{"document":{"slug":"rec-20250424-5211","title":"Comments of Center for Biological Diversity","issued":"2025-04-24","accession":"20250424-5211","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Center for Biological Diversity","kind":"comments","file":"sources/filings/text/20250424-5211_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250424-5211","tier":"record","sha256":"485691b11b3887a117b8d6d6154d6a6b25b7e947dbcc88d52e6ccecba13bc47b","pages":35,"tokens":10846,"emptyPages":[],"textThemes":["colo","flex","study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":26,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n) \nPJM Interconnection, L.L.C., et al. \n \n)  Docket No. EL-25-49-000 \n) \nCOMMENTS OF CENTER FOR BIOLOGICAL DIVERSITY"},{"page":2,"startToken":26,"endToken":270,"text":"2 \n \nTABLE OF CONTENTS \n \nI. \nTHRESHOLD ISSUES THE COMMISSION SHOULD CONSIDER IN ADDRESSING \nTHE MATTERS RAISED IN THIS PROCEEDING \n \nA. The Commission Should Consider The Environmental Implications Of Any Tariff \nThat Encourages The Growth Of Data Centers And Other Large Load Facilities \n \n1. Data Centers And Cryptomining Threaten The Climate  \n \n2. These Facilities Also Have Numerous Other Adverse Environmental Impacts \n \nB. The Commission Should Maximize Opportunities For These Facilities To Facilitate \nRenewable Energy Alternatives \n \n1. These Facilities Can Help Address Load Demand Issues Through Demand \nResponse and Load Flexibility Programs \n \n2. FERC Should Encourage Renewable Energy to Power These Facilities \n \nII. \nCENTER COMMENTS ON THE COMMISSION'S QUESTIONS \n \nA. Any Tariff Or Other Regulations Must Protect Consumers From Allowing Private \nCorporations To Shift The Cost Of These Facilities To Ratepayers  \n \n1. There Should Be Restrictions On Special Contracts Allowing Utilities to Take \nAdvantage of Opaque Accounting Practices to Pass on the Costs of Supplying \nPower to High-energy Using Customers \n \n2. Appropriate Oversight Of Cost Allocation Formulas Is Necessary To Protect \nAgainst Ratepayers Being Improperly Charged For Infrastructure Costs to \nSupport These Facilities \n \n3. The Commission Must Also Help Ensure That Co-location Arrangements Do \nNot Increase Wholesale Prices And Distort Electricity Delivery Rates \n \nB. FERC Should Not Leave Any Regulatory Gaps For These Facilities \n \nADDENDUM \n \nA. The Climate Crisis is an Emergency Requiring Urgent Action to Reduce Greenhouse \nGases from the Power Sector \n \nB. The Commission has a Mandate to Facilitate The Nation's Clean Energy Transition"},{"page":3,"startToken":270,"endToken":504,"text":"3 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n) \nPJM Interconnection, L.L.C., et al. \n \n)  Docket No. EL-25-49-000 \n) \nCOMMENTS OF CENTER FOR BIOLOGICAL DIVERSITY \nINTRODUCTION \nPursuant to the Federal Energy Regulatory Commission’s (“Commission”) February 20, \n2025 Order (“Order”), the Center for Biological Diversity (“Center”) submits the following \nresponse to the parties’ March 24, 2025 filings. Feb. 20, 2025 Order at 57. The Center \nappreciates the opportunity to comment on the Commission’s Order Instituting Proceeding \nconcerning co-location of large loads at generating facilities. The Center is a national, non-profit \nconservation organization with more than 1.8 million members and online activists who care \nabout the country’s urgent need to expedite the renewable energy transition and protect human \nhealth, the natural environment, and species from the ravages of the climate emergency, \nextinction crisis, and environmental degradation.  \nAs discussed below, in addressing the energy needs of data centers and other large load \nfacilities that are rapidly proliferating across the country, it is vital that the Commission address \nboth the challenges and opportunities these facilities provide. Regarding challenges, to fulfill its \nstatutory obligations—as detailed in the Addendum below—it is critical that the Commission \ntake into account the environmental implications of these facilities, including both the climate \nchange threats they pose and their other environmental impacts. As for opportunities, the \nCommission should consider how these facilities can help address grid and load needs through"},{"page":4,"startToken":504,"endToken":789,"text":"4 \n \ndemand response and load flexibility, and how to maximize reliance on renewable energy to \naddress the facilities’ energy demand needs. \nIn addition, the Center also offers comments below more specifically addressing the \nissues raised in the Commission’s Order and initial comments. First, our comments detail steps \nthe Commission should take to ensure that any tariff or other measures protect consumers from \nbeing forced to subsidize data centers and related facility and infrastructure costs that should be \nborne by private corporations benefiting from these expenditures. Second, we address the issue \nof ensuring these facilities do not escape regulation by being mischaracterized as either behind-\nthe-meter or offline. At bottom, the Commission must ensure that these facilities—and the load \ngrowth the facilities are bringing to the Nation’s energy system—is both fair to consumers and \nconsistent with FERC’s statutory mandates. \nDISCUSSION \nI. \nThreshold Issues the Commission Should Consider in Addressing the Matters \nRaised in This Proceeding. \n \nA. The Commission Should Consider the Environmental Implications of Any Tariff \nThat Encourages the Growth of Data Centers and Other Large Load Facilities. \nAs reflected in the comments already in the record, the growth of data centers for \nArtificial Intelligence (“AI”) and other purposes, as well as of cryptomining facilities, are key \ndrivers of the effort towards co-location arrangements. Before turning to the Commission’s \nspecific questions, therefore, it is vital to address the risks data centers and cryptomining \nfacilities pose to the climate and the environment.1 \n \n \n1  Our Addendum to these comments below details the climate emergency and urgent need to curb fossil-fuel energy \ngeneration to mitigate the climate emergency’s worst impacts, as well as the Commission’s statutory responsibility \nto take these matters into account in its decision-making."},{"page":5,"startToken":789,"endToken":1006,"text":"5 \n \n \n1. Data Centers and Cryptomining Threaten the Climate. \n \nData centers, AI, and cryptomining facilities demand enormous amounts of energy, \nwhich is why they are prime candidates for co-locations arrangements. However, the load growth \nthese facilities are projected to bring is driving more fossil fuel generation, taking the Nation in \nthe completely wrong direction to address the climate emergency. The Commission has an \nobligation to take into consideration this strong connection between these facilities and fossil \nfuels as it considers appropriate regulatory structures. \na. \nData Centers, AI, and Crypto-Facilities Demand Seismic-Levels of \nEnergy. \n \nData centers are highly energy- and water-intensive. These facilities host vast computing \ninfrastructure—such as server racks, networking equipment, backup power systems, physical \nsecurity features, and advanced cooling technologies—to process massive amounts of data and \nsupport services like artificial intelligence, cryptocurrency mining, photo sharing, and video \nstreaming.  \nCloud Service Providers, largely owned and operated by major technology corporations, \ncurrently control approximately 67 percent of global cloud infrastructure.2 This dominance, \ncoupled with Big Tech’s strategic prioritization of the AI and cryptocurrency sectors, is fueling a \nrapid proliferation of conventional and AI-specific data centers, as well as cryptocurrency \nmining operations, across the United States. \n \n2 Slingerland, C., 13 Top Cloud Service Providers Globally In 2025, (July 18, 2024), \nhttps://www.cloudzero.com/blog/cloud-service-providers/."},{"page":6,"startToken":1006,"endToken":1366,"text":"6 \n \nAs of March 2025, the U.S. housed 5,426 recorded data centers.3 In 2023, these facilities \nconsumed 176 terawatt-hours (TWh) of electricity, or 4.4 percent of the country’s total \nelectricity use—more than the total energy consumption of Ohio in 2022.4 The energy demands \nof AI applications exacerbate this impact: while a conventional data center rack uses an average \nof 7 kilowatts (kW), AI data center racks can require up to 50 kW.5 In 2023, AI workloads \nrepresented about 20 percent of total data center capacity, and projections indicate a tenfold \nincrease in AI-related electricity consumption by 2026. 6 \nCryptocurrency mining (“cryptomining”), which employs energy-intensive \ncomputational systems in facilities like data centers to solve complex algorithms and extract \ndigital assets, represents perhaps the most egregious strain on America’s energy infrastructure. \nEven though less than 2 percent of U.S. residents are using cryptocurrency for transactions, \ncryptomining facilities can be even more energy-intensive than AI data centers. As of December \n2024, Bitcoin alone was estimated to consume 175.87 TWh annually—surpassing the total \nenergy use of Pakistan in 2023.7  \n \n \n3 Petroc, Taylor, Leading countries by number of data centers as of March 2025, Statista, (Mar. 21, 2025), \nhttps://www.statista.com/statistics/1228433/data-centers-worldwide-by-country/.  \n \n4 Shehabi, A., Smith, S.J., Hubbard, A., Newkirk, A., Lei, N., Siddik, M.A.B., Holecek, B., Koomey, J., Masanet, \nE., Sartor, D. 2024. 2024 United States Data Center Energy Usage Report. Lawrence Berkeley National Laboratory, \nBerkeley, California. LBNL-2001637; Electricity consumption in the United States 2022, by leading state, Statista \n(June 28, 2024), https://www.statista.com/statistics/560913/us-retail-electricity-consumption-by-major-state/.  \n \n5 Loten, A., AI-Ready Data Centers Are Poised for Fast Growth, Wall street Journal (Aug. 3, 2023), \nhttps://www.wsj.com/articles/ai-ready-data-centers-are-poised-for-fast-growth-fadae952. \n  \n6 Ramachandran, K., et al, As generative AI asks for more power, data centers seek more reliable, cleaner energy \nsolutions, Deloitte (Nov. 19, 2024), https://www2.deloitte.com/us/en/insights/industry/technology/technology-\nmedia-and-telecom-predictions/2025/genai-power-consumption-creates-need-for-more-sustainable-data-\ncenters.html.  \n \n7 De Best, R., Bitcoin energy consumption worldwide from February 2017 to February 3, 2025, Statista (Feb. 6, \n2025), https://www.statista.com/statistics/881472/worldwide-bitcoin-energy-consumption/."},{"page":7,"startToken":1366,"endToken":1685,"text":"7 \n \nb. \nData Centers, AI, and Crypto-Facilities’ Reliance on Climate-Killing \nFossil Fuels Is Driving Growth in the Fossil Fuel Power Sector. \n \nToday, data centers, artificial intelligence, and cryptocurrency operations predominantly \ndepend on energy sourced from fossil fuels, resulting in substantial emissions of carbon dioxide \n(CO₂) and other greenhouse gases. For example, each Bitcoin transaction is estimated to generate \napproximately 535 kilograms of CO₂, equivalent to the emissions from 1,186,233 VISA \ntransactions or 89,203 hours of video streaming on YouTube.8  \nThe immense electricity demand from data centers, AI, and cryptocurrency mining—\nlargely met by fossil-fueled energy—not only accelerates climate change but also drives the \ncontinued operation and revival of gas and coal power plants, posing serious environmental \nrisks. For instance, this year, Southern Company, a major U.S. utility, announced that it would be \nextending the operational lifespan of three coal plants in Georgia and Mississippi to address the \ngrowing energy demands of data centers.9 This decision permits the continued operation of a \ncombined 8.2 gigawatts (GW) of fossil fuel-based, environmentally harmful energy capacity.10  \n \nSimilarly, in February, NRG Energy Inc., GE Vernova, Inc., and The Industrial Company \nannounced their collaboration to build four new fossil gas power plants, totaling more than 5 \nGW, to provide energy to data centers supporting AI and GenAI operations in the ERCOT and \nPJM markets.11  \n \n8 Maceka, M., Bitcoin in 2025: 30+ Must-Know Stats on Market Growth, Adoption, & More, Website Planet (Feb. \n21, 2025), https://www.websiteplanet.com/blog/bitcoin-statistics/.  \n \n9 Skidmore, Z., Southern Company to extend life of three coal plants due to data center energy demand, Data Center \nDynamics (Feb. 22, 2025), https://www.datacenterdynamics.com/en/news/southern-company-to-extend-life-of-\nthree-coal-plants-due-to-data-center-energy-demand/. \n \n10 Id.  \n \n11 Press Release: NRG Energy, GE Vernova and Kiewit Accelerating New Generation Capacity to Support Demand \nGrowth, Business Wire (Feb. 26, 2025), https://www.businesswire.com/news/home/20250225753165/en/NRG-\nEnergy-GE-Vernova-and-Kiewit-Accelerating-New-Generation-Capacity-to-Support-Demand-Growth."},{"page":8,"startToken":1685,"endToken":1972,"text":"8 \n \nc. \nEnergy Demand from Data Centers, AI, and Crypto Is Projected to \nGrow Exponentially. \n \nThe energy footprint of these industries is expected to grow greatly in the coming years \nand decades, posing significant risks to the stability of the electric grid and potentially \nundermining national efforts to reduce greenhouse gas emissions. \nCurrent trend analysis shows that global demand for data center capacity could grow by \n19 to 27 percent annually through 2030, reaching as much as 171 to 298 GW per year by the end \nof the decade.12 This is a sharp increase from today’s estimated demand of 60 GW and signals \nthe risk of a major supply shortfall.13 Avoiding this gap will require building at least twice the \ntotal data center capacity constructed since 2000, but in less than a quarter of the time.14  \nThe demand for AI-compatible data center capacity alone is anticipated to grow at an \naverage annual rate of approximately 33 percent through 2030.15 By the end of the decade, it is \nprojected that roughly 70 percent of the total demand for data center capacity will be directed \ntoward facilities specifically designed to accommodate advanced artificial intelligence \nworkloads.16 Generative AI—currently the most rapidly expanding application of advanced AI—\nis expected to represent approximately 40 percent of the total demand.17 \n \n12 Srivathsan, B., et al., AI power: Expanding data center capacity to meet growing demand, McKinsey & Co. (Oct. \n29, 2024),  https://www.mckinsey.com/industries/technology-media-and-telecommunications/our-insights/ai-power-\nexpanding-data-center-capacity-to-meet-growing-demand#/. \n \n13 Srivathsan, B., et al., AI power: Expanding data center capacity to meet growing demand, McKinsey & Co. (Oct. \n29, 2024),  https://www.mckinsey.com/industries/technology-media-and-telecommunications/our-insights/ai-power-\nexpanding-data-center-capacity-to-meet-growing-demand#/. \n \n14 Id. \n \n15 Id. \n \n16 Id. \n \n17 Id."},{"page":9,"startToken":1972,"endToken":2258,"text":"9 \n \nProjections indicate that the cryptocurrency industry’s energy consumption in the United \nStates is on track to grow at an alarming rate over the next few years. By 2030, data centers—\nincluding those supporting cryptocurrency mining—could account for up to 9 percent of the \nnation’s total electricity use.18 In Texas alone, electricity demand is expected to nearly double, \nwith 60 percent of that growth attributed to cryptomining and data center expansion.19 Further, \nanalysts project that by the end of 2027, approximately 20 percent of the power capacity \ncurrently dedicated to Bitcoin mining will be repurposed for AI applications.20 This shift reflects \nthe evolving dynamics of the data center landscape, driven by technological advancements and \nmarket demands, while also highlighting the long-term, enduring nature of these investments. \nThe rapid expansion of digital infrastructure—propelled by corporate interests rather than \npublic need—is emerging as a major and accelerating driver of climate disruption. Energy-\nintensive data centers are straining power grids, increasing fossil fuel demand, and undermining \nglobal climate goals. Without urgent regulatory and policy action, this unchecked growth \nthreatens to lock in high-emissions systems for decades to come. \n \n \n \n \n18 Kearney, L., and Roy, M., AI's race for US energy butts up against bitcoin mining, Reuters (August 24, 2024), \nhttps://www.reuters.com/technology/artificial-intelligence/ais-race-us-energy-butts-up-against-bitcoin-mining-2024-\n08-28/?utm_source=chatgpt.com.  \n \n19 Hao, C., Texas lawmakers turn on cryptocurrency industry after learning of high power demand projections, \nHouston Chronicle (June 14, 2024), https://www.houstonchronicle.com/business/energy/article/texas-lawmakers-\nsour-bitcoin-mining-fearing-19508969.php.  \n \n20 Kearney, L., and Roy, M., AI's race for US energy butts up against bitcoin mining, Reuters (August 24, 2024), \nhttps://www.reuters.com/technology/artificial-intelligence/ais-race-us-energy-butts-up-against-bitcoin-mining-2024-\n08-28/?utm_source=chatgpt.com."},{"page":10,"startToken":2258,"endToken":2519,"text":"10 \n \n2. These Facilities Also Have Numerous Other Adverse Environmental \nImpacts. \n \nBeyond greenhouse gas emissions, data centers result in numerous adverse environmental \nimpacts, including impaired air quality, increased noise, high water demand, and harm to special-\nstatus species and habitat.  \nFirst, data centers degrade air quality in surrounding communities, largely due to diesel \nbackup generators. Since 2017, more than 1 GW of diesel-based energy—enough to power at \nleast 161,969 households for a year—has been approved as emergency power for California data \ncenters alone.21 These generators not only add to greenhouse gas impacts, but they harm public \nhealth through emitting nitrogen oxide and particulate matter. Researchers at UC Riverside and \nCaltech found that an increase in permits for diesel generators at data centers in Virginia since \n2023 may have resulted in 14,000 asthma symptom cases and caused as much as $300 million in \nhealth care costs.22 By 2030, researchers predict the health burdens of data centers could amount \nto $20 billion.23 \nSecond, data centers impact the environment through their massive water demand. A \nmid-sized data center consumes on average around 300,000 gallons of water a day, about as \n \n21 Capital & Main, California needs more data centers—but builders are using a legal loophole to power them with \ndiesel, Fast Company (Jan. 23, 2025), https://www.fastcompany.com/91265352/california-needs-more-data-centers-\nbut-builders-are-using-a-legal-loophole-to-power-them-with-diesel. \n \n22 Capital & Main, California needs more data centers—but builders are using a legal loophole to power them with \ndiesel, Fast Company (Jan. 23, 2025), https://www.fastcompany.com/91265352/california-needs-more-data-centers-\nbut-builders-are-using-a-legal-loophole-to-power-them-with-diesel. \n \n23 Id."},{"page":11,"startToken":2519,"endToken":2877,"text":"11 \n \nmuch as 1,000 U.S. households,24 while a large data center uses 1 to 5 million gallons per day.25 \nThis is because data centers produce a considerable amount of heat, requiring air conditioning to \ncool the servers or water for evaporative cooling.26 Indeed, data centers rank among the top 10 \nwater-consuming commercial industries in the United States.27 And with the advent of artificial \nintelligence, each year they require even more: Google’s data centers used 20 percent more water \nin 2022 than in 2021, while Microsoft’s water use rose by 34 percent.28 This high water demand \ndepletes nearby groundwater and disrupts local ecosystems. \nThird, data centers impact surrounding communities through constant noise, well \ndocumented by residents living near data centers throughout the United States.29 Data centers \ncreate noise through generators, cooling systems, and energy drawn from the power grid. Beyond \nsimply providing an annoyance, however, noise pollution is the second largest environmental \n \n24 Michael Copley, Data centers, backbone of the digital economy, face water scarcity and climate risk, NPR (Aug. \n30, 2022), https://www.npr.org/2022/08/30/1119938708/data-centers-backbone-of-the-digital-economy-face-water-\nscarcity-and-climate-risk. \n \n25 Shannon Osaka, A new front in the water wars: Your internet use, The Washington Post (April 25, 2023), \nhttps://www.washingtonpost.com/climate-environment/2023/04/25/data-centers-drought-water-use/. \n \n26 Id. \n \n27 M. Siddik, A. Shehabi, & L. Marston, The environmental footprint of data centers in the United States, IOP \n(2021), https://iopscience.iop.org/article/10.1088/1748-9326/abfba1. \n \n28 David Berreby, As Use of A.I. Soars, So Does the Energy and Water It Requires, Yale Environment 360 (Feb. 6, \n2024), https://e360.yale.edu/features/artificial-intelligence-climate-energy-emissions. \n \n29 Bianca Bosker, Why is everything getting louder, The Atlantic (Nov. 2019), \nhttps://www.theatlantic.com/magazine/archive/2019/11/the-end-of-silence/598366/; Peter Cary, Some cities \nsuffering from data center noise turn to tough limits, Prince William Times (Feb. 27, 2023), \nhttps://www.princewilliamtimes.com/news/some-cities-suffering-from-data-center-noise-turn-to-tough-\nlimits/article_2aa7fb8c-b6aa-11ed-8626-5738aae2f76c.html; Antonio Olivo, Northern Va. is the heart of the \ninternet. Not everyone is happy about that, The Washington Post (Feb. 10, 2023), \nhttps://www.washingtonpost.com/dc-md-va/2023/02/10/data-centers-northern-virginia-internet/."},{"page":12,"startToken":2877,"endToken":3289,"text":"12 \n \ncause of health problems, just after air pollution.30 Large-scale studies show that noise exposure \nincreases the risk of high blood pressure, type 2 diabetes, coronary heart disease, and heart \nattacks, as well as strokes, diabetes, dementia, sleep disturbances, memory impairment, and \ndepression.31 Chronic noise exposure contributes to about 48,000 new cases of heart disease in \nEurope each year and disrupts 6.5 million people’s sleep.32 For children, noise pollution \ninterferes with behavioral and cognitive development and speech and language development, and \nit decreases concentration, impairs memory retention, and increases blood pressure.33 For \nadolescents, it can interfere with mental health.34  \nAnd beyond impacting public health, data center noise impacts species through altered \nvocal behavior to mitigate masking, changes in vigilance and foraging behavior, and impacts on \n \n30 Angelina Angelo, Could Everyday Noise be Affecting your Health?, UC Davis (March 3, 2023), \nhttps://environmentalhealth.ucdavis.edu/blog/could-everyday-noise-be-affecting-your-health; Stephanie Dutchen, \nNoise and Health, Harvard Medicine (2022), https://magazine.hms.harvard.edu/articles/noise-and-health. \n \n31 Stephanie Dutchen, Noise and Health, Harvard Medicine (2022), \nhttps://magazine.hms.harvard.edu/articles/noise-and-health; Bianca Bosker, Why is everything getting louder, The \nAtlantic (Nov. 2019), https://www.theatlantic.com/magazine/archive/2019/11/the-end-of-silence/598366/; Minho \nKim, et al., Road Traffic Noise, American Journal of Preventive Medicine (Oct. 2012), \nhttps://www.ajpmonline.org/article/S0749-3797(12)00444-8/fulltext; Taeho Park, et al., The Public Health Impact \nof Road-Traffic Noise in a Highly-Populated City, Republic of Korea: Annoyance and Sleep Disturbance, \nSustainability (Aug. 20, 2018), https://www.mdpi.com/2071-1050/10/8/2947; W. Passchier-Vermeer, Noise \nExposure and Public Health, Environmental Health Perspectives (March 2000), \nhttps://pmc.ncbi.nlm.nih.gov/articles/PMC1637786/. \n \n32 Stephanie Dutchen, Noise and Health, Harvard Medicine (2022), https://magazine.hms.harvard.edu/articles/noise-\nand-health. \n \n33 Angelina Angelo, Could Everyday Noise be Affecting your Health?, UC Davis (March 3, 2023), \nhttps://environmentalhealth.ucdavis.edu/blog/could-everyday-noise-be-affecting-your-health; Kim Ferguson, et al., \nThe physical environment and child development: An international review. Int J Psychol. 2013; 48(4): 437–468 \n(June 8, 2013), https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4489931/; Raess, M. et al., Association between \ncommunity noise and children’s cognitive and behavioral development: A prospective cohort study, Environment \nInternational (Jan. 2022), https://www.sciencedirect.com/science/article/pii/S0160412021005869. \n \n34 Jongseok Lim, et al., Negative Impact of Noise and Noise Sensitivity on Mental Health in Childhood, Noise \nHealth (2018), https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6301087/."},{"page":13,"startToken":3289,"endToken":3718,"text":"13 \n \nindividual fitness and the structure of ecological communities.35 In particular, noise can \nsignificantly degrade habitat value for migrating songbirds, decreasing feeding behavior and \nduration.36 One study specifically found a 28% decrease in bird abundance in areas when traffic \nnoise was present compared to when there was no traffic noise.37 And these impacts do not \nalways improve over time: researchers have postulated that some species in areas with chronic \nnoise pollution may become more sensitive to noise stressors instead of becoming habituated or \nless sensitive to them.38 Thus, ongoing noise could significantly impact special-status and \nsensitive species and other native wildlife in and around data centers. \nFinally, data centers can also harm wildlife by contributing to habitat loss and \nfragmentation. As detailed in a 2021 Center for Biological Diversity Report,39 development \ncreates barriers that can affect wildlife behavior, movement patterns, reproductive success, and \nphysiological state, resulting in significant impacts on individual wildlife, populations, \ncommunities, landscapes, and ecosystem function.40 For example, habitat fragmentation from \n \n35 Graeme Shannon, et al., A synthesis of two decades of research documenting the effects of noise on wildlife, \nBiological Reviews, 91(4), 982–1005 (2016), https://doi.org/10.1111/brv.12207. \n \n36 Heidi E. Ware, et al., A phantom road experiment reveals traffic noise is an invisible source of habitat \ndegradation, Proceedings of the National Academy of Sciences (Aug. 31, 2015), \nhttps://www.pnas.org/doi/10.1073/pnas.1504710112. \n \n37 Christopher J. W. McClure, et al., An experimental investigation into the effects of traffic noise on distributions of \nbirds: Avoiding the phantom road. Proceedings of the Royal Society B: Biological Sciences (2013), \nhttps://royalsocietypublishing.org/doi/10.1098/rspb.2013.2290. \n38 Ian Goudie & Ian Jones, Dose-response relationships of harlequin duck behaviour to noise from low-level military \njet over-flights in central Labrador, Environmental Conservation, 31(4), 289–298 (2004), \nhttps://doi.org/10.1017/S0376892904001651. \n \n39 Tiffany Yap, et al., California Connections: How Wildlife Connectivity Can Fight Extinction and Protect Public \nSafety (2021), https://www.biologicaldiversity.org/campaigns/wildlife-connectivity/pdfs/California-Connections-\nwildlife-connectivity-report.pdf. \n \n40 Ana Ceia-Hasse, et al., Population persistence in landscapes fragmented by roads: Disentangling isolation, \nmortality, and the effect of dispersal, Ecological Modelling, 375, 45–53 (2018); Nic M. Haddad, et al., Habitat \nfragmentation and its lasting impact on Earth’s ecosystems, Science Advances, 1(e1500052), 1–9 (2015); William J. \nMitsch, et al., Improving the success of wetland creation and restoration with know-how, time, and self-design, \nEcological Applications, 6(1), 16–17 (1996); Stephen C. Trombulak, et al., Review of ecological effects of roads on"},{"page":14,"startToken":3718,"endToken":4221,"text":"14 \n \nroads and development has been shown to cause mortalities and harmful genetic isolation in \nCentral Coast and Southern California mountain lions,41 increase local extinction risk in \namphibians and reptiles,42 cause high levels of avoidance behavior and mortality in birds and \ninsects,43 and alter pollinator behavior.44 Habitat fragmentation also severely impacts plant \ncommunities: an 18-year study found that reconnected landscapes had nearly 14% more plant \nspecies compared to fragmented habitats, and that number will likely rise as time passes.45   \nFurther, edge effects of data center development, such as traffic, light, and noise \npollution, in and adjacent to open space will likely impact both key, wide-ranging predators, for \nexample, mountain lions and bobcats,46 as well as smaller species with poor dispersal abilities, \n \nterrestrial and aquatic communities, Conservation Biology, 14(1), 18–30 (2001); Rodney van der Ree, et al., Effects \nof roads and traffic on wildlife populations and landscape function: Road ecology is moving toward larger scales, \nEcology and Society, 16(1), 48 (2011). \n \n41 John F. Benson, et al., Extinction vortex dynamics of top predators isolated by urbanization, Ecological \nApplications, 29(3), e01868 (2019); Kyle D. Gustafson, et al., Multi‐population puma connectivity could restore \ngenomic diversity to at‐risk coastal populations in California, Evolutionary Applications (2021), \nhttps://pmc.ncbi.nlm.nih.gov/articles/PMC8867711/. \n \n42 Samuel Cushman, et al., Effects of habitat loss and fragmentation on amphibians: A review and prospectus, \nBiological Conservation, 128, 231–240 (2006); Cheryl S. Brehme, et al., An objective road risk assessment method \nfor multiple species: Ranking 166 reptiles and amphibians in California, Landscape Ecology, 33, 911–935 (2018). \n \n43 Anita Benítez-López, et al., The impacts of roads and other infrastructure on mammal and bird populations: A \nmeta-analysis, Biological Conservation, 143, 1307–1316 (2010); Tuula Kantola, Spatial risk assessment of eastern \nmonarch butterfly road mortality during autumn migration within the southern corridor, Biological Conservation, \n231, 150–160 (2019); Scott Loss, et al., Estimation of bird-vehicle collision mortality on U.S. roads, Journal of \nWildlife Management, 78, 763–771 (2014). \n \n44 Ramiro Aguilar, et al., Genetic consequences of habitat fragmentation in plant populations: Susceptible signals in \nplant traits and methodological approaches, Molecular Ecology, 17, 5177–5188 (2008); M. Goverde, et al., \nSmall-scale habitat fragmentation effects on pollinator behaviour: Experimental evidence from the bumblebee \nBombus veteranus on calcareous grasslands, Biological Conservation, 104, 293–299 (2002); Stephen C. \nTrombulak, et al., Review of ecological effects of roads on terrestrial and aquatic communities, Conservation \nBiology, 14(1), 18–30 (2000). \n \n45 Ellen I. Damschen, et al., Ongoing accumulation of plant diversity through habitat connectivity in an 18-year \nexperiment, Science, 365(6460), 1478–1480 (2019). \n \n46 Rafael Barrientos, et al., Nearby night lighting, rather than sky glow, is associated with habitat selection by a top \npredator in human-dominated landscapes, Philosophical Transactions of the Royal Society B: Biological Sciences, \n378(1892), 20220370 (2023); Amy C. Collins, et al., Behavioral responses to anthropogenic noise at highways vary \nacross temporal scales, Frontiers in Ecology and Evolution, 10, 891595 (2022)."},{"page":15,"startToken":4221,"endToken":4571,"text":"15 \n \nsuch as song birds, small mammals, and reptiles.47 Development that limits movement and \ndispersal can affect species’ ability to find food, shelter, mates, and refugia after disturbances \nlike fires or floods. Individuals can die off, populations can become isolated, sensitive species \ncan become locally extinct, and important ecological processes like plant pollination and nutrient \ncycling can be lost. Negative edge effects from human activity, such as traffic, lighting, noise, \nand pollutants have been found to be biologically significant up to 300 meters (~1000 feet) away \nfrom anthropogenic features in terrestrial systems.48  \nB. The Commission Should Maximize Opportunities For These Facilities To \nFacilitate Renewable Energy Alternatives.   \nAs noted, on the current trajectory data centers, AI and cryptomining facilities threaten to \nundermine progress on addressing the climate emergency. However, as we discuss next, the \nCommission should also consider the ways in which these facilities could instead help to \npromote load flexibility, renewable energy, and distributed energy resources. \n1. These Facilities Can Help Address Load Demand Issues Through Demand \nResponse and Load Flexibility Programs.  \nA recent study from the Duke University Nicholas Institute for Energy, Environment & \nSustainability demonstrates how using data centers as flexible load results in tremendous grid \nreliability benefits and critically reduces the need for new generation. Remarkably, if data \n \n \n47 Ana Benítez-López, et al., The impacts of roads and other infrastructure on mammal and bird populations: A \nmeta-analysis, Biological Conservation, 143, 1307–1316 (2010); Samuel A. Cushman, Effects of habitat loss and \nfragmentation on amphibians: A review and prospectus, Biological Conservation, 128, 231–240 (2006); Kathleen S. \nDelaney, et al., Reptile and Amphibian Diversity and Abundance in an Urban Landscape: Impacts of Fragmentation \nand the Conservation Value of Small Patches, Ichthyology and Herpetology, 109(2), 424–435 (2021); A.V. \nKociolek, et al., Effects of Road Networks on Bird Populations, Conservation Biology, 25(2), 241–249 (2011); Hans \nSlabbekoorn, et al., Birdsong and anthropogenic noise: Implications and applications for conservation, Molecular \nEcology, 17, 72–83 (2008). \n \n48 Environmental Law Institute, Conservation thresholds for land use planners (2003), \nhttps://www.eli.org/sites/default/files/eli-pubs/d13-04.pdf."},{"page":16,"startToken":4571,"endToken":4892,"text":"16 \n \ncenters could limit their power demands over just a handful of hours each year, the country’s \nelectric grid (across 22 balancing authorities) could accommodate around 100 GW of new load \nwithout expanding generation.49  \nSimple shifts in data center operations would not only prevent the construction of new \nfossil fuel generation, and thus the creation of new greenhouse gas emissions which drive \nextreme weather and worsen public health, but it would also save money for the millions of \nresidential customers who otherwise would have subsidized the costs for this new generation.  \nPractically, load flexibility through demand response allows high-energy users like data centers \nto reduce energy consumption during periods of peak demand by adjusting operations, shifting \nworkloads, and utilizing on-site back-up generation. According to the Nicholas Institute study, if \ndata centers limited load a mere 0.5 percent (less than 44 hours out of the year), the grid could \nhandle 98 GW of new load—enough to power 70 million homes. Increasing curtailment by \nanother half-percent means the grid could handle an additional 28 GW of new load.  \nLoad flexibility does raise questions about whether demand response programs could be \nuniversal across the data center industry, such as for AI operations that require model training \nand around-the-clock power. In these cases, curtailment can still occur with “work” shifting \ngeographically to other data centers that are available (i.e. not participating in a curtailment \nwindow).  \nFor load flexibility to work, it will require thoughtful coordination across balancing \nauthorities and utilities, but this is necessary to protect the public interest amid the data center \nboom. It is not in the public interest to saddle customers with higher costs, forcing families to \n \n49 Tyler H. Norris, et al., “Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads \nin US Power Systems,” Nicholas Institute for Energy, Environment, & Sustainability, Duke University (2025), \nhttps://nicholasinstitute.duke.edu/sites/default/files/publications/rethinking-load-growth.pdf."},{"page":17,"startToken":4892,"endToken":5205,"text":"17 \n \nsacrifice paying to keep the lights on or putting food on the table. Furthermore, communities \nshould not have to suffer from worsening air and water quality as utilities invest in more highly \npolluting fossil fuel generation to meet new data center load, particularly where these harms are \neasily preventable through load flexibility.  \nMoreover, if engaging in demand response or power curtailment forces a data center to \ninvest in more back-up generation, utilities and public utilities commissions (“PUCs”) should \nrequire that data centers prioritize on-site battery storage in conjunction with renewable energy, \nsuch as solar and wind, as well as investments in energy efficiency measures. \n2. FERC Should Encourage Renewable Energy to Power These Facilities.  \nFERC must also incentivize renewable energy in co-location agreements to mitigate the \ndata center industry’s massive greenhouse gas emissions. As discussed in the Addendum below, \nCongress has repeatedly directed FERC to prioritize the nation’s transition away from fossil fuel \npower sources and administer new programs to foster renewable energy development. \nUndoubtedly, these directives apply here, considering that experts expect the expanding data \ncenter industry to largely rely on fossil gas. 50 By 2030, additional fossil gas demand could reach \n3 to 6 billion cubic feet of gas per day—equivalent to gas consumption of the entire state of \nFlorida per day.51  \nFurther, FERC must encourage renewable energy in co-location agreements to meet its \nmandate to ensure grid reliability. Section 219 of the Federal Power Act requires FERC to work \n \n50 A. Samuelson, AI is guzzling gas, Heated (Dec. 19, 2024), https://heated.world/p/ai-is-guzzling-\ngas?utm_source=post-email-title&publication_id=2473&post_id=153337841&utm_campaign=email-post-\ntitle&isFreemail=true&r=2g9jj&triedRedirect=true&utm_medium=email. \n \n51 S&P Global, Data Centers: More Gas Will Be Needed To Feed U.S. Growth (Oct. 22, 2024), \nhttps://www.spglobal.com/ratings/en/research/articles/241022-data-centers-more-gas-will-be-needed-to-feed-u-s-\ngrowth-13290987."},{"page":18,"startToken":5205,"endToken":5551,"text":"18 \n \ntowards a more efficient, reliable, and affordable electrical grid for consumers and specifically to \n“promote reliable and economically efficient transmission and generation of electricity.”52 To do \nso, FERC must focus on the grid’s decarbonization, as climate change poses significant, ongoing \nthreats to grid reliability.53 Power outages have doubled over the past 20 years, 54 largely due to \nclimate change-fueled extreme heat, wildfires, winter storms, hurricanes, and other extreme \nweather events straining the grid.55 For example, in 2021, an extreme winter storm event in \nTexas caused a massive grid failure, which resulted in 4.5 million homes losing power, at least \n57 deaths across 25 counties, and over $195 billion in property damage.56 Data center emissions \nwill only contribute to this issue: By 2030, experts expect the data center industry alone to \nannually emit about 40% of the United States’ annual greenhouse gas emissions,57 fueling \nfurther outages. \nCo-locating data centers with solar and/or wind would protect and promote grid \nreliability by expanding data center capacity while avoiding further strain on the grid. Numerous \n \n52 16 U.S.C. § 824s(b)(1). \n \n53 Mitali Chatterjee, Avoiding gridlock: The Impact of climate on electric grids, Swiss Re Institute (June 27, 2024), \nhttps://www.swissre.com/institute/research/topics-and-risk-dialogues/climate-and-natural-catastrophe-risk/impact-\nof-climate-on-electric-grids.html. \n \n54 Matthew Brown, Storms batter aging power grid as climate disasters spread, Associated Press (April 5, 2022), \nhttps://apnews.com/article/wildfires-storms-science-business-health-7a0fb8c998c1d56759989dda62292379. \n \n55 U.S. Dep’t of Energy, Extreme Weather and Climate Vulnerabilities of the Electric Grid: A Summary of \nEnvironmental Sensitivity Quantification Methods (Aug. 16, 2019), \nhttps://www.energy.gov/sites/prod/files/2019/09/f67/Oak%20Ridge%20National%20Laboratory%20EIS%20Respo\nnse.pdf. \n \n56 University of Texas at Austin, The Timeline and Events of the February 2021 Texas Electric Grid Blackouts (July \n2021), \nhttps://energy.utexas.edu/sites/default/files/UTAustin%20%282021%29%20EventsFebruary2021TexasBlackout%2\n020210714.pdf. \n \n57 Global data center industry to emit 2.5 billion tons of CO2 through 2030, Morgan Stanley says, Reuters (Sept. 3, \n2024), https://www.reuters.com/markets/carbon/global-data-center-industry-emit-25-billion-tons-co2-through-2030-\nmorgan-stanley-2024-09-03/."},{"page":19,"startToken":5551,"endToken":5915,"text":"19 \n \nstates have reported unprecedented energy demand due to data centers, which the Virginia State \nCorporation Commission describes as “creating issues and risks for electric utilities and their \ncustomers that have not heretofore been encountered.”58 In Virginia, for example, data centers \nconsumed 25.59% of the state’s total electricity consumed in 2023,59 and experts project that \nnew data centers alone will increase demand for power up to 50 percent by 2030.60 Similarly, the \nElectric Reliability Council of Texas predicts it will need to double its power generation in the \nnext decade to support skyrocketing data center demand in Texas,61 and Silicon Valley Power \npredicts the same.62 Rather than adding to these issues, onsite renewable energy helps meet the \nrising demand for reliable data center power while also lessening the industry’s greenhouse gas \nemissions.  \nSolar and wind co-location with data centers is not a new concept, as multiple companies \nhave begun exploring this arrangement both in the United States and internationally. For \nexample, a data center co-located with Japan Renewable Energy Corporation’s solar farm runs \nentirely on solar,63 and Apple claims that 100% renewable energy powers its data center in \n \n58 Evan Halper, As data centers for AI strain the power grid, bills rise for everyday customers (Nov. 1, 2024), \nhttps://www.washingtonpost.com/business/2024/11/01/ai-data-centers-electricity-bills-google-amazon/ \n \n59 EPRI, Powering Intelligence Analyzing Artificial Intelligence and Data Center Energy Consumption (May 2024), \nhttps://www.epri.com/research/products/000000003002028905. \n \n60 Evan Halper, As data centers for AI strain the power grid, bills rise for everyday customers (Nov. 1, 2024), \nhttps://www.washingtonpost.com/business/2024/11/01/ai-data-centers-electricity-bills-google-amazon/ \n \n61 Phil Prazan, Texas thirsty for energy as datacenters, crypto mining, and EVs increase, NBC DFW (May 9, 2024), \nhttps://www.nbcdfw.com/news/politics/lone-star-politics/texas-needs-energy-for-evs-crypto-datamining/3536718/. \n \n62 Sebastian Moss, Silicon Valley Power says data center load to double by 2035, will need geothermal power and \nbatteries, Data Center Dynamics (Dec. 5, 2023), https://www.datacenterdynamics.com/en/news/silicon-valley-\npower-says-data-center-load-to-double-by-2035-will-need-geothermal-power-and-batteries/. \n \n63 Georgia Butler, JRE’s 100% onsite solar-powered data center in Japan achieves stable operations, Data Center \nDynamics (May 9, 2023), https://www.datacenterdynamics.com/en/news/jres-100-onsite-solar-powered-data-center-\nin-japan-achieves-stable-operations/."},{"page":20,"startToken":5915,"endToken":6251,"text":"20 \n \nMaiden, North Carolina, of which a large percentage comes from onsite solar.64 Additionally, \nGoogle and partners Intersect Power and TPG Rise Climate recently announced plans to co-\nlocate data centers with high capacity, clean electricity such as solar alongside battery storage in \nthe United States.65 \nII. \nCenter Comments On The Commission’s Questions \nThe Center urges the Commission to take the foregoing discussion into account in \nresolving the issues raised in this proceeding. With regard to the more specific issues the \nCommission has already raised, the Center offers the following comments. \nA. Any Tariff or Other Regulations Must Protect Consumers from Allowing \nPrivate Corporations to Shift the Cost of These Facilities to Ratepayers. \nThe Commission’s Order addresses several cost allocation issues. E.g. Order at 52-54. As \ndiscussed below, the Commission should ensure that the tariff and any other regulatory \nprovisions protect consumers from bearing inappropriate costs related to these facilities. \nResidential customers across the country are facing increasingly unaffordable utility bills. \nThe median customer utility bill rose 6 percent in January, with residents in Hawaii, Michigan, \nMaine, and Wisconsin paying some of the highest rates.66 And more than 30 million U.S. \n \n64 Press Release, Apple now globally powered by 100 percent renewable energy, Apple (April 9, 2018), \nhttps://www.apple.com/newsroom/2018/04/apple-now-globally-powered-by-100-percent-renewable-energy/. \n \n65 Ethan Howland, Google, Intersect Power to develop co-located energy parks with $20B of renewables, storage, \nUtility Dive (Dec. 11, 2024), https://www.utilitydive.com/news/google-intersect-power-co-located-energy-park-\ndata-center-ferc/735198/; see also, e.g. David Mock and John Bush, DERs Role in a More Reliable, Sustainable, \nand Resilient Power System, UNC Energy Center (2024),  https://www.kenan-flagler.unc.edu/wp-\ncontent/uploads/2024/10/DER-Paper.pdf;  Wei He, et al.,  Optimization analysis of different distributed energy \nconfigurations for data centers, Sustainable Minerals and Technologies 41 (2024), \nhttps://www.sciencedirect.com/science/article/abs/pii/S2214993724001854.  \n \n66 Giulia Carbonaro, Electricity Prices Surge in US: Map Shows Most Expensive States, Newsweek (February 28, \n2025), https://www.newsweek.com/electricity-prices-surge-us-map-shows-most-expensive-states-2037618."},{"page":21,"startToken":6251,"endToken":6598,"text":"21 \n \nhouseholds are energy insecure, and therefore at risk of losing access to life-saving electricity.67 \nThe combination of rising energy costs and worsening wealth inequality contributes to \npersistently high energy burdens, forcing millions of families into energy poverty.68 Access to \nelectricity is essential yet out of reach for far too many people.  \nThe energy affordability crisis is worsening, especially now as utilities raise rates to pay \nfor expensive large generation assets, like fossil gas plants, and keep un-economic coal plants \nonline longer, to power high-energy consuming data centers. Just recently Kentucky Utilities and \nLouisville Gas and Electric announced a proposed $3.7 billion investment to build 1.3 GW of \nnew fossil gas generation and 400 megawatts (MW) of battery storage, to power data centers.69 \nIn the Southeast, Duke Energy plans to build 9 GW of new fossil gas to accommodate a \nforecasted 12 percent increase in demand by 2038.70 This rate of growth is unsustainable, yet \nutilities are actively pursuing data centers because it benefits their bottom line, even if it comes \nat the expense of residential customers. \nUtilities have an incentive to attract high energy-using customers like data centers \nbecause they turn a profit from building high-cost capital projects. The bigger the project, the \nhigher the return on investment. Data centers’ power needs are extraordinary—one large data \n \n67 Just Solutions Collective, Left in the Dark; Utility Disconnections in the United States, (December 19, 2024), \nhttps://justsolutionscollective.org/left-in-the-dark-utility-disconnections-in-the-united-states/.   \n \n68 Selah Goodson Bell and Jean Su, Powerless in the United States: How Corporate Utilities Drive Energy \nUnaffordability and Climate Chaos, Center for Biological Diversity (January 2025), \nhttps://www.biologicaldiversity.org/programs/energy-\njustice/pdfs/Powerless_Report_2025.pdf?_gl=1*15hp645*_gcl_au*MTgwNTU2NTc5NC4xNzM5NTU2NzI2.  \n \n69 Ethan Howland, PPL’s Kentucky utilities propose 1.3 GW of gas, 400 MW of storage to meet data center load, \n(March 3, 2025), https://www.utilitydive.com/news/ppl-kentucky-psc-ku-gas-storage-data-center/741351/. \n  \n70 Jeff St. John, More demand, more gas: Inside the Southeast’s dirty power push, Canary Media, (April 11, 2024), \nhttps://www.canarymedia.com/articles/utilities/more-demand-more-gas-inside-the-southeasts-dirty-power-push."},{"page":22,"startToken":6598,"endToken":6939,"text":"22 \n \ncenter could use as much as 100 MW of power.71 And it is estimated that overall energy \nconsumption by data centers could reach 35 GW by 2030.72 By attracting data centers, utilities \nhave a reason to invest in expensive fossil gas plants, risky nuclear projects, and large-scale \ntransmission that they inevitably profit from. And while they reap millions from these \ninvestments, residential customers risk footing the bill for the lion’s share of costs to build a grid \ncapable of withstanding a projected 12 percent increase in load by 2030.73  \nThe current utility rate structure is in large part to blame for this cost-shift, saddling \nresidential customers—especially those who can least afford to pay—with the costs of \ninfrastructure improvements, from new transmission lines and substations to fossil gas plants that \npump alarming rates of planet-warming emissions into the atmosphere.  \nAccording to a recent report from Harvard Law School’s Environmental and Energy Law \nProgram, utilities are getting away with socializing the costs of the data center boom, and \nsimultaneously keeping rates low to attract data centers, by: (1) entering into special contracts; \n(2) taking advantage of discrepancies between federal and state regulations over cost allocation; \nand (3) relying on co-location agreements. Through all these avenues, utilities are effectively \nputting the financial burden of accommodating data center load onto the shoulders of working \nfamilies.74 \n \n71 Data Center Knowledge, Data Center Power: Fueling the Digital Revolution, (March 22, 2024), \nhttps://www.datacenterknowledge.com/energy-power-supply/data-center-power-fueling-the-digital-revolution. \n  \n72 Matthew Gooding, Newmark: US data center power consumption to double by 2030,Date Center Dynamics, \n(January 15, 2024), https://www.datacenterdynamics.com/en/news/us-data-center-power-consumption/.  \n \n73 U.S. Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data \nCenters, (December 20, 2024), https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-\nelectricity-demand-data-centers.  \n \n74 Eliza Martin and Ari Peskoe, Extracting Profits from the Public: How Utility Ratepayers Are paying for Big \nTech’s Power, Environmental & Energy Law Program, Harvard Law School, (March 2025), \nhttps://eelp.law.harvard.edu/extracting-profits-from-the-public-how-utility-ratepayers-are-paying-for-big-techs-\npower/?ref=floodlightnews.org."},{"page":23,"startToken":6939,"endToken":7247,"text":"23 \n \n1. There Should Be Restrictions on Special Contracts Allowing Utilities to Take \nAdvantage of Opaque Accounting Practices to Pass on the Costs of Supplying \nPower to High Energy-Using Customers. \n \nUnder current regulatory regimes, utilities can use special contracts to offer data centers \ndiscounts while shoring up any shortfalls in costs related to building new power infrastructure \nthrough raising rates for its other customers.75 Because PUC orders approving these contracts \nlack vital third-party analysis and robust public participation, utilities can easily claim that they \nare isolating data center energy costs from other ratepayers with little oversight to ensure that is \nindeed the case.  \nFor instance, Duke Energy was shifting costs of a special contract which would have \nprovided a $325 million discount to a new power plant developer onto its other ratepayers.76 \nWhile this effort by Duke Energy was properly resolved, the Commission should help ensure \nthese special contracts are not approved by state regulators at the expense of ratepayers who will \nface higher costs. \n2. Appropriate Oversight of Cost Allocation Formulas Is Necessary to Protect \nAgainst Ratepayers Being Improperly Charged for Infrastructure Costs to \nSupport These Facilities. \n \nTo serve the power needs of data centers, regional transmission organizations (“RTOs”) \nare also working to build new transmission with costs trickling their way down to residential \nratepayers due to a mismatch between federal and state cost allocation practices. RTOs pass \ntransmission costs onto their member utilities “in proportion to the power system benefits each \nutility receives, such as lower market prices and improved reliability.”77 This model also relies \n \n \n75  Id. \n \n76 Duke Energy Carolinas, LLC v. NTE Carolinas II, LLC, 111 F.4th 347 (4th Cir. 2024).  \n \n77 Eliza Martin and Ari Peskoe, Extracting Profits from the Public: How Utility Ratepayers Are paying for Big \nTech’s Power, Environmental & Energy Law Program, Harvard Law School, (March 2025),"},{"page":24,"startToken":7247,"endToken":7515,"text":"24 \n \non the premise that these investments in new transmission are broadly beneficial. State PUCs \nthen apply their own model for how those higher costs are then split across their ratepayer \nclasses (residential, commercial, and industrial). This mismatch in how costs are distributed at \nthe federal and state level ends up “socializing the costs of reliable power delivery [and] now \nforcing the public to pay for infrastructure designed to supply a handful of exceedingly wealthy \ncorporations.”78  \nPJM’s transmission buildout to accommodate Virginia’s data center growth shows how \nthis cost-shift plays out and unfairly burdens residential customers. PJM spent $5.1 billion on \nnew transmission, and half of those costs were distributed to member utilities based on their \nshare of power demand.79 Since Virginia’s data center boom was primarily driving the load \ngrowth that precipitated the need for more transmission, Virginia utilities ended up paying the \nremaining half. However, because each state PUC then divvies up transmission costs differently \nacross ratepayer classes, in Maryland for example, residential ratepayers will then pay for two-\nthirds of the state’s overall share in transmission costs, even though PJM is building this new \ntransmission for Virginia data centers and not the average Maryland residential ratepayer.80 \n \nhttps://eelp.law.harvard.edu/extracting-profits-from-the-public-how-utility-ratepayers-are-paying-for-big-techs-\npower/?ref=floodlightnews.org. \n \n78 Id. \n \n79 PJM, PJM Board of Managers Approves Critical Grid Upgrades, PJM Inside Lines, (December 11, 2023), \nhttps://insidelines.pjm.com/pjm-board-of-managers-approves-critical-grid-upgrades/.  \n  \n80 Maryland People’s Counsel Protest, Affidavit of Ron Nelson, available at: \nhttps://opc.maryland.gov/Portals/0/Files/Publications/Others/MdOPC%20Protest%20and%20Affidavit%20of%20R.\n%20Nelson%20ER24-843%2002-09-24%20(1).pdf."},{"page":25,"startToken":7515,"endToken":7828,"text":"25 \n \nFurthermore, while RTOs and utilities make all these investments in new power infrastructure on \nthe premise that there will be significant load growth, should that demand fail to materialize, \nratepayers will be left to cover the costs of stranded assets.  \n3. The Commission Must Also Help Ensure That Co-location Arrangements Do \nNot Increase Wholesale Prices and Distort Electricity Delivery Rates. \n \nData center owners are looking for opportunities to secure power as quickly as possible, \nand power plants have jumped at the opportunity to offer co-location agreements whereby a data \ncenter can directly connect to an existing power plant, behind the meter. The data center \ntherefore does not have to rely on power delivered through the utility’s transmission network, \ncutting the utility out of profits they eagerly seek.  \nData centers can leverage co-location arrangements to argue that they should be exempt \nfrom paying any fees to the utility for delivering power. Constellation Energy leaned into this \nmodel to get out of paying federal and state-regulated delivery charges.81  \nAs for ratepayers, co-location has the consequence of precluding them from receiving \nlower delivery rates that they might otherwise have paid when a new energy-intensive customer \nbecomes a utility ratepayer and pays its share of the utility’s cost of service. In the end, \nresidential ratepayers could end up paying higher costs as those costs are no longer distributed \nacross a greater number of customers. \nThe data center boom is a big gamble. Contracts may fall through, and other less-energy \nintensive processing models for AI could become more mainstream. Moreover, load growth \n \n81 Martin and Peskoe, Extracting Profits from the Public: How Utility Ratepayers Are paying for Big Tech’s Power; \nsee also PJM Interconnection, LLC, FERC Docket No. ER24-2172 [hereinafter Susquehanna Nuclear \nInterconnection Agreement], Protest of Exelon Corporation & American Electric Power Service Corporation, \nDeclaration of John J. Reed & Danielle S. Powers, at 4 (Jun. 24, 2024)."},{"page":26,"startToken":7828,"endToken":8135,"text":"26 \n \nprojections are still uncertain.82 Therefore, utilities’ quick moves to accommodate projected load \ngrowth comes with real consequences for residential customers who will shoulder the \noverwhelming costs of the nearly 20 GW of gas and transmission infrastructure utilities are \nbuilding that may not ultimately be needed.83 \nB. FERC Should Not Leave Any Regulatory Gaps For These Facilities. \nThe Commission’s Order explains that questions have been raised concerning the \nCommission’s jurisdiction over co-located load arrangements. Order at 9-11; 29-31. Some have \nargued that a sale between co-located load and a generator is beyond FERC’s jurisdiction, id. at \n9, 29, while others have asserted that because the generators are subject to FERC jurisdiction, \ntheir agreements with direct load also necessarily are subject to FERC rules. Id. at 30. The \nCenter urges that the latter view is the correct application of the Federal Power Act to these \nfacilities. \nIn particular, in their comments on the Order, the Indicated PJM Owners correctly \nexplain that co-located load should be treated as load in front of the meter and subject to FERC \nand RTO rules. PJM Comments at 1. They also correctly explain that so long as the generator is \ngrid-connected, it is a misnomer to suggest the co-located load is “fully isolated,” and that so \nlong as the generator is connected to the grid, the entire arrangement is subject to FERC \njurisdiction. Id. at 9. Similarly, as PJM explains, a co-located load is subject to FERC jurisdiction \n \n82 Jeff St. John, Utilities are flying blind on data center demand. That’s a big problem, Canary Media, (February 25, \n2025), https://www.canarymedia.com/articles/utilities/utilities-are-flying-blind-on-data-center-demand-thats-a-big-\nproblem.  \n \n83 Quentin Good, et al., Big data centers, big problems: The surging environmental and consumer costs of AI, crypto \nand big data, Environment America, (January 23, 2025), https://environmentamerica.org/center/resources/big-data-\ncenters-big-problems/."},{"page":27,"startToken":8135,"endToken":8444,"text":"27 \n \n(and must pay its share of grid services) even if there is a mechanism to prevent energy from the \ngrid from going to the load should the generator go offline. PJM Comments at 14. \nHowever, PJM’s comments also suggest that truly isolated co-located loads—where \nneither the generator nor the load are connected to the grid—could be subject to a regulatory gap, \nwherein there is neither federal nor state jurisdiction. Id. at 2129. In the Center’s view, given the \neconomic and environmental impacts of data centers in particular, state regulatory authorities \nshould have jurisdiction even in the unusual situation where FERC jurisdiction may not extend. \nFinally, Public Service Electric and Gas (“PSE&G”) Company asserts that a generator \nand co-located load is no different from a behind-the-meter generator like a university with solar \narray. Pub. Svc. Elec. & Gas. Co. Comments at 14-18. Because the latter facility is permitted to \nnet its generation against network load for purposes of transmission cost allocation, PSE&G \nclaims, co-located load is entitled to the same arrangement. Id. \nThis is incorrect. The reason for allowing this kind of net billing for facilities with \nbehind-the-meter generation is to at least partially compensate for the contribution the energy \nconsumer’s generation provides to the bulk system. Cf. 16 U.S.C. § 2621(d)(11) (setting out the \nfederal “net metering” standard, providing for energy consumer’s generation to be netted against \nusage). In the scenario at issue here, where a load is located with a generator behind the meter, \nthe consumer and the generator are different entities. Allowing such a customer to be treated as \nif they were providing the generation themselves makes no sense. Rather, in such arrangements \nthe load should be considered in the same manner as any other load.  \n* \n* \n* \n \nThank you for the opportunity to be heard on these important issues. \n    \n \n \n \n \n \nRespectfully submitted,"},{"page":28,"startToken":8444,"endToken":8507,"text":"28 \n \n \n/s/ Howard M. Crystal \n \n \n \n \n \nHoward M. Crystal \n \n \n \n \n \n \nEnergy Justice Legal Director \n \n/s/ Camden L. Weber \n \n \n \n \n \nCamden L. Weber \n \n \n \n \n \n \nClimate and Energy Policy Specialist \n \n/s/ Meredith Stevenson \n \n \n \n \n \n \nMeredith Stevenson \n \n \n \n \n \n \nUrban Wildlands Staff Attorney \n \n \n \n \n \n \n \n/s/ Gabriela R. Sarri-Tobar \n \n \n \n \n \n \nGabriela R. Sarri-Tobar \n \n \n \n \n \n \nSenior Energy Justice Campaigner \n \n \n \n \n \n \n \n \nCenter for Biological Diversity \n1411 K Street N.W., Suite 1300 \nWashington, D.C. 20005 \nhcrystal@biologicaldiversity.org \n202-809-6926"},{"page":29,"startToken":8507,"endToken":8794,"text":"29 \n \nADDENDUM \nThe Climate Emergency, and FERC’s  \nResponsibility To Act On This Pressing Issue \n \n \nIn order to properly address the issues raised in this proceeding, it is vital for FERC to \nacknowledge the climate emergency and the agency’s statutory mandate to play a vital \nleadership role in addressing this issue. This Addendum addresses these matters.  \nA. The Climate Crisis is an Emergency Requiring Urgent Action to Reduce \nGreenhouse Gases from the Power Sector. \nThe scientific community is unequivocal in its assessment that human activity is the \nprimary driver of climate change, and that without decisive, coordinated efforts to reduce \ngreenhouse gas emissions, its impacts will continue to cause extensive and far-reaching harm \nacross the globe. As the most recent Assessment Report from the Intergovernmental Panel on \nClimate Change (IPCC) makes clear, fossil-fuel driven climate change is a “code red for \nhumanity,” and every additional ton of CO2 and fraction of a degree of temperature rise \nmatters.84 \nWith the 1.5°C target set by the Paris Climate Agreement rapidly slipping out of reach, \nthe potential trajectories of the nation’s climate future are becoming ever more concrete—and \nincreasingly alarming. Extreme heat events will become significantly more frequent and severe, \nstraining energy systems, threatening public health, and disproportionately impacting vulnerable \ncommunities and species.85 Sea-level rise and intensified coastal storms will endanger critical \n \n84 United Nations Secretary-General, Secretary-General’s statement on the IPCC Working Group 1 Report on the \nPhysical Science Basis of the Sixth Assessment, (Aug. 9, 2021), https://www.un.org/sg/en/content/secretary-\ngenerals-statement-the-ipcc-working-group-1-report-the-physical-science-basis-of-the-sixth-assessment. \n \n85 Wagner, A., Climate-driven extreme heat may make parts of Earth too hot for humans, Penn State University \n(Oct. 9, 2023), https://www.psu.edu/news/health-and-human-development/story/climate-driven-extreme-heat-may-\nmake-parts-earth-too-hot-humans."},{"page":30,"startToken":8794,"endToken":9143,"text":"30 \n \nhabitats and infrastructure and displace populations in low-lying regions.86 America’s agriculture \nwill experience heightened stress due to drought, shifting growing seasons, and increased pest \nand disease pressures, while water resources in the West will become increasingly scarce. These \nchanges will amplify existing social and economic inequalities, endanger the country’s \nbiodiversity, drive up disaster response and recovery costs, and test the resilience of institutions \nand governance structures at every level.  \nThe reality of climate disasters in the United States is no longer an abstraction. The last \nfew years alone have crystallized what the climate emergency looks and feels like in the United \nStates: unparalleled heat domes in the West,87 record-setting wildfires in Oregon88 and \nWyoming,89 record low temperatures that led to the Texas energy crisis and outages,90 and fatal \nhurricanes Helene, Milton, and Beryl that swept the southeast causing a combined 300 deaths.91 \nA 2021 study of the health costs in the U.S. of air pollution from fossil fuel combustion and \n \n86 Imdieke, A., Melting ice and rising sea levels: Why 2 degrees Celsius is too high, Columbia Climate School (June \n12, 2023), https://news.climate.columbia.edu/2023/06/12/melting-ice-and-rising-sea-levels-why-2-degrees-celsius-\nis-too-high/.  \n \n87 Tyler Clifford, Record temperatures scorch US West as Americans sweat through extreme heat, Reuters (July 8, \n2024), https://www.reuters.com/world/us/record-temperatures-scorch-us-west-americans-sweat-through-extreme-\nheat-2024-07-07/. \n \n88 Joni Auden Land, Record Oregon wildfire season keeps NWS meteorologists extremely busy, Oregon Public \nBroadcasting, (Sept. 14, 2024), https://www.opb.org/article/2024/09/14/record-wildfires-oregon-keep-northwest-\nmeteorologists-busy-summer-forecasting/.  \n \n89 Mike Koshmrl, Wyoming’s ‘massive’ 2024 wildfire season second only to infamous ‘88, WyoFile (Nov. 4, 2024), \nhttps://wyofile.com/wyomings-massive-2024-wildfire-season-second-only-to-infamous-88/.  \n \n90 Michael E. Webber, The Texas Power Crisis Didn’t Have to Happen, ASME (June 15, 2021), \nhttps://www.asme.org/topics-resources/content/the-texas-power-crisis-didn-t-have-to-happen; Peter Cramton, \nLessons From the 2021 Texas Electricity Crisis, Utility Dive (Mar. 23, 2021), \nhttps://www.utilitydive.com/news/lessons-from-the-2021-texas-electricity-crisis/596998/.  \n \n91 Adam B. Smith, 2024: An active year of U.S. billion-dollar weather and climate disasters, Climate.gov, (Jan. 10, \n2025), https://www.climate.gov/news-features/blogs/beyond-data/2024-active-year-us-billion-dollar-weather-and-\nclimate-disasters."},{"page":31,"startToken":9143,"endToken":9603,"text":"31 \n \nresulting climate change estimated the costs already exceed $800 billion per year and are \nexpected to become even more expensive without rapid action to curb fossil fuel pollution.92 \nClimate change poses particularly severe threats to environmental justice communities, \nwho are on the front lines of the climate emergency, and disproportionately bear the burden of \nutilities’ and other corporations’ failure to sufficiently account for and address climate change-\nrelated risks.93 It also poses additional risks to other communities, including children, older \nadults, immigrant groups, and persons with disabilities and pre-existing medical conditions.94  \nThe IPCC Sixth Assessment makes clear that there is “a rapidly closing window of opportunity \nto secure a livable and sustainable future for all” and taking action now to reduce the country’s \ngreenhouse gas emissions is the only pathway forward.95 The IPCC Sixth Assessment also \nfinds—with high confidence—that continued greenhouse gas emissions at current levels will \n \n92 Medical Society Consortium on Climate and Health, The Costs of Inaction: The Economic Burden of Fossil Fuels \nand Climate Change on Health in the United States (2021), https://medsocietiesforclimatehealth.org/wp-\ncontent/uploads/2021/05/CostofInactionReport-May2021.pdf at 5. \n \n93 E.g. Carina J. Gronlund, Racial and Socioeconomic Disparities in Heat-Related Health Effects and Their \nMechanisms: a review, Curr. Epidemiol. Rep. 1 (3): 165-173 (2014) at \nhttps://www.ncbi.nlm.nih.gov/pmc/articles/PMC4264980/; R. Dean Hardy, Richard A. Milligan, and Nik Heynen, \nInjustice of Colorblind Adaptation Planning for Sea-Level Rise, Geoforum, 87: 62-72 (2017) at \n(https://www.sciencedirect.com/science/article/pii/S0016718517302944; NAACP, Environmental and Climate \nJustice, at https://www.naacp.org/issues/environmental-justice/. We use the term “environmental justice \ncommunities”' in accordance with the definition provided by the White House Environmental Justice Advisory \nCouncil (“WHEJAC”), which defines the term as “a geographic location with significant representation of persons \nof color, low-income persons, indigenous persons, or members of Tribal nations, where such persons experience, or \nare at risk of experiencing, higher or more adverse human health or environmental outcomes.” White House Env’tal \nJustice Advisory Council, 79 (May 21, 2021), WHEJAC Final Report Executive Order 14008, \nhttps://www.epa.gov./sites/production/files/2021-05/documents/whiteh2.pdf .     \n94 NCA4, Vol. II, at 540, 548; U.S. Global Change Research Program, The Impacts of Climate Change on Human \nHealth in the United States: A Scientific Assessment (2016); see also Nick Watts, et al., Health and Climate Change: \nPolicy Responses to Protect Public Health, 386 The Lancet 1861 (2015) at 1861.  \n95 IPCC, 2023: Sections. In: Climate Change 2023: Synthesis Report. Contribution of Working Groups I, II and III \nto the Sixth Assessment Report of the Intergovernmental Panel on Climate Change [Core Writing Team, H. Lee and \nJ. Romero (eds.)]. IPCC, Geneva, Switzerland, p. 88."},{"page":32,"startToken":9603,"endToken":9952,"text":"32 \n \nlock in highly damaging and irreversible changes to the climate for hundreds to thousands of \nyears.96 \nThe global average atmospheric carbon dioxide in 2024 was 424.61 parts per million \n(ppm), a level not seen for millions of years.97 The last time CO2 in the Earth’s atmosphere was \nat 400 ppm, global mean surface temperatures were 2 to 3°C warmer and the Greenland and \nWest Antarctic ice sheets melted, leading to sea levels that were 10 to 20 meters higher than \ntoday.98 Global carbon emissions over the past 15 to 20 years have tracked the highest emission \nscenario used in IPCC climate projections, the RCP8.5 scenario,99 which is projected to lead to \ndevastating impacts.100 \nIn light of the climate emergency, the IPCC has emphasized the urgent need for “rapid \nand far-reaching transitions” across all sectors including electricity generation.101 Indeed, a \ncritical feature of 1.5°C-consistent pathways is that the power sector must be significantly clean \nby 2030 and achieve “virtually full decarbonisation” by around mid-century.102  \n \n96 IPCC, 2023: Sections. In: Climate Change 2023: Synthesis Report. Contribution of Working Groups I, II and III \nto the Sixth Assessment Report of the Intergovernmental Panel on Climate Change [Core Writing Team, H. Lee and \nJ. Romero (eds.)]. IPCC, Geneva, Switzerland, p. 69. \n \n97 Statista, Average monthly carbon dioxide (CO₂) levels in the atmosphere worldwide from 1990 to 2025 (Mar. 25, \n2025), https://www.statista.com/statistics/1091999/atmospheric-concentration-of-co2-historic/.  \n \n98Corinne Le Quéré, et al.,  Global Carbon Budget 2018, 10 Earth Syst. Sci. Data 2141 (2018); World \nMeteorological Organization, WMO Greenhouse Gas Bulletin, No. 13, Oct. 30, 2017 at 5. \n99 NCA4, Vol. I at 31, 133-34, and 152 ( “The observed increase in global carbon emissions over the past 15–20 \nyears has been consistent with higher scenarios (such as RCP8.5) (very high confidence)”). \n100 IPCC, Climate Change 2014: Synthesis Report. Contribution of Working Groups I, II and III to the Fifth \nAssessment Report of the IPCC (2014) at Figure 2.1. \n101 Id. at 15. \n \n102 IPCC Special Report, at 112."},{"page":33,"startToken":9952,"endToken":10422,"text":"33 \n \nThe U.S. is the world’s largest historic emitter of GHG pollution and is the world’s \nsecond highest emitter on an annual and per capita basis.103 Scientific studies have estimated the \nremaining U.S. carbon budget consistent with the 1.5°C Paris Agreement target is approximately \n25 gigatons (Gt) CO2 equivalent (CO2eq) to 57 GtCO2eq on average,104 depending on the equity \nprinciples used to apportion the global budget across countries.105 As the U.S. emits around 6 \nGtCO2eq each year, the remaining U.S. carbon budget compatible with the Paris Agreement’s \nclimate targets is extremely small and is rapidly being expended, highlighting the urgent need for \nthe U.S. to transition from fossil fuels to renewable energy. \nIn 2022, the electricity sector accounted for 33 percent of the United States’s total energy-\nrelated CO2 emissions, with 53 percent of emissions from coal, 44 percent from gas, and 2 \npercent from petroleum.106 The power sector therefore has a unique responsibility to decarbonize \n \n103 Corinne LeQuéré, Corinne et al., Global Carbon Budget 2018, 10 Earth Sys. Sci. Data 2141, 2161 fig. 5 (2018); \nGlobal Carbon Project, Global Carbon Budget 2018, 19 (Dec. 5, 2018), \nhttps://www.globalcarbonproject.org/carbonbudget/archive/2018/GCP_CarbonBudget_2018.pdf  (Historical \ncumulative fossil CO2 emissions by country). \n \n104 Yann Robiou du Pont, et al., Equitable Mitigation to Achieve the Paris Agreement Goals, 7 Nature Climate \nChange 38 (2017), and Supplemental Tables 1 and 2. Quantities measured in GtCO2eq include the mass emissions \nfrom CO2 as well as the other well-mixed GHGs (CO2, methane, nitrous oxide, hydrofluorocarbons, \nperfluorocarbons and SF6) converted into CO2-equivalent values, while quantities measured in GtCO2 refer to mass \nemissions of just CO2 itself.  \n \n105 Robiou du Pont, et al. (2017) averaged across IPCC sharing principles to estimate the U.S. carbon budget from \n2010 to 2100 for a 50 percent chance of returning global average temperature rise to 1.5°C by 2100, based on a cost-\noptimal model. The study estimated the U.S. carbon budget consistent with a 1.5°C target at 25 GtCO2eq by \naveraging across four equity principles: capability (83 GtCO2eq), equal per capita (118 GtCO2eq), greenhouse \ndevelopment rights (-69 GtCO2eq), and equal cumulative per capita (-32 GtCO2eq). The study estimated the U.S. \nbudget at 57 GtCO2eq when averaging across five sharing principles, adding the constant emissions ratio (186 \nGtCO2eq) to the four above-mentioned principles. However, the constant emissions ratio, which maintains current \nemissions ratios, is not considered to be an equitable sharing principle because it is a grandfathering approach that \n“privileges today’s high-emitting countries when allocating future emission entitlements.”  \n \n106 How much of U.S. carbon dioxide emissions are associated with electricity generation? U.S. EIA, (Nov. 30, \n2023), https://www.eia.gov/tools/faqs/faq.php?id=77&t=11."},{"page":34,"startToken":10422,"endToken":10709,"text":"34 \n \nall operations and shift away from the fossil fuel energy harming marginalized and vulnerable \ncommunities, as well as species.  \nB. The Commission Has a Mandate to Facilitate the Nation’s Clean Energy \nTransition. \nCongress has directed that FERC make the Nation’s transition away from fossil fuel \npower sources a high priority. In the Energy Act of 2020 Congress set forth a national goal “to \nreduce emissions and meet 100 percent of the power demand in the United States through clean, \nrenewable, or zero emission energy sources . . . .”107  Given FERC’s vital role in overseeing the \nNation’s power sector, this provision demonstrates a Congressional expectation for FERC to \nincorporate decarbonization into all its decision-making. \nThis is not a new Congressional priority. More than forty years ago, Congress passed the \nPublic Utility Regulatory Policies Act (PURPA), directing FERC to reduce the nation’s reliance \non fossil fuels, and charging the agency with administering new programs to foster the \ndevelopment of renewable energy resources.108 Thus, as the Supreme Court has explained, in \nconsidering the use of the term “public interest,” FERC is called upon to consider the objective \nto “reduce reliance on fossil fuels,” based on the fundamental premise that the country benefits \nfrom renewable energy development and the “resulting decrease in the Nation’s dependence on \nfossil fuels.”109 \nMaking decarbonization, as well as larger questions of energy justice, a central priority at \nFERC is also entirely consistent with the remainder of FERC’s statutory mandates. As former \n \n107 Pub. L. No. 116-260, Division Z, § 11003 (2020) (emphasis added).   \n108 Public Utility Regulatory Policies Act, Pub. L. No. 95–617, 92 Stat. 3117 (1978). \n \n109 American Paper Inst. v. Am. Elec. Power Serv. Corp., 461 U.S. 402, 417-418 (1983) (emphasis added)."},{"page":35,"startToken":10709,"endToken":10846,"text":"35 \n \nChairman Glick explained, the agency is charged with making decisions that comport with the \npublic interest, and “it is hard to imagine a consideration more relevant to the ‘public interest’ \nthan the existential threat posed by climate change.”110 Moreover, as noted, in one of the few \ncases to address the definition of “public interest” on a federal level, the U.S. Supreme Court \nnoted the agency’s broad authority to pursue appropriate public interest objectives, including \nenvironmental and conservation objectives.111  \nAccordingly, we urge FERC to affirmatively prioritize the goal of rapid decarbonization \ninto all facets of the transmission planning process. \n \n \n \n \n \n \n \n \n  \n \n  \n \n110 Rich Glick and Matthew Christiansen, FERC and Climate Change, 40 Energy L. J. 1, 6 (2019). \n111 National Association for the Advancement of Colored People v. Federal Power Commission, 425 U.S. 662 \n(1976)."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":5,"startToken":0,"endToken":27},{"p":2,"at":5,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":2,"endAt":26,"startToken":27,"endToken":30},{"p":2,"at":26,"title":"I. THRESHOLD ISSUES THE COMMISSION SHOULD CONSIDER IN ADDRESSING","method":"printed heading","endPage":2,"endAt":134,"startToken":30,"endToken":45},{"p":2,"at":134,"title":"A. The Commission Should Consider The Environmental Implications Of Any Tariff","method":"printed heading","endPage":2,"endAt":428,"startToken":45,"endToken":86},{"p":2,"at":428,"title":"B. The Commission Should Maximize Opportunities For These Facilities To Facilitate","method":"printed heading","endPage":2,"endAt":730,"startToken":86,"endToken":126},{"p":2,"at":730,"title":"II. CENTER COMMENTS ON THE COMMISSION'S QUESTIONS","method":"printed heading","endPage":2,"endAt":784,"startToken":126,"endToken":133},{"p":2,"at":784,"title":"A. Any Tariff Or Other Regulations Must Protect Consumers From Allowing Private","method":"printed heading","endPage":2,"endAt":1456,"startToken":133,"endToken":227},{"p":2,"at":1456,"title":"B. FERC Should Not Leave Any Regulatory Gaps For These Facilities","method":"printed heading","endPage":2,"endAt":1537,"startToken":227,"endToken":239},{"p":2,"at":1537,"title":"A. The Climate Crisis is an Emergency Requiring Urgent Action to Reduce Greenhouse","method":"printed heading","endPage":2,"endAt":1652,"startToken":239,"endToken":257},{"p":2,"at":1652,"title":"B. The Commission has a Mandate to Facilitate The Nation's Clean Energy Transition","method":"printed heading","endPage":3,"endAt":201,"startToken":257,"endToken":297},{"p":3,"at":201,"title":"INTRODUCTION","method":"printed heading","endPage":4,"endAt":949,"startToken":297,"endToken":644},{"p":4,"at":949,"title":"DISCUSSION","method":"printed heading","endPage":4,"endAt":961,"startToken":644,"endToken":645},{"p":4,"at":961,"title":"I. Threshold Issues the Commission Should Consider in Addressing the Matters","method":"printed heading","endPage":4,"endAt":1070,"startToken":645,"endToken":660},{"p":4,"at":1070,"title":"A. The Commission Should Consider the Environmental Implications of Any Tariff","method":"printed heading","endPage":15,"endAt":647,"startToken":660,"endToken":4315},{"p":15,"at":647,"title":"B. The Commission Should Maximize Opportunities For These Facilities To","method":"printed heading","endPage":20,"endAt":313,"startToken":4315,"endToken":5963},{"p":20,"at":313,"title":"II. Center Comments On The Commission’s Questions","method":"printed heading","endPage":20,"endAt":614,"startToken":5963,"endToken":6008},{"p":20,"at":614,"title":"A. Any Tariff or Other Regulations Must Protect Consumers from Allowing","method":"printed heading","endPage":26,"endAt":331,"startToken":6008,"endToken":7876},{"p":26,"at":331,"title":"B. FERC Should Not Leave Any Regulatory Gaps For These Facilities.","method":"printed heading","endPage":29,"endAt":363,"startToken":7876,"endToken":8562},{"p":29,"at":363,"title":"A. The Climate Crisis is an Emergency Requiring Urgent Action to Reduce","method":"printed heading","endPage":34,"endAt":136,"startToken":8562,"endToken":10442},{"p":34,"at":136,"title":"B. The Commission Has a Mandate to Facilitate the Nation’s Clean Energy","method":"printed heading","endPage":35,"endAt":915,"startToken":10442,"endToken":10846}]}
