{"document":{"slug":"rec-20250423-5260","title":"Comments of the Independent Market Monitor for PJM","issued":"2025-04-23","accession":"20250423-5260","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Monitoring Analytics, LLC","kind":"comments","file":"sources/filings/text/20250423-5260_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5260","tier":"record","sha256":"732b8e6e6bc5f430dec18fc3cd8fc780730f7951a7e09c35f369e5ee8dd9a0fd","pages":15,"tokens":4754,"emptyPages":[],"textThemes":["colo","adequacy","study"]},"pages":[{"page":1,"startToken":0,"endToken":248,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n) \n) \n) \n \nDocket No. EL25-49-000 \nCOMMENTS OF THE INDEPENDENT MARKET MONITOR FOR PJM \nPursuant to Rule 211 of the Commission’s Rules and Regulations,1 Monitoring \nAnalytics, LLC, acting in its capacity as the Independent Market Monitor (“Market Monitor”) \nfor PJM Interconnection, L.L.C. (“PJM”),2 submits these comments responding to the \nresponses submitted on March 24, 2025, by PJM and others in compliance with the show \ncause order issued February 20, 2025 (“Show Cause Order”).3 \nThe Show Cause Order found (at P 2) that: “As discussed below, based on the \ncombined records of the technical conference and the Constellation complaint proceeding, \nwe find that PJM’s Tariff appears to be unjust, unreasonable, unduly discriminatory or \npreferential.” That finding was based on the lack of clear rules addressing the ways in which \nlarge loads can and cannot be added to the PJM system.   \nIn the Show Cause Order, the Commission adopted (at P 3) PJM’s definition of co-\nlocated load: “PJM defined co-located load as a configuration through which end-use \ncustomer load is physically connected to the facilities of an existing or planned generation \n                                                          \n1 \n18 CFR § 385.211 (2024). \n2 \nCapitalized terms used herein and not otherwise defined have the meaning used in the PJM Open \nAccess Transmission Tariff (“OATT”), the PJM Operating Agreement (“OA”) or the PJM Reliability \nAssurance Agreement (“RAA”). \n3  \nPJM Interconnection, L.L.C., 190 FERC ¶ 61,115."},{"page":2,"startToken":248,"endToken":575,"text":"- 2 - \nunit on the interconnection customer’s side of the point of interconnection to the PJM \ntransmission system.” \nThe Commission stated (at P 65):  \nAs the foregoing discussion indicates, the surge of interest in co-\nlocation arrangements in PJM has put before the Commission \nseveral significant and novel issues.  To address those issues on a \ncomprehensive basis, we are instituting a show cause proceeding \nunder section 206 of the FPA, and we consolidate it with Docket \nNos.   AD24-11-000 (the co-location technical conference) and EL25-\n20-000 (the Constellation Complaint) because they raise common \nissues of law and fact, and considering the proceedings together \nwill result in greater administrative efficiency. \nI. COMMENTS \nThe Market Monitor appreciates the opportunity to comment on the questions raised by the \nCommission about how to most effectively, efficiently and competitively address the \nquestions related to the addition of large loads to the PJM markets. The Market Monitor \nagrees that clear rules governing all aspects of the addition of large loads are required. The \nMarket Monitor agrees that the current rules are not clear. The issues are more general than \naddressing what has been termed the co-located load model. The Market Monitor uses the \nterm co-located in the narrow sense defined by PJM and adopted by the Commission of a \nload that is connected to the grid through a generating unit. Large load additions have \nalready had a significant impact and will have additional significant impacts on the grid and \non other customers regardless of the details of interconnection. The PJM Capacity Market is \nextremely short largely as a result of the prior addition of large loads and the expected \naddition of more large loads, almost all of which, to date, are connected to the grid as \ntransmission customers. The details of how to add large loads addressed by the Show Cause \nOrderr matter because it is those details that determine whether the process for the addition \nof large loads will be effective, efficient and competitive."},{"page":3,"startToken":575,"endToken":957,"text":"- 3 - \nThe questions about co-located load need to be put in context in order to understand \nthe proposed role for the co-location model but more importantly to understand the \nalternatives to the co-located model. \nThe basic facts in PJM at present are that the capacity market is very tight, meaning \nthat supply is approximately equal to forecast demand plus a reserve margin. Even if the \nissues, other than the fundamental ELCC issues, identified by the Market Monitor were \nresolved, the market would still be tight and prices correspondingly high.4 The addition of \nlarge loads over recent years and the expected addition of large loads in the forecast are the \nprimary reasons that the market is tight. Although large loads are discussed, the extreme \nimpacts that the addition of those loads has already had on capacity market clearing prices \ndoes not seem to be generally appreciated in discussions of the capacity market. \nPJM has proposed an extremely high maximum price in the capacity market and \nproposes even higher maximum prices.5 These prices are relevant when the market is clearing \nat the maximum price. The market is likely to clear at the maximum price as a direct result of \nthe prior and planned addition of large loads in PJM. The discussions in the PJM stakeholder \nprocess have largely ignored this impact. \nThere are two broad policy options for addressing current market conditions in PJM. \nThe first path would rely on PJM to more comprehensively and transparently plan for the \naddition of large loads by ensuring that large loads are not added unless there is new \ngeneration to match them. This has been the primary path in PJM to date, although the \n                                                          \n4  \nSee Market Monitor reports analyzing the 2025/2026 RPM Base Residual Auction: “Analysis of the \n2025/2026 RPM Base Residual Auction–Parts A–F (September 20, 2024, etc.), which can be accessed \nat \n<https://www.monitoringanalytics.com/reports/Reports/2024.shtml> \nand \n<https://www.monitoringanalytics.com/reports/Reports/2025.shtml>.  \n5  \nSee Brattle Group, PJM Markets Implementation Committee (MIC), Sixth Review of PJM’s RPM VRR \nCurve Parameters: Final Recommendations (April 11, 2025), which can be accessed at: <item-01-1-\ncone-and-vrr-curve-final-recommendations.pdf>. PJM indicated its support for some of the Brattle Report \nrecommendations at the next special MIC meeting, April 16, 2025."},{"page":4,"startToken":957,"endToken":1317,"text":"- 4 - \nplanning process is not adequate. The second path, co-location, would rely on private \nbilateral transactions to remove capacity from the PJM markets and dedicate it to specific \nlarge loads. This approach would ignore the impacts on the PJM Capacity Market and on the \ncost of transmission. This approach would bypass PJM planning processes. \nThere is currently only very limited co-located load in PJM. The recently added and \ncurrently forecasted large load additions are almost entirely directly interconnected and not \nco-located. The loads are located on the grid and take transmission service and buy energy \nand capacity like other customers. However, the amount of potential co-located load in PJM \nis very large. There are currently multiple applications to PJM for co-located load NSAs. \nApplications for co-located load would be expected to increase substantially if the \nCommission were to allow co-located load. \nThe problem that has increasingly faced potential new large loads is that there are \ndelays in getting added to the grid as a direct result of constraints on the transmission system \nand the lack of capacity to serve those loads. \nThe solution to these grid reliability issues proposed by some large loads is to co-\nlocate. Co-location means identifying an existing generating resource as the source of energy, \ndedicating the output of the generating resource to the co-located load and removing that \ngenerating resource from the capacity market and the energy market. The co-located load \nwould enter into a bilateral contract with the generating resource, but pay no transmission, \ndistribution or ancillary services charges. The generating resource would give up its CIRs, \nalthough some generation owners propose ways in which they keep their CIRs and \neffectively sell the capacity twice, consistent with initial proposal in the PJM stakeholder \nprocess by Constellation and Brookfield. \nThe attractions of the co-located model to the large loads and to the generators are \nclear. The large loads avoid all the difficulties with interconnecting to the grid and avoid \npaying transmission, distribution and ancillary services charges. The large loads can be \nadded quickly. The generators lock in a long term stable source of revenue that does not \ndepend on the PJM energy or capacity markets."},{"page":5,"startToken":1317,"endToken":1680,"text":"- 5 - \nThe problem for everyone else taking wholesale power service from PJM is that the \nco-location approach not only fails to address the underlying grid issues, it makes them \nworse. The co-located approach would pretend that the large loads exist in a separate \nprivately defined vacuum unrelated to the real issues on the grid. The co-located approach \nwould actually accelerate the PJM reliability issues. The co-located approach would allow the \ngenerator and the load to bypass the PJM planning processes. Rather than having to wait for \nadequate generation to serve additional large loads or bringing their own generation, the co-\nlocated approach would immediately remove large amounts of capacity from the PJM \nmarkets. The result would be scarcity conditions in the PJM Capacity Market and calls for \ndramatic price increases for other customers. That could drive additional, existing large \ncustomers to seek co-located arrangements with a resultant acceleration of market \ndysfunction. The co-located approach is not a solution to the transmission and capacity issues \nfacing PJM. The co-location approach is the opposite of a solution; the co-location makes the \nexisting issues worse. The goal of the Commission and PJM and all market participants \nshould be to address those issues directly, for the benefit of grid reliability and all grid \ncustomers. \nThe immediate problem facing the PJM system is how to add large loads in a rational \nway while serving all loads reliably and at least cost. The discussion to date has largely \nignored the fact that the addition and expected addition of large loads has already had a very \nlarge impact on PJM markets and on the costs of transmission and capacity to other PJM \ncustomers. The broader question is whether it is reasonable to impose billions of dollars of \nadditional costs on other customers in order to serve large loads. PJM’s Option 6 would help \naddress this issue for new large load additions by requiring new large loads to bring their \nown generation. The co-located approach would substantially worsen these impacts.  \nAs has been pointed out by those on both sides of the co-location debate, the addition \nof large loads will have a significant impact on PJM markets and customers whether co-"},{"page":6,"startToken":1680,"endToken":2046,"text":"- 6 - \nlocated or not. 6 The impact is less transparent with the co-located approach because the co-\nlocated load is not included in PJM load, the generation is not included in the capacity and \nenergy markets, and the transmission costs avoided by the co-located loads are never \ncalculated. The impact is transparent if large loads are simply treated as customers and pay \nfor energy, capacity and transmission as has been the case for almost all large load additions \nin PJM to date. \nThere are basic, straightforward principles that the process for the addition of large \nloads should follow. The Market Monitor’s recommendations about how to address the \nissues that result from the addition of large loads are based on these principles. \nAll loads should be served. All loads should be served reliably. The process for adding \nlarge loads should be transparent. All loads should benefit from competitive markets. All \nloads should have equal access to the transmission system. All loads should be treated as full \ntransmission customers. All loads and generation are on the grid and the grid is highly \ninterconnected. \nOn the demand side, the tight capacity market conditions highlight the significance \nfor future capacity market auctions of the ongoing efforts to pursue the co-location model \nand thus remove that capacity from the capacity market. Removal of even a relatively small \namount of capacity from the market would have a significant impact on reliability and \ncapacity market prices. This highlights the point that there should be no artificial incentives \nor changes to fundamental capacity market rules in order to allow large loads to be given \npreferential treatment and to bypass the PJM planning process and regulatory policy. Yet \nthat is exactly what the proponents of the co-located load approach are proposing. The gains \n                                                          \n6  \nSee the Market Monitors “Comments to the Maryland PSC Senate Bill 1 Co-location Study \nAdministrative \nDocket \nPC \n61,” \n<https://www.monitoringanalytics.com/filings/2024/\nIMM_Comments_MDPSC_PC61_20240924.pdf> (September 24, 2024); and the “Supplemental \nComments to the Maryland PSC Senate Bill 1 Co-location Study Administrative Docket PC 61,” \n<https://www.monitoringanalytics.com/filings/2024/IMM_Supplemental_Comments_re_MDPSC_PC61_C\no_Located_Load_20241213.pdf>  (December 13, 2024)."},{"page":7,"startToken":2046,"endToken":2404,"text":"- 7 - \nfor the generators from the proposed co-location model would come at the expense of other \ncustomers in the PJM markets. The core feature of the co-located load approach is increasing \nthe level and certainty of revenues to specific generating units, avoiding the transmission and \ndistribution costs associated with both state and federal regulation and avoiding the PJM \nplanning process. Contrary to the co-location proponents, the impacts of the proposed co-\nlocated load arrangements on reliability do matter and must be considered when defining \nthe appropriate rules for large load additions. \nNew load must be served in wholesale power markets. New data center load must be \nserved in PJM and elsewhere. Any national security issues are about serving data center load \nand not about the co-located model. Serving existing industrial, commercial and residential \nload is also a national security issue. The only question is how to serve the potentially very \nlarge increases in load in a way that does not threaten reliability or the ability of PJM markets \nto reliably serve all load at the lowest possible cost. The co-located load model is clearly not \nthe answer. The co-located model would solve the issue for individual large loads while \nexacerbating the issue and shifting the associated costs to other market participants. The \nprimary proponents of the co-located load model are owners of existing generation although \nsome data center operators also support co-location. PJM’s preference is to have new load \nexplicitly connected to the grid as transmission customers.7 \nThe addition of large amounts of load is not a private decision that should be \naddressed via private negotiations about the terms of ISAs or studied only narrowly via \nNSAs. The large impacts on PJM capacity and energy prices that would result from \nimplementation of the co-located load model are evidence of that fact as are the potential \nimpacts on reliability. PJM must have the authority to plan for meeting large load additions \nin the same way that PJM plans for generation additions. The impact of the addition of large \ndata centers would be minimized if the data centers brought new generation matching the \n                                                          \n7  \nSee PJM at 38–39."},{"page":8,"startToken":2404,"endToken":2790,"text":"- 8 - \nparameters of their demand to the market in addition to new load. Some data center owners \nhave proposed exactly that. If there is a policy decision that large data centers must be \nbrought online more quickly, that timing issue can be handled through the PJM planning \nprocess in a transparent manner without threatening reliability and without requiring \nsubsidies from other customers. The timeline for bringing load online does not depend on \navoiding regulatory and planning requirements via the co-located model. The timing issue \nwould also be addressed via a requirement that large load additions bring their own \ngeneration. \nAdding large amounts of data center load would have impacts on PJM markets \nregardless of whether the load is co-located or explicitly interconnected to the grid. If the load \nis interconnected to the grid it will go through the PJM planning process to ensure that the \nload can be met reliably through a combination of generation and transmission and that the \nload will pay an appropriate share of system costs, including a full share of transmission costs \nas a network customer and the costs of adding matching generation. The correct market \nsignals would be created for the location of data centers if that process were followed.  \nPower grids were built to permit all participants to take advantage of the diverse \ncharacteristics of loads and of generation. When a generator is on an outage, other generators \nare available on the grid to replace the output. The co-located model would directly remove \nsignificant capacity from the market but the co-located load would continue to rely on the \ngrid for backup. The co-located proposals illustrate the basic fact that the co-located load \ncannot and will not be isolated from the grid. The co-located load model would rely on the \ngrid for backup while asserting that it is isolated from the grid. \nPJM’s planning on the load side should include complete transparency from \nbeginning to end about the addition of new load in utility (Electric Distribution Company or \nEDC) service territories, unrestricted by secret agreements and associated NDAs and ensure \nthat there is enough generation to meet the new and existing load, including through a \nrequirement to bring new generation to the market. PJM’s planning process should be \nmodified to integrate transmission planning with markets planning in order to eliminate the"},{"page":9,"startToken":2790,"endToken":3139,"text":"- 9 - \nsignificant gaps in the current process. NSAs are not adequate planning tools and miss most \nof the fundamental issues associated with large load additions and with co-location \nproposals. \nOn the supply side, competition starts with open access to the transmission grid. The \nfundamental purpose of the queue process is to provide open access to the grid and to ensure \nthat the energy from capacity resources is deliverable so that capacity resources can meet \ntheir must offer obligations in the energy market and provide reliable energy supply during \nall conditions. The ideal solution to the issues created by the addition of large loads is for the \nloads to bring their own generation. That can take a variety of forms but would entail the \nlarge loads taking responsibility for adding new generation to the grid that has characteristics \nreasonably matched to their load profile. \nOn the basis of this overall approach to the issues associated with the addition of large \nloads, the Market Monitor will address each of PJM’s eight options rather than address each \nof the specific questions addressed to PJM by the Commission. PJM appears to have covered \nthe full range of options that have been discussed to date. While that serves a useful \ninformational function, PJM’s options cover a wide range of arrangements, many of which \nare not effective, efficient and competitive. The Market Monitor attempts to apply a consistent \noverall approach to each of the eight options and to reach a conclusion about each one based \non that approach. \nThe temptation is to focus on fine points of regulatory design rather than the broader \nissues and context. The broader issue is how to add large loads to the competitive markets in \nan effective, efficient and competitive manner. The fine points of regulatory design follow \nnaturally from that choice. \nA. Option 1: Load with a separate Point of Interconnection that is Network Load \nThe Market Monitor supports this option as part of Option 6 for the reasons detailed \nin this filing. This option treats large loads like other loads. The issue with Option 1 is that it"},{"page":10,"startToken":3139,"endToken":3495,"text":"- 10 - \ndoes not address the need for large load additions to bring their own generation. See Option \n6. \nB. Option 2: Co-located load that is at the same Point of Interconnection but \nseparately metered that is Network Load \nThe Market Monitor supports this option as part of Option 6 for the reasons detailed \nin this filing. This option treats large loads like other loads. The issue with Option 2 is that it \ndoes not address the need for large load additions to bring their own generation. See Option \n6. \nC. Option 3: Existing Behind the Meter Generation where the load is the customer \nThe Market Monitor opposes the use of this option for large loads. The existing behind \nthe meter option is limited under PJM rules and those limitations should remain. \nD. Option 4: Co-located load with connection to the grid with protections to avoid \ndelivery of system energy to serve the load \nThe Market Monitor opposes this option for the reasons detailed in this filing. This \noption is based on the pretense that the load is not on the grid. This option permits the load \nto avoid paying a share of transmission costs. This option permits the accelerated removal of \ncapacity from the grid without consideration of the impact on the markets and other \ncustomers. This option ignores the other side of the issue which is that the energy delivered \nto the grid from the associated generation will fluctuate as the load fluctuates. No load is \nactually perfectly flat. \nE. Option 5: Co-located load with connection to the grid with protections to avoid \ndelivery of system energy to load, but with back-up service from PJM with \npermission \nThe Market Monitor opposes this option for the reasons detailed in this filing. This \noption is based on the pretense that the load is not on the grid. This option permits the load \nto avoid paying a share of transmission costs. This option permits the accelerated removal of \ncapacity from the grid without consideration of the impact on the markets and other \ncustomers. This option ignores the other side of the issue which is that the energy delivered"},{"page":11,"startToken":3495,"endToken":3863,"text":"- 11 - \nto the grid from the associated generation will fluctuate as the load fluctuates. No load is \nactually perfectly flat. In addition, this option would permit the load to avoid all the costs of \nthe grid while still leaning on the grid as needed. PJM permission is not well defined and \nshould not be the basis for allowing loads to lean on the grid. \nF. Option 6: Co-located load that elects to be Network Load and bring its own \ngeneration \nThe Market Monitor supports this option with the proviso that the load is connected \nto the grid directly rather than in the narrow sense of co-location as defined, for the reasons \ndetailed in this filing. The Market Monitor supports an expedited interconnection process for \nload and matching new generation that is consistent with the PJM queue processes. The \nMarket Monitor’s support assumes that this option means that new generation resources are \nbrought to the market as capacity resources. As the Market Monitor understands the options, \nOption 6 combines Option 1 and Option 2 with the requirement to bring new generation \ncapacity resources to the market. With that understanding the Market Monitor supports \nOption 6 as the preferred option. \nG. Option 7: Potential new non-capacity backed service as a Transitional Service \nThe Market Monitor opposes this option for the reasons detailed in this filing. The \nnotion of non-capacity backed service misunderstands the definition and role of capacity in \nwholesale power markets. Capacity resources serve load all 8,760 hours of the year. Capacity \nresources do not serve load for only a small number of hours per year as this approach \nassumes. The point is especially clear for data centers who have made clear their need for \n8,760 power. That fact does not change if a data center installs backup diesels that can serve \nas backup when the grid is not available. If this arrangement were equivalent to not relying \non capacity, it would be identical to the assertion that the backup diesels could serve as high \ncapacity factor capacity resources in the PJM Capacity Market. The simple substitution of \nbackup power for a small number of hours does not change anything significant about the \naddition of this load."},{"page":12,"startToken":3863,"endToken":4242,"text":"- 12 - \nIt is illusory to imagine in this or other scenarios that a promise that an arrangement \nis transitory changes anything fundamental about the arrangement. If it is a bad idea, it is \nstill a bad idea for five years or for 20 years. \nThe recent filing of a Necessary Study Agreement (NSA) by PJM and Doswell \nGeneration illustrates many of the issues with this approach.8 Most significantly, the NSA \nproposes that the generating unit retain its CIRs during the transition, which is of uncertain \nduration. The NSA invents a new concept of “temporarily” surrendered CIRs. The treatment \nof CIRs has been a central issue in the co-located load discussions. Yet the NSA would entirely \nreverse the tariff and the precedents. The entire point of returning the CIRs to the PJM market \nis to make them available for new generation to interconnect. By definition that cannot \nhappen on temporary basis. Another key element of returning the CIRs is to make clear that \nthere are long term consequences for removing capacity from the PJM market. Instead, the \nNSA proposes to create a new form of market power by permitting LS Power to give up the \nCIRs only temporarily and effectively hoard the CIRs for later use. This would prevent new \ngeneration in the interconnection queue from using the CIRs to add new capacity. \nH. Option 8: Co-located load participating in Demand Response \nThe Market Monitor opposes this option for the reasons detailed in this filing and for \nthe reasons in the response to Option 7. There is no necessary relationship between the co-\nlocation approach and participation as demand response. The large load could participate in \nthe markets like any other customer and participate in existing demand response programs \nlike any other customer. This option appears to assume that the agreement to participate as \ndemand response would change the impact on the markets and the grid. Removing a capacity \nresource from the markets still reduces the capacity available to serve other loads. This option \nhas all the flaws of the co-location approach with the added feature that while removing \n                                                          \n8  \nSee PJM Filing, Docket No. ER25-1623-000 (March 14, 2025); Answer and Motion for Leave to Answer \nof the Independent Market Monitor for PJM, Docket No. ER25-1623-000 (April 21, 2025)."},{"page":13,"startToken":4242,"endToken":4588,"text":"- 13 - \ncapacity from the markets, the generation resource would also sell its capacity in the capacity \nmarket as a demand resource. This ignores the fact that the PJM demand response model \nrelies on the incorrect assumption that promising to reduce load to a predefined level means \nthat you are supplying capacity rather than using capacity. \nI. Jurisdictional Issues \nThe Show Cause Order provides guidance on jurisdictional issues related to co-\nlocation and requests comment (at P 73). The Market Monitor largely agrees with PJM’s \ndiscussion of transmission jurisdiction issues (at 29–30).  Because the primary concern here is \nthe proper assignment of the costs of the transmission system that is just, reasonable and not \nunduly discriminatory, the question of whether the sale of power is at wholesale or retail \nshould be set aside. That the data center is interconnected to the transmission grid and \nreceives jurisdictional service from jurisdictional transmission facilities is sufficient for the \nCommission to treat co-located loads like any other loads on the transmission system. \nJ. Process Issues \nSome parties have proposed that the issues raised by the Commission be addressed \nthrough a settlement process. The Market Monitor does not agree that such a process is likely \nto lead to an effective, efficient and competitive solution. \nAttempting to resolve this matter through settlement proceedings would be a \nsignificant mistake. Issues concerning the treatment of co-located load have major and far \nreaching policy implications. These issues must be resolved objectively, transparently and in \nthe public interest. Relying on negotiations among private parties based on their narrow self \ninterests is not likely to lead to a comprehensive and satisfactory policy on the addition of \nlarge new loads. The relative size, level of resources and influence of market participants \nshould play no role in the ultimate policy decisions on this matter. The Market Monitor \nopposes subjecting these issues to any kind of settlement process. The Market Monitor \nsupports the full consideration of the positions of all parties. These are issues that require a \nreview process and decision by the Commission. The Market Monitor recommends that the"},{"page":14,"startToken":4588,"endToken":4689,"text":"- 14 - \nCommission decide the questions based on submissions by the parties and a hearing at the \nCommission’s discretion. \nII. CONCLUSION \nThe Market Monitor respectfully requests that the Commission afford due \nconsideration to these comments as it resolves the issues raised in this proceeding. \n \nJoseph E. Bowring \nIndependent Market Monitor for PJM \nPresident \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8051 \njoseph.bowring@monitoringanalytics.com \n \nRespectfully submitted, \n \nJeffrey W. Mayes \n \nGeneral Counsel \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8053 \njeffrey.mayes@monitoringanalytics.com \n \nDated: April 23, 2025"},{"page":15,"startToken":4689,"endToken":4754,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list compiled by the Secretary in this proceeding. \nDated at Eagleville, Pennsylvania, \nthis 23rd day of April, 2025. \nJeffrey W. Mayes \nGeneral Counsel \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nEagleville, Pennsylvania 19403 \n(610) 271‐8053 \njeffrey.mayes@monitoringanalytics.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":729,"startToken":0,"endToken":355},{"p":2,"at":729,"title":"I. COMMENTS","method":"printed heading","endPage":9,"endAt":1863,"startToken":355,"endToken":3091},{"p":9,"at":1863,"title":"A. Option 1: Load with a separate Point of Interconnection that is Network Load","method":"printed heading","endPage":10,"endAt":106,"startToken":3091,"endToken":3157},{"p":10,"at":106,"title":"B. Option 2: Co-located load that is at the same Point of Interconnection but","method":"printed heading","endPage":10,"endAt":511,"startToken":3157,"endToken":3228},{"p":10,"at":511,"title":"C. Option 3: Existing Behind the Meter Generation where the load is the customer","method":"printed heading","endPage":10,"endAt":763,"startToken":3228,"endToken":3270},{"p":10,"at":763,"title":"D. Option 4: Co-located load with connection to the grid with protections to avoid","method":"printed heading","endPage":10,"endAt":1469,"startToken":3270,"endToken":3389},{"p":10,"at":1469,"title":"E. Option 5: Co-located load with connection to the grid with protections to avoid","method":"printed heading","endPage":11,"endAt":358,"startToken":3389,"endToken":3559},{"p":11,"at":358,"title":"F. Option 6: Co-located load that elects to be Network Load and bring its own","method":"printed heading","endPage":11,"endAt":1205,"startToken":3559,"endToken":3693},{"p":11,"at":1205,"title":"G. Option 7: Potential new non-capacity backed service as a Transitional Service","method":"printed heading","endPage":12,"endAt":1322,"startToken":3693,"endToken":4086},{"p":12,"at":1322,"title":"H. Option 8: Co-located load participating in Demand Response","method":"printed heading","endPage":13,"endAt":347,"startToken":4086,"endToken":4297},{"p":13,"at":347,"title":"I. Jurisdictional Issues","method":"printed heading","endPage":14,"endAt":124,"startToken":4297,"endToken":4606},{"p":14,"at":124,"title":"II. CONCLUSION","method":"printed heading","endPage":15,"endAt":0,"startToken":4606,"endToken":4689},{"p":15,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":15,"endAt":445,"startToken":4689,"endToken":4754}]}