ISA.108   \nWhile not highlighted in PJM’s Answer, the proposed amendments to the Susquehanna \nISA also indicate that there may be a couple of additional items that are appropriate to include in \nthese ISA revisions.  For example, the proposed Susquehanna ISA included details about \ncoordinating the use of a secondary backup generator.109  It also included a process relating to the \ntreatment of the generator’s capacity interconnection rights.  Specifically, Susquehanna was \nrequired to reduce the generator’s CIRs as load is incrementally added, and to purchase \nreplacement capacity.110  Generic provisions on both items may be appropriate to include in the \nrevised pro forma ISA, or elsewhere in the tariff.   \nNone of these changes require an overhaul of the ISA.  Rather, they can be accomplished \nthrough narrow, surgical changes, or the creation of a new, short appendix or schedule attached to \nthe ISA.   \n \n104  PJM Answer at 52. \n105  Id. at 60. \n106  Id. at 61-62. \n107  Id.  \n108  Id.  \n109 Susquehanna ISA Filing at 9 \n110 Id. at 6."},{"page":30,"startToken":8915,"endToken":9288,"text":"-30- \n4. Secondary, Interruptible Backup Units Should be Allowed to Participate \nin the Capacity Market \nThe last issue that requires further clarity in PJM’s tariff is the ability of a secondary \ngeneration unit in a co-location arrangement to retain capacity resource status.  Resources that are \ncommitted to providing primary service to a co-located load clearly should not also sell that same \ncapacity to PJM.111  However, there is disagreement over the extent to which a secondary unit that \noccasionally will provide back-up service to the co-located load should be able to participate in \nthe capacity market.112  PJM suggests that non-network load can never be served by a capacity \nresource.113  However, this position ignores the existing retail BTMG provisions that allow a \ngenerator that designates a portion of its resource as BTMG to sell the rest of its resource as a \ncapacity resource.114  Vistra submits that there is no justification for prohibiting a secondary unit \nfrom participating in the capacity market if the secondary unit’s service to the co-located load is \ninterruptible.115  \nAllowing secondary backup resources to participate in the capacity market ensures that the \nmarket gets the greatest reliability benefit from these resources.  Ratepayers would enjoy access \nto additional capacity that would otherwise be underutilized, while the generation resource’s owner \nwould put its resource to use and increase its contribution to the market.  In fact, these types of \nsecondary backup units are more suited to capacity market participation than reliability must run \n \n111 See Susquehanna ISA Filing at 6-7 (requiring the Susquehanna nuclear facility to obtain replacement capacity \nand reduce the capacity value of its units by the amount of incremental load added).   \n112  See Show Cause Order P 86. \n113 See PJM Answer at 58 (“To the extent the co-located load is not considered Network Load and PJM does not \nhave any resource adequacy obligation with respect to such load, such load may not be served by installed capacity \nassociated with an Existing Capacity Resource.”). \n114 Dr. Shanker Aff. at PP 38-39. \n115 In this context, interruptible service means that the co-located load would not be supplied by the secondary unit.  \nRather, it would have the option to either cease consuming power or use an on-site backup generator."},{"page":31,"startToken":9288,"endToken":9571,"text":"-31- \n(“RMR”) resources, and the Commission recently approved the participation of certain RMR \nresources in the PJM capacity market.  Despite Vistra’s arguments that RMR units distort dynamic \nefficiency of the capacity market and do not face non-performance penalties, the Commission \nallows RMR resources to participate in the capacity market because they “can be reasonably \nexpected to perform.”116  A secondary unit that occasionally serves co-located load on an \ninterruptible basis can also be expected to perform when needed because PJM can recall it.  \nMoreover, these secondary units could be held subject to capacity market non-performance \npenalties and do not distort dynamic efficiency in the capacity market.   \nAllowing units providing secondary service to participate in the capacity market while also \nsubjecting those units to non-performance penalties would allow generators to meet a market need \nwhile ensuring that they are held accountable for their commitments to the market.  If PJM deems \nit necessary, it could also create a mechanism to address for how the second unit complies with its \ncapacity must offer obligation when it is serving the co-located load.  Given these protections, \nresources that are made available to serve a co-located load on a secondary, interruptible basis \nwhen the primary resource is unavailable should not unreasonably be prevented from selling \ncapacity.  \nB. Alternatively, Applying BTMG Netting Rules to Behind-the-Meter Load Would \nConstitute a Just and Reasonable Replacement Rate \nIf the Commission decides not to proceed with the replacement rate described above, \nanother possible avenue to remedy PJM’s failure to accommodate behind-the-meter co-located \nload would be to clarify that its existing retail BTMG provisions (i.e., Option 3) apply to new, \n \n116  PJM Interconnection, L.L.C., 190 FERC ¶ 61,088, at P 47 (2025)."},{"page":32,"startToken":9571,"endToken":9854,"text":"-32- \nlarge loads served behind-the-meter.  As Dr. Roy Shanker explains, this clarification is entirely \nconsistent with the retail BTMG program.117 \nPJM’s Answer misrepresented pertinent facts about the BTMG program because it jumped \nback and forth between describing its retail and non-retail BTMG provisions.118  Non-retail BTMG \ninvolves netting for multiple customers—that are not necessarily co-located—spread over a muni \nor coop distribution system.119   Retail BTMG is the relevant program here because it applies where \nload is located “at the same electrical location as the BTMG, such that no transmission or \ndistribution facilities are utilized to transmit energy from the BTMG to the load.”120  The same is \ntrue of behind-the-meter co-located load.   \nThe retail BTMG program reflects the same principles and logic as behind-the-meter co-\nlocated load.121  The retail BTMG “netting approach developed by PJM and its stakeholders \nreduces the cost to those market participants that rely to a lesser degree on the PJM integrated \ntransmission system to serve load because they serve loads that utilize behind the meter generation.  \nAs a result, entities that serve loads with behind the meter generation are allocated a fairer share \nof the costs associated with the operation of the PJM integrated transmission system, including \ncosts for energy, capacity, ancillary services, and administrative fees.”122   \n \n117 Dr. Shanker Aff. at PP 30-37. \n118 Id. P 31. \n119 Id. P 30. \n120  PJM Manul 14D, Appendix A, ¶ 3; Dr. Shanker Aff. at P 32. \n121 Dr. Shanker Aff. at P 32. \n122  Id. P 33 (citing PJM Interconnection, L.L.C., Submission of Revisions to Open Access Transmission Tariff, the \nAmended and Restated Operating Agreement, Etc., Docket No. ER04-608-000, at 1 (March 1, 2004))."},{"page":33,"startToken":9854,"endToken":10153,"text":"-33- \nMoreover, as Dr. Roy Shanker explains, behind-the-meter co-located load uses the \ntransmission system less than many traditional retail BTMG configurations.123  Oftentimes, \nBTMG only serves a fraction of the co-located load; furthermore, such configurations can draw \npower from the grid.  To contrast, load that is co-located behind a generator’s meter is served \nentirely by the co-located generator, and either cannot draw any power from the transmission \nsystem (Option 4) or can only do so with express permission from PJM (Option 5).124   \nPJM’s justification for not allowing new co-location configurations to use its BTMG \nprogram is because PJM asserts that the BTMG construct was created for smaller loads.125  \nHowever, PJM provides no source for this assertion.126  In fact, as Dr. Shanker explains, this is \ninconsistent with his long experience with co-location arrangements in PJM.127  Moreover, PJM’s \nstatements regarding the total cap on the BTMG program applies only to the non-retail BTMG \nprogram, not the retail BTMG program.128  PJM failed to provide a reasoned explanation for why \nnew behind-the-meter co-located load cannot be treated as retail BTMG.  The Commission could \nquickly remedy the undue discrimination against behind-the-meter co-located load by simply \nclarifying that these types of new, large co-located loads can use PJM’s retail BTMG provisions. \nV. \nIn General, the Necessary Study Rules Remain Just and Reasonable \nRegardless of which replacement rate the Commission directs PJM to adopt, the \nCommission should find that the necessary study process generally remains just and reasonable as \n \n123  Id. P 36; see also Mot. for Leave to Answer and Answer of Vistra Corp., Docket Nos. ER24-2888-000 et al, at 6 \n(filed Nov. 19, 2024). \n124 See Dr. Shanker Aff. at P 37. \n125  PJM Answer at 13. \n126 See Dr. Shanker Aff. at P 31. \n127 Id. \n128 Id."},{"page":34,"startToken":10153,"endToken":10439,"text":"-34- \napplied to the interconnection of co-located load behind-the-meter of an existing generator.  With \nthe minor clarification that transmission owners must cooperate during the necessary study \nprocess, the overall structure will work well.129  Vistra agrees with PJM’s defense of the necessary \nstudy process.130  This process is well established; PJM has been completing necessary studies to \nfacilitate behind-the-meter co-location for years.131  While, as PJM noted, there may be \nopportunities to enhance the transparency of the necessary study process, the basic structure of the \nstudy makes sense.132  The necessary study process ensures that PJM and the transmission owner \nhave “an opportunity to perform studies to evaluate the potential reliability impact of a proposed \naddition or reduction of a co-located load configuration onto the PJM Transmission System, and \ndetermine what, if any, system reinforcements are required prior to the addition or reduction of the \nplanned co-located load configuration.133  PJM explained that the “necessary study process is \ncapable of incorporating and evaluating the impact of co-located arrangements” and that an \nadditional queue “is not necessary.”134 \nIn any event, PJM must continue to administer its necessary study process during the \npendency of this proceeding.  The necessary study tariff provisions remains on file with the \nCommission, and the Federal Power Act requires that PJM continue to administer the currently \n \n129 See supra § IV.A.1.  \n130 See PJM Answer at 56. \n131 See Doswell NSA; PJM Interconnection, L.L.C., Original NSA, SA No. 6027; Queue No. NQ123, Docket No. \nER21-1728 (filed Apr. 22, 2021); PJM Interconnection, L.L.C., Original NSA, SA No. 6265; Queue No. M04, Docket \nNo. ER22-685-000 (filed Dec. 20, 2021). \n132  PJM Answer at 48-49. \n133 Id. \n134 Id. at 56."},{"page":35,"startToken":10439,"endToken":10829,"text":"-35- \neffective tariff.135  PJM’s Answer appeared to rely on the rejection of the Susquehanna ISA as \nevidence that it cannot accommodate Option 4 or 5.136  However, the Commission’s order on \nrehearing of the Susquehanna ISA proceeding clarified that the Commission’s rejection of the \nSusquehanna ISA should not be read to indicate that other entities should not file non-conforming \nISAs to address behind-the-meter co-located load.137  It is therefore clear that PJM can implement \nOptions 4 and 5, though the reforms proposed above will help ensure PJM accommodates Options \n4 and 5 in a just and reasonable and not unduly discriminatory manner.  In the meantime, PJM \nmust be required to tender an amended ISA to any customers that have received the results of a \nnecessary study under the current process, in line with the filed rate doctrine and the Commission’s \ntypical practice of respecting the settled expectations of late-stage interconnection customers.138    \nVI. \nPJM’s Answer Highlighted Additional Issues that the Commission Should Explore But \nthat Should Not Delay Expeditious Resolution of this Proceeding \nA. The Commission Should Encourage PJM to Engage with Stakeholders to Explore \nTariff Reforms to Accommodate Options 6, 7, and 8 \nPJM’s Answer highlighted three other examples of potential co-location configurations \nthat the tariff does not currently accommodate (Options 6, 7, and 8).  Vistra agrees with PJM that \nall three configurations appear beneficial to provide customers with additional options and to \n \n135  See, e.g., Old Dominion Elec. Coop. v. FERC, 892 F.3d 1223, 1230 (D.C. Cir. 2018) (“The filed rate doctrine and \nthe rule against retroactive ratemaking leave the Commission no discretion to waive the operation of a filed rate[.]”); \nTowns of Concord, Norwood, & Wellesley v. FERC, 955 F.2d 67, 71 (D.C. Cir. 1992). \n136 PJM Answer at 14-15 (explaining that fully isolated behind-the-meter co-located load is ‘a new potential option’ \nfor which “[t]ariff modifications would be needed based on the Commission’s November 1, 2024 Order in Docket \nNo. ER24-2172.”). \n137 Susquehanna ISA Rehearing Order at P 30. \n138  See Improvements to Generator Interconnection Procedures and Agreements, Order No. 2023, 184 FERC ¶ \n61,054, at P 865 (2023) (allowing customers with an executed facilities study agreement to proceed with a facilities \nstudy and requiring transmission providers to tender an LGIA to interconnection customers that have received final \nfacilities study reports)."},{"page":36,"startToken":10829,"endToken":11130,"text":"-36- \nenhance operational flexibility.139  However, the record in the Commission’s various co-location \nproceedings to date contains far less information on these three options than it does for Options 4 \nand 5.  As pointed out by Dr. Shanker, Options 4 and 5 do not raise unique resource adequacy or \nreliability concerns; therefore, Options 6-8 are not required to address resource adequacy or \nreliability.140  These options may nonetheless provide beneficial avenues to facilitate new entry or \nflexibility.  Vistra believes that these options are worthy of further exploration but would benefit \nfrom further discussion with stakeholders.  The Commission should encourage PJM to initiate \nstakeholder proceedings to develop tariff revisions to implement these options as soon as possible.   \nHowever, the Commission should not wait until those further tariff revisions are ready \nbefore directing PJM to adopt a replacement rate to remedy the clear deficiencies in PJM’s tariff \nthat are already apparent in the record.  Furthermore, implementing Options 4 and 5 in the tariff \nnow would make it easier to implement such additional options later.  For instance, the “bring your \nown generation” approach of Option 6 could contain significant overlap with Options 4 or 5.  A \nconfiguration that brings its own generation could design its facility into any potential layout.  \nOnce PJM has a framework in place for behind-the-meter co-location in addition to front-of-the-\nmeter co-location, the only unique element that would be needed for Option 6 is a way to \ncoordinate the generation and load interconnection processes.  As discussed further below, an \nexcellent step in that direction would be to explore standardized interconnection procedures for \nfront-of-the-meter load interconnections.   \nB. There is a Regulatory Gap for Front-of-the-Meter Load Interconnection to the \nTransmission System that the Commission Should Fill  \n \n139 See PJM Answer at 8. \n140 See Dr. Shanker Aff. at P 52, 54-57, 69."},{"page":37,"startToken":11130,"endToken":11439,"text":"-37- \nAs described above, PJM’s Answer highlighted a troubling regulatory gap and lack of \ntransparency with regards to front-of-the-meter load interconnection.  Load interconnection to the \ntransmission system (i.e., Options 1 and 2) currently occurs through transmission owner load \nintegration studies.141  Unlike generator interconnections to the transmission system, there are \ncurrently no FERC-regulated standardized procedures setting forth the rates, terms, and conditions \nof service for load interconnections to the interstate transmission system.  As PJM’s Answer \nexplained, the network upgrades identified in transmission owner load integration studies are \ndesignated as supplemental projects.142  PJM only reviews these supplemental projects under a \nbare minimum standard to ensure that they “do no harm” to the transmission system.143  As OPSI \nhas previously explained, state regulators often do not have authority to review these supplemental \nprojects.144  According to PJM, these projects are “cost allocated to the local Transmission \nOwners’ zone pursuant to individual Transmission Owners’ cost allocation frameworks.”145  In \nother words, these supplemental projects oftentimes are virtually unreviewed before they go \ndirectly into the transmission owners’ rate base.   \nThe Commission has jurisdiction to close this regulatory gap.  The Show Cause Order \nasked a series of important questions regarding when load should be considered interconnected to \nthe transmission system in interstate commerce.146  This is the right question because the \n \n141 PJM Answer at 9-12. \n142  Id at 7. \n143 Id. \n144  See, e.g., Comments of the Organization of PJM States, Docket No. RM21-17, at 6 (filed Aug. 17, 2020) (“Some \nretail regulators have extensive processes for reviewing [supplemental projects], and others do not. In the latter case, \nretail regulators often lack authority over the vast majority of these local projects, meaning that the local projects being \nproposed simply do not undergo a review at the retail level.”) \n145  PJM Answer at 17. \n146  Show Cause Order at P 73."},{"page":38,"startToken":11439,"endToken":11809,"text":"-38- \nCommission has jurisdiction when load interconnects to the transmission system in interstate \ncommerce based on its exclusive authority over interstate transmission.147  The Commission \nregulates the terms of generator interconnections to the transmission system under this same \nauthority.148   \nThe Supreme Court has found that transmission facilities that are connected to the interstate \ngrid operate in interstate commerce.149  Therefore, the operative question is when load is \ninterconnected to the transmission system; if it is, then it is properly considered interstate \ncommerce.  The answer is relatively straightforward:  load that can draw power directly from the \ntransmission system (regardless of whether the load is co-located in front-of-the-meter or behind-\nthe-meter or not co-located at all) should be considered interconnected to the transmission \nsystem.150  To contrast, load that is designed with protective schemes to prevent it from drawing \npower from the grid should not be considered interconnected to the transmission system because \nit will only receive power that flows over distribution facilities between the generator and the load. \nAfter concluding this show cause proceeding on behind-the-meter co-location \narrangements, the Commission should consider commencing a separate proceeding to explore the \nissue of front-of-the-meter load interconnection practices on a PJM-wide, or perhaps even \nnationwide, basis.  The Commission should exercise its authority over load interconnection to the \n \n147 See id. P 72 (“[T]he Commission has exercised authority over the terms of certain interconnections to the \ntransmission system”) (citing Standardization of Generator Interconnection Agreements & Procs., Order No. 2003, \n104 FERC ¶ 61,103 (2003)). \n148  See Order No. 2003, 104 FERC ¶ 61,103, at PP 18-20 (2003); order on reh’g, Order No. 2003-A, 106 FERC ¶ \n61,220, at P 6, order on reh’g, Order No. 2003-B, 109 FERC ¶ 61,287 (2004), order on reh’g, Order No. 2003-C, 111 \nFERC ¶ 61,401, at PP 51-52 (2005), aff’d sub nom. Nat’l Ass’n of Regul. Util. Comm’rs v. FERC, 475 F.3d 1277 \n(D.C. Cir. 2007). \n149  New York v. FERC, 535 U.S. 1, 16 (2002); Fla. Power & Light Co., 404 U.S. 453, 466–67 (1972) (“[The \nCommission’s] alternative assertion that energy commingles in a bus is, in our opinion, sufficient to sustain [the \nCommission’s] jurisdiction.”)) \n150  See Dr. Shanker Aff. at P 19."},{"page":39,"startToken":11809,"endToken":12106,"text":"-39- \ntransmission system to prevent undue discrimination and ensure that interconnection service is \nprovided in a just and reasonable manner.  The Commission could fulfill this responsibility by \nissuing a notice of inquiry to explore the adoption of standardized load interconnection procedures.  \nStandardized load interconnection procedures could help provide PJM more visibility into load \nthat seeks to interconnect and the timing of such load, which can help alleviate the resource \nadequacy and load forecasting concerns.  However, similar to the discussion regarding behind-the-\nmeter load interconnection, any such standardized load interconnection procedures should include \na transition for any interconnection customers that are sufficiently far along in the process.  \nVII. \nConclusion \nVistra urges the Commission to act quickly to provide a pathway to adequately \naccommodate Options 4 and 5 configurations.  The Commission should confirm its preliminary \nfinding that the PJM tariff is unjust and unreasonable and unduly discriminatory because it does \nnot contain provisions that address behind-the-meter co-located load with sufficient clarity.  PJM’s \nnew assertion that its tariff does not accommodate Options 4 and 5 demonstrates this point.  It \nwould be manifestly unjust and unreasonable and unduly discriminatory not to accommodate \nbehind-the-meter co-location given that PJM accommodates other co-location configurations.  \nMoreover, PJM’s contention that new, large loads must interconnect through Options 1 or 2 creates \na structural bias in favor of transmission-served load and against competitive, bilateral supply \narrangements.  PJM provides no justification for this discrimination that can withstand scrutiny.  \nIn particular, Dr. Roy Shanker’s analysis demonstrates that Option 4 and 5 configurations provides \nsignificant benefits to the grid and other market participants when compared with PJM’s preferred \nOption 1.  Even putting aside PJM’s new position that its tariff prohibits Options 4 and 5, the \nrecent history of its implementation demonstrate that its tariff does not contain the clarity necessary"},{"page":40,"startToken":12106,"endToken":12437,"text":"-40- \nto ensure that it can actually facilitate such configurations.  In light of these facts, the Commission \nmust confirm its preliminary finding and proceed to set a replacement rate to remedy these issues. \nVistra herein suggests a replacement rate that the Commission could adopt quickly to \nensure that the tariff accommodates Options 4 and 5 configurations in a just and reasonable and \nnot unduly discriminatory manner.  This proposal would ensure that Options 4 and 5 configurations \npay their fair share and that other customers are not harmed.  Vistra’s solution includes the \nfollowing four elements. \n \nFirst, the Commission should clarify that transmission owners must cooperate in the \nnecessary study process.  This can be done through the surgical edit to Attach. O, App’x 2, Section \n3.1 noted above.  This clarification is necessary given that some transmission owners have refused \nto participate in the necessary study process to facilitate Option 4 and 5 configurations. \nSecond, the Commission could create a new rate design to ensure that Options 4 and 5 \nconfigurations pay their fair share.  First, the Commission can allocate costs of any facilities \nidentified through the necessary study process to accommodate the new behind-the-meter load to \nthe generator in the co-location arrangement.  The Commission could also create a grid services \nrider in the ISA to address ongoing costs.  In particular, this grid services rider could include \npenalties for any unintended grid usage in the rare case of a protective scheme failure.  Such \npenalties would be reasonable because they respond to actual use of the transmission system, rather \nthan a baseline rate where the utility is providing no transmission service.  The rate design could \nalso include some ancillary service charges.  PJM has rightly clarified that generators might be \nobligated to pay for some ancillary services, even under an Option 4 or 5 configuration.  However, \nto be consistent with the cost causation principle, it is critical that the Commission and PJM \nidentify, with specificity, the actual services that co-location arrangements use.  Vistra urges the"},{"page":41,"startToken":12437,"endToken":12746,"text":"-41- \nCommission to direct PJM to identify and apply a principled approach for evaluating whether, and \nto what extent, these configurations should pay for such services.  For example, it could be \nreasonable to charge co-location configurations for regulation services where the addition of a co-\nlocated load introduces more variability in the generator’s output.  For Option 5 configurations, it \nwould be reasonable to impose some transmission service charges when the load draws power \nfrom the grid, subject to netting consistent with the retail BTMG program. \nThird, the Commission should modify the pro forma ISA to include provisions specific to \nthe addition of co-located load.  In particular, such provisions could include language formalizing \nany applicable protective schemes and data exchange requirements.  The provisions could also \naffirm the generators’ continued rights and duties, include details on coordinating the use of a \nsecondary backup generator, and address the treatment of the generator’s capacity interconnection \nrights.     \nFourth, the Commission should clarify that a secondary generator that provides occasional, \ninterruptible backup service to a co-located load can also serve as a capacity resource.  If the \nbackup service is interruptible, the generator will be available to PJM when needed, and there is \nno reason to exclude such a resource from capacity market participation.  Moreover, such resources \ncould be subject to non-performance penalties to ensure they are held accountable for their \ncommitment to the market.  Allowing interruptible secondary resources to participate in the \ncapacity market ensures that the market gets the greatest reliability benefit from these resources.   \nThis framework provides a path forward to facilitate Options 4 and 5 configurations in a \njust and reasonable and not unduly discriminatory way.  After the Commission ensures that PJM \naccommodates Options 4 and 5 in this proceeding, the Commission should also turn its attention \nto other issues raised by PJM’s Answer.  In particular, the Commission should direct PJM to"},{"page":42,"startToken":12746,"endToken":12908,"text":"-42- \nconduct an expedited stakeholder process to create tariff provisions to accommodate Options 6-8.  \nThe Commission should also explore the possibility of creating standardized load interconnection \nprocess that would govern load interconnection to the transmission system.   \nHowever, the sequence and timeline of these steps is important.  The Commission must \nremedy the undue discrimination that is already apparent in the record, and it must do so quickly.  \nTime is of the essence in removing unnecessary regulatory hurdles to deploying data center \ninfrastructure, thereby fostering economic growth and national security benefits.   \n \n \nRespectfully submitted, \n  \n \n/s/ J. Arnold Quinn \nJ. Arnold Quinn \nSVP of Regulatory Policy  \n \nAndrew Weinstein \nVice President, FERC Market Policy \n \nVistra Corp. \n325 7th Street NW \nSuite 520 \nWashington, DC 20004 \narnie.quinn@vistracorp.com  \nandrew.weinstein@vistracorp.com \n__________________ \nNicholas M. Gladd \nSarah Greenberg \nWilson Sonsini Goodrich & Rosati \n1700 K Street NW \nFifth Floor \nWashington, DC 20006 \n(617) 598-7871 \nngladd@wsgr.com  \nsgreenberg@wsgr.com  \n \nCounsel for Vistra Corp. \n \nDated:  April 23, 2025"},{"page":43,"startToken":12908,"endToken":12972,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service lists compiled by the Secretary of the Commission in these \nproceedings. \n \nDated: April 23, 2025 \nWashington, D.C. \n \n \n/s/ Sarah Greenberg \nSarah Greenberg \nWilson Sonsini Goodrich & Rosati \n1700 K Street NW \nFifth Floor \nWashington, DC 20006 \n(202) 431-5231 \nsgreenberg@wsgr.com"},{"page":44,"startToken":12972,"endToken":12982,"text":"1\n \n \n \n \n \n \n \n \nAttachment A \n \nAffidavit of Dr. Roy J. Shanker, PhD"},{"page":45,"startToken":12982,"endToken":13223,"text":"2\nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nAFFIDAVIT OF ROY J. SHANKER, PH.D. \n \nI. \nQualifications and Purpose of Affidavit \n1. \nMy name is Roy J. Shanker.  My address is P.O. Box 1480, Pebble Beach, California, \n93953.  I have a bachelor’s degree from Swarthmore College and both a master’s degree and a \ndoctorate degree from Carnegie-Mellon University. \n2. \nMy resume, Attachment B hereto, summarizes my experience in numerous regulatory \nproceedings before state commissions and the Federal Energy Regulatory Commission (“FERC” \nor “Commission”).  As detailed therein, I have over 50 years of experience covering a broad \nrange of issues in the electric utility/power generation/energy sectors for a broad range of clients.  \nPrior to the creation of PJM Interconnection, L.L.C. (“PJM”) and the New York Independent \nSystem Operator, Inc. (“NYISO”), I was extensively involved in the development of on-site \ngeneration arrangements similar to the co-location issue under consideration in this docket.  In \n1977, I was the Project Manager for New York’s first Energy Conservation Plan and New \nJersey’s first Energy Master Plan, both of which involved understanding the status quo in terms \nof potential barriers or limitations related to on-site generation.   \n3. \nDuring the initial development of PJM and NYISO, I helped to formulate the underlying \nrationales for various elements of their market designs.  In PJM, I also participated extensively in \nthe creation of net billing procedures for behind-the-meter generation (“BTMG”) in the 2003-"},{"page":46,"startToken":13223,"endToken":13533,"text":"3\n2005 time period.  I also worked on subsequent adjustments to the BTMG paradigm.1 \nThroughout my 50 years of experience, I have participated extensively in stakeholder meetings \nand discussions concerning the underlying issues in this proceeding: co-location, net metering \nand behind-the-meter load.   \n4. \nOn February 20, 2025, the Commission issued a Show Cause Order to address its \nconcerns that PJM’s tariff is not just and reasonable with respect to the ability for a Network \nResource to enter into an agreement to serve new behind-the-meter load.  The Show Cause Order \ncontains an extensive list of questions to PJM regarding arrangements related to co-location \narrangements and their interaction with the current tariff, and/or what potential tariff revisions \nmay be necessary.   \n5. \nOn March 24, 2025, PJM filed its response to the Show Cause Order (“PJM Answer or \nResponse”).  I was asked by Vistra Corporation (“Vistra”) to review PJM’s Answer to the Show \nCause Order and to review the existing tariff provisions as they relate to co-location \narrangements.  In fulfilling this engagement, the below affidavit includes my assessment of the \nspecific representations made by PJM.  It also presents a more general and organized approach to \nguide the Commission in its consideration of the questions it presented and appropriate context \nto evaluate various co-location arrangements.   \nII. \nSummary of Conclusions and Recommendations \n6. \nAs a starting point, the PJM Answer indicates that PJM is confused about the \nCommission’s inquiry.  PJM posits that there are only three existing ways within the current \n \n1 This experience facilitated my correction of the misleading comments of PJM related to Behind the Meter \nGeneration.  See PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 (2004); PJM Interconnection, L.L.C., 112 FERC \n¶ 61,034 (2005); PJM Interconnection, L.L.C., 113 FERC ¶ 61,279 (2005); PJM Interconnection, L.L.C., Letter \nOrder, Docket No. ER22-548-000 (January 31, 2022)."},{"page":47,"startToken":13533,"endToken":13873,"text":"4\ntariff to implement the co-location of generation and load.  It also posits that there may be at \nleast five additional ways to implement co-location.2  PJM appears to be saying that the current \ntariff is just and reasonable because of the three identified options and also suggests it is willing \nto discuss, going forward, modifications to existing tariff to address additional options.  All this \nseems contrary to the Commission’s directive, as stated above, which put upon PJM the \nobligation to explain why the tariff is not unjust and unreasonable or unduly discriminatory as it \nrelates to co-location arrangements similar to arrangements like Options 4 and 5.  Further, PJM’s \nnew position directly contradicts PJM’s own actions in executing and submitting to the \nCommission a modified Interconnection Service Agreement, coupled with identified necessary \nfacilities for the proposed Talen/Susquehanna project (Docket ER24-2172), which appeared to \nbe an Option 4 arrangement.  PJM’s position in its Answer also appears contradictory to its \nactions with respect to recently submitting a Necessary Study Agreement with LS Power for an \nisolated co-located load for a short-term arrangement again similar to Options 4 and 5.   \n7. \nWithin this context, I reached the following conclusions.  First, in general there is nothing \nnew about the concept of co-location.  These types of arrangements have existed from the very \nbeginning of electrification.  I have been involved with these arrangements since prior to the \nimplementation of PURPA in 1978.  The issues and concerns raised opposing such arrangements \nare old and oft repeated.  These issues do need to be addressed, but it is important to note that \nneither the concerns nor the remedies to those concerns are new or unusual. \n8. \nSecond, there does not appear to be any prohibition within the existing tariff with respect \nto the range of co-location options presented by PJM, and in particular, options 4 and 5.  \n \n2 As noted below, there are hundreds of alternative co-location options.  Some of those options are commercially \nsuperior to others in that they offer benefits compared to an appropriate comparison case."},{"page":48,"startToken":13873,"endToken":14154,"text":"5\nHowever, as described in Vistra’s comments, FERC should direct PJM to implement reforms to \nensure that PJM will permit co-location in a just and reasonable and not unduly discriminatory \nmanner.   \n9. \nThird, PJM misrepresents its own tariff with respect to its existing Option 3 (BTMG).  In \ndiscussing BTMG, PJM switches back and forth between discussing retail BTMG and non-retail \nBTMG.  Retail BTMG is the appropriate comparison for a behind-the-meter co-located load \nconfiguration.  Retail BTMG reflects an arrangement that allows behind the meter load to net its \nconsumption against credits from PJM for the associated generation.  PJM’s Answer \nmisrepresents the properties of the relevant existing program, retail BTMG, particularly with \nrespect to any limitation on the total program level of participation (there is none) and the notion \nthat the program was established for smaller loads (there are no such statements). \n10. \nFourth, PJM offers no organized approach to identifying and evaluating the various \npossible co-location configurations.  PJM did not provide an analytic foundation with respect to \nthe use of a proper comparison case for each configuration of co-located generation and load to \ndetermine any differential impacts from the various options.  These omissions lead PJM to \nclearly incorrect conclusions regarding the properties of co-location arrangements.  In any \npotential replacement rate, the Commission should utilize an analytically sound basis to evaluate \npotential co-location arrangements to ensure they are treated fairly under the tariff.  Utilizing the \nproper comparison case for each co-location arrangement is critical to this analysis, because it \nwill allow the Commission to properly evaluate the status quo, and any possible adjustments in \norder to assure the tariff is just and reasonable and not unduly discriminatory with respect to \nbehind-the-meter co-location arrangements."},{"page":49,"startToken":14154,"endToken":14498,"text":"6\n11. \nFifth, when we evaluate Options 4 and 5 appropriately, it is apparent that they present \ninterconnection and load service arrangements that are either the same or superior in terms of  \nplanning reliability, LMP, capacity pricing, and billing results for existing load when compared \nto the appropriate comparison case.3  I recommend that the Commission direct PJM to ensure \nthat market participants can enter into co-location arrangements that offer both benefits to the \nrest of system load or at minimum do not increase costs or adversely affect reliability for the rest \nof the system load when subjected to the proper comparison evaluations.   \n12. \nTo facilitate that participation, FERC should direct PJM to implement the narrow set of \ntariff reforms identified by Vistra.  Those reforms would ensure that parties involved in a co-\nlocation arrangement pay their fair share.  Specifically, any incremental network upgrades that \nare identified as necessary to facilitate the addition of co-located load should be directly paid by \nthe parties to the co-location arrangement.  With respect to transmission service, the co-located \nload should be eligible for netting consistent with the treatment of retail BTMG.  The reforms \ncould also potentially include regulation service charges to the generator to the extent that high \nvariances in the co-located load, seen by the grid as changes in generator output, is considered as \nusing regulation services.  Other ancillary services that support PJM’s response to contingencies \ncould be appropriate, but the specific allocation would need to be based on analysis has yet been \nprovided by PJM or any other party.  Finally, those reforms also should include a recognition \nthat a second unit that serves co-located load on an interruptible basis under PJM’s direction can \nserve as a capacity resource. \n \n3 As noted in Vistra’s comments, this showing of all parties being in the same or better economic condition is not a \nnecessary condition for a finding by the Commission that these alternatives are both just and reasonable.  However, \nthe existence of this feature makes it clear that a contrary finding by the Commission could not be justified."},{"page":50,"startToken":14498,"endToken":14892,"text":"7\nIII. \nCo-Location is Not New \n13. \nMy previous work history is particularly relevant to the repeated assertions about the \n“novelty” of the co-located load and generation business paradigms.  From time to time, since \nprior to the enactment of PURPA, I have been involved with both regulatory and business \ntransactions that would be classified as a form of co-location arrangements.   \n14. \nThe ability for parties to operate in parallel with or independent from the grid under a \nwide variety of business and regulatory arrangements has existed for over a century.  Thomas \nEdison’s famous Pearl Street Generating station (1892) was in fact also a co-generation facility, \nproviding energy for a steam loop.4  Hydro-electric generation at paper mills was very common.5  \nThese arrangements continued against a backdrop of changing state and federal regulation, most \nnotably the Public Utility Regulatory Policies Act of 1978 (“PURPA”).  Even prior to PURPA, I \nassisted in the co-location of new generation at an industrial site.6   \n15. \nThe regulatory adjustments that occurred in the context of PURPA and PJM’s BTMG \nparadigm are no different than the matters currently before the Commission.  The claims of \n“novelty” and “first impression” need not delay or obfuscate this iteration of co-location options \nbeing presented to the Commission.  Interestingly, the parties that oppose current behind-the-\n \n4 Sonal Patel et al., History of Power: The Evolution of the Electric Generation Industry, Power Magazine, (October \n1, 2022), https://www.powermag.com/history-of-power-the-evolution-of-the-electric-generation-industry/.  \n5 For example, in 1902, the Great Barrington Electric Light Company purchased a site on the Housatonic River at \nthe north end of town.  This site, known as the Russell Water Power, was used in connection with the former \nBerkshire Woolen Mills at that location.  A combination hydroelectric and steam generating station was constructed \nthere that used Stanley “S.K.C.” alternators.  This facility would have supplemented the power being obtained from \nthe Alger’s Furnace hydroelectric station at Monument Mills. Thomas J. Blalock, In the Berkshires, Part 2, IEEE \nPower & Energy Magazine (Sept./Oct. 2012), https://magazine.ieee-pes.org/septemberoctober-2012/history-\n4/#:~:text=In%201902%2C%20the%20Great%20Barrington,were%20known%20as%20McCormick%20turbines.  \n6 In 1977, I was engaged to help address regulatory issues related to the successful development of additional \nelectric power generation at a petroleum coking facility.  This was done in cooperation with a local distribution \ncompany and private industrial entity."},{"page":51,"startToken":14892,"endToken":15218,"text":"8\nmeter co-located load arrangements are almost the same as those who previously opposed the \nability of Qualifying Facilities and co-located loads to net their own generation against purchases \nfrom the grid.  Their claims are remarkably similar to those made almost 50 years ago:  that \ngeneration combined with load running in parallel to the grid would harm the reliability of the \ngrid, or service to existing customers would be somehow compromised, or that independent \nsuppliers would not be reliable partners in the provision of power.7  When analyzed, these \nobjections are wrong, and just as in the past, there are legitimate current mechanisms to pursue \nalternative competitive supply arrangements for electric consumers that are consistent with both \nreliability, overall cost impacts, and in this case, the existing PJM tariff.  In the case of co-\nlocation, some of those mechanisms can come with benefits to reliability and costs to existing \ncustomers when subject to the correct analyses.   \nIV. \nRate Design, Use, Cost Causality, Billing Determinants \n16. \nAnother area of confusion relates to terminology related to the “taking” or “use” of \nNetwork Integration Transmission Service (“NITS”).8  It is worthwhile to explain the basics to \ninform the assessment of whether any particular co-location arrangement takes or uses NITS and \nwhat that means with respect to the specific cost recovery and charges.  The Commission \ntypically seeks to assign costs to market participants (load and generation) in a fashion, to the \n \n7 This is despite the fact that cogeneration and combined heat and power facility provide approximately 82,000 MW \nof power nationally in 3,700 locations with over a century of actual operations.  See Combined Heat and Power: A \nClean Energy Solution 5, DOE & EPA (Aug. 2012), https://www.epa.gov/sites/default/files/2015-\n07/documents/combined_heat_and_power_a_clean_energy_solution.pdf.   \n8 NITS to refer to all transmission services collectively rather than repeatedly referring to separate services such as \npoint to point (PTP) service."},{"page":52,"startToken":15218,"endToken":15613,"text":"9\nextent possible, that considers and reflects who causes the costs and the related use of facilities \nor services.9  \n17. \nIn doing so, it is typical to identify the cost “causer,” and then identify indicators of use \n(referred to as billing determinants) of the related facilities or services.  Costs are then spread \nover those billing determinants in total and assigned pro rata to customers based on their \nindividual billing determinants.  As a simple example, the allocation of energy related LMP costs \n(i.e., payments to generators for energy) to customers would be based on the number of MWHs \nthe customer consumes at a specific location and the LMP at that location.  In this example, the \nbilling determinant is MWHs.  One has to be able to determine how many MWHs of power a \ncustomer consumed, and where and when, in order to then bill the customer for the energy.  \n18. \nThis general paradigm continues to apply in the co-location context, including with \nrespect to the “taking” of NITS and determination of what is “Network Load.”  In PJM, NITS \nrelated costs are broken out into various billing determinants.10  These billing determinants relate \nto PJM’s determination of the elements of use and cost causality associated with NITS, and the \nCommission’s determination that this was a just and reasonable allocation of costs.  \n19. \nThese billing determinants reflect different types of use, and their total costs.  When \ncombined with the allocated unit costs for these services, the billing determinants determine the \ncharge for load directly connected to the PJM grid.  In certain co-location arrangements, like \nPJM Option 4, the load is not interconnected to the grid.  This load is not interconnected to the \n \n9 See e.g. Southwest Power Pool, Inc., 137 FERC ¶ 61,075, at P 20 (2011) (“Under the cost causation principle, ‘it \nhas been traditionally required that all approved rates reflect to some degree the costs actually caused by the \ncustomer who must pay them’ . . . the cost allocation mechanism must not be ‘arbitrary or capricious’ in light of the \nburdens imposed or benefits received.”) (citing KN Energy, Inc. v. FERC, 968 F.2d 1295, 1300 (D.C. Cir. 1992); \nMidwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1369 (D.C. Cir. 2004)). \n10 See PJM Manual 29 at 14-16; PJM, Guide to Billing, available at https://www.pjm.com/markets-and-\noperations/billing-settlements-and-credit/guide-to-billing."},{"page":53,"startToken":15613,"endToken":15941,"text":"10\ntransmission system because it cannot take power from the transmission system due to specific \nprotective schemes reviewed and approved by PJM.  Rather, the load takes its service solely \nfrom the co-located generator (or through an intermediary).  The power this load takes only \nflows over the facilities between the generator and the load.  These facilities are all distribution \nfacilities.  In such arrangements, only the generator is interconnected to the grid.  Under the \ncurrent tariff, PJM has no billing determinants for generators with respect to NITS activity.  \nThere are similarly no billing determinants for load that is not interconnected to the PJM system.  \nThus, in terms of the ability to charge for such use and services, the current PJM tariff has \ndetermined that it is just and reasonable that these costs are recovered via load-based charges \napplied to load that is interconnected to the transmission system.  There is no basis for assigning \nthese costs to load that is not interconnected and is “behind” a generator, and where only the \ngenerator is directly connected to the grid.   \n20. \nWhile this represents the status quo, a different perspective of cost causality might lead to \nother cost allocations and billing determinants for either load or generation that the Commission \nmight deem just and reasonable.  For example, in a co-located arrangement, a 1 MWH increase \nin the load results in the decrease of 1 MWH of sales of energy from the generator to the grid \n(and vice versa for a decrease in co-located load).  Variances in the co-located load, which is \nonly seen by the grid as changes in generator output, could be seen as related to the need for \nregulation service.  Thus, high load variation, (which appears to the grid as high generation \nvariability) could be seen as using regulation services.  In turn, charging the generator for \nregulation services might be a reasonable causality and cost allocation approach for recovering \ncosts related to regulation ancillary services.  Indeed, the Commission has previously considered"},{"page":54,"startToken":15941,"endToken":16233,"text":"11\nimposing an ancillary charge on variable generation though decided a generic requirement was \nnot necessary.11    \n21. \nAs the last paragraph indicates, changing perspectives can suggest alternative cost \nallocation.  In the above regulation discussion, some portion of cost recovery would shift to \ngenerators.  To the extent that other ancillary services are reviewed in the similar context of a \ngrowing presence of arrangements such as the isolation of the load in Option 4, a different \nperspective on cost allocation may also be developed for those services.  For instance, another \nperspective could justify some cost allocation for other ancillary services.  This may differ from \nthe status quo where these costs only are recovered by specific NITS billing determinants.  It \nwould be a reasonable exercise going forward to consider this type of question and if necessary, \nadjust cost recovery.  \nV. \nThe Current Tariff Does Not Prohibit Behind-the-Meter Co-Location \nArrangements \n22. \nThe fundamental attributes of behind-the-meter co-located load arrangements make it \nclear that there is no material regulatory impediment to a wide variety of co-location \narrangements (nor should there be).  This can also be seen by decomposing the co-location \nprocess into its two basic components.  \n23. \nFirst, a generator that is interconnected with PJM chooses to stop selling parts of its \nenergy and capacity into the PJM market.  This action will be reasonably reviewed consistent \nwith the current tariff requirements.  For example, PJM will assure that necessary adjustments \nare made to the generator’s interconnection agreement and facilities.  After meeting these \n \n11 See Integration of Variable Energy Resources, Order No. 764, 139 FERC ¶ 61,246, at PP 267-269 (2012) \n(declining to adopt proposed generic approach to recovery of generator regulation charges but confirming the rule \n“should not be interpreted as an unwillingness to consider individual proposals[.]”)."},{"page":55,"startToken":16233,"endToken":16608,"text":"12\nrequirements, there is no bar to this action in the tariff, that I am aware of, for making such sales.  \nAs conditioned above, a generator and its owner are free to sell to other parties under the PJM \ntariff. \n24. \nSecond, the generator then enters into a sale for power, either directly to the load at retail \nor to an LSE at wholesale.  If the generator is an Exempt Wholesale Generator (EWG), then the \nsale must be at wholesale.12  In those cases, the wholesale buyer would be a Load Serving Entity \nthat, under state law, is permitted to purchase at wholesale and resell at retail.  Alternatively, a \ngenerator that is not an EWG could make a direct sale to a retail entity if it met the appropriate \nstate regulatory requirements.  Again, none of these actions are prohibited by the PJM tariff.  \n25. \nAlthough tariff revisions would be needed if the Commission wishes to modify the status \nquo with regards to issues like charges for certain ancillary services, it is apparent from a review \nof the components of the co-location process that the current tariff permits these configurations.  \nReferences to physical elements like synchronization or an expansive notion of use of the \ntransmission system obfuscate the fact that the actions described above are already permissible.  \n26. \nSimilarly, debates regarding the term “isolated” to describe electrical arrangements that \nare designed to prevent the co-located load from unintentionally drawing power from the grid \nobfuscate the fact that such electrical arrangements are already permissible.  While some parties \n \n12 The Public Utility Holding Company Act of 2005 (“PUHCA 2005”) states that the term “exempt wholesale \ngenerator” will have the same meaning as that term had in section 32 of the Public Utility Holding Company Act of \n1935 (“PUHCA 1935”).  42 U.S.C. § 16451(6) (2005).  Section 32(a)(1) of PUHCA 1935 defined an exempt \nwholesale generator as “any person determined by the Federal Energy Regulatory Commission to be engaged \ndirectly, or indirectly through one or more affiliates . . . , and exclusively in the business of owning or operating, or \nboth owning and operating, all or part of one or more eligible facilities and selling electric energy at wholesale.”  15 \nU.S.C. § 79z-5a(a)(1) (1935) (repealed 2005)."},{"page":56,"startToken":16608,"endToken":16953,"text":"13\nsuggest these types of arrangements cannot be depended on, PJM itself approved the design of \nsuch an arrangement in the Susquehanna ISA.13  \n27. \nMoreover, PJM already has in place at least 14 Remedial Action Schemes (“RAS”) or \nSpecial Protection Schemes (“SPS”) that involve complicated switching or other transmission \narrangements in real time to prevent adverse circumstances in the operation of the transmission \nsystem.14  As indicated in BPM Manual 7, Section 17, these types of arrangements are consistent \nwith NERC standards.  The PJM manuals also describe the process for the use of automatic \nsectionalization, adjustments that can isolate dynamically faulted sections of the grid.15  For \ninstance, in describing system operating limits, PJM acknowledges the role of “system \nreconfiguration through manual or automatic control or protection actions.”16  The notion of \npreventing a load from drawing power from the grid is fully within the scope of these types of \nexisting configurations.  It seems incongruous that PJM would sponsor before the Commission \nan arrangement such as it submitted for Talen/Susquehanna if it did not believe that such actions \nwere both permissible and reliable. \n28. \nDebates regarding the term “synchronized” are also irrelevant as relating to the \njurisdictional categorization of these facilities and the resulting NITS or PTP charges.  It is a \nnatural property of an alternating current transmission and distribution system to synchronize in \n \n13 See PJM Interconnection, L.L.C., Amendment to ISA, SA No. 1442; Queue No. NQ-123, Docket No. ER24- \n2172-000 (filed Jun. 3, 2024). \n14 See PJM Manual 3: Transmission Operations, Attachment A (November 21, 2024), https://www.pjm.com/-\n/media/DotCom/documents/manuals/m03.pdf. \n15 See id. at § 1.9 (“Several PJM Transmission Owners use line and substation designs that automatically switch \nequipment in order to isolate faulted system elements (e.g., a line or a transformer) from unfaulted elements. Within \nthe protection schemes for these system elements, sufficient fault detection and control capability is provided to \nautomatically isolate the faulted element and then restore remaining equipment to service.”).  \n16 See PJM Manual 14 B, Attachment F."},{"page":57,"startToken":16953,"endToken":17219,"text":"14\nterms of frequency, voltage, phase and wave form.  The generator in a co-location arrangement \nmust continue to be synchronized with the grid to be able to operate safely.  The same is true of \nall facilities, inclusive of retail BTGM and load on the system.  \n29. \nWhile that synchronization is necessary, it does not speak to the jurisdictional boundaries \nor related cost allocations.  The actual utilization of the facilities with respect to issues like \nreduction in voltage or geographic range or direction of power flow drive conclusions about \nwhether facilities constitute transmission facilities that can implicate FERC-jurisdictional \ntransmission charges.  In all instances, the power flowing over non-jurisdictional distribution \nfacilities remain synchronized with the grid.    \nVI. \nPJM's Answer Distorts Existing Option 3 (BTMG) \n30. \nOption 3 illustrates that PJM precedent acknowledges the different cost causality in \ntransmission use and services based on the proximity of load to dedicated generation.  However, \nPJM’s Answer misstates pertinent details regarding the existing BTMG programs in the tariff.  \nAs described further below, it is critical to understand that PJM’s BTMG program comes in two \nforms:  retail BTMG and non-retail BTMG.  The below PJM graphic makes this distinction \nexplicit in a very simple manner.17  Retail BTGM is referring to a single load co-located with a \ngenerator that does not utilize the transmission system. Non-real BTMG is referring to netting \narrangements for multiple customers spread over the muni/coop distribution system with no \n \n17 Theresa Esterly, PJM, Behind the Meter Generation Education, at 4, (June 1, 2023), available at \nhttps://www.pjm.com/-/media/DotCom/committees-groups/cifp-ra/2023/20230601/20230601-item-02b---behind-\nthe-meter-generation-education.ashx."},{"page":58,"startToken":17219,"endToken":17361,"text":"15\nlimitations on proximity to each other or the generator. \n \nFigure 1:  PJM BTMG Programs \n31. \nUnderstanding this distinction between retail and non-retail BTMG illustrates why PJM’s \nAnswer appears to misstate the pertinent details of Option 3.  PJM’s Answer shuffles facts \nbetween the two programs.  For example, PJM’s Answer attempted to distinguish the BTMG \nprogram from Options 4 or 5 by stating that BTMG is limited with respect to total MWs and that \nit was only intended for small loads.18  First, the MW limitation that PJM references only applies \nto the total non-retail BTMG, which allows municipal and cooperative utilities to net at dispersed \nlocations.  This limitation does not apply to retail BTMG, which is the arrangement of interest to \nthe co-location discussion here.  Second, there is no source for PJM’s assertion that the retail co-\n \n18 PJM Answer, Exh. A."},{"page":59,"startToken":17361,"endToken":17686,"text":"16\nlocated BTMG was intended only for small loads.19  In fact, while PJM encourages all BTMG \ngenerators to coordinate their interconnection, the requirement to coordinate only applies to \ngenerators above 10 MWs.20  So while there is a lower limit for review, there is no statement \nanywhere of an upper limit.  Moreover, PJM provides no inventory, or reporting of the total of \nthe co-located retail BTMG or related parallel generation arrangements such as qualifying \nfacilities (QFs).  This type of information on the quantity of retail BTMG and similar QF type \narrangements would be helpful to the Commission.  \n32. \nThe history of the BTMG provisions explains why retail BTMG is the relevant program \nto consider in this proceeding.  Both the retail and non-retail BTMG allow netting of generation \nagainst load requirements to reduce NITS or PTP services, including down to zero.  However, as \nPJM explained in its original retail BTMG filing, that program was intended “to implement \nmarket rules . . . [to] allow market participants to net operating behind the meter generation (or \nbehind the meter generation expected to be operating in the case of the day ahead markets) \nagainst load at the same electrical location for the purposes of calculating charges for energy, \ncapacity, transmission service, ancillary services, and PJM administrative fees.”21  This \narrangement was intended to address generation and load at the same electrical location—which \nis what is now referred to as a co-location arrangement.  To contrast, non-retail BTMG was \nadded to allow for netting of multiple customers—that are not necessarily co-located—behind a \nmunicipal or cooperative meter.   \n \n19 I have personal experience within PJM with parallel operations that were eligible to net, if desired, in excess of \nseveral hundred MWs.  \n20 PJM Manuals 14 G and 14 D.  \n21 PJM Interconnection, L.L.C., Submission of Revisions to Open Access Transmission Tariff, the Amended and \nRestated Operating Agreement, Etc., Docket No. ER04-608-000, at 1 (March 1, 2004) (“PJM Retail BTMG \nFiling”)."},{"page":60,"startToken":17686,"endToken":17995,"text":"17\n33. \nThe retail BTMG “netting approach developed by PJM and its stakeholders reduces the \ncost to those market participants that rely to a lesser degree on the PJM integrated transmission \nsystem to serve load because they serve loads that utilize behind the meter generation.  As a \nresult, entities that serve loads with behind the meter generation are allocated a fairer share of \nthe costs associated with the operation of the PJM integrated transmission system, including \ncosts for energy, capacity, ancillary services, and administrative fees.”22  That “fairer share” can \nnet all charges down to zero.  \n34. \nThe Commission itself adopted and endorsed this perspective:  \nThe Commission finds that . . . PJM’s proposed market rules [for \nbehind the meter generation and total netting] are just and \nreasonable and will encourage qualifying entities with behind the \nmeter generation to reduce their use of the PJM transmission system \n. . . . PJM’s total netting approach is consistent with our [prior] \ndecision [where] the Commission specifically found that “charges \nfor the use of PJM’s transmission system should be allocated to \nnetwork customers based on a network customer’s actual use of \nPJM’s system, consistent with the principle of cost causation.”23   \n \n35. \nPJM also further explained that: “the new [retail BTMG] rules will permit an entity \nserving load with behind the meter generation that is operating and serving load at the same, \nsingle electrical location to net such generation against load for the purposes of calculating the \ncharges for various services under the PJM agreements . . . . In the event there is more behind the \nmeter generation than load or the behind the meter generation desires to sell all or part of the \n \n22 Id. at 7 (footnote omitted).  \n23 PJM Interconnection, L.L.C., 107 FERC ¶ 61,113, at PP 27-28 (2004) (citing Occidental Chemical Corp. v. PJM \nInterconnection, L.L.C., 102 FERC ¶ 61,275 (2003)) (emphasis added)."},{"page":61,"startToken":17995,"endToken":18286,"text":"18\noutput of its generation into the PJM market, it may qualify as an Energy Resource or a Capacity \nResource and sell energy into the PJM markets.”24 \n36. \nPJM’s Manuals continue to view retail BTMG in just this manner.  The following is from \nthe current Manual 14 G:  \nGenerating resources operating “behind the meter,” in isolation \nfrom the PJM bulk power transmission system and which do not \nintend to participate in the PJM wholesale energy market, need \nonly coordinate planning, construction and/or operation with the \nhost Transmission Owner. \n \nBehind the Meter Generation (BtMG) is the output from \ngeneration that offsets load and does not and cannot participate in \nthe wholesale market. Thus, in order to be considered BtMG, \npower claimed as BtMG must deliver energy to load without using \nthe Transmission System or any distribution facilities (unless the \nentity that owns or leases the distribution facilities has consented to \nsuch use of the distribution facilities and such consent has been \ndemonstrated to the satisfaction of PJM). \n \n37. \nIt is clear that the retail BTMG program reflects the same general principles and logic as \nmany of the proposed alternative co-location arrangements (such as Options 4 and 5).  The issue \nof discriminatory treatment thus must become front and center in the Commission’s \ndeliberations.  It is also important to note that Option 4 configurations use the transmission \nsystem less than retail BTMG because “there are protection mechanisms in place to prevent \ndelivery of energy from the grid to serve the load in the event the generation is offline.”25  Retail \nBTMG arrangements can draw from the grid; the net impact may vary at the discretion of the \ncustomer.    \n \n24 PJM Retail BTMG Filing at 4 (emphasis added). \n25 PJM Answer at 13."},{"page":62,"startToken":18286,"endToken":18682,"text":"19\n38. \nWith respect to the capacity status of the generator under the retail BTMG, the \nCommission recognized that an appropriate portion of the generator (in excess of the load), can \nstill be a Capacity Resource.26  However, PJM Indicated that in its Exhibit A that an Option 3 \nconfiguration cannot include Generation Capacity Status.  This directly contradicts the tariff \nprovisions stating that so long as the capacity is in excess of the maximum load, that portion may \nbe sold as a Capacity Resource. 27 \n39. \nThis observation also informs PJM’s new claim that a secondary unit in a co-location \narrangement cannot sell capacity.  As presented in an arrangement such as Talen’s, the co-\nlocated load receives the dedicated output of a single unit, the primary unit.  Should that primary \nunit not be available, a switching arrangement allows power supply from a secondary unit.  \nHowever, the secondary unit is not dedicated to the co-located load.  It may only provide power \nto the co-located load with advanced permission from PJM.  PJM has full discretion to not \nprovide that permission and/or interrupt the service.  There is no limitation from the co-location \narrangement to limit the secondary unit from providing firm service as a Capacity Resource.  \nVII. \nPJM’s Answer Offers No Coherent Way to Identify or Evaluate the Various Co-\nLocation Options \n40. \nPJM failed to present an organized and reasoned approach to identifying and defining \npossible co-location options and evaluating those options.  One of the first things I looked for \n \n26 PJM Retail BTMG Filing at 4. \n27 See e.g., PJM, Intra-PJM Tariff, A-B, OATT Definitions A-B (21.0.0) (“Behind The Meter \nGeneration: ‘Behind The Meter Generation’ shall refer to a generation unit that delivers energy to load without \nusing the Transmission System or any distribution facilities (unless the entity that owns or leases the distribution \nfacilities has consented to such use of the distribution facilities and such consent has been demonstrated to the \nsatisfaction of the Office of the Interconnection); provided, however, that Behind The Meter Generation does \nnot include (i) at any time, any portion of such generating unit's capacity that is designated as a Generation \nCapacity Resource; or (ii) in an hour, any portion of the output of such generating unit that is sold to another entity \nfor consumption at another electrical location or into the PJM Interchange Energy Market”) (emphasis added)."},{"page":63,"startToken":18682,"endToken":19018,"text":"20\nwhen reviewing PJM’s Exhibit A was PJM’s characterization of the reliability of each option.  \nFor example, Options 1 and 2 state PJM’s preference as “Yes, Highest Reliability.”  PJM did not \nexplain the basis for its conclusion that Options 1 and 2 provide the highest reliability.  Any such \ncharacterization is inherently based on a comparison between that configuration and a \ncounterfactual case.  However, PJM did not provide any such description or comparison.  Nor \ndid PJM analyze how energy or capacity prices would be impacted or whether how existing \nNITS customers’ billing determinants would be impacted.  PJM did not even provide a \ncharacterization of the reliability of Option 3; rather, it simply stated “Not for Large Loads.”  \nPJM similarly did not provide a characterization of the reliability of Options 4 and 5, but simply \nnoted that they are “Less preferred.”  This subjective evaluation was not supported by any formal \nanalysis. \n41. \nThe first step in identifying the possible co-location options is to define the various \nrelevant attributes or features of a co-location configuration.  The number of possible options \nwould be the product of all the different possible values for each attribute identified.  This could \nresult in several thousand options, although many may not be desirable or worth further \ndiscussion.  In table 1, I present what I identified as the key attributes.   Each attribute also \nindicates the number of possible options for each attribute (i.e., whether the generator is an EWG \nor not is a binary, so there are two possible options for that attribute).  The number of possible \nco-location alternatives is the product of multiplying all of the possible options for each attribute. \nTable 1:  Possible Attributes of Co-location Arrangements \nAttribute28\nPossible Options\nComment\nNew or Existing Load \n(2) \nKey to most comparisons as incremental load \nmust be served\nDirect or Isolated \nInterconnection\n(2) \nAbility of load to draw directly from the grid or \nonly from the generator\n \n28 There may be other possible attributes, but I have limited my consideration to the most important attributes."},{"page":64,"startToken":19018,"endToken":19367,"text":"21\nFirm or Interruptible \nService to Load \n(3) \nCommitment of generator to always service load \nwhen operating, or interrupt by price at PJM \ndirection\nSingle or dual supplying \nGenerator(s)\n(2) \nPotential for change in isolation or firmness of \nsupply after one generator fails\nOn Site Backup for Load  \n(2) \nInternal reliability and/or ability to support \ngeneral grid as subset\nSupplying Generator \n(Energy or Capacity)\n(2) \nImplications for CIRs and system reliability as a \nwhole\nGenerator Economic or \nUneconomic/Retiring/New\n(3) \nWhether the generator should be assumed to be \npresent going forward or retire\nDispatch Price/Must Run \n(2) \nDirect impact on dispatch and LMP, co-located \ndispatchable units inherently will lower LMPs \nwhich market price is below generator offer price\nPayment for Necessary \nFacilities or Not\n(2)  \nPayment and Ownership of Necessary Facilities \nMay also create new property rights\nIs the Generator an EWG\n(2)\nRole of LSE in sale, or ability for direct sale\n \n42. \nThe next step would be to evaluate the possible options by establishing a proper \ncomparison case (i.e., what would have happened “but for” the presence of the co-location \narrangement).  How do the impacts compare to a case where the co-location proposal was not \nimplemented?  This is the most crucial and difficult step.  While seemingly simple, proper \ncomparison cases can be tricky and often offer surprising results.  Without the strength of a \nformal analytic comparison, important properties in decision making are missed.  \n43. \nMuch of the confusion in the debate so far is due to various parties drawing comparisons \nfrom different assumptions that create different comparison cases (or in PJM’s Answer, no \ncomparison case at all).  The most common one of these differences is the representation of the \namount of load in the comparison case.  Without reason, many people assume that if there were \nno co-location, the co-located load would not exist.  There is no reason to make this assumption.  \nThere has been no indication that the load desiring to locate in PJM would “disappear” if there \nwere no co-location arrangement.  Many parties are also pursuing options similar to PJM Option"},{"page":65,"startToken":19367,"endToken":19709,"text":"22\n1,29 and one of the key elements for data centers seems to be speed to market, not just the electric \nsupply arrangements alone.  There is no reason to believe that an appropriate comparison should \nnot reflect the same level of load, in the same location, being served overall in a fashion that \nlooks like PJM Option 1.  \n44. \nA very simple example shows how critical the right comparison is with respect to both \nthe level and nature of load.  Several parties have raised concerns regarding the potential for \ncommon mode outages of data centers,30 possibly linked to a widespread internet failure that \ndisrupts the operation of all data centers in a local area, such that all the data center load would \ndrop off at the same time.  However, this concern is not about co-location, but about new large \nloads generally.  A comparison case would recognize the existence of the same loads regardless \nof whether they are co-located.  If the cause of load drop was indeed linked to the internet, that \nload drop would occur whether these data centers were directly connected as Network Load, or \nisolated behind the generator in a co-location arrangement.  The impact of the situation would be \nidentical in terms of the system dealing with a large surge in generation as the load drops.  As \ndiscussed above, this indeed might be the basis for a modification in cost allocation for \nregulation services, but it is not specifically linked to the co-location arrangement.   \n45. \nThe rest of the comparison case can be constructed by looking down at the relevant \nattributes and choosing comparable or contrasting attribute values for the comparison case \nconsistent with an appropriate appraisal of differentiated attributes and impacts.   \n \n29 See, e.g., US utilities see uptick in data center deals, signaling booming demand, Reuters, (January 16, 2025), \nhttps://www.reuters.com/business/energy/us-utilities-signal-booming-demand-data-centers-ai-takes-root-2024-08-\n12/.  \n30 See, e.g., Incident Review Considering Simultaneous Voltage-Sensitive Load Reductions, NERC (Jan. 8, 2025), \nhttps://www.nerc.com/pa/rrm/ea/Documents/Incident_Review_Large_Load_Loss.pdf."},{"page":66,"startToken":19709,"endToken":20072,"text":"23\n46. \nThe third step is to evaluate the proposed configuration and the comparison case \nand assess any differences in defined criteria.  This step provides a basis for the Commission’s \nanalytic decision-making.  Table 2 below lists relevant criteria, as informed by consideration of \nthe background of this proceeding and related cases.  A proper comparison would assess the \ndifferences for each attribute between the specific co-location arrangement and its associated \ncomparison case to draw conclusions about impacts of each possible arrangement.  \nTable 2:  Proposed Evaluation Criteria \nEVALUATION CRITERION \nCOMMENT/DESCRIPTION \nPlanning Reliability Rest of Pool / \nReserves \nIs the planning reliability for the rest of the pool higher, \nlower or the same in the co-location case v comparison \ncase. \nNITS Payments by Existing \nCustomers \nAre these higher, lower or the same for the existing \ncustomers in the co-location case v comparison case. \n(Enumerated by current tariff billing determinant categories \nin comparison chart).\nPayment for Transmission \nEnhancements/Interconnection Costs \nAs defined by the cases themselves \nDispatch\nHow does system dispatch differ in the two cases\nLMPs for Existing Customers \nAre the LMPs higher, lower or the same of existing \ncustomers in the co-location case v comparison case\nCapacity Prices \nAre the capacity prices higher, lower or the same of existing \ncustomers in the co-location case v comparison case\nTotal Generation to Serve Load \nHow does the total generation to serve load differ in the two \ncases (e.g. preventing a retirement would enhance \nreliability)\nAncillary Services \nHow the addition of the co-located load impacts total cost \nof ancillary services v. comparison case, and the extent to \nwhich the co-location arrangement benefits from ancillary \nservices\nCapacity Interconnection Rights \nWho receives or relinquishes the rights and any value for \nexisting rights versus incremental rights\nIncremental ARRs  \nWho receives or relinquishes the rights and any value for \nexisting rights versus incremental rights\n \n47. \nConsidering all possible combinations of all attributes yields hundreds or thousands of \ndifferent possible co-location arrangements, not just the eight PJM discusses.  However, there are \nalso a number of attributes or combinations of attributes that are “dominant,” in the sense that \nparties to the arrangement would be generally better off, and the arrangement would have either"},{"page":67,"startToken":20072,"endToken":20351,"text":"24\na positive or neutral impact on all other market participants.  For example, certain attributes in a \nconfiguration might be “dominant” if they ensure that the configuration does not change costs for \ncurrent customers in a manner any different than the proper comparison case.  Among these \n“dominant” attributes includes features very similar to PJM’s Option 4 and 5.  Given that those \nfeatures are the most salient part of this proceeding, the following section will focus on an \nevaluation of those two options, rather than all possible co-location arrangements.   \n48. \nIn any further analyses of the appropriateness of other co-location arrangements the \nCommission should consider these types of dominant features (alone or in combination).  A \nmore methodical review of the variations I have listed above may identify other arrangements for \nco-location that are win/win or a net neutral that can expedite the addition of new high priority \nloads.  \nVIII. Evaluation of PJM Options 4 and 5 \n49. \nThe following sections evaluate Options 4 and 5.  For both configurations, Option 1 is \ngenerally the most appropriate comparison case.31  As discussed below, both Options 4 and 5 are \n“dominant” configurations that are comparatively superior to PJM Option 1 in terms of planning \nreliability, capacity costs, NITS cost impacts to other customers, network upgrade cost \nallocation, and LMPs.   \na. Option 4 Evaluation v Comparison Case  \n \n50. \nPJM’s formulation of Option 4 is reproduced below in Table 3. \n \n \n31 For Option 5, during the limited instances in which the configuration would draw from the transmission system, it \nbecomes an interruptible load.  Therefore, during those limited times, the comparison case could also be an \ninterruptible load that is otherwise similar to Option 1."},{"page":68,"startToken":20351,"endToken":20472,"text":"25\nTable 3:  PJM Option 4 \n \n51. \nTable 4 below lists the relevant attributes as compared to an Option 1 comparison case.  \nAs part of this evaluation, I have also included two possible supplying generators:  one a must \nrun nuclear unit and the other a dispatchable combined cycle with a $30 per MWh dispatch \nenergy offer.  This table does not include every possible attribute included in Table 1 above \nbecause not all attributes are relevant for every comparison. \nTable 4: Attributes of PJM Option 4 versus PJM Option 1 \n \n PJM OPTION 4 \nIsolated Co-Located Load Reference \nCase   \nPJM OPTION 1  \nComparison Case \nSupplying \nGenerator \na) Existing 1,000 MW Nuclear \nFacility that is economic today \na) The Same \nb) The Same"},{"page":69,"startToken":20472,"endToken":20786,"text":"26\n \n PJM OPTION 4 \nIsolated Co-Located Load Reference \nCase   \nPJM OPTION 1  \nComparison Case \nlocated in Dominion zone (high \ncapacity and availability factors) \nb) Existing 400 MW CC with \n$30/MWH dispatch cost\nDirect or \nIsolated Load \n400 MW new data center, co-located and \nsited behind the generator with back up. \nHigh load factor. \n400 MW new data center directly \nconnected to the grid in close proximity \nto the generator \nFirm or \nInterruptible \nLoad \nFirm while generator is online.  When \ngenerator is offline, load is interrupted or \nmust use on-site backup generator.\nFirm \nNITS \nNot taking NITS service (not receiving \nenergy and capacity from the grid), no \nservice billing determinants\nNITS customer (either Load becomes its \nown LSE or another LSE serves the load) \nCapacity \nStatus of \nSupplying \nGenerator \n400 MW of CIRs are delisted, no new \nload is served by the PJM system. \nGenerator may sell these CIRs. 100 MW \nof New CIRs are created\nNo CIRs are delisted to serve new load, \n400 MW of new load is added to the PJM \nsystem demand. 100 MW of new CIRs \nare created\n52. \nWhile each of the individual components of the comparison are discussed below, the \noverall conclusion is that Option 4 is superior to the Option 1 comparison case.  All parties—\nincluding other market participants—are either better off or unaffected compared to the Option 1 \ncomparison case (in which the new load connects directly to the grid).  This occurs because in \ngeneral the new load is willing to pay a premium in order to be connected faster.  In doing so, \nthey accept a lower quality of service and pay all the incremental costs (including those \nnecessary to adjust their on-site reliability to an acceptable level).  This creates an opportunity to \nhold all other customers harmless and give those other customers potentially millions of dollars \nper year in terms of reliability benefits."},{"page":70,"startToken":20786,"endToken":21123,"text":"27\n53. \nBased on these attributes, the following section analyzes the two cases pursuant to the \nevaluation criteria provided above, namely:  (1) reliability and planning reserves, (2) NITS costs, \n(3) interconnection costs, (4) impact on system dispatch, (5)  LMPs, (6) capacity prices, (7) total \ngeneration and load, (8) ancillary services, and (9) capacity interconnection rights / transmission \nrights. \n54. \nReliability and Planning Reserves.  An Option 4 configuration increases reliability for \nthe rest of PJM compared to the Option 1 comparison case.  In terms of installed reserve margin \n(IRM) based on the ratio of Installed Capacity to System Coincident Peak, the Option 4 case is \nmore reliable because the load increase is met by the same amount of generation decrease, with \nno adjustment for reserves (i.e., 400 MW of load will be served by 400 MW of ICAP from the \ngenerator, which is removed from the wholesale market).  The differing results for reserves \nmakes sense because the co-located load has no ability to take power from the grid even if its co-\nlocated generator experiences a forced outage.  To contrast, in the Option 1 comparison case, the \ngrid-connected load can take power from the grid even if the generator “next door” has an \noutage, so there is a need to include a reserve margin.   \n55. \nThe same conclusion would apply under ELCC evaluations.  For the Option 4 case, \nwhenever the generator is unavailable, load would also be decreased by the 400 MW.  As \ndiscussed earlier, the effect is an equal shift in the supply and demand curves with no adjustment \nfor reserves.  \n56. \nTo estimate of the cost impact, using an 18% installed reserve margin, then 72 MWs less \ncapacity would be needed in the Option 4 case compared to the Option 1 case. (.18 x 400).  I \nestimate that at the pool wide accreditation rate of approximately 80%,32 and the most recent \n \n32 PJM 2025/2026 Base Residual Auction Report, at 6 (July 30, 2024), https://pjm.com/-/media/markets-\nops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.ashx."},{"page":71,"startToken":21123,"endToken":21429,"text":"28\nauction clearing price, 72 MW of additional capacity in the Dominion zone would cost \napproximately $9.3 million per year (.8 x 72 x $444 x 365).33   \n57. \nThese conclusions directly contradict PJM’s characterization of Option 4.  However, PJM \ndid not explain the basis for its conclusion regarding reliability.  \n58. \nNITS.  For the co-location case, because the co-location arrangement pays all \nincremental costs for interconnection and upgrades, NITS charges remain the same for the rest of \nPJM load.  In Option 1, total NITS related costs increase by at least the socialization of the \nnecessary facilities costs, but the number of entities with billing determinants for these services \nwill also increase, spreading these costs among more customers.  As a result, it is difficult to \npredict whether costs to existing customers will increase or decrease.  The ancillary service \nimpacts are discussed further below. \n59. \nInterconnection Costs and Other System Upgrades.  In Option 4, direct \ninterconnection costs would be borne by the co-located customer.  In the Option 1 comparison \ncase, 90% of those costs could ultimately go into rate base for all customers.  \n60. \nDispatch.  For the Option 4 co-located case with the nuclear unit, the dispatch of the \nsystem remains unchanged.  In the Option 4 co-located case where a combined cycle is the \nsupplying generator, the dispatch will change.  In that situation, at all prices lower than the \ndispatch price of the combined cycle unit, the must run nature of the combined cycle unit will \nresult in additional energy being available.  In comparison, in the Option 1 case, combined cycle \nunits will be turned down or not committed at the lower prices.34 \n \n33 Id.  \n34 This is a simplification with respect to the operation of the CC unit.  No consideration was given to start-up, \nminimum or other operational requirements, but the general result is unchanged."},{"page":72,"startToken":21429,"endToken":21796,"text":"29\n61. \nLMPs.  In the Option 4 case in which the supplying generator is a must run nuclear unit, \nLMPs would be the same compared to the Option 1 comparison case.  In both cases, load, \ngeneration, and dispatch would be the same, resulting in the same LMPs.  However, in the \nOption 4 case where a $30/MWh dispatch price unit was running whenever it was available to \nserve the isolated load regardless of the market price LMP, LMPs would be lower compared to \nthe Option 1 comparison case whenever the market LMP at that location would have been $30 or \nless and the 400 MW unit was still operating.  This occurs because the co-location arrangement \nturns a dispatchable unit into a must run unit, always operating when available to serve the co-\nlocated load.  As a result, there is effectively more energy available into the market at a price of \nzero at all price levels below the assumed $30.  Using elasticity data, supply curve information \nand load duration information from the State of the Market report for 2024, this type of change in \ndispatch for 400 MW reduced costs to other market participants by millions of dollars annually, \nbut PJM has ignored these types of benefits and not estimated them in reaching its conclusions.  \n62. \nCapacity Prices.  In the Option 1 comparison case, the demand curve would shift to the \nright, and capacity prices would increase.  In the Option 4 co-located case, the demand curve \ndoes not change from before the addition of the load, but the supply curve is shifted to the left \nand capacity prices increase.  In either case, the addition of new load raises capacity prices with \nall other factors held constant in both cases.  However, prices would increase more in the Option \n1 comparison case because it requires more planning reserves than the Option 4 co-located load \ncase.  This relates to the fact that the co-located load is receiving a form of less reliable service; \nif the amount of load is the same, and the reliability for a portion of load is lower, the rest of the \nsystem is either more reliable or requires less capacity to achieve the same reliability.  The net"},{"page":73,"startToken":21796,"endToken":22151,"text":"30\nbenefit would depend on the shape and clearing location of the demand curve but would apply to \nall of the capacity cleared either in the RTO, or just the LDA if prices separated.  \n63. \nTotal generation and load.  As appropriate for an accurate comparison, the total \ngeneration and load were equivalent in both the co-location and comparison cases.  \n64. \nReactive Requirements.  In the Option 4 co-location case, the generator’s reactive \ncapability is unchanged from before the load energized; to the extent that the increase in load \nidentifies necessary facilities such as capacitor banks, the co-location arrangement will pay for \nthese facilities.  Thus, requirements will be met without additional cost to the rest of the system.  \nIn the Option 1 comparison case, the total reactive generator capability will remain the same, but \nthe cost of related facilities would be socialized.  The empirical result of whether the incremental \ncost of the additional facilities, coupled with the increased billing determinants of the increased \nload, increase or decrease the individual bills of the rest of load.  \n65. \nRegulation.  The regulating capability of the system is unchanged in the co-location \ncase.  Any variation in load would be expected to be the same in both cases, however in the co-\nlocation case, the load variation occurs behind the generator and is seen as a movement up or \ndown in generator output.  To date, PJM has not indicated that the regulation requirements for \nthe system would change for the co-location case.35  Thus, regulation costs for the rest of the \nsystem load would be the same in the comparison and co-location cases.     \n66. \nBlack Start.  There should be no differences, or only beneficial improvements for the \nblack start process (with no costs to other customers) between the Option 4 co-location case and \nOption 1 as the comparison case.  As there are no related billing determinants for the co-located \n \n35 It has been reported that there have been common mode outages of data center loads.  This could change total \nregulation requirements.  But in a proper comparison, as noted above, the loads and the resulting changes would be \nthe same in both cases."},{"page":74,"startToken":22151,"endToken":22518,"text":"31\nload, there would be no change in any charges to the rest of the system load between the two \ncases.  Many parties have asserted that co-located load receives comparable benefits to network \nload from black start and thus should pay for this type of service.  However, I have not seen any \ntechnical justification for this assertion.  In my view, the ability to isolate large loads so that they \ncannot draw power from the system would act to sectionalize the grid and make black start more \nmanageable.  I am not aware of any work done by PJM or others to quantify this benefit to the \nrest of load, so the proper comparison at this point would be that there are no differences.  \n67. \nCapacity Interconnection Rights/Transmission Rights.  If the generator in the Option \n4 co-location case sells or releases the CIRs in the same quantity as the firm co-located load, \nthere is no difference between the Option 4 co-located case and the Option 1 comparison case.  \nIn the Option 1 comparison case, there would be the same potential CIRs that now exist because \nthe generator would still be entirely a Capacity Resource with the CIRs.  In the Option 4 co-\nlocation case, the firm load on the system is reduced compared to Option 1, and the CIRs held by \nthe generator are reduced by the same amount.  By releasing their CIRs, those CIRs would \nbecome available to new generation to purchase.  Furthermore, in the Option 4 co-location case, \nthe addition of facilities (the necessary study additions), may very likely result in new CIRs that \nwill be available in the same area.  These additional CIRs will be created in both the co-located \nand comparison case, but the only difference is who is paying for these upgrades.  In the Option \n1 comparison case, these types of costs are socialized and any incremental CIRs are given away \nbased on queue priorities, with IARRs effectively just increasing the feasible set of rights \navailable under the current allocation process.  This type of comparison is complicated, as part of \nthe incremental CIR availability may be related to an increase of load in a generation pocket, and \nnot to any transmission related facilities."},{"page":75,"startToken":22518,"endToken":22991,"text":"32\n68. \nMost of these findings are also reiterated in the following Table 5, which specifically \ncompares Options 1 and 4 as it relates to the overall rate impacts as dictated by the billing \ndeterminants in PJM’s current rate design.  \nTable 5:  Comparison of Rate Impacts of Option 4 versus Option 1 \nCategory \nPJM OPTION 4 \nIsolated New Load \nDedicated Existing Generation \nCOMPARISON CASE  \n(PJM OPTION 1) \nNew Load Included  \nNITS  \npayments \nThe total cost, number and total \nload of customers making NITS \npayments will remain the same. \nBilling determinants for this load \nremain the same, and no new \nsocialized costs are added to \ntransmission rate base. Thus, \nindividual charges to current \ncustomers will not change from \nprior to the co-location. \nTotal NITS related costs may increase.  \nThe specifics depend on the total costs \nsocialize for upgrades needed for the new \nload.  The amount of load taking NITS \nservice will also increase and the increased \nNITS charges will be spread across a larger \namount of coincident peak load.  The net \nimpact on customer rates is the result of the \ntwo offsetting effects and could result in \neither a net increase or decrease in unit \ncharges to existing customers.  \nInterconnection \nCosts \n \nThe co-located load/generator \npay all interconnection costs: \n$200 million in the case \nassumption. \n$200 million,36 of which $180 million may \nbe socialized to existing customers and rate \nbased (socialized costs approximated at \n90%).37 \n \nTotal costs increase, unit cost changes \ndepend on the level of additional billing \ndeterminants added.\nTransmission \nenhancements \nAll necessary enhancements to \nbring the co-located load online \nare paid for by the supplying \ngenerator and co-located load. \nNo change in total costs borne \nEnhancement costs are socialized as well \nas some portion of interconnection.  There \nwould be an increase in billing \ndeterminants due to the increased load on \nthe system. The net effect will depend on \n \n36 The dollar figure is an estimate based on recent load additions.  See Transmission Expansion Advisory Committee: \nPPL Supplemental Projects, at 4 (Apr. 2, 2024), https://www.pjm.com/-/media/committees-\ngroups/committees/teac/2024/20240402/20240402-item-08---ppl-supplemental-projects.ashx (identifying $244 \nmillion supplemental project); see also Transmission Expansion Advisory Committee: AEP Supplemental Projects, \nat 7 (June 4, 2024), https://www.pjm.com/-/media/committees-groups/committees/teac/2024/20240604/20240604-\nitem-05---aep-supplemental-projects.ashx (identifying $155.69 million supplemental project). \n37 In a recent Illinois Commerce Commission docket, ComEd explained that the average cost to interconnect a large \nload customer is $11,899,297, and the large load customer paid $981,392 on average.  This indicates that the large \nload customer typically pays under 10% of the total cost to interconnect.  See Commonwealth Edison Company’s \nResponse to Constellation Energy Generation LLC’s Data Request, Ill. Commerce Comm’n, Docket No. 22-0486 \n(May 30, 2024), https://www.icc.illinois.gov/docket/P2023-0055/documents/352947/files/617782.pdf."},{"page":76,"startToken":22991,"endToken":23417,"text":"33\nCategory \nPJM OPTION 4 \nIsolated New Load \nDedicated Existing Generation \nCOMPARISON CASE  \n(PJM OPTION 1) \nNew Load Included  \nand unit costs for transmission to \nother customers.  An assumed \n$30 million upgrade from the \nnecessary study result.  The \nenhancements may create \nincremental transmission related \nrights for the parties paying for \nthe upgrades.  \nthe specifics of the size of the new load \nand the cost of enhancements.  The case \nassumes the same enhancement costs as the \nOption 4.  The enhancements may create \nincremental transmission related rights and \nwould be allocated consistent with current \nPJM procedures.  \nReliability  \nand planning \nreserves \nThe Fully Isolated Co-Located \nLoad case is more reliable for \nthe remainder of the system \nbecause the co-located load \nincrease is met by the same \namount of generation decrease, \nwith no adjustment for reserves.  \nLoad is not served by system \nresources if co-located \ngeneration is not available.   \nPJM would need to adjust installed \ncapacity to reflect the need for additional \nplanning reserves. Assuming an Installed \nReserve Margin (“IRM”) is approximately \n18%38 the 400 MW of additional load \nwould require approximately 472 MW of \nadditional capacity for comparable \nreliability in terms of the IRM.  This \nincreases costs to remaining load by ~$95 \nmillion NPV \nOperating reserves \nCurrent allocation of operating \nreserves and synchronized and \nnon-synchronized reserves is \nbased on load share at different \ntimes, but in all cases would still \nresult in a zero allocation to the \nco-located load because it is not \ntaking service from the grid; it is \nisolated, and not included in any \nload or peak share.  This case \nwould not increase costs of these \nreserves to existing load.  May \nbe appropriate to allocate some \nreserves consistent with existing \ncost allocation principles.\nIf the new load did not change the \noperating reserve total charges, these \nwould now be spread over a larger set of \nbilling determinants and unit costs should \nbe lower.  If there were a change in \noperating reserve charges the unit costs to \nexisting load could be higher or lower.  \nPJM scheduling, \nsystem control and \ndispatch control \nThere is no increase in these \ntotal costs.  Unit costs for \nTotal costs would remain unchanged, but \nunit costs would decrease due to the \n \n38 PJM 2025/2026 Base Residual Auction Report, at 6 (July 30, 2024), https://pjm.com/-/media/markets-\nops/rpm/rpm-auction-info/2025-2026/2025-2026-base-residual-auction-report.ashx. Comparisons can similarly be \nmade to Accredited UCAP, Forecast Pool Requirement and Expected Unserved Energy. In this case, the high \naccreditation for the generation and high load factor use of IRM should closely approximate the Accredited UCAP \nresults."},{"page":77,"startToken":23417,"endToken":23838,"text":"34\nCategory \nPJM OPTION 4 \nIsolated New Load \nDedicated Existing Generation \nCOMPARISON CASE  \n(PJM OPTION 1) \nNew Load Included  \nexisting load would be \nunchanged.   \nincrease in billing determinants from the \nnew load.  \nPhysical dispatch of \nthe system inclusive \nof the new load \nThe nuclear units will run as \nusual and total load will be met \nin the same manner in the two \ncases.  \n \nFor CC units, they would be \ndispatched all the time.\nThe nuclear units will run as usual and \ntotal load will be met in the same manner \nin the two cases.  \n \nFor CC units, they would only be \ndispatched when economic. \nLocational marginal \nprices (LMPs) \nLMPs will be the same in both \ncases assuming the comparison \ncase load is electrically adjacent \nto the nuclear interconnection \npoint to the grid.   \n \nAs noted, for dispatchable co-\nlocation supply LMPs would be \nlower for all prices below the \ndispatch price.  PJM has not \nestimated these savings.\nLMPs will be the same in both cases \nassuming the comparison case load is \nelectrically adjacent to the nuclear \ninterconnection point to the grid.   \n \nAs noted, if the supplying generator is \ndispatchable, prices would be higher for all \nperiods when prices are below the dispatch \nprice of that unit.  \nCapacity prices \nLower than Option 1.  The \nsupply curve will shift to the left \nreflecting the 400 MW reduction \nand prices will increase.  But \nbecause of the lack of network \nreserves for this load, the \nincrease would be less than the \ncomparison case \nHigher than Option 4.  The demand curve \nwill shift to the right including both the \n400 MW plus reserves and prices will \nincrease.  The increase in prices would be \nmore than in the co-located load case.  \nTotal generation \navailable to serve \ntotal load \nTotal amount of generation is \nunchanged.  All the same \nresources are available to serve \nthe same total load in both cases.   \nTotal amount of generation is unchanged.  \nAll the same resources are available to \nserve the same total load in both cases. \nReactive power \nsupply and costs \nTotal reactive capability from \ngenerators is the same in both \ncases.  Costs of any network \nupgrades for reactive supply to \naddress the increased load would \nbe borne by the co-located load \narrangement.  \nTotal reactive capability from generation \nwould remain the same.  To the extent that \nthe new load requires network \nenhancements, these costs would be \nsocialized and related total costs and \ncharges increase.  The unit cost increase \nwould depend on the cost of the \nenhancements and change in billing \ndeterminants for reactive supply."},{"page":78,"startToken":23838,"endToken":24226,"text":"35\nCategory \nPJM OPTION 4 \nIsolated New Load \nDedicated Existing Generation \nCOMPARISON CASE  \n(PJM OPTION 1) \nNew Load Included  \nRegulation \nIf the total amount of regulation \nstays the same, unit charges to \nexisting customers remain \nunchanged.  If common mode \nload drop increased regulation \nrequirements, they would \nincrease by the same amount for \nboth cases.  However, the Option \n4 case would not otherwise pay \nfor such additional regulation \nservice.\nIf total amount of regulation increased, \nwould increase by the same amount for \nboth cases.  Unit charges would be \nexpected to decrease reflecting the increase \nin billing determinants from the new load \nif the regulation requirement stayed \nconstant.  The unit cost impact may be an \nincrease or decrease if the regulation \nrequirement is increased.   \nBlack start \nThe total cost for black start \nshould remain unchanged as \nwell as the unit costs for the rest \nof load.  Sectionalizing the new \nload by isolation may improve \nblack start capability at no cost \nto other customers.\nThe total costs for black start should \nremain unchanged but the unit cost and \ncharges to load would decrease based on \nthe increased load and billing determinants. \nHowever, the black start process may be \nless flexible than the co-location case as \nthe new load cannot be isolated.\nCapacity \ninterconnection \nrights (CIRs) \nThe nuclear unit would have to \nsell or release 400 MW of CIRs.  \nThey then would become \navailable for use by new or \nexpanded existing generation.  It \nis possible that the transmission \nenhancements coupled with the \nload increase would create new \nCIR capability. \nThe nuclear unit would retain all its CIRs \nand new load interconnection studies \nwould include the increased load.  If new \nCIRs are created by the socialized \nenhancements, incremental CIRs are given \naway for free via the queue.  \nPJM monitoring \nand administration \nTotal costs would be expected to \nstay the same or decrease.  The \nunit costs to existing load would \nstay the same or slightly \ndecrease. \nTotal costs would stay the same and the \nunit costs would decrease based on the \nincreased load and billing determinants.  \n \nb. Option 5 Evaluation v Option 1 Comparison Case \n69. \nAs described by PJM Option 5 “is the same configuration as Option 4 above, but with the \npotential for the load to receive back-up service with PJM’s advanced authorization.”39  Given \n \n39 PJM Answer at 15 (emphasis added)."},{"page":79,"startToken":24226,"endToken":24583,"text":"36\nthe similarities between Options 4 and 5, there is little difference in the analysis, particularly \nbecause the back-up service that Option 5 can take from PJM is conditional and non-firm.  PJM \nhas no obligation to plan for providing this back-up in any manner, nor expend costs beyond \nthose that it would have for PJM Option 4.  One might conclude that the co-located load benefits \nin some manner from this, but it is difficult to specify exactly what that benefit may be as it is \nfully conditional on PJM’s determination in a specific incident.  It is irrational to assume PJM \nwould serve such interruptible load to the detriment of firm load.  As commented above, these \nobservations also resolve the debate regarding the ability of a secondary unit to sell its capacity \nin the market.  So long as PJM has the ability to call the output (curtail the co-located load) when \nsupply is from a unit other than the primary generator, the secondary unit is not differentiated in \nits obligations from any other Capacity Resource in PJM and can sell its capacity.  \n70. \nThe reliability of PJM Option 5 is therefore exactly the same as Option 4 and is superior \nto the Option 1 comparison case when the primary unit is operating.  When the secondary unit is \noperating, because the load in interruptible, the reliability would be the same as in the \ncomparison case or better.40  The conclusions on comparisons between Option 5 and its \ncomparison case in the other categories discussed above are also the same, except that the Option \n5 configuration would pay some transmission and ancillary service charges when pulling from \nthe grid.  This could be analogous to the current type of charges for retail BTMG when the net \nuse exceeds zero.   \n \n40 Because the nature of service changes based on the availability of the primary generation unit, it could be argued \nthat the comparison case could change as well when the primary unit is unavailable.  But changing the comparison \ncase to reflect the interruptibility of the co-located load results in the planning reliability being either the same or \nbetter in the co-location case."},{"page":80,"startToken":24583,"endToken":24740,"text":"37\n71. \nPJM does not explain why this Option is “less preferred.”  Further, PJM suggests that this \narrangement could lead to an increase in the coincident peak and thus reserve requirements.  It is \nunclear why this is the case, given that PJM would decide, at its sole discretion, whether or not to \nprovide additional services.   \n72. \nThere is one potential source of difference between Options 4 and 5, which is difficult to \nquantify, but makes little difference, and is eliminated in the proper comparison.  If PJM decided \nto provide back-up service, it would receive payment for those services through LMP payments.  \nLMPs during that period would be higher than otherwise, but not higher than the proper \ncomparison case.  However, it is difficult to predict this result because it is unknown how often \nPJM would agree to provide back-up service.  Again, consideration of the right comparison case \nmakes these types of differences disappear.  \n73. \nThis concludes my affidavit."},{"page":81,"startToken":24740,"endToken":24740,"text":""},{"page":82,"startToken":24740,"endToken":24754,"text":"Roy J. Shanker  \n \nPage 1 \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nAttachment B \n \nResume of  \nDr. Roy J. Shanker, PhD"},{"page":83,"startToken":24754,"endToken":24897,"text":"Roy J. Shanker \nPage 2 \n \nQUALIFICATIONS \nAND  \nEXPERIENCE OF \n \nDR. ROY J. SHANKER \n \n \n \nEDUCATION: \n \nSwarthmore College, Swarthmore, PA  \nA.B., Physics, 1970 \n \nCarnegie-Mellon University, Pittsburgh, PA \nGraduate School of Industrial Administration  \nMSIA Industrial Administration, 1972 \nPh.D., Industrial Administration, 1975 \n           \nDoctoral research in the development of new non-parametric multivariate \ntechniques for data analysis, with applications in business, marketing and \nfinance.  \n \nEXPERIENCE: \n \n1981 -         \nIndependent Consultant \nPresent        \nP.O. Box 1480 \n \n \nPebble Beach, CA 93953 \n \nProviding management and economic consulting services in \nnatural resource-related industries, primarily electric \nand natural gas utilities. \n \n1979-81        Hagler, Bailly & Company \n               \n2301 M Street, N.W. \n               \nWashington, D.C. \n           \nPrincipal and a founding partner of the firm; director of electric utility \npractice area.  The firm conducted economic, financial, and technical \nmanagement consulting analyses in the natural resource area. \n \n1976-79        Resource Planning Associates, Inc. \n               \n1901 L Street, N.W. \n               \nWashington, D.C."},{"page":84,"startToken":24897,"endToken":25152,"text":"Roy J. Shanker \nPage 3 \nPrincipal of the firm; management consultant on resource problems, \ndirector of the Washington, D.C. utility practice.  Direct supervisor of \napproximately 20 people. \n \n1973-76        Institute for Defense Analysis \n               \nProfessional Staff \n               \n400 Army-Navy Drive \n               \nArlington, VA \n           \n           \nMember of 25 person doctoral level research staff \n           \nconducting economic and operations research analyses of military and \nresource problems. \n \n \nRELEVANT EXPERIENCE: \n \n2024  \n \n270—On behalf of PJM Power Providers. EL24-148-000.  Testimony \nregarding reliability must run designation and price formation for energy \nand capacity in the context of the development of the PJM Reliability \nPricing Model.  \n \n269—On behalf of Constellation Energy Generation LLC, Before the \nFederal Energy Regulatory Commission Dockets No. ER24-2172-000 \nAffidavit addressing the proper comparison of impacts of co-located load \nbehind a generator to Network Load or behind the meter generation in the \nPJM Interconnection markets. Conclusions addressing the specific \nbusiness configuration of interest. \n \n268—On behalf of Constellation Energy Generation LLC, Before the \nFederal Energy Regulatory Commission Dockets No. El24-2888 et al. \nAffidavit addressing the proper comparison of impacts of co-located load \nbehind a generator to Network Load or behind the meter generation in the \nPJM Interconnection markets. Conclusions addressing the specific \nbusiness configuration of interest.  \n267—On behalf of Kiewit Power Constructors. AAA CASE NO. 01-23-\n0000-2706. Analyses of the proper comparison of alternatives to estimate \ndamages related to the performance of an electric generator during Winter \nStorm Elliott.   \n \n \n2023 \n \n266—On behalf of the PJM Power Providers. Before the Federal Energy \nRegulatory Commission. Docket No. EL 23-19-000 and Docket ER23-729"},{"page":85,"startToken":25152,"endToken":25450,"text":"Roy J. Shanker \nPage 4 \nAffidavit regarding the calculation of the Capacity Emergency Transfer \nObjective and model properties and how they interact with the Reliability \nRequirements for a Locational Deliverability Area. Explanation of the role \nof offer options in degrading information in the Capacity Auctions.  \n \n265—On Dr. Shanker’s own behalf. Before the Federal Energy \nRegulatory Commission, Docket EL23-13. Answer ing statements to \nintervenors regarding Dr. Shanker’s complaint.  \n \n2022 \n \n264—On Dr. Shanker’s own behalf. Before the Federal Energy \nRegulatory Commission, Docket EL23-13. An FPA Section 206 complaint \nfor violating its Tariff via over accreditation of certain Variable Capacity \nResoruces.  \n \n263—On Dr. Shanker’s own behalf. Before the Federal Energy \nRegulatory Commission, Docket RM22-14. Comments and reply \ncomments regarding the Notice of Proposed Rulemaking Improvements to \nGenerator Interconnection Procedures and Agreements. \n \n \n262—On behalf of the Energy Trading Institute. Before the Federal \nEnergy Regulatory Commission, Docket No. ER22-797. Affidavit in \nsupport of PJM LLC proposals for modifications to the Auction Revenue \nRights/Financial Transmission Rights Market. Preparation of extensive \ngeneral regulatory and PJM history regarding the formation of such rights \nover time.  \n2021 \n \n261—On behalf of the PJM Power Producers Group (P3) before the \nFederal Energy Regulatory Commission Docket No. ER21-2582-000. \nAffidavit addressing PJM’s proposed modification of the Minimum Offer \nPrice Rule and problems related to the economic justification of the \nproposed narrowing of the applicability of the rule.  \n \n \n260—On behalf of LS Power Associates L.P. before the Federal Energy \nRegulatory Commission Docket No. ER21-2043. Affidavit discussing \nPJM’s revised Effective Load Carrying Capability proposal, its limitations \nand associated PJM responses to previous comments regarding its initial \nproposal.  \n \n259—On behalf of Indicated Suppliers before the Federal Energy \nRegulatory Commission in Dockets No. EL19-47-000 and EL19-63-000 \ncomments regarding the PJM proposed modification to its Market Seller"},{"page":86,"startToken":25450,"endToken":25759,"text":"Roy J. Shanker \nPage 5 \nOffer Cap in the Reliability Planning Model Base Residual Auction for \nCapacity Resources.  \n \n258—Written post conference comments in Federal Energy Commission \nDocket No. AD21-10. Discussion of the appropriate scope and range of \nactions for the Commission with respect to the PJM Minimun Offer Price \nRate. Similar considerations of the legal scope of the Commission under \nthe Federal Power Act.  \n \n257—Invited Speaker before the Federal Energy Energy Regulatory \nCommission Docket No. AD21-10. Comments before the Commissioners \nrelated to the role of subsidies and their impact in terms of the \ndetermination of satisfaction of just and reasonable rates under the Federal \nPower Act.  \n \n256—On behalf of LS Power Associates L.P. before the Federal Enegy \nRegulatory Commission Docket No. ER21-278-001. Affidavit discussing \nPJM’s Effective Load Carrying Capability proposal, its limitations and \nassociated PJM responses to the Commission’s deficiency notice.  \n \n2020 \n \n256—On behalf of Cricket Valley Energy Center and Empire Generating \nCompany before the Federal Energy Commission Docket EL21-7. \nAffidavit addressing the appropriate design of offer price floors in the \nNYISO Capacity market and associated mitigation and extension of the \nrelated rules to the entire state.  \n \n255—Invited speaker and written submission before the Federal Energy \nRegulatory Commission Docket AD20-14. Comments about the legal \nissues under the Federal Power Act relevant to the implementation of \ncarbon pricing within the wholesale regional transmission organizations.  \n \n254—On behalf of Shell Energy North America before the Federal Energy \nRegulatory Commission, Docket EL20-49. Affidavit addressing bilateral \ntrading of FTRs, associated agreements and the interaction with PJM’s \nFTR Center reporting and Tariff.  \n \n2019  \n \n253—On behalf of White Oak Power Constructors before the United \nStates District Court for the Eastern District of Virginia (Richmond \nDivision). Expert report on proper calculation of damages and costs \nassociated with the delay in commercial operations of a new electric \npower generation facility."},{"page":87,"startToken":25759,"endToken":26094,"text":"Roy J. Shanker \nPage 6 \n252—On behalf of the Public Service Companies before the Federal \nEnergy Regulatory Commission, Docket ER19-1486. Affidavit regarding \nthe PJM proposed operating reserve demand curve and other \nmodifications to the reserve products market. Comments on missing \nelements within the proposal.  \n \n251—On behalf of  Indicated Parties, (Calpine, Vestra, and Electric Power \nSupply Association) before the Federal Energy Regulatory Commission. \nDocket EL19-63. Affidavit regarding the complaint of the Joint Consumer \nAdvocates regarding PJM’s market seller offer cap, the potential exercise \nof market power in the capacity market and appropriate market design \nadjustments under the Capacity Performance paradigm.  \n \n250—On behalf of  Indicated Parties, (Calpine, Vestra, and Electric Power \nSupply Association) before the Federal Energy Regulatory Commission. \nDocket EL19-47. Affidavit regarding the appropriate adjustment of \npenalties and the Market Seller Offer Cap within the PJM Capacity \nPerformance paradigm.  \n \n249—Supreme Court of the United States. Brief of Energy Economists as \nAmici Curiae in Support Of Petitioners, Nos. 18-868 & 18-879. \nDiscussion of the impact of subsidies in electric energy market structures \nand the relationship of the instant cases where a Writ of Certiorari is being \nsought to previous Supreme Court precedent regarding state actions that \neffect Federal Energy Regulatory Commission jurisdictional rates.  \n \n2018 \n \n248—On behalf of PJM Power Providers (P3). Federal Energy Regulatory \nCommission. Docket EL18-178. Affidavit addressing the appropriate \nmechanisms to address state/public policy subsidies in the PJM Reliability \nPlanning Model capacity construct. Related comments with respect to a \n“Clean” Minimum Price Offer Rule.  \n \n247—On behalf of Calpine Corporation, Eastern Generating and CPV \nPower Holdings. Federal Energy Regulatory Commission. Docket No. \nEL18-169. Affidavit addressing the the establishment of a “clean” \nMinimum Offer Price Rule for capacity offers in the PJM markets.  \n \n246—On behalf of DC Energy LLC and Vitol Inc. Federal Energy \nRegulatory Commission. Docket No. ER18-1334. Affidavit on the CAISO \nproposals to limit source and sink pairs in its annual and monthly CRR \nauctions, as well as comments addressing appropriate coordination of \ntransmission outage and constraint information."},{"page":88,"startToken":26094,"endToken":26414,"text":"Roy J. Shanker \nPage 7 \n245—On behalf of the PJM Power Providers. Federal Energy Regulatory \nCommission Docket No. ER18-1314-000. Affidavit on the PJM proposed \nmitigation alternatives for addressing out of market subsidies either by \nRepricing or a modified Minimum Offer Price Rule.  \n \n244—On behalf of Joint Commentors. Federal Energy Regulatory \nCommission Docket EL18-34. Participation in the preparation of \ncomments addressing PJM’s proposed fast start pricing modifications and \nrelated price formation issues.  \n \n243—On behalf of the PJM Power Providers Group. Federal Energy \nRegulatory Commission Dockets EL17-32 and EL17-36. Pre-Technical \nConference Comments and participant technical conference regarding \nseasonal capacity products and specific related reliability and forecasting \nquestions from Commission Staff. \n \n(2018) Non-public reports regarding potential market manipulation within \nISO NE markets.  \n \n2017 \n \n242—On behalf of the PSEG Companies. Federal Energy Regulatory \nCommission Docket No. ER13-535-000. Affidavit regarding \nimplementation of Court of Appeals remand to FERC of the PJM capacity \nmarket Minimum Offer Price Rule.  \n241-- In the United States Court of Appeals for the Second Circuit. Case \nNo. 17-2654.Co-writer/sponsor of the Brief of Energy Economists as \nAmici Curiae in Support of Plaintiffs-Appealants-Reversal. Comments \nregarding the impacts of subsidies on the operation of organized electric \nmarkets. \n \n240—In the United States Court of Appeals for the Seventh Circuit. No. \n17-2433.Co-writer/sponsor of the Brief of Energy Economists as Amici  \nCuriae in Support of Plaintiffs-Appealants. Comments regarding the \nimpacts of subsidies on the operation of organized electric markets.  \n \n239—Invited speaker Federal Energy Regulatory Commission technical \nsession, Docket AD17-11. Comments on the appropriate incorporation of \nstate policies in wholesale electric markets. Submission of post technical \nsession comments.  \n \n238—On behalf of PJM Power Providers. Federal Energy Regulatory \nCommission Dockets EL17-36 and EL17-32  addressing the current \nCapacity Performance design and criticisms related to the exclusion of an \ninferior seasonal capacity product. Explanation of how PJM establishes its \nadequacy targets and whether or not the asserted criticisms were valid."},{"page":89,"startToken":26414,"endToken":26699,"text":"Roy J. Shanker \nPage 8 \n \n2016 \n \n237- On behalf of DC Energy, Vitol, Intertia Power, Saracen Energy East. \nFederal Energy Regulatory Commission Dockets EL16-6, ER16-121. \nSubmission of post technical session statement regarding PJM FTR \nmarket “netting” proposal. \n \n236-On behalf of DC Energy, Vitol, Intertia Power, Saracen Energy East. \nFederal Energy Regulatory Commission Dockets EL16-6, ER16-121. \nParticipant in two Technical Session Panels addressing PJM FTR market \ndesign and deficiency in the pending proposal to remove netting in the \nmarket settlement.  \n \n2015  \n \n235- On behalf of the Electric Power Supply Associaton. Federal Energy \nRegulatory Commission Dockets EL15-70, 71, 72, 82. Affidavit regarding \nMISO capacity market design and also addressing use of opportunity costs \nin offers. \n \n234-On behalf of the Electric Power Supply Associaton. Federal Energy \nRegulatory Commission Dockets EL15-70, 71, 72, 82. Discussant in \ntechnical session addressing the establishment of opportunity costs as the \nbasis for capacity reference pricing in the MISO Planning Resource \nAuctions. \n \n233-On behalf of Dominion Virginia Power. Federal Energy Regulatory \nCommission Docket ER15-1966. Affidavit regarding changing economic \nincentives for suppliers associated with the modification of PJM’s \ncalculation of Lost Opportunity Costs.  \n \n232-On behalf of “Indicated Suppliers” Federal Energy Regulatory \nCommission Docket No. EL15-64-000. Testimony addressing the \nappropriateness of proposed changes to the NYISO buyer side mitigation \nexemptions.  \n \n231-On behalf of Hydro Quebec, Energy Services U.S. Federal Energy \nRegulatory Commission Docket No. ER15-623. Affidavit addressing the \nconsistent treatment of energy imports under PJM’s Capacity Performance \nproposal.  \n \n230-Before the Supreme Court of the United States, No. 14-995, On \nPetition for a Writ of Certiorari to the United States Court of Appeals for \nthe Third Circuit. Brief of electrical engineers, scientists and economists \nas amici curiae in support of petitioners. Metropolitan Edison et al. versus"},{"page":90,"startToken":26699,"endToken":27001,"text":"Roy J. Shanker \nPage 9 \nPennsylvania Public Utility Commission et al., http://www.americanbar.\norg/content/dam/aba/publications/supreme_court_preview/briefs_2015_20\n16/14-840_Borlick_et_al.pdf. \n \n2014 \n \n229-On behalf of Benton County Wind Farm. United States District Court \nSouthern District of Indiana, Indianapolis Division, Civil Action No. 1:13-\ncv-1984-SEB-TAB. Expert Reports addressing custom and practice in \nelectric power purchase agreements. \n \n228-On behalf of FirstEnergy Services. FERC Docket EL14-55. Affidavit \nrelated to the appropriate characterization of Demand Response in \nCapacity Markets reflecting performance as the reduction of retail energy \nconsumption.  \n \n227-Federal Energy Regulatory Commission. Docket RM10-17. On my \nown behalf, a statement regarding the ability of the PJM capacity and \nenergy markets to clear in the transition from any determination that \ndemand response would be excluded jurisdictionally from wholesale \nmarkets. This could in turn result in a more appropriate representation of \nretail demand response.  \n \n226-Illinois Commerce Commission. Matter: No. 13-0657. On behalf of \nCommonwealth Edison Company. Testimony regarding the operation of \nthe PJM regional transmission expansion planning process in general and \nparticularly with regards to the preservation of long-term transmission \nrights (Stage 1A Auction Revenue Rights), and the consequences that \noccur when such mandated rights are infeasible.  \n \n225-Federal Energy Regulatory Commission. Docket ER14-1579. On \nbehalf of H-P Energy. Affidavit explaining importance of property rights \nand associated contracts within the PJM transmission planning process, \nparticularly as they pertain to Upgrade Construction Service Agreements.  \n \n2013 \n \n224-Federal Energy Regulatory Commission. Docket No. ER14-456. On \nbehalf of NextEra Energy to analyze a proposed modification to the PJM \nTariff allowing for “easily resolved constraints” to be address by \ntransmission upgrades without any analyses of benefits.  \n \n223-Federal Energy Regulatory Commission. Docket No. ER14-504. \nAffidavit on behalf of PJM Power Producers addressing the interaction \nbetween the PJM adequacy planning processes and the formulation of"},{"page":91,"startToken":27001,"endToken":27302,"text":"Roy J. Shanker \nPage 10 \nsaturation constraints on Limited and Extended Summer Demand \nResponse products. \n \n222-Federal Energy Regulatory Commission. Docket AD13-7. Invited \nspeaker on the Commission’s technical session regarding capacity markets \nin RTO’s. Comments addressed basic principles of market design, market \nfeatures, and consequences of market failures and deviations from design \nprinciples.  \n \n221-Federal Energy Regulatory Commission. Docket No. EL13-62 on \nbehalf of TC Ravenswood LLC. Two affidavits addressing the treatment \nof reliability support services agreements and associated capacity in the \nNYISO capacity market design.  \n \n2012 \n \n220-Federal Energy Regulatory Commission. Docket No. ER12-715-003. \nOn behalf of First Energy Services Company. An affidavit and testimony \naddressing the appropriateness of the application of a proposed new MISO \ntariff provision after the fact to a withdrawing MISO member.  \n \n219-Federal Energy Regulatory Commission. Docket ER13-335. On \nbehalf of Hydro Quebec U.S. Affidavit addressing appropriate application \nof ISO-NE Market Rule 1/ Tariff with respect to the qualification of  new \nexternal capacity to participate in the Forward Capacity Market. \n \n218-Federal Energy Regulatory Commission. Docket IN12-4. On behalf \nof Deutsche Bank Energy Trading. Affidavit regarding a review of \nspecific transactions, related congestion revenue rights, and deficiencies in \nCAISO tariff implementation during periods when market software \nproduces multiple feasible pricing solutions.  \n \n217-Federal Energy Regulatory Commission. Docket No. ER12-715-003. \nOn behalf of FirstEnergy Services Company.  Affidavit regarding \nimplementation of the MISO Tariff with respect to the determination of \nappropriate exit fees and charges related to certain transmission facilities.  \n \n216-Federal Energy Regulatory Commission. Docket No. IN12-11. On \nbehalf of Rumford Paper Company. Affidavit regarding free riding \nbehavior in the design of demand response programs, and its relationship \nto accusations of market manipulation.  \n \n215-Federal Energy Regulatory Commission. Docket No. IN12-10. On \nbehalf of Lincoln Paper and Tissue LLC. Affidavit regarding relationship \nof demand response behavior and value established in Order 745 to"},{"page":92,"startToken":27302,"endToken":27603,"text":"Roy J. Shanker \nPage 11 \nclaimed market impacts associated with accusations of market \nmanipulation.  \n \n214-Federal Energy Regulatory Commission. Docket No. AD12-16-000. \nOn behalf of PJM Power Providers, testimony regarding deliverability of \ncapacity between the MISO and PJM RTO’s and associated basic \nadequacy planning concepts. \n \n213-United States Court Of Appeals, District of Columbia Circuit. Electric \nPower Supply Asociation, et al (Petitioners) v. Federal Energy Regulatory \nCommission et al (Respondents) Nos. 11-1486. Amici Curiae brief \nregarding the appropriate pricing of demand reduction services in \nwholesale markets vis a vis the FERC determinations in Order 745.  \n \n212-United States Supreme Court. Metropolitan Edison Company and \nPennsyvalnia electric Company (Petitioners), Pennsylvania Public Utility \nCommission (Respondent) (No. 12-4) Amici Curiae brief regarding the \nnature of physical losses in electric transmission and relationship to proper \nmarginal cost pricing of electric power and the marginal cost of \ntransmission service.  \n \n2011 \n \n211-Federal Energy Regulatory Commission Docket No. ER12-513-000. \nOn behalf of PJM Power Providers, testimony regarding the establishment \nof system wide values for the net cost of new entry related to \nmodifications of the Reliability Planning Model.  \n \n210-Federal Energy Regulatory Commission Docket No. EL11-56-000, on \nbehalf of First Energy Services. Affidavit regarding the appropriateness of \nproposed transmission cost allocation of Multi-Value Projects to an \nexiting member of the Midwest Independent System Operator.   \n \n209-Federal Energy Regulatory Commission Docket No. ER11-4081-000, \non behalf of “Capacity Suppliers”. Affidavit addressing correct market \ndesign elements for Midwest Independent System Operator proposed \nresource adequacy market. \n \n208-Public Utility Commission of Ohio, Case Nos. 11-346-EL-SSO,11-\n348-EL-SSO,Nos. 11-349-EL-AAM, 11-350-EL-AAM, on behalf of First \nEnergy Services. Testimony regarding the interaction between the \ncapacity default rates for retail access under the PJM Fixed Resource \nRequirement and the PJM Reliability Planning Model valuations.  \n \n207-Federal Energy Regulatory Commission Dockets No. ER11-2875, \nEL11-20, Staff Technical Conference on behalf of PJM Power Providers,"},{"page":93,"startToken":27603,"endToken":27901,"text":"Roy J. Shanker \nPage 12 \naddressing self supply and the Fixed Resource Requirement elements of \nPJM’s capacity market design.  \n \n206-New Jersey Board of Public Utilities, Docket Number EO11050309 \non behalf of PSEG Companies. Affidavit addressing the implications of \nmarkets and market design elements, and regulatory actions on the relative \nrisk and trade-offs between capital versus energy intensive generation \ninvestments.  \n \n205-Federal Energy Regulatory Commission Docket No. ER11-2875. \nAffidavit and supplemental statement on behalf of PJM Power Providers \naddressing flaws in the PJM tariff’s Minimum Offer Price Rule regarding \nnew capacity entry and recommendations for tariff revisions.  \n \n204-Federal Energy Regulatory Commission Docket No. EL11-20. \nAffidavit on behalf of PJM Power Providers addressing flaws in the PJM \ntariff’s Minimum Offer Price Rule regarding new capacity entry.  \n \n203-Federal Energy Regulatory Commission  Docket Nos. ER04-449. \nAffidavit and supplemental statement on behalf of New York Suppliers \naddressing the appropriate criteria for the establishment of a new capacity \nzone in the NYISO markets.  \n \n2010 \n \n202-New Jersey State Assembly and Senate. Statements on behalf of the \nCompetitive Supplier Coalition addressing market power and reliability \nimpacts of proposed legislation, Assembly Bill 3442 and Senate Bill 2381. \n \n201-Federal Energy Reglatory Commission. Docket ER11-2183. Affidavit \non behalf of First Energy Services Company addressing default capacity \ncharges for Fixed Resource Requirement participants in the PJM \nReliability Pricing Model capacity market design.  \n \n200-Federal Energy Regulatory Commission. Docket ER11-2059 \nAffidavit on behalf of First Energy Services Company addressing \ndeficiencies and computational problems in the  proposed “exit charges” \nfor transmission owners leaving the MISO RTO related to long term \ntransmission rights.  \n \n199-Federal Energy Regulatory Commission Docket RM10-17. Invited \npanelist addressing metrics for cost effectiveness of demand response and \nassociated cost allocations and implications for monopsony power.  \n \n198-Federal Energy Regualtory Commission Consolidated Dockets ER10-\n787-000, EL10-50-000, and EL10-57-000. Two affidavits on behalf of the"},{"page":94,"startToken":27901,"endToken":28197,"text":"Roy J. Shanker \nPage 13 \nNew England Power Generators Association regarding ISO-NE modified \nproposals for alternative price rule mitigation and zonal \ndefinitions/functions of locational capacity markets. \n \n197-Federal Energy Regulatory Commission Docket No. ER10-2220-000. \nAffidavit on behalf of the Independent Energy Producers of New York. \nAddressing rest of state mitigation thresholds and procedures for adjusting \nthresholds for frequently mitigated units and reliability must run units.  \n \n196-Federal Energy Regulatory Commission Docket PA10-1. Affidavit on \nbehalf of Entergy Services related to development of security constrained \nunit commitment software and its performance.  \n \n195-Federal Energy Regulatory Commission Docket No. ER09-1063-004. \nTestimony on behalf of the PJM Power Providers Group (P3) regarding \nthe proposed shortage pricing mechanism to be implemented in the PJM \nenergy market. Reply comments related to a similar proposal by the \nindependent market monitor.  \n \n194-PJM RTO. Statement regarding the impact of the exercise of buyer \nmarket power in the PJM RPM/Capacity market. Panel discussant on the \nissue at the associated Long Term Capacity Market Issues Sympossium.  \n \n193-Federal Energy Regulatory Commission Docket No. ER10-787-000. \nAffidavit on behalf of New England Power Generators Association \naddressing proper design of the alternative price rules (APR) for the ISO-\nNE Forward Capacity Auctions. Second affidavit offered in reply. \nSupplemental affidavit also submitted \n \n192-Federal Energy Regulatory Commission Docket No. RM10-17-000. \nAffidavit on behalf of New England Power Generators Association \naddressing proper pricing for demand response compensation in organized \nwholesale regional transmissiom organizations.  \n \n191-Federal Energy Regulatory Commission Docket No. RM10-17-000, \nAffidavit on my on behalf regarding inconsistent representations made \nbetween filings in this docket and contemporaneous materials presented in \nthe PJM stakeholder process.  \n \n2009 \n \n190-Federal Energy Regulatory Commission Docket No. ER09-1682. \nTwo affidavits on behalf of an un-named party regarding confidential \ntreatment of market data coupled with specific market participant bidding, \nand associated issues."},{"page":95,"startToken":28197,"endToken":28496,"text":"Roy J. Shanker \nPage 14 \n189-American Arbitration Assoication, Case No. 75-198-Y-00042-09 \nJMLE, on behalf of Rathdrum Power LLC. Report on the operation of \nspecific pricing provision of a tolling power purchase agreement.  \n \n188-Federal Energy Regulatory Commission. Docket No. IN06-3-003. \nAnalyses on behalf of Energy Transfer Partners L.P. regarding trading \nactivity in physical and financial natural gas markets.  \n \n187-Federal Energy Regulatory Commission. Docket No. ER08-1281-\n000. Analyses on behalf of Fortis Energy Trading related to the impacts of \nloop flow on trading activities and pricing.  \n \n186-American Arbitration Association. Report on behalf of PEPCO \nEnergy Services regarding several trading transactions related to the \npurchase and sale of Installed Capacity under the PJM Reliability Pricing \nModel.  \n \n185-Federal Energy Regulatory Commission Docket No. EL-0-47. \nAnalyses on behalf of HQ Energy services (U.S.) regarding pricing and \nsale of energy associated with capacity imports into ISO-NE.  \n \n184-Federal Energy Regulatory Commission Docket No.  ER04-449 019, \nAffidavit on behalf of HQ Energy Services (U.S.) regarding the \nimplementation of the consensus deliverability plan for the NYISO, and \nassociated reliability impacts of imports.  \n \n183-Federal Energy Regulatory Commission Docket ER09-412-000, \nER05-1410-010, EL05-148-010. Affidavit and Reply Affidavit on behalf \nof PSEG Companies addressing proposed changes to the PJM Reliability \nPricing Model and rebuttal related to other parties’ filings.  \n \n2008 \n \n182-Pennsylvania Public Service Commission. En Banc Public Hearing on \n\"Current and Future Wholesale Electricity Markets\", comments regarding \nthe design of PJM wholesale market pricing and state restructuring. \n \n181-Maine Public Utility Commission. Docket No. 2008-156. Testimony \non behalf of a consortium of energy producers and suppliers addressing \nthe potential withdrawal of Maine from ISO New England and associated \nmarket and supplier response.  \n \n180-Federal Energy Regulatory Commission. Docket No. EL08-67-000. \nAffidavit on behalf of Duke Energy Ohio and Reliant Energy regarding \ncriticisms of the PJM reliability pricing model (RPM) transitional \nauctions."},{"page":96,"startToken":28496,"endToken":28764,"text":"Roy J. Shanker \nPage 15 \n \n179-Federal Energy Regulatory Commission. Docket AD08-4, on behalf \nof the PJM Power Providers. Statement and participation in technical \nsession regarding the design and operation of capacity markets, the status \nof the PJM RPM market and comments regarding additional market \ndesign proposals.  \n \n178-Federal Energy Regulatory Commission. Docket ER06-456-006, \nTestimony on behalf of East Coast Power and Long Island Power \nAuthority regarding appropriate cost allocation procedures for merchant \ntransmission facilities within PJM.  \n \n2007 \n \n177-FERC Docket No. EL07-39-000. Testimony on behalf of Mirant \nCompanies and Entergy Nuclear Power Marketing regarding the operation \nof the NYISO In-City Capacity market and the associated rules and \nproposed rule modifications.  \n \n176-FERC Dockets: RM07-19-000 and AD07-7-000, filing on behalf of \nthe PJM Power Providers addressing conservation and scarcity pricing \nissues identified in the Commission’s ANOPR on Competition.  \n \n175-FERC Docket No. EL07-67-000. Testimony and reply comments on \nbehalf of Hydro Quebec U.S. regarding the operation of the NYISO TCC \nmarket and appropriate bidding and competitive practices in the TCC and \nEnergy markets.  \n \n174-FERC Docket Nos. EL06-45-003. Testimony on behalf of El Paso \nElectric regarding the appropriate interpretation of a bilateral transmission \nand exchange agreement.  \n \n2006 \n \n173-United States Bankruptcy Court for the Southern District of New \nYork. Case No. 01-16034 (AJG). Report on Behalf of EPMI regarding the \nproperties and operation of a power purchase agreement. \n \n172-FERC Docket No. EL05-148-000. Testimony regarding the proposed \nReliability Pricing Model settlement submitted for the PJM RTO.  \n \n171-FERC Docket No. ER06-1474-000, FERC. Testimony on behalf othe \nPSEG Companies regarding the PJM proposed new policy for including \n“market efficiency” transmission upgrades in the regional transmission \nexpansion plan."},{"page":97,"startToken":28764,"endToken":29032,"text":"Roy J. Shanker \nPage 16 \n170-FERC Docket No. EL05-148-000,  FERC. Participation in \nCommission technical sessions regarding the PJM proposed Reliability \nPricing Model.  \n \n169-FERC Docket No. EL05-148-000,  FERC. Comments filed on behalf \nof six PJM market participants concerning the proposed rules for \nparticipation in the PJM Reliability Pricing Model Installed Capacity \nmarket, and related rules for opting out of the RPM market.  \n \n168-FERC Docket No. ER06-407-000. Testimony on behalf of GSG, \nregarding interconnection issues for new wind generation facilities within \nPJM.  \n \n2005 \n \n167-FERC Docket No. EL05-121-000, Testimony on behalf of several \nPJM Transmission Owners (Responsible Pricing Alliance)  regarding \nalternative regional rate designs for transmission service and associated \nmarket design issues.  \n \n166-FERC Technical Conference of June 16, 2005. (Docket Nos. PL05-7-\n000, EL03-236-000, ER04-539-000). Invited participant. Statement \nregarding the operation of the PJM Capacity market and the proposed new \nReliability Pricing Model Market design.  \n \n165-American Arbitration Association Nos. 16-198-00206-03 16-198-\n002070.On behalf of PG&E Energy Trading. Analyses related to the \noperation and interpretation of power purchase and sale/tolling agreements \nand electrical interconnection requirements.  \n \n164-Arbitration on behalf of Black Hills Power, Inc. Expert testimony \nrelated to a power purchase and sale and energy exchange agreement, as \nwell as FERC criteria related to the applicable code and standards of \nconduct.  \n \n2004 \n \n163-Federal Energy Regulatory Commission Docket No. EL03-236-003.     \nTestimony on behalf of Mirant companies relating to PJM proposal for \ncompensation of frequently mitigated generation facilities.  \n \n162-Federal Energy Regulatory Commission. Docket No. ER03-563-030. \nTestimony on behalf of Calpine Energy Services regarding the \ndevelopment of a locational Installed Capacity market and associated \ngenerator service obligations for ISO-NE. Supplemental testimony filed \n2005."},{"page":98,"startToken":29032,"endToken":29319,"text":"Roy J. Shanker \nPage 17 \n \n161-Federal Energy Regulatory Commission.  Docket No. EL04-135-000. \nTestimony on behalf on the Unified Plan Supporters regarding \nimplications of using a flow based rate design to allocate embedded costs.  \n \n160-Federal Energy Regulatory Commission. Docket No. ER04-1229-\n000. Testimony on behalf of EME Companies regarding the allocation and \nrecovery of administrative charges in the NYISO markets.  \n \n159-Federal Energy Regulatory Commission. Dockets No. EL01-19-000, \nNo. EL01-19-001, No. EL02-16-000, EL02-16-000. Testimony on behalf \nof PSE&G Energy Resources and Trade regarding pricing in the New \nYork Independent System Operator energy markets. \n \n158-Federal Energy Regulatory Commission. Invited panelist regarding \nperformance based regulation (PBR)  and wholesale market design. \nComments related to the potential role of PBR in transmission expansion, \nand its interaction with market mechanisms for new transmission.  \n \n157-Federal Energy Regulatory Commission. Docket No. ER04-539-000 \nTestimony on behalf of EME Companies regarding proposed market \nmitigation in the energy and capacity markets of the Northern Illinois \nControl Area.  \n \n156-Federal Energy Regulatory Commission. Standardization of \nGenerator Interconnection Agreements and Procedures Docket No. RM02-\n1-001, Order 2003-A, Affidavit on Behalf of PSEG Companies regarding \nthe modifications on rehearing to interconnection crediting procedures.  \n \n \n155-Federal Energy Regulatory Commission. Dockets ER03-236-\n000,ER04-364-000,ER04-367-000,ER04-375-000. Testimony on behalf of \nthe EME Companies regarding proposed market mitigation measures in \nthe Northern Illinois Control Area of PJM.  \n \n154-Federal Energy Regulatory Commission. Dockets PL04-2-000, EL03-\n236-000. Invited panelist, testimony related to local market power and the \nappropriate levels of compensation for reliability must run resources.  \n \n2003 \n \n153-American Arbitration Association. 16 Y 198 00204 03. Report on \nbehalf of Trigen-Cineregy Solutions regarding an energy services \nagreement related to a cogeneration facility.  \n \n152-Federal Energy Regulatory Commission. Docket No. EL03-236-000. \nTestimony on behalf of EME Companies regarding the PJM proposed"},{"page":99,"startToken":29319,"endToken":29623,"text":"Roy J. Shanker \nPage 18 \ntariff changes addressing mitigation of local market power and the \nimplementation of a related auction process.  \n \n151-Federal Energy Regulatory Commission. Docket No. PA03-12-000. \nTestimony on behalf of Pepco Holdings Incorporated regarding \ntransmission congestion and related issues in market design in general, \nand specifically addressing congestion on the Delmarva Peninsula.  \n \n150-Federal Energy Regulatory Commission. Docket Nos. ER03-262-007, \nAffidavit on behalf of EME Companies regarding the cost benefit analysis \nof the operation of an expanded PJM including Commonwealth Edison.  \n \n149-Supreme Court of the State of New York, Index No. 601505/01. \nReport on behalf of Trigen-Syracuse Energy Corporation regarding energy \ntrading and sales agreements and the operation of the New York \nIndependent System Operator.  \n \n148-Federal Energy Regulatory Commission. Docket No. ER03-262-000. \nAffidavit on behalf of the EME Companies regarding the issues associated \nwith the integration of the Commonwealth Edison Company into PJM.  \n \n147-Federal Energy Regulatory Commission. Docket No. ER03-690-000. \nAffidavit on behalf of Hydro Quebec US regarding New York ISO market \nrules at external generator proxy buses when such buses are deemed non-\ncompetitive.  \n \n146-Federal Energy Regulatory Commission. Docket RT01-2-006,007. \nAffidavit on behalf of the PSEG Companies regarding the PJM Regional \nTransmission Expansion Planning Protocol, and proper incentives and \nstructure for merchant transmission expansion.  \n \n145-Federal Energy Regulatory Commission. Docket No. ER03-406-000. \nAffidavit on behalf of seven PJM Stakeholders addressing the \nappropriateness of the proposed new Auction Revenue Rights/Financial \nTransmission Rights process to be implemented by the PJM ISO.  \n \n144-Federal Energy Regulatory Commission. Docket No. ER01-2998-\n002. Testimony on behalf of Pacific Gas and Electric Company related to \nthe cause and allocation of transmission congestion charges.  \n \n143-Federal Energy Regulatory Commission. Docket No. RM01-12-000. \nOn behalf of six different companies including both independent \ngenerators, integrated utilities and distribution companies comments on \nthe proposed resource adequacy requirements of the Standard Market \nDesign."},{"page":100,"startToken":29623,"endToken":29905,"text":"Roy J. Shanker \nPage 19 \n142-United States Bankruptcy Court, Northern District of California, San \nFrancisco Division, Case No. 01-30923 DM. On behalf of Pacific Gas and \nElectric Dr. Shanker presented testimony addressing issues related to \ntransmission congestion, and the proposed FERC SMD and California \nMD02 market design proposals.  \n \n2002 \n \n141-Arbitration. Testimony on behalf of AES Ironwood regarding the \noperation of a tolling agreement and its interaction with PJM market rules.  \n \n140-Federal Energy Regulatory Commission. Docket No. RM01-12-000. \nDr. Shanker was asked by the three Northeast ISO’s to present a summary \nof his resource adequacy proposal developed in the Joint Capacity \nAdequacy Group. This was part of the Standard Market Design NOPR \nprocess.  \n \n139-Federal Energy Regulatory Commission. Docket No. ER02-456-000. \nTestimony on behalf of Electric Gen LLC addressing comparability of a \ncontract among affiliates with respect to non-price terms and conditions.  \n \n138-Circuit Court for Baltimore City. Case 24-C-01-000234. Testimony \non behalf of Baltimore Refuse Energy Systems Company regarding the \nappropriate implementation and pricing of a power purchase agreement \nand related Installed Capacity credits.  \n \n137-Federal Energy Regulatory Commission. Docket No. RM01-12-000. \nComments on the characteristics of capacity adequacy markets and \nalternative market design systems for implementing capacity adequacy \nmarkets.  \n \n2001 \n \n136-Federal Energy Regulatory Commission.  Docket ER02-456-000. \nTestimony on behalf of Electric Gen LLC regarding the terms and \nconditions of a power sales agreement between PG&E and  Electric \nGenerating Company LLC.   \n \n135-Delaware Public Service Commission. Docket 01-194. On behalf of \nConectiv et al. Testimony relating to the proper calculation of Locational \nMarginal Prices in the PJM market design, and the function of Fixed \nTransmission Rights.  \n \n134-Federal Energy Regulatory Commission. Docket No. IN01-7-000 On \nbehalf of Exelon Corporation . Testimony relating to the function of Fixed"},{"page":101,"startToken":29905,"endToken":30187,"text":"Roy J. Shanker \nPage 20 \nTransmission Rights, and associated business strategies in the PJM market \nsystem.  \n  \n133-Federal Energy Regulatory Commission. Docket No. RM01-12-000. \nComments on the basic elements of RTO market design and the required \nmarket elements.  \n \n132-Federal Energy Regulatory Commission. Docket No. RT01-99-000. \nOn behalf of the One RTO Coalition. Affadavit on the computational \nfeasibility of large scale regional transmission organizations and related \nissues in the PJM and NYISO market design.  \n \n131-Arbitration. On behalf of Hydro Quebec. Testimony related to the \neligibility of power sales to qualify as Installed Capacitywithin the New \nYork Independent system operator.  \n \n130-Virginia State Corporation Commission. Case No. PUE000584. On \nbehalf of the Virginia Independent Power Producers. Testimony related to \nthe proposed restructuring of Dominion Power and its impact on private \npower contracts.  \n \n129-United States District Court, Northern District of Ohio, Eastern \nDivision, Case: 1:00CV1729. On behalf of Federal Energy Sales, Inc. \nTestimony related to damages in disputed electric energy trading \ntransactions.  \n \n128-Federal Energy Regulatory Commission. Docket Number ER01-\n2076-000. Testimony on behalf of Aquila Energy Marketing Corp and \nEdison Mission Marketing and Trading, Inc. relating to the \nimplementation of an Automated Mitigation Procedure by the New York \nISO. \n \n2000 \n \n127-New York Independent System Operator Board. Statement on behalf \nof Hydro Quebec, U.S. regarding the implications and impacts of the \nimposition of a price cap on an operating market system.  \n \n126-Federal Energy Regulatory Administration. Docket No. EL00-24-000. \nTestimony on behalf of Dayton Power and Light Company regarding the \nproper characterization and computation of regulation and imbalance \ncharges.  \n \n125-American Arbitration Association File 71-198-00309-99. Report on \nbehalf of Orange and Rockland Utilities, Inc. regarding the estimation of \ndamages associated with the termination of a power marketing agreement."},{"page":102,"startToken":30187,"endToken":30439,"text":"Roy J. Shanker \nPage 21 \n \n124-Circuit Court, 15th Judicial Circuit, Palm Beach County, Florida. On \nbehalf of Okeelanta and Osceola Power Limted Partnerships et. al. \nAnalyses related to commercial operation provisions of a power purchase \nagreement.  \n \n1999 \n \n123-Federal Energy Regulatory Commission. Docket No. ER00-1-000. \nTestimony on behalf of TransEnergie U.S. related to market power \nassociated with merchant transmission facilities. Also related analyses \nregarding market based tariff design for merchant transmission facilities.  \n \n122-Federal Energy Regulatory Commission. Docket RM99-2-000. \nAnalyses on behalf of Edison Mission Energy relating to the Regional \nTransmission Organization Notice of Proposed Rulemaking.  \n \n121-Federal Energy Regulatory Commission. Docket No. ER99-3508-\n000. On behalf of PG&E Energy Trading, analyses associated with the \nproposed implementation and cutover plan for the New York Independent \nSystem Operator.  \n \n120-Federal Energy Regulatory Commission. Docket No. EL99-46-000. \nComments on behalf of the Electric Power Supply Association relating to \nthe Capacity Benefit Margin.  \n \n119-New York Public Service Commission, Case 97-F-1563. Testimony \non behalf of Athens Generating Company describing the impacts on \npricing and transmission of a new generation facility within the New York \nPower Pool under the new proposed ISO tariff.  \n \n118-JAMS Arbitration Case No. 1220019318 On behalf of Fellows \nGeneration Company. Testimony related to the development of the \nindependent power and qualifying facility industry and related industry \npractices with respect to transactions between cogeneration facilities and \nthermal hosts. \n \n117-Court of Common Pleas, Philadelphia County, Pennsylvania. \nAnalyses on behalf of Chase Manhattan Bank and Grays Ferry \nCogeneration Partnership related to power purchase agreements and \nelectric utility restructuring."},{"page":103,"startToken":30439,"endToken":30691,"text":"Roy J. Shanker \nPage 22 \n1998 \n \n116-Virginia State Corporation Commission. Case No. PUE 980463. \nTestimony on behalf of Appomattax Cogeneration related to the proper \nimplementation of avoided cost methodology.  \n \n115-Virginia State Corporation Commission. Case No. PUE980462 \nTestimony on behalf of Virginia Independent Power Producers related to \nan applicaton for a certificate for new generation facilities.  \n \n114-Federal Energy Regulatory Commission. Analyses related to a \nnumber of dockets reflecting amendments to the PJM ISO tariff and \nReliability Assurance Agreement. \n \n113-U.S. District Court, Western Oklahoma. CIV96-1595-L. Testimony \nrelated to anti-competitive elements of utility rate design and promotional \nactions.  \n \n112-Federal Energy Regulatory Commission Dockets No. EL94-45-001 \nand QF88-84-006. Analyses related to historic measurement of spot prices \nfor as available energy.  \n \n111-Circuit Court, Fourth Judicial Circuit, Duval County, Florida. \nAnalyses related to the proper implementation of a a power purchase \nagreement and associated calculations of capacity payments. (Testimony \n1999)  \n \n1997 \n \n110-United States District Court for the Eastern District of Virginia, CA \nNo. 3:97CV 231. Analyses of the business and market behavior of \nVirginia Power with respect to the implementation of wholesale electric \npower purchase agreements.  \n \n109-United States District Court, Southern District of Florida, Case No. \n96-594-CIV, Analyses related to anti-competitive practices by an electric \nutility and related contract matters regarding the appropriate calculation of \nenergy payments. \n \n108-Virginia State Corporation Commission. Case No. PUE960296. \nTestimony related to the restructuring proposal of Virginia Power and \nassociated stranded cost issues.  \n \n107-Federal Energy Regulatory Commission. Dockets No. ER97-1523-\n000 and OA97-470-000, Analyses related to the restructuring of the New"},{"page":104,"startToken":30691,"endToken":30963,"text":"Roy J. Shanker \nPage 23 \nYork Power Pool and the implementation of locational marginal cost \npricing.  \n \n106-Federal Energy Regulatory Commission Dockets No. OA97-261-000 \nand ER97-1082-000 Analyses and testimony related to the restructuring of \nthe PJM Power Pool and the implementation of locational marginal cost \npricing.  \n \n105-Missouri Public Service Commission. Case No. ET-97-113. \nTestimony related to the proper definition and rate design for standby, \nsupplemental and maintenance service for Qualifying facilities.  \n \n104-American Arbitration Association. Case 79 Y 199 00070 95. \nTestimony and analyses related to the proper conditions necessary for the \ncurtailment of Qualifying Facilities and the associated calculations of \nnegative avoided costs.  \n \n103-Virginia State Corporation Commission. Case Number PUE960117 \nTestimony related to proper implementation of the differential revenue \nrequirements methodology for the calculation of avoided costs.  \n \n102-New York Public Service Commission. Case 96-E-0897, Analyses \nrelated to the restructuring of Consolidated Edison Company of New York \nand New York Power Pool proposed Independent System Operator and \nrelated transmission tariffs.  \n \n1996 \n \n101-Florida Public Service Commission. Docket No. 950110-EI. \nTestimony related to the correct calculation of avoided costs using the \nValue of Deferral methodology and its implementation.  \n \n100-Federal Energy Regulatory Commission Dockets No. EL94-45-001 \nand QF88-84-006.  Testimony and Analyses related to the estimation of \nhistoric market rates for electricity in the Virginia Power service territory.  \n \n99-Circuit Court of the City of Richmond Case No. LA-2266-4. Analyses \nrelated to the incurrence of actual and estimated damages associated with \nthe outages of an electric generation facility.  \n \n98-New Hampshire Public Utility Commission, Docket No. DR96-149. \nAnalyses related to the requirements of light loading for the curtailment of \nQualifying Facilities,  and the compliance of a utility with such \nrequirements."},{"page":105,"startToken":30963,"endToken":31236,"text":"Roy J. Shanker \nPage 24 \n97-State of New York Supreme Court, Index No. 94-1125. Testimony \nrelated to system planning criteria and their relationship to contract \nperformance specifications for a purchased power facility. \n \n96-United States District Court for the Western District of Pennsylvania, \nCivil Action No.  95-0658.  Analyses related to anti-competitive actions of \nan electric utility with respect to a power purchase agreement.  \n \n95-United States District Court for the Northern District of Alabama, \nSouthern Division. Civil Action Number CV-96-PT 0097-S. Affadavit on \nbehalf of TVA and LG&E Power regarding displacement in wholesale \npower transactions.  \n \n1995 \n \n94-American Arbitration Association. Arbitration No. 14 198 012795 \nH/K. Report concerning the correct measurement of savings resulting from \na commercial  building cogeneration system and associated contract \ncompensation issues. \n \n93-Circuit Court City of Richmond. Law No. LX-2859-1. Analyses related \nto IPP contract structure and interpretation regarding plant compensation \nunder different operating conditions.  \n \n92-Federal Energy Regulatory Commission. Case EL95-28-000. Affidavit \nconcerning the provisions of the FERC regulations related to the Public \nUtility Regulatory Policies Act of 1978,  and relationship of estimated \navoided cost to traditional rate based recovery of utility investment.  \n \n91-New York Public Service Commission, Case 95-E-0172, Testimony on \nthe correct design of standby, maintenance and supplemental  service rates \nfor qualifying facilities. \n \n90-Florida Public Service Commission, Docket No. 941101-EQ. \nTestimony related to the proper analyses and procedures related to the \ncurtailment of purchases from Qualifying Facilities under Florida and \nFERC regulations.  \n \n89-Federal Energy Regulatory Commission, Dockets ER95-267-000 and \nEL95-25-000. Testimony related to the proper evaluation of generation \nexpansion alternatives. \n \n1994 \n \n88-American Arbitration Association, Case Number 11 Y198 00352 94 \nAnalyses related to contract provisions for milestones and commercial"},{"page":106,"startToken":31236,"endToken":31519,"text":"Roy J. Shanker \nPage 25 \noperation date and associated termination and damages related to the \nconstruction  of a NUG facility. \n \n87-United States District Court, Middle District Florida, Case No. 94-303 \nCiv-Orl-18. Analyses related to contract pricing interpretation other \ncontract matters in a power purchase agreement  between a qualifying \nfacility and Florida Power Corporation. \n \n86-Florida Public Service Commission Docket 94037-EQ. Analyses \nrelated to a contract dispute between Orlando Power Generation and \nFlorida Power Corporation. \n \n85-Florida Public Service Commission Docket 941101-EQ.  Testimony \nand analyses of the proper procedures for the determination and \nmeasurement for the need to curtail purchases from qualifying facilities.  \n \n84-New York Public Service Commission Case 93-E-0272, Testimony \nregarding PURPA policy considerations and the status of services \nprovided to the generation and consuming elements of a qualifying \nfacility. \n \n83-Circuit Court for the City of Richmond. Case Number LW 730-4. \nAnalyses of the historic avoided costs of Virginia Power, related \nprocedures and fixed fuel transportation rate design.  \n \n82-New York Public Service Commission, Case 93-E-0958 Analyses of \nStand-by, Supplementary and Maintenance Rates of Niagara Mohawk \nPower Corporation for Qualifying Facilities . \n \n81-New York Public Service Commission, Case 94-E-0098. Analyses of \ncost of service and rate design  of Niagara Mohawk Power Corporation.  \n \n80-American Arbitration Association, Case 55-198-0198-93, Arbitrator in \ncontract dispute regarding the commercial operation date of a qualifying \nsmall power generation facility.  \n \n1993 \n \n79-U.S. District Court, Southern District of New York Case 92 Civ 5755. \nAnalyses of contract provisions and associated commercial terms and \nconditions of power purchase agreements between an independent power \nproducer and Orange and Rockland Utilities.  \n \n78-State Corporation Commission, Virginia. Case No. PUE920041. \nTestimony related to the appropriate evaluation of historic avoided costs in \nVirginia and the inclusion of gross receipt taxes."},{"page":107,"startToken":31519,"endToken":31775,"text":"Roy J. Shanker \nPage 26 \n \n77-Federal Energy Regulatory Commission. Docket ER93-323-000. \nEvaluations and analyses related to the financial and regulatory status of a \ncogeneration facility.  \n \n76-Federal Energy Regulatory Commission. Docket EL93-45-000; Docket \nQF83-248-002. Analyses related to the qualifying status of cogeneration \nfacility.  \n \n75-Circuit Court of the Eleventh Judicial Circuit, Dade County, Florida.  \nCase No. 92-08605-CA-06.  Analyses related to compliance with electric \nand thermal energy purchase agreements. Damage analyses and testimony.  \n \n74-Board of Regulatory Commissioners, State of New Jersey. Docket EM \n91010067. Testimony regarding the revised GPU/Duquesne 500 MW \npower sales agreement and associated transmission line. \n \n73-State of North Carolina Utilities Commission. Docket No. E-100 Sub \n67. Testimony in the consideration of rate making standards pursuant to \nSection 712 of the Energy Policy Act of 1992.  \n \n72-State of New York Public Service Commission. Cases 88-E-081 and \n92-E-0814. Testimony regarding appropriate procedures for the \ndetermination of the need for curtailment of qualifying facilities and \nassociated proper production cost modeling and measurement.  \n \n71-Pennsylvania Public Utility Commission. Docket No. A-110300f051. \nTestimony regarding the prudence of the revised GPU/Duquesne 500 MW \npower sales agreement and associated transmission line. \n \n1992 \n \n70-Pennsylvania Public Service Commission. Dockets No. P-870235,C-\n913318,P-910515,C-913764. Testimony regarding the calculation of \navoided costs for GPU/Penelec. \n \n69-Public Service Commission of Maryland. Case No. 8413,8346. \nTestimony on the appropriate avoided costs for Pepco, and appropriate \nprocedures for contract negotiation.  \n \n1991 \n68-Board of Regulatory Commissioners, State of New Jersey. Docket EM-\n91010067. Testimony regarding the planned purchase of 500 MW by GPU \nfrom Duquesne Light Company."},{"page":108,"startToken":31775,"endToken":32040,"text":"Roy J. Shanker \nPage 27 \n67-Public Service Commission of Wisconsin. Docket 05-EP-6. State \nAdvance Plan. Testimony on the calculation of avoided costs and the \nstructuring of payments to qualifying facilities. \n \n66-State Corporation Commission, Virginia. Case No. PUE910033. \nTestimony on class rate of return and rate design for delivery point \nservice. Northern Virginia Electric Cooperative. \n \n65-State Corporation Commission, Virginia. Case No. PUE910048 \nTestimony on proper data and modeling procedures to be used in the \nevaluation of the annual Virginia Power fuel factor. \n \n64-State Corporation Commission, Virginia. Case No. PUE910035. \nEvaluation of the differential revenue requirements method for the \ncalculation of avoided costs. \n \n63-Public Service Commission of Maryland. Case Number 8241 Phase II. \nTestimony related to the proper determination of avoided costs for \nBaltimore Gas and Electric.  \n \n62-Public Service Commission of Maryland. Case Number 8315. \nEvaluation of the system expansion planning methodology and the \nassociated impacts on marginal costs and rate design, PEPCO.  \n \n1990 \n \n61-Public Utility Commission, State of California, Application 90-12-064. \nAnalyses related to the contractual obligations between San Diego Gas \nand Electric and a proposed QF. \n \n60-Montana Public Service Commission. Docket 90.1.1 Testimony and \nanalyses related to natural gas transportation, services and rates.  \n \n59-State Corporation Commission, Virginia. Case No. PUE890075. \nTestimony on the calculation of full avoided costs via the differential \nrevenue requirements methodology. \n \n58-District of Columbia Public Service Commission. Formal Case 834 \nPhase II. Analyses and development of demand side management \nprograms and least cost planning for Washington Gas Light.  \n \n57-State Corporation Commission, Virginia. Case No. PUE890076. \nAnalyses related to administratively set avoided costs. Determination of \noptimal expansion plans for Virginia Power."},{"page":109,"startToken":32040,"endToken":32301,"text":"Roy J. Shanker \nPage 28 \n56-State Corporation Commission, Virginia. Case No. PUE900052. \nAnalyses supporting arbitration of a power purchase agreement with \nVirginia Power. Determination of expansion plan and avoided costs.  \n \n55-Public Service Commission of Maryland. Case Number 8251. \nAnalyses of system expansion planning models and marginal cost rate \ndesign for PEPCO.  \n \n54-State Corporation Commission, Virginia. Case No. PUE900054. \nEvaluation of fuel factor application and short term avoided costs.  \n \n53-Federal Energy Regulatory Commission. Northeast Utilities Service \nCompany Docket Nos. EC90-10-000, ER90-143-000, ER90-144-\n000,ER90-145-000 and El90-9-000. Analyses of the implications of \nNortheast Utilities and Public Service Company of New Hampshire \nmerger on electric supply and pricing.  \n \n52-Public Service Commission of Maryland. Re: Southern Maryland \nElectric Cooperative Inc. Contract with Advanced Power Systems, Inc. \nand PEPCO.  \n \n51-Puerto Rico Electric Power Authority, Office of the Governor of \nPuerto Rico. Independent evaluation for PREPA of avoided costs and the \nevaluation of competing QF's.  \n \n50-State Corporation Commission, Virginia. Case No. PUE890041. \nTestimony on the proper determination of avoided costs with respect to \nOld Dominion Electric Cooperative. \n \n1989 \n \n \n49-Oklahoma Corporation Commission.  Case Number  PUD-000586.  \nAnalyses related to system planning and calculation of avoided costs for \nPublic Service of Oklahoma. \n \n48-Virginia State Corporation Commission.  Case  Number PUE890007.  \nTestimony relating to the proper determination of avoided costs to the \ncertification evaluation of new generation facilities. \n \n47-Federal Energy Regulatory Commission.  Docket RP85-50. Analyses \nof the gas transportation rates, terms and conditions filed by Florida Gas \nTransmission. \n \n46-Circuit Court of the Fifth Judicial Circuit, Dade County, Florida.  Case \nNo. 88-48187.  Analyses related to compliance with electric and thermal \nenergy purchase agreements."},{"page":110,"startToken":32301,"endToken":32536,"text":"Roy J. Shanker \nPage 29 \n \n45-Florida Public Service Commission.  Docket 880004-EU. Analysis of \nstate wide expansion planning procedures and associated avoided unit. \n \n1988 \n \n44-Virginia State Corporation Commission.  Case No. PUE870081.  \nTestimony on the implementation of the differential revenue requirements \navoided costmethodology recommended by the SCC Task Force. \n \n43-Virginia State Corporation Commission.  Case No. PUE880014.  \nTestimony on the design and level of standby, maintenance and \nsupplemental power rates for qualifying facilities. \n \n42-Virginia State Corporation Commission.  Case No. PUE99038.  \nTestimony on the natural gas transportation rate design and service \nprovisions. \n \n41-Montana Public Service Commission.  Docket 87.8.38. Testimony on \nNatural Gas Transmission Rate Design and Service Provisions. \n \n40-Oklahoma Corporation Commission.  Cause Pud No. 00345. \nTestimony on estimation and level of avoided cost payments for \nqualifying facilities. \n \n39-Florida Public Service Commission.  Docket No.8700197-EI.  \nTestimony on the methodology for establishing non-firm load service \nlevels. \n \n38-Arizona Corporation Commission.  Docket No. U-1551-86-300.  \nAnalysis of cost-of-service studies and related terms and conditions for \nmaterial gas transportation rates. \n \n1987 \n \n37-Virginia State Corporation Commission.  Case No. PUE870028.  \nAnalysis of Virginia Power fuel factorapplication and relationship to \navoided costs. \n \n36-District of Columbia Public Service Commission.  Formal Case No. \n834 Phase II.  Analysis of the theory and empirical basis for establishing \ncost effectiveness of natural gas conservation programs. \n \n35-Virginia State Corporation Commission.  Case No. PUE860058.  \nTestimony on the relationship of small power producers and cogenerators \nto the need for power and new generation facilities."},{"page":111,"startToken":32536,"endToken":32769,"text":"Roy J. Shanker \nPage 30 \n \n34-Virginia State Corporation Commission.  Case No. PUE870025.  \nTestimony addressing the proper design of rates for standby, maintenance \nand supplement power sales to cogenerators. \n \n33-Florida Public Service Commission.  Docket No. 860004 EU.  \nTestimony in the 1986 annual planning hearing on proper system \nexpansion planning procedures. \n \n1986 \n \n32-Florida Public Service Commission.  Docket No. 860001 EI-E.  \nTestimony on the proper methodology for the estimation of avoided O&M \ncosts. \n \n31-Florida Public Service Commission.  Docket No. 860786-EI.  \nTestimony on the proper economic analysis for the evaluation of self-\nservice wheeling. \n \n30-U.S. Bankruptcy Court, District of Ohio.  Testimony on capabilities to \ndevelop and operate wood-fired qualifying facility. \n \n29-Public Utility Commission, New Hampshire Docket No. DR-86-41.  \nTestimony on pricing and contract terms for power purchase agreement \nbetween utility and QFs. (Settlement Negotiations) \n \n28-Florida Public Service Commission, Docket No. 850673-EU. \nTestimony on generic issues related to the design of standby rates for \nqualifying facilities. \n \n27-Virginia State Corporation Commission.  Case No. 860024. Generic \nhearing on natural gas transportation rate design and tariff terms and \nconditions. \n \n26-Virginia State Corporation Commission. Commonwealth Gas Pipeline \nCorporation.  Case No. 850052. Testimony on natural gas transportation \nrate design and tariff terms and conditions. \n \n25-Bonneville Power Administration.  Case No. VI86. Testimony on the \nproposed Variable Industrial Power Rate for Aluminum Smelters. \n \n24-Virginia Power.  Case No. PUE860011.  Testimony on the proper ex \npost facto valuation of avoided power costs for qualifying facilities."},{"page":112,"startToken":32769,"endToken":33015,"text":"Roy J. Shanker \nPage 31 \n23-Florida Public Service Commission.  Docket No. 850004 EU.  \nTestimony on proper analytic procedures for developing a statewide \ngeneration expansion plan and associated avoided unit. \n \n1985 \n \n22-Virginia Natural Gas.  Docket No. 85-0036.  Testimony and cost of \nservice procedures and rate design for natural gas transportation service. \n \n21-Arkansas Louisiana Gas.  Louisiana Docket No. U-16534. Testimony \non proper cost of service procedures and rate design for natural gas \nservice. \n \n20-Connecticut Light and Power.  Docket No. 85-08-08.  \nAssist in the development of testimony for industrial natural gas \ntransportation rates. \n \n19-Oklahoma Gas and Electric.  Cause 29727.  Testimony and system \noperations and the development of avoided cost measurements as the basis \nfor rates to qualifying facilities. \n \n18-Florida Public Service Commission.  Docket No. 840399EU.  \nTestimony on self-service wheeling and business arrangements for \nqualifying facilities. \n \n17-Virginia Electric and Power Company.  General Rate application No. \nPUE840071.  Testimony on proper rate design procedures and \ncomputations for development of supplemental, maintenance and standby \nservice for cogenerators. \n \n16-Virginia Electric and Power Company.  Fuel Factor \nProceeding No. PUE850001.  Testimony on the proper use of the \nPROMOD model and associated procedures in setting avoided cost energy \nrates for cogenerators. \n \n15-New York State Public Service Commission.  Case No. 28962.  \nDevelopment of the use of multi-area PROMOD models to estimate \navoided energy costs for six private utilities in New York State. \n  \n14-Vermont Rate Hearings on Payments to Small Power Producers.  Case \nNo. 4933.  Testimony on proper assumptions, procedures and analysis for \nthe development of avoided cost rates."},{"page":113,"startToken":33015,"endToken":33243,"text":"Roy J. Shanker \nPage 32 \n1984 \n \n13-Northern Virginia Electric Cooperative.  Case No. PUE840041.  \nTestimony on class cost-of-serviceprocedures, class rate of return and rate \ndesign. \n \n12-BPA 1985 Wholesale Rate Proceedings.  Analysis of Power 1985 Rate \nDirectives.  Testimony on theory and implementation of marginal cost rate \ndesign. \n \n11-Virginia Electric Power Company.  Application to Revise Rate \nSchedule 19 -- Power Purchases from Cogeneration and Small Power \nProduction Qualifying Facilities.  Case No. PUE830067.  Testimony on \nproper PROMOD  modeling procedures for power purchases and \nproperties of PROMOD model. \n \n10-Northern Virginia Electric Cooperative.  Case No. PUE840041.  \nTestimony on class cost-of-service procedures, class rate of return and rate \ndesign. \n \n9-BPA 1985 Wholesale Rate Proceedings.  Analysis of Power 1985 Rate \nDirectives.  Testimony on the theory and implementation of marginal cost \nrate design, financial performance of BPA; interactions between rate \ndesign, demand, system expansion and operation. \n \n1983 \n \n8-Northern Virginia Electric Cooperative.  Case No. PUE830040.  \nTestimony on class cost-of-service procedures, class rate of return and rate \ndesign. \n \n7-Vermont Rate Hearings to Small Power Producers.  No.4804.  \nTestimony on proper use and application of production costing analyses to \nthe estimation of avoided costs. \n \n6-BPA Wholesale Rate Proceedings.  Testimony on the theory and \nimplementation of marginal cost rate design; financial performance of \nBPA; interactions between rate design, demand, system expansion and \noperation. \n \n5-Idaho Power Company, PUC-U-1006-185.  Analysis of system \nplanning/production costing model play of hydro regulation and associated \nenergy costs."},{"page":114,"startToken":33243,"endToken":33359,"text":"Roy J. Shanker \nPage 33 \n1982 \n \n4-Generic Conservation Proceedings, New York State.  Case No. 18223.  \nTestimony on the economic criteria for the evaluation of conservation \nactivities; impacts on utility financial performance and rate design. \n \n3-PEPCO, Washington Gas Light.  DCPSC-743.  Financial evaluation of \nconservation activities; procedures for cost classification, allocation; rate \ndesign. \n \n2-PEPCO, Maryland PSC Case Nos. 7597-I, 7597-II, and 7652. \nTestimony on class rates of return, cost classification and allocation, \npower pool operations and sales. \n \n1981 \n \n1-Pacific Gas and Electric.  California PSC Case No. 60153.  Testimony \non rate design; class cost-of-service and rate of return. \n \nPrevious testimony before the District of Columbia \nPublic Service Commission, Maryland PSC, New York Public Service \nCommission, FERC; Economic Regulatory Administration"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":8,"endAt":649,"startToken":0,"endToken":2141},{"p":8,"at":649,"title":"I. Summary of Proposal","method":"printed heading","endPage":9,"endAt":165,"startToken":2141,"endToken":2428},{"p":9,"at":165,"title":"II. Background","method":"printed heading","endPage":11,"endAt":661,"startToken":2428,"endToken":3116},{"p":11,"at":661,"title":"III. PJM’s Tariff is Unjust and Unreasonable and Unduly Discriminatory","method":"printed heading","endPage":13,"endAt":6,"startToken":3116,"endToken":3615},{"p":13,"at":6,"title":"A. It Would be Unjust and Unreasonable and Unduly Discriminatory and","method":"printed heading","endPage":19,"endAt":1301,"startToken":3615,"endToken":5750},{"p":19,"at":1301,"title":"B. PJM’s Recent Tariff Administration Demonstrates that the Tariff Lacks","method":"printed heading","endPage":22,"endAt":6,"startToken":5750,"endToken":6442},{"p":22,"at":6,"title":"IV. FERC Must Direct a Replacement Rate to Remedy the Deficiencies in PJM’s Tariff","method":"printed heading","endPage":22,"endAt":955,"startToken":6442,"endToken":6582},{"p":22,"at":955,"title":"A. Only A Few Narrow Elements of the Tariff Require Further Clarity","method":"printed heading","endPage":31,"endAt":1418,"startToken":6582,"endToken":9498},{"p":31,"at":1418,"title":"B. Alternatively, Applying BTMG Netting Rules to Behind-the-Meter Load Would","method":"printed heading","endPage":33,"endAt":1397,"startToken":9498,"endToken":10064},{"p":33,"at":1397,"title":"V. In General, the Necessary Study Rules Remain Just and Reasonable","method":"printed heading","endPage":35,"endAt":976,"startToken":10064,"endToken":10592},{"p":35,"at":976,"title":"VI. PJM’s Answer Highlighted Additional Issues that the Commission Should Explore But","method":"printed heading","endPage":35,"endAt":1129,"startToken":10592,"endToken":10613},{"p":35,"at":1129,"title":"A. The Commission Should Encourage PJM to Engage with Stakeholders to Explore","method":"printed heading","endPage":36,"endAt":1804,"startToken":10613,"endToken":11095},{"p":36,"at":1804,"title":"B. There is a Regulatory Gap for Front-of-the-Meter Load Interconnection to the","method":"printed heading","endPage":39,"endAt":784,"startToken":11095,"endToken":11915},{"p":39,"at":784,"title":"VII. Conclusion","method":"printed heading","endPage":43,"endAt":0,"startToken":11915,"endToken":12908},{"p":43,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":44,"endAt":18,"startToken":12908,"endToken":12973},{"p":44,"at":18,"title":"Attachment A","method":"printed heading","endPage":45,"endAt":120,"startToken":12973,"endToken":13000},{"p":45,"at":120,"title":"I. Qualifications and Purpose of Affidavit","method":"printed heading","endPage":46,"endAt":1406,"startToken":13000,"endToken":13436},{"p":46,"at":1406,"title":"II. Summary of Conclusions and Recommendations","method":"printed heading","endPage":50,"endAt":2,"startToken":13436,"endToken":14499},{"p":50,"at":2,"title":"III. Co-Location is Not New","method":"printed heading","endPage":51,"endAt":1009,"startToken":14499,"endToken":15048},{"p":51,"at":1009,"title":"IV. Rate Design, Use, Cost Causality, Billing Determinants","method":"printed heading","endPage":54,"endAt":910,"startToken":15048,"endToken":16078},{"p":54,"at":910,"title":"V. The Current Tariff Does Not Prohibit Behind-the-Meter Co-Location","method":"printed heading","endPage":57,"endAt":796,"startToken":16078,"endToken":17067},{"p":57,"at":796,"title":"VI. PJM's Answer Distorts Existing Option 3 (BTMG)","method":"printed heading","endPage":62,"endAt":1271,"startToken":17067,"endToken":18490},{"p":62,"at":1271,"title":"VII. PJM’s Answer Offers No Coherent Way to Identify or Evaluate the Various Co-","method":"printed heading","endPage":82,"endAt":69,"startToken":18490,"endToken":24745},{"p":82,"at":69,"title":"Attachment B","method":"printed heading","endPage":114,"endAt":887,"startToken":24745,"endToken":33359}]}