{"document":{"slug":"rec-20250423-5264","title":"Comments of Business Council for Sustainable Energy in response to FERC's 02/21/2025 Notice of Institution of Section 206 Proceeding and Refund Effectives Dates","issued":"2025-04-23","accession":"20250423-5264","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Business Council for Sustainable Energy","kind":"comments","file":"sources/filings/text/20250423-5264_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250423-5264","tier":"record","sha256":"fe32b95826a1f3e9fb6f50b668af33b7c6791d958eba2a2fc7319ba77994ff0d","pages":5,"tokens":954,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":205,"text":"UNITED STATES OF AMERICA \nBEFORE THE \n \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nPJM Interconnection, L.L.C. et al. \n) \n) \n) \n \nDocket No. EL25-49-000 \n \n \nLarge Loads Co-Located at Generating Facilities \n) \n) \n) \n \nDocket No. AD24-11-000 \n \nConstellation Energy Generation, LLC \nComplainant, \n     v. \nPJM Interconnection, L.L.C. \nRespondent. \n)\n)\n)\n)\n)\n) \n \n \n \nDocket No. EL25-49-000 \n \n \n \nCOMMENTS OF THE \nBUSINESS COUNCIL FOR SUSTAINABLE ENERGY \nPursuant to Rules 212 and 213 of the Federal Energy Regulatory Commission’s (the \n“Commission” or “FERC”) Rules of Practice and Procedure,1 and pursuant to the Commission’s \nFebruary 21, 2025 Notice of Institution of Section 206 Proceeding and Refund Effective Dates2 \nissued in the referenced proceedings, the Business Council for Sustainable Energy (“BCSE” or \n“Coalition”) respectfully submits the following comments.  \nBCSE is a coalition of companies and trade associations from the energy efficiency, \nnatural gas, and renewable energy sectors, and also includes independent electric power \nproducers, investor-owned utilities, public power, industrial manufacturers, commercial end-\nusers, and energy and environmental service companies.  BCSE was founded in 1992, and \nadvocates for policies at state, national and international levels that increase the use of \n \n1  \n18 C.F.R. §§ 385.212, 385.213 (2024). \n2  \nNotice of Institution of Section 206 Proceeding and Refund Effective Dates, Docket Nos. EL25-49-000, \nAD24-11-000, EL25-20-000 (consolidated) (issued February 21, 2025)."},{"page":2,"startToken":205,"endToken":519,"text":"2 \ncommercially-available clean energy technologies, products and services.  The coalition’s \ndiverse business membership is united around realizing a vibrant and competitive U.S. economy \nand the creation of a secure, affordable and sustainable energy future for the country.3   \nBCSE supports FERC taking action as soon as is practicable to address the issues related \nto the co-location of large loads and encourages FERC and PJM to consider the specific issues in \nthis context of energy reliability, resource adequacy, implications for energy costs, as well as \ninfrastructure and transmission planning.   \nI. SUMMARY  \nBCSE recognizes that co-location load arrangements are becoming increasingly common \nin PJM and this occurrence raises various planning, cost and market design issues. However, \nmeeting this new load quickly and affordably is critical. Load growth is being driven by several \nfactors, including expansion of data centers, artificial intelligence, and domestic manufacturing \nreasons – all of which are important to national security and the modernization of the U.S. \nenergy system. There are supply side and demand side solutions available to address this load \ngrowth, and updated market rules are needed that can support this new load.  The Commission \nshould work as quickly as possible to provide direction, and resolve issues related to serving \nlarge loads. \nIn reviewing the various FERC issues considered as part of the November 1, 2024 \nTechnical Conference and the Post-Technical Conference Comment submissions, BCSE \nprovides an important resource for the Commission’s consideration, Rethinking Load Growth: \nAssessing the Potential for Integration of Large Flexible Loads in US Power Systems, published \n \n3 More information about BCSE is available at: www.bcse.org.  As BCSE is a diverse coalition, not all BCSE \nmembers endorse or take positions on the issues included in these comments.  The comments contained in this filing \nrepresent the position of BCSE as an organization, but not necessarily the view of any particular member with \nrespect to any specific issue."},{"page":3,"startToken":519,"endToken":753,"text":"3 \nin February 2025 by Duke University’s Nicholas Institute for Energy, Environment & \nSustainability. \n \nII.   BCSE PERSPECTIVES \nBCSE is a diverse coalition of organizations from all parts of the energy industry. While \nindividual BCSE members have filed comments in this proceeding reflecting specific \nperspectives, BCSE offers the following comments in response to the Commission’s Show \nCause order: \n- \nBCSE appreciates the consideration of the broad set of issues related to load growth \nand co-location of large loads into the U.S. energy system. BCSE’s 2025 Sustainable \nEnergy in America Factbook4 provides data on load growth in 2024 in PJM and \nERCOT specifically, and contrasts this data with trends in electricity demand over the \npast several decades.  \n- \nBCSE recognizes that load growth of all sizes is being driven by several factors, \nincluding expansion of data centers, artificial intelligence, and domestic \nmanufacturing – all of which are important to national security, economic \ncompetitiveness and the modernization of the U.S. energy system. \n- \nThere are supply-side and demand-side energy solutions available to meet this new \ndemand. Critical to making these solutions available and to lowering costs is the need \nto update the relevant market rules, and to make these updates as quickly as possible.  \n- \nFERC should work as quickly as possible to provide direction and resolve issues \nrelated to large loads. \n \n4 Business Council for Sustainable Energy, BloombergNEF, 2025 Sustainable Energy in America Factbook, \nFebruary 2025, www.bcse.org/factbook"},{"page":4,"startToken":753,"endToken":894,"text":"4 \n- \nIn considering updates to market rules, FERC should note the following resource: \no Rethinking Load Growth: Assessing the Potential for Integration of Large \nFlexible Loads in US Power Systems,5 published in February 2025 by Duke \nUniversity’s Nicholas Institute for Energy, Environment & Sustainability. \n \nV. CONCLUSION \nBCSE thanks the Commission for its consideration of these important issues and requests \nthat the Commission consider these comments in the development of its decisions on co-location \nof large loads. \n \n \n \n \nRespectfully submitted, \n                                                                           \n \n    /s/ \n \n \n \n \n \n \n \n \n \n \n5 Duke University’s Nicholas Institute for Energy, Environment & Sustainability, Rethinking Load Growth: Assessing the \nPotential for Integration of Large Flexible Loads, February 2025, www.nicholasinstitute.duke.edu/publications \nLisa Jacobson \nPresident \nBusiness Council for Sustainable Energy \n805 15th Street, NW, Suite 710 \nWashington, DC 20005 \nTel: (202) 785-0507   \nFax: (202) 785-0514  \nEmail:  ljacobson@bcse.org \n             www.bcse.org \n \nDate: April 23, 2025"},{"page":5,"startToken":894,"endToken":954,"text":"5 \nCERTIFICATE OF SERVICE \n \n \nThe undersigned certifies that a copy of this pleading has been served this day upon each \nperson designated on the official service list compiled by the Secretary in this proceeding. \n \nDated at Washington, DC this 23h day of April, 2025. \n \nLisa Jacobson \nBusiness Council for Sustainable Energy \n805 15th Street, NW, Suite 710 \nWashington, DC 20005"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":612,"startToken":0,"endToken":294},{"p":2,"at":612,"title":"I. SUMMARY","method":"printed heading","endPage":3,"endAt":106,"startToken":294,"endToken":532},{"p":3,"at":106,"title":"II. BCSE PERSPECTIVES","method":"printed heading","endPage":4,"endAt":314,"startToken":532,"endToken":797},{"p":4,"at":314,"title":"V. CONCLUSION","method":"printed heading","endPage":5,"endAt":3,"startToken":797,"endToken":895},{"p":5,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":5,"endAt":382,"startToken":895,"endToken":954}]}
