{"document":{"slug":"rec-20250423-5262-6","title":"Exhibit 5 (Kormos)","issued":"2025-04-23","accession":"20250423-5262","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"attachment","file":"sources/filings/text/20250423-5262_006.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5262","tier":"record","parent":"rec-20250423-5262","sha256":"d6c7a2bf2e93d2c8fcad7cf0e160a95306b767c1827fa97c2ff8336eceba4e3e","pages":39,"tokens":11875,"emptyPages":[12],"textThemes":["colo","study","cost","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":6,"text":"EXHIBIT 5 \nAFFIDAVIT OF MICHAEL KORMOS"},{"page":2,"startToken":6,"endToken":56,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n \n \nLarge Loads Co-Located at Generating Facilities \n \n \nConstellation Energy Generation, LLC. \n \nv. \n \nPJM Interconnection, L.L.C. \n) \n \n \n) \n \n \n) \n) \n) \n) \n) \nDocket No. EL25-49-000 \n \n \nDocket No. AD24-11-000 \n \n \nDocket No. EL25-20-000 \n      (Consolidated) \n \n \n \n \n \nAFFIDAVIT OF  \nMICHAEL KORMOS \n \nApril 23, 2025"},{"page":3,"startToken":56,"endToken":344,"text":"1 \n \nI. \nQUALIFICATIONS AND OVERVIEW OF AFFIDAVIT \n1. \nMy name is Michael Kormos.  My extensive professional experience includes \ntransmission planning and operations as a senior executive at both PJM Interconnection, L.L.C. \n(PJM) and one of the largest transmission owners within the PJM region.  I currently serve as an \nelectric utility consultant helping industry participants develop transmission interconnection and \ntransmission solutions and resolve issues related thereto.  Until 2021, I was Sr. Vice President, \nTransmission & Compliance for Exelon Corporation, where I was responsible for the operations \nand long-term planning for transmission systems of Exelon utilities Atlantic City Electric, \nBaltimore Gas & Electric, ComEd, Delmarva Power, PECO, and PEPCO.  In that role, I shaped \nExelon and its utilities’ policy positions on issues related to the Federal Energy Regulatory \nCommission (FERC), Regional Transmission Organizations (RTOs), and national transmission \nmatters.  Before joining Exelon, I spent 27 years at PJM.  As PJM’s Chief Operations Officer, I \nwas responsible for grid planning and operations and directly involved in implementing \nnumerous significant FERC orders, including Order No. 1000, and supported the development \nand implementation of competitive wholesale markets in PJM.  Earlier in my career at PJM, I \noversaw an operational expansion that tripled the size of the system controlled by PJM.  I also \nheld management and engineering positions in transmission operations while at PJM.  In \naddition, I have also served on the board of directors for Reliability First Corporation; as an \nofficer of the Eastern Interconnection Planning Collaborative and the Eastern Interconnection \nData Sharing Network; and as a member of the North America Electric Reliability Corporation \noperating committee.   \n2. \nAs such, I have significant experience in transmission planning and operations \nthroughout the PJM region and am well-qualified to provide this affidavit.  In addition, I testified"},{"page":4,"startToken":344,"endToken":710,"text":"2 \n \nextensively as a panelist during FERC’s Technical Conference in the AD24-11 proceeding on co-\nlocated loads and submitted my Whitepaper, The Co-located Load Solution (the Whitepaper), in \nthat proceeding (which I understand has been consolidated into the record for this proceeding).1 \nFor convenience, I am attaching it hereto.   \n3. \nThere has been significant discussion recently at FERC and elsewhere2 about serving \nload that is co-located with a generator.  As I discussed previously, traditional utility models for \nconnecting large load directly to the grid are proving ineffective at keeping pace with the \ndemands of new large loads and are taking five years or longer to connect such load.3  Based on \nconversations I have had with clients and others active in the industry since the Whitepaper, I \nunderstand that wait times for new large load connections in PJM are taking even longer – as \nlong as seven to ten years.4  This is simply too long for new load to wait – a disservice to \ncustomers, and other, more expeditious, connection alternatives must be pursued.            \nII. \nBENEFITS OF CO-LOCATION \n4. \nA more expedient and efficient alternative and one that I have strongly advocated for is to \nco-locate the load with the generator that is serving the load in a way that avoids making use of \nthe grid altogether.  Based on my years of experience as a grid planner and operator, I can say \nwith certainty that the closer load is to its supply, the costs, time to connect the load, and the \noperational risk are all likely to be reduced.  And co-locating load with a generator that avoids \nuse of the grid will minimize: transmission infrastructure costs; potential supply chain issues and \n \n1 Michael Kormos, The Co-Located Load Solution, Docket No. AD24-11 (Nov. 4, 2024).  \n2 See, e.g., Senate Bill 1 Co-location Study, MD Pub. Serv. Comm’n, Docket PC61. \n3 Whitepaper at 1 and fn. 1. \n4 See, e.g., Comments of Talen Energy Corp., Docket No. AD24-11, Analysis Group Report at fn. 43 (Oct. 28, 2024) \n(describing wait times to plan, design, site and construct a new grid connection to be as long as seven years for \nDominion and seven to ten years for AEP)."},{"page":5,"startToken":710,"endToken":990,"text":"3 \n \ndelays on long-lead transmission infrastructure equipment; potential delays due to land-\nacquisition, rezoning, permitting, siting and the like; line losses; and grid operational risks \n(because fewer grid infrastructure facilities and potential failure points are implicated in serving \nthe load).  Conversely, if new load is connected to the grid, distant from the generator that is \nserving it (a far more complicated arrangement), costs will generally be greater and delays and \noperational problems will be more likely.5  In addition to serving new load expeditiously and on \na least cost basis, certain co-located load connections provide numerous other benefits as \ncompared to traditional grid connections including: \n• Transferring risk from the grid and other customers to the co-located load; \n• Directly assigning interconnection costs to the co-located load instead of existing grid \ncustomers for any necessary transmission upgrades; \n• Protecting reliability through PJM’s robust necessary study process; \n• Facilitating long-term commercial arrangements that provide a basis for the continued \noperation of generation resources including nuclear; and \n• Increasing interconnection opportunities for other resources. \nRather than discuss these benefits of co-location here, these benefits are discussed in greater \ndetail in the Whitepaper at 8-12.     \nIII. \nPJM STUDIES \n5. \nIn addition, I attach hereto comments I submitted in October 2024 to the Maryland Public \nService Commission explaining the efficacy of PJM’s necessary study process in response to \ngenerator interconnection modification requests to serve co-located load.6  In those comments, I \n \n5 See, e.g., P 8, infra (describing how the likelihood of a large load drop in the wake of a system voltage drop can be \nreduced through co-location).  \n6 Post-Conference Comments of Michael Kormos, MD Pub. Serv. Comm’n, Docket PC61 (Oct. 16, 2024) \n(Connection Study Process Comments)."},{"page":6,"startToken":990,"endToken":1278,"text":"4 \n \nalso compare PJM’s necessary study analysis to the analysis done by individual PJM \ntransmission owners when connecting a new load directly to the grid.7   \n6. \nThe Connection Study Process Comments provide a helpful summary of the different \nstudy processes used in PJM when connecting new load.  While I do not have any significant \nobjection to PJM’s description of its necessary study process (as summarized in PJM’s March 24, \n2025 Answer in this proceeding),8 I disagree with any suggestion that the necessary study \nprocess is anything but a robust, highly effective study of the impact of the modification \nrequested.  Indeed, PJM’s necessary studies are: led by an independent RTO; uniform and \ntransparent (and not guided by an opaque process and rules that differ from transmission owner \nto transmission owner); updated by PJM, if needed; and focused on the overall grid impacts of \nthe new load explicitly (and not focused predominantly on local impacts or studied along with a \nhost of other changes as part of an RTEP study).9  To the extent FERC is concerned that large \nload connections are not being robustly and effectively studied to ensure reliability, it should not \nbe concerned with the necessary study process used for co-located load.  \nIV. \nMANY OF PJM’S AND OTHERS’ CONCERNS ARE NOT UNIQUE TO CO-LOCATED LOADS \n7. \nIn addition, PJM raises numerous concerns that PJM seems to suggest are caused by co-\nlocated load.  PJM’s discussion fails to make clear the essential point that these concerns are \ncaused by any large load addition to the PJM region, and do not depend on how the load is \nconnected.  A few examples include: \n \n7 Id. \n8 See PJM Answer at 47-52. \n9 Connection Study Process Comments at 2-6."},{"page":7,"startToken":1278,"endToken":1557,"text":"5 \n \n• PJM suggests that resource adequacy could be impacted when adding co-located \nload.10  But resource adequacy could be impacted when any new load is added, \nregardless of how that load is connected – the resource adequacy impact is the same \nfor co-located connections as for grid connections.  \n• PJM suggests that special protection schemes or remedial action schemes used to \nsupport co-located loads could fail.11  But PJM fails to acknowledge that such \nmechanisms are not exclusive to co-located load or that PJM can and should be \nprepared to respond to even the low likelihood of potential problems with them.  \nProtection schemes are commonly used mechanisms to ensure safe and reliable grid \noperations, and transmission system planners and operators rely on a host of system \nprotections schemes (including primary and secondary relays as well as redundant \nprotection systems) to maintain the safe and reliable operations of the grid on a \nregular basis.  While planners and operators are careful to design protection schemes \nto meet the particular need and protection schemes are not appropriate for every \nsituation, they are viewed across the industry as effective and reliable \ntools.  Restricting their use by planners or operators would represent a fundamental \nshift in the way the transmission system is planned and operated.  Relatedly, I have \nreviewed the affidavit of Steven R. Herling which is included with my affidavit as \npart of Constellation’s filing, and I concur with Mr. Herling’s conclusions as to the \nefficacy of redundant relay schemes to ensure co-located load is isolated from the grid \nand unable to draw power therefrom in the event the co-located generator trips.     \n \n10 See, e.g., PJM Answer at 62. \n11 Id. at 44, 52."},{"page":8,"startToken":1557,"endToken":1813,"text":"6 \n \n• The failure of a relaying scheme itself does not create a reliability issue if PJM is \nprepared for it.  If a co-located generator trips but the co-located load is not \nsimultaneously disconnected, PJM will experience the same generation/load \nimbalance that would have occurred if the generator tripped and the load was not co-\nlocated.  In the co-located load situations, the load is likely to be removed \nsimultaneously with a generator loss providing PJM a benefit with less imbalance to \nresolve.  And because contingency overloads are typically tolerated based on a four-\nhour transmission line rating specification, PJM should have more than adequate time \nto manually remove the load if necessary.   \n• In addition, I agree with Mr. Herling’s view that PJM does not plan or require \nupgrades to cover third contingency events (such as would occur if two serially \nconnected breakers fail simultaneously) and add that I am aware of no grid operators \nwho model such contingencies.  If PJM nonetheless remains concerned, it can model \nsuch third contingency and take any further action it believes necessary and consistent \nwith prudent practices.  While not standard to perform such studies, PJM can model \nthe potential failure of redundant relays to remove the load when the co-located \ngenerator trips to assess in real-time what the impact of a relay failure would be and \nthereby be prepared to act.   \n• PJM suggests that it may be worthwhile to explore enhancements to the load \nforecasting process.12  It makes perfect sense to enhance load forecasting, but more \n \n12 Id. at 66."},{"page":9,"startToken":1813,"endToken":2071,"text":"7 \n \naccurate forecasts again are not exclusive to co-location and would be helpful \nregardless of how load is connected.  \n• PJM also describes its effort to leverage back up diesel generators,13 but the potential \nto increase reliance on backup diesels as part of a resource adequacy solution again is \nnot exclusive to co-location and could be considered for any new load and should not \nbe dependent on how it is connected.    \n• PJM suggests there may be concerns with the stability impact of co-located loads \nunder certain conditions including light-load and summer peak conditions.14  But \nstability impacts are not a concern relevant only to co-located loads.  Rather, prudent \ngrid planners and operators should consider the stability impact of any load regardless \nof its connection configuration. \n• PJM suggests “extensive transmission level equipment modelling and data” that could \nbe “unique” are needed for co-located load.15  The need for information on load \ncharacteristics is not unique to co-located load – grid planners and operators would \nneed such information regardless of how the load is connected.  And there is no \nserious issue here; PJM routinely models complicated transmission scenarios and \nroutinely obtains all the information it needs to do so.  Thus, PJM also has the ability \nto model any large load in both planning and operations in whatever detail it desires.   \nHow the load is commercially connected and takes service should have no impact on \nwhat and how PJM models new large loads to maintain reliability.  Given the growing \n \n13 Id. at 63, 68-69. \n14 Id. at 53. \n15 Id. at 60."},{"page":10,"startToken":2071,"endToken":2408,"text":"8 \n \nprevalence of large loads in PJM, I would expect PJM to increase its consideration of \nsuch loads and understanding of their operations regardless of how they are connected \nand served. \n• There has been some suggestion that grid issues could arise if large load suddenly \ndrops from the grid in response to a voltage drop event in both these proceedings on \nco-located loads in PJM16 and in other proceedings.17  This voltage drop concern is \nnot one exclusive to co-location and, in fact, illustrates how co-locating load and \ngeneration can provide benefits to the grid as compared to direct grid connections.  \nFirst, as is clear in the recent NERC Presentation (at 3), the large load drop incidents \nin Northern Virginia all involved grid connected data center loads where the load was \nlocated remote from generation supply source.  Second, had those data centers been \nco-located with a generator (especially a nuclear generator), it is possible that the load \nwould not have dropped offline as a result of the load being closer to the voltage \nsource, and because - nuclear generators are managed to a strict voltage bandwidth \nand typically have state of the art automatic voltage regulators.  As a result, I would \nexpect voltage deviations -- like those that triggered the load drops in Northern \nVirginia –– to be fewer, smaller and of shorter duration, if they occur at all, for load \nlocated in close proximity to a large generator.  Large generators also typically \nprovide significant inertia that can help the local grid avoid or minimize the impact of \nmany anomalies.  Given the reduced likelihood of a voltage drop in the first place for \n \n16 See Statement of the North American Electric Reliability Corporation, Docket No. AD24-11, at 2 (Nov. 1, 2024) \n(expressing concern with an incident where data center dropped in response to a voltage drop as part of a pleading in \nthe Co-Located Load Technical Conference proceeding). \n17 See NERC Activities and Plans to Address Reliability Impacts from Large Load Integration, Docket No AD25-10 \n(Apr. 17, 2025) (NERC Presentation)."},{"page":11,"startToken":2408,"endToken":2553,"text":"9 \n \nload co-located with a generator, it is less likely that such load will sense a voltage \nanomaly that will lead it to drop.  Third, to the extent a large load drop risk remains, \nNERC appears to be on the correct path towards rectifying it (i.e., as explained in the \nNERC Presentation, NERC has an ongoing process to study the issue, develop risk \nmitigation strategies, etc.).  NERC’s path is consistent with the path grid operators \nfollowed several years ago to adjust to operational challenges encountered as wind \nand solar resource intermittency issues became increasingly prevalent on the grid.              \nPJM’s discussion of these issues in this consolidated proceeding – in particular PJM’s focus on \nresource adequacy concerns – are not issues specific to co-located load at all.  In the case of \nresource adequacy concerns, FERC has already announced an entirely separate proceeding to \nspecifically address such concerns."},{"page":12,"startToken":2553,"endToken":2553,"text":""},{"page":13,"startToken":2553,"endToken":2566,"text":"APPENDIX  \nMichael Kormos, The Co-Located Load Solution \nDocket No. AD24-11 (Nov. 4, 2024)"},{"page":14,"startToken":2566,"endToken":2574,"text":"Michael Kormos \nJULY 2024 \nThe Co-Located  \nLoad Solution"},{"page":15,"startToken":2574,"endToken":2723,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n1\nTable of Contents \nThe Co-Located Load Solution ................................................................................................ 2 \nSeparating Co-Location Facts from General Concerns About New Load ............................................5 \nServing any new load will affect market prices .................................................................................................... 5 \nServing any new load may affect infrastructure costs ......................................................................................... 5 \nServing any new load may affect reliability ......................................................................................................... 6 \nBehind-the-meter service imposes no new costs on grid customers .................................................................. 7 \nThe Benefits of Co-Location ............................................................................................................8 \nServe the Load ...................................................................................................................................................... 8 \nImprove Grid Efficiency ........................................................................................................................................ 8 \nTransfer Risk from the Grid to the Co-Located Load............................................................................................ 8 \nCharge Data Centers Instead of Grid Customers for More of the Transmission Facilities ................................... 9 \nProtect Reliability ................................................................................................................................................. 9 \nFacilitate Steady Customers for Nuclear Units to Remain in Service ................................................................. 10 \nIncrease Interconnection Opportunities for Renewables .................................................................................. 11 \nThere Is No Cost Shift Without a Fundamental Market Redesign ................................................... 12 \nTransmission Service .......................................................................................................................................... 13 \nDistribution Service ............................................................................................................................................ 14 \nCapacity .............................................................................................................................................................. 14 \nEnergy ................................................................................................................................................................ 14 \nAncillary Services ................................................................................................................................................ 14 \nNext Steps ................................................................................................................................... 16 \nBiography ........................................................................................................................... 17"},{"page":16,"startToken":2723,"endToken":3275,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n2\nThe Co-Located Load Solution \nAn influx of large new loads is projected to seek to connect to the transmission grid over the \nnext several years—including most prominently hyperscale data centers. The standard \nutility models are struggling to accommodate large data center projects on a workable \ntimeline, and can take five years or longer.1 These delays are caused in part by the increasing \nsize of data centers, which in the past did not typically exceed 100 megawatts (MWs) but \nnow can be up to ten times larger to accommodate artificial intelligence and other \nsophisticated applications.  \nConnecting a new gigawatt-sized load to the power grid would almost certainly require \nconstruction of new transmission lines, which is one of the most difficult challenges faced by \nthe power sector. Based on my experience as chief operations officer of PJM Interconnection \nand related roles in the power industry, it can take up to a decade to plan, design, permit, \nand construct new transmission lines if they are contested (as are most large projects). These \nlong delays risk impeding economic growth as well as technological advances.  \nIn order to bring large data center projects online efficiently and equitably, the electric \nindustry should be focused on finding solutions that best manage reliability, affordability \n(for all), efficiency, and speed. In the restructured markets where sellers compete to serve \nnew demand, one such solution is for the new load to serve its own power needs “off the \ngrid,” and the most promising configuration is for this load to co-locate behind-the-meter \nwith an existing power plant.  \nBy not taking service from the transmission grid, the new load expedites the timeline but \nmust pay for its behind-the-meter delivery facilities and assume the costs and risks of not \nbeing served by the grid. Because the new load has no ability to “lean” on the grid,2 there is \nno need for expensive new network transmission projects to connect the load or the \nassociated regional cost allocations to other customers. In addition, by partnering with an \nexisting plant, the load avoids the long lead time for grid interconnection and the generator \nsecures a steady customer, which can be critical for plants needing predictable, long-term \n \n1  \nSee, e.g., “AI, data center electricity demand could drive advanced nuclear investment: NERC head Jim \nRobb,” Utility Dive (June 6, 2024) (\"it takes me about four years to build a substation,\" according to David \nSchleicher, Northern Virginia Electric Cooperative CEO), https://www.utilitydive.com/news/ai-data-\ncenter-electricity-demand-advanced-nuclear-investment-Robb/718181/; “Elk Grove Mayor Meets With \nComEd on Substations for Data Centers,” Journal & Topics (Mar. 14, 2024) (Mayor of Elk Grove, Illinois, \n“expressed frustration with ComEd, saying the electricity utility was ‘dragging their feet’ in building \nsubstations to support the growing data center industry”), https://www.journal-topics.com/articles/elk-\ngrove-mayor-meets-with-comed-on-substations-for-data-centers/. \n2  \nTo be clear, the co-located behind-the-meter load configuration I suggest here is one where the load is \nunable to take energy or other services from the grid and in fact pays for and installs equipment to \nautomatically disconnect in the event its co-located power supply trips. The load instead must rely on its \nco-located generator(s), batteries or other back-up resources to meet its needs.  While other co-located \nload configurations may be considered, I have not done so here."},{"page":17,"startToken":3275,"endToken":3347,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n3\nrevenues to ensure continued operation and justify renewal of operating licenses and \npotential uprates.   \nCo-Located Behind-the-Meter Configuration\n \nGrid-Supplied Front-of-Meter Configuration\n \nWhile co-location could involve the pairing of any type of power plant with any large load, \nexisting nuclear plants provide some of the best opportunities for data centers.  Nuclear \nplants are large, often with multiple units, carbon-free and sustainable, and capable of and"},{"page":18,"startToken":3347,"endToken":3705,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n4\npreferring to run at maximum power for up to 18 to 24 months, which matches perfectly \nwith the data center load profile.3 Nuclear units have the highest reliability and availability \nof any of the existing resources. \nDespite their benefits, nuclear units have, in the recent past, faced economic challenges that \nled many to announce retirements. In the last decade, over 10 GW of capacity retired, mostly \ndue to economic factors, and 20 nuclear units representing 20.3 GW of capacity avoided \nretirement by seeking and obtaining state-based economic support. Although the federal \ngovernment has stepped in to prevent further retirements through enactment of the nuclear \nproduction tax credit (PTC), that program expires in 2032 at which time federal agencies \nproject a new wave of nuclear retirements far exceeding the generating capacity lost over \nthe last decade.4   \n \nUnder a co-location configuration, the data center gets the carbon-free electricity it wants \nwithout lengthy delays (but must pay for any on-site delivery facilities), and the nuclear plant \ngets a steady customer (forestalling premature retirement and enabling NRC license \nextension and potential uprates). And with the nuclear unit now supplying the data center \nload and not some distant network load, deliverability on the transmission grid is freed up \nfor other existing and newly-interconnecting resources, typically wind and solar projects. \n \n3  \nNuclear plants have the added benefits of usually being remote, secure, and well-buffered, minimizing the \npotential for noise, visual or other impacts that can be associated with data center development.   \n4  \nU.S. Energy Info. Admin., Annual Energy Outlook 2023, Table 9 (Electric Generating Capacity, Reference \nCase), https://www.eia.gov/outlooks/aeo/data/brower/#/?id=9-\nAEO2023&cases=ref2023&sourcekey=0; EPA, Power Sector Modeling, Post-IRA 2022 Reference Case (last \nupdated Mar. 1, 2024), https://www.epa.gov/power-sector-modeling/post-ira-2022-reference-case; \nEPA, Power Sector Modeling, Pre-IRA 2022 Reference Case (last updated Dec. 13, 2023), \nhttps://www.epa.gov/power-sector-modeling/pre-ira-2022-reference-case. \n0\n10\n20\n30\n40\n50\n60\n2032\n2034\n2036\n2038\n2040\n2042\n2044\nRetirement from 2012 to 2032\n2033+ Retirements Projected by EIA\nGW\nAdditional 2033+ Retirements Projected by EPA"},{"page":19,"startToken":3705,"endToken":4220,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n5\nSeparating Co-Location Facts from General Concerns \nAbout New Load \nSome have raised questions about whether pairing data centers with nuclear behind-the-\nmeter increases costs for other customers and ratepayers via higher prices, system \nupgrades, or cost shifts, or otherwise harms reliability. Based on my years of experience \noperating power systems, I think these concerns have very little to do with co-location itself. \nIn most cases the questions raised are a consequence of adding load anywhere on the grid \nand not how it is served, whether connected to the grid or co-located behind-the-meter.   \n1. Serving any new load will affect market prices \nOne frequently mentioned issue relating to co-located load is the impact on energy and \ncapacity markets by “removing” an existing generator that is currently serving network load. \nAll things being equal, co-locating data centers with nuclear units will not raise network \nprices any more than serving the same load in front of the meter in the same general \nlocation.5 Any new demand will affect price, so unless we assume the new load would \ndisappear or not otherwise be served, how the load is served does not materially change the \neffect on market prices. While every situation is unique, dedicating a portion of existing \ngeneration to a particular customer behind-the-meter through a direct connection will have \nthe same effect on the supply/demand dynamic as serving the same amount of new load \nthrough deliveries over the transmission system from participating in the market or from a \nremote generator under a power purchase agreement. This new load, regardless of \nconfiguration, can be met using existing market and system planning tools. \n2. Serving any new load may affect infrastructure costs \nAnother common misconception is that if an existing generator is used to serve a behind-\nthe-meter load, new infrastructure (most likely transmission) will be needed and existing \ncustomers will have to pay for it. In my experience, it is far more likely that connecting a data \ncenter to the grid in front of the meter will require more transmission upgrades than co-\nlocating it behind a generator, which does not rely upon the grid for service.  \nLarger loads (those approaching 1000 MWs) must connect to the grid on an extra high \nvoltage line (230 kV or greater). This requires an extra high voltage substation and \nassociated facilities to accommodate the front-of-the-meter data center. The construction \ncosts for this type of transmission project will depend on the circumstances but can range \nfrom $150 million up to $250 million.6 In a co-location configuration, these costs will be paid \n \n5  \nGiven both nuclear plants and data centers operate generally as baseload facilities, the impact of adding \nnew load or “removing” such supply will have virtually the same effect on market prices.  \n6  \nSee “Transmission Expansion Advisory Committee – PPL Supplemental Projects,” April 2, 2004 at \nhttps://www.pjm.com/-/media/committees-groups/committees/teac/2024/20240402/20240402-\nitem-08---ppl-supplemental-projects.ashx (identifying $244 million PPL supplemental project); see also \nPJM, Transmission Expansion Advisory Committee: AEP Supplemental Projects, at 7 (June 4, 2024),"},{"page":20,"startToken":4220,"endToken":4743,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n6\nby the co-located load. In a front-of-the-meter configuration, by contrast, some of these costs \nwill be allocated to grid customers. \nMoreover, in a front-of-the-meter configuration, there will be additional costs associated \nwith other transmission upgrades required to get power to the new substation built for that \ncustomer. The costs can be significant. In Northern Virginia, for example—where no data \ncenters have co-located—data center growth combined with generator retirements has \nrequired over $5 billion of transmission investment to reliably serve the new load. The costs \nof those new transmission facilities, like all transmission facilities, will be shared by all \ncustomers in accordance with PJM’s and the transmission owner’s tariffs.  \nAs discussed later, serving that same load behind-the-meter at a power plant can reduce the \nneed for new transmission lines compared to a grid-connected configuration. The nuclear \nunit is also giving up use of the transmission system to others. Some transmission investment \nmight be required in a co-location configuration to replace the generation with excess or new \nunits. But if the load were in front of the meter, it is far more likely that a greater amount of \ntransmission investment would be needed. The overall costs to grid customers should be \nsignificantly less in a co-location configuration.  \nSo again, unless we are simply assuming these large new loads will not be served, any \naddition of that load will result in incremental infrastructure costs and the co-located \nconfiguration ensures that the costs incurred to serve the new load are paid for by the data \ncenter, not by customers of the surrounding utilities. \n3. Serving any new load may affect reliability \nThe next common refrain is reliability, and that we should not let nuclear resources “take \nmegawatts off the grid” to serve new loads because we cannot adequately replace the critical \ngeneration in a timely manner. Again, the issue is not whether we are serving the load \nbehind-the-meter versus using the transmission grid to serve the load in front of the meter \nbut instead is about serving new load, period. And again, unless one assumes the new load \nwould not otherwise be built or delayed for years, the effect on grid reliability is the same. \nTools already are in place in every restructured market to bring on any new resources \nneeded to serve network load. \nAs an aside, the challenges of integrating new generation resources to replace retiring fossil \ngeneration and to meet all new load are a rightful focus of policymakers. In my view, markets \nshould provide better incentives to attract new resources and the generation \ninterconnection process should be significantly improved to get needed resources timely \nconnected. What should not happen, however, is discrimination against one type of large \nnew load (data centers) or one type of generation (nuclear). It cannot be that, after many \nyears of financial struggles by nuclear units, we are now troubled by arrangements with \ncounterparties that are willing to contract to ensure continued operation of those units. We \n \nhttps://www.pjm.com/-/media/committees-groups/committees/teac/2024/20240604/20240604-\nitem-05---aep-supplemental-projects.ashx (identifying $155.69 million AEP supplemental project)."},{"page":21,"startToken":4743,"endToken":5114,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n7\nmust find mechanisms to allow all new types of load to be connected in their preferred \nconfiguration and on their timeline and not claim some new load can connect but others \nmust wait or not be served at all. \n4. Behind-the-meter service imposes no new costs on grid customers \nThe last general claim is that behind-the-meter load causes “cost shifts” that negatively \nimpact existing customers. For example, in the recent Exelon/AEP protest to the \nSusquehanna Interconnection Service Agreement amendment, a consultant from Concentric \nclaimed up to $140 million in “cost shifts” from the data center to grid customers. This \ncalculation is nothing more than the revenue that the transmission owner would have been \npaid if the data center had connected in front of the meter where it would take grid service \nand benefit from being connected from the grid. But in the co-location scenario, the extension \ncord to the grid is cut – the data center does not cause grid costs to be incurred, cannot take \nany service from the grid, and is not a customer of the transmission owner. There are no \ncosts to shift in the co-location scenario.    \nIt is true that existing grid customers cannot share the costs of their service with the data \ncenter supplying its own service, but no one can reasonably expect to share costs with \nsomeone who is not taking service.  \nNot only is there no cost shift, but co-location can help grid customers save money. The \nexisting grid customers do not pay for new costs assumed by the data center or the costs for \nany upgrades identified in the host generator’s updated interconnection studies. As \nelaborated below, many risks (e.g., outage risk) are directly the responsibility of the loads in \nthis co-located configuration, alleviating the need for other customers to share in costs to \ncover such risks.  \n*    *    *    *    * \nWe must not compare serving new data center load behind-the-meter with not serving it at \nall, as some suggest. Adding new load in any location may add new costs, so the question is \nhow the configurations at issue—grid-connected or behind-the-meter—result in efficiency, \nreliability, and affordability for all customers, including the new data center load."},{"page":22,"startToken":5114,"endToken":5612,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n8\nThe Benefits of Co-Location \nThe beneficiaries of co-location behind-the-meter extend well beyond the data center and \nthe host generator. In many cases, these configurations are better for all than if the data \ncenter were served in front of the meter. Co-location behind-the-meter helps to: \n1. Serve the Load \nRemember that co-location allows us to serve large new loads that otherwise would have to \nwait years for service, and thus to meet the technology needs and fuel economic growth on \na much more expedited basis. As I noted above, connecting a new gigawatt-sized load to the \npower grid will almost always require construction of new transmission infrastructure, \nwhich can take years to plan, design, permit, and construct. Our goal should always be to \nserve customers when and how they want to be served, and co-location offers an excellent \nalternative.   \n2. Improve Grid Efficiency \nThe best and most cost-efficient way to supply a new large load is by generating as close as \npossible to that customer. The further the generation is from the load, the more expensive it \nbecomes to move the power and the more at risk the system is to overloading existing \ntransmission lines. By placing a data center where it can be directly served by a generator \nversus locating the load somewhere remote from the ultimate generation needed to serve it, \nthe grid requires fewer upgrades to serve that new demand.  \nSimilarly, the geographic proximity inherent in co-location also is likely to reduce energy \nlosses (“line losses”) resulting from transmitting long-distances from the power plant to data \ncenter, which at the transmission level are in the range of 1-3 percent. For a gigawatt-sized \ndata center, that would avoid the loss of 90,000-260,000 megawatt hours of electricity. Given \nthat large data center customers generally seek sources of carbon-free power, this prevents \nthe unnecessary loss of an increasingly important commodity: clean electricity.   \n3. Transfer Risk from the Grid to the Co-Located Load \nGreater risks equal greater costs and the co-locating data center load bears its own risks, \nwhile imposing no incremental risks on the network. \nThe risks the data center itself takes on are significant. If the data center were supplied from \nthe grid, it could expect supply certainty in 99+% of hours given the diversity of resources in \na region like PJM. This is very different for load connected to a single resource, even a very-\nwell run nuclear resource that can be expected to run ~93% of the time.7 To the extent a co-\nlocated load seeks to improve the reliability of the individual resource(s) it is co-located with, \n \n7  \nSee DOE, Office of Nuclear Energy, 5 Fast Facts About Nuclear Energy (June 11, 2024), \nhttps://www.energy.gov/ne/articles/5-fast-facts-about-nuclear-\nenergy#:~:text=Nuclear%20energy%20is%20one%20of%20the%20most%20reliable%20energy%20s\nources%20in%20America (noting that nuclear power plants operated at full capacity more than 93% of \nthe time in 2023)."},{"page":23,"startToken":5612,"endToken":6149,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n9\nit must pay for additional back-up (e.g., on site back-up generators, batteries, etc.). Some \ncustomers might also choose to size to one unit at a dual unit site and use the second unit \nduring refueling outages, i.e., have the second unit be part of its additional supply.   \nAnother way to view this is from the perspective of the data center itself: a grid-supplied \ndata center avails itself of the redundancy and high availability inherent in a wholesale \nmarket overseen by an RTO as well as all the grid-supplied ancillary services. If the data \ncenter were in front of the meter and thus on the network, if one grid supply resource fails, \nanother would be started to make up for the lost output from the failed resource, allowing \ngrid connected load to continue seamless service under most scenarios. \nIn contrast, a co-located center must accept the outage risk associated with a discrete \nresource which will always be higher than grid power even if that resource is individually \nhighly reliable. It also must carry—and pay for—its own reserves. This is a critical distinction \nbetween the two configurations: the services co-located data centers receive from a \ngenerator are not the same as the services the data center would receive if supplied by the \npower grid. \n4. Charge Data Centers Instead of Grid Customers for More of the \nTransmission Facilities \nNot only are risks transferred to the data center, so too are many of the costs. The data center \npays for the private behind-the-meter delivery facilities as well as the electricity. And as I \ndiscussed above, in my experience it is very likely that a data center connecting to the grid \nwill impose significantly more grid upgrade costs that will be socialized than a data center \nsupplied behind-the-meter. The costs for this can be substantial (easily in the billions) and \ncan be spread beyond the data center customer to all other customers.   \n5. Protect Reliability \nReliability always is paramount, and the data center/nuclear pairing will be studied \nappropriately to ensure reliability is maintained on the electric grid. If anything, co-location \nhelps reliability by not trying to move more power a further distance.  \nThe independent grid operator responsible for reliability studies the impacts of the new \nconfiguration at the nuclear facility to ensure reliability is maintained. In the PJM process, \nfor example, PJM conducts a “necessary study” to determine whether a generator’s \nmodification to include behind-the-meter load has any reliability impact on the generator’s \ninterconnection with the grid.8 If so, the generator pays for changes at its facility and any \nnecessary network upgrades to cure the potential issue. PJM also reduces the available \ncapacity for sale through the reduction of the capacity interconnection rights of the \ngenerator to reflect any behind-the-meter sales. Changes to the Interconnection Service \n \n8  \nPJM has provided detailed guidance for the current process to connect co-located load and all the steps \nrequired to ensure reliability. See PJM Guidance on Co-Located Load (March 22, 2024) (Updated April 17, \n2024), \nhttps://pjm.com/-/media/markets-ops/rpm/rpm-auction-info/pjm-guidance-on-co-located-\nload.ashx. Numerous proposals to adjust these rules have been raised at PJM and in other fora."},{"page":24,"startToken":6149,"endToken":6691,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n10\nAgreement on file at FERC may also be made to clarify reliability procedures given the \nbehind-the-meter configuration. \nBecause a co-located data center served in a behind-the-meter scenario has equipment to \nprevent it from taking service from the grid, the grid will not be planned for or otherwise \naccommodate the load. Data centers almost always have their own backup power supply, \nfurther reducing demands that would exist if their backup supply was the network, or if the \nbackup supply itself relied on the network for transmission services. \nIn the case of a nuclear unit, it will also remain connected to the network, as required by law. \nAny power at the nuclear station not committed to the behind-the-meter load still will be \navailable for sale to the network or to others. The electricity is not disappearing or retiring. \nIt is being used to serve load, just as it would if it were injecting into the grid and delivering \nto the data center over the transmission system. \n6. Facilitate Steady Customers for Nuclear Units to Remain in Service \nSpeaking of nuclear, the behind-the-meter configuration supports long-term investment in \nnuclear power plants and the grid and environmental benefits they provide. It creates the \nfinancial security needed to support a subsequent license renewal (the application itself cost \ntens of millions of dollars), making it more likely the nuclear plant and its emissions-free \noutput remain available well into the future and able to consider uprate projects to increase \noutput. \nOver the last decade, nuclear resources faced significant financial uncertainty and one-third \nof the fleet either retired or obtained state support to preserve the assets and prevent higher \nprices and increased emissions.9 The federal government followed with the PTC, which \nprovides near-term financial stability for the nuclear fleet. However, it expires in 2032 just \nas a large portion of the fleet will be going through the NRC regulatory process to extend \noperating licenses, which can take five years or longer to complete. Thirty percent of the \nmerchant nuclear units will need to renew operating licenses in the next 10 years to prevent \nshutdown, increasing to 50 percent over the following decade. Hosting a data center with a \nlong-term power sales agreement would certainly play the key role in a unit owner’s decision \n \n9  \nSee, e.g., D. Murphy & M. Berkman, The Brattle Group, The Impacts of Illinois Nuclear Power Plants on the \nEconomy and the Environment (2019) (prepared for Ill. IBEW State Council and Ill. AFL-CIO), \nhttps://www.brattle.com/wpcontent/uploads/2021/05/17147_the_impacts_of_illinois_nuclear_power_p\nlants_on_the_economy_and_the_environment.pdf; D. Murphy & M. Berkman, The Brattle Group, \nPennsylvania Nuclear Power Plants’ Contribution to the State Economy (2016) (prepared for Penn. \nBuilding \nand \nConstruction \nTrades \nCouncil, \net \nal.), \nhttps://www.brattle.com/wpcontent/uploads/2017/10/5732_pennsylvania_nuclear_power_plants_cont\nribution_to_the_state_economy.pdf; D. Murphy & M. Berkman, The Brattle Group, Salem and Hope Creek \nNuclear Power Plants' Contribution to the New Jersey and Local Economies (2020) (prepared for PSEG), \nhttps://www.brattle.com/wpcontent/uploads/2021/05/20628_salem_and_hope_creek_nuclear_power_\nplants_contribution_to_the_new_jersey_an d_local_economies.pdf."},{"page":25,"startToken":6691,"endToken":6849,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n11\nof whether to undertake the multi-year regulatory process and related investments needed \nto relicense.  \n \n7. Increase Interconnection Opportunities for Renewables \n \nFinally, other beneficiaries of co-location would be renewable projects being curtailed \nbecause of inadequate capacity on the transmission system to deliver from remote locations \nto load centers. Co-location of data center and nuclear generation frees up transmission \nheadroom for new generator resources by making available the transmission capacity \ncurrently used by the host power plant. This benefit can be significant, such as in Illinois \nwhere transmission congestion is projected to increase in the next decade as the state adds \nmore wind and solar generation to meet decarbonization goals. Co-locating data centers at \nIllinois nuclear plants could reduce curtailment of wind and solar output by over 80%.10 \n \n \n \n \n \n \n \n \n \n10  Analysis provided by Constellation Energy reflecting anticipated wind and solar expansion needed to \ncomply with the Climate and Equitable Jobs Act."},{"page":26,"startToken":6849,"endToken":7186,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n12\nRenewable Curtailments – Annual, GWh (Bars) \nRenewable Curtailments – Cumulative, GWh (Lines) \n \n \n \nCo-locating data centers at nuclear plants also could benefit renewable projects idling in the \ninterconnection queue. As mentioned above, PJM’s rules, for example, require a co-locating \ngenerating resource to forgo its capacity interconnection rights which can then free up \ncapacity rights for another resource, which based on PJM’s current queue is likely to be wind, \nsolar or batteries. This can allow those resources to more quickly connect to the \ntransmission grid with no (or fewer) transmission upgrades needed.  \nThere Is No Cost Shift Without a Fundamental Market \nRedesign \nNotwithstanding these benefits and the fact that new load connecting behind-the-meter \nimposes no new costs on grid customers—and cannot use grid power—some opposing \nvoices still claim that transmission and related services are being provided to the \ndisconnected load through the co-located generator. They claim because the generator \nremains connected to the grid, any load connected to the generator is “free riding” on the \nnetwork including because they are synchronized through the generator.11 For proof, they \npoint to ancillary and other grid services provided to generation from the grid and claim \nthat the co-located load benefits. This argument is creative but reflects a fundamental \nmisunderstanding of the open access rate design established by the Federal Energy \nRegulatory Commission (FERC) thirty years ago. \nWhile it is true nuclear plants must remain connected to the grid, any surface appeal this \n“cost shift through the generator” argument has falls apart when we look at current practices \nand precedent. Generators always have been connected to the grid and have never been \n \n11  Simply being synchronized to the grid through a generator which in turn is synchronized to the power grid \ndoes not mean the co-located load receives the same service as those relying on the grid for service. This \nmisses the point elaborated below that the co-located load is not taking service from the grid, even if the \nco-located generator may be."},{"page":27,"startToken":7186,"endToken":7750,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n13\ncharged for most of the services in question. This is a core design choice made by FERC when \nit adopted its open access transmission requirements in Order No. 888.12  \nLike any grid-connected generator, the co-located generator will continue to deliver any \ngeneration not consumed by the data center onto the grid for the benefit of the network’s \ncustomers. Reducing the output of these generators has no material bearing on the system \nor its costs. It would be discriminatory to charge only a few generators for these services and \nwould take a fundamental market design shift to start charging all generators for things like \nfluctuations in their output before these alleged cost shifts could be credible. In other words, \nfor there to be a credible cost shift here, two things would need to happen: first, FERC would \nneed to overhaul the basic open access rates applicable to all generators to start charging \nthem for these services; and, second, co-located generators would have to be the only \ngenerators that do not pay them.13   \nSuch a market redesign also would require regulators to reevaluate how costs are allocated \nwhen generation is located behind a grid customer’s meter, i.e., when it is generation that is \nbehind-the-meter, not load.  Load that owns generation, such as a municipal customer with \ncity-owned generation or a retail customer with roof-top solar, use that generation to reduce \nthe volume of grid-delivered electricity for which they pay.  It would be highly discriminatory \nto apply grid charges to load co-located behind-the-meter of a generator without doing the \nsame to the portion of a customer’s load met by behind-the-meter generation.   \nTo put all this in context, let’s consider each type of grid service and how it applies to a co-\nlocated behind-the-meter load configuration where the generator is connected to the grid \nand the co-located load takes power only from the generator: \n• Transmission service – Since the co-located load is not able to take power from the \ngrid, no system power is transmitted from the grid to the load. Indeed, equipment is \ninstalled to automatically switch the load off in the event the nuclear resource and any \nbackup generation supply become unavailable so that the co-located load is never served \nby the grid. Any power that is transmitted over the grid is an injection from the existing \nnuclear unit to and for the benefit of network load and—like all generating resources in \nevery RTO/ISO market—the generator is not required to pay any transmission service, \neither network or point to point to serve internal network load. The generator has an \n \n12  Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public \nUtilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888, FERC Stats. \n& Regs. ¶ 31,036 (1996).  \n13  Prompted by the increase in variable-output renewable generation across the country, FERC undertook a \nmulti-year investigation fifteen years ago to evaluate whether open access rules should be altered to \nassign generators the cost of certain ancillary services. FERC declined to do so, instead providing a \nframework for any public utility that might seek to impose such costs on generators that includes, among \nother things, requirements to justify with operational data any distinction between different types of \ngenerators. Integration of Variable Energy Resources, 139 FERC ¶ 61,246 at P 315-335 (2012)."},{"page":28,"startToken":7750,"endToken":8269,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n14\ninterconnection service agreement, which will be amended as needed, that provides for \nthe ability to inject power into grid. No cost shift. \n• Distribution service – Since any power supplied by the co-located resources to the \nload would be provided over a privately-owned line and not a utility’s distribution (or \ntransmission) system, no distribution services are being provided by the utility. Sale of \npower from the generating facility to the co-located load remains subject to the state’s \nauthority, including how the state assesses charges used to fund infrastructure and social \nprograms. Depending on the state, there could be state-level charges that co-located load \nwould pay—not for utility distribution infrastructure, but for those state-jurisdictional \nservices or programs. No cost shift. \n• Capacity – Whether the new load is in front of the meter or behind-the-meter being \nserved by existing resources, new resources or excess from existing resources will be \nneeded to meet remaining customer demand. As described above, reducing the amount \nof output an existing generator sells into the market or adding new load to be served by \nthat market has the same effect on capacity—one adds to the “demand” side of the \nequation, while the other subtracts from the “supply” side.14 No cost shift. \n• Energy – Since the co-located load would have no ability to draw power from the grid, \nthere is no grid energy purchased. Any energy sold into the market by the generator in \nexcess of what the co-located load is consuming is treated like every other generator \nconnected to the grid, subject to both day-ahead and real-time pricing. As with any \ngenerator connected to the grid, generators have the right and the ability to sell energy \nto anyone on the grid including externally to other systems. Like capacity, any new load \nbehind-the-meter or in front of the meter is going to increase energy requirements by \neither reducing the supply curve or increasing the demand curve but the effect on the \noverall market is the same. No cost shift.  \n• Ancillary Services \n• Regulation and Frequency Response (aka Load Following) – Variations in the co-\nlocated generator/load balance will change the amount of megawatts a generator is \ninjecting into the grid. This is not the same as withdrawing power from the grid. While \nit is true the grid is absorbing the variations in the generator’s injections, the grid \ndoes this for every generator regardless of whether on-site load is being served. Many \nresource types, particularly intermittent wind and solar, inject into the grid at levels \nthat vary from moment to moment, with grid injections fluctuating up (or down) quite \nquickly and significantly in response to variable weather patterns or other factors. No \ngenerator—regardless of type—in any RTO/ISO region pays for regulation service to \n \n14  While current PJM rules do not give a generator serving behind-the-meter load the ability to retain its \nrights to sell that capacity into the PJM markets, those rules could evolve in a way that enables the \ngenerator to retain such rights (and the related obligations), making that alternative available to co-\nlocated data center customers."},{"page":29,"startToken":8269,"endToken":8784,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n15\nensure the grid is prepared to absorb their moment-to-moment fluctuations in power \noutput. Nuclear units are no exception. It would require a fundamental policy change \nto begin charging all generators for this service, as discussed above. No cost shift \nwithout fundamental market redesign. \n• Operating Reserves – Reserves are primarily to respond to a reduction in generator \noutput or outages; they allow the grid to make up for a sudden change in the \ngeneration/load balance.15 As with regulation service, generators do not pay for \nreserve services regardless of generator type and regardless of whether they have co-\nlocated, on-site load. As for the co-located load, it provides its own reserves through \nits supply arrangement with the host generator and has no ability to obtain reserves \nfrom the grid, nor does the presence of the co-located load increase or affect the \nexisting grid reserves required in any way. Instead, if its co-located generator has an \noutage, the co-located load is on its own to either shed its load or provide its own \nreserves via interruptible power supplies and backup generation. No cost shift \nwithout fundamental market redesign. \n• Reactive Power – Co-located generators are under the same NERC and RTO \nrequirements to provide reactive power to the system as any other units. If, for \nexample, PJM determines as part of its “necessary study” that any reactive \ndeficiencies are caused by the co-location configuration, it will require the co-located \ngenerator to supply the reactive power—most likely through the installations of \ncapacitors at the location that are paid for entirely by the generator—before the co-\nlocated load is connected to the generator. Generator already pays/contributes in \nkind. \n• Black Start – Today no generator pays for black start, yet all generators (and all \nloads) benefit from the grid being restored. To the extent the nuclear plant’s location \nis included and prioritized in any restoration plan, FERC could change the current \nparadigm and find that it may be appropriate for generators to pay a share regardless \nof whether it hosts co-located load. The cost would be minimal. Using PJM as an \nexample, assigning a 1,000 MW nuclear unit a share of PJM’s total $73 million annual \nblack start costs would amount to a $590,000 per year charge for the nuclear unit that \nreduces costs assigned to others by 0.008 percent. Even if black start charges were \nassessed to generators, it does not follow that full network service should apply to co-\nlocated load. Generators could pay, but it would require fundamental market \nredesign.  \n• Station Power Services and Emergency Services Supporting Nuclear Units – To \nthe extent that a nuclear resource is relying on grid-supplied power to meet its station \npower service needs and/or NRC license obligations, it should pay for those services. \nThis is no different than how any other resource connected to the grid is treated and \nthere is no reason to alter that treatment just because there is a load behind that \n \n15  Rapid load changes or dispatch error can also cause the needs for reserves."},{"page":30,"startToken":8784,"endToken":9027,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n16\nresource because that load is unable to avail itself of those services. Generator already \npays. \nThe only way serving co-located behind-the-meter generation could create a cost shift to grid \ncustomers is if we implement market design changes to begin charging all generators for \nload following, reserves, and black start but then excused a generator supporting a behind-\nthe-meter load from those charges. I am not aware of any current efforts to enact any such \nproposals as the general view is that the provision of these services to generators benefits \nthe grid much more than it costs. \nNext Steps \nPolicymakers, regulators, and industry have a basic obligation to serve load. There is no \ndispute that it will take years for large data centers and other loads to connect to the grid \nunder the standard utility models. Our collective focus should be on finding solutions that \nbest manage reliability, affordability (for all), efficiency, and speed, without standing in the \nway of data centers choosing to pay for and provide their own transmission facilities and \npower supply (and backup power supply). Under the co-location behind-the-meter model, \ndata centers and nuclear plants can do so without risking reliability or shifting costs to \nnetwork customers, including those in other states. This data center/nuclear pairing is not \nonly symbiotic for the parties, but for anyone with an interest in the promises of the digital \nage and a sustainable future."},{"page":31,"startToken":9027,"endToken":9245,"text":"Michael Kormos | The Co-Located Load Solution | July 2024 \n17\nBiography \n \nMichael Kormos is an electric utility consultant with extensive \nexperience solving complex problems and leading large teams across \nthe energy industry. Until 2021, Mr. Kormos was Sr. Vice President, \nTransmission & Compliance for Exelon Corporation, where he was \nresponsible for the operations and long-term planning for transmission \nsystems of Exelon utilities Atlantic City Electric, Baltimore Gas & \nElectric, ComEd, Delmarva Power, PECO, and PEPCO. Mr. Kormos \nshaped Exelon and its utilities’ policy positions on issues related to the \nFederal Energy Regulatory Commission, Regional Transmission \nOrganizations (RTOs), and national transmission matters. \n \nBefore joining Exelon, Mr. Kormos spent 27 years at PJM Interconnection, the RTO responsible \nfor transmission systems in 13 Mid-Atlantic and Midwestern states, and Washington, D.C. As \nPJM’s Chief Operations Officer, he supported the development and implementation of \ncompetitive wholesale markets in PJM and earlier in his career at PJM, he oversaw an \noperational expansion that tripled size of the system controlled by PJM. He also held \nmanagement and engineering positions in transmission operations while at PJM. \n \nMr. Kormos has also served on the board of director for Reliability First Corporation; an officer \nof the Eastern Interconnection Planning Collaborative and the Eastern Interconnection Data \nSharing Network; and as a member of the North America Energy Reliability Corporation \noperating committee."},{"page":32,"startToken":9245,"endToken":9255,"text":"Michael Kormos Post-Conference Comments \nMd. Pub. Serv. Comm’n Docket PC61"},{"page":33,"startToken":9255,"endToken":9644,"text":"1 \n \nBEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND \n \n \n* \nSENATE BILL 1 CO-LOCATION STUDY \n \n* \nADMINISTRATIVE DOCKET \n \n \n \n \n \n \n \n* \n \n          PC 61 \n* \n* \n* \n* \n* \n* \n* \n* \n* \n* \n* \n* \n* \n \nPOST-CONFERENCE COMMENTS OF MICHAEL KORMOS \nPursuant to the Public Service Commission’s (Commission) notice inviting comments on issues \ndiscussed during the September 24, 2024 technical conference (Technical Conference) in this docket, I \nsubmit these comments to address potential confusion regarding the efficacy of PJM Interconnection, \nL.L.C.’s (PJM) Necessary Study process used to evaluate a generator’s proposed addition of co‐located \nload and how that Necessary Study compares to analysis done by a Transmission Owner and ultimately \nPJM in response to a request to connect a similar load to the grid.  Given that the discussion of these \nissues spanned multiple panels during the conference, I summarize below the scope and timing of these \nvarious studies to aid the Commission in the preparation of its report to the legislature.   \n1. Transmission Owner study process for a new load connected to and served from the \ntransmission system \nI start by reviewing the study process for new loads seeking to connect to and receive service from \nthe transmission system, which I refer to simply as network load, since that is the model against which it \nappears the Commission is evaluating the impacts of fully isolated co‐located load.1    \n \n1 I use the term “fully isolated co‐located load” to mean load that is connected to a generator behind the \ngenerator’s meter and that, due to equipment and systems installed by the load and/or the generator, has no \nability to receive electricity from the transmission system.  The Commission’s use of the term non‐networked co‐\nlocated load at the Technical Conference appeared intended to refer to this type of load configuration.  I use the \nterm fully isolated co‐located load because it clearly communicates that this load is isolated from the power grid \nand, therefore, only capable of receiving electricity from the host generator.  A load that is connected to a \ngenerator behind the generator’s meter but that also has access to electricity from the transmission system could \nbe referred to as networked co‐located load.  For purposes of transmission planning, the addition of a networked \nco‐located load would be studied similar to the addition of a network load, since both would be connected to and \ntake power from the transmission system."},{"page":34,"startToken":9644,"endToken":10006,"text":"2 \n \nRequests for new network load are made to the local distribution utility which then refers that \nrequest to the host Transmission Owner (if different) to determine if upgrades to the transmission \nsystem are needed, as is the case with most large loads.  The host Transmission Owner conducts studies \nto ensure that the addition of that load to its transmission system does not impair reliability.  The \ncriteria and specifics of these studies are at the discretion of the Transmission Owner and can (and do) \ndiffer from Transmission Owner to Transmission Owner.  In general, though, Transmission Owners \nevaluate local delivery headroom at the point of interconnection to determine if local upgrades – i.e., \nupgrades on that Transmission Owner’s system – are needed to enable the addition of the new network \nload.  If any upgrades are identified, the Transmission Owner typically proceeds with those upgrades \nthrough the Supplemental Project planning process at PJM, which results in the posting of those \nupgrades for stakeholder awareness and a “do no harm” check by PJM.  As a Supplemental Project \nunder the PJM Tariff, the costs of these upgrades can be allocated to the Transmission Owner’s entire \nzone rather than being assigned individually or directly to the new network load. \nWhile robust for what it evaluates, the Transmission Owner’s study of new network load is locally \nfocused.  This is because each individual Transmission Owner generally focuses its analysis on impacts \nwithin its own system rather than impacts on the broader grid.  Only PJM typically applies such a \nsystem‐wide focus but, per the PJM tariff, PJM is not involved in the local studies conducted by the \nTransmission Owner.  The “do no harm” analysis conducted by PJM for Supplemental Projects considers \nonly whether the local upgrades identified by the Transmission Owner will cause any new, incremental \nreliability violations.  Under this “do no harm” analysis, PJM adds the Supplemental Project to its \nRegional Transmission Expansion Plan (RTEP) model and runs the RTEP analysis with the Supplemental \nProject.  If there is no violation, the test is passed; if there is a violation, the Transmission Owner works \nwith PJM to modify its project or otherwise address the problem.  However, PJM does not review,"},{"page":35,"startToken":10006,"endToken":10388,"text":"3 \n \nevaluate or otherwise verify the Transmission Owner’s studies.  The “do no harm” review is therefore \ninherently limited by design.   \nThe system‐wide review conducted by PJM does not occur until PJM begins its RTEP process in the \nplanning year following the Transmission Owner’s processing of the local planning studies.  This means \nthat the interaction of the new network load with other changes that are occurring across the broader \ngrid are not evaluated until PJM aggregates that new network load with all other new load, as well as \nchanges in the generation stack, as part of the baseline RTEP analysis.  Given the local focus of the \nTransmission Owner’s study and the somewhat limited nature of PJM’s “do no harm” review, the \naddition of the new network load is a potential driver of additional upgrades across the broader PJM \nsystem.  By that point, though, the Transmission Owner has already moved forward with connecting the \nnew load, baking that demand into its load forecast and thus contributing to the need for RTEP \nupgrades.2     \nAs discussed at the Technical Conference, this is a critical distinction between the studies conducted \nfor new network load and new fully isolated co‐located load (which I discuss in more detail below).  \nWhen the annual baseline RTEP is run, a new network load most likely already has an interconnection \narrangement with the Transmission Owner and PJM has no authority to prevent or delay the \nTransmission Owner from bringing the new network load online.  PJM can only work with the \nTransmission Owner and/or load to delay service until any needed upgrades uncovered in the annual \nRTEP study are completed.  PJM is not a signatory to any arrangements between the Transmission \nOwner and the load and, thus, has limited ability to adjust new load implementation timing.   \nThis sequenced process starting with the Transmission Owner’s locally focused review can result in \nreliability problems being uncovered only after the annual baseline RTEP is run.  For example, a number \n \n2 PJM is evaluating how it can improve the forecasting of and planning for data centers and other large loads in its \nannual RTEP process.  One risk to earlier inclusion of projected data center network load, however, is that \ntransmission will be built for load that does not materialize, needlessly increasing costs for consumers."},{"page":36,"startToken":10388,"endToken":10751,"text":"4 \n \nof data centers were granted service by a Transmission Owner in Northern Virginia only to later be told \nby PJM that the aggregation of data center projects in the area was triggering billions of dollars of \ntransmission upgrades in order to maintain reliability on the regional grid.  Even though the new \nnetwork load had been cleared by the Transmission Owner through its local planning process, the data \ncenters have been asked to defer in‐service dates in order to avoid the reliability problems identified by \nPJM during its later‐in‐time RTEP analysis.  Meanwhile, the costs of these regional upgrades are being \nspread across customers throughout PJM. Unlike Supplemental Projects that are allocated only to the \nTransmission Owner’s zone, PJM rules require that the cost of RTEP upgrades be spread across the \nregion in proportion to a combination of power flows and peak load contribution, depending on the \ncharacteristics of each upgrade.  This is why Maryland consumers are paying for roughly $550 million of \nthe $5 billion in RTEP upgrades being constructed to enable network load data centers in Northern \nVirginia.3  \n2. Necessary Study process for fully isolated co‐located load \nUnlike a new network load, PJM leads the evaluation of new fully isolated co‐located load from the \noutset.  A generator connected to the PJM transmission system is not permitted to alter its equipment \nin order to serve co‐located load without prior review and approval of PJM.  This review is initiated \nthrough the submission of a request to modify the generator’s equipment under the Interconnection \nService Agreement, which is evaluated by PJM through what is referred to as a Necessary Study.  The \nNecessary Study is not limited to a local focus and instead evaluates the incremental impact on the \nentire PJM system of the generator’s proposed reduction in deliveries to the grid in order to instead \ndeliver that energy to the co‐located customer.  The Necessary Study usually includes all of the reliability \nscreens, North American Electric Reliability Corporation (NERC) considerations and other review criteria \n \n3 Protest and Comments of Maryland People’s Counsel, PJM Interconnection, L.L.C., FERC Docket No. ER24‐843 \n(filed Feb. 9, 2024), at 2."},{"page":37,"startToken":10751,"endToken":11139,"text":"5 \n \nevaluated by PJM in its annual RTEP analysis, including incorporation of each Transmission Owner’s local \nplanning requirements.  But unlike the Transmission Owner’s local evaluation of a new network load, \nPJM’s evaluation of a new fully isolated co‐located load includes all relevant grid information because \nPJM uses the most recent RTEP case as the starting point for its analysis.  PJM confirmed this at the \nTechnical Conference: “The necessary study process would have the same reliability criteria of what we \nwould do in our normal regional transmission expansion planning.”4By design, then, the Necessary Study \nfor a new fully isolated co‐located load takes a broader view than the local studies performed by a \nTransmission Owner when it evaluates a service request for new network load. The Necessary Study \nensures that the addition of new fully isolated co‐located load will not adversely impact reliability of the \nPJM grid including the host Transmission Owner’s system in one step, while the Transmission Owner’s \nstudy of new network load first ensures that the addition of that load will not adversely impact reliability \nof the Transmission Owner’s system (at which point the Transmission Owner typically grants service) \nonly to be subsequently incorporated into a baseline RTEP analysis in order to fully evaluate impacts on \nPJM grid reliability as a second step.  For a new fully isolated co‐located load PJM ensures that local \ntransmission issues are considered as part of its Necessary Study process by explicitly including an \nopportunity for the host Transmission Owner to review its analysis.  That review should result in the \nTransmission Owner conducting studies comparable to those used to evaluate a new network load but \nas described above, PJM has no role in those studies and so it is not entirely clear what level of analysis \nis conducted by the Transmission Owner.  Another key distinction with the Necessary Study is that, as \ndiscussed during the Technical Conference, PJM can hold up the timing for when a generator can begin \nserving fully isolated co‐located load because PJM must agree to the changes proposed by the generator \nin order for the generator to move forward.  If PJM identifies any issue as part of the Necessary Study, \nthe new load cannot come online until the issue is addressed.  PJM explained at the Technical \n \n4 Technical Conference Tr. at 57."},{"page":38,"startToken":11139,"endToken":11539,"text":"6 \n \nConference that “[PJM] can definitely say these transmission reinforcements need to be, obviously not \nonly paid for by the generator, but they need to be completed and in service before the co‐location \noccurs.  And so, in that sense, we can ensure that the transmission system is reliably supplied.”5  In \naddition, PJM requires that the costs for any upgrades uncovered by a Necessary Study be borne by the \ngenerator and/or its associated co‐located load with no costs spread to other grid customers.  As PJM \nstated during the Technical Conference: “Any required transmission upgrades to support the requested \nconfiguration will be identified and must be implemented at the cost of the generator before the co‐\nlocated load is permitted.”6   \n3. Study timing and related considerations \nTo be clear, all the studies described above are performed using snapshots in time of the relevant \nsystem.  This includes Necessary Studies, annual RTEP analysis and Transmission Owner studies of their \nsystems.  This is, however, an added benefit of using the Necessary Study process to evaluate the \nreliability impact of adding a large load within the PJM footprint.  Baseline RTEP studies and Necessary \nStudies use the same model, updated to include all the relevant changes for the applicable period and \nreason studied.  Thus, the analyses performed for a Necessary Study reflect all changes already made to \nthe PJM system to ensure reliability at the time of the analysis, with the one additional change of adding \nthe proposed fully isolated co‐located load.  This ensures that any reliability issues identified in the \nNecessary Study are only caused – and paid for – by the proposed fully isolated co‐located load.   \nSubsequent RTEP analysis (including the annual baseline RTEP analysis) will include the new load \nand any system changes to accommodate it, regardless of configuration (co‐located or networked), \n \n5 Technical Conference Tr. at 70; see also PJM Guidance on Co‐Located Load, at ¶ 7 April 17, 2024), \nhttps://www.pjm.com/‐/media/marketsops/ \nrpm/rpm‐auction‐info/pjm‐guidance‐on‐co‐located‐load.ashx (PJM noting that “[s]ervice to the co‐located load \npursuant to the co‐located load configuration may not commence until the necessary PJM service agreement(s) \nhas been fully executed by the parties, filed with and accepted by the FERC, and all required system \nreinforcements, system protection facilities, and metering are in place.”).  \n6 Technical Conference Tr. at 13."},{"page":39,"startToken":11539,"endToken":11875,"text":"7 \n \nalong with all other changes in load and generation (including generation retirements and delists), and \ntransmission topology elsewhere in the PJM footprint that have already been reviewed by PJM.  Any \nupgrades required to ensure reliability will be identified and implemented, and the costs of those \nupgrades will be allocated per PJM’s rules.  Here we find another benefit of co‐locating large loads.  As \nnoted above, PJM rules require that the cost of annual RTEP upgrades be spread across the region in \nproportion to power flows and/or peak load contribution.  Because fully isolated co‐located loads do not \ntake power from the grid, they are not included in peak load calculations, which results in lower RTEP \nallocations compared to that same load being network load.  By encouraging large loads to co‐locate at \ngenerators on a fully isolated basis, states like Maryland can reduce the amount of regional transmission \ncosts allocated to consumers in the state.   \n*           *           *           *           * \nIn summary, PJM’s Necessary Study process consists of a rigorous set of system‐wide analyses that \nare consistent with its baseline RTEP analysis while also considering local issues in order to capture all \nimpacts of the co‐located load on the system.  Any impacts identified must be resolved and paid for \ndirectly by the generator and/or the fully isolated co‐located load, and the generator may not proceed \nwith its proposed new configuration until PJM agrees that any detrimental grid impacts have been \nresolved.  While Transmission Owner and PJM studies of new network load consider these same issues, \nthey do so through a two‐step process that disconnects the granting of service by the Transmission \nOwner from the evaluation of PJM grid impacts, and that provides PJM with no authority to prevent or \ndelay the Transmission Owner from bringing the new network load online.  Maryland should encourage \nlarge loads to choose co‐location because of the increased transparency and accountability provided by \nthe Necessary Study process. \n \n \n \n \n \n \n \n \nDated:  October 16, 2024 \n \n \n/s/ Michael Kormos \n \n \n \n \n \n \n \nMichael Kormos \n \n \n \n \n \n \n \nkormosm@comcast.net"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":5,"startToken":0,"endToken":57},{"p":3,"at":5,"title":"I. QUALIFICATIONS AND OVERVIEW OF AFFIDAVIT","method":"printed heading","endPage":4,"endAt":1096,"startToken":57,"endToken":518},{"p":4,"at":1096,"title":"II. BENEFITS OF CO-LOCATION","method":"printed heading","endPage":5,"endAt":1374,"startToken":518,"endToken":897},{"p":5,"at":1374,"title":"III. PJM STUDIES","method":"printed heading","endPage":6,"endAt":1268,"startToken":897,"endToken":1195},{"p":6,"at":1268,"title":"IV. MANY OF PJM’S AND OTHERS’ CONCERNS ARE NOT UNIQUE TO CO-LOCATED LOADS","method":"printed heading","endPage":15,"endAt":61,"startToken":1195,"endToken":2583},{"p":15,"at":61,"title":"Table of Contents","method":"printed heading","endPage":39,"endAt":2211,"startToken":2583,"endToken":11875}]}
