{"document":{"slug":"rec-20250423-5262","title":"Answer of Constellation Energy Generation, LLC re PJM Interconnection, L.L.C.’s Tariff filing","issued":"2025-04-23","accession":"20250423-5262","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20250423-5262_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5262","tier":"record","sha256":"5ceaa382de69ad00fda8b547543fe7d697dd8dc21ee2219eaad7e7ac9e3b2721","pages":110,"tokens":36340,"emptyPages":[],"textThemes":["colo","study","adequacy","flex"]},"pages":[{"page":1,"startToken":0,"endToken":277,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n \n \nLarge Loads Co-Located at Generating Facilities \n \n \nConstellation Energy Generation, LLC. \n \nv. \n \nPJM Interconnection, L.L.C. \n) \n \n \n) \n \n \n) \n) \n) \n) \n) \nDocket No. EL25-49-000 \n \n \nDocket No. AD24-11-000 \n \n \nDocket No. EL25-20-000 \n(Consolidated) \n \n \n \n \nANSWER OF CONSTELLATION ENERGY GENERATION, LLC \nConstellation submits this answer1 and respectfully requests that the Commission adopt its \npreliminary finding that the existing PJM Tariff is unjust and unreasonable because it lacks clarity \nin how it applies to a variety of co-location arrangements.  The position favored by the Indicated \nTransmission Owners (and PJM to a lesser extent) for a one-size-fits-all solution with full Network \nIntegration Transmission Service (“NITS”) billed on gross load is wrong as a matter of law and \npolicy.  Constellation asks the Commission to (1) adopt most of PJM’s proposed options for \nreplacement rates with the modifications proposed herein, which will permit the prompt \ninterconnection of data centers pursuant to critical national interests while minimizing \ntransmission upgrade costs to consumers and maximizing efficient use of existing energy \ninfrastructure, or (2) initiate time-limited settlement discussions to establish an appropriate \nreplacement rate. \n \n1 Specifically, Constellation Energy Generation, LLC (“Constellation”) files this answer to the Commission’s Order \nto Show Cause, PJM Interconnection, L.L.C., et al., 190 FERC ¶ 61,115 (2025) (“Show Cause Order”), and also \nresponds to the answers of PJM Interconnection, L.L.C. (“PJM”), the “Indicated Transmission Owners,” Public \nService Electric and Gas Company (“PSEG”) and others pursuant to Rule 213 of the Commission’s Rules of Practice \nand Procedure, 18 C.F.R. § 385.213.  The Indicated Transmission Owners are a subset of Transmission Owners in \nPJM, excluding PSEG, for example."},{"page":2,"startToken":277,"endToken":581,"text":"2 \nTABLE OF CONTENTS \nAnswer of Constellation Energy Generation, LLC ........................................................................ 1 \nExecutive Summary ........................................................................................................................ 3 \nArgument ...................................................................................................................................... 13 \n \nRequiring All New Load to Take NITS Is Unjust and Unreasonable .............................. 13 \nA. \nEnsuring the Prompt Connection of Data Centers Is Imperative to America’s \nEconomic Competitiveness and National Security. .............................................................. 15 \nB. \nLimiting Large New Load to NITS Imposes Billions of Dollars of Unnecessary \nTransmission Upgrades. ........................................................................................................ 19 \nC. \nRequiring Co-Located Loads to Always Take NITS Unduly Limits State Jurisdiction \nand Flexibility. ...................................................................................................................... 26 \nD. \nRequiring All Large New Load to Take NITS Violates Rate Design Principles. ...... 28 \n1. \nA Just and Reasonable Rate Design Must Account for the Different Costs Caused \nby Different Configurations. ............................................................................................. 28 \n2. \nLimiting Large New Load to NITS Is Unduly Discriminatory, As Is Requiring Co-\nLocated Load to Pay Based On Gross Load. .................................................................... 32 \n3. \nRequiring Large New Loads in Every Co-Location Configuration to Pay for All \nAncillary Services Is Unjust and Unreasonable. ............................................................... 33 \nE. \nNo Party Has Demonstrated That a NITS-Only Approach Is Just and Reasonable and \nNot Unduly Discriminatory or Preferential. ......................................................................... 35 \n The Commission Should Adopt a Replacement Rate of Several Co-Location Options ... 36 \nA. \nPJM’s Proposed Options Are the Foundation for Just and Reasonable Rates. .......... 36 \n1. \nOption 1 - Firm Service Without Co-Location ....................................................... 38 \n2. \nOption 2 – Firm Service With Co-Location ........................................................... 38 \n3. \nOption 3—Behind-the-Meter Generation ............................................................... 41 \n4. \nOption 4—Generator-Contingent Service with No Backup Grid Service .............. 45 \n5. \nOption 5—Generator-Contingent Service with Optional Backup Grid Service ..... 50 \n6. \nOption 6—Bring Your Own Generation................................................................. 52 \n7. \nOption 7—Interim Interruptible Transmission Service .......................................... 55 \n8. \nOption 8—Expansion of Demand Response Opportunities ................................... 58 \nB. \nCo-Location Has No Difference in Effect on Resource Adequacy. ........................... 58 \nC. \nThe Commission Should Adopt Constellation’s Proposed Replacement Rates or, \nAlternatively, Establish Time-Limited Settlement Proceedings in this Docket ................... 64 \nAnswers to the Briefing Questions ............................................................................................... 68 \nConclusion .................................................................................................................................. 108"},{"page":3,"startToken":581,"endToken":935,"text":"3 \nEXECUTIVE SUMMARY \nThis proceeding is about clarifying the PJM Tariff—and in some cases, adding appropriate \nrules—so that the significant data center load coming onto the system can be served promptly and \nefficiently.  The Commission was right that the existing PJM Tariff lacks requisite clarity, and this \nhas paralyzed co-location efforts and service to data centers.  Consequently, the PJM Tariff is not \njust or reasonable.  This load must be connected promptly because of its critical strategic \nimportance to this nation:  we are in a race with China and other nations for supremacy in Artificial \nIntelligence (“AI”), and we will lose the race if we are not able to promptly connect the data centers \nthat hyperscalers require to train their models and serve users.  President Trump has explained that \nthe United States needs to be “very competitive with China and others” in the development of AI \ninfrastructure and that co-location enables such development “on a very rapid basis.”2  Limiting \nthis new load to only one type of front-of-the-meter service that requires a years-long \ninterconnection process, or even (as we have seen in Ohio) that are subject to a moratorium on \nnew load connection, will lead to defeat.  The load also must be connected efficiently: the \nCommission should be looking for ways to bring this new load online while minimizing the need \nfor costly system upgrades paid for by all consumers.   \nAccording to the Indicated Transmission Owners, however, all new load should be required \nto take front-of-the-meter service and become a NITS customer paying for service based on gross \nload.3  The Indicated Transmission Owners read the existing Tariff to require this one-size-fits-all \nlimitation, and they have refused to perform studies for new load seeking a different configuration.  \nIt is no surprise that they want to foreclose customers from any other option: large new NITS \n \n2 The White House, Remarks by President Trump at the World Economic Forum, January 23, 2025, 11-12, \nhttps://www.whitehouse.gov/remarks/2025/01/remarks-by-president-trump-at-the-world-economic-forum/. \n3 Answer of the Indicated PJM Transmission Owners, Docket No. EL25-49-000, et al., at 3 (filed Mar. 24, 2025) \n(“Indicated Transmission Owners Answer”)."},{"page":4,"startToken":935,"endToken":1361,"text":"4 \ncustomers mean extensive system upgrades, which the transmission owners get to build and add \nto their rate base.  Having this be the only option in PJM is unjust and unreasonable: it results in \nyears of delay in connecting new load, induces massive and unnecessary overbuild of the system, \nimposes substantial additional costs on existing customers who are already struggling to pay their \nbills, and fails to send efficient signals about where load should be sited.4   \nRequiring all new load in PJM to sign up for front-of-the-meter NITS also usurps state \nauthority to decide that a generator should be able to make a direct sale to an end-user.  Under the \nFederal Power Act, the Commission has no jurisdiction over “facilities used for the generation of \nelectric energy” or over retail sales.5  Instead, states have jurisdiction over those subjects, and \nmany states allow generation facilities to serve end-use customers.  The Pennsylvania Public \nUtility Commission explained that such a decision is not “a failure to regulate” and it is “not an \noversight,” but rather “it is a deliberate choice that has been enshrined in Pennsylvania law for \nalmost a century.”6  The Commission may not obstruct that lawful state choice by compelling \ngenerators to sell all their output at wholesale and by forcing end-use customers to pay for \ntransmission service they do not want and do not use.7  For all these reasons, the Commission \nshould find the existing Tariff unjust and unreasonable.   \n \n4 A finding that the PJM Tariff is unjust, unreasonable and unduly discriminatory for failing to set forth rules governing \nco-location arrangements would not require the Commission to amend the pro forma Open Access Transmission \nTariff (OATT).  PJM is uniquely situated, with a large amount of data centers already in operation, a generator \nalready approved to serve co-located load, and on-going disputes about what rules should apply to additional co-\nlocation arrangements, including guidance that PJM has enforced (but since rescinded) and Transmission Owners \ntaking diverging positions on how, and if they are required to, processing co-location related requests. \n5 16 U.S.C. § 824(b). \n6 Comments of the Pennsylvania Public Utility Commission at 3, Docket Nos. EL25-49-000, AD24-11-000, and EL25-\n20-000 (filed Apr. 22, 2025).  \n7 For example, nothing compels generators to become exempt wholesale generators (“EWGs”), and nothing requires \nexisting EWGs to maintain that status.  Whether to be an EWG, or instead bear the recordkeeping burdens under the \nPublic Utility Holding Company Act but be able to make direct sales as well as wholesale sales, is up to the generator."},{"page":5,"startToken":1361,"endToken":1699,"text":"5 \nIn designing a replacement rate, the Commission should embrace a range of possible \nmodels that recognize, as the Commission found, “that different co-location arrangements are \nlikely to use or benefit from the transmission system in different ways depending on how they are \nconfigured and, moreover, that those different configurations will themselves likely have different \nimpacts on the transmission system.”8  As PJM’s filing suggests, there are many potential \nconfigurations load could select that would allow it to connect more quickly while imposing fewer \nsystem costs than limiting load to a front-of-meter configuration.  Allowing load to select a \nconfiguration that best serves its needs will enhance national security and national economic \ncompetitiveness by speeding connection for those new customers who need to connect quickly and \nwill save existing customers money by minimizing system upgrades.  \nThe available options for load should include models that attempt to use the headroom on \nthe existing transmission system as well as those that avoid or minimize costly and time-\nconsuming system upgrades.  Some new load may want a firm, front-of-the-meter connection and \nbe willing to wait for the requisite studies to be performed and transmission upgrades to be \ndesigned, sited, permitted, and built.  Other new load may be willing to locate behind-the-meter \nand forgo reliance on the grid to be connected more quickly while still ensuring grid reliability.  \nExisting customers benefit from such alternative approaches because they reduce the amount of \nsystem upgrades that trigger cost socialization.  Existing customers also benefit from co-locating \ngeneration and supply near each other because it reduces demands on the transmission system, \nincluding the risks of grid instability caused by large load drop events such as those that recently \noccurred in Northern Virginia (all caused by grid-connected large loads).9  Other new loads may \n \n8 Show Cause Order at P 76.   \n9 See Kormos Aff. at 7-8; Mark Lauby, NERC Activities and Plans to Address Reliability Impacts from Large Load \nIntegration at 3-4 (Apr. 17, 2025), https://www.ferc.gov/news-events/news/presentation-nerc-seeks-address-\nreliability-impacts-large-load-integration (“NERC Large Load Presentation”)."},{"page":6,"startToken":1699,"endToken":2025,"text":"6 \nbe willing to agree to interruption of service at peak times, making the most of the current grid’s \nheadroom until the transmission upgrades needed for full NITS are constructed.  Existing \ncustomers also would benefit from that choice of service by the new load because the new load \nwould be added without the immediate need for any additional capacity.  The Commission should \nestablish rules that allow new load (and the states) this range of choice and adopt corresponding \nrates that promote efficiency and respect principles of cost causation.  \nIn its filing, PJM has identified eight potential options for how large, new load might \nconnect.10  All but one of these options can be just and reasonable, though some require the \nmodifications we describe below, and the Commission should direct PJM to implement them, as \nmodified, in a compliance filing.   \nOption 1 and 2 are traditional in-front-of-the-meter NITS in which load is billed on a gross \nbasis (Option 2 merely joins the generator and the load at the same point of interconnection, but \notherwise is standard NITS).  Of course, no one disputes that new load should be able to connect \nto the system as a NITS customer if it chooses.  But, as discussed, making NITS the only option \nfor large new loads is unjust and unreasonable and unduly discriminatory and preferential.  In \naddition, Option 2, which bills for NITS on a gross basis even though the generator is actually \nlocated at the same point of interconnection as the load, eliminates the incentive from a \ntransmission rate perspective for the load to site itself at or near the point of delivery.  This \nincentive could be restored if the load co-located with the generator were charged for NITS based \non the greater of (i) NITS with net billing or (ii) a discounted standby charge to “reflect the fact \n \n10 Answer of PJM Interconnection, L.L.C., Docket No. EL25-49-000, et al., Exh. A (filed Mar. 24, 2025) (“PJM \nAnswer”)."},{"page":7,"startToken":2025,"endToken":2403,"text":"7 \nthat many co-located generators will be on and available during the system peak, offsetting the co-\nlocated load and reducing the system cost impact of all loads in this configuration.”11 \nOption 3 is the existing tariff model for Behind-the-Meter Generation (“BTMG”), that \nallows load to take grid service when the co-located load exceeds the co-located generator’s output. \nThe load is billed for NITS on a net basis, i.e., when the load exceeds the output of the co-located \ngenerator.  As applied to co-location, the name “Behind the Meter Generation” is misleading as a \nsignificant portion of the generation is likely to remain in-front-of-the-meter, but a portion would \nbe dedicated to serving behind-the-meter load, thereby reducing demands the large new load would \nnormally impose on the grid.  As PSEG explains in detail in its response, this configuration is a \ntime-tested model for co-location, under which the load is charged a rate based on its net usage of \nthe transmission grid.12  This model incentivizes the efficient use of the grid by encouraging new \nload to locate at a site that will minimize the need for system upgrades.  While PJM states that this \noption was intended for smaller loads,13 the Tariff contains no such restriction.  And PJM’s only \nexpressed concern about the use of this option by larger loads is that PJM does not currently carry \nreserves for this load.14  That is no reason to reject the option.  PJM’s current approach can easily \nbe modified to include reserves for large loads if necessary.  PJM focuses on a small subset of \nexisting BTMG—that using “wholesale” BTMG—but it disregards the more common retail \nBTMG.  PJM’s focus on “wholesale” BTMG appears to be intended to create the false impression \nthat use of PJM’s BTMG netting rules is limited.  In fact, as PSEG explains, it is not.15   \n \n11 Testimony of Zachary Ming, Exh. 2 at 55.  \n12 Response of Public Service Electric and Gas Company, Docket No. EL25-49-000, et al., at 13-18 (filed Mar. 24, \n2025) (“PSEG Response”). \n13 PJM Answer at 13. \n14 Id. at 13, n.5. \n15 PSEG Response at 13, 17.  See also, Ming Testimony at 21 (noting that over 10,000 MW of BTMG of one resource \ntype – solar – exists in PJM.)"},{"page":8,"startToken":2403,"endToken":2733,"text":"8 \nOption 4 would allow load co-located with generation to elect to receive service directly \nfrom the generator, with protection schemes in place to prevent the load from drawing on the grid.  \n(Option 5 is similar, except that the load could call on power from the grid as available.)  Many \nstates allow generators to engage in direct sales, as PJM acknowledges in its answer.16  The \nCommission should not intrude on the states’ jurisdiction by foreclosing this option, as that would \ngrossly overstep federal authority.  As the load is not drawing any power from the grid—it \nphysically cannot do so with protection schemes in place—it is not using the transmission system, \nso transmission rates would not apply.  In attacking Options 4 and 5, the Indicated Transmission \nOwners focus almost exclusively on arguing that the load should pay ancillary services, conflating \nbenefits received from ancillary services by the co-located generator with the use of the \ntransmission system to deliver energy.  It may indeed be appropriate in this type of configuration \nto pay some amount for ancillary services, such as regulation and black start.  But that does not \nmean the load should be paying a NITS transmission rate for transmission services it does not use.  \nOption 4 or 5 could also serve as a transitional service for load that prioritizes connecting \nimmediately, but that ultimately will want to become a NITS customer once any needed system \nupgrades are complete.  The availability of these options facilitates prompt connection and \nminimizes system upgrade costs for load willing to receive generator-contingent service. \nOption 6 is a “bring your own generation” approach that allows new generation resources \nto skip the generator interconnection queue if they can demonstrate support from an individual \nload, rather than being favored based on their shovel-readiness and contributions to reliability, as \nPJM’s Reliability Resource Initiative (“RRI”) proposal envisioned or the first-ready, first-served \ninterconnection queue reforms implemented in PJM in 2023.  While PJM does not explicitly \n \n16 PJM Answer at 27-29."},{"page":9,"startToken":2733,"endToken":3081,"text":"9 \ncondition load interconnection upon a load bringing its own generation, Option 6 nevertheless \ncreates a strong incentive for the states to pursue such a course by affording the “new” generation \nresource a significant advantage in the queue.  Option 6 also discriminates against existing \nresources and new resources that have not contracted with load.  Option 6 thus undermines the \ninvestment signal that is being sent by the capacity market, instead of reinforcing it.  PJM indicated \nthat not all its options were created equal, and this option does not merit further consideration. \nOption 7 is an interruptible network transmission service that would be available on a \nprovisional basis until – as PJM proposed, resource adequacy balance is achieved, or – as \nConstellation recommends, the network upgrades required for NITS are complete.  PJM would \nhave the right to interrupt the load under pre-defined criteria relating to transmission constraints \nor reserve shortages.  Option 7 helps to maximize the use of existing infrastructure, allowing \ncritical large load to be added quickly and served during virtually all hours of the year while \ntransmission upgrades are being constructed.  PJM’s right to curtail the load during defined criteria \nalso means that the load, while it is receiving this service, need not be counted toward the region’s \nreliability requirement.  A recent study by the Nicholas Institute at Duke University found that if \nonly 0.5% of new load were willing to curtail at peak, PJM could connect an additional nearly 18 \nGW of load without the need for any new capacity.17  The rate for this interruptible service should \nbe based on net usage of the transmission system and discounted to reflect the inferior curtailable \nservice.  PJM’s proposal for Option 7 does need to be revised in one important respect: PJM’s \nproposal for the duration of the interruptible NITS would depend on PJM’s view of the capacity \nsupply/demand balance.  This flaw can easily be fixed.     \n \n17 Tyler H. Norris, et al., Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in \nUS Power Systems (Feb. 2025), https://nicholasinstitute.duke.edu/publications/rethinking-load-growth (“Duke \nStudy”)."},{"page":10,"startToken":3081,"endToken":3438,"text":"10 \nOption 8 is merely an acknowledgment of PJM’s existing demand response provisions that \ncould be appropriate for participation by large loads but has very little to do with co-location.  \nConstellation encourages the Commission, at its resource adequacy technical conference, to \nexplore how demand response programs might be expanded to wring the most out of our existing \ninfrastructure, but this is a worthwhile endeavor separate from co-location.   \nIn sum, all of PJM’s proposed options, with the exception of Option 6 and with just a few \nmodifications to some of the others, are just and reasonable and should be included in a \nreplacement rate.  If the Commission does not adopt this replacement rate, it should, after finding \nthe existing Tariff unjust and unreasonable, set the replacement rate for time-limited settlement \ndiscussions as previously requested in this proceeding.18  The Commission’s goal should be to \nserve new load as quickly as it needs to be served, while minimizing transmission system costs \nand respecting the Commission’s jurisdictional boundaries.  The Indicated Transmission Owners’ \nNITS-only position accomplishes none of these objectives; instead, it frustrates them by throttling \nnew load until costly system upgrades can be constructed, and by intruding upon state jurisdiction.  \nThat may pad the Indicated Transmission Owners’ rate base, but it does nothing to help our Nation \nwin the contest for AI dominance.   \nFinally, this proceeding is not about resource adequacy.  All parties agree that load must \nbe served, and, as PJM acknowledges, new load is no different than existing load with respect to \nresource planning.19  The Commission likewise stated that resource adequacy concerns are “not \nnecessarily unique to co-location arrangements and that significant load growth more generally \n \n18 See Joint Comments and Motion to Stay Proceedings and Request to Establish Settlement Judge Procedures of The \nElectricity Supply Association, The PJM Power Providers Group, Calpine Corporation, Cogentrix Energy Power \nManagement, LLC, Constellation Energy Generation, LLC and LS Power Development, LLC, Docket Nos. EL25-49-\n000, AD24-11-000, and EL25-20-00 (consolidated) (filed Apr. 22, 2025) (“Joint Parties Settlement Request”). \n19 PJM Answer at 3 (explaining that PJM’s approach to large load expansion does not change whether that expansion \nis “co-located or not”)."},{"page":11,"startToken":3438,"endToken":3783,"text":"11 \nmay raise many of the same concerns.”20  Load that takes front-of-the-meter service has the same \neffect on resource adequacy as load that is co-located.   \nAs the Commission further explained, resource adequacy concerns are arising because of \na mismatch between the speed with which large new load seeks to connect to the system, on the \none hand, and the time needed to build new transmission and new generation, on the other.21  A \nNITS-only approach “solves” that problem only by delaying the entry of new load—but that \nsolution is untenable as a policy matter.  Instead, the Commission should determine whether there \nare additional tools to address near-term capacity needs, while reinforcing PJM’s capacity market, \nwhich is already sending strong signals for new entry (or for delaying retirement of existing \nresources).  For example, PJM’s RRI, designed to advance shovel-ready projects, has drawn 94 \napplications consisting of 26.6 GW of new or expanded capacity.22  The Commission can also \nconsider additional queue reform, such as deployment of interconnection automation software \nplatforms (which Commissioner Rosner has advocated)23 or a separate queue for short lead-time \nresources; enhanced demand response programs; or even an appropriately limited procurement for \nshort lead-time resources needed to satisfy the reserve margin if it turns out to be necessary (which \nis unlikely given the tools already in PJM’s Tariff).  Such programs should be considered outside \nof this proceeding, and the Commission has scheduled a two-day technical conference in June for \nthat purpose.24  In this proceeding, however, the Commission should be focused on allowing load \n \n20 Show Cause Order at P 85. \n21 Id. \n22 \nReliability \nResource \nInitiative \nDraws \n94 \nApplications, \nPJM INSIDE LINES \n(Mar. \n21, \n2025), \nhttps://insidelines.pjm.com/reliability-resource-initiative-draws-94-applications/. \n23 See Letter from David Rosner, Commissioner, Federal Energy Regulatory Commission, to Manu Asthana, President \nand CEO, PJM Interconnection (Mar. 17, 2025), https://www.ferc.gov/media/commissioner-rosner-letter-pjm-\ninterconnection-automation-letter. \n24 See Meeting the Challenge of Resource Adequacy in Regional Transmission Organization and Independent System \nOperator Regions, Supplemental Notice of Commissioner-led Technical Conference, Docket No. AD25-7-000 (issued \nApr. 3, 2025)."},{"page":12,"startToken":3783,"endToken":4127,"text":"12 \na range of options to connect, including some that would permit a faster connection than a NITS-\nonly approach would otherwise allow and that would impose fewer costs on existing customers  \nby maximizing the use of existing infrastructure.   \nIn support of this response and the recommendations herein, we submit analyses, \ntestimony, and affidavits of the following respected experts in their respective fields: \n• Dr. Paul Stockton, former Assistant Secretary of Defense for Homeland Defense and \nAmericas’ Security Affairs, addresses the national security imperative of serving AI loads \n(“Stockton Declaration”), Exh. 1 hereto. \n• Zachary Ming of Energy+Environmental Economics (“E3”) is an expert in electricity market \ndesign who teaches a graduate course on this topic at Stanford University; he testifies about \nthe rate design issues associated with large new loads (“Ming Testimony”), Exh. 2 hereto. \n• Aaron T. Patterson of the NorthBridge Group, Inc., an expert in electric market design, \naddresses resource adequacy questions (“Patterson Aff.”), Exh. 3 hereto. \n• Steven R. Herling, a former Vice President of Planning for PJM with over 30 years’ experience \nin the operations and planning of the transmission system, addresses how different co-location \nconfigurations use the transmission system in different ways (“Herling Aff.”), Exh. 4 hereto. \n• Michael Kormos, PJM’s former Chief Operations Officer and Exelon’s Senior Vice President \nof Transmission and Compliance, with nearly 30 years’ experience operating and planning \ntransmission systems and running electricity markets, addresses PJM’s reliability studies and \nrelated issues (“Kormos Aff.”), Exh. 5 hereto. \nThe Commission should consider this evidence in its decision-making, and keep in mind the \nrelative credentials of those sponsoring the analyses submitted to this Commission in these dockets \n(e.g., lawyers are not electric system operations experts; electric system operators are).25 \nConstellation addresses the Commission’s briefing questions throughout this reply but also \nprovides answers to specific questions after the argument section. \n \n25 Contra, e.g., Show Cause Order at PP 25, 37, 46, 79 (citing a lawyer’s views on various technical planning and \nreliability issues).  The Commission’s Show Cause Order repeatedly failed to cite actual experts’ analyses and \ntestimonies in the record."},{"page":13,"startToken":4127,"endToken":4528,"text":"13 \nARGUMENT \n \nREQUIRING ALL NEW LOAD TO TAKE NITS IS UNJUST AND \nUNREASONABLE \nThe Commission was correct in its preliminary finding that the PJM Tariff is unjust and \nunreasonable because it does not contain “provisions addressing with sufficient clarity or \nconsistency the rates, terms, and conditions of service that apply to co-location arrangements”26 \nand “[t]he absence of such provisions may leave entities unable to determine what steps they can \nor must take to effectuate co-location arrangements of various configurations.”27  There is no Tariff \nban on pursuing different co-location configurations;28 there is only ambiguity about how to \neffectuate co-location configurations other than a NITS-only option.  In response, the Indicated \nTransmission Owners, comprising most but not all of the transmission owners in PJM, insist upon \na “one-size-fits-all” Tariff interpretation requiring all large loads to take NITS or point-to-point \nservice.29  Not only do the transmission owners themselves differ in their interpretation of the \nTariff, but PJM itself has adopted different interpretations over time; for example, in its Answer \nin this proceeding, PJM now purports to rescind its prior Guidance Document regarding co-\nlocation.30 \n \n26 Id. at P 75.  \n27 Id. at P 74. \n28 Nor does the order on the amended Interconnection Service Agreement (“ISA”) for Talen’s Susquehanna facility in \nDocket No. ER24-2172 preclude co-location configurations.  PJM Interconnection, L.L.C. 191 FERC ¶ 61,025, at P \n30 (2025). \n29 Since no co-location party is likely to ever take point-to-point service, we will not refer to it again.  But, technically, \nit is a Tariff option.   \n30 PJM’s Guidance Document is included as Exhibit 2 to Constellation’s complaint in Docket No. EL25-20-000.  See \nComplaint Requesting Fast Track Processing of Constellation Energy Generation, LLC, Docket No. EL25-20-000, \nExh. 2 (filed Nov. 22, 2024) (“Constellation Complaint”).  PJM recently rescinded the Guidance Document (PJM \nAnswer at 33) despite previously relying on that Guidance Document in developing changes to the ISA for \nSusquehanna.  Similarly, PPL Electric Utilities Corporation (“PPL”) agreed to the co-located load arrangement for \nSusquehanna without requiring NITS, but now, as an Indicated Transmission Owner, takes the view that co-located \nload must be a Network Customer, taking NITS.  Even earlier, PJM had issued guidance in the form of a “Frequently \nAsked Questions” document on co-location, which also contemplated co-location configurations other than the NITS-\nonly approach now prevailing at some transmission owners’ instigation.  PJM Rules Regarding the Siting of New Load"},{"page":14,"startToken":4528,"endToken":4911,"text":"14 \nAs an initial matter, the Tariff contains no NITS-only, “one-size-fits-all” requirement for \nlarge loads.  PJM’s Guidance Document highlighted other co-location options “consistent with \nPJM’s review of PJM’s current Tariff.”31  And the Commission already preliminarily found that \n“the Tariff does not appear to require that [NITS-only] arrangement and there is no clear record \nbefore us that [NITS] is the appropriate transmission service for all co-location arrangements.”32  \nThe Commission found instead that “[i]t appears that PJM does not have a process for determining \nwhat transmission service different co-location configurations must take.”33  The Commission \nshould adopt its preliminary findings that the existing Tariff is unjust and unreasonable due to the \npatent need for clarity.34  \nWhat is more, regardless of what the Tariff actually says and does not say, some of the \nIndicated Transmission Owners have refused to cooperate in PJM’s “necessary studies” process \nunless the load agrees to taking NITS, claiming justification under the Tariff.  Some of the \nIndicated Transmission Owners have refused to process necessary studies, demanded expensive \nupgrades under their unfiled interconnection procedures, and forced a generator seeking to serve \nco-located load to procure additional services not required by the Tariff.35  The lack of clarity in \nthe Tariff, combined with the exclusionary practices of several transmission owners, has led to an \n \nBehind the Meter of Existing Generation (Dec. 1, 2021), https://www.pjm.com/-/media/DotCom/committees-\ngroups/committees/mic/2021/20211201/20211201-item-10b-pjm-rules-on-siting-new-load-behind-the-meter-of-\nexisting-generation.pdf.   \n31 PJM Guidance Document at 1. \n32 Show Cause Order at P 77. \n33 Id. P 78 (emphasis added). \n34 The Commission already unanimously rejected efforts by Exelon—the lead “Indicated Transmission Owner”—to \n“clarify” the PJM Tariff to change the definition of “Network Load” to require all new load to be NITS customers, \nfinding that Exelon lacked the authority to revise PJM’s Tariff.  Atlantic City Elec. Co., 190 FERC ¶ 61,109 (2025).  \nNo party sought rehearing. \n35 See Complaint Requesting Fast Track Processing of Constellation Energy Generation, LLC, Docket No. EL25-20-\n000, at 7 (filed Nov. 22, 2024) (“Constellation Complaint”) (citing Protest of Constellation Energy Generation, LLC, \nDocket No. EL24-149-000, Exh. 2 (correspondence with Exelon) (filed Oct. 30, 2024); Motion to Lodge of \nConstellation Energy Generation, LLC, Docket No. EL24-149-000, Exh. 1 (November 12, 2024 Exelon Letter) (filed \nNov. 18, 2024))."},{"page":15,"startToken":4911,"endToken":5246,"text":"15 \nunconscionable delay in connecting large new loads, especially given our Nation’s pressing \nnational security need for AI deployment.   \nNot only is a requirement that all large loads within PJM take NITS nowhere to be found \nin the Tariff, but it is also terrible policy.  It delays service to critically important data centers, \npotentially by years, due to time-consuming system studies and the likely need for new upgrades \nto serve data centers, to the detriment of our Nation’s economic competitiveness and national \nsecurity.  It imposes massive, unnecessary transmission upgrade costs on all existing customers, \nrather than efficiently using existing transmission and other infrastructure.  It fails to respect state \njurisdictional authority to allow generators to directly serve end-users.  And it violates fundamental \nrate design principles and is unduly discriminatory because it imposes a one-size-fits-all solution \non loads that are not similarly-situated. \nA. Ensuring the Prompt Connection of Data Centers Is Imperative to America’s \nEconomic Competitiveness and National Security. \nIn arguing that all new load should take NITS, the Indicated Transmission Owners \nconveniently omit the elephant in the room: it takes at least four to five years, and often seven to \nten years, to complete the study process and build all the transmission upgrades necessary to \nprovide NITS to a hyperscale data center.36  If we start today, a large data center might be able to \nobtain service by 2030, but more likely not before 2035.  This is an eternity to a data center \ncustomer locked in an existential competitive battle to develop the fastest and most sophisticated \nAI models.  The Indicated Transmission Owners completely ignore this fact. \nFour years or longer is too long for any new load to wait, but this is particularly true given \nthe global race for AI dominance.  As the Commission has previously been told, “the United States \nis competing in a global market for data center development” and “many of our geopolitical \n \n36 Patterson Aff. at ¶ 17; Kormos Aff. at ¶ 3 (citing examples); Stockton Declaration at 9, n.35 (citing examples)."},{"page":16,"startToken":5246,"endToken":5637,"text":"16 \ncompetitors are working to gain this economic opportunity.”37  Earlier this year, France and the \nUnited Arab Emirates announced an agreement worth up to $50 billion to build a 1 gigawatt data \ncenter dedicated to AI operations in France.38 The Middle East is “becoming a data cent[er] \npowerhouse” with planned investments in Kuwait, Oman, and Bahrain.39  And a China-based \ncompany recently released DeepSeek AI which, according to President Trump, should “be a wake-\nup call for our industries that we need to be laser focused on competing.”40  Indeed, the Trump \nAdministration recently outlined the policy of the United States “to preserve an open investment \nenvironment to help ensure that [AI] and other emerging technologies are built, created, and grown \nright here in the United States” and to “restrict foreign adversary access to United States talent and \noperations in sensitive technologies (especially in [AI]).”41   \nExperts are now warning Congress that to remain competitive, the United States needs to \n“[e]nsure diverse, competitive energy markets for AI advancement” and “[r]equire federal \nagencies to review existing policies to determine how they might be hampering AI innovation.”42  \nThe United States can remain a leader in data center and AI-technology investment only if the \nCommission ensures regulatory certainty and provides paths to quick interconnection for such load \nand efficient use of existing infrastructure.   \n \n37 Letter of Representative John Joyce, Docket No. AD24-11-000, at 2 (filed Nov. 7, 2024). \n38 John Irish, France, UAE Agree to Develop 1 Gigawatt AI Data Centre, REUTERS (Feb. 6, 2025), \nhttps://www.reuters.com/technology/artificial-intelligence/france-uae-agree-develop-1-gigawatt-ai-data-centre-\n2025-02-06/. \n39 \nSee \nUnlocking \nthe \nData \nCentre \nOpportunity \nin \nthe \nMiddle \nEast, \nPWC (Apr. \n10, \n2025), \nhttps://www.pwc.com/m1/en/media-centre/articles/unlocking-the-data-centre-opportunity-in-the-middle-\neast.html#:~:text=Other%20nations%20in%20the%20Middle,for%20a%20facility%20in%20Bahrain. \n40 David Ingram, Trump says China's DeepSeek AI 'should be a wake-up call' for American tech companies, NBC \nNEWS (Jan. 27, 2025), https://www.nbcnews.com/tech/innovation/trump-china-deepseek-ai-wake-call-rcna189526. \n41 American First Investment Policy, THE WHITE HOUSE (Feb. 21, 2025), https://www.whitehouse.gov/presidential-\nactions/2025/02/america-first-investment-policy/. \n42 Submitted Statement of Adam Thierer, Resident Senior Fellow, Technology and Innovation R Street Institute, Before \nthe Committee on Science, Space, and Technology, Hearing on “DeepSeek: A Deep Dive” (Apr. 8, 2025), \nhttps://www.rstreet.org/outreach/adam-thierer-testimony-hearing-on-deepseek-a-deep-dive/#_ftnref36."},{"page":17,"startToken":5637,"endToken":5942,"text":"17 \nU.S. Representative Dan Meuser reminded the Commission last year that while the United \nStates currently hosts more data centers than any other country, “dozens of countries (not all of \nwhich are allies) are competing for this economic opportunity.”43  The parenthetical in his \nstatement cannot be overemphasized; data centers are vitally important to national security.  Paul \nStockton, the former U.S. Assistant Secretary of Defense for Homeland Defense and Americas’ \nSecurity Affairs, explains that data centers are essential for national security, supporting AI \nservices critical to peacetime and conflict operations.44  Rapid deployment of such technology is \nneeded to keep pace with America’s competitors.45  The White House Office of Science and \nTechnology Policy Director reiterated that point earlier this month, stating that the United States \n“cannot afford to remain dependent ... on Chinese inputs and products, nor can we allow our closest \npartners to become points of insecurity by relying on Chinese-controlled critical infrastructure, \nwhether in telecom, the grid, or AI.”46  President Trump has emphasized that co-location is \nparticularly valuable for data centers that support national security infrastructure, because co-\nlocation reduces that infrastructure’s vulnerability to grid outages or insufficient grid power, which \ncould occur during a conflict.47  The Commission should allow co-location arrangements to come \nonline rapidly to ensure that the United States does not lose AI-enabled advances in the combat \nactivities of our military.48   \n \n43 Letter of U.S. Representative Dan Meuser, Docket No. AD24-11-000, at 2 (filed Oct. 17, 2024). \n44 Stockton Declaration at 4-7. \n45 Id. at 7-8 (describing “China’s drive for AI preeminence” and the “broader strategic competition between China \nand the United States”). \n46 Remarks by Director Kratsios at the Endless Frontiers Retreat, THE WHITE HOUSE (Apr. 14, 2025), \nhttps://www.whitehouse.gov/articles/2025/04/8716/. \n47 Stockton Declaration at 2. \n48 Id."},{"page":18,"startToken":5942,"endToken":6329,"text":"18 \nMake no mistake about what, in substance, the Indicated Transmission Owners are \nproposing: to preserve their monopoly on new load interconnection, they want to throttle data \ncenter load, preventing new service to this vitally important sector of our economy and national \nsecurity until they can build the rate-based upgrades needed for NITS.  AEP has made this explicit, \nimposing a moratorium on new data center load connection in its service territory,49 while \nsimultaneously litigating against co-location arrangements that would enable the interconnection \nof that load.50  That position is indefensible when co-location arrangements would allow data \ncenters to connect faster and at a lower cost to existing customers.   \nThere should be no question that load must be served—and as quickly as possible, \nconsistent with system reliability.  Utility regulation is founded on the principle that utilities \nauthorized to operate monopolies must submit to regulation, including price regulation and the \nobligation to extend service to customers within their service territory and to provide continued \nservice once commenced.51  The latter is commonly referred to as the “duty to serve.”  Nearly \nevery jurisdiction in the United States has promulgated regulations establishing a duty to serve.52  \nAlthough each state applies its own flavor, the general requirement is the same—an electric utility \n \n49 See, e.g., Russell Ernst, Lack of Consensus on Ohio Datacenter Settlement Does not Compute, Says AEP, S&P \nGLOBAL \n(Oct. \n16, \n2024), \nhttps://www.spglobal.com/market-intelligence/en/news-insights/research/lack-of-\nconsensus-on-ohio-datacenter-settlement-does-not-compute-says-aep (“[I]n March 2023, Ohio Power implemented a \nmoratorium on accepting new service requests from [datacenter] customers to allow American Electric Power’s \ntransmission planning group time to evaluate the impacts that the datacenter load requests would have on the \ncompany’s system.”).  \n50 See, e.g., Joint Protest of Exelon Corporation and American Electric Power Service Corporation to PJM Deficiency \nResponse, Docket No. ER24-2172-001 (filed Sept. 24, 2024) (requesting that the Commission reject a non-conforming \ninterconnection service agreement that would provide for the co-location of data center load). \n51 Jim Rossi, Universal Service in Competitive Retail Electric Power Markets: Whither the Duty to Serve?, 21 ENERGY \nL. JOURNAL 27 (2000).  \n52 See Heather Payne, Unservice: Reconceptualizing the Utility Duty to Serve in Light of Climate Change, 56 UNIV. \nOF RICH. L. REV. 603, 610-12 (2022) (describing the duty to serve in various states)."},{"page":19,"startToken":6329,"endToken":6681,"text":"19 \nmust serve customers seeking service and cannot unduly discriminate or delay such service.53  \nIllinois’s statute, for example, provides that the duty to serve is “without discrimination and \nwithout delay.”54  Delays of five, seven, or ten years are untenable and objectively cannot be \nconsidered service “without delay.”  While “the demand for interconnection by data centers driven \nby the needs of artificial intelligence and other technologies is a recent phenomenon,” the \nobligation to serve load without delay is as old as utility regulation.55   \nThe PJM Tariff is not just and reasonable because it lacks clear rules and creates confusion \nthat has enabled utilities to block alternative configurations, including co-location, that would \nallow faster interconnection without endangering system reliability.  The Indicated Transmission \nOwners’ suggested one-size-fits-all approach, meanwhile, would result in severe service delays \nfor data centers that are key to our national competitiveness and national security.  That cannot be \nthe answer. \nB. Limiting Large New Load to NITS Imposes Billions of Dollars of Unnecessary \nTransmission Upgrades. \nThe delay associated with standard NITS interconnection would be bad enough.  But worse \nstill, requiring NITS interconnection imposes costs on all customers that are unnecessary—costs \nthat could be avoided if large loads were able to select an interconnection option that required \n \n53 See, e.g., 220 Ill. Comp. Stat. 5/8-101 (Illinois statute stating that a “public utility shall, upon reasonable notice, \nfurnish to all persons who may apply therefor and be reasonably entitled thereto, suitable facilities and service, without \ndiscrimination and without delay”); N.J. STAT. ANN. § 48:3-3(a) (“No public utility shall provide or maintain any \nservice that is unsafe, improper or inadequate, or withhold or refuse any service which reasonably can be demanded \nor furnished....”); VA. CODE ANN. § 56-234(A) (“It shall be the duty of every public utility to furnish reasonably \nadequate service and facilities at reasonable and just rates to any person, firm or corporation along its lines desiring \nsame.”). \n54 220 Ill. Comp. Stat. 5/8-101. \n55 Answer and Motion to Dismiss of PJM Interconnection, L.L.C., Docket No. EL25-20-000, at 5 (filed Dec. 12, \n2024)."},{"page":20,"startToken":6681,"endToken":7090,"text":"20 \nfewer costly upgrades.56  Yet again, however, the Indicated Transmission Owners are silent about \nthis reality.  They never acknowledge that a NITS-only approach to serving hyperscale data centers \nand other large new loads will create a need for massive transmission upgrades and impose billions \nof dollars of costs on existing customers—at a time when transmission costs already are the \nprimary cause of rate inflation.57  Perhaps it is no wonder that this is left unacknowledged.  After \nall, the Transmission Owners will be the beneficiaries of these billions. \nThere is no question the NITS bill will be enormous.  Mr. Patterson analyzed the \ntransmission upgrade costs of adding larger loads to the grid that are socialized to all customers.  \nBetween 2022 and April 2025, there were 144 projects to integrate loads larger than 50 MW that \nresulted in “supplemental projects” to build transmission upgrades.58  The projects covered 42.3 \ngigawatts of summer peak load with a total cost of $8.5 billion.  The data demonstrates that the \n“expected integration cost of a 100 MW large load is about $41 million ($9.5 [million] size-\ndependent plus $31.3 [million] fixed), while the expected integration cost of a 1,000 MW large \nload is about $126 million ($95 [million] size-dependent plus $31.3 [million] fixed).”59  Again, \nthese transmission costs are socialized: they are paid by all transmission customers. \nWhile transmission and distribution rates have risen significantly, the “all-in” price for \ngeneration in PJM has remained stable and even decreased over the past 15 years.60  The \n \n56 Ming Testimony at 25 (“the current tariff, which a number of transmission owners interpret as requiring all co-\nlocated customers to subscribe to a firm service, will invariably result in some customers paying higher costs to fund \ntransmission upgrades that are not needed to provide the level of service they desire.”). \n57 James Downing, FERC’s Christie Discusses Making Electricity More Affordable at NASEO, RTO INSIDER (Feb. 6, \n2025), https://www.rtoinsider.com/97608-ferc-christie-discusses-electricity-affordable-naseo/ (quoting Chairman \nChristie that “[t]he last four years [have] seen the highest rate of inflation in people’s power bills over the last 25 \nyears” and attributing this to escalating transmission and distribution costs). \n58 Patterson Aff. at ¶ 51. \n59 Id. at ¶ 52 (emphasis added).  Mr. Patterson also finds that “[t]here is a large amount of variation in the integration \ncosts among large loads of similar size.”  Id. at ¶ 53. \n60 See Patterson Aff. at Figures 4-5."},{"page":21,"startToken":7090,"endToken":7391,"text":"21 \nCommission should be searching for ways to connect vitally important new load while minimizing \nincremental transmission costs.  A NITS-only approach cuts off that inquiry. \nEven when new load is willing to wait the lengthy period needed to receive NITS \ninterconnection, the Commission should identify rate structures that incentivize that load to locate \nat the most efficient points on the grid, where the fewest system upgrades will be needed.  Mr. \nPatterson’s analysis of large new loads found that “locational factors specific to each load are a \nmajor additional driver of cost and can either result in much lower or higher costs than would be \nexpected on average for a load of a given size.”61  “This location-dependence,” he explains, \nimpacts transmission costs and the Commission should send “the correct incentives via \ntransmission rates to new large loads to locate efficiently” to “minimize total system costs.”62  In \nshort, co-location saves existing customers money, and new load should be incentivized to choose \nco-located sites.  Mr. Kormos further provides that “I can say with certainty that the closer load is \nto its supply, the costs, time to connect the load, and the operational risk are all likely to be \nreduced.”63   \nThe Indicated Transmission Owners’ proposed approach—under which NITS is charged \nbased on gross billing determinants, even when the load is co-located with generation—frustrates \nthat approach.  As Mr. Ming explains, “if all load is charged equivalently regardless of its impact \non the transmission system, load will have no incentive to seek configurations that could lower \ntransmission system costs, and they therefore will not.  This will cause total costs to rise due to \ninefficient and ultimately unnecessary investments in the transmission system.”64  This inefficient \n \n61 Patterson Aff. at ¶ 54. \n62 Id.  \n63 Kormos Aff. at ¶ 4. \n64 Ming Testimony at 22."},{"page":22,"startToken":7391,"endToken":7822,"text":"22 \napproach to siting load is not just or reasonable and is unduly discriminatory and preferential.  As \ndiscussed further below, a just and reasonable rate would provide economic incentives to co-locate, \nas co-locating large load with generation resources can obviate the need for upgrades and reduce \nthe overall system costs paid by customers at large.65  Applying net billing determinants to co-\nlocated load, rather than gross billing determinants, can help provide that incentive. \nCo-location not only provides cost savings, but reliability benefits as well.  Recent widely-\npublicized reliability events in Northern Virginia occurred when grid-connected large loads \nsimultaneously dropped.66  As Mr. Kormos explains, “[t]his voltage drop concern is not one \nexclusive to co-location and, in fact, illustrates how co-locating load and generation can provide \nbenefits to the grid as compared to direct grid connections.”67  Mr. Kormos’ opinion as a former \nPJM Chief Operations Officer is that “had those data centers been co-located with a generator \n(especially a nuclear generator), it is possible that the load would not have dropped offline” \nbecause nuclear generators “typically have state of the art automatic voltage regulators,” and \nvoltage deviations—like those that triggered the load drops—would be “expected to be fewer, \nsmaller and of shorter duration, if they occur at all.”68  The load drop events are only one recent, \nprominent example of grid problems resulting from large, grid-connected loads, and co-location \nthat “avoids the use of the grid” minimizes “grid operational risks (because fewer grid \n \n65 See Michael Kormos, The Co-Located Load Solution at 9 (July 2024) (“Kormos Co-Located Load Solution”), \nDocket No. AD24-11-000 (filed Nov. 4, 2024) (attached hereto as an appendix to the Kormos Aff., Exh. 5) (explaining \nthat connecting data centers to the grid can result in costs that are “substantial (easily in the billions) and can be spread \nbeyond the data center customer to all other customers”). \n66 See Statement of the North American Electric Reliability Corporation, Docket No. AD24-11-000, at 2 (filed Nov. \n1, 2024) (expressing concern with an incident where data center dropped in response to a voltage drop as part of a \npleading in the Co-Located Load Technical Conference proceeding); see also NERC Large Load Presentation. \n67 Kormos Aff. at ¶ 7. \n68 Id.; see id. (“Large generators also typically provide significant inertia that can help the local grid avoid or minimize \nthe impact of many anomalies.  Given the reduced likelihood of a voltage drop in the first place for load co-located \nwith a generator, it is less likely that such load will sense a voltage anomaly that will lead it to drop.”)."},{"page":23,"startToken":7822,"endToken":8148,"text":"23 \ninfrastructure facilities and potential failure points are implicated in serving the load),” while also \nminimizing “transmission infrastructure costs, potential supply chain issues and delays on long-\nlead transmission infrastructure equipment ... [and] line losses.”69 \nThe Commission should also be seeking to encourage interconnection configurations that \nmake the most of existing headroom on the grid.  One of the primary benefits of co-location \nconfigurations (all of them) is that they take advantage of existing infrastructure and therefore \nminimize costs.  Requiring all co-located load to be served under traditional NITS (based on gross \nload peak load contributions) is inimical to these goals because that approach assumes 100% \nreliance on the grid and a firm load.  A study by the Nicholas Institute at Duke University explained \nthe inefficiency of this approach.  The study logically explains that, if new load is required to take \nfirm service and one assumes that such load will “operate at 100% of its maximum electricity draw \nat all times, including during system-wide peaks”—which is the assumption underlying traditional \nNITS—then it is “far more likely” that “significant upgrades, such as new transformers, \ntransmission line reconductoring, circuit breakers, or other substation equipment” will be \nrequired.70  By contrast, if a different service was offered to such new load by which the load could \n“temporarily reduce (i.e., curtail) its electricity consumption from the grid during [] peak stress \nperiods … it may be able to connect while deferring—or even avoiding—the need for certain \nupgrades.”71  \nThe Duke Study concludes that a new load curtailment rate of just 0.5% annually would \nresult in nearly 18 gigawatts (“GW”) of potential new load integration in PJM without capacity \n \n69 Id. at ¶ 4. \n70 Duke Study at 5. \n71 Id. (citing ERCOT, Large Loads—Impact on Grid Reliability and Overview of Revision Request Package, Presented \nat \nthe \nNPRR1191 \nand \nRelated \nRevision \nRequests \nWorkshop \n(Aug. \n16, \n2023), \nhttps://www.ercot.com/files/docs/2023/11/08/PUBLIC-Overview-of-Large-Load-Revision-Requests-for-8-16-23-\nWorkshop.pptx)."},{"page":24,"startToken":8148,"endToken":8192,"text":"24 \nexpansion.72  This amount increases to 23.6 GW with a 1.0% curtailment rate.  The chart below \nfrom the Duke Study illustrates the “curtailment-enabled headroom” in different balancing areas \nin the United States.73  \n \n72 Id. at 2. \n73 Id. at 4."},{"page":25,"startToken":8192,"endToken":8231,"text":"25 \n \nSource: https://nicholasinstitute.duke.edu/publications/rethinking-load-growth. \nThe Duke Study also explains that a failure to use this headroom, reflecting the gap between \nthe average and peak demand in the balancing area, increases costs on ratepayers.  Specifically, a"},{"page":26,"startToken":8231,"endToken":8579,"text":"26 \nlow system utilization rate (i.e., more headroom) means that ratepayers are paying to build and \nmaintain generation assets, transmission infrastructure, and distribution networks that may remain \nidle for much of the year.74  Therefore, the Commission should endorse paths that would allow \nnew large load to connect without first requiring the completion of system upgrades needed to \nsupport NITS service at peak, and without requiring any additional capacity.  Authorizing an \ninterruptible transmission service, as described in our discussion of PJM’s Option 7, will result in \na more efficient use of the system (i.e., increased system utilization rate) and significant near-term \ncustomer savings as compared to a NITS-only framework.  The Indicated TOs rigid adherence to \ntraditional NITS is not in the best interests of their customers or of the nation.   \nC. Requiring Co-Located Loads to Always Take NITS Unduly Limits State \nJurisdiction and Flexibility. \nThe Indicated Transmission Owners’ NITS-only approach also transgresses the \njurisdictional limits in the FPA, which expressly provides that the Commission “shall not have \njurisdiction … over facilities used for generation of electric energy or over facilities used in local \ndistribution or only for the transmission of electric energy in intrastate commerce, or over facilities \nfor the transmission of electric energy consumed wholly by the transmitter.”75  Thus, Congress \nreserved to the states “regulatory authority over retail sales (as well as intrastate wholesale \nsales)”76 as well as facilities used for the generation, distribution, or intrastate transmission of \nelectric energy.77  As a result, the Commission has held that states “have jurisdiction in all \n \n74 Id. at 6.  \n75 16 U.S.C. § 824(b)(1). \n76 FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 279 (2016) (“EPSA”) (citing New York v. FERC, 535 U.S. 1, 17 \n(2002)) (emphasis added); id. at 265 (“[T]he law places beyond FERC’s power, and leaves to the States alone, the \nregulation of ‘any other sale’—most notably, any retail sale—of electricity.”) (quoting 16 U.S.C. § 824(b)) (emphasis \nadded).   \n77 See, e.g., New York v. FERC, 535 U.S. at 22-23."},{"page":27,"startToken":8579,"endToken":9116,"text":"27 \ncircumstances over the service of delivering energy to end users.”78  Even the question of whether \na retail sale has occurred is a question reserved to the states.79  Despite the well-established bounds \nof federal and state jurisdiction under the FPA, the PJM Tariff is being interpreted in such a way \nas to preclude states from exercising their jurisdictional authority.   \nSpecifically, the Indicated Transmission Owners argue that the Commission should \n“affirm” that all co-located load which is “synchronized” to the grid must take NITS.80  This would \nmean that all sales to co-located load (which is by design an end user)—even sales under co-\nlocation arrangements with protective relays to ensure no power is received from the grid, i.e., \nPJM Options 4 and 5—would become subject to wholesale transmission rates.  This is inconsistent \nwith the Commission’s jurisdiction under the FPA.   \nThe Commission cannot allow the inappropriate federalization of retail regulatory \ndeterminations.  Requiring large new load to take wholesale service, rather than taking service \ndirectly from a generator, and requiring the generator to only make wholesale sales,81 rather than \nproviding service directly to a co-located load, effectively precludes states from regulating \n \n78 Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public \nUtils., Order No. 888, 61 Fed. Reg. 21,540, at 21,626 (1996) (emphasis added), order on reh’g, Order No. 888-A, 62 \nFed. Reg. 12,274 (1997), aff’d sub nom., New York v. FERC, 535 U.S. 1; see also Ind. Mun. Power Agency City of \nLawrenceburg, Ind. v. PJM Interconnection, L.L.C., 174 FERC ¶ 61,035, 61,150 (2021) (“The Commission has \nrejected the argument that the provision of station power is a practice directly affecting rates for wholesale sales \nsubject to the Commission’s jurisdiction, explaining that station power is a sale for end use and the Commission has \nno jurisdiction over sales for end use.”).   \n79 See 16 U.S.C. § 824(b)(1); see also Southern Cal. Edison Co. v. FERC, 603 F.3d 996, 1000-01 (D.C. Cir. 2010) \n(“[W]e do not understand why FERC is empowered to conclude that a retail sale has not taken place unless it can \nclaim the transaction is, instead, a wholesale sale or a transmission.  To simply declare that the state lacks jurisdiction \nbecause FERC believes no retail sale has taken place really begs the jurisdictional question.  Unless a transaction falls \nwithin FERC’s wholesale or transmission authority, it doesn’t matter how FERC characterizes it.”); Indiana Mun. \nPower Auth. v. PJM Interconnection, L.L.C., 172 FERC ¶ 61,243, at P 106 (2020) (regarding station power, “the \nCommission lacks jurisdiction to determine whether a retail sale has occurred”); id. at P 94 (“The determination of \nwhether a retail sale has occurred . . . is appropriately within the jurisdiction of the states.”). \n80 See Indicated Transmission Owners Answer, Att. A at 2. \n81 While PJM is of the view that most generators must maintain their status as EWGs and thus engage only in wholesale \nsales, it has been repeatedly informed that this assumption is not accurate.  It also begs the question of whether under \nstate law the direct delivery of power from a generator to an end-use customer is a “retail sale.”"},{"page":28,"startToken":9116,"endToken":9487,"text":"28 \ntransactions that fall squarely within their jurisdiction.  Such an outcome would be contrary to the \nFPA and an unwarranted preemption of a state’s sovereign authority.82  To echo the words of \nChairman Christie, just because PJM and other RTOs are federally regulated does not mean that \nthey can preempt a state’s inherent authority and to suggest otherwise “is, frankly, outrageous.”83 \nRetail issues are a matter of state law, and the states are well-equipped to resolve these questions \nwithout federal intrusion, including who is permitted to serve a large load and whether to regulate \nthe sale to an end-use customer.  Indeed, many states allow both regulated direct sales, which are \npower services held out and generally offered to the public on a non-discriminatory basis, and one-\noff bespoke private transactions between a provider and end-use consumer.84  That is a matter for \nthe states to decide—not the Commission.   \nD. Requiring All Large New Load to Take NITS Violates Rate Design Principles. \n1. A Just and Reasonable Rate Design Must Account for the Different Costs \nCaused by Different Configurations. \nAs the Commission correctly found, “[t]he record demonstrates that different co-location \narrangements are likely to use or benefit from the transmission system in different ways depending \non how they are configured and, moreover, that those different configurations will themselves \nlikely have different impacts on the transmission system.”85  The Commission also is correct that \n“there is no clear record before us that [NITS] is the appropriate transmission service for all co-\nlocation arrangements or that such service would be consistent with the cost causation principle \n(i.e., that [NITS] appropriately aligns costs and benefits in a manner that is roughly commensurate) \n \n82 See PJM Interconnection, L.L.C., 191 FERC ¶ 61,056 (2025) (Christie, Chairman, concurring).  \n83 Id. at P 4. \n84 See PJM Answer at 27-29. \n85 Show Cause Order at P 76 (emphasis added).  Mr. Ming agrees “with PJM’s statement that ‘whether the transmission \nsystem needs to be planned to be able to serve these large loads if they are co-located and operate behind the meter of \na generator will be instructive to the question of transmission cost allocation.’”  Ming Testimony at 24 (citing PJM \nAnswer at 38)."},{"page":29,"startToken":9487,"endToken":9845,"text":"29 \nfor all such arrangements.”86  The key question is how each type of potential co-location \nconfiguration uses the transmission system, if at all.  And since we are determining whether a one-\nsize-fits-all NITS approach is just and reasonable and not unduly discriminatory or preferential for \nevery possible type of co-location configuration, another way of asking that key question is \nwhether every possible configuration uses the transmission system in the same way. \nThe Indicated Transmission Owners simply assume the conclusion, repeating several times \nthat anything “synchronized” to the grid must take NITS for their gross load and that NITS charges \nbased on gross load regardless of configuration are just and reasonable.87  They provide no further \nanalysis.  Never mind that there already are tens of thousands of MWs of load synchronized to the \ngrid who do not pay NITS based on gross billing determinants.88 \nBy contrast, Constellation asked engineering and rate design experts to analyze the issue.  \nMr. Ming identifies “three potential configurations of co-located load” and describes their potential \ntransmission system usage:   \nFirst, a “firm” configuration grants the co-located load the right to draw from the grid when \nit is not drawing power from the co-located generation.89  In this configuration, “the transmission \nsystem must be planned and built to serve the co-located load,” even if it is “implausible that all \n \n86 Show Cause Order at P 77 (emphasis added). \n87 See, e.g., Indicated Transmission Owners Answer at 17 (“Because all loads physically connected to and \nsynchronized with the transmission system benefit from the transmission system, any attempt to isolate or piecemeal \nwholesale transmission services to quantify costs would be discriminatory because it would disregard the \ninterconnected nature of the transmission system.”); id., Att. A at 2 (urging the Commission to “affirm” that all co-\nlocated load which is “synchronized” to the grid must take NITS).   \n88 See, e.g., PSEG Response at 18 (identifying universities, government agencies, manufacturers, real estate companies \nand pharmaceutical companies); see also Ming Testimony at 21 (providing that PJM estimates there is over 10,000 \nMW of behind-the-meter solar capacity across its footprint in 2025).  \n89 Ming Testimony at 17."},{"page":30,"startToken":9845,"endToken":10144,"text":"30 \nco-located generation will be unavailable at the same time.90  This is NITS.  According to the \nIndicated Transmission Owners, there is no other possible service, regardless of configuration. \nSecond, a “generator-contingent” configuration means that the co-located load only has \nrights to power from its co-located generator and has no rights to draw on the grid—as enforced \nby protective relay equipment.  The grid thus does not need to be planned to accommodate this \nload.  For the same reason, the additional option of having the co-located load draw energy from \nthe transmission system on an as-available basis, meaning only when PJM determines it will not \ncause any impacts on the transmission system—similar to PJM’s proposed Option 5—also would \nnot require any additional investment in transmission infrastructure.  According to the Indicated \nTransmission Owners, this configuration is impossible because protective relays may fail.  \nHowever, according to Mr. Herling, former transmission planner for PJM, these configurations \ncan be designed to include “completely redundant primary and backup protective schemes,”91 \nwhich are relied on “to maintain the safe and reliable operations of the grid on a regular basis.”92  \nMoreover, there is nothing in the current Tariff that prevents a generator-contingent configuration. \nThird, an “interruptible” configuration lets PJM interrupt the co-located load at any time, \nmeaning that PJM can interrupt the load in pre-defined emergency conditions regardless of \nwhether the co-located generator is online and available.  “Interruptions may be facilitated through \neither load curtailment or additional backup generation,” but “PJM must be certain that the co-\nlocated load will interrupt whenever system conditions require without any limit applied to the \nlength of the interruption.”93  This co-location configuration has “minimal if any impacts to \n \n90 Id. \n91 Herling Aff. at ¶ 21.  \n92 Kormos Aff. at ¶7. \n93 Ming Testimony at 16."},{"page":31,"startToken":10144,"endToken":10562,"text":"31 \ntransmission system costs” on the grid as PJM can interrupt the load any time there are operational \nissues.94  This configuration is similar to PJM’s Option 7. \nIn case there were any doubt about the engineering feasibility of Mr. Ming’s rate design \nanalysis, Steve Herling, PJM’s former Vice President of Planning, analyzed the same issue of \npotential transmission system usage from an engineering perspective and concluded that various \nco-location configurations use the system differently.95  This is just as the Commission found.96 \nReturning to the key question—whether cost causation principles require NITS charged on \na gross basis under each of these various types of co-location configurations merely because the \nload is “synchronized” to the grid—the answer is no.  “[S]ynchronization does not require or \nsuggest that energy delivery from … generation to … load flows on the transmission facilities of \nthe grid.”97  Moreover, as evaluated by basic Bonbright rate design principles, a one-size-fits-all \ngross NITS rate no matter the configuration (1) fails to fairly apportion costs, because it charges \nthe same rates to customers who impose different costs on the system, and (2) is economically \ninefficient, because it creates no incentive for loads to choose the lowest cost location.98  The gross \nNITS rate further fails the Bonbright principles of being “free from controversies as to improper \ninterpretation,” because the Tariff mandates no such requirement to treat all configurations the \nsame, and for the reasons set forth below, is unduly discriminatory.99  \n \n94 Id.; see also id. at 47 (same). \n95 Herling Aff. at ¶¶ 9-10 (identifying co-location configurations that where “the co-located load will rely on the grid \nand NITS for energy” and other configurations where “the co-located load will not be able to draw energy from the \ngrid”). \n96 See Show Cause Order at P 76. \n97 Herling Aff. at ¶ 32; see also id. (“Synchronization is clearly important and even necessary to the stability of the \ngenerating facility and the ability of the generating facility to deliver energy to the co-located load on an on-going \nbasis, but that does not change the fact that the energy does not flow on the transmission facilities of the grid.”). \n98 Ming Testimony at 9; see id. at 10-12 (explaining what causes transmission costs, the role of peak load, the \nconsequences of increasing peak load, marginal costs, sending appropriate incentives, and the impact of reducing \nsystem costs); see also infra at 82 (discussing locational signal). \n99 Ming Testimony at 20; see also supra at Section I.D.2"},{"page":32,"startToken":10562,"endToken":10940,"text":"32 \nIn sum, even though the Tariff does not require gross NITS rates for every co-location \nconfiguration, that is how some Transmission Owners are currently interpreting it.  And this results \nin an unjust and unreasonable rate that charges the same rate to load that uses and benefits from \nthe system differently, violating core cost causation and other rate design principles.   \n2. Limiting Large New Load to NITS Is Unduly Discriminatory, As Is Requiring \nCo-Located Load to Pay Based On Gross Load. \nAccepting the Indicated Transmission Owners’ position that only traditional NITS is \nallowed under the Tariff for co-location configurations also is unduly discriminatory.  Not all large \nloads are the same and want the same service.  Some prioritize firm transmission service, while \nothers are willing to accept generator-contingent service if that allows them to get online faster.  \nSome are willing to be interruptible.  Some want to rely only on carbon-free power; others are \ncontent with the mix of resources on the grid.  Some prefer to be directly connected to a generator, \nor a certain type of generator.  Forcing them all into the same box disadvantages those new loads \nthat desire more bespoke or limited service, including no transmission service at all.100  Charging \nthem all a NITS rate based on gross load (as opposed to net) no matter their actual use of the \ntransmission system discriminates because such a construct “is incapable of differentiating \ncustomers who impose different costs on the transmission system through co-location.”101   \nCharging all large co-located loads a NITS rate on a gross basis is also inconsistent with \nthe treatment of other behind-the-meter generation and loads in PJM.  This results in undue \n \n100 See generally AI Power: Expanding Data Center Capacity to Meet Growing Demand, MCKINSEY & COMPANY \n(Oct. 29, 2024), https://www.mckinsey.com/industries/technology-media-and-telecommunications/our-insights/ai-\npower-expanding-data-center-capacity-to-meet-growing-demand (describing bespoke data center developments using \nfuel cells, batteries, renewables, and explaining that “[i]n the longer term, small modular reactors (SMRs) might be \nan option” to “help overcome transmission issues”). \n101 Ming Testimony at 36.  Note that depending on the configuration type, “the rate designs that “[Mr. Ming] outline[s] \ndo not simply assess zero charges for zero net use of the transmission system.”  Id.; see id. at 37-40 (discussing \nproposed charges under various configurations)."},{"page":33,"startToken":10940,"endToken":11218,"text":"33 \ndiscrimination between an undefined category of “large” new co-located loads, which must pay \nNITS on a gross basis, and other behind-the-meter configurations pairing generators and loads \n(BTMG), which are allowed to net.  Some of these existing BTMG combinations involve large \ngenerator/load combinations that are allowed to net, 3,000 MWs of which are not even required to \nbe located at the same delivery point.102  Potentially smaller “large” co-located loads will be billed \nbased on gross load.  None of these categories are defined in the Tariff or in any pleadings filed to \ndate.   \nThis discrimination is not due.  We discuss the Commission’s rationale for netting charges \nbelow in our discussion of BTMG as PJM Option 3,103 but “[t]here is no physical, technical, or \neconomic reason why a netting construct should apply differently for customers with behind-the-\nmeter generation or co-located generation.”104   \n3. Requiring Large New Loads in Every Co-Location Configuration to Pay for \nAll Ancillary Services Is Unjust and Unreasonable. \nAnother question is whether every configuration relies on ancillary services in the same \nway.  The Commission preliminarily found that it may be appropriate to charge co-located load \nconfigurations to the “extent” “they benefit from or contribute to the need for certain ancillary \nservices and black start services.”105  The Commission further stated that since the “Tariff does \nnot address this issue,” “we find that the absence of rates, terms, and conditions governing the use \nand sale of ancillary services and black start services by co-location arrangements may render the \n \n102 See id. at 21. \n103 See infra at Section II.A. \n104 Ming Testimony at 55. \n105 Show Cause Order at P 82."},{"page":34,"startToken":11218,"endToken":11548,"text":"34 \nTariff unjust and unreasonable or unduly discriminatory or preferential.”106  The Commission \nshould adopt this preliminary finding. \nUnder firm configurations, loads currently pay for ancillary services but generators do not, \non the theory that generators typically are providing ancillary services.  Under a generator-\ncontingent configuration, where the load would have no right to draw on the grid for power (except \npossibly on an as-available basis), the load fully relies on its co-located generator for all services.  \nSome have raised the question whether this co-located load nevertheless benefits from the \nprovision of ancillary services to the generator.  As Mr. Herling previously explained, under a \ngenerator-contingent configuration, PJM’s necessary studies may require the co-located generator \nto install capacitor banks or other equipment to maintain current reactive supply and voltage \ncontrol capability to the grid, and thus the co-located load has no impact on these ancillary \nservices.107  Co-located loads in any configuration are unlikely to increase requirements for \nsynchronized or non-synchronized reserves.108  Thus, while there may be some benefit to co-\nlocated load for some ancillary services provided to the interconnected generator, a universal \nrequirement for every co-located load to pay for all ancillary services, regardless of their \nconnection and use of the system (or lack thereof), is not required by the current Tariff and is \nunjust and unreasonable and unduly discriminatory and preferential.109  As discussed herein, it \nmay be appropriate to include some ancillary service charges, such as regulation and black start, \nin replacement rates if the co-located load configuration is contributing to the costs of providing \nancillary services.   \n \n106 Id. \n107 See Protest of Constellation Energy Generation, LLC, Docket Nos. ER24-2888-000, et al., Att. 1, Affidavit of \nSteven R. Herling at ¶ 26 (Oct. 2, 2024); see also Herling Aff. at ¶ 34 (discussing same). \n108 See Ming Testimony at 42. \n109 See Herling Aff. at ¶ 36 (explaining that the Commission has not charged for ancillary services based on \n“synchronization benefits” but rather by load’s use of ancillary services)."},{"page":35,"startToken":11548,"endToken":11868,"text":"35 \nE. No Party Has Demonstrated That a NITS-Only Approach Is Just and Reasonable \nand Not Unduly Discriminatory or Preferential.   \nNo party has “show[n] cause as to why the Tariff remains just and reasonable and not \nunduly discriminatory or preferential due to the lack of provisions addressing with sufficient clarity \nor consistency the rates, terms, and conditions of service that apply to co-location \narrangements.”110  They barely tried to consider options other than NITS.  Rather, the Indicated \nTransmission Owners simply equate synchronization to the grid to firm transmission service in \nevery case, but this has never been the standard—mere synchronization says nothing about how \nload is using the transmission system, if at all.111 \nFor its part, PJM states that its Tariff is just and reasonable112 but provides no meaningful \nsupport for this conclusion.  PJM goes on to note “improvements and clarifications” may be \nappropriate, asks repeatedly for Commission guidance on various aspects of co-location, and also \nconstructively provides eight options for consideration as replacement rates.  But PJM states a \nstrong preference for configurations where the load takes firm NITS and pays based on gross load, \nwhich “does not incentivize nor facilitate interconnection in a lower cost manner through co-\nlocation” and “ultimately drives unnecessary increases in transmission system costs.”113  PJM also \ncommits that it “remains open to modifying its Tariff as necessary to clarify any rates, terms, or \nconditions relating to co-location arrangements to provide the industry with needed regulatory \nclarity, certainty, and optionality.”114 \n \n110 Show Cause Order at P 87. \n111 See Herling Aff. at ¶ 33 (“synchronization does not require or suggest that energy delivery from … generation to \n… load flows on the transmission facilities of the grid.”) \n112 Contra PJM Answer at 4 (asserting that “[t]he record will support a finding that PJM’s existing Tariff remains just \nand reasonable”). \n113 Ming Testimony at 62. \n114 PJM Answer at 32 (response to a.ii.)."},{"page":36,"startToken":11868,"endToken":12137,"text":"36 \nThe Commission should take PJM up on its offer.  It should find the existing Tariff unjust \nand unreasonable for all the reasons discussed above. \n \nTHE COMMISSION SHOULD ADOPT A REPLACEMENT RATE OF SEVERAL \nCO-LOCATION OPTIONS \nAs a replacement rate, the Commission should require modifications to PJM’s Tariff to \nprovide for co-location options that incentivize large new load to locate in places and on terms that \nmaximize the efficiency of the existing transmission grid and allow for timely service without \njeopardizing reliability or unjustly shifting costs.  “The existence of multiple options for co-located \nloads to interconnect under different arrangements is, itself, foundational to economically efficient \ntariff design.”115  The Commission’s overall policy goals should be to ensure that new data center \nload can be connected promptly, in a way that maximizes the efficiency of the existing grid, and \nthat requires the new load to pay a just and reasonable rate for the service it receives.  PJM \nconstructively laid out eight options and most offer appropriate frameworks for just and reasonable \nco-location configurations.  However, modifications are needed to some aspects of the rate design, \nas set forth herein.   \nA. PJM’s Proposed Options Are the Foundation for Just and Reasonable Rates. \nPJM proposes eight potential options that could, in its view, serve as a replacement rate for \nintegrating large loads through co-location arrangements.  The options are as follows: \n \n \n \n115 Ming Testimony at 25; see id. (“Large customers seeking interconnection as co-located loads will have a range of \nexpectations and preferences for the level of reliability of service, and providing multiple options enables those \ncustomers to evaluate trade-offs between reliability and cost.”)."},{"page":37,"startToken":12137,"endToken":12365,"text":"37 \n \nPJM \nRate \nOption \nDescription \nFundamental \nConfiguration \n(E3 Determination) \n1 \nNITS without co-location \nFirm \n2 \nNITS with co-location \nFirm \n3 \nLoad customer with BTMG \nFirm \n4 \nCo-located load with ‘generator-\ncontingent’ protections \nGenerator-Contingent \n5 \nCo-located load with ‘generator-\ncontingent’ protections + as-available \nenergy purchase option \nGenerator-Contingent \n6 \nNITS with co-location + BYOG \nFirm \n7 \nNITS with co-location where load is \ninterruptible \nInterruptible \n8 \nNITS with co-location where load \nparticipates as demand response \nInterruptible \n \nThe options should be evaluated under “the rate design principle” of “[f]air apportionment \nof costs” or, in other words, “costs should be borne by the customers that cause the costs” and the \ncustomers that do not cause the costs, should not.116  The options should also be economically \nefficient, “free from controversies as to improper interpretation,” and “non-discriminatory.”117  For \neach option, Constellation proposes rate modifications to bring the option in line with these \nfundamental rate principles.  Of these options, all but Option 6 can be just and reasonable as part \nof a selection of co-location options (though some require modifications).   \nAs set forth below, with appropriate rate design, these eight options converge into three: \n(1) a firm NITS option with the load paying based on either gross load or net load, depending on \nits configuration, (2) a generator-contingent option where co-located load does not pay NITS but \n \n116 See Ming Testimony at 9. \n117 Id."},{"page":38,"startToken":12365,"endToken":12686,"text":"38 \npays for any necessary upgrades and could pay a discounted transmission charge for as-available \nenergy purchases, if any, and (3) an interruptible transmission option—lasting until network \nupgrades are completed—where co-located load  pays a discounted transmission charge reflecting \nits inferior service.118   \n1. Option 1 - Firm Service Without Co-Location \nPJM’s first option involves the large load procuring existing NITS without being physically \nco-located with generation (i.e., connecting anywhere on the grid).  As PJM explains, “[b]ecause \nthe load is taking NITS, the load and generator do not have to be sited at the same location because \nthe load and the generation are electrically connected to the grid separately.”119  This is a firm \nservice option, with a NITS rate paid on gross load. \nOf course, NITS service is a just and reasonable option for load choosing such a \nconfiguration; but, as discussed above, it would not be reasonable to provide this option to the \nexclusion of any other configuration choice.  That would “drive[] unnecessary transmission build \nthat could be avoided” through a generator-contingent or interruptible co-location configuration, \nand intrude on state jurisdiction to permit direct sales from a generator to co-located load if this is \nthe only option for load.120   \n2. Option 2 – Firm Service With Co-Location \nPJM’s Option 2 is the same as Option 1 (firm) except the load and generation are co-located \nat same Point of Interconnection.  Aside from specifying additional requirements for any necessary \ngenerator modifications, everything else is the same as traditional NITS service, with PJM \n \n118 See Ming Testimony at 15, 53.  These are Option 2: NITS with Co-location; Option 5: Co-located load with \n‘generator-contingent’ protections + as-available energy purchase option; Option 7: NITS with co-location where load \nis interruptible.  See also id. at 50, Table 1 (providing overview of appropriate transmission charges for firm, generator-\ncontingent, and interruptible configurations).   \n119 PJM Answer at 10 (emphasis added). \n120 See Ming Testimony at 54."},{"page":39,"startToken":12686,"endToken":13045,"text":"39 \nproposing to apply the full NITS rate to gross load.121  Yet electrically Option 2 is identical to \nOption 3 for behind-the-meter configurations (PJM Option 3), under which NITS charges are \napplied to net load.122  “[C]onsistent with FERC precedent and non-discriminatory treatment with \nbehind-the-meter generation, the starting point for a co-located load configuration should be a net \nbilling construct that measures the actual energy flowing between the entire co-location \nconfiguration and the transmission system.”123  Ordinarily, two electrically identical options \nshould be charged the same rate—yet PJM proposes to charge different rates.  This is not consistent \nwith good rate design principles.124  Option 2 not only suffers the same flaws as Option 1, but also \nfails to “provide any discount to reflect the fact that many co-located generators will be on and \navailable during the system peak, offsetting the co-located load and reducing the system cost \nimpact of all loads in this configuration.”125  The failure to differentiate between a regular NITS \ncustomer—which locates wherever it wants no matter the socialized upgrade costs—and a co-\nlocated customer, which has “a lesser impact on the transmission system,” fails to “fairly apportion \ncosts.”126 \nNevertheless, load and a co-located generator, if presented with both Options (2 and 3), \nmay prefer Option 2 (under which the generator remains a capacity resource) over pursuit of \nBTMG netting (under which the generator is required to delist the capacity used to serve the co-\nlocated load and PJM procures capacity based on the load’s net contribution at the coincident \n \n121 Ming Testimony at 55, 62.  \n122 See id. at 55 (noting that “[c]ustomers in this configuration still represent firm loads”).  \n123 Id. at 28.  \n124 It is also a well-established principle that all similarly situated entities are charged consistent rates.  Tenaska Clear \nCreek Wind, LLC v. FERC, 108 F.4th 858, 868 (D.C. Cir. 2024) (citing Consol. Edison Co. of N.Y., Inc. v. FERC, 45 \nF.4th 265, 282 (D.C. Cir. 2022) (“And undue discrimination occurs when similarly situated entities are charged \ndifferent rates for no good reason.”). \n125 Ming Testimony at 55. \n126 Id."},{"page":40,"startToken":13045,"endToken":13427,"text":"40 \npeaks).  Thus, co-located load should have the choice to pay gross NITS (in which case the \ngenerator and the load would remain in the capacity market) or instead, if the load and generator \nagree, to pay NITS calculated on a net basis as in Option 3 (in which case the portion of the \ngenerator serving the load would delist and PJM procures capacity for the load based on net load \nduring the coincident peaks).  \nSince “there is a high likelihood that the co-located generator will be available during the \ncoincident peak hours, meaning that the co-located load is unlikely to be withdrawing energy \nduring coincident peak hours” and “conventional NITS charges based on net system energy \nwithdrawals may not fully capture the costs associated with designing the transmissions system to \nensure the co-located load could be served,” it is also appropriate to add a standby charge.127  This \nstandby charge would “reflect the fact that the transmission system must be built to a certain extent \nto serve the load on a firm basis.”128  The standby charge would be based on a “customer-\ndesignated firm load subscription level of what the customer could draw from the transmission \nsystem.”129  There are numerous ways to calculate the standby charge, but Mr. Ming proposes one \npotential methodology based on rate design principles and Commission precedent.130  For its part, \nthe Pennsylvania Public Utility Commission also has endorsed the use of standby charges.131  \n \n127 Id. (emphasis in original). \n128 Id. at 29. \n129 Id. (emphasis in original). \n130 See id. \n131 See Pa. Pub. Util. Comm’n, Opinion and Order, Pa. P.U.C. No. R-2018-3000124, at 62 (Dec. 20, 2018) (concluding \nthat Duquesne Light Company’s “Rider No. 16” standby service rate “is reasonable because it is voluntary, and the \ncustomers can achieve savings through Rider No. 16 because it is less than the applicable full requirements rate”); see \nalso Exergy Partners Corp., Standby/Capacity Reservation Charge Best Practices and Review: Prepared for \nPennsylvania \nPublic \nUtility \nCommission \nCHP \nWorking \nGroup, \nat \n12 \n(July \n16, \n2018), \nhttps://www.puc.pa.gov/Electric/pdf/CHPWG/Standby_Cap_Res_Best_Practices_Review-071618.pdf (Standby rate \ndesign should not assume that all forced outages of on-site generators occur simultaneously, or at the time of the utility \nsystem peak.”)."},{"page":41,"startToken":13427,"endToken":13786,"text":"41 \nThe ideal rate for firm transmission service for co-located loads under Option 2 would be \nthe greater of NITS applied to net load or the standby charge—unless, as discussed above, the \ngenerator and load would prefer for the load to pay NITS on a gross basis so that the generator and \nload can remain in the capacity market.132  This rate would appropriately reflect the co-located \nload’s use of the transmission system, as well as the benefits it provides.   \n3. Option 3—Behind-the-Meter Generation \nPJM’s third option is the existing Tariff provisions for BTMG, where the load is a NITS \ncustomer, but NITS charges only apply to the “net” of load minus BTMG at the relevant coincident \npeaks.  The generator must delist the capacity used to serve the load, and the load only counts \ntoward the reliability requirement based on its net coincident peak.  Thus, the effect on resource \nadequacy is no different than if the generator remained a capacity resource and the load counted \ntoward the reliability requirement based on its gross coincident peak.   \nThere are two kinds of BTMG: (a) so-called “retail” BTMG, which is load and generation \nco-located at the same point of interconnection, where the total quantity is not limited, and \n(b) “non-retail” BTMG, which is load at a separate point of interconnection from the generation \nbut served by municipal utilities over a distribution system, which is limited to a certain quantity \nof megawatts.133  PJM’s narrative describes both kinds of BTMG,134 but its charts and most of its \ndiscussion concern only non-retail BTMG, which has quantity limitations that do not apply to the \nregular—and far more common—retail BTMG.135   \n \n132 Ming Testimony at 31. \n133 See PJM Answer at 12. \n134 PJM Answer at 12, 34-26. \n135 See Ming Testimony at 21 (“non-retail behind-the-meter generation[] is capped at 3,000 MW, … PJM estimates \nthat retail behind-the-meter solar capacity across its footprint in 2025 totaled more than 10,000 MW.”) (emphasis in \noriginal), citing Appendix A: https://www.pjm.com/-/media/DotCom/documents/manuals/m14d.pdf; and Page 2, \nhttps://www.pjm.com/-/media/DotCom/about-pjm/newsroom/fact-sheets/distributed-energy-resources.pdf"},{"page":42,"startToken":13786,"endToken":14078,"text":"42 \nUnder both types of BTMG arrangements, the load pays for NITS and ancillary services \non a net basis—meaning only the amount withdrawn from the grid after subtracting the \ngeneration.136  The Commission found that netting was appropriate to “encourage qualifying \nentities with behind the meter generation to reduce their use of the PJM transmission system.”137  \nIn another case involving ISO New England Inc. (where netting also is standard for behind-the-\nmeter configurations), the Commission found that netting “reasonably reflect[s] each Network \nCustomer’s usage of the transmission system and assigns the cost of providing Regional Network \nService accordingly.”138  This option is readily applicable to the co-location of large loads.  As \nnoted above, the co-location arrangement described in Option 2 is electrically identical to the \nBTMG arrangement currently authorized in PJM’s Tariff.  The picture below depicts the “retail” \nBTMG configuration.  The only difference between a “retail” BTMG configuration and a behind-\nthe-meter co-located generation and load configuration is that the generator and load would swap \npositions.  Either way, they are both behind the meter, and the load uses grid power only to the \nextent it exceeds what the co-located generator can supply—and accordingly is billed on a net \nbasis. \n \n136 See id. at 21, 55. \n137 PJM Interconnection, L.L.C., 107 FERC ¶ 61,113, at PP 27-28 (2004) (citing Occidental Chemical Corp. v. PJM \nInterconnection, L.L.C., 102 FERC ¶ 61,275, at P 14 (2003)) (emphasis added). \n138 ISO New England Inc., 178 FERC ¶ 61,086, at P 49 (2022); see also Ming Testimony at 56 (arguing that for a fair \napportionment of costs, the rate treatment should include both netting and an “appropriate discount that reflects the \ntransmission costs savings” of a behind-the-meter co-location configuration)."},{"page":43,"startToken":14078,"endToken":14251,"text":"43 \n \n \nAs Mr. Herling explains, “BTMG arrangements and co-located load arrangements can be designed \nfrom an engineering perspective in exactly the same manner.  In one, the load is typically greater \nin magnitude than the generating facility.  In the other, the load is typically lesser in magnitude \nthan the generating facility.”139  Yet, “[t]he physics of energy delivery are the same in both \narrangements and are not related to contractual arrangements or rate structures.”140  Accordingly, \n“[t]here is no physical, technical, or economic reason why a netting construct should apply \ndifferently for customers with behind-the-meter generation or co-located generation.”141  Any \nconfiguration where the generator and the load are co-located behind-the-meter is similarly \nsituated and should qualify for netting.142   \n \n139 Herling Aff. at ¶ 30. \n140 Id. \n141 Ming Testimony at 55. \n142 The names for BTMG all are misleading, including BTMG itself.  As shown here, both the generation and the load \nare behind-the-meter in a retail BTMG configuration or a PJM Option 4 configuration.  It is also unclear why this is"},{"page":44,"startToken":14251,"endToken":14599,"text":"44 \nPSEG, which is a Transmission Owner but not one of the “Indicated Transmission Owners” \nin this case, persuasively argued that “[a]n approach that aligns with cost causation principles is \none that treats all co-located customers as NITS customers with netting rules applied” which “is \nthe current construct for BTMG customers” and consistent with the treatment of other customers, \ne.g., universities and hospitals, which “are allowed to net BTMG out of their transmission charges \nreflecting the fact that when they are generating behind the meter, they are not using the system.”143  \nPSEG concludes that “[t]here is no reason to treat behind the meter load any differently than \nBTMG.”144 \nThe second type of existing BTMG illustrates even more starkly why net billing is \nappropriate for a configuration like “retail” BTMG.  In a non-retail BTMG configuration, the \ngenerator and load are not at the same point of interconnection.  This configuration looks no \ndifferent than a standard front-of-the-meter configuration.  Yet under the PJM Tariff rules, this \nspecial class of non-retail BTMG is still allowed to net.  It would be discriminatory to allow this \ntype of non-retail BTMG to net but not to allow netting for generation and load co-located at the \nsame point of interconnection, such in PJM Option 2.   \nPJM asserts that the existing BTMG configuration “was conceived for, and has been \nimplemented for, substantially smaller loads.”145  But there is no size limitation for BTMG in the \nPJM Tariff, and it has been implemented for large loads.  This attempted differentiation between \nequally “large” facilities certainly smacks of undue discrimination.  And size itself is not a rationale \nfor discriminatory rate treatment. \n \ncalled “retail.”  It is simply a “BTM” configuration of generation and load.  As for the “non-retail BTMG” \nconfiguration in the existing Tariff, it is not behind-the-meter.  It is simply an example where certain privileged \ngenerators and loads are allowed to net (while most others are not). \n143 PSEG Response at 13 (citations omitted) (emphasis in the original); see id. at 17 (citing cases in support). \n144 Id.  \n145 PJM Answer at 13 & n.5."},{"page":45,"startToken":14599,"endToken":14950,"text":"45 \nPJM expresses concern that load under the existing BTMG tariff is not required to carry \nreserves and may lean on the PJM system when the co-located generation is on outage, or when \nthe load exceeds the rating of the co-located generation.  PJM also contends such loads should pay \nfor certain ancillary services, such as black start, and netting may not result in a sufficiently large \ncharge to capture these loads’ true reliance on the system.146  These concerns are easily addressed.  \nThe behind-the-meter rules under PJM Option 3 could be modified to require the co-located load \nto carry or pay for reserves and ancillary services.  If needed, a minimum demand charge for NITS \ncould be fashioned to account for any non-volumetric costs the BTMG load imposes on the system.   \nThis mechanism may be appropriate for including in a replacement rate for co-location \narrangements, perhaps with carrying of reserves and/or ancillary services charges, as appropriate.  \nBut one thing is clear: billing should be based on the load’s net use of the transmission grid, and \nthis is true whether the load is “large” or “small.”147   \n4. Option 4—Generator-Contingent Service with No Backup Grid Service \nPJM Option 4 is a generator-contingent configuration where both the generator and the \nload are behind the same point of interconnection with protective equipment to prevent the load \nfrom drawing power from the grid.  The diagram below illustrates this configuration.148   \n \n146 PJM Answer at 36. \n147 Ming Testimony at 55-56; see also PSEG Response at 2 (“There is no justification to treat behind the meter load \nany differently than BTMG, and the Commission should ensure that there is no undue discrimination in the treatment \nof co-located arrangements.  Both should pay (and in the case of BTMG customers continue to pay) based only on \nactual usage of the transmission system.”). \n148 Graphics Slide of Mike Kormos, Docket No. AD24-11-000 (filed Nov. 4, 2024) (the break in the lines between the \nnuclear plant and the data center substation represent the potential placement of protective equipment to prevent the \ndata center from drawing load from the grid)."},{"page":46,"startToken":14950,"endToken":15141,"text":"46 \n \n \nExisting generators that serve new co-located load under this configuration will delist the \ncapacity used to serve the load, and the load does not contribute toward the region’s reliability \nrequirement.  Under this option, the load pays no transmission charges because it is not using the \ntransmission system, but the load must pay for its own transmission system upgrades if PJM’s \n“necessary studies” show that the withdrawal of the existing generator’s power from the grid \ncreates any congestion or other transmission issues.   \nThis configuration allows load to connect more quickly and more efficiently by removing \nthe need for costly transmission upgrades, most of the cost of which would be socialized to all \ncustomers.149  This option also is preferable from a resource adequacy perspective because reserves \ndo not need to be procured for the large new load.   \n \n149 See Herling Aff. at ¶ 28 (“Because the associated special-purpose relay scheme …, no energy will flow to the co-\nlocated load over the transmission grid following a contingency; no new transmission infrastructure will be required \non the grid to facilitate the interconnection and to ensure reliability for existing load customers other than what might"},{"page":47,"startToken":15141,"endToken":15454,"text":"47 \nWhile nothing in the current Tariff purports to foreclose this option, Constellation agrees \nwith PJM that Tariff modifications could clarify that, under the existing Tariff, the co-location of \ngeneration and load behind-the-meter already is permissible, and memorialize the rules in PJM’s \nCo-Location Guidance (which are largely concerned with ensuring reliability).150  This would \ninclude the necessary studies process as well.   \nThe Commission has voiced concern about co-location arrangements being “adequately \nand transparently reflected” in planning mechanisms, such as the PJM capacity market.151  Such \ntransparency is provided under the necessary study process.  As explained by Mr. Kormos, “[t]he \nNecessary Study is not limited to a local focus and instead evaluates the incremental impact on the \nentire PJM system....”152  Further, under this process, if any reliability issue is identified then “the \nnew load cannot come online until the issue is addressed.”153  Thus, the necessary study process \nprovides transparency and predictability into the development of co-location arrangements.  In \nfact, it is likely more transparent than existing practice.  Transparency is hindered under existing \npractice because PJM relies on transmission owners to provide assessments of large load demand \nin their respective zones, but, without a standardized process to create such assessments, PJM is \nforced to “make a number of judgment calls.”154  Transparency can be bolstered by increasing the \nfrequency in which transmission owners report load assessments from once to 2-4 times per \nyear.155 \n \nbe identified in the Necessary Study performed for the change in status (partial delisting) of the generator,” which the \nload would pay for). \n150 See PJM Answer at 14 (“Tariff modifications would be needed based on the Commission’s November 1, 2024 \nOrder in Docket No. ER24-2172.”) (citing PJM Interconnection, L.L.C., 189 FERC ¶ 61,078 (2024)). \n151 See Show Cause Order at P 85.  \n152 Kormos Aff., Appendix.  \n153 Id.  \n154 Patterson Aff. at ¶ 29.  \n155 Id."},{"page":48,"startToken":15454,"endToken":15804,"text":"48 \nSince the load also is connected directly to the generator—as opposed to the grid—the load \ndoes not rely on the grid for ancillary services; the generator does.  Commission policy does not \nsupport charging generators for ancillary services, largely because generators typically provide the \nancillary services to the grid.156  Nonetheless, Constellation is open to negotiating fair charges, if \nany, for regulation and black start services, or other ancillary services if usage can be factually \nproven (as opposed to rhetorically asserted by lawyer witnesses).157  The Commission should not \nallow the debate over ancillary services to obscure the much more important point here: allowing \nload to co-locate with protective relay equipment so they cannot draw power from the grid will \navoid costly and unnecessary transmission upgrades that would be required if the load were forced \nto become a full NITS customer.  That cost dwarfs any ancillary services costs.   \nPJM and the Indicated Transmission Owners oppose this configuration because they fear \nthat the protective relays themselves might fail, and the possibility of such failure supposedly \nrequires the Indicated Transmission Owners to plan the system as though the protective relays did \nnot exist at all.158  The Commission should reject these arguments.  Protective mechanisms are \ncommonplace and frequently used by PJM and others in situations beyond co-located load to \nensure safe and reliable grid operations—including, for example, primary and secondary relays \nand redundant protection systems.159  Mr. Herling explains the engineering.  Specifically, a “fully \nredundant” protective relay scheme involves two circuit breakers placed in series behind the meter, \neach with two trip coils so that either the primary or backup protective relay can trip the load via \n \n156 See Integration of Variable Energy Resources, Order No. 764, 139 FERC ¶ 61,246, order on reh’g, Order No. 764-\nA, 141 FERC ¶ 61,232 (2012), order on reh’g, Order No. 764-B, 144 FERC ¶ 61,222 (2013). \n157 See Ming Testimony at 42-44 (discussing use of ancillary services and possible charges for same). \n158 PJM Answer at 14, 44; Indicated Transmission Owners Answer, Att. A at 10. \n159 Kormas Aff. at ¶ 6."},{"page":49,"startToken":15804,"endToken":16164,"text":"49 \nfiber optic channels.160  Each element of the protective scheme, “including the electric current \ntransformers, the fiber channels, and the trip relays, are redundant resulting in a single-failure-\nproof design.”161  The system is not planned for nor does PJM require upgrades to address \nsubsequent “third contingency events”162 and it would not “be reasonable to do so, short of events \nthat would result in a cascading outage of grid facilities.”163  Mr. Herling explains that protective \nsystems are “regularly employed on the PJM transmission system, and the successful operation of \nsuch protective systems is a common observance within PJM.”164  Mr. Kormos, PJM’s former \nChief Operations Officer, also describes such protectively relay systems as “commonly used \nmechanisms.”165  If a concern remains regarding third contingency events, then PJM can model \nfor such a situation and prepare accordingly.166  As Mr. Herling confirms, it would be \ndiscriminatory to suggest that protective relaying cannot be used in the context of co-located \nconfigurations or that co-location arrangements must be designed to a different standard.167 \nFinally, PJM suggests that Option 4 would only be available “where state law permits such \na configuration.”168  Constellation agrees.  The PJM Tariff should not attempt to interpret the \nvarious states’ laws on this topic, both because PJM has no authority to do so, and because the \nstates themselves are far better equipped to enforce their own laws.  Further, the Commission \nshould not inhibit state flexibility and autonomy if a state permits a configuration such as Option \n \n160 Herling Aff. at ¶ 23. \n161 Id.  \n162 Kormos Aff. at ¶ 7. \n163 Herling Aff. at ¶ 23; see also Kormos Aff. at ¶ 7 (providing that “[t]he failure of a relaying scheme itself is also \nnot necessarily unreliable if PJM is prepared for it”); see also Ming Testimony at 35 (discussing remedial action \nschemes operated by PJM). \n164 Herling Aff.at ¶ 23.  \n165 Kormos Aff. at ¶ 7. \n166Id.  Mr. Kormos also explains that in the event the co-located generator trips offline, the protective relays will \nsimultaneously cut the load “providing PJM a benefit with less imbalance to resolve.”  Id. \n167 Herling Aff. at ¶ 23. \n168 PJM Answer at 14."},{"page":50,"startToken":16164,"endToken":16465,"text":"50 \n4.  Doing so would effectively preclude states from regulating transactions that fall squarely within \ntheir jurisdiction.  Instead, the Commission should facilitate and encourage states to take the \ninitiative to proactively develop regulations and procedures for such co-location configurations.  \nThe Commission can do so by directing PJM to clarify in its existing Tariff that the co-location of \ngeneration and load behind-the-meter already is permissible, and memorialize the rules in PJM’s \nGuidance Document, as proposed herein. \nUltimately, Option 4 (subject to resolution of regulation and black start services charges) \nis aligned with the rate principle of fair apportionment of costs.169  Customers should be able to \nselect this service if they are willing to accept the tradeoffs in the nature of service.  They can later \ntransition to full NITS if they choose (following the required studies for NITS) and remove any \nprotective equipment previously installed to prevent drawing power from the grid. \n5. Option 5—Generator-Contingent Service with Optional Backup Grid Service \nThis option is like Option 4 in that it is a generator-contingent configuration where load is \nlocated behind the generation with a protective mechanism to prevent delivery of energy from the \ngrid, but backup service from PJM would be “as available” with advanced authorization for an \nappropriate transmission charge.    \nThe capacity used to serve the load must delist.  The load is assigned no NITS charges if it \nhas no network load at the coincident peaks.  Further, any network upgrades to serve the load \nwould be borne by the co-located entities.  Charges for ancillary services would be handled the \nsame way as in Option 4.  Thus, this option (as amended to reflect regulation and black start \nservices, as described above for Option 4) is consistent with the fair apportionment of costs.170  \n \n169 Ming Testimony at 57. \n170 Id. at 57."},{"page":51,"startToken":16465,"endToken":16838,"text":"51 \nThis option also aligns with the principle of economic efficiency because the lower costs assessed \nto the load provides a price signal for load to arrange this configuration where possible and the as-\navailable energy purchases provide an opportunity for beneficial transactions.171 \nThe difference between this option and Option 4 is that the co-located load has the option \nto draw energy from the transmission system on an as-available basis, meaning only when PJM \ndetermines it will not cause any impacts on the transmission system.89  “Because this energy would \nonly be provided if the transmission system as built is capable of delivering it, as-available energy \nwould not require any additional investment in transmission infrastructure.”90  \nAs presented by PJM, this option does not provide for a usage fee associated with the as-\navailable backup service.  Constellation proposes that it would be reasonable to provide as-\navailable energy at the locational marginal price plus a discounted transmission charge because, \nwhile energy would be drawn from the grid, it would only be “as available” when it is not adding \nany burden to the transmission system (and the load would not need to be planned for reliability \nor resource adequacy).172  Since access to power from the grid would only be “as available,” this \nis an inferior service to PJM Option 3, for example, which would allow full service to the load \nwhenever the generator was offline. \nAs PJM states, “[t]his option requires real-time, bespoke operational decision-making to \ndetermine whether load can continue to be served.”173  But, as with Option 4, this is not a uniquely \ndifficult operational challenge for PJM.  As Mr. Kormos explains, PJM “has the ability to model \nany large load in both planning and operations in whatever detail it desires” and the configuration \n \n171 Id. \n172 See Ming Testimony 38-42 (proposing a discounted transmission rate for as available energy based on the marginal \ncost of transmission); Table 1.  Mr. Ming further points out that “[c]ollection of as-available transmission charges \nwould directly benefit existing ratepayers by reducing rates since as-available energy purchases by co-located loads \nwould contribute to the recovery of transmission costs without requiring any additional costs be incurred.”  Id. at 41. \n173 PJM Answer at 15."},{"page":52,"startToken":16838,"endToken":17143,"text":"52 \nof the load makes no difference with respect to such modeling.174  In other words, this concern is \nnot unique to this co-located load configuration, and according to PJM’s former Chief Operations \nOfficer, the challenge is not all that challenging in any event. \n6. Option 6—Bring Your Own Generation \nOption 6 involves firm large load additions that interconnect as Network Load and bring \nadditional generation to serve as Capacity Resources or otherwise make arrangements with \ngeneration that has or is scheduled to deactivate.175  PJM acknowledges that not all the options it \nproposed are “equivalent, desirable, or even necessarily workable.”176  Such is the case with Option \n6, and it should be rejected accordingly.  Some of the other options may require modification (see, \ne.g., the discussion of Option 7 below), but Option 6 is dead on arrival as unduly discriminatory \nand likely to exacerbate the very resource adequacy issues it purports to address.   \nFirst, Option 6 discriminates against existing generation.  As explained in the Patterson \nAffidavit, “[t]his approach is functionally equivalent to an out-of-market payment or subsidy (for \nthe same resource adequacy services) which effectively lowers the cost of the with-contract class \nand thus distorts and depresses market economics for all other resources (including all without-\ncontract new resources and all existing resources).”177  Mr. Patterson further explains that the \nfavorable interconnection queue treatment presented by Option 6 does not make up for the \ndiscriminatory nature of this option because “[t]he ultimate endpoint of such a policy is to drive \nall resource additions to seek contracts with large load and depress economics for other resources, \nleading to reduced new entry outside of the large load contract path and potentially retirements of \n \n174 Kormos Aff. at ¶ 7. \n175 PJM Answer at 16.  \n176 Id. at 5. \n177 Patterson Aff. at ¶ 40."},{"page":53,"startToken":17143,"endToken":17452,"text":"53 \nexisting resources.”178  Another concern is that “because the right to integrate with the system is \nof very high value to large loads, and restricting that right to only those loads that bring their own \ngeneration confers an additional high-value benefit on new capacity that is able to secure a contract \nwith a new entrant large load.” 179  As a result, this option discriminates against existing generation \nand new generation that for whatever reason cannot contract with a new large co-located load prior \nto completion of the generator interconnection queue process.  Such a result “would further \nadvantage this subset of capacity relative to other types of capacity by paying them a large effective \nsubsidy.”180 \nThe undue discrimination presented by Option 6 is akin to contractual vintaging that the \nCommission has historically found to be ineffective for resource development.  For example, over \na half century ago, the Commission analyzed the practice of establishing prices for natural gas \nbased on contract date vintaging whereby one rate applied to “‘old’ or ‘flowing’ gas (based on \nhistoric ten year costs) and another for ‘new’ gas (based on current costs and designed to provide \nincentives for future development).”  The Commission held that “vintaging by contract date is an \nanachronism which should be eliminated.”181  The Commission’s rationale was that contract \nvintaging did not “respond[] to the present need for increased exploration and development” \nbecause the incentives applied to “‘new’ gas ratemaking are totally lost as to undeveloped acreage \ncommitted under old contracts.”182  The same rationale applies here.  Option 6 proposes to provide \ncertain advantages to a subset of new capacity that can be developed simultaneously and co-located \n \n178 Id.  \n179 Id. at ¶ 41. \n180 Id.  \n181Re Area Rate Proceeding for Rocky Mountain Area, 49 FPC 924, 942 (1973) (citing Opinion No. 468, Permian I, \n34 FPC 159, 185 (1965)).  \n182 Id."},{"page":54,"startToken":17452,"endToken":17789,"text":"54 \nwith large new load, which will lead to the underutilization of existing generation capacity or new \ncapacity that cannot co-locate with new large load for whatever reason and that, in turn, will stunt \noverall development efforts.  This is untenable considering the importance of promptly connecting \nlarge data center load.183 \nThe Commission has previously rejected measures to attract new entry that unduly \ndiscriminated against existing capacity resources.184  Mr. Patterson explains the rationale for \napplying the same principle to Option 6, i.e., it “is essentially a form of vintage pricing in that it \noffers an effective subsidy for a favored class of new resources, while denying that subsidy to non-\nfavored new resources and existing resources.”185  In turn, this will result in depressed revenue for \n“non-favored resources with no offsetting benefits, which ultimately chills new entry from \nresources that are unable to contract with new large loads and potentially leads to market exit by \nexisting resources, undermining reliability and reducing overall market efficiency.”186 \nSecond, this option may create perverse incentives for existing generators to retire.  \nAlthough PJM has the option to enter into “reliability must-run” contracts with deactivating \ngenerators, there is no obligation on behalf of the generator to enter into such arrangements.187  If \nOption 6 is the prioritized option to effectuate co-located load arrangements, then PJM may find \nitself with an escalating list of retirement notices as generators vie for co-located load projects \nseeking deactivated generators that can quickly come online (or stay online). The Commission \n \n183 See supra at Section I.A. \n184 PJM Interconnection, L.L.C., 126 FERC ¶ 61,275, at P 149 (2009) (finding that PJM’s proposal to increase the \nRPM’s New Entry Price Adjustment provision from three years to seven years would “further bifurcate capacity \nmarkets by giving new suppliers longer payments and assurances unavailable to existing suppliers providing the same \nservice”), order on reh’g, 128 FERC ¶ 61,157 (2009).  \n185 Patterson Aff. at ¶ 42. \n186 Id. \n187 PJM Tariff, Part V, Sections 113.2, 119."},{"page":55,"startToken":17789,"endToken":18148,"text":"55 \ncannot avoid this outcome by simply saying the option will only apply to new generation because, \nas described above, this would be unduly discriminatory.   \nThe only benefits of Option 6 are that it maintains resource adequacy and “offers a \npotentially faster interconnection path for generation resources supporting co-located loads in \nstates that want them.”188  However, these benefits are not unique to Option 6 but are provided by \nother options.  In addition, expedited interconnection pathways for certain resources are also not \nnecessarily a generally accepted benefit and have recently been challenged in other proceedings.189  \nPJM also states that an existing generator could utilize this option by entering into a bilateral \ncontract with the load, as long as it remains a capacity resource (i.e., is in front-of-the-meter/no \nnetting)—but it is unclear what this offers for existing generation beyond Options 1 or 2.190  The \ngeneral benefits of Option 6 do not outweigh its fatal flaws, i.e., it is unduly discriminatory and \ndoes not make efficient use of the existing system.  For these reasons, Option 6 should not be \nconsidered as a viable option. \n7. Option 7—Interim Interruptible Transmission Service \nOption 7 is a provisional, interruptible service that can be curtailed by PJM during pre-\ndefined conditions; as modified by Constellation, the service would be available until the \ntransmission upgrades needed for NITS service are completed.  With the necessary rate design \nmodifications discussed below, this option could provide large data center loads speed-to-service \nif they are willing to be interruptible under pre-defined conditions (with the load then either being \n \n188 PJM Answer at 17. \n189 See, e.g., Letter of Former FERC Commissioners, Docket No. ER25-1674-000 (filed Apr. 7, 2025) (challenging \nthe Midcontinent Independent System Operator’s proposed Expedited Resource Addition Study as an “opportunity \nfor self-dealing by utilities to advance their affiliated generation” and running “counter to everything FERC has tried \nto do to preserve open access since the Commission’s landmark issuance of Order No. 888”); Motion to Intervene and \nProtest of NextEra Resources, LLC, Docket No. ER25-1674-000 (arguing that MISO’s proposal is contrary to open \naccess and unduly discriminatory and preferential).  \n190 Id."},{"page":56,"startToken":18148,"endToken":18454,"text":"56 \nserved by backup generation or not at all).  The Duke Study identifies the significant benefits to \nthe efficient use of the transmission grid and existing capacity when loads can “temporarily reduce \n(i.e., curtail) its electricity consumption from the grid during [] peak stress periods.”191  \nSome modifications to PJM’s discussion of this option are needed.  PJM states this option \nwould be available “for a transitional period until any resource adequacy supply/demand \nimbalances associated with the large load addition could be addressed and the load could assume \nfull Network Load.”192  This misunderstands the purpose of an interruptible NITS, which is to \nfacilitate speedier connection for critical customers such as data centers by making the most of the \nheadroom on the existing transmission system until the system upgrades needed for full NITS can \nbe completed.  New load should not need to wait for the completion of all the system upgrades \nneeded to provide them with NITS if they can be connected earlier on an interruptible basis while \nthose upgrades are being constructed.  Such “unfettered discretion to decide what constitutes a \n‘supply/demand imbalance’ and how long it lasts ... harms markets because the functional effect \nof [this option] as written is that PJM would be conditioning the availability and term of valuable \nload integration rights on its subjectively determined view of resource adequacy.”193  The result is \nthat resource developers could justifiably lose faith in market price signals and their ability to \ndecide whether to enter the market and when so much is left to PJM’s discretion.194  Accordingly, \nthe interruptible service should cease to be available once the upgrades are complete—not based \non PJM’s assessment of resource adequacy.195    \n \n191 Duke Study at 5 (citing ERCOT, supra n.45). \n192 PJM Answer at 18-19. \n193 Patterson Aff. at ¶ 43. \n194 See id. \n195 Id."},{"page":57,"startToken":18454,"endToken":18729,"text":"57 \nNevertheless, an interruptible NITS could also provide some resource adequacy benefit if \nthe conditions for interruptibility included both local transmission constraints and reserve \nshortages.  In the latter scenario, the resource would effectively be supplying a demand response-\nlike product that, unlike other demand response, would be enforceable by PJM through a right to \ninterrupt; because capacity would not need to be procured for that load, the load could avoid \ncapacity payments during the duration of this provisional interruptible service.  Again, even under \nthis latter interruptible NITS option, the service should terminate upon completion of the \ntransmission facilities needed to enable full NITS.  This is because the availability of transmission \nservice for any customer regardless of size or configuration is based on an evaluation of \ntransmission security, not resource adequacy, and co-location itself has no effect on resource \nadequacy relative to a traditional NITS configuration. \nPJM also proposed a full NITS transmission charge (based on gross usage during the \ncoincident peaks) but a bypass of capacity charges for the load.  A NITS charge based on gross \nload is appropriate if the load is not co-located with the generator, but for co-located load, the rate \nfor Option 7 should include netting as with any other co-located load (see discussion of Option 2 \nand Option 3 above).196  In addition, “an interruptible co-located load does not require the \ntransmission system to be planned, built, or adapted in any way to accommodate the load because \nPJM can interrupt the load when needed to avoid system impacts. Therefore, no standby or system \nimpact charges are appropriate.”197    \n \n196 Ming Testimony at 50, at Table 1. \n197 Id. at 34."},{"page":58,"startToken":18729,"endToken":19106,"text":"58 \n8. Option 8—Expansion of Demand Response Opportunities  \nThe eighth option involves co-located load that elects to be Network Load and participates \nas a Demand Response resource.198  The primary difference between Option 7 and Option 8 is that \nPJM controls the curtailment in Option 7 whereas the load controls it in Option 8.  Like Option 7, \nthis option presents a non-discriminatory approach and an efficient use of the existing system.199  \nIn addition, “demand response provided by new large loads themselves is a particularly compelling \nsource of short-lead supply because its size and entry time are by definition tied to the entry of the \nlarge load resources that themselves create the need for new supply.”200   \nThe Commission and PJM will need to consider enhancements or revisions to demand \nresponse products to better suit co-located load such as data centers, including the circumstances \nwhen the load will be interruptible.201  Nonetheless, Constellation supports the Commission’s and \nPJM’s efforts to take such considerations under advisement and explore this option further. \nB. Co-Location Has No Difference in Effect on Resource Adequacy. \nIn setting an appropriate replacement rate, the Commission should reject any notion that \nNITS is required to maintain resource adequacy, and thus—effectively—that all other options are \noff the table.  This is one of the primary arguments of the Indicated Transmission Owners, who \npaint any alternative to NITS as endangering resource adequacy.202  But NITS is not a resource \nadequacy construct.  It is a type of transmission service.  PJM does not evaluate resource adequacy \nwhen studying a request for NITS because PJM uses a different set of tools, including the capacity \n \n198 PJM Answer at 19-20.  \n199 See Duke Study at 8-9 (stating that data centers have historically exhibited low participation in demand response \nprograms, but acknowledging that demand response promotes efficient utilization of the transmission system).  \n200 Patterson Aff. at ¶ 32 (supporting efforts “to maximize the ability of large loads, whether co-located or otherwise, \nto provide demand response capability to PJM markets”). \n201 PJM Answer at 20; see also Duke Study at 9.  \n202 As set forth in the prior section, the Indicated Transmission Owners also argue that NITS is mandated by the Tariff, \nbut there is no such mandate in the PJM Tariff."},{"page":59,"startToken":19106,"endToken":19508,"text":"59 \nmarket, i.e., the Reliability Pricing Model (“RPM”), to evaluate and ensure resource adequacy for \nthe collective set of customers that are receiving transmission service.  PJM studies transmission \nsecurity when evaluating requests for transmission service, regardless of the type of service being \nrequested or provided.  The decision of how to facilitate transmission service to a load, whether or \nnot co-located, is entirely distinct from resource adequacy. \nResource adequacy “is the ability of the electric system to meet the energy needs of \nelectricity consumers,” which generally means that the system has “sufficient generation to meet \nprojected electric demand.”203  Constellation, the Commission, PJM, the Indicated Transmission \nOwners, and every other party is concerned about maintaining resource adequacy as we serve large \nnew loads.  But the co-location debate we are having in this proceeding does not turn on resource \nadequacy questions.  The Commission acknowledged this in the Show Cause Order, stating that it \n“recognize[s], as does PJM, that these [resource adequacy and related] concerns are not necessarily \nunique to co-location arrangements and that significant load growth more generally may raise \nmany of the same concerns.”204  The Indicated Transmission Owners admit this themselves, \narguing that “[a]ll load additions create new demands for energy regardless of their location.  The \nresource adequacy and reliability challenges exist regardless of whether end-use load is connected \nto the grid at a generator site or elsewhere, and regardless of whether the point of connection lies \n‘behind’ or ‘in front of’ the generator’s meter.”205  Mr. Ming agrees in his testimony that, “[t]he \n \n203 \nReliability \nExplainer, \nFED. \nENERGY \nREGULATORY \nCOMM’N \n(accessed \nApr. \n18, \n2025), \nhttps://www.ferc.gov/reliability-explainer. \n204 Show Cause Order at P 85 (citing Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C., Docket \nNo. EL25-20-000, at 15 (filed Jan. 20, 2025); Large Loads Co-Located at General Facilities, Technical Conference \nTr.  (“Tech. Conf. Tr.”) at 104:17–105:18 (Bowring) (Nov. 1, 2024) (“…co-located load is a distraction….the issue \nis reliability.  At the moment PJM is right on the edge, in talking about dumping or not dumping.  Adding 10 or 20,000 \nmegawatts of load on a system that is already very tight doesn’t make a lot of sense, so the question is what’s the \nproblem?  The problem is reliability.  How do we deal with it?  It’s about expanding generation.”)). \n205 Indicated Transmission Owners Answer, Att. A at 19."},{"page":60,"startToken":19508,"endToken":19820,"text":"60 \nresource adequacy impact of a new load is not dependent upon whether it is connected directly to \nthe transmission system or co-located” because the net effect of co-located load, which decreases \nthe supply of capacity possibly available to the system, is the same as load connected to the \ntransmission system, which increases capacity demand.206  In other words, as Mr. Patterson \nexplains, “[f]rom a resource adequacy perspective, a megawatt of load added to the system creates \na need for the same amount of incremental supply regardless of whether the load is co-located with \ngenerator or not.”207 \nIt appears everyone agrees with this.  But the import is that the Commission should not \nreject alternative co-location configurations on the theory that they may somehow impact resource \nadequacy more than load receiving NITS.  All parties likewise agree that load must be served, and, \nas PJM acknowledges, new load is no different than existing load with respect to resource \nadequacy planning.208  PJM has sufficient tools to ensure resource adequacy, including RPM, \nwhich is designed to send strong price signals to add new generation when needed and to maintain \nexisting resources.  The Affidavit of Mr. Patterson, an electric market design expert, includes \nempirical data demonstrating that RPM has previously “faced significant incremental supply needs \ndriven by coal retirements and successfully brought forth market-based replacement supply at the \nscale needed to maintain the target level of resource adequacy.”209  Mr. Patterson further explains \nthat, “[h]istorically the RPM has been successful in bringing forth capacity at the scale needed to \nmaintain resource adequacy of a similar order of magnitude as will be needed in the future.”210  \nAccording to Mr. Patterson, the PJM markets are capable of responding to increased load demand \n \n206 Ming Testimony at 45. \n207 Patterson Aff. at ¶ 15. \n208 PJM Answer at 57. \n209 Patterson Aff. at ¶ 18.  \n210 Id."},{"page":61,"startToken":19820,"endToken":20249,"text":"61 \nand any “[p]re-supposition of market failure is premature.”211  And recent reversals by several \ngenerators of their prior retirement decisions indicates that market incentives are effectively \nresponding.212  Mr. Patterson proposes mechanisms by which the RPM can be optimized, if \nnecessary.213  PJM also has the RRI, which resulted in 94 applications consisting of 26.6 GW of \nnew or expanded “shovel-ready” capacity.214  If these tools are inadequate to ensure resource \nadequacy, the Commission should address those concerns in separate proceedings.  The \nCommission already has scheduled a technical conference on resource adequacy.215   \nOne refrain from those opposing co-location arrangements is that the speed with which \nnew co-located load can be developed—as opposed to front-of-the-meter load—may pose unique \nresource adequacy concerns.216  If there are concerns that more short lead-time capacity is needed \nthan PJM’s existing tools can procure, other reforms are available, such as potential queue reform, \nincluding deployment of interconnection automation software platforms217 or including a separate \nqueue for a short lead-time resources, enhanced demand response programs (including PJM’s \n \n211 Id. at ¶ 21.  \n212 Patterson Aff. at ¶ 20 n.9. \n213 See id. at ¶¶ 24-30 (advising that the Commission should support (1) ongoing efforts by PJM to improve the \naccuracy of the competitive market prices that generators and other capacity resources rely on to signal whether to \nenter, remain in, or exit the market; (2) improvements to the load forecast to provide more information (qualitatively \nand quantitatively) on future large load additions; (3) polices which shorten the development lead time of all capacity \nresource types to improve responsiveness of the market to load growth, including considerations to accelerate \ninterconnection queue cycles based on criteria similar to that used for the Reliability Resource Initiative; (4) efforts to \nmaximize the ability of large loads, whether co-located or otherwise, to provide demand response capability to PJM \nmarkets; and (5) policies for contingent procurement of short lead-time capacity supply resources in the event that the \nnormal operational of the RPM fails to clear enough supply to meet a minimum acceptable level of reliability in the \nbase residual auction).   \n214 Reliability Resource Initiative Draws 94 Applications, PJM INSIDE LINES (Mar. 21, 2025), \nhttps://insidelines.pjm.com/reliability-resource-initiative-draws-94-applications/. \n215 Meeting the Challenge of Resource Adequacy in Regional Transmission Organization and Independent System \nOperator Regions, Supplemental Notice of Commissioner-led Technical Conference, Docket No. AD25-7-000 (issued \nApr. 3, 2025). \n216 Show Cause Order at P 85 (citing Illinois Attorney General’s Office December 12 Comments of Complaint at 6). \n217 See Patterson Aff. at ¶ 30 (regarding Commissioner Rosner’s letter to PJM)."},{"page":62,"startToken":20249,"endToken":20556,"text":"62 \nOption 8), or an updated backstop procurement for short lead-time resources needed to satisfy the \nreserve margin.   \nMoreover, some of the co-location options the Commission should adopt would enhance \nresource adequacy in a non-discriminatory manner.  For example, as discussed above, under \nOption 7 as it should be modified, new co-located load could voluntarily elect to receive an \ninterruptible transmission service that would be available until transmission upgrades necessary to \nenable NITS are put in place and that would be curtailed in emergency grid conditions; such load \nwould pose no new resource adequacy burden on the grid.  After all, the grid sees peak load only \nfor a few hours a year.  The rest of the time, there are many gigawatts of unused capacity sitting \nidle.  As noted above, a recent Duke University study has found that if only 0.5% of new load were \nwilling to curtail at peak, PJM could connect an additional nearly 18 GW of load without the need \nfor any new capacity.218  Constellation supports efforts by PJM to use the existing headroom on \nthe transmission system to facilitate the addition of new load until upgrades are completed.  Such \nan option would enable quicker connections and promote efficiency by maximizing the use of \nexisting infrastructure.   \nIt is also important not to conflate resource adequacy and reliability.  Reliability is “the \nability to withstand sudden electric system disturbances that can lead to blackouts.”219  PJM and \nthe transmission owners conduct studies of proposed configurations to ensure reliability.  \nReliability would be safeguarded under the generator-contingent configurations (Options 4 and 5) \nif the Commission amended the Tariff to implement the Guidance Document procedures.  \nSpecifically, the Guidance Document provides that any co-location arrangement will be subject to \n \n218 Duke Study at 20. \n219 \nReliability \nExplainer, \nFED. \nENERGY \nREGULATORY \nCOMM’N \n(accessed \nApr. \n18, \n2025), \nhttps://www.ferc.gov/reliability-explainer."},{"page":63,"startToken":20556,"endToken":20908,"text":"63 \na necessary study process by which such impacts would be evaluated and determined.  The \nCommission states that co-location technical conference witness, Vincent Duane, PJM’s former \nGeneral Counsel, voiced concerns about the scope of the necessary study process.220  Mr. Duane \nsuggested to the Commission that the necessary study process is “a much more localized study” \nand not a system impact evaluation.221  This is not the case, as Mr. Kormos, PJM’s former Chief \nOperations Officer with significant transmission operations and planning experience, explained.  \nThe necessary study process implemented by PJM and described in the Guidance Document \n“evaluate[s] the potential reliability impact of a proposed addition or reduction of a co-located \nconfiguration on the PJM Transmission System, and determine[s] what, if any, system \nreinforcements are required prior to the addition or reduction of the planned co-located load \nconfiguration.”222  Mr. Kormos further explained that if any reliability impacts are identified then \n“the generator pays for changes at its facility and any necessary network upgrades to cure the \npotential issue.”223  The necessary study process is not limited to localized regions or delivery \nareas.  Rather, it is a system-wide study that determines whether any system-wide reinforcements \nare necessary to ensure resource adequacy and reliability.   \nConstellation appreciates that resource adequacy and reliability are crucial focuses of the \nCommission.  Keeping the lights on is the Commission’s most important responsibility.  But PJM \nand the Commission have many mechanisms to ensure resource adequacy—some already in place, \nand some that can be developed.  These are not issues specific to co-location and should not be \ndetermining factors with respect to implementing a just and reasonable replacement rate. \n \n220 Show Cause Order at P 79 (citing Post-Technical Conference Comments of Vincent Duane, Docket No. AD24-11-\n000 (Dec. 9, 2024)).  \n221 Id. (citing Tech. Conf. Tr. at 46:4-20 (Duane)).  \n222 PJM Guidance Document at P 7 (emphasis added).  \n223 Kormos Co-Located Load Solution at 9; see also Kormos Aff. at ¶ 6 (a necessary study is “a robust, highly effective \nstudy ... focused on the overall grid impacts of the new load (and not focused predominantly on local impacts).”"},{"page":64,"startToken":20908,"endToken":21060,"text":"64 \nC. The Commission Should Adopt Constellation’s Proposed Replacement Rates or, \nAlternatively, Establish Time-Limited Settlement Proceedings in this Docket \nThe Commission should adopt all but Option 6 as a menu of options, as modified, as the \nreplacement rate.  As PJM stated, “identified options are not mutually exclusive, as it is possible \nseveral of the options may be used seriatim or concurrently.”224  With Constellation’s proposed \nrate modifications, PJM’s eight co-location options (less Option 6) largely converge into three \noptions consistent with the “ideal rate” for each type of co-location configuration,225 a firm NITS \noption (derived from PJM Options 2 and 3), a generator-contingent option (PJM Option 4, or with \nas available energy, Option 5), and an interruptible option (PJM Option 7), with proposed (and in \nsome cases, modified) rate treatment as follows:  \n \n \n \n224 PJM Answer at 5. \n225 See Ming Testimony at 50-51 (explaining how the eight options converge into three)."},{"page":65,"startToken":21060,"endToken":21325,"text":"65 \n \n \nCo-location Configuration \nRate \n Component \nFirm \n(derived from \nOptions 2, 3) \nGenerator-\nContingent \n(derived from \nOptions 4, 5) \nInterruptible \n(derived from \nOption 7) \nTransmission \nGreater of 1) \nStandby charge at \ndiscounted NITS \nrate applied to firm \nsubscription level \nor 2) standard \nNITS applied to \nnet usage \nOne-time system \nimpact charge \nbased on studied \nnetwork upgrade \ncosts. If as \navailable energy \npurchases are \nallowed, these are \nbilled at discounted \n$/MWh charge  \nDiscounted \n$/MWh charge for \nas-available energy \npurchases \nAncillary \nServices \nCharges for all \nancillary services \nconsumed based on \nnet load (if needed \nto avoid \ndiscrimination) or \ngross load \nCharges for all \nancillary services \nconsumed based on \nnet load (if needed \nto avoid \ndiscrimination) or \ngross load \nCharges for all \nancillary services \nconsumed based on \nnet load (if needed \nto avoid \ndiscrimination) or \ngross load \nEnergy \nLMP energy \ncharges based on \nnet injection or \nwithdrawal \nLMP energy \ncharges based on \nnet injection or \nwithdrawal \nLMP energy \ncharges based on \nnet injection or \nwithdrawal \nCapacity \nCo-located load \nparticipates in \ncapacity market at \nfirm subscription \nlevel. Co-located \ngenerator \nparticipates in \ncapacity market at \naccredited capacity \nlevel \nNo charges to co-\nlocated load served \nby dedicated \nportion of \ngenerator (PJM \ndoes not procure \ncapacity for co-\nlocated load); \ncapacity market \nsales from the co-\nlocated generator \nmay be made if the \naccredited capacity \nof the co-located \ngenerator exceeds \nthe capacity of the \nco-located load \nNo charges to load \n(PJM does not \nprocure for load); \nco-located \ngenerator is not \ndedicated to co-\nlocated load and \ncan participate in \ncapacity market at \nfull accredited \ncapacity \nNon-PJM \nStates decide  \nStates decide  \nStates decide"},{"page":66,"startToken":21325,"endToken":21608,"text":"66 \n \nAncillary services should be charged on a gross or net load basis for firm and interruptible \nconfigurations, as required to avoid discrimination.226  For generator-contingent configurations, \nsome charge for regulation or black start service may be appropriate.  Energy charges should be \nassessed based on a net injection or withdrawal of the co-located load generator and load to the \ntransmission system.227   \nCapacity charges should also be consistent with the configuration of the co-located load.  \nFor firm co-located load, the entire load and co-located generator should participate in the capacity \nmarket at a level equal to its subscription and accredited capacity, respectively.228  Note that with \nOption 3, PJM is only procuring for the load PLC above the generation and the generator delists.  \nGenerator-contingent co-located load should not be assessed capacity charges because the co-\nlocated load cannot draw energy from the grid.229  Interruptible co-located load should also not be \nassessed capacity charges because the output of the co-located generator can be re-directed by PJM \nform the co-located load to the broader system.230 \nFinally, non-PJM charges such as non-bypassable charges to fund state energy efficiency \nprograms, renewable programs, and stranded cost recovery are under the jurisdiction of states and \nshould be governed by state law that is not relevant to charges under the PJM Tariff.231  \nThe replacement rate proposed herein most appropriately allocates costs and, in so doing, \navoids any improper cost shifting to existing customers.  In fact, the primary benefit of the \nproposed replacement rate is that it is consistent with rate design fundamentals, including a fair \n \n226 Id. at 44. \n227 Id.  \n228 Id. at 46-47. \n229 Id. at 47. \n230 Id. at 47-48. \n231 Id. at 48."},{"page":67,"startToken":21608,"endToken":21888,"text":"67 \napportionment of costs.  The proposed replacement rate is appropriately tailored to ensure that new \nload pays for its fair share of costs and, equally significant, avoids extensive and unnecessary \nnetwork upgrade costs under a NITS-only approach, most of which would be socialized and paid \nfor by existing customers.  The Commission should adopt the proposed replacement rate as just \nand reasonable accordingly. \nIf the Commission declines to adopt our proposed replacement rate, the Commission \nshould order time-limited settlement discussions in this docket to consider the replacement rate.232  \nIn ordering any settlement to address an appropriate replacement rate, the Commission should \naccept PJM’s request and “issue a compliance directive under its section 206 authority to set a \nclear deadline for future filings given the important national interests implicated.”233  Data center \ndevelopment in the PJM region has already been negatively affected by a cloud of uncertainty over \nthe rules of the road for over three years.  Our national security and national economic \ncompetitiveness depend on providing clear guidance promptly.  A finding by the Commission that \nthe existing Tariff is unjust and unreasonable and unduly discriminatory and preferential as part of \nits order establishing settlement discussions would help discipline the discussions.  Further, \nsettlement “efforts would be greatly assisted by Commission guidance as to the reasonableness of \nany of the [eight] existing and proposed options for co-located load,”234 including, for example, an \nexpress Commission finding that generator-contingent and interruptible configurations use the \ntransmission system differently than a firm configuration and thus justify different rate \ntreatment.235   \n \n232See Joint Parties Settlement Request. \n233 PJM Answer at 4-5 (emphasis added). \n234 PJM Answer at 32-33. \n235 See Show Cause Order at P 76."},{"page":68,"startToken":21888,"endToken":22177,"text":"68 \nANSWERS TO THE BRIEFING QUESTIONS \na. General Issues \ni. \nDo you agree with the jurisdictional principles outlined in section VI.A and should \nthe Commission reach any other conclusions regarding jurisdiction in a final order it \nmay issue in this proceeding?  Why or why not?   \nConstellation generally agrees with the jurisdictional principles outlined in section VI.A., \nalthough Constellation disagrees with the suggestion that the manner in which generating \nresources “are allowed to operate to serve co-located load”236 is a matter of exclusive state \njurisdiction.  The interaction of the generator with the PJM markets (the rules for which are \nimplicated in every co-location option presented by PJM) are a matter of exclusive FERC \njurisdiction.  We assume that this language in the Show Cause Order refers to the uncontroversial \nconcept that the state decides whether and under what rules generation may engage in direct sales \nto end use customers.  Constellation generally agrees with PJM’s response to this question, but \ndisagrees with the positions PJM has taken with respect to EWGs and the import of EWG status \nfor generators vis-a-vis Option 3.  Constellation supplements PJM’s analysis in its answer with a \nreview of the Commission’s jurisdictional boundaries and their application to PJM’s Options 4 \nand 5.   \nThe Jurisdictional Boundaries of the Commission and the States are Well-Settled Under \nthe FPA.  \n \nThe Commission is a “creature of statute,” having “only those authorities conferred upon \nit by Congress.”237  The FPA gives the Commission authority over “the transmission of electric \nenergy in interstate commerce and … the sale of electric energy at wholesale in interstate \n \n236 See Show Cause Order at P 71. \n237 Atl. City Elec. Co. v. FERC, 295 F.3d 1, 8 (D.C. Cir. 2002) (emphasis in original)."},{"page":69,"startToken":22177,"endToken":22619,"text":"69 \ncommerce,”238 which means a sale of electric energy to any person for resale.239  The \nCommission’s jurisdiction is limited to rules or practices that “directly affect the wholesale \nrate.”240   \nThe FPA expressly provides that the Commission “shall not have jurisdiction … over \nfacilities used for generation of electric energy or over facilities used in local distribution or only \nfor the transmission of electric energy in intrastate commerce, or over facilities for the transmission \nof electric energy consumed wholly by the transmitter.”241  Thus, Congress reserved to the states \n“regulatory authority over retail sales (as well as intrastate wholesale sales)”242 as well as facilities \nused for the generation, distribution, or intrastate transmission of electric energy.243  As a result, \nthe Commission has held that states “have jurisdiction in all circumstances over the service of \ndelivering energy to end users,”244 including bundled retail transmission service.245 \nThe Commission is allowed to “exercise jurisdiction over generation facilities to the extent \nnecessary to regulate interstate commerce.”246  In other words, the Commission may properly \nexercise jurisdiction directly over matters federalized by the FPA in a way that also affects areas \nover which the states exercise exclusive regulatory authority as long as the Commission does not \n \n238 16 U.S.C. § 824(b)(1). \n239 Id. § 824(d). \n240 EPSA, 577 U.S. 260, 278 (2016) (internal quotations and citations omitted). \n241 16 U.S.C. § 824(b)(1). \n242 EPSA at 279 (citing New York v. FERC, 535 U.S. 1, 17 (2002)) (emphasis added); id. at 265 (“[T]he law places \nbeyond FERC’s power, and leaves to the States alone, the regulation of ‘any other sale’—most notably, any retail \nsale—of electricity.”) (quoting 16 U.S.C. § 824(b)) (emphasis added).   \n243 See, e.g., New York v. FERC, 535 U.S. at 22-23.   \n244 Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public \nUtils., Order No. 888, 61 Fed. Reg. 21,540, at 21,626 (1996), order on reh’g, Order No. 888-A, 62 Fed. Reg. 12,274 \n(1997), aff’d sub nom., New York v. FERC, 535 U.S. 1; see also Ind. Mun. Power Agency City of Lawrenceburg, \nIndiana, 174 FERC ¶ 61,035, 61,150 (2021) (“The Commission has rejected the argument that the provision of station \npower is a practice directly affecting rates for wholesale sales subject to the Commission’s jurisdiction, explaining \nthat station power is a sale for end use and the Commission has no jurisdiction over sales for end use.”).   \n245 Order No. 888 at 21,577-78.   \n246 Transmission Access Pol’y study Grp. v. FERC, 225 F.3d 667, 718 (D.C. Cir. 2000)."},{"page":70,"startToken":22619,"endToken":22999,"text":"70 \n“aim[] at” or “target” the states’ domain.247  When determining the bounds of its jurisdiction with \nrespect to co-location arrangements, the Commission should consider the questions guiding the \nD.C. Circuit’s decision-making in NextEra Energy Resources, LLC and NextEra Energy \nSeabrook, LLC v. FERC.248  In that case, the D.C. Circuit explained that it asks three questions in \nconsidering jurisdictional arguments with respect to the Commission: “[f]irst, whether the action \nat issue directly affects facilities or transactions that FERC may regulate; second, whether FERC \nhas impermissibly regulated matters outside its jurisdiction; and third, whether the contested \nassertion of authority is consistent with the statute’s core purposes.”249  \nThe D.C. Circuit’s guidance is based on first principles, i.e., ensuring the regulation of a \nfacility or transaction at issue is consistent with the applicable FPA text and does not over-extend \nfederal or state jurisdiction into matters under the exclusive jurisdiction of the other.   \nBased on the text and purpose of the FPA as described above, the Commission cannot \nregulate a generating resource; however, it can and should regulate certain activities associated \nwith a generator’s operation such as: interconnection of the generator to the interstate transmission \ngrid, including standard interconnection service agreement provisions and modifications; \nparticipation in wholesale markets; transmission and ancillary service charges; and bulk power \nsystem reliability.  By contrast, states retain sole jurisdiction over distribution and retail rates and \nsales, non-bypassable charges, and interconnection of load at distribution voltage levels.  Even the \nquestion of whether a retail sale has occurred is a question reserved to the states.250 \n \n247 EPSA, 577 U.S. at 282 (quoting Oneok, Inc. v. Learjet, Inc., 575 U.S 373, 385-86 (2015)). \n248 118 F.4th 361 (D.C. Cir. 2024) (“NextEra”). \n249 Id. at 368. \n250 See 16 U.S.C. § 824(b)(1); see also Southern Cal. Edison Co. v. FERC, 603 F.3d 996, 1000-01 (D.C. Cir. 2010) \n(“[W]e do not understand why FERC is empowered to conclude that a retail sale has not taken place unless it can \nclaim the transaction is, instead, a wholesale sale or a transmission.  To simply declare that the state lacks jurisdiction \nbecause FERC believes no retail sale has taken place really begs the jurisdictional question.  Unless a transaction falls"},{"page":71,"startToken":22999,"endToken":23430,"text":"71 \nFederal Jurisdiction Does Not Correspond With “Synchronization.” \nThere are potential jurisdictional disputes with PJM Options 4 and 5, which involve \nbehind-the-meter sales between a co-located generator and load.251  Under these options, system \nprotection facilities are installed to prevent the delivery of energy to the co-located load from the \ngrid (with Option 5 allowing for back-up service from the PJM system with permission).  PJM \nacknowledges that under such a configuration “load is not Network Load unless designated by the \ncustomer subject to applicable state law.”252  Even the Indicated Transmission Owners \nacknowledge that the PJM Tariff should not interfere with state jurisdiction.253  Nonetheless—and \ninconsistently—the Indicated Transmission Owners posit that all co-located load, including under \nOptions 4 and 5, should be treated as Network Load and required to take NITS because the load is \n“synchronized” to the grid.254  But the Commission does not have authority to decide what kind of \nservice a load must take merely because that load is synchronized to the grid.  After all, every \ngenerator and every end-user within the Eastern Interconnection is synchronized to the grid.  The \nfact that a home, grocery, or any other load is synchronized to the grid does not give the \nCommission authority to decide that the load must purchase its energy from the Commission-\n \nwithin FERC’s wholesale or transmission authority, it doesn’t matter how FERC characterizes it.”); Indiana Mun. \nPower Auth. v. PJM Interconnection, L.L.C., 172 FERC ¶ 61,243, at P 106 (regarding station power, “the Commission \nlacks jurisdiction to determine whether a retail sale has occurred”); id. at P 94 (“The determination of whether a retail \nsale has occurred . . . is appropriately within the jurisdiction of the states.”); see also Ming Testimony at 48 (“Non-\nPJM charges vary by state and local utility and may include non-bypassable charges to fund energy efficiency \nprograms, renewable programs, stranded cost recovery, or more. The jurisdiction of these charges lies with the \nstates.”). \n251 PJM Answer at 13-15. \n252 Id. at 14.  \n253 Indicated Transmission Owners Answer, Att. A at 18 (“Because the federal role in end-use load is limited, PJM \nand the Commission should not create processes in the PJM Tariff that would interfere with state jurisdiction.”) \n(emphasis added).  \n254 See id. at 9 (“The Indicated TOs consider all the arrangements being contemplated or requested as being \ninterconnected with and synchronized with the transmission and/or distribution grid and thus not ‘fully isolated.’”) \n(emphasis in original); id. at 3 and n.6 (providing that co-located end-use loads should be treated as front-of-the-meter \nNetwork Load with applicable firm transmission service)."},{"page":72,"startToken":23430,"endToken":23832,"text":"72 \nregulated wholesale market or that energy must be delivered on the Commission-regulated \ninterstate transmission grid.  Nor does the fact that a generator is synchronized to the grid authorize \nthe Commission to require the generator to make only wholesale sales or inject its output onto \ninterstate transmission lines.  That would upend the traditional division of authority under the FPA.  \nThe Commission has authority to set rates for wholesale sales or interstate transmissions when \nthey occur, but states get to decide whether to allow direct sales between a generator and a \ncustomer.   \nThe Indicated Transmission Owners’ position violates this limit on the Commission’s \njurisdictional authority.  They contend that generators should not be permitted to make direct sales \nto load in a co-located arrangement, arguing instead that such sales must use the transmission \nsystem and pay for transmission service.  They seek a Commission directive to prohibit a generator \nfrom selling directly to a co-located load – something the Commission has no authority to do.  \nDiffering Treatment of Direct Sales by States Does not Mean There are “Regulatory Gaps” \nin Options 4 and 5, and the Commission Should Not Usurp the States’ Jurisdiction By \nAdopting the Indicated TO’s Preferred “NITS Only” Approach. \nPJM warns against an assumption of state regulation with respect to direct sales and a “risk \nin painting with too broad a brush” in establishing co-location arrangements that may or may not \nbe regulated or permitted by the states.255  This presents the potential, in PJM’s assessment, of \n“regulatory gaps with respect to co-located load arrangements.”256  As PJM acknowledges, \nhowever, some states allow direct sales between a generator and end-use consumer over wires that \n \n255 PJM Answer at 25-28, 29.  \n256 Id. at 21.  PJM also suggests that an Exempt Wholesale Generator (“EWG”) engaging in wholesale transactions \nwith a counterparty that then engages in retail sales is somehow a nefarious shield of regulatory invisibility.  See id. \nat 25 (“Yet under certain co-located load arrangements (Options 4 and 5 in Exhibit A, for example), EWGs could seek \nto sell power to an intermediary that then engages in retail sales.”).  The requirements to certify and maintain EWG \nstatus are clear.  Constellation has and will comply with such regulations.  Exemption from PUHCA does not mean \nthat the EWG’s sales are exempt from rate regulation.  PUHCA exemptions are not a reason to prevent the states from \nchoosing how to regulate co-location however they choose within their authority."},{"page":73,"startToken":23832,"endToken":24371,"text":"73 \nare not committed to public use.257  Whether to do so is a matter for states to decide—not the \nCommission.  Differing treatment of direct sales by states is not indicative of a regulatory gap,258 \nnor is it “a failure to regulate.”  Rather, it is likely indicative of “a deliberate policy choice that has \nbeen enshrined” in state law.259  It is also not an invitation for the Commission to extend its \njurisdiction beyond that established by the FPA.    \nRetail issues are a matter of state law, and the states are well-equipped to resolve these \nquestions without federal intrusion, including who is qualified to sell to end use customers and \nhow and whether to regulate retail transactions.  Thus, the real risk in “painting with too broad a \nbrush” would be to use the PJM Tariff to preclude state flexibility to regulate (or choose not to \nregulate) direct sales between a generator and a behind-the-meter load, intruding on matters that \nCongress left to the states.  Any requirement to take NITS would inappropriately preclude states \nfrom regulating transactions involving direct sales to end users, which may involve delivery \nfacilities that do not transmit power in interstate commerce and fall squarely within the states’ sole \n \n257 See id. at 27-28.  See also Comments of the Pennsylvania Public Utility Commission, Docket No. EL25-49-000, \nAD24-11-000, and EL25-20-000 (filed Apr. 22, 2025) (“The PA PUC agrees, and it is well-established in \nPennsylvania law that when electric service is provided to a ‘defined, privileged, and limited group’ it is not provided \n‘to or for the public’.”) (internal citations omitted). 52 Pa. Code § 69.1401 (any one of three non-binding criteria could \ncause the Commission to find that an entity is not providing service “to or for the public”:   \n(1) The service being provided by the utility project is merely incidental to nonutility business with \nthe customers which creates a nexus between the provider and customer. \n(2) The facility is designed and constructed only to serve a specific group of individuals or entities, \nand others cannot feasibly be served without a significant revision to the project. \n(3) The service is provided to a single customer or to a defined, privileged and limited group when \nthe provider reserves its right to select its customers by contractual arrangement so that no one \namong the public, outside of the selected group, is privileged to demand service, and resale of the \nservice is prohibited, except to the extent that a building or facility owner/operator that manages the \ninternal distribution system serving the building or facility supplies electric power and related \nelectric power services to occupants of the building or facility.) \nSee also, e.g., Wyo. Stat. Ann. § 37-1-101(a)(vi)(H)(VI) (“Public utility” provides an exception for generation, \ntransmission, or distribution of electricity from a producer for use of tenants and not for sale to others; however, this \nexemption does not apply for direct sales of electricity by a producer to tenants). \n258  Show Cause Order at P 18 (providing that the Organization of PJM States, Inc. contends that “there is no regulatory \ngap involving co-location arrangements”). \n259 Comments of the Pennsylvania Public Utility Commission at 3, Docket Nos. EL25-49-000, AD24-11-000, and \nEL25-20-000 (filed Apr. 22, 2025)."},{"page":74,"startToken":24371,"endToken":24700,"text":"74 \njurisdiction.  Applying the guidance questions from NextEra, the Commission should conclude \nthat such action would be an inappropriate and unlawful extension of the Commission’s \njurisdiction because it would require the Commission to exert jurisdiction over objectively state-\nregulated facilities and transactions that are outside of its jurisdiction under the FPA and contrary \nto the FPA’s purpose.  \nThe states likewise cannot take actions that unduly interfere with the Commission’s \njurisdiction over wholesale rates.260 For example, no state could legally mandate that all sales \nbetween co-located generation and load occur as wholesale transactions over the transmission grid.  \nConstellation supports the Commission’s effort to create a standard approach to co-location \narrangements that is in accordance with and respects the jurisdiction of the Commission and the \nstates.  Just as states should not be permitted to alter or intrude upon the Commission’s jurisdiction, \nthe Commission has no role in interpreting or wading into matters delegated to the jurisdiction of \nthe states or indirectly stripping any state of its ability to exercise its jurisdiction.  Any final policy \nadopted by the Commission in this proceeding should adhere to this fundamental understanding. \nii. \nDoes the Tariff sufficiently address co-location arrangements with respect to each \nissue listed in this order?  Please include specific tariff provisions or other governing \ndocuments that may apply. \nConstellation agrees with the Commission’s preliminary findings that the Tariff does not \naddress with sufficient clarity the methods to effectuate co-location arrangements.261  The Tariff \nlacks clarity with respect to rules for transmission service applicable to co-located load, if any, and \nthe use and payment for ancillary services, if any are used.  The Tariff is also particularly deficient \nwith respect to interconnection procedures for co-located load (e.g., amendments to ISAs).  For \n \n260 See, e.g., Hughes v. Talen Energy Mktg., LLC, 578 U.S. 150, 166 (2016) (rejecting a state program because it \ninterfered with the wholesale rate required by FERC).  \n261 See, e.g., Show Cause Order at PP 74, 78, 79."},{"page":75,"startToken":24700,"endToken":25064,"text":"75 \nexample, the Tariff is silent with respect to the procedures, services, and facilities required to \neffectuate co-location arrangements where the co-located load will not take service from the PJM \nTransmission System, i.e., PJM Option 4.  The Tariff is also silent with respect to methods to \nimplement Option 5 (co-location with protective systems and back-up service ability) and Option \n7 (co-located load electing a new transitional interruptible network service offering).262  The PJM \nGuidance Document provided useful language to implement PJM’s Option 4, but it is not part of \nthe Tariff and has now been rescinded, underscoring the need to ensure inclusion of relevant \nprovisions in the Tariff.  The lack of clarity results in disparate treatment of co-located load \n“resulting in different interpretations and applications of the tariff by different transmission owners \nwithin PJM.”263  As the Commission aptly recognized, “these dynamics raise the potential for \nundue discrimination.”264  As discussed in the response below to Question a.iii., the Tariff is unjust \nand unreasonable and unduly discriminatory and preferential because of such lack of clarity and \nshould be revised accordingly. \niii. \nIf the Tariff does not sufficiently address co-location arrangements, how should the \nTariff be modified to do so?  As part of your answer, address whether portions of the \nGuidance Document may serve as a just and reasonable and not unduly \ndiscriminatory or preferential replacement rate.  Alternatively, address whether \nexisting rules in the Tariff may or should be modified to address co-location \narrangements. \nIn its filing, PJM has identified eight potential options for how large new load might \nconnect.  Except for Option 6, which is unsalvageable, PJM’s other proposed options are just and \nreasonable, or can be made just and reasonable with only a few modifications and should be \nincluded in a replacement rate. See discussion supra, Section II.  \n \n262 See PJM Answer at 15, 17.  \n263 Ming Testimony at 19; id. (such disparate treatment by transmission owners is not aligned with accepted rate design \nprinciples); see also Show Cause Order at P 75 (comparing and contrasting Exelon’s treatment of Constellation’s \nrequests to co-located load and PPL’s treatment of Susquehanna Nuclear’s request to co-located load).  \n264 Show Cause Order at P 75."},{"page":76,"startToken":25064,"endToken":25418,"text":"76 \niv. \nParties may also address how co-located loads are similar to or disparate from other \ntypes of arrangements where load and generation share the same point of \ninterconnection (such as Behind the Meter Generation as defined in PJM’s Tariff or \nnon-retail behind the meter generation) and should consider how any proposed \nreplacement rate would interact with these other arrangements.   \nCo-located loads where load and generation share the same point of interconnection can be \nconfigured in various ways.  In some configurations, the generator and load are both “behind-the-\nmeter.”  This is true, for example, of PJM Option 3 (BTMG, which is co-located behind-the-meter \ngeneration and load) and PJM Option 4 (behind-the-meter load co-located with generation with \nprotective relays in place to prevent draws of power from the grid).  Other behind-the-meter \noptions would include switching equipment to permit load to draw from the grid with permission \n(Option 5, behind-the-meter load with back-up service), curtailment by PJM (Option 7, \ninterruptible load), or curtailment by the load (Option 8, demand response).  (Under PJM Option \n2, the generator and load would share a point of interconnection but be separately metered.  Our \ncomments on PJM Option 2 are discussed supra at Section II.A.2.). \nThe Indicated Transmission Owners suggest that no matter the configuration \n“synchronized” load is taking transmission service and should be charged full gross transmission \nrates.  According to the Indicated Transmission Owners, “[c]o-located load that is physically \ninterconnected with and synchronized to the grid uses the transmission system.  Neither the fact \nthat co-located load is geographically near a generator, nor its agreement to buy energy from the \nco-located generator, changes that, legally or physically.  This is a straight-forward, engineering-\nbased decision.”265  Yet BTMG—which is just as synchronized to the grid as co-located behind-\nthe-meter generation and load—only pays for transmission service on a net basis, meaning the \n \n265 Indicated Transmission Owners Answer, Att. A at 4 (emphasis added); see also id., Att. A at 2 (“[T]he Commission \nand PJM should affirm that co-located loads that are physically interconnected to and synchronized with the PJM \ntransmission system are utilizing the transmission system.”)."},{"page":77,"startToken":25418,"endToken":25760,"text":"77 \namount of power drawn from the grid after subtracting the power from their behind-the-meter \ngenerator.  The Indicated Transmission Owners even admit that BTMG “applies to arrangements \nthat ‘deliver[] energy to load without using the Transmission System.’”266  The Indicated \nTransmission Owners never explain how “synchronized” behind-the-meter co-located load “uses \nthe transmission system” but “synchronized” BTMG does not.  For its part, PJM points out that \n“inside the fence” QF cogeneration facilities “were not electrically islanded” but still “established \nand maintained interconnections” to the grid.267  In other words, they also are synchronized to the \ngrid.  The same is true of BTMG.  Yet, “[a]s PJM described in 2004 when it proposed its BTM \nGeneration Tariff revisions, BTM Generation ‘refers to generating units that are located with load \nat a single electrical location such that no transmission or distribution facilities are used to deliver \nenergy from the generating unit to the load.’”268   \nThere is nothing that sets apart the “synchronization” of BTMG versus the synchronization \nof any other co-location configuration that would justify disparate treatment.269  Accordingly, it \nshould be “a straight-forward, engineering-based decision” to treat behind-the-meter co-located \nload like other BTMG configurations involving co-located generation and load—by allowing \nnetting, for example.  While PJM calls into question the continued use of netting for BTMG,270 it \nfails to offer any sort of detailed critique or Tariff support for limiting the long-standing practice \nof netting consumption and generation at the same point of interconnection.   \n \n266 Id., Att. A at 4 (emphasis added). \n267 PJM Answer at 24.   \n268 Id. at 34-35 (citing PJM Interconnection, L.L.C., 107 FERC ¶ 61,113, at P 4 (2004)) (emphasis added). \n269 Herling Aff. at ¶ 33 (“Comparing PJM’s Option 4 and PJM’s Option 5 with the BTMG construct (the basis for \nPJM Option 3), clearly both arrangements involve load and generation that is synchronized to the grid.  However, \nsynchronization does not require or suggest that energy delivery form that generation to that load flows on the \ntransmission facilities of the grid.”). \n270 PJM Answer at 35-36."},{"page":78,"startToken":25760,"endToken":26076,"text":"78 \nFor a full discussion of various potential co-location configurations, how they use the \ntransmission system, and appropriate rate treatments, please see our discussion of PJM’s eight \noptions, supra, Section II.A. \nb. Transmission Service \ni. \nPlease explain whether and to what extent different configurations of co-located load \nrely on or otherwise use the transmission system to receive power, directly or \nindirectly, from the co-located generator; \nPlease see our lengthy discussion of PJM’s eight options, supra at Section II.A.  In sum, \nthere are three broad categories of transmission system usage that generally correspond to one or \nmore of PJM’s proposed options: firm (see Options 1, 2, 3 and 6), generator-contingent (see \nOptions 4 and 5), and interruptible (see Options 7 and 8).271  Constellation identifies which \ncategory of transmission service applies to each of PJM’s eight options, although it should be noted \nthat the ”interruptible” category applies to options where the transmission service itself is \ninterruptible (Option 7) or the load is interruptible as Demand Response (Option 8).272   \nThe Indicated Transmission Owners answer this question by repeating their claim that a \n“straight-forward, engineering-based decision” results in a finding that “[c]o-located load that is \nphysically interconnected with and synchronized to the grid uses the transmission system.”273  \nNowhere is this assertion more patently untrue than with respect to Option 4, which contains as a \ncomponent a commonly used protective relay scheme to prevent power flows from the PJM \nTransmission System (which is a defined term under the PJM Tariff) to the load.  As a result, this \nreductive view is not as “straight-forward” as the Indicated Transmission Owners would like it to \nbe.  In fact, as explained by Mr. Ming, it ignores the disparate transmission system impacts \n \n271 Ming Testimony at 15-18; see also infra at Section II.A. (discussing same). \n272 Ming Testimony at 53. \n273 Indicated Transmission Owners Answer, Att. A at 4."},{"page":79,"startToken":26076,"endToken":26432,"text":"79 \nassociated with different configurations of load and generation.274  It is also the opposite of how \nBTMG is treated.275 \nii. \nPlease explain whether and to what extent different co-location configurations impose \ncosts on the transmission system or increase transmission costs allocated to other \nparties.  How can those costs be approximated, given that certain co-location \nconfigurations may change power flows on the grid and necessitate upgrades to the \ntransmission system?  Retail loads typically take service from wholesale entities that \npay for Network Integration Transmission Service that allocates these costs; co-\nlocated loads may not.  Network Loads pay directly for Network Integration \nTransmission Service.  How should PJM estimate the effects that different \nconfigurations of co-located load have on the transmission system?  Should these costs \nbe passed through to co-location arrangements in some way, and, if so, how? \nThe three broad categories of transmission system usage referenced in the answer to the \nprior question (firm, generator-contingent, and interruptible), and which generally correspond to \none or more of PJM’s proposed options, impose different costs.276  Constellation proposes \nappropriate rate treatment supra in Section II.A.277  In certain configurations, Constellation also \nproposes usage charges when the load calls on the grid (as available and when allowed by PJM). \nWe reiterate that the largest potential cost by far is for transmission upgrades.  Under \nstandard firm NITS based on gross load (PJM Options 1 and 2), existing customers will be required \nto pay the costs of substantial system upgrades to accommodate large, new data center loads.278  \nOther options minimize or avoid these costs entirely, with the co-locating load being responsible \nfor all costs, such as with Options 4 and 5.  This is one of the primary distinguishing benefits of \nOptions 4 and 5. \n \n274 Ming Testimony at 15-16. \n275 See supra, Answer to a.iv. (discussing uselessness of “synchronization” standard for determining whether \ntransmission system is being used).  Contrasting the “synchronization” standard with Mr. Ming’s analysis makes this \npoint obvious. \n276 Ming Testimony at 15-18; see also infra at Section II.A. (discussing same).  \n277 Id. at 5-51 \n278 See Patterson Aff. at ¶¶ 52-53 (calculating costs of transmission upgrades)."},{"page":80,"startToken":26432,"endToken":26778,"text":"80 \nThe Indicated Transmission Owners suggest that a benefit of NITS is that it sends no \nlocational signal: “PJM’s rate design ... permits transmission owners to recover, on a postage stamp \nbasis without consideration of the distance between load and generation, the embedded costs of \ntheir respective portions of the transmission grid from network customers.”279  In a world where \nall co-located load is required to pay NITS based on gross load, and the cost of transmission \nupgrades is paid for mostly by other customers, a load would be relatively indifferent to where it \nlocates and have little incentive to locate in a place that is most efficient for the system as a whole.  \nWhile the Indicated Transmission Owners may be technically correct that “[i]n general, \ntransmission upgrades required for a co-located load will be similar or the same as those required \nfor an equivalent load addition close to, but not co-located with, the relevant generator,” they gloss \nover the fact that a one-size-fits-all NITS rate approach makes the load indifferent to locational \ncosts and that this indifference can significantly increase overall costs.280  This is because, as the \nIndicated Transmission Owners remind us, the “costs of these transmission upgrades are typically \nrecovered from all load on the system via the Network Service rate.”281  An appropriate rate \ntreatment should create incentives for the load to reduce locational costs, not be indifferent to them. \niii. \nPlease explain whether co-location arrangements are or should be required to take \nNetwork Integration Transmission Service or Point-to-Point Transmission Service; \nor whether a more tailored new category of transmission service is warranted.  Please \nalso address any cost allocation implications of your position on this issue. \nRequiring all co-location arrangements to take NITS is technically and economically \ninefficient and a poor policy choice, as explained supra in Section I.  The Tariff does not support \nthis approach, and the lack of clarity combined with the shifting sands of PJM’s guidance on how \n \n279 Indicated Transmission Owners Answer, Att. A at 5 (emphasis in the original). \n280 Id., Att. A at 6. \n281 Id."},{"page":81,"startToken":26778,"endToken":27059,"text":"81 \nto address co-location creates an opportunity for differing discriminatory outcomes depending on \nthe Transmission Owner involved.  As explained supra in Section II, the Commission should adopt \nseveral co-location options that reflect different co-location arrangements (firm, generator-\ncontingent, and interruptible) and their respective use (or lack thereof) of the PJM Transmission \nSystem.  Constellation also proposes a rate treatment for each PJM Option to ensure proper cost \nallocation between load and existing customers, including proposing charges for co-located load \nto contribute to the embedded costs of the transmission grid when the load uses the grid.   \nIn their answer to this question, the Indicated Transmission Owners claim that “[t]here has \nbeen no allegation ... that the current regime requiring [NITS] has impaired any load’s ability to \nsecure service safely, reliably, and at reasonable cost, or that service had been unobtainable as a \nresult of the PJM Tariff’s longstanding requirements.”282  This is patently false.  Constellation has \nrepeatedly demonstrated that requiring all large loads to take NITS for its gross load unreasonably \ndelays service to critical data center loads.283  Delay is an impairment of “load’s ability to secure \nservice.”284  Constellation similarly has shown that a one-size-fits-all NITS approach will lead to \nmassive transmission upgrade costs—and this is the largest potential cost associated with co-\nlocation configurations by far.  Since other configurations would make these transmission upgrade \ncosts largely unnecessary, forcing all large new loads to impose such costs on the grid is unjust \nand unreasonable.285  \n \n282 Indicated Transmission Owners Answer, Att. A at 7 (emphasis added). \n283 See supra at Section I.A. \n284 Indicated Transmission Owners Answer, Att. A at 7. \n285 See supra at Section I.B.1."},{"page":82,"startToken":27059,"endToken":27415,"text":"82 \niv. \nWhat changes to the rates, terms, and conditions of Network Integration \nTransmission Service or Point-to-Point Transmission Service or, alternatively, what \nnew form of transmission service(s) may be necessary for different configurations of \nco-location to ensure that the Tariff is consistent with cost causation principles and \nthe beneficiary pays principle? \nAs established in the previous questions, Constellation identifies the applicable rates and \ncharges for each of PJM’s eight configurations (except Option 6, which is unjust and \nunreasonable).  Changes to the rates, terms, and conditions of service will be required for any rule \nchanges associated with these recommendations.286   \nContrary to assertions raised by the Indicated Transmission Owners, the Commission has \nnot rejected requests for “special third categories” where loads are not required to take transmission \nservice.287  In the proceeding cited by the Indicated Transmission Owners, the load owner, Amtrak, \nchallenged NITS pass-through charges because its electric supply from PPL was obtained from a \nnearby and directly-connected Safe Harbor hydroelectric generation facility.  However, Amtrak \nacknowledged that “when power from Safe Harbor is insufficient, [Amtrak] uses PPL transmission \nfacilities to obtain power.”288  The Safe Harbor facility was therefore designated as a Network \nResource and the load was designated as Network Load, and the Commission held that the NITS \ncharges were appropriate.289  This case is distinguishable from the physical arrangements under \nPJM Option 4, for example, where the co-located load is not connected to the grid and there are \nphysical protections to prevent the delivery of system energy from the grid.  Such non-connected \nload is not taking and cannot take transmission service from the grid and should not be required to \npay for transmission service accordingly.  PJM even acknowledges that an “open question” is \n \n286 See supra at II.C. (Ming chart summarizing proposed rates). \n287 Indicated Transmission Owners Answer at 17-18 (citing Nat’l R.R. Passenger Corp. v. PPL Elec. Utils. Corp. et \nal., 171 FERC ¶ 61,237 (2020), order on reh’g, 173 FERC ¶ 61,043 (2020)).  \n288 Nat’l R.R. Passenger Corp. v. PPL Elec. Utils. Corp. et al., 171 FERC ¶ 61,237, at P 43 (2020). \n289 Id. at PP 38-39."},{"page":83,"startToken":27415,"endToken":27732,"text":"83 \n“what level of NITS charges, if any, should be assessed in certain co-location arrangements in \naccordance with cost causation principles.”290  For non-connected load, such as in Option 4, the \nanswer is none.  \nThe cost causation principle supports a finding that co-located load which by design is \nprevented from receiving power from the grid should not pay for NITS.  The cost causation \n“principle requires that ‘[t]he cost of transmission facilities … be allocated to those within the \ntransmission planning region that benefit from those facilities in a manner that is at least roughly \ncommensurate with estimated benefits.’”291  It is also a well-established principle that all similarly \nsituated entities are charged consistent rates.292  Under this principle, co-located load that does not \nreceive power from the grid is not benefitting from the Transmission System and such entities \nshould not be required to pay for a service from which it is not benefitting.293  \nCo-located load that is not taking firm service from the grid is not necessarily causing costs \nwith respect to constructing and maintain the Transmission System; however, as Mr. Ming \nexplains, they are benefiting from the existence of the Transmission System and certain minimum \ncharges could be applicable.294  Payment for certain ancillary services (e.g., black start and \nregulation) is a separate consideration and discussed below in response to Question c.i.  \n \n290 PJM Answer at 40 (emphasis added). \n291 Tenaska Clear Creek Wind, LLC v. FERC, 108 F.4th 858, 868 (D.C. Cir. 2024) (citing S.C. Pub. Serv. Auth. v. \nFERC, 762 F.3d 41, 53 (D.C. Cir. 2024) (per curiam)).  \n292 See id. (citing Consol. Edison Co. of N.Y., Inc. v. FERC, 45 F.4th 265, 282 (D.C. Cir. 2022) (“And undue \ndiscrimination occurs when similarly situated entities are charged different rates for no good reason.”).  \n293 Ming Testimony at 31-33. \n294 See id. at 32."},{"page":84,"startToken":27732,"endToken":28107,"text":"84 \nv. \nParties may also wish to address how to determine which co-located load \nconfigurations should be required to take Network Integration Transmission Service \nor Point-to-Point Transmission Service or a new form of transmission service (i.e., \nwhether generalized policies or tests, such as a multi-factor test, to be applied case-\nby-case, may be appropriate), as well as the magnitude (i.e., how the service taken by \nco-located load compares to service by other types of load).  For example, if a co-\nlocated generator is synchronized to the grid but the load can be configured to be \nwholly isolated from the grid in the event the co-located generator trips offline, what \ntechnical and operational factors should determine whether the co-location \narrangement still relies on the transmission system in ways that warrant a \nrequirement that the co-located load take Network Integration Transmission Service \nor Point-to-Point Transmission Service or a new form of transmission service?  Are \nthere potential co-located load configurations for which tailored approaches may be \nappropriate? \nFor a discussion of proposed rate treatments under each of PJM’s eight configurations, see \nsupra at II.A. \nFor a discussion of the “synchronized to the grid” issue, see Answer at a.iv and Herling \nAffidavit at paragraphs 33-34.  Mr. Herling, Mr. Kormos, and Mr. Ming all address the use of \nprotective relay schemes, which are “commonly used” in the PJM Transmission System.295   \nvi. \nWith respect to the Guidance Document, please explain what it means to be \n“electrically connected and synchronized to the PJM Transmission System when \nconsuming power” and how that implicates the use of Network Integration \nTransmission Service or Point-to-Point Transmission Service or a new form of \ntransmission service; \nPlease see answer to a.iv and Herling affidavit at paragraphs 33-34.  As discussed there \nand elsewhere, synchronization is not an appropriate standard and the test should be whether the \nload is actually using the Transmission System for delivery of power, in which case it should pay \nfor NITS on a gross or netted basis, or benefiting from the Transmission System, in which case \nsome payment for ancillary services may be justified.   \n \n295 Kormos Aff. at ¶ 7; see also Herling Aff. at ¶ 8 (describing protective relaying as “a common and technically sound \ntool for managing the grid”)."},{"page":85,"startToken":28107,"endToken":28476,"text":"85 \nvii. \nWhat operational or commercial factors of a co-location arrangement would result in \na co-located load not needing to take any form of transmission service, including what \ntypes of special protection schemes or backup arrangements may be necessary to \nensure the co-located load never takes any form of transmission service? \nOf PJM’s eight options for co-location configurations, only Option 4 would not take any \nform of transmission service, although several of the configurations would rely on standard \nprotective relays or switching equipment (see Answer to a.iv.).  PJM’s proposed Option 5 is the \nsame as Option 4 from a configuration perspective, including protection mechanisms, but allows \nfor as-available back-up service to be provided to the load from the PJM grid with PJM permission.  \nUnder Option 4 and 5, the protective scheme can be designed to trip the co-located load from the \ngrid in three cycles (0.05 seconds) following a trip of the co-located generating unit or after sensing \nthat the energy produced by the co-located generating unit has been reduced to a level such that \nthe co-located load is attempting to draw energy from the grid.  PJM points to potential concerns \nabout relying on protective schemes.296  Constellation addresses this issue in its discussion of PJM \nOption 4, supra in Section II.A.4.  See also, Herling Aff. at III. \nc. Ancillary or Other Wholesale Services \ni. \nPlease explain whether and to what extent different configurations of co-location \narrangements rely on or benefit from ancillary services or black start services297 and, \nif so, provide specific details about the type of service and how the co-location \narrangement relies on it.  To what extent are these benefits distinct from the benefits \nthat other Network Integration Transmission Service and Point-to-Point \nTransmission Service customers derive from ancillary services? \nPlease see the discussion supra in Section I.D.3.  Co-located loads benefit from ancillary \nservices and black start under PJM Options 1-3 and 7-8 (we ignore Option 6).  The benefits are \nless clear under Options 4 and 5, since the benefits are for the co-located generator in the first \ninstance (and generators are not charged for ancillary services, as generators typically provide \n \n296 PJM Answer at 44. \n297 See supra notes 244-245."},{"page":86,"startToken":28476,"endToken":28781,"text":"86 \nthem).  In any event, Constellation is willing to consider payment for regulation and black start as \npart of a generator-contingent option in a replacement rate.  But it remains the case that co-located \nload’s minimal use of ancillaries does not alone justify NITS charges assessed on gross load and \nthat total ancillary service costs are only a small fraction of NITS charges and transmission \nupgrades required under a one-size-fits-all NITS approach to co-location.  \nii. \nPlease explain whether and to what extent co-location arrangements impose costs \nrelated to ancillary services or black start services or increase the costs for such \nservices allocated to other parties and how those costs could be approximated. \nSee answer to c.i.  \niii. \nPlease explain whether and to what extent co-location arrangements use, benefit \nfrom, provide, or contribute to the need for transmission system services in a manner \nthat does not fit into a pre-existing category of ancillary services or black start \nservices, and, if so, should new categories of services be created to accommodate that \nuse?  Alternatively, please explain whether an alternative mechanism of cost \nallocation for pre-existing ancillary services would be more appropriate. \nNo new categories of ancillary or black start services are needed, although the application \nof existing services to load co-located with generation in a generator-contingent configuration \n(PJM Options 4 and 5) is an open question.  As discussed above, co-located load that is not taking \nfirm service from the grid is not necessarily causing costs with respect to constructing and \nmaintaining the Transmission System, but as Mr. Ming explains, it is benefiting from the existence \nof the Transmission System and certain minimum charges could be applicable.298  Payment for \ncertain ancillary services (e.g., black start and regulation) is a separate consideration and discussed \nabove in response to Question c.i.   \n \n298 See Ming Testimony at 27."},{"page":87,"startToken":28781,"endToken":29120,"text":"87 \niv. \nWhat changes to rates, terms, and conditions of ancillary services, including ancillary \nservices procured in PJM’s markets, are necessary for different configurations of co-\nlocation arrangements to ensure that the Tariff is consistent with cost causation \nprinciples and the beneficiary pays principle? \nPlease see supra at Section II.C. (table summarizing rate treatment under firm, generator-\ncontingent, and interruptible configurations).  Constellation proposes that co-located load be \nassessed ancillary service charges based, in the first instance, on use of the Transmission System \nand, if the Transmission System is not used, based on the benefit received from the service.299  For \nOptions 4 and 5 please see supra at answer c.i.  \nv. \nPlease explain how PJM should determine which co-located load configurations take \nancillary services or black start services (i.e., whether generalized policies or tests, \nsuch as a multi-factor test, to be applied case-by-case may be appropriate), as well as \nthe amount of such service (i.e., how the service taken by co-located load compares to \nservice taken by other types of load); \nSee answer to c.iv. \nd. Interconnection Procedures and Cost Allocation \ni. \nDoes the necessary study process adequately address potential impacts caused by a \nco-location arrangement or is an additional study or new study process warranted, \ne.g., a system impact study or generator deactivation study?  PJM should provide the \ndetails regarding the geographic scope of the existing necessary study process, what \nis studied, and how the results are reported, including what opportunities \nstakeholders, the interconnected transmission owner, or the PJM IMM have to \nreview the results, if any. \nYes.  Constellation notes that while we generally agree with PJM’s description of the \nnecessary study process, we disagree that the current necessary study process offers any less \n“visibility” or transparency than the current Regional Transmission Expansion Planning (“RTEP”) \nprocess (and note that, in some respects, it offers more).300  Mr. Kormos makes clear the robust \nnature of the necessary study process as follows: \n \n299 Ming Testimony at 44, 50. \n300 See PJM Answer at 48."},{"page":88,"startToken":29120,"endToken":29585,"text":"88 \nI disagree with any suggestion that the necessary study process is anything but a \nrobust, highly effective study of the impact of the modification requested.  Indeed, \nPJM’s necessary studies are: led by an independent RTO; uniform and transparent \n(and not guided by an opaque process and rules that differ from transmission owner \nto transmission owner); updated by PJM, if needed; and focused on the overall grid \nimpacts of the new load explicitly (and not focused predominantly on local impacts \nor studied along with a host of other changes as part of an RTEP study).  To the \nextent FERC is concerned that large load connections are not being robustly and \neffectively studied to ensure reliability, it should not be concerned with the \nnecessary study process used for co-located load.301   \n \nThe one key problem with the current rules is the ability of some Transmission Owners \nrefusing to cooperate with the necessary study process and lack of any enforcement of the Tariff \nto require the Transmission Owner to fulfill its Tariff obligations. \nii. \nPlease explain whether PJM’s necessary study process allows a co-location \narrangement to demonstrate its capability to flexibly adjust its withdrawals from or \ninjections to the transmission system (e.g., by using secondary backup generation or \nby curtailing on-site load), and reflect this capability in the operating assumptions \nPJM considers when estimating the co-location arrangement’s impacts on the \ntransmission system?  If not, would it be appropriate to establish a new or revised \nstudy process that allows for such a demonstration? \nYes.  Constellation generally agrees with PJM’s answer but notes that PJM can perform \nany sensitivity analyses it deems appropriate and propose any Tariff language it deems appropriate.  \nConstellation does not agree with PJM’s suggestion that there is a reasonable risk that protection \nfacilities are likely to fail in co-location arrangements when PJM otherwise assumes they will \noperate when planning and operating the Transmission System.302  As Mr. Herling explains, \n“protection schemes are regularly employed on the PJM transmission system, and the successful \n \n301 Kormos Aff. at ¶ 6 (citations omitted). \n302 See Herling Aff. at ¶ 23 (“PJM does not plan for or require upgrades for such third contingencies, nor would it be \nreasonable to do so, short of events that would result in a cascading outage of grid facilities. The protection system, \ndiscussed above, is fully redundant and, while it cannot be guaranteed to never fail, it is unreasonable to treat the \nfailure of both primary and secondary relay system facilities following the loss of a generator as anything other than \na third contingency”); Kormos Aff. at ¶ 7 (“PJM does not plan or require upgrades to cover third contingency events \n(such as would occur if two serially connected breakers fail simultaneously) and add that I am aware of no grid \noperators who model such contingencies.”)."},{"page":89,"startToken":29585,"endToken":29944,"text":"89 \noperation of such protective systems is a common observance within PJM.  There is no technical \nreason from my perspective to expect that protective relaying in the context of co-location would \nperform any less reliably.  If anything, suggesting that protective relaying – a common and \ntechnically sound tool for managing the grid – cannot be used in the context of co-located \nconfigurations or must be designed to a different standard strikes me as an unduly discriminatory \nposition.”303  \niii. \nWhat changes to interconnection procedures and agreements may be necessary to \nensure that PJM identifies the reliability impact to the transmission system of load \nco-locating with existing generation including the need for dynamic response models? \nFor PJM Options 4 and 5, the necessary study process is sufficient, and Constellation \nsupports adding provisions to the PJM Tariff to address reliability issues for this type of \nconfiguration.304  The Tariff also would benefit from the addition of a clear obligation on the part \nof the relevant Transmission Owner to cooperate and provide timely feedback on the necessary \nstudies when requested by PJM and in the interconnection agreement amendment process.  There \nis language in the Tariff that provides a general duty to cooperate with PJM studies,305 but this \nobligation should be clarified for the reasons outlined in Constellation’s Complaint.  Constellation \notherwise does not object to PJM’s answer. \n \n303 Herling Aff. at ¶ 23. \n304 See Constellation Complaint at 25-28 and Exhibit 1 (detailing proposed Tariff language originally included in \nPJM’s Guidance Document). \n305 PJM OATT, Part VII, subpart E, section 322 (“Responsibilities of Transmission Provider and Transmission \nOwners”) specifies that:    \n  \nTransmission Provider shall be responsible for the preparation of all studies required by the Tariff. \nTransmission Provider may contract with consultants, including the affected Transmission \nOwner(s), to obtain services or expertise with respect to any such study, including but not limited \nto (1) the need for Interconnection Facilities, Network Upgrades, and Merchant Transmission \nUpgrades, (2) estimates of costs and construction times required by all such studies, and (3) \ninformation regarding distribution facilities. Transmission Owner(s) shall supply such information \nand data reasonably required by Transmission Provider to perform its obligations under this Part \nVII."},{"page":90,"startToken":29944,"endToken":30263,"text":"90 \niv. \nTo what extent does a co-location arrangement raise potentially distinct cost-\nallocation issues relative to a deactivating generator that causes the need for \ntransmission upgrades?  What principles should the Commission apply to allocate the \ncosts of any transmission upgrades needed to mitigate the impacts of co-locating load?  \nWhat steps should PJM take to ensure these costs are transparent to all parties? \nAs a preliminary matter, in a co-location scenario, there is no deactivating generator.  A \ndelist, which reduces capacity rights but does not affect the unit’s maximum facility output \n(MFO)—the energy interconnection rights—is not equivalent to a deactivation, which affects both \nenergy and capacity rights.  Under a generator-contingent co-location configuration, the load relies \non a generator for its own power and has no right to withdraw power from the grid (as enforced \nby physical protection systems).  This is equivalent to PJM Option 4, or Option 5 if the load can \ncall on grid power when available.  Under either Option 4 or Option 5, PJM conducts a necessary \nstudy to determine whether the re-direction of a generator’s output to a co-located load causes any \ntransmission issues and requires transmission reinforcements or network upgrades.306  If any such \nupgrades are required, the co-located load pays for them.  This is in contrast to a NITS approach \n(PJM Options 1-3 and 7-8) (we do not address Option 6) where significant transmission upgrades \nmay be required, the bulk of which will be socialized to existing customers.307  This is the primary \nbenefit to existing customers of a generator-contingent configuration.   \nFor details on cost allocation under each of PJM’s options, please see supra at Section II.308 \n \n306 Ming Testimony at 32. \n307 See Indicated Transmission Owners Answer, Att. A at 15 (under their NITS-only approach, the “costs of \ntransmission upgrades as a result of new end-use load additions are shared among transmission customers.”). \n308 Ming Testimony at 50, Table 1."},{"page":91,"startToken":30263,"endToken":30527,"text":"91 \nv. \nAre changes needed to how PJM allocates the costs of any transmission upgrades \nneeded to mitigate the transmission system impacts of co-locating load, if any, \nincluding whether the costs of those upgrades can ever be allocated to a party other \nthan the co-located generator, co-located load, and/or co-location arrangement? \nPlease see supra at Section II where Constellation proposes a cost allocation methodology \nfor each of PJM’s options based on rate design principles (other than Option 6, which should be \nrejected outright). \nvi. \nAre changes to the pro forma interconnection-related agreements necessary to \naccommodate the addition of co-located load to existing generation? \nNo.  The Susquehanna ISA proceeding dictates that generic rules on co-location, such as \nthose contained in the now-withdrawn Guidance Document, should be in the Tariff.   \nvii. \nPlease explain whether changes to interconnection procedures and agreements are \nnecessary to accommodate new generation interconnecting with co-located load, \nincluding whether the existing queue process is sufficient for such arrangements? \nNo changes are necessary.  Any interconnection reforms should be generally applicable \nand not tied specifically to co-located load. \nviii. \nPlease explain whether or not it would be appropriate to establish an interconnection \nstudy process outside of PJM’s interconnection queue process for newly \ninterconnecting co-location arrangements that do not exchange power with the \ntransmission system and do not require network upgrades? \nConstellation agrees with PJM’s answer that it would not be appropriate.309  See also \nConstellation’s Answer e.iv., below, for discussion of the efficacy of PJM’s existing necessary \nstudy process, which is especially relevant for Options 4 and 5.  \n \n309 PJM Answer at 56."},{"page":92,"startToken":30527,"endToken":30927,"text":"92 \nix. \nA generator with a co-located load that is not a party to a transmission service \nagreement is arguably distinguishable from other generators.  To the extent co-\nlocated arrangements create costs, or benefit from bulk power system services, but \nthe generator and load are not exposed to these costs because of their contractual \nrelationship, should PJM modify the Tariff and related agreements to allocate those \ncosts to the generator directly? \nConstellation agrees with PJM’s response to this question.310 \ne. PJM Capacity Market, Reliability, and Resource Adequacy \ni. \nWhat changes to PJM’s capacity market rules are necessary to ensure that the Tariff \nspecifies how co-located generation and/or load participates in the capacity market in \na way that reflects the potentially unique physical and operational characteristics of \nthe co-location arrangement (e.g., the presence of secondary backup generation, the \ncapability to curtail on-site load or other operational flexibilities, among others) and \nis otherwise just, reasonable, and not unduly discriminatory or preferential? \nNo changes to PJM’s capacity market rules are necessary to ensure that the Tariff specifies \nhow co-located generation and load participate in the capacity market.311  Although Constellation \nsupports opportunities to further improve market rules and processes,312 the existing rules suffice.  \nAs Mr. Ming explains in his testimony, under the existing rules, “[f]or any generator to participate \nin the capacity market, it must output to the grid when conditions require and when ordered to by \nPJM.  If a co-located generator clears in the capacity market, this means that it must output to the \ngrid when conditions require even if that means interruption of the co-located load, either through \ncurtailment or backup generation.”313  And to be clear, Constellation’s view is that any Existing \nGeneration Capacity Resources that would prioritize serving co-located load over following PJM \n \n310 Id. \n311 Elsewhere in this pleading, Constellation suggests several improvements that can be made to PJM’s capacity market \nand rules related to it.  See also Patterson Aff., at Section II.C (suggesting several improvements to markets and \nmechanisms that effect markets). \n312 See Patterson Aff. at ¶¶ 8-9 (providing that PJM’s “RPM market design has not exhibited any general market \nfailure” but “PUM should continue efforts to improve the accuracy of price formation in both its energy and capacity \nmarkets, with particular emphasis on removing out-of-market price distortions that lead prices to diverge from system \nfundamentals”).  \n313 Ming Testimony at 46."},{"page":93,"startToken":30927,"endToken":31226,"text":"93 \ndispatch should instead seek removal of Capacity Resource status or otherwise seek appropriate \nreplacement capacity to cover its capacity supply obligation.314  This can be accomplished via \nexisting capacity market rules where necessary.  \nii. \nWhat Tariff change or changes to the interconnection service agreement are \nnecessary to ensure that PJM and the interconnected transmission owner have \nsufficient visibility into the co-located load configuration? \nPlease see supra at Section II.A.4., discussing PJM Option 4, where Constellation responds \nto the question of “visibility.”  Constellation is not aware of any specific changes that are necessary \nto the Tariff or interconnection service agreements.  For a generator-contingent configuration, \nConstellation’s Complaint proposed to add various reliability provisions to the Tariff from PJM’s \nGuidance Document.315  Constellation does not oppose such clarifying additions for each type of \nco-location configuration.  Our understanding is that the interconnection service agreement would \nbe updated to reflect any specific arrangements related to the particular co-location arrangement, \none-line diagrams and the like, which provide adequate visibility.  Please also see supra at Section \nII.B. (addressing resource adequacy issues). \niii. \nPlease explain whether the existing Tariff rules are sufficient to ensure resource \nadequacy if increasing numbers of large existing generators choose to co-locate with \nload. \nPlease see supra at Section II.B. (addressing resource adequacy issues),316 and the \nPatterson Affidavit attached hereto as Exhibit 3.  In addition, we agree with PJM’s positions that \n“[t]o the extent the Existing Generation Capacity Resource relinquishes Capacity Resource status \ncommensurate with its obligation to the co-located load, PJM’s capacity market is designed to \n \n314 PJM Answer at 59-60. \n315 Constellation Complaint at Section II.B (Nov. 22, 2014). \n316 See also Patterson Aff. at Section II (providing an extensive discussion on resource adequacy issues related to \nadditions of large loads in PJM)."},{"page":94,"startToken":31226,"endToken":31551,"text":"94 \nsend a price signaling the relative need for the additional capacity”317 and that “[s]elf-supply, either \nthrough direct ownership or longer-term bilateral contracting, is a critical part of how [its] markets \nfunction to ensure resource development to support future reliability.”318 \niv. \nWhat deactivation or interconnection modification studies should PJM undertake to \nensure resource adequacy and/or protect reliability should an existing generator seek \nto enter into a co-location arrangement?  If PJM finds that the co-location would \ncause reliability standards violations, what remediation techniques would be \nappropriate (e.g., reliability must-run contracts, delaying the co-location \narrangement until the reliability violations are addressed, etc.)? \nAs stated above in response to question d.iv., there is no deactivating generator in the \ncontext of co-location; rather, under certain co-location configurations, the capacity \ninterconnection rights will be reduced but the energy interconnection rights would generally stay \nthe same.  We also agree with PJM’s position that “[t]o the extent the Existing Generation Capacity \nResource relinquishes Capacity Resource status commensurate with its obligation to the co-located \nload, PJM’s capacity market is designed to send a price signaling the relative need for the \nadditional capacity.”319     \nWith respect to potential transmission system impacts, for generators seeking to serve co-\nlocated load under PJM Options 4 and 5, the generators’ ISA would be modified to reflect such \nco-location, and PJM would perform a necessary study to ensure the grid can accommodate such \narrangement, with the costs of any transmission reinforcements and system upgrades to \naccommodate such co-location typically being born by the co-locating parties.320  PJM’s necessary \nstudy process is sufficient for PJM to ensure resource adequacy and/or protect reliability.  Under \n \n317 PJM Answer at 64. \n318 Id. at 63. \n319 PJM Answer at 64. \n320 See id. at 54 (citing PJM Interconnection, L.L.C., 190 FERC ¶ 61,080 (2025) (accepting interconnection \nconstruction service agreement assigning upgrade costs to generator seeking to modify interconnection to \naccommodate co-located load))."},{"page":95,"startToken":31551,"endToken":31766,"text":"95 \nthis process, PJM will “perform studies to evaluate the potential reliability impact of a proposed \naddition or reduction of a co-located load configuration on the PJM Transmission System, and \ndetermine what, if any, system reinforcements are required prior to the addition or reduction of the \nplanned co-located load configuration.”321  As Mr. Kormos confirms, the necessary study process \nis “a robust, highly effective study of the impact of the modification requested....  To the extent \nFERC is concerned that large load connections are not being robustly and effectively studied to \nensure reliability, it should not be concerned with the necessary study process used for co-located \nload.”322  \nFor co-located load that is Network Load and taking NITS, the relevant Transmission \nOwner would study the transmission system (as would PJM as part of its ensuing RTEP review) \nand any transmission upgrades necessary to accommodate the load must be completed prior to \neffectuating the co-location proposal.323   \nGiven that these existing mechanisms address both potential resource adequacy concerns \nand transmission system concerns under grid-connected as well as co-located arrangements, there \nis no need nor authority to consider “remediation techniques.” \n \n321 PJM Answer at 49. \n322 Kormos Aff. at ¶ 6 and Appendix. \n323 See Kormos Aff., Appendix (explaining the transmission study process for direct connects to the grid)."},{"page":96,"startToken":31766,"endToken":32159,"text":"96 \nv. \nWhat changes are necessary, if any, to other PJM planning processes to better plan \nfor and address the resource adequacy and reliability impacts of co-location \narrangements, including, for example, whether or not the frequency of such processes \nmight be changed?  Similarly, should PJM consider changes to load forecasting \nmethods, informational postings, or the reserve margin study process to better plan \nfor and address the resource adequacy and reliability impacts of co-location \narrangements? \nPlease see supra at Section II.B. (addressing resource adequacy issues),324 and the \nPatterson Affidavit attached hereto.  With respect to load forecasting, as explained in the Patterson \nAffidavit, PJM currently relies on Transmission Owners to provide estimates of large load \nadditions based on customer interactions on an annual basis.325  Mr. Patterson proposes that PJM \nadopt detailed, mandatory rules with respect to how Transmission Owners report anticipated load \nadditions.  Moreover, such reporting should occur two to four times per year to improve the \nresponsiveness of the information for market participants.326  PJM appears open to pursuing \nimprovements to its forecasting process,327 an effort that Constellation supports.  \nvi. \nUnder what circumstances can PJM direct the operators of co-location arrangements \nto shed such load if deemed necessary to preserve system reliability during a declared \nemergency? \nExisting rules allow for PJM to direct load shedding if the co-located load is connected to \nthe grid as a Network Customer.328  Co-located load with protective systems that prevent it from \nconnecting to the grid would not be a Network Customer,329 and thus PJM’s existing load shedding \n \n324 See also Patterson Aff. at Section II (providing an extensive discussion on resource adequacy issues related to \nadditions of large loads in PJM).  \n325 Patterson Aff. at ¶ 29. \n326 Id.  \n327 PJM Answer at 66. \n328 See, e.g., PJM Tariff, Section 33.6 (“To the extent that a system contingency exists on the Transmission Provider’s \nTransmission System and the Transmission Provider determines that it is necessary for the Transmission Owners and \nthe Network Customer to shed load, the Network Customer and the Transmission Owners shall shed load in \naccordance with previously established procedures under the Operating Agreement.”) \n329 Suggestions by the Indicated Transmission Owners that if a co-located generator trips offline, “the unmetered load \n‘appears’ on the system and draws power from the grid” (Indicated Transmission Owners Answer, Att. A at 19) are"},{"page":97,"startToken":32159,"endToken":32566,"text":"97 \nrules would not directly apply to such co-located load.  In such instances, any load shedding would \nhave to be coordinated through the co-located generator.330   \nFinally, the potential interruptions of a new interruptible transmission service (i.e., PJM’s \nOption 7) in response to declared emergencies are discussed supra in Section II.A.7., and, while \nPJM already has rules applicable to demand response interruptions, Constellation would be open \nto discussing changes thereto as suggested supra in Section II.A.8.  \nf. Other \ni. \nAre any changes to PJM’s energy or ancillary services market rules necessary to \naddress co-location arrangements? \nAs discussed above, a rate for regulation and black start service in a generator-contingent \nconfiguration (PJM Options 4-5) could be appropriate to include as part of a replacement rate.  \nHowever, no changes are necessary to PJM’s energy and ancillary service market rules to address \nco-location arrangements. \nii. \nPlease discuss whether back-up service can provide benefits to customers or \notherwise help minimize system costs, including with specific examples or best \npractices, if possible. \nBack-up service can reduce the impact of co-located loads on the transmission system \ndesign, thereby decreasing costs, and can allow grid operators to better manage system \n \n“unreasonable.”  Herling Aff. at ¶ 23; see also Kormos Aff. at ¶ 7 (“I agree with Mr. Herling’s view that PJM does \nnot plan or require upgrades to cover third contingency events (such as would occur if two serially connected breakers \nfail simultaneously) and add that I am aware of no grid operators who model such contingencies.”).  \n330 See PJM Answer at 67, n.89 (citing PJM Operating Agreement, Section 11.3.1 (“To facilitate and provide for the \nwork of the Office of the Interconnection and of the several committees appointed by the Members Committee, each \nMember shall, to the extent applicable . . . (e) Comply with the requirements of the PJM Manuals and all directives of \nthe Office of the Interconnection to take any action for the purpose of managing, alleviating or ending an Emergency, \nand authorize the Office of the Interconnection to direct the transfer or interruption of the delivery of energy on their \nbehalf to meet an Emergency and to implement agreements with other Control Areas interconnected with the PJM \nRegion for the mutual provision of service to meet an Emergency, and be subject to the emergency procedure charges \nspecified in Operating Agreement, Schedule 9 for any failure to follow the Emergency instructions of the Office of \nthe Interconnection.”))."},{"page":98,"startToken":32566,"endToken":32897,"text":"98 \nreliability.331  Developing more innovative means of taking advantage of the potential flexibility \nprovided through the more effective use of backup service is well worth the effort.   \nMr. Kormos has explained that “[d]ata centers almost always have their own backup power \nsupply, further reducing demands that would exist if their backup supply was the network, or if \nthe backup supply itself relied on the network for transmission services.”332  Mr. Ming also \nexplains that “[i]n both a separately metered or co-located load configuration, the load can be \ninterruptible (either through load curtailment or backup generation) which would eliminate its \nresource adequacy impact.”333  The Duke Study provides clear evidence that there is significant \n“headroom” available on the grid (including in PJM) that can be used “to more quickly integrate \nnew loads, reduce the cost of capacity expansion, and enable greater focus on the highest-value \ninvestments in the electric power system.”334 Specifically, the Duke Study found that curtailing \nnew load at just 0.5% annually could result in 18 GWs of potential load integration in PJM without \nany capacity expansion.335  This is known as “headroom” on the system, and more headroom in \nthe system—meaning a larger gap between average and peak demand—means ratepayers are \npaying to build and maintain assets that may remain idle for most of the year.  More effective \nutilization of this headroom should be pursued.   \nIn addition, storage could play a role in providing back-up flexibility and efforts to tap into \nstorage more effectively are worth pursuing.  For example, large energy-capacity battery energy \nstorage systems (“BESS”) can supply a consistent level of energy for several hours.336  \n \n331 See generally Ming Testimony at 28. \n332 Michael Kormos, The Co-Located Load Solution at 10; Kormos Aff., Appendix. \n333 Ming Testimony at 46. \n334 Duke Study at 3. \n335 Id.  \n336 Electricity Explained: Energy Storage for Electricity Generation, U.S. ENERGY INFORMATION ADMINISTRATION \n(Aug. 28, 2023), https://www.eia.gov/energyexplained/electricity/energy-storage-for-electricity-generation.php."},{"page":99,"startToken":32897,"endToken":33337,"text":"99 \nAccordingly, back-up service, such as that provided by a BESS, for example, can immediately \nminimize costs related to outages by preserving energy and transmission capacity for remaining \nload and minimize costs related to system design.  \nPJM seems to recognize the potential value of making more efficient use of resources and \nsuggests some avenues that can be pursued to increase their efficacy.337  On the other hand, the \nIndicated Transmission Owners remain focused on their steadfast desire to build, own and earn a \nreturn on transmission assets in arguing that any flexibility provided through back-up service \nshould “not exempt load from paying the costs of transmission service.”338  The Commission \nshould not countenance such inflexibility in developing cost-effective, efficient solutions.  \niii. \nParties may also choose to address how co-location arrangements may provide \nbenefits, including potentially reducing required transmission upgrades to \ninterconnect large loads, reducing congestion, or providing operational flexibility \nduring system peaks or emergencies? \nThe record is replete with evidentiary support for co-location arrangements.  Constellation \nrespectfully directs the Commission to the Kormos Affidavit attached hereto for a discussion on \nthe benefits of co-location and his whitepaper (attached to his Affidavit and filed in Docket No. \nAD24-11) for a summary of the benefits of co-location.339 As Mr. Kormos summarized:  \nI can say with certainty that the closer load is to its supply, the costs, time to connect the \nload, and the operational risk are all likely to be reduced . . . . Conversely, if new load is \nconnected to the grid, distant from the generator that is serving it (a far more complicated \n \n337 See, e.g., PJM Answer at 20 (suggesting options to enhance its existing demand response product to make more \nefficient use of back-up resources).  \n338 Indicated Transmission Owners Answer, Att. A at 20.  The Indicated Transmission Owners also suggest that any \nbackup service provided by a nuclear unit “is dependent on continued grid operation to function at all.”  Id.  Again, \nthe Commission should not countenance efforts to increase transmission expenditure at the expense of more flexible, \nefficient and less costly use of existing assets.  In addition, Constellation already responded to the Indicated \nTransmission Owners’ suggestion (Id.) that nuclear connection arrangements are somehow different from other \nresource connection arrangements or that their reliance on station power service somehow equates to transmission \nservice to a co-located load, and the Commission should include and consider such evidence in this proceeding.  \nSecond Motion for Leave and Answer of Constellation Energy Generation, LLC, Docket Nos. ER24-2888-000, et al., \nat Section II and Attachments 1 and 2 (filed Nov. 12, 2024).   \n339 Kormos Aff. at ¶ 4; Kormos Aff., Appendix, The Co-Located Load Solution at 8-12."},{"page":100,"startToken":33337,"endToken":33605,"text":"100 \narrangement), costs will generally be greater and delays and operational problems will be \nmore likely.340 \n \nMore granularly, the benefits of co-location include, but are not limited to, the following: \n1. \nSpeed to Market – It can take up to ten years to complete the requisite transmission \nupgrades to serve a hyperscale data center in front of the meter.￼  This is untenable \nfor data center developers, especially data centers that are essential for national \nsecurity.￼341 co-location arrangements 342 come online sooner, which can ensure \nthat the United States does not lose AI-enabled advances in combat activities \ncritical to our military.￼  The speed to market (as compared to traditional large \nload connections) is a result of fewer required transmission upgrades, less \n“potential supply chain issues and delays on long-lead transmission infrastructure \nequipment,” and less “delays due to land acquisition, rezoning, permitting, siting \nand the like.”343  Co-location enables significantly quicker load connections which \nis vital to national security and economic prosperity. \n2. \nLower Costs – Less delays and transmission upgrades associated with co-location \nalso means lower costs.  Serving large co-located new loads through a NITS-only \napproach will impose substantial costs on existing customers.344  As elaborated in \nSection I.B.1, Mr. Patterson explains that supplemental projects for transmission \nupgrades to serve load costs approximately $9.5 million for each 100 MW of load \nsize (plus a fixed, size independent component of about $31 million).345  Between \n \n340 Kormos Aff. at ¶ 4. \n341 Id. at n.5. \n342 Stockton Declaration at 2. \n343 Kormos Aff. at ¶ 4.  \n344 Supra at Section I.B.1. \n345 Patterson Aff. at ¶ 53."},{"page":101,"startToken":33605,"endToken":33857,"text":"101 \n2022 and April 2025, there were 144 projects to integrate large loads covering 42.3 \nGW of summer peak load with a total cost of $8.5 billion.346  By contrast, co-located \nload under PJM Options 4 and 5 would impose no upgrade costs on existing \ncustomers.347  The bottom line is that co-location reduces the overall cost for \ntransmission and the potential cost impacts on existing customers. \n3. \nSystem Efficiency – Co-location benefits system efficiency by decreasing line \nlosses and increasing system utilization.  Energy losses or “line losses” resulting \nfrom transmitting power long distances are in the range of 1-3 percent.348  That is \nthe equivalent of 90,000-260,000 MWh of electricity for a 1 GW-sized data \ncenter.349  Co-location prevents such unnecessary loss.   \n4. \nIncreased Interconnection Availability – System efficiency goes hand in hand with \ninterconnection availability.  Co-location arrangements “free[] up transmission \nheadroom for new generator resources by making available the transmission \ncapacity currently used by the host power plant.”350  Transmission congestion can \nsignificantly delay the interconnection of new generation resources and force other \nresources to be curtailed even when their operating costs indicate they are economic \nand should run.  Co-location can help ameliorate these problems.  For example, \n“[c]o-locating data centers at Illinois nuclear plants could reduce curtailment of \nwind and solar output by over 80 [percent].”351 \n \n346 Supra at Section I.B.1. \n347 Id. \n348 Kormos, The Co-Located Load Solution at 8. \n349 Id.  \n350 Id. at 11-12. \n351 Id. at 11 (internal citation omitted)."},{"page":102,"startToken":33857,"endToken":34193,"text":"102 \n5. \nAppropriate Risk Allocation – Mr. Kormos explains in his whitepaper that “a co-\nlocated center must accept the outage risk associated with a discrete resource which \nwill always be higher than grid power even if that resource is individually highly \nreliable,” and the co-located load “must carry—and pay for—its own reserves.”352  \nBearing such risks directly will inversely decrease the risk for other grid customers. \n6. \nEnhanced Cost Causation – Connecting large loads to the grid can impose \n“significantly more grid upgrade costs that will be socialized than” a co-located \nload.353  Such costs can be spread to all customers in a grid-connected arrangement,  \nwhereas, in a co-location arrangement, the co-located load pays for the private \nbehind-the-meter delivery facilities directly.354  Such direct assignment of \ninterconnection costs is aligned with cost causation principles.  The Commission \nhas explained that “the cost causation principle provides that costs should be \nallocated to those who cause them to be incurred and that otherwise benefit from \nthem.”355  There can be no more equitable allocation of costs than that of a co-\nlocation arrangement.  \n7. \nIncreased Reliability – “[C]o-location helps reliability by not trying to move more \npower a further distance.”356  In addition, data centers that cannot draw power from \nthe grid (e.g., Option 4) will also reduce demands that would exist if their primary \nand backup supply were on the network or relied on the network for transmission \n \n352 Id. at 9.  \n353 Id.  \n354 See id.  \n355 Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities, Order No. \n1000, 136 FERC ¶ 61,051, at P 535 (2011); see also BNP Paribas Energy Trading GP v. FERC, 743 F.3d 264, 268 \n(D.C. Cir. 2014 (“[T]he cost causation principle itself manifests a kind of equity.  This is most obvious when we frame \nthe principle (as we and the Commission often do) as a matter of making sure that burden is matched with benefit.”).  \n356 Kormos, The Co-Located Load Solution at 9."},{"page":103,"startToken":34193,"endToken":34432,"text":"103 \nservices.357  Reliability is also ensured through the necessary study process.358  Mr. \nKormos explains that the PJM necessary study process is a robust, highly effective \nstudy that is “focused on the overall grid impacts of the new load (and not focused \npredominantly on local impacts).”359  In addition, as Mr. Kormos explains, co-\nlocating large load with a generator can reduce the likelihood of a sudden large load \ndrop in response to a grid voltage drop.360  NERC has recently become increasingly \nconcerned with such issues, and co-locating load with a generator can relieve this \nconcern.361  \n8. \nExtended Facility Utilization – Co-location arrangements present “a basis for the \ncontinued operation of generation resources.”362  This is particularly true for \nnuclear resources.363  Co-location “creates the financial security needed to support \nsubsequent license renewal . . . making it more likely the nuclear plant and its \nemissions-free output remain available well into the future and able to consider \nuprate projects to increase output.”364  Mr. Kormos explains that 30 percent of \nmerchant nuclear units will need to renew their licenses in the next decade and 50 \npercent will need to renew their licenses over the next two decades.365  Co-location \narrangements present the financial certainty necessary to continue operations. \n \n357 Id.  \n358 Id.  \n359 Kormas Aff. at ¶ 6. \n360 Id. at ¶ 7. \n361 Id. \n362 Id. at ¶ 4.  \n363 See id.  \n364 Kormos, The Co-Located Load Solution at 10. \n365 Id."},{"page":104,"startToken":34432,"endToken":34777,"text":"104 \n9. \nMaximized State Flexibility – Congress reserved to the states “regulatory authority \nover retail sales (as well as intrastate wholesale sales)”366 as well as facilities used \nfor the generation, distribution, or intrastate transmission of electric energy.367  Any \nrequirement to treat sales or service to co-located load as wholesale no matter what \neffectively precludes states from regulating transactions that fall squarely within \ntheir jurisdiction.  Co-location arrangements allow states to exercise their \nCongressionally-protected authority to incentivize and regulate retail sales as they \nsee fit.  If states truly are the laboratory of democracy, then co-location permits \nstates to creatively pursue such arrangements and other states or regions can benefit \nfrom the lessons learned.    \niv. \nParties may also address whether, and if so, how, the Tariff should be modified to \nbest accommodate or encourage co-location arrangements to be constructed in such \na way as to minimize total system costs or otherwise provide certain benefits, \nincluding protections for existing customers and allocation of costs consistent with the \ncost-causation principle. \nPlease see supra at Section II (discussing appropriate replacement rate).368  The charges \nfor each variation, as described by Mr. Ming, maximize benefits while protecting existing \ncustomers through the allocation of costs most consistent with the cost causation principle.   \nv. \nWhat Tariff provisions, if any, are necessary to ensure clarity regarding the aspects \nof service to co-located load and generation facilities that may be administered \nthrough the Tariff versus state jurisdictional retail tariffs? \nNo revisions to PJM’s Tariff are necessary with respect to clarifying the jurisdictional \nbounds of PJM and the states.  PJM acknowledges that “additional Tariff revisions may not be \n \n366 EPSA, 577 U.S. 260, 279 (2016) (citing New York v. FERC, 535 U.S. 1, 17 (2002)) (emphasis added); id. at 264 \n(“[T]he law places beyond FERC’s power, and leaves to the states alone, the regulation of ‘any other sale’—most \nnotably, any retail sale—of electricity.”) (quoting 16 U.S.C. § 824(b)) (emphasis added).   \n367 See, e.g., New York v. FERC, 535 U.S. at 22-23.   \n368 See Ming Testimony at 24-51."},{"page":105,"startToken":34777,"endToken":35085,"text":"105 \nnecessary....”369  PJM is correct.  PJM also states that interested parties “need to have assurances \nand an understanding of relevant law to respect the jurisdictional principles” at issue.370  That \nassurance can and should be provided by the Commission as set forth in Constellation’s answer to \nQuestion a.i.; however, no Tariff revisions must necessarily result from such clarification.  \nThe Indicated Transmission Owners suggest what the Commission “might” or “could” do, \nbut likewise do not set forth any specific Tariff revision proposals.371  The suggestion proposed by \nthe Indicated Transmission Owners to clarify in PJM’s Tariff that co-located load is Network Load \nand must arrange for NITS or Point-To-Point Service accordingly is entirely inappropriate.  As \nexplained in detail supra in Section I.C., this would, in turn, prohibit states from exercising their \nvalid jurisdiction over distribution and load connections.  The Indicated Transmission Owners \neffectively seek the Commission’s blessing to obstruct every state’s lawful regulation of co-located \nload.  This is an untenable result that the Commission should reject outright.  \nvi. \nWe also encourage parties to address any national security implications associated \nwith co-location arrangements, including with respect to the specific issues discussed \nin this show cause order, and what actions, if any, the Commission should take in \nresponse. \nData centers supporting AI services are critically important to the national security mission \nof the country.  As described by Paul Stockton, data centers support AI services critical to \npeacetime and conflict operations.372  Rapid deployment of such technology is needed to keep pace \nwith America’s competitors.373  Any Commission order resulting from this proceeding should \n \n369 PJM Answer at 71.  \n370 Id.  \n371 Indicated Transmission Owners Answer at 9; id., Att. A at 21.  \n372 Stockton Declaration at 4-5. \n373 Id. at 7-9 (describing “China’s drive for AI preeminence” and the “broader strategic competition between China \nand the United States”)."},{"page":106,"startToken":35085,"endToken":35379,"text":"106 \n(1) facilitate data center speed to market; and (2) refrain from precluding any particular co-location \narrangement option.  \nSecretary of Energy Chris Wright recently compared America’s effort to incentivize \nnuclear fuel and AI technological development to “the start of Manhattan Project 2.”374  China \ntakes the role of antagonist in this analogy, which is apt considering that “China views DeepSeek \nas a major step forward in its AI-enabled military capabilities and, more broadly, a breakthrough \nthat reshapes the balance of power in the U.S.-China AI competition.”375  Co-location can enable \ndata center development years before grid-connected alternatives.376 Indeed, “[s]peed is of the \nessence for national security.”377 \nThe Indicated Transmission Owners understand that moving “forward rapidly” is a \nnecessity for national security.378  However, they incorrectly claim the “most straightforward way \nto accomplish that goal is simply to recognize that co-located load is Network Load . . . and should \npay for Network Service like all other customers.”379  This is farcical.  Such a declaration would \nresult in unnecessary processes for co-locating certain load and additional regulatory burdens \nthereby decreasing efficiency, and increasing the wait time for defense-critical load to connect.  \nIn addition, co-location options provide a potential resilience benefit that can be critical during \ntimes of war.380  The Stockton Declaration makes certain that the Department of Defense should \nhave “all options available to accelerate the connection of [data] centers....”381  And the decision \n \n374 Peirce Gentry, ‘We’re at the Start of Manhattan Project 2’: U.S. Energy Secretary Visits Oak Ridge, WPLN NEWS \n(Mar. 3, 2025), https://wpln.org/post/were-at-the-start-of-manhattan-project-2-u-s-energy-secretary-visits-oak-ridge/. \n375 Stockton Declaration at 8. \n376 Id. at 9-10. \n377 Id.  \n378 Indicated Transmission Owners Answer, Att. A at 21. \n379 Id.  \n380 Stockton Declaration at 10-13. \n381Id. at 10."},{"page":107,"startToken":35379,"endToken":35706,"text":"107 \nas to which connection option to pursue should be made by the customer, not by the Commission, \nPJM, or a transmission owner.382  The Commission should not preclude co-location configurations \nthat save existing customers money and do not endanger reliability.   \nvii. \nFinally, for generation units paid for originally by consumers in base rates prior to \nrestructuring, is it fair and/or just and reasonable if these units are taken out of the \nsystem’s supply stack and devoted exclusively to serving co-location arrangements \nwith one or a few large customers? \nThe premise of this question is based on a fundamental misunderstanding of the \npredominantly merchant generator model in place across most of PJM.  Under this model, \ngenerating resources were sold by most utilities to merchant owners over 20 years ago and, for the \nmost part, have since participated in markets administered by PJM or in bi-lateral markets.  \nConsumers bear no risk related to owning and operating these generating resources.  Rather, the \nmerchant owners bear these risks exclusively and have no ratebase or other consumer fail-safe \nmechanism to fall back on if things do not go as planned.  If, for example, revenues are insufficient \nto support ongoing operations and a return for a generator, consumers have no obligation to provide \nany “make whole” payment (let alone a return payment) to support that uneconomic generator—\nthe generator is forced to go out of business, with any loss borne entirely by its owner.  And this \nrisk is real.  For example, in 2019, Constellation was forced to prematurely retire its Three Mile \nIsland nuclear facility (now the Crane Clean Energy Center) for economic reasons.  And \nconsumers bore no risk in that unfortunate development just as they bear no risk in Constellation’s \nrecently announced plan to restart the facility.383     \n \n382 Id. at 2. \n383 Constellation to Launch Crane Clean Energy Center, Restoring Jobs and Carbon-Free Power to The Grid (Sept. \n20, \n2024), \nhttps://www.constellationenergy.com/newsroom/2024/Constellation-to-Launch-Crane-Clean-Energy-\nCenter-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html."},{"page":108,"startToken":35706,"endToken":36156,"text":"108 \nIn addition, we do not believe there was ever any basis for consumers to claim that \nresources were devoted to serving their needs exclusively even under the rate-base model that may \nhave applied previously to some merchant-owned facilities (and may still apply in same parts of \nthe PJM region).  In a nutshell, consumers paid for service, not for assets.384  Regardless, even if \nthere was some speculative claim under that model, it was severed over 20 years ago for merchant-\nowned resources when the merchant owners purchased those resources and assumed all the \noperating risks related to them.   \nCONCLUSION \nWHEREFORE, Constellation respectfully requests that the Commission adopt its \npreliminary finding that the PJM Tariff is unjust and unreasonable and unduly discriminatory and \npreferential because it lacks clear provisions for the treatment of large loads co-located with \ngeneration, and this lack of clarity has caused undue discrimination against large loads seeking to \nco-locate.  The Commission should then either (1) fix the replacement rates set forth herein—\nnamely a group of co-location configuration options and rate treatments that recognize the different \nuses of the transmission system of these different configurations, or (2) set the replacement rates \nfor time-limited settlement proceedings. \n \n384 As previously explained above with respect to the “duty to serve,” utilities are provided authorizations to hold \nnatural monopoly positions and in exchange are subject to price regulation and have a duty to serve customers in their \nservice territory.  The customers or ratepayers pay for the service they receive.  The price for that service is established \nby cost-of-service ratemaking through which the utility can “yield a reasonable return on the value of the property \nused at the time it is being used to render the service.”  Bluefield Waterworks & Imp. Co. v. Pub. Serv. Comm’n of W. \nVa., 262 U.S. 679, 690 (1923).  The utility undertakes an investment in transmission and distribution infrastructure \nand, in some instances, generation.  The utility receives the yield or rate of return on that capital investment in an \namount that is “sufficient to assure confidence in the financial integrity of the enterprise, so as to maintain its credit \nand attract capital.” Fed. Power Comm’n v. Hope Natural Gas Co., 320 U.S. 591, 603 (1944).  The ratepayers did not \nmake the investment in capital infrastructure.  Instead, ratepayers pay the utility to provide a service, i.e., delivering \nenergy to their home or business.  The service rate is not a downpayment or investment in the underlying assets by \nwhich the utility provides that service.  If a specific generation unit is no longer being used to render service to \nratepayers, then it is reasonable for the utility to be able to optimize that unit by other means."},{"page":109,"startToken":36156,"endToken":36255,"text":"109 \nRespectfully submitted, \n /s/ Paul F. Wight \nCarrie Hill Allen \nSr. Vice President & Deputy General Counsel \nSeth Lucia \nAssistant General Counsel  \nConstellation Energy Generation, LLC  \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001     \ncarrie.allen@constellation.com   \nseth.lucia@constellation.com  \n \nChristopher A. Wilson  \nManaging Director, Federal Regulatory Affairs \nConstellation Energy Generation, LLC  \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001  \n(202) 347-7500  \nFERCe-filings1@constellation.com \n \nPaul F. Wight \nKirkland & Ellis LLP \n1301 Pennsylvania Ave., NW \nWashington, D.C. 20004 \n(202) 389-3321 \npaul.wight@kirkland.com \n \n \n \n \n \n \n \n \n \n \n \n \nCounsel for Constellation Energy \nGeneration, LLC \n \nApril 23, 2025"},{"page":110,"startToken":36255,"endToken":36340,"text":"110 \nCERTIFICATE OF SERVICE \nI hereby certify that I have on this 23rd day of April, 2025, caused to be served a copy of \nthe foregoing upon all parties on the service list in these proceedings in accordance with the \nrequirements of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. \n§ 385.2010 (2024). \n \n/s/ Kevin W. Hivick \n \n \n \n \n \n \n \nKevin W. Hivick \nKirkland & Ellis LLP \n \n \n \n \n \n \n \n1301 Pennsylvania Ave., N.W. \n \n \n \n \n \n \n \nWashington, D.C. 20004 \n \n \n \n \n \n \n \nTel: (202) 389-3514 \n \n \n \n \n \n \n \nKevin.Hivick@kirkland.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":3,"startToken":0,"endToken":278},{"p":2,"at":3,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":2,"endAt":535,"startToken":278,"endToken":305},{"p":2,"at":535,"title":"A. Ensuring the Prompt Connection of Data Centers Is Imperative to America’s","method":"printed heading","endPage":2,"endAt":729,"startToken":305,"endToken":323},{"p":2,"at":729,"title":"B. Limiting Large New Load to NITS Imposes Billions of Dollars of Unnecessary","method":"printed heading","endPage":2,"endAt":941,"startToken":323,"endToken":339},{"p":2,"at":941,"title":"C. Requiring Co-Located Loads to Always Take NITS Unduly Limits State Jurisdiction","method":"printed heading","endPage":2,"endAt":1858,"startToken":339,"endToken":429},{"p":2,"at":1858,"title":"E. No Party Has Demonstrated That a NITS-Only Approach Is Just and Reasonable and","method":"printed heading","endPage":2,"endAt":3148,"startToken":429,"endToken":554},{"p":2,"at":3148,"title":"C. The Commission Should Adopt Constellation’s Proposed Replacement Rates or,","method":"printed heading","endPage":3,"endAt":3,"startToken":554,"endToken":582},{"p":3,"at":3,"title":"EXECUTIVE SUMMARY","method":"printed heading","endPage":15,"endAt":979,"startToken":582,"endToken":5051},{"p":15,"at":979,"title":"A. Ensuring the Prompt Connection of Data Centers Is Imperative to America’s","method":"printed heading","endPage":19,"endAt":1063,"startToken":5051,"endToken":6481},{"p":19,"at":1063,"title":"B. Limiting Large New Load to NITS Imposes Billions of Dollars of Unnecessary","method":"printed heading","endPage":26,"endAt":871,"startToken":6481,"endToken":8363},{"p":26,"at":871,"title":"C. Requiring Co-Located Loads to Always Take NITS Unduly Limits State","method":"printed heading","endPage":28,"endAt":941,"startToken":8363,"endToken":9266},{"p":28,"at":941,"title":"D. Requiring All Large New Load to Take NITS Violates Rate Design Principles.","method":"printed heading","endPage":35,"endAt":4,"startToken":9266,"endToken":11549},{"p":35,"at":4,"title":"E. No Party Has Demonstrated That a NITS-Only Approach Is Just and Reasonable","method":"printed heading","endPage":36,"endAt":1246,"startToken":11549,"endToken":12055},{"p":36,"at":1246,"title":"A. PJM’s Proposed Options Are the Foundation for Just and Reasonable Rates.","method":"printed heading","endPage":58,"endAt":1104,"startToken":12055,"endToken":18900},{"p":58,"at":1104,"title":"B. Co-Location Has No Difference in Effect on Resource Adequacy.","method":"printed heading","endPage":64,"endAt":4,"startToken":18900,"endToken":20909},{"p":64,"at":4,"title":"C. The Commission Should Adopt Constellation’s Proposed Replacement Rates or,","method":"printed heading","endPage":108,"endAt":610,"startToken":20909,"endToken":35805},{"p":108,"at":610,"title":"CONCLUSION","method":"printed heading","endPage":110,"endAt":5,"startToken":35805,"endToken":36256},{"p":110,"at":5,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":110,"endAt":560,"startToken":36256,"endToken":36340}]}