{"document":{"slug":"rec-20250423-5262-2","title":"Exhibit 1 (Stockton)","issued":"2025-04-23","accession":"20250423-5262","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"attachment","file":"sources/filings/text/20250423-5262_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5262","tier":"record","parent":"rec-20250423-5262","sha256":"0d1661b3206fb56a0791727acb613f9d879425c28bdadf828ec70d5caa988ae9","pages":19,"tokens":6526,"emptyPages":[17],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":7,"text":"EXHIBIT 1\nDECLARATION OF DR. PAUL STOCKTON"},{"page":2,"startToken":7,"endToken":93,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n \n \nLarge Loads Co-Located at Generating Facilities \n \n \nConstellation Energy Generation, LLC. \n \nv. \n \nPJM Interconnection, L.L.C. \n) \n \n \n) \n \n \n) \n) \n) \n) \n) \nDocket No. EL25-49-000 \n \n \nDocket No. AD24-11-000 \n \n \nDocket No. EL25-20-000 \n      (Consolidated) \n \n \n \n \n \n \nTHE NATIONAL SECURITY IMPERATIVE FOR ARTIFICIAL  \nINTELLIGENCE: Why the United States Cannot Afford a One-\nSize Fits All Solution for Powering Data Centers \n \nDeclaration of Dr. Paul Stockton, former Assistant Secretary of Defense for Homeland Defense \nand Americas’ Security Affairs \n \n April 23, 2025"},{"page":3,"startToken":93,"endToken":628,"text":"1 \n \nWhile broad agreement exists that artificial intelligence (AI) is crucial for US security, that \nconsensus papers over key issues for determining how to connect and power the data centers that \nprovide such AI services.1 In the Federal Energy Regulatory Commission’s (FERC) Order \nInstituting Proceeding Under Section 206 of the Federal Power Act and Consolidating with Other \nProceedings (February 20, 2025),2 FERC calls for assessments of “any national security \nimplications associated with co-location arrangements,” including options for behind-the-meter \nnuclear power plants that serve data centers.3 This Declaration examines the specific ways in which \nAI data centers are becoming crucial for US defense in peacetime and war, the implications for \nco-located power, and broader security requirements for FERC to consider in its proceedings.  \n \nIn the first round of filings, most of the PJM Interconnection, L.L.C. (PJM) Transmission Owners \nargued that all load needs to be interconnected to the utility-owned transmission grid, despite the \nfact that in some areas in PJM there are lengthy delays and even moratoriums on new large load \nutility interconnections. PJM, for its part, acknowledged its preference for a connection to the \ntransmission grid that it operates, but also identified a number of additional options that could be \nexplored for connecting large loads such as those used to power AI services for the Department of \nDefense (DOD). It appears that a number of these options may offer advantages in terms of the \nspeed with which such plants can meet surging data center needs, and the resilience of the power \nsupply certain configurations may provide over traditional interconnections.  \n \nThis Declaration finds that given the extensive and accelerating dependence of US security on AI \ndata centers, FERC must ensure that rules enable the quickest and most resilient options to connect \nand serve those data center loads, including rules that enable co-location arrangements, or other \noptions to ensure a prompt connection to the transmission system, if that is what the load desires. \nThe entities that own or operate the AI facilities should be given the choice to determine which \nconfiguration for interconnecting them is best for their needs, in close consultation with DOD and \nthe other national security agencies that depend on their AI services. Neither FERC, PJM nor \nindividual transmission owners should make that choice for them.     \n \n \n1 This Declaration employs the definition of AI provided by Exec. Order 14179 on AI and as set forth in 15 U.S.C. § \n9401(3): AI is “a machine-based system that can, for a given set of human-defined objectives, make predictions, \nrecommendations or decisions influencing real or virtual environments. Artificial intelligence systems use machine- \nand human-based inputs to (A) perceive real and virtual environments; (B) abstract such perceptions into models \nthrough analysis in an automated manner; and (D) use model inference to formulate options for information or \naction.” The term machine learning means “a set of techniques that can be used to train AI algorithms to improve \nperformance at a task based on data.” 15 U.S.C. § 9401(3). In this Declaration, machine learning is treated as a \nsubcomponent of AI. \n2 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115 (2025) (February 2025 Order). \n3 Id. P 88(f)(vi)."},{"page":4,"startToken":628,"endToken":1054,"text":"2\nI. \nARGUMENT SUMMARY \n \nDOD relies on AI to help execute an immense, and rapidly growing, range of military missions. \nAI services provided by private sector data centers are crucial for meeting DOD’s requirements. \nEnsuring that the energy sector can keep pace with that growth, and connect new data centers \nquickly and provide the power that data centers need to support America’s defense, is especially \nimportant as China competes for primacy in AI. Co-locating existing power plants with data \ncenters can often provide such connections and power years faster than interconnecting data \ncenters for grid-provided service. That speed advantage should constitute a key factor in assessing \nthe national security implications of co-location.  \n \nThe resilience of power for data centers against enemy attack offers an additional security \nconsideration, and one that has thus far been overlooked in proceedings on co-location. DOD uses \nAI every day to train autonomous drones and conduct other peacetime activities. But if a conflict \nbreaks out in the Taiwan Strait or other region, DOD will rely on AI to support essential combat-\nrelated functions, including wartime intelligence analysis and the command, control, and \ncoordination of US forces. \n \nThe distinction between data center defense support in peacetime versus war has profound \nimplications for meeting their power requirements. In peacetime, any quick and reliable way to \nmeet growing data center loads will do. In conflict, the US Intelligence Community assesses that \nChina could conduct cyberattacks and potentially physical attacks against the US energy sector \nand other critical infrastructure systems.4 Given DOD’s dependence on AI data centers for combat \nsupport, those centers must have power supplies that are resilient against attacks by China or other \npotential adversaries.   \n \nFERC, the North American Electric Reliability Corporation (NERC), and their industry partners \nhave greatly strengthened the cyber and physical security of the Bulk Power System (BPS). Those \nefforts improve the resilience of grid-provided power for data centers. They also bolster the \nresilience of service from co-located nuclear plants, by mitigating threats to the transmission lines \nthose plants need for safe operations. Especially valuable: BPS critical infrastructure protection \n(CIP) standards make it far more difficult for China to create interconnection-wide blackouts than \nwould otherwise be the case.  \n \n \n4 Office of the Director of Nat’l Intelligence (ODNI), Annual Threat Assessment of the U.S. Intelligence Community,  \nMar. 2025, p. 11, https://www.dni.gov/index.php/newsroom/reports-publications/reports-publications-2025/4058-\n2025-annual-threat-assessment; ODNI, Annual Assessment of the U.S. Intelligence Community, Feb. 6, 2023, p. 10, \nhttps://www.dni.gov/files/ODNI/documents/assessments/ATA-2023-Unclassified-Report.pdf (ODNI 2023 Annual \nThreat Assessment)."},{"page":5,"startToken":1054,"endToken":1521,"text":"3\nHowever, co-located power can offer significant resilience advantages against lesser (but still \nhighly disruptive) events. Winter Storms Uri and Elliott help illuminate these potential benefits. \nIn both storms, severe cold disrupted supplies of natural gas for power generation, requiring \nmassive load shedding even though transmission systems were largely unaffected.5 Chinese \nattacks on natural gas pipelines – which do not have the robust physical and cyber security \nprotection standards on par with those applied to the BPS – could create similar disruptions of gas-\nfired generation. The US Intelligence Community warns that China is specifically targeting gas \npipelines for cyberattacks.6 If such attacks require Uri or Elliott-scale load shedding, AI data \ncenters co-located with nuclear plants would have alternative mechanisms available for receiving \npower precisely when DOD and the Nation need them the most.  \n \nII. \nAI AND THE TRANSFORMATION OF NATIONAL DEFENSE \n \nSecretary of Defense Pete Hegseth emphasizes that AI capabilities are disruptive and vital to \nDOD’s success in the future, and is prioritizing its use for monitoring cyberspace, countering \ntransnational criminal organizations, testing and evaluating weapons, and other critical missions \nand support functions.7 Under the Department’s Data, Analytics, and Artificial Intelligence \nAdoption Strategy, the range of such AI applications is rapidly expanding. The strategy calls for \nan extensive range of AI applications to “enhance the warfighting capabilities of the Joint Force,” \nacross the continuum “from the boardroom to the battlefield.”8  \n \nThe scope and accelerating pace of DOD’s uses of AI are astonishing and little recognized beyond \nthe Defense community – except, of course, by the private sector data center owners/operators \nwho provide AI services to the military, including for highly classified missions. Meeting the \npower requirements for these data centers is crucial so that DOD can 1) train autonomous vehicles \nand conduct other AI functions in peacetime; 2) help DOD prevail during future conflicts; and 3) \ncounter China’s drive for AI supremacy and its use of AI to help achieve military superiority over \nthe United States.  \n \n5 FERC, NERC and Regional Entity Staff Report, Winter Storm Elliott Report: Inquiry into Bulk-Power System \nOperations During December 2022, Feb. 7, 2023, https://www.ferc.gov/media/winter-storm-elliott-report-inquiry-\nbulk-power-system-operations-during-december-2022 (FERC/NERC Winter Storm Elliott Report); FERC, NERC \nand Regional Entity Staff Report, The February 2021 Cold Weather Outages in Texas and the South Central United \nStates, Nov. 16, 2021, https://www.ferc.gov/media/february-2021-cold-weather-outages-texas-and-south-central-\nunited-states-ferc-nerc-and. \n6 ODNI 2023 Annual Threat Assessment, p. 10.  \n7 Brandi Vincent, Trump’s defense secretary nominee pledges to prioritize AI investments, Defense Scoop, Jan. 14, \n2025, https://defensescoop.com/2025/01/14/trump-pete-hegseth-defense-secretary-nominee-pledges-prioritize-ai-\ninvestments/. \n8 DOD, Data, Analytics, and Artificial Intelligence Adoption Strategy, Nov. 2, 2023, p. 5,  \nhttps://media.defense.gov/2023/Nov/02/2003333300/-1/-\n1/1/DOD_DATA_ANALYTICS_AI_ADOPTION_STRATEGY.PDF (DOD Data, Analytics, and AI Strategy)."},{"page":6,"startToken":1521,"endToken":1978,"text":"4\n \nA. Peacetime Defense Support \n \nAI is now crucial for DOD efforts to help America prevail in future conflicts – and, even better, \ndeter Chinese and other attacks on the US and its security partners in Asia and beyond. Prime \nexamples of AI applications with significant power requirements include:  \n \nAutonomous system training. AI-controlled drones are not born smart. Their ability to dogfight \nand perform other missions depends on using extensive data sets (comprised of real world and \nsimulated scenarios) to teach AI algorithms to autonomously navigate, identify targets, make \ntactical decisions, and react to adversary aircraft behavior. DOD and its industry partners \ncontinuously update these data sets to account for results of autonomous flights, evolving \nassessments of “wingman” requirements to support manned aircraft, and threat data.9 Massive AI \ntraining activities will also be required for the many thousands of air, sea and land-based \nautonomous vehicles that DOD will soon be deploying.10 \n \nMaintenance. At the opposite end of the glamour spectrum lies maintenance – mundane yet \nabsolutely vital to keep drones and all other US weapons and platforms ready for war. Data center \nowners and operators are providing AI services to the armed forces to enable predictive \nmaintenance. In particular, these solutions use AI algorithms and data analytics tools to monitor \noperations, detect anomalies, and predict possible defects or breakdowns in equipment before they \nhappen.11 \n \n \n9 Training autonomous systems is a key focus of the DOD’s Defense Innovation Unit and the Pentagon’s Chief \nDigital and Artificial Intelligence Office (CDAO). Jon Harper, Pentagon Contemplating AI Hub for Replicator \nInitiative; Hill briefings Underway, DefenseScoop, Jan. 24, 2024, https://defensescoop.com/2024/01/24/replicator-\nai-hub-cdao-lawmaker-briefings-aditi-kumar/. On training the Air Force’s unmanned Collaborative Combat Aircraft \nto serve as “loyal wingmen” that will fly alongside crewed fighters, see Chris Gordon, America’s First Unmanned \nFighters are Here: YFQ-42 and YFQ-44, Air & Space Forces Magazine, Mar. 3, 2025, \nhttps://www.airandspaceforces.com/americas-first-unmanned-fighters-yfq-42-yfq-44/. \n10 DOD, Defense Innovation Official Says Replicator Initiative Remains on Track, Jan. 26, 2024, \nhttps://www.defense.gov/News/News-Stories/Article/Article/3657609/defense-innovation-official-says-replicator-\ninitiative-remains-on-track/; Admiral Steve Koehler, Commander, U.S. Pacific Fleet, West 2025 Address, Jan. 28, \n2025, https://www.cpf.navy.mil/Newsroom/News/Article/4048491/west-2025-keynote-address/DOD; DOD, Deputy \nSecretary of Defense Hicks Announces First Tranche of Replicator Capabilities Focused on All Domain Attritable \nAutonomous Systems, May 6, 2024, https://www.defense.gov/News/Releases/Release/Article/3765644/deputy-\nsecretary-of-defense-hicks-announces-first-tranche-of-replicator-capabil/; Congressional Research Service, The \nArmy’s Robotic Combat Vehicle (RCV) Program, Jan. 16, 2025, \nhttps://crsreports.congress.gov/product/pdf/IF/IF11876/13. \n11 See, e.g., Liz Martin, Amazon Web Services (AWS), The U.S. Air Force Improves Aircraft Readiness with AI and \nPredictive Maintenance Solutions, Dec. 14, 2023, https://aws.amazon.com/blogs/publicsector/the-us-air-force-\nimproves-aircraft-readiness-with-ai-and-predictive-maintenance-solutions/."},{"page":7,"startToken":1978,"endToken":2403,"text":"5\nDefense Manufacturing and the Defense Industrial Base. The examples of peacetime AI \napplications highlighted above primarily focus on DOD activities. However, the DOD makes very \nfew of its own weapons. It depends on the defense industrial base (DIB) to manufacture products \nfor national defense. With DOD’s support, defense companies are rapidly adopting AI tools to \ndesign, develop, and produce the next generation of US weaponry. Especially important, the DOD \nOffice of Industrial Base Resilience is driving the integration of AI into defense systems, and is \ncollaborating with the DIB to rapidly adopt AI for defense applications and maintain the Nation’s \ntactical advantage.12 The DIB’s adoption of AI drastically increases the total defense-related uses \nof data centers. More than 100,000 DIB companies and their subcontractors perform under contract \nto the DOD.13 \n \nDefense Intelligence. Project Maven exemplifies the emerging value of AI for intelligence \napplications. Maven provides image-processing AI capabilities that have become some of the \nmilitary’s most in-demand tools for intelligence and targeting. In US Central Command alone, \n13,000 Maven accounts are already in frequent use. The National Geospatial-Intelligence Agency \n(NGA) now plans to expand its total user base ten-fold. The problem, according to NGA director \nVice Admiral Frank Whitworth: the explosive growth in computer requirements to operate \nintelligence-related AI functions.14 Of course, these computational requirements (and the \nelectricity loads they require) are greater still if we include the broader intelligence community \nessential for national security, including the booming uses of AI by the Central Intelligence \nAgency.15 \n \nB. Combat Support in Future Conflicts \n \nAI is driving a tidal wave of change in how DOD will operate in future conflicts. Those changes \nwill greatly improve our warfighting capabilities, but also heighten why our adversaries (China in \nparticular) will gain by disrupting electric service to US data centers. Key AI-enabled advances \ncritical to supporting combat activities include:  \n \n12 DOD, Defense Industrial Base Adoption of Artificial Intelligence for Defense Applications; Notice of \nAvailability, 89 Fed. Reg. 44,964, May 22, 2024, https://www.federalregister.gov/documents/2024/05/22/2024-\n11195/defense-industrial-base-adoption-of-artificial-intelligence-for-defense-applications-notice-of. \n13 Cybersecurity and Critical Infrastructure Agency (CISA), The Defense Industrial Base Sector, \nhttps://www.cisa.gov/topics/critical-infrastructure-security-and-resilience/critical-infrastructure-sectors/defense-\nindustrial-base-\nsector#:~:text=The%20Defense%20Industrial%20Base%20partnership,Department%20of%20Defense%2C%20and\n%20government%2D. \n14 Sydney Freedberg, Jr., ‘Success begets challenges’: NGA struggles to meet rising demand for Maven AI, Breaking \nDefense, Sept. 3, 2024, https://breakingdefense.com/2024/09/success-begets-challenges-nga-struggles-to-meet-\nrising-demand-for-maven-ai/. \n15 CIA, Creating the Future of Intelligence with DDI, https://www.cia.gov/stories/story/creating-the-future-of-\nintelligence-with-ddi/."},{"page":8,"startToken":2403,"endToken":2854,"text":"6\n \nCommand and Control. Autonomous vehicles again serve as the poster child for AI. The US Air \nForce is planning to deploy a fleet of more than 1,000 unmanned warplanes, the first of them \noperating by 2028.16 With thousands more Navy, Army and Marine autonomous vehicles \noperating in all warfare domains, managing the integrated operation of all of these assets against \nenemy forces (themselves AI-enabled) will be immensely difficult.17 DOD’s Combined Joint All-\nDomain Command & Control (CJADC2) initiative is structured to meet this challenge.  With the \nhelp of AI, the program was originally designed to produce “the warfighting capability to sense, \nmake sense, and act at all levels and phases of war, across all domains, and with partners, to deliver \ninformation advantage at the speed of relevance.”18  \n \nDecision Support. DOD’s AI strategy calls for the development of additional ways to achieve \n“decision advantage” over enemy commanders, via 1) battlespace awareness and understanding; \n2) adaptive force planning and application; 3) fast, precise, and resilient attack structures; and 4) \nother applications of AI to combat and combat support functions.19  \n \nThe advantages that AI offers for decision support is driving the rapid expansion of their use. A \ncomprehensive analysis of these services found that “artificial intelligence promises to help \nmilitary commanders make sense of vast amounts of data at superhuman speeds. The military has \na strong motivation to take advantage of AI, and among the most interested within the armed forces \nare commanders charged with making operational decisions in war. These commanders must \ncontinuously ‘observe, orient, decide, and act’ on a fast-paced and multidimensional battlefield \nwhere decisions are life-and-death.”20 To meet these needs, Palantir, Scale AI, Anduril, and other \nAI companies and their associated commercial data centers are rapidly scaling up their decision \nsupport and situational awareness services to DOD.21 \n  \nDecision support applications are already moving into surprising realms. Air Force Gen. Anthony \nJ. Cotton, Commander of the Strategic Air Command, declared “AI will enhance our decision-\n \n16 Tara Copp, AI-Controlled Fighter Jet Takes Air Force Secretary on Historic Ride, AP News, May 3, 2024, \nhttps://apnews.com/article/artificial-intelligence-fighter-jets-air-force-6a1100c96a73ca9b7f41cbd6a2753fda. \n17 Section II.C of this Declaration examines the emerging AI warfighting capabilities of China and other potential \nadversaries. \n18 DOD, Summary of the Joint All-Domain Command & Control (JADC2) Strategy, Mar. 2022, p. 2, \nhttps://media.defense.gov/2022/Mar/17/2002958406/-1/-1/1/SUMMARY-OF-THE-JOINT-ALL-DOMAIN-\nCOMMAND-AND-CONTROL-STRATEGY.pdf. \n19 DOD Data, Analytics, and AI Strategy, p. 5. \n20 Emelia Probasco, et al., AI for Military Decision-Making: Harnessing the Advantages and Avoiding the Risks, \nCenter for Security and Emerging Technology, Apr. 1, 2025, p. 5, https://cset.georgetown.edu/wp-\ncontent/uploads/CSET-AI-for-Military-Decision-Making.pdf. \n21 Id. pp. 11-12."},{"page":9,"startToken":2854,"endToken":3297,"text":"7\nmaking capabilities” for nuclear command and control. Cotton also stated that growing threats, an \noverwhelming flow of sensor data, and increasing cybersecurity concerns are driving the need for \nAI to keep American forces a step ahead of those seeking to challenge the US. Accordingly, AI \nand other advanced systems “can inform us faster and more efficiently.”22 Applications of \nequivalent uses of AI for decision support are accelerating across US Combatant Commands \naround the globe.23 \n \nUndersea warfare and beyond. In every warfare domain, AI and machine learning (ML) tools are \ntransforming the way our armed forces will engage the enemy.24 For example, the Navy relies on \ncommercially provided ML models to support underwater target threat detection by unmanned \nunderwater vehicles. DOD’s Defense Innovation Unit is now partnering with ML vendors to \nprovide a pipeline to track, modify, and redeploy ML algorithms for underwater target threat \ndetection.25  \n \nEquivalent AI-enabled progress is underway for surface warfare, air and land operations under the \nThunderforge program and other DOD initiatives. DOD’s Defense Innovation Unit notes that in \naddition to Thunderforge’s peacetime applications, the effort “marks a decisive shift toward AI-\npowered, data-driven warfare, ensuring that US forces can anticipate and respond to threats \nwith speed and precision” across all realms of combat.26 \n \nC. Countering China’s Drive for Primacy \n \nThe defense missions summarized above highlight the imperative to ensure that as DOD increases \nits dependence on AI, the data centers that provide those AI services will have the power they \nneed. The imperative for the energy sector to serve these growing loads is magnified by an \n \n22 Cotton also stated that as the Command adopts AI tools, “we must always maintain a human decision in the loop \nto maximize the adoption of these capabilities and maintain our edge over our adversaries.” Greg Hadley, AI ‘Will \nEnhance’ Nuclear Command and Control, Says STRATCOM Boss, Air & Space Forces Magazine, Oct. 28, 2024, \nhttps://www.airandspaceforces.com/stratcom-boss-ai-nuclear-command-control/. \n23 Jon Harper, Combatant Commands to Get New Generative AI Tech for Operational Planning, Wargaming, \nDefenseScoop, Mar. 5, 2025, https://defensescoop.com/2025/03/05/diu-thunderforge-scale-ai-combatant-\ncommands-indopacom-eucom/.  \n24 Machine learning is a subfield of AI that gives computers the ability to learn without explicitly being \nprogrammed. Sara Brown, Machine Learning Explained, MIT, Apr. 21, 2021, https://mitsloan.mit.edu/ideas-made-\nto-matter/machine-learning-explained.  \n25 DOD, Defense Innovation Unit, DoD Successfully Deploys Commercial AI Infrastructure to Support Underwater \nTarget Detection, June 16, 2024, https://www.diu.mil/latest/dod-successfully-deploys-commercial-ai-infrastructure-\nto-support-underwater.  \n26 Hayden Field, Scale AI Announces Multimillion-Dollar Defense Deal, a Major Step in US Military Automation, \nCNBC, Mar, 5, 2025, https://www.cnbc.com/2025/03/05/scale-ai-announces-multimillion-dollar-defense-military-\ndeal.html."},{"page":10,"startToken":3297,"endToken":3781,"text":"8\nadditional factor: China’s drive for AI preeminence, and the broader strategic competition between \nChina and the United States that AI will help shape in the defense realm and beyond.   \n \nPresident Trump warns that “the release of DeepSeek AI from a Chinese company should be a \nwake-up call” for US industry, and that “we need to be laser focused on competing.”27 China is \nalready employing DeepSeek and other AI tools to improve its cyberattack capabilities and \noverwhelm US defenses.28 Moreover, DOD warns that “China is a global leader in AI technology \nand aims to overtake the West in AI [research and development] by 2025 to become the world \nleader in AI by 2030.”29 China’s leaders believe that “advances in AI and autonomy are central to \nintelligentized warfare,” in which AI integrates and leverages vast amounts of data to conduct \ncyberattacks against US infrastructure and other targets with unprecedented speed, precision, and \neffectiveness.30  \n \nChina views DeepSeek as a major step forward in its AI-enabled military capabilities and, more \nbroadly, a breakthrough that reshapes the balance of power in the US-China AI competition. US \nstrategists Tye Graham and P.W. Singer, reviewing Chinese defense publications on DeepSeek, \nnote that Chinese military analysts laud DeepSeek’s ability to improve intelligent decision-making \nin combat scenarios, optimize weapons systems, and improve real-time battlefield analysis.31 \nCompanies that provide AI services to DOD are carefully tracking these Chinese advances as well. \nDan Tadross, Head of Public Sector at Scale AI, testified to the US Senate Armed Services \nCommittee in March 2025 that “AI is made up of three main pillars—compute, data, and \nalgorithms. More than one year ago, the United States was clearly ahead on all three. However, \ntoday that is no longer the case. Advancements from China, most notably with the launch of \nDeepseek, have shown that they have closed the gap.”32 And while China currently constitutes our \n \n27 David Ingram, Trump Says China’s DeepSeek ‘Should be a Wake Up Call’ for American Tech Companies, NBC \nNews, Jan. 27, 2025, https://www.nbcnews.com/tech/innovation/trump-china-deepseek-ai-wake-call-rcna189526.   \n28 Tye Graham and Peter Singer, To China, DeepSeek is more than an app—it's a strategic turning point, Defense \nOne, Feb. 21, 2025, https://www.defenseone.com/ideas/2025/02/china-sees-deepseek-strategic-turning-\npoint/403159/?oref=d1-hp-voices-module. \n29 DOD, Military and Security Developments Involving the People’s Republic of China, 2023, p. 169, \nhttps://media.defense.gov/2023/Oct/19/2003323409/-1/-1/1/2023-MILITARY-AND-SECURITY-\nDEVELOPMENTS-INVOLVING-THE-PEOPLES-REPUBLIC-OF-CHINA.PDF.  \n30 Id. \n31 Tye Graham and Peter Singer, To China, DeepSeek is more than an app—it's a strategic turning point, Defense \nOne, Feb. 21, 2025, https://www.defenseone.com/ideas/2025/02/china-sees-deepseek-strategic-turning-\npoint/403159/?oref=d1-hp-voices-module.  \n32 Statement by Dan Tadross, Head of Public Sector, Scale AI, to Sen. Armed Services Comm., Subcomm. Hearing \non Cybersecurity, Mar. 25, 2025, https://www.armed-services.senate.gov/imo/media/doc/tadross_testimony.pdf."},{"page":11,"startToken":3781,"endToken":4306,"text":"9\nonly competitor for global AI primacy, other nations are acquiring advanced AI capabilities that \nwill strengthen their cyberattack capabilities, including Russia,33 Iran,34 and North Korea.35 \n \nD. The Need for Speed \n \nDOD’s growing reliance on AI in peacetime and war, combined with China’s efforts to overtake \nUS progress, provide compelling reasons for FERC to facilitate the rapid connection of data \ncenters and to continue its efforts to ensure power sources are incented and rapidly deployed. Speed \nis of the essence for national security.    \n \nPresident Trump has pointed the way to a promising option to achieve such speed: have data \ncenters rely on power generators sitting “right next” to them.36 The President noted that co-located \ndata center projects can go forward on a “very rapid basis” compared to other options.37 That speed \noffers a significant advantage over grid-connected alternatives for data center power, which can \ntake as many as 7 years or longer to build the necessary transmission infrastructure and meet other \nproject requirements.38 Some transmission owners argue that their preferred grid-connection \noptions should be the only connection option available.39 However, limiting data center \ndevelopment to only grid-connected options may simply take too long to implement in many \n \n33 Annie Fixler, Russia’s AI-Powered Cyberattacks Threaten to Outpace Western Defenses, Foundation for Defense \nof Democracies, Feb. 20, 2025, https://www.fdd.org/analysis/policy_briefs/2025/02/20/russias-ai-powered-\ncyberattacks-threaten-to-outpace-western-defenses/. \n34 Steven Stalinsky, Iran’s Dangerous Push to Become an AI Superpower, Middle East Media Institute, Feb. 11, \n2025, https://www.memri.org/reports/irans-dangerous-push-become-ai-superpower. \n35 Hyuk Kim, North Korea’s Artificial Intelligence Research: Trends and Potential Civilian and Military \nApplications, 38 North, Jan. 23, 2024, https://www.38north.org/2024/01/north-koreas-artificial-intelligence-\nresearch-trends-and-potential-civilian-and-military-applications/. \n36 The White House, Remarks by President Trump at the World Economic Forum, Jan. 23, 2025, \nhttps://www.whitehouse.gov/remarks/2025/01/remarks-by-president-trump-at-the-world-economic-forum/. \n37 Id. \n38 See, e.g., Josh Saul, Data Centers Face Seven Year Wait for Dominion Power Hookups, Bloomberg, Aug. 19, \n2024, https://www.bloomberg.com/news/articles/2024-08-29/data-centers-face-seven-year-wait-for-power-hookups-\nin-virginia; Christopher Tozzi, Why Data Center Grid Connections are Slowing Down – And How to Fix it, Data \nCenter Knowledge, Mar.17, 2025, https://www.datacenterknowledge.com/energy-power-supply/why-data-center-\ngrid-connections-are-slowing-down-and-how-to-fix-it; Robert Walton, AI, data center electricity demand could \ndrive advanced nuclear investment: NERC head Jim Robb, Utility Dive, June 6, 2024, \nhttps://www.utilitydive.com/news/ai-data-center-electricity-demand-advanced-nuclear-investment-Robb/718181/ \n(“it takes me about four years to build a substation,” according to David Schleicher, Northern Virginia Electric \nCooperative CEO); Tom Robb, Elk Grove Mayor Meets With ComEd on Substations for Data Centers, Journal & \nTopics, Mar. 14, 2024, https://www.journal-topics.com/articles/elk-grove-mayor-meets-with-comed-on-substations-\nfor-data-centers/ (Mayor of Elk Grove, Illinois, “expressed frustration with ComEd, saying the electricity utility was \n‘dragging their feet’ in building substations to support the growing data center industry”); Comments of Talen \nEnergy Corporation re Co-Located Load: Market, Economic, and Ratemaking Principles, Docket No. AD24-11, \nOct. 10, 2025, fn. 43 (describing delays of 7 to 10 years to establish new load connections for several PJM \ntransmission owners).   \n39 Answer of the Indicated PJM Transmission Owners, Docket No. EL25-49, Mar. 24, 2025, Att. A p. 21."},{"page":12,"startToken":4306,"endToken":4698,"text":"10\nsituations to meet rapidly growing defense requirements because it requires transmission owners \nto build out infrastructure that would not be necessary if the data center instead co-locates with a \ngenerator. DOD and the AI data centers should have all options available to accelerate the \nconnection of those centers, especially expedient ones, so that the DOD and its AI partners can \ndetermine the quickest path forward. FERC should ensure rules that make all such options \navailable to DOD and should act quickly to do so.  \n \nMeasures to accelerate data center connections should also account for DOD’s dependence on \nprivate sector facilities. It would be mistaken to imagine that because AI services are so critical to \nnational defense, DOD relies entirely on its own data centers sited on military bases or other \ndefense installations, and that somehow the DOD powers these centers with its own generation \nresources. The opposite is true. Both DOD-owned data centers and their private sector counterparts \nthat provide AI service to the DOD overwhelmingly depend on grid-provided power, co-located \nnuclear plants, or other commercial solutions. Moreover, DOD’s utilization of private sector data \ncenters is rapidly growing, including highly classified AI support functions.40 Rules to facilitate \nthe rapid connection of data centers must enable options that meet all such urgent requirements for \npower.  \n \nIII. \nPOWER RESILIENCE \n \nIn addition to accelerating the availability of expedient data center connection options given its \nimportance to America’s defense, rules on data center connections should also enable DOD and \nits data center partners to benefit from the increased resilience that locating at or near nuclear \nplants can provide in future conflicts. \n \nReliable electric service is necessary for day-to-day operations of data centers in peacetime. \nHowever, given the importance of data centers to support US warfighting, and the risk that China \nwill attack the grid and natural gas infrastructure in future conflicts, connections to data centers \nmust also be resilient: that is, be able to “prepare for and adapt to changing conditions and \nrecover rapidly from operational disruptions,” including from “deliberate attacks, accidents, or \nnaturally occurring threats or incidents.”41  \n \n \n40 See, e.g., Adam Mazmanian, Microsoft Deploys Air-Gapped AI for Classified Defense, Intelligence Customers, \nNextgov/FCW, May 7, 2024, https://www.nextgov.com/artificial-intelligence/2024/05/microsoft-deploys-air-\ngapped-ai-classified-cloud/396354/. \n41 US Dep’t of Energy (DOE), Resilience, https://www.directives.doe.gov/terms_definitions/resilience."},{"page":13,"startToken":4698,"endToken":5100,"text":"11\nA. Intensifying Threats and US Resilience Initiatives \n \nThe March 2025 Annual Threat Assessment of the US Intelligence Community states that “China \nhas demonstrated the ability to compromise U.S. infrastructure through formidable cyber \ncapabilities that it could employ during a conflict with the United States.”42 In particular, “if \nBeijing believed that a major conflict with Washington was imminent, it could consider aggressive \ncyber operations against U.S. critical infrastructure and military assets. Such strikes would be \ndesigned to deter U.S. military action by impeding U.S. decision-making, inducing societal panic, \nand interfering with the deployment of U.S. forces.”43 \n \nThis US Intelligence Community assessment provides additional context for responding to \nFERC’s February 2025 request for analysis of the national security implications associated with \nco-location arrangements.44 As noted in Section II.B above, AI data center services play a vital \nand rapidly growing role in supporting US combat decision-making, command and control, and \nother missions essential for deploying and operating US forces. Given the US Intelligence \nCommunity’s assessment of Chinese conflict objectives, strengthening the resilience of power \nflows to data centers is crucial to help counter those goals and reinforce deterrence against Chinese \nattacks.  \n \nOngoing improvements to the cybersecurity of the BPS help strengthen that resilience. FERC, \nNERC, and BPS entities deserve enormous credit for developing and implementing CIP standards \nthat strengthen the grid’s resilience against cyber and physical threats. These ongoing security \nimprovements to the BPS strengthen the resilience of grid-provided power for data centers. Those \nimprovements also benefit co-located nuclear plants by mitigating threats to the transmission lines \nthat plants need to safely operate.  \n \nNatural gas pipeline systems and other gas infrastructure owners and operators are also taking \nsignificant, urgently needed steps to strengthen the cyber resilience of their systems. The US \nTransportation Security Administration (TSA) has issued a series of performance-based \ncybersecurity mandates for these systems, including that owners/operators establish and \nimplement TSA-approved cybersecurity implementation and incident response plans.45 On a \n \n42 ODNI, 2025 Annual Threat Assessment, p. 9. \n43 Id. pp. 11-12. \n44 February 2025 Order, P 88(f)(vi).  \n45 US Transportation Security Admin., SD Pipeline-2021-02E: Pipeline Cybersecurity Mitigation Actions, \nContingency Planning, and Testing, July 26, 2024, https://www.tsa.gov/sites/default/files/tsa-security-directive-\npipeline-2021-02e-and-memo-508c.pdf. For a comprehensive list of cybersecurity measures for pipelines, see US \nTransportation Security Admin., Security Directives and Emergency Amendments, https://www.tsa.gov/sd-and-ea."},{"page":14,"startToken":5100,"endToken":5538,"text":"12\nvoluntary basis, many system operators also adopt cybersecurity guidelines that go over and above \nTSA’s mandates.46  \n \nNevertheless, these requirements are far less comprehensive and detailed than the BPS CIP \nstandards for cybersecurity established by FERC and NERC. Given this disparity between these \nstandards for the grid versus natural gas systems, the US must continue to account for the risk that \nChina will adopt an indirect strategy to disrupt electric service to data centers and other critical \ncustomers, by striking the flow of natural gas on which 43% US power generation depends.47  \n \nThis threat is more than hypothetical. In 2023, the US Intelligence Community warned that “China \nalmost certainly is capable of launching cyber attacks that could disrupt critical infrastructure \nservices within the United States, including against oil and gas pipelines” and other targets.48 China \nhas continued to upgrade its capabilities to attack this infrastructure ever since. Indeed, with the \ngap between increasingly stringent BPS security mandates and the equivalent standards for natural \ngas infrastructure, the risks of gas-focused strategies to disrupt electric service to critical customers \n– including data centers – will intensify.   \n \nAccordingly, from a national security perspective, it makes sense for FERC rules to enable data \ncenter operators to choose from a diverse set of resilient power options. Some operators (and their \nDOD customers) may decide that grid-connected power best meets their needs. Others may want \nto prioritize resilience against attacks on natural gas systems designed to disrupt the grid, and \ndecide instead to rely on co-located or proximate generation. The section that follows highlights \nthe potential advantages of co-location.  \n \nB. Uri, Elliott, and Power Resilience for Defense-Critical Data Centers \n \nExtreme weather events provide “real world” examples of how disruptions of natural gas supplies \nfor generation can degrade electric service, even when transmission systems are largely unaffected. \nWinter Storms Elliott and Uri offer prime examples. In both storms, severe cold disrupted supplies \nof natural gas for power generation. The resulting generation outages, de-rates, and failures to start \nrequired grid operators to conduct large scale load shedding operations to maintain the grid’s \nreliability – including shedding firm load.49 \n \n \n46 Natural Gas Ass’n, Natural Gas Cybersecurity Guidelines & Standards Portfolio, https://www.aga.org/wp-\ncontent/uploads/2022/11/ong_cybersecurity_guidelines_and_standards_002.pdf; Interstate Natural Gas Ass’n of \nAmerica (INGAA), Commitments to Pipeline Security, https://ingaa.org/wp-content/uploads/2019/02/34310.pdf. \n47 US Energy Information Agency, EIA Publishes its First Energy Sector Forecasts Through 2026, Jan. 14, 2025, \nhttps://www.eia.gov/pressroom/releases/press564.php. \n48 ODNI, 2023 Threat Assessment, p. 10. \n49 FERC/NERC Winter Storm Elliott Report, pp. 5-6."},{"page":15,"startToken":5538,"endToken":5974,"text":"13\nMoreover, even as severe cold disrupted gas generation and electric service to key customers, \nnuclear power plants kept providing much-needed power. During Winter Storm Elliott, 31 nuclear \nreactors in operation across PJM’s service territory produced more than 96 percent of their \npotential power output during the storm.50 A key enabler: unlike gas generators, nuclear power \nplants typically have many months of fuel stored on site, and that fuel is impervious to disruptions \nby severe weather or adversary attacks.  \n \nOf course, the ability of nuclear plants to sustain their operations in severe weather events depends \non the continued availability of transmission system ties to enable their safe operation. The same \nwill be true in future conflicts. It is prudent to assume that, to disrupt US military operations, China \nwill attack both natural gas infrastructure and the BPS on which data centers and other defense-\ncritical assets depend. Thanks to the security initiatives taken by FERC and its partners, US \ntransmission systems may be able to keep operating in the face of such attacks, just as they did in \nUri and Elliott. That survivability could help nuclear power plants sustain service to co-located \ndata centers even if large scale load-shedding is underway in the surrounding grid. And of course, \nthe resilience of nuclear-provided power is further enhanced by their compliance with the \nstringent, continuously upgraded cyber and physical security standards established by the US \nNuclear Regulatory Commission.51  \n \nIV. \nCONCLUSION: ALTERNATIVE PATHS TO POWER RESILIENCE \n \nNot all data center owners and operators will assess their needs for resilient power in the same \nway. And over time, new technologies may become available to provide resilient power beyond \nthose that exist today, including the deployment of small modular reactors. As FERC assesses the \nsecurity considerations involving co-location arrangements it should consider the following: \n \n• Data center owners and operators should have the latitude to select power sources and \ninterconnection configurations that best meet the requirements of their particular \napplications, including power resilience for military and other mission-critical use cases. \nOne size will not fit all. Rules affecting large load interconnections should preserve that \nlatitude.  \n \n• That said, accelerating the pace with which new sources of power can meet data center \nloads will remain absolutely vital to national security. The advantages of alternatives to \ntraditional utility grid connections in this regard are compelling, and should be weighted \naccordingly by FERC as it moves forward in this proceeding.  \n \n50 Matt Crozat, Nuclear Saves the Holiday Season, Nuclear Energy Institute, Jan. 26, 2023, \nhttps://www.nei.org/news/2023/nuclear-saves-the-holiday-season. \n51 US Nuclear Regulatory Comm’n, Cybersecurity, https://www.nrc.gov/security/cybersecurity.html."},{"page":16,"startToken":5974,"endToken":6045,"text":"14\n \nLet me conclude by offering my thanks to the Commissioners for including national security \nconsiderations in FERC’s proceedings on co-location arrangements. The extent of DOD’s \nextraordinary (and growing) dependence on AI data centers is only beginning to be recognized \noutside the defense realm. By factoring the resulting imperatives for speed and resilience in serving \ndata center loads, the Commission has the opportunity to advance America’s security in uniquely \nvaluable ways."},{"page":17,"startToken":6045,"endToken":6045,"text":""},{"page":18,"startToken":6045,"endToken":6050,"text":"Attachment A to Stockton Declaration"},{"page":19,"startToken":6050,"endToken":6526,"text":"PAUL N. STOCKTON  \nPROFESSIONAL BIOGRAPHY \nDr. Stockton leads Paul N Stockton LLC, a strategic advisory firm in Santa Fe, NM. He helps \nprivate sector and government leaders strengthen the resilience of US infrastructure. He also chairs \nthe Board of Directors of Analytic Services, Inc., the Homeland Defense and Defense Support to \nCivil Authorities subcommittee of DOD’s Reserve Forces Policy Board, and the Grid Resilience \nfor National Security subcommittee of DOE’s Electricity Advisory Committee. \nAs Assistant Secretary of Defense for Homeland Defense and Americas’ Security Affairs from \n2009-2013, Dr. Stockton led the development of DOD’s Strategy for Mission Assurance and \nstrengthened defense partnerships with Canada, Mexico, and other Western Hemisphere nations. \nHe guided Defense support in response to Superstorm Sandy and other catastrophes. Dr. Stockton \nalso served as Executive Director of the US Council of Governors, and led Department policy \ninitiatives on continuity planning and antiterrorism/force protection. \nAfter leaving DOD, Dr. Stockton provided grid regulators with innovative metrics and cost \nrecovery criteria in Resilience for Black Sky Days (2014). His recent studies on the electric system \ninclude Resilience for Grid Security Emergencies: Opportunities for Industry-Government \nCollaboration (June 2019), Strengthening the Cyber Resilience of the North American Energy \nSystems (September 2020), and Securing the Grid from Supply-Chain Based Attacks (September \n2020). He is the co-editor of Blackstart Power Restoration for a Greener Grid (2004) and is \ncurrently drafting Surfing the Wave: Resilience Strategies for the Decentralizing Grid.  \nDr. Stockton supports resilience initiatives in other infrastructure sectors as well. Strengthening \nthe Cyber Resilience of America’s Water Systems: Industry-Led Regulatory Options (August \n2021) examines new opportunities to counter intensifying threats. In addition, he has helped \nFEMA and DHS assess and mitigate risks of cascading failures across infrastructure sectors, and \nserved as contributing editor to the 4th Edition of the National Response Framework. \nDr. Stockton also analyzes options to counter the Chinese use of information operations (IOs) and \ncyberattacks to influence US decision-making in confrontations over Taiwan or other conflicts.  \nDefeating Coercive Information Operations in Future Crises (2021) analyzes these threats and \nproposes strategies to defeat them. \nDr. Stockton holds a PhD from Harvard University and a BA from Dartmouth College. He was \ntwice awarded the Department of Defense Medal for Distinguished Public Service, DOD's highest \ncivilian award. DHS also awarded Dr. Stockton its Distinguished Public Service Medal. After \nleaving DOD, Dr. Stockton served as Managing Director of Sonecon LLC. Prior to becoming \nAssistant Secretary, he was a Senior Research Scholar at Stanford’s Center for International \nSecurity and Cooperation, an Associate Provost of the Naval Postgraduate School, a Legislative \nAssistant for Senator Daniel Patrick Moynihan, and served as the founding director of the Center \nfor Homeland Defense and Security. \nDr. Stockton is a Senior Fellow of the Johns Hopkins University’s Applied Physics Laboratory. \nHe also serves on the Science and Technology and Strategic Advisory Committees of the Idaho \nNational Laboratory."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":4,"endAt":2,"startToken":0,"endToken":629},{"p":4,"at":2,"title":"I. ARGUMENT SUMMARY","method":"printed heading","endPage":5,"endAt":934,"startToken":629,"endToken":1188},{"p":5,"at":934,"title":"II. AI AND THE TRANSFORMATION OF NATIONAL DEFENSE","method":"printed heading","endPage":6,"endAt":4,"startToken":1188,"endToken":1522},{"p":6,"at":4,"title":"A. Peacetime Defense Support","method":"printed heading","endPage":7,"endAt":1740,"startToken":1522,"endToken":2231},{"p":7,"at":1740,"title":"B. Combat Support in Future Conflicts","method":"printed heading","endPage":9,"endAt":1421,"startToken":2231,"endToken":3067},{"p":9,"at":1421,"title":"C. Countering China’s Drive for Primacy","method":"printed heading","endPage":11,"endAt":198,"startToken":3067,"endToken":3810},{"p":11,"at":198,"title":"D. The Need for Speed","method":"printed heading","endPage":12,"endAt":1426,"startToken":3810,"endToken":4522},{"p":12,"at":1426,"title":"III. POWER RESILIENCE","method":"printed heading","endPage":13,"endAt":3,"startToken":4522,"endToken":4699},{"p":13,"at":3,"title":"A. Intensifying Threats and US Resilience Initiatives","method":"printed heading","endPage":14,"endAt":1799,"startToken":4699,"endToken":5364},{"p":14,"at":1799,"title":"B. Uri, Elliott, and Power Resilience for Defense-Critical Data Centers","method":"printed heading","endPage":15,"endAt":1552,"startToken":5364,"endToken":5776},{"p":15,"at":1552,"title":"IV. CONCLUSION: ALTERNATIVE PATHS TO POWER RESILIENCE","method":"printed heading","endPage":19,"endAt":3384,"startToken":5776,"endToken":6526}]}
