{"document":{"slug":"rec-20250423-5263","title":"Comments of Natural Resources Defense Council in response to FERC's 02/20/2025 Order and PJM Interconnection, L.L.C.'s 03/24/2025 Answer","issued":"2025-04-23","accession":"20250423-5263","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Natural Resources Defense Council","kind":"answer","file":"sources/filings/text/20250423-5263_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5263","tier":"record","sha256":"5ad73a6c1fc554ff0740aaf80f3ddadb9f219ec060c94c201e810f917c20cc46","pages":11,"tokens":2670,"emptyPages":[],"textThemes":["colo","flex","registry","cost"]},"pages":[{"page":1,"startToken":0,"endToken":145,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n) \n \nPJM Interconnection, L.L.C. et. al. \n) \nDocket Nos. ER25-49-000 \n \n) \n \n \n \n \n \n) \n \nLarge Loads Co-Located at  \nGenerating Facilities \n) \n) \nAD24-11-000 \n \n) \n \n \n \n \n \n) \n \nConstellation Energy Generation, LLC \n) \n \nv. \n) \nEL14-20-000 (Consolidated) \nPJM Interconnection, L.L.C. \n) \n \n \n) \n \n \nCOMMENTS OF NATURAL RESOURCES DEFENSE COUNCIL  \nPursuant to Rule 211 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission (“the Commission” or “FERC”),1 the Natural Resources Defense \nCouncil (“NRDC”) respectfully submits these Comments in response to the Commission’s \nFebruary 20, 2025 order2 and PJM’s March 24, 2025 Answer.3 \n \n \n \n1 18 C.F.R. §§ 385.211. \n2 Order Instituting Proceeding Under Section 206 of the Federal Power Act and Consolidating with Other \nProceedings, 190 FERC ¶ 61,115 (2025), (“Order”). \n3 Answer of PJM Interconnection, L.L.C., Docket Nos. ER25-712-000 et. al., (March 24, 2025), Accession No. \n20250324-5313, (“PJM Answer”)."},{"page":2,"startToken":145,"endToken":406,"text":"2 \n \n \nI. \nINTRODUCTION \nIn most aspects, NRDC agrees with the conclusions in the PJM Answer: the jurisdictional \nframework suggested by the Commission in the Order is correct; co-located loads’ use of the \ntransmission system and wholesale services is a function of the specific configuration; co-located \nloads are best addressed by fitting them into existing market structures.  However, in some areas \nPJM’s Answer appears to suggest unduly preferential treatment for co-located loads or their \nassociated generation, and the Answer also misses several specific issues that if left unaddressed \ncould lead to unjust cost shifting or reliability violations. \nII. \nCOMMENTS \nA. \nCo-Located Load Remains Retail Load and is Unambiguously Under State \nJurisdiction \nWe join OPSI in requesting the Commission affirm that the sale between co-located load \nand the generator is a retail sale subject to state jurisdiction.4 We agree with the Commission’s \nstatement in the Order that: \n[U]nder the FPA, the states get to determine which entities are \nlegally permitted to provide electricity to retail customers in co-\nlocation arrangements. The states also get to determine how the \nwholesale costs of providing electricity to those retail customers are \n \n4 Post-Technical Conference Comments of the Organization of PJM States, Inc., Docket No. AD24-11-000, at 4 \n(Dec. 9, 2024), Accession No. 20241209-5086; see also Comments of the Organization of PJM States, Inc., Docket \nNos. EL25-49-000 et. al., at 5 (April 23, 2025), Accession No. 20250423-5159. Certain aspects of PURPA \nQualifying Facilities (18 C.F.R. § 292) are subject to federal regulation, which would extend to co-located \ngeneration that is also a Qualifying Facility."},{"page":3,"startToken":406,"endToken":698,"text":"3 \n \nrecovered through retail rates. That is true irrespective of where the \nload interconnects…5 \nPJM’s Answer presents several examples where state law does not regulate co-located \nloads.6 None of these call the basic premises above into question, as they all represent cases \nwhere states have chosen not to exercise authority—in none of them is there any indication that a \nstate legislature could not opt to exercise jurisdiction should they choose. While PJM correctly \npoints out that there may be places states currently decline to exercise their authority, that does \nnot alter the bright line boundary of FERC jurisdiction as set out in the Order. \nB. \nCertain Proposals in the PJM Answer Would Result in Unduly Preferential \nTreatment \n1. \nCreating an expedited interconnection process for generation dedicated to \nco-located loads is unduly discriminatory. \nThe PJM Answer proposes one option in which co-located load elects to be network load \nand bring its own generation—either in the form of new generation or arrangements with \nexisting generation that has or is scheduled to deactivate. PJM envisions that one way this option \ncould be facilitated is through “a potentially faster interconnection path for generation resources \nsupporting co-located loads.”7 This would entail a further erosion of open access principles \nbeyond those recently approved by FERC as the Reliability Resource Initiative (“RRI”). \nIn their concurrence to the RRI Order, Commissioners Phillips and Rosner noted that \nthey accepted RRI because “it is a one-time, extraordinary measure.”8 If FERC were to approve \n \n5 Order at P 69. \n6 PJM Answer at 27-29 \n7 PJM Answer at 17. \n8 Order Accepting Tariff Revisions re PJM Interconnection, L.L.C., 190 FERC ¶ 61,084, (February 11, 2025) \n(Rosner and Phillips, Comm’rs, concurring at P 1) (“RRI Order”)."},{"page":4,"startToken":698,"endToken":963,"text":"4 \n \nexpedited interconnection for the purposes of serving co-located loads, it would be abandoning \nthat bright line for waiving FERC’s “longstanding principle of nondiscriminatory open access,” \nrisking “seriously undermin[ing] confidence in Commission-jurisdictional electricity markets.”9 \nRather than a one-time exception in response to an extraordinary reliability issue, special \ntreatment of generation serving co-located load would be a routine process that is predicated on a \ndetermination of which load additions justify special treatment for associated generation. This \nwould place PJM and the Commission in the position of deciding what types of load growth \nenjoy priority access to the transmission system. This would potentially put FERC in the middle \nof state decisions on issues such as electrification or data center development. For these reasons, \nthe Commission should be deeply skeptical of any proposal along these lines. \nIt may be that PJM’s goals could be reached through enhancements to provisional \ninterconnection service, as PJM acknowledges.10 If carefully designed, such an approach might \nbe non-discriminatory. However, it would require tailored rules to ensure that all generation \nreceives the same opportunities to serve load while under provisional interconnection. We \nsubmit that allowing such arrangements based solely on the existence of an arrangement between \nthe generator and a load or load serving entity would be unduly discriminatory, as it would \ncontradict many years’ precedent supporting equal access for merchant and utility-affiliated \ngeneration. Most likely, a non-discriminatory solution would require wide-ranging changes to \nPJM’s deliverability requirements for capacity resources. \n \n9 Concurrence of Commissioners Rosner and Phillips, in 18 C.F.R. §§ 385.211, P 6. \n10 PJM Answer at 17."},{"page":5,"startToken":963,"endToken":1340,"text":"5 \n \n2. \nTo avoid undue discrimination, flexibility of co-located loads must be \ntreated on the same terms as any other demand response. \nRecent work has highlighted that flexibility on the part of large loads can dramatically \nreduce their impact on system reliability.11 Reflecting this, the PJM Answer includes an option \nfor a new non-capacity backed service offering.12 Essentially, PJM proposes offering \ninterruptible service to co-located loads. \nHowever, PJM already has an interruptible service offering, in the form of its existing \nand well-developed demand response rules. Demand response in PJM’s capacity market is, at its \ncore, a mechanism for customers to specify the price at which they are willing to designate a \nportion of their load as interruptible, along with detailed provisions for measuring and enforcing \ncompliance with commitments to take interruptible service. PJM also offers a little-used Price \nResponsive Demand product that enables load serving entities to reduce their capacity \nobligations to reflect load that is automatically curtailed based on market conditions.13 \nThe proposed non-capacity backed service would simply be a new third type of demand \nresponse. That is a perilous path, as it would be difficult to design such a product that did not \namount to being simply an unduly preferential method for favored loads to provide demand \nresponse. For example, most load resources in PJM cannot offset their full capacity charge even \nif they commit to dropping to zero consumption on request,14 but PJM’s proposed non-capacity \n \n11 Norris, Tyler, Timothy Profeta, Dalia Patino-Echeverri and Adam Cowie-Haskell, Rethinking Load Growth: \nAssessing the Potential for Integration of Large Flexible Loads in US Power Systems, (2025). Available at \nhttps://hdl.handle.net/10161/32077.  \n12 PJM Answer at 18. \n13 See PJM Manual 18: PJM Capacity Market, Section 4.3 (demand response) and Section 3A (Price Responsive \nDemand), available at https://www.pjm.com/pjmfiles/directory/manuals/m18/index.html#about.html \n14 Demand Response winter capacity values are determined using a separate baseline from the load’s capacity \nobligation, so a resource can only offset its winter capacity charges if its winter consumption is higher than its \nsummer coincident peak hour consumption. See PJM Manual 19: Load Forecasting and Analysis, Attachment A, \navailable at https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf"},{"page":6,"startToken":1340,"endToken":1605,"text":"6 \n \nservice would allow just that. Even if the product was designed to be non-discriminatory, adding \na new demand response method would require maintenance of a parallel set of market rules. If \nthe history of demand response is any indication, it would likely take several iterations over \nmany years before all the kinks were worked out of such a product. In the best case, it would \ncause redundant and error-prone work to maintain rules that duplicate existing demand response \nproducts. \nThe region would be much better served by allowing co-located loads to represent their \nflexibility through the existing demand response products. If shortcomings are identified in those \nproducts that prevent realization of the full value of co-located load flexibility, they should be \nremedied in the existing products so that all flexible load has non-discriminatory opportunity to \navoid capacity costs. \nPJM’s discussion of this option reveals shortcomings in how demand response is treated \nin planning. Currently, PJM’s transmission planning simply assumes that the amount of demand \nresponse on the system will remain constant. Straightforward improvements to this unreasonable \nassumption would be appropriate and potentially avoid large unnecessary costs. Currently, \nutilities notify PJM of expected future large loads, which PJM then treats as adjustments to load \nforecasts. There seems to be no barrier to allowing the utilities, or the loads themselves, to also \nprovide PJM with information about the future loads’ demand response capability as part of this \nsame process. That would enable PJM’s planning to properly consider benefits from load \nflexibility, realizing the same value as the proposed non-capacity backed service without creating \na new product."},{"page":7,"startToken":1605,"endToken":1956,"text":"7 \n \nC. \nThe PJM Answer Fails to Address Important Planning and Reliability Issues \n1. \nCo-located loads that rely on the wholesale grid for backup create a need \nfor capacity that is not adequately captured under PJM’s Tariff. \nThe PJM Answer presents options where a co-located, non-network load is primarily \nserved by its own generator but may draw upon PJM when needed.15 Under current rules, such \nload would generally have no capacity obligation, provided that the on-site generation was \nrunning during the coincident peak hours PJM uses to allocate capacity costs. If done at scale \nthis will create a reliability gap: when the co-located load’s generator is off-line, PJM will have \nload that it has not procured capacity for. Should this occur during a time of system stress, \nreliability may be threatened. This is a matter of particular concern because of the prominence of \ncorrelated or common-mode generator outages in recent reliability events. If outages of the \ngenerator serving the co-located load are correlated with outages of PJM’s fleet generally, PJM \nruns a risk of seeing an unplanned for increase in load just when supply is falling short. \nIt is well established that utilities may charge for on-demand backup power service.16 \nHowever, PJM’s tariff currently contains no provisions for this. To maintain reliability, capacity \nmust be procured for any significant load with the possibility of withdrawing from PJM’s grid \nduring emergencies, such as would occur for a co-located load if the associated generator fails.  \nLarge loads that use backup generators may be somewhat similarly situated to co-located \nloads in this respect, provided that they use their generators to reduce load during coincident \npeaks. In this case, capacity is procured for those loads,17 but the peak shaving load is not \nallocated a share of capacity costs. Since PJM procures capacity based on these loads’ full year \n \n15 Option 5 and Option 4 in the case where the proception system fails. See PJM Answer at 13-15. \n16 See, e.g., 18 CFR § 292.305(b)(ii). \n17 PJM’s IRM requirements are determined based on full load history, not only coincident peaks."},{"page":8,"startToken":1956,"endToken":2245,"text":"8 \n \nconsumption profile, but only bills them based on their reduced consumption during coincident \npeak hours, this shifts costs from the peak shaver to other customers. While this is a long-\nstanding practice, the cost shifts will become significantly larger if data centers interconnect and \npeak shave at the scale currently envisioned.  \nFollowing PJM’s shift to marginal ELCC accreditation,18 PJM’s coincident-peak based \ncost allocation became largely untethered to actual cost causation. Because of changing system \nconditions, peak risk hours, and thus the drivers of the need for capacity, are no longer the hours \nof peak load. At the time, the Commission declined to address that issue. As large loads with the \nability to peak shave grow, the unintended cost shifts resulting from not updating the capacity \ncost allocation method to match cost causation will grow. \n2. \nCosts incurred on the basis of utility speculation of future loads may not \nbe allocated to other utilities. \n This Section 206 proceeding raises very important issues, but NRDC also urges the \nCommission to be proactive in addressing the other ways in which PJM’s tariff and planning \nprocedures need to be updated to the reflect the marked load growth—predominantly driven by \ndata center development—currently being experienced across its footprint. Specifically, PJM \nshould explore increasing the certainty and discipline in its load forecasting methodologies with \nrespect to new large loads. Accurate load forecasts are essential to inform PJM’s transmission \nplanning, interconnection procedures, and investment decisions by existing and new generation, \nstorage, and demand response resources. Inflated load forecasts could drive a potential costly \noverbuild of the system that would ultimately be paid for by other rate classes other than these \n \n18 Order Accepting Tariff Revisions, 186 FERC ¶ 61,080 (February 11, 2024)."},{"page":9,"startToken":2245,"endToken":2476,"text":"9 \n \nlarge new loads. Many utilities within PJM have already either proposed or finalized tariffs via \nstate utility commission proceedings that require large loads above a certain MW threshold to \nprovide a significant financial commitment upfront to its load serving entity or electric \ndistribution company in order to be included in their respective load forecasts.19 PJM’s load \nforecast methodology should distinguish between large load adjustments that are backed by \nsignificant financial commitments from those that are not; including only the former in load \nforecasts will minimize the impact of speculative data center projects on consumers, and improve \ntransmission and resource planning.   We urge the Commission to examine the extent to which \nRTO load forecasts apply appropriate rigor to exclude speculative data center projects, through \nthe Commission’s recently opened AD25-7 proceeding on Meeting the Challenge of Resource \nAdequacy in Regional Transmission Organization and Independent System Operator Regions, \nand other venues.  \n \n \n \n19 There are many examples of this approach, including the Indiana Michigan Power Large Load Settlement \n(February 2025), available at https://www.indianamichiganpower.com/company/news/view?releaseID=10036; an \nAEP Ohio tariff filing (May 2024), available at https://www.aepohio.com/company/news/view?releaseID=9539; an \nAppalachian Company tariff filing (March 2025), available at  \nhttps://www.scc.virginia.gov/docketsearch/DOCS/84hh01!.PDF; and a filing by Dominion available at \nhttps://www.scc.virginia.gov/docketsearch/DOCS/84sc01!.PDF."},{"page":10,"startToken":2476,"endToken":2600,"text":"10 \n \nIII. \nCONCLUSION \nNRDC respectfully requests the Commission consider these comments in determining \nwhat reforms to PJM rules are necessary to accommodate co-location and large loads.  NRDC \nspecifically emphasizes the importance of avoiding special treatment in regards to \ninterconnection, demand response opportunities, and planning. \n \nDATED April 23, 2025 \nRespectfully submitted, \n \n/s/ Thomas Rutigliano  \nThomas Rutigliano  \nSenior Advocate, Sustainable FERC Project  \nNatural Resources Defense Council  \n1125 15th Street NW, Suite 300  \nWashington DC, 20005  \ntrutigliano@nrdc.org  \n \n/s/ Claire Lang-Ree  \nClaire Lang-Ree  \nAdvocate, Sustainable FERC Project  \nNatural Resources Defense Council  \n40 W 20th St.  \nNew York, NY, 11216  \nclangree@nrdc.org  \n \n \n/s/ Jackson Morris  \nJackson Morris  \nDirector, State Power Sector  \nNatural Resources Defense Council  \n40 West 20th St,  \nNew York, NY, 10011  \njmorris@nrdc.org"},{"page":11,"startToken":2600,"endToken":2670,"text":"11 \n \nCERTIFICATE OF SERVICE  \nI hereby certify that the foregoing has been or soon will be served in accordance with 18 \nC.F.R. § 385.2010 upon each party designated in the official service list compiled by the \nSecretary in this proceeding, by email. \n \n/s/ Thomas Rutigliano  \nThomas Rutigliano  \nSenior Advocate, Sustainable FERC Project  \nNatural Resources Defense Council  \n1125 15th Street NW, Suite 300  \nWashington DC, 20005  \ntrutigliano@nrdc.org"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":7,"startToken":0,"endToken":146},{"p":2,"at":7,"title":"I. INTRODUCTION","method":"printed heading","endPage":2,"endAt":662,"startToken":146,"endToken":241},{"p":2,"at":662,"title":"II. COMMENTS","method":"printed heading","endPage":2,"endAt":677,"startToken":241,"endToken":243},{"p":2,"at":677,"title":"A. Co-Located Load Remains Retail Load and is Unambiguously Under State","method":"printed heading","endPage":3,"endAt":660,"startToken":243,"endToken":513},{"p":3,"at":660,"title":"B. Certain Proposals in the PJM Answer Would Result in Unduly Preferential","method":"printed heading","endPage":7,"endAt":5,"startToken":513,"endToken":1606},{"p":7,"at":5,"title":"C. The PJM Answer Fails to Address Important Planning and Reliability Issues","method":"printed heading","endPage":10,"endAt":6,"startToken":1606,"endToken":2477},{"p":10,"at":6,"title":"III. CONCLUSION","method":"printed heading","endPage":11,"endAt":6,"startToken":2477,"endToken":2601},{"p":11,"at":6,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":11,"endAt":456,"startToken":2601,"endToken":2670}]}