{"document":{"slug":"rec-20250425-5013","title":"Comments of Clean Air Task Force re FERC's Order Instituting Proceeding under Section 206 of the Federal Power Act and Consolidating with Other Proceedings","issued":"2025-04-25","accession":"20250425-5013","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Clean Air Task Force","kind":"comments","file":"sources/filings/text/20250425-5013_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250425-5013","tier":"record","sha256":"b3000433a7e86b25b436daaaa73e3eee87e986b4e62e6b4b48428f0ea87ba8a6","pages":17,"tokens":4971,"emptyPages":[],"textThemes":["colo","study","adequacy","flex"]},"pages":[{"page":1,"startToken":0,"endToken":195,"text":"UNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. AEP \nKentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company  \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, Division  \nDocket Nos. EL25-49-000"},{"page":2,"startToken":195,"endToken":383,"text":"2 \n \n \nof Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \n \nLarge Loads Co-Located at Generating Facilities \n \n \nConstellation Energy Generation, LLC \n \nv. \n \nPJM Interconnection, L.L.C. \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nAD-24-11-000 \n \n \nEL25-20-000 \n(Consolidated) \n \n \n \nORDER INSTITUTING PROCEEDING UNDER SECTION 206 OF THE FEDERAL \nPOWER ACT AND CONSOLIDATING WITH OTHER PROCEEDINGS \n \nCOMMENTS OF CLEAN AIR TASK FORCE \n \nPursuant to Rule 211 of the Federal Energy Regulatory Commission’s (“Commission”) \nRules of Practice and Procedure, 18 C.F.R. § 385.211, Clean Air Task Force, Inc. \n(“CATF”) respectfully submits these comments responding to the filings of the parties in the \nShow Cause Order pursuant to section 206 of the Federal Power Act (“FPA”) dated February 20, \n2025, seeking information about whether the Open Access Transmission Tariff (“OATT”) of \nPJM Interconnection, L.L.C. (“PJM”), “remains just and reasonable and not unduly \ndiscriminatory or preferential without provisions addressing with sufficient clarity or consistency \nthe rates, terms, and conditions of service that apply to co-location arrangements; or (2)"},{"page":3,"startToken":383,"endToken":684,"text":"3 \n \n \nexplain[ing] what changes to the Tariff would [be necessary to] remedy the identified \nconcerns.”1 \nCATF is a nonprofit organization dedicated to advancing the policy and technology \nchanges necessary to achieve a zero-emissions high-energy planet at an affordable cost. With \nmore than 25 years of internationally recognized expertise on environmental policy and law, and \na commitment to exploring all potential solutions, CATF is a pragmatic, non-ideological \nadvocacy group with the bold ideas needed to address climate change and air pollution. CATF \nhas offices in Boston, Washington, D.C., and Brussels, with staff working remotely around the \nworld.   \nCATF thanks the Commission for initiating this inquiry. CATF’s interest in this docket \narises from our mission, which includes working towards a transition to a clean and sustainable \nenergy system, where costs are just and reasonable for all. Such a future requires careful \nplanning for the transmission development and services required to support the addition of new \nloads and new generation. The recent and imminent surge in demand for co-located generation to \nserve data centers and other large loads makes holistic grid planning even more critical to \nensuring that transmission rates, practices, and procedures are just, reasonable, and not unduly \ndiscriminatory. It is CATF’s view that, not just in PJM, FERC must consider the issues presented \nhere as it engages with transmission planners across the country on regional planning, going \nbeyond a case-by-case approach to create generally applicable rules for integrating new large \nloads onto the grid, with or without co-located generation. Furthermore, until such generally \napplicable rules are created, FERC should not approve any waivers for interconnection service \nagreements.  \n \n1 PJM Interconnection, L.L.C., Order Instituting Proceeding Under Section 206 of the Federal Power Act and \nConsolidating with Other Proceedings at ¶ 2, Docket Nos. EL25-49-000, et al. (“Show Cause Order”)."},{"page":4,"startToken":684,"endToken":1057,"text":"4 \n \n \nAs an initial matter, CATF supports the comments made by Public Interest Organizations \n(PIOs)2 and the Union of Concerned Scientists3 in this docket, and submits this additional letter \nto provide a few supplemental points of specific concern to CATF. \nI. CO-LOCATED GENERATION TO SERVE LARGE LOADS CANNOT BE \nFULLY ISOLATED FROM THE GRID \nAs an initial matter, CATF bases its position on the physical reality that existing and new \ngeneration that is designated to serve large loads cannot be isolated from the rest of the \ntransmission system. CATF supports the conclusions of PJM, Indicated PJM Transmission \nOwners, Public Service Gas & Electric, and the Union of Concerned Scientists that all co-located \nload is Network Load, cannot be fully isolated, and inevitably uses and also impacts the \ntransmission system.4 The co-located load, co-located generator, and transmission system are not \nonly physically connected, but inter-reliant. As such, while fully isolated load configurations \nmay be spelled out in contractual arrangements, the claim that they do not take necessary \nservices from the transmission system is simply not factually supported by the physical operation \nof the system. Co-located operations routinely include unplanned generator run-backs or \nreductions in output, generator MW output oscillations, and co-located load utilization \nfluctuations. When these conditions occur, they result in “brief, but routine, imbalances between \nthe load and the generation that would need to rely on the grid to balance.”5  \n \n2 Comments of Public Interest Organizations, Docket no. EL25-49-000 (April 13, 2025), Accession No. 20250423-\n5243 (“PIO Comments”). \n3 Comments of the Union of Concerned Scientists, Docket no. E;25-49-000 (April 11, 2025), Accession No. \n20250411-5020 (“UCS Comments”).  \n4 Show Cause Order ¶ 4, citing PJM Guidance on Co-Located Load (March 22, 2024); Answer of the Indicated PJM \nTransmission Owners to the Order Instituting the Proceeding Under Section 206 of the Federal Power Act and \nConsolidating with Other Proceedings, Docket no. EL25-49-000 (April 23, 2025), Accession No. 20250324-5298 at \n9; Response of Public Service Electric and Gas Company to Show Cause Order issued on 02/20/2025 under EL25-\n49, et al., Docket no. EL25-49-000 (March 24, 2025), Accession No. 20250324-5299 at 1. \n5 Answer of PJM Interconnection, LLC, Docket No. EL25-49-000 at 45 (March 24, 2025), Accession No. \n20250324-5313 (“PJM Answer”)."},{"page":5,"startToken":1057,"endToken":1397,"text":"5 \n \n \nII. FERC HAS JURISDICTION IN THIS MATTER TO REQUIRE REGIONAL \nTRANSMISSION TARIFF PROVISIONS FOR CO-LOCATED LOAD \nThe Federal Power Act tasks the Commission with the regulation of the transmission and \nwholesale sale of electricity to protect the public interest and ensure just and reasonable rates. 16 \nU.S.C. §§ 824, 824d. The Commission’s jurisdiction extends over all facilities used for the \ntransmission or sale of electric energy in interstate commerce; states maintain jurisdiction over \nthe regulation of facilities used for the generation of electricity. 16 U.S.C. § 824. The \nCommission is required to issue an order setting just and reasonable rates, rules, and practices \nwhenever it determines that existing rates, rules, and practices involving transmission or \nelectricity sales under its jurisdiction are unjust, unreasonable, unduly discriminatory or \npreferential. 16 U.S.C. § 824e. As the Commission sets forth in its Show Cause Order, it has \nauthority and jurisdiction to “ensure that rates, charges, and classifications for . . . wholesale sale \nand transmission as well as the practices directly affecting such sale and transmission, are just \nand reasonable, and not unduly discriminatory or preferential.”6   \nAs the Commission describes at Section VI.A. of the Show Cause Order, the issues raised by \nthe interconnection of large loads co-located with generation resources (either new or existing), \nalso implicate some state jurisdictional questions.7 However, as noted above and described by \nothers, because all co-located generation configurations necessarily receive essential services \nfrom the transmission grid, this makes them subject to FERC’s jurisdiction and consequently all \nrates, practices, and procedures involving such facilities must be just, reasonable, and not unduly \ndiscriminatory.8 As such, considerations related to the adequacy of PJM’s tariff to properly plan \n \n6 Show Cause Order, ¶ 66 (citing FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 278 (2016). \n7 Id., ¶ 67-71. \n8 See UCS Comments at 8-14 (citing Indicated PJM Transmission Owners and NERC to demonstrate how all listed \nconfigurations cannot be isolated); see id. at 17 (“We illustrate how the fully isolated load idea is a fiction…the"},{"page":6,"startToken":1397,"endToken":1744,"text":"6 \n \n \nfor and allocate costs pertaining to such large co-located loads is clearly within FERC’s \njurisdiction under section 206 of the Federal Power Act. 16 U.S.C. §824e. Where, as here, the \nevidence demonstrates that the existing tariff provisions are inadequate, unjust, and \nunreasonable, FERC is obligated to issue new rates, practices, and procedures that comply with \nFederal Power Act requirements. 16 U.S.C. §824d. \nCo-located generation and large load configurations create both the need for additional new \ninvestment in transmission infrastructure and grid system services, and also sometimes include \nthe ability to provide ancillary and other services back to the system. Especially in light of the \nanticipated size of individual generating units and the expected share of the data centers as a \nproportion of future load, it is absolutely critical that grid operators appropriately plan for and \njustly allocate the costs of such investments. As discussed further below, in developing just and \nreasonable rates for co-located load arrangements (particularly any “bring your own generation” \nconfiguration), the Commission must consider both the full costs of transmission services \nnecessary to support such resources, as well as any potential benefits offered by all kinds of co-\nlocated firm generation for system reliability and to meet state clean energy requirements. \nAs set forth in Order No. 1920, the Commission’s jurisdiction clearly extends over the \nholistic transmission system planning necessary to properly identify, implement, and pay for the \nfacilities and services required to support large load growth.9 Along with Orders 888, 890, and \n1000, these Commission directives represent decades of precedent establishing FERC’s authority \n \nloads require transmission and ancillary services because the host generators are unable to operate without the \ngrid.”).  \n9 Building for the Future Through Elec. Reg’l Transmission Plan. & Cost Allocation, 89 Fed. Reg. 49,280 (June 11, \n2024), 187 FERC ¶ 61,068 (May 13, 2024), (hereinafter “Order No. 1920”) at ¶¶ 253-258, order on reh’g & \nclarification, Order No, 1920-A, 89 Fed. Reg. 97,14 (Dec. 6, 2024), 189 FERC ¶ 61,126 (2024) order on reh’g & \nclarification, Order No, 1920-B, 191 FERC ¶ 61,026 (Apr. 11, 2025)."},{"page":7,"startToken":1744,"endToken":2091,"text":"7 \n \n \nto require transmission stakeholders to meet transmission planning practices and procedures \nnecessary to ensure just and reasonable rates.10 Supreme Court Justice Thomas, with Justice \nScalia and Justice Kennedy concurring in part, have weighed in on FERC’s extensive authority \nover transmission, stating that the Federal Power Act “unambiguously grants FERC jurisdiction \nover all interstate transmission and § 824e mandates that FERC remedy undue discrimination \nwith respect to all transmission within its jurisdiction …,” and finding that the statute “require[s] \nFERC … to engage in reasoned decisionmaking to determine whether there is undue \ndiscrimination with respect to transmission associated with retail bundled sales, and if so, what \nremedy is appropriate.”11 \nIII. PER ORDER NO. 1920, DATA CENTERS MUST BE INTEGRATED INTO \nLONG TERM PLANNING TO ADDRESS IMPLICATIONS OF LARGE \nLOADS ON TRANMISSION SYSTEM \nWhile the Commission is asked to look at PJM’s tariff of today, as it considers issuance of a \nbroader ruling it must ensure that planning to meet transmission needs associated with large \nloads in the immediate term also aligns with the requirements of Order No. 1920, the central aim \nof which is to ensure that transmission planners accurately identify long-term transmission needs \nand implement efficient and cost-effective solutions to meet those needs.   \nAs the Commission has found, effective long-term transmission planning is critical to \nunblocking interconnection queue delays that currently thwart the ability to expeditiously bring \n \n10 See, e.g., Transmission Access Policy Study Group v. FERC, 225 F.3d 667, 343 U.S. App. D.C. 151 (D.C. Cir. \n2000) (\"TAPS\"), aff'd sub nom. New York, 535 U.S. 1 (2002) (upholding Order No. 888 in nearly all respects, \nconcluding that the Commission had authority under FPA Section 206 to require open access as a generic remedy \nfor systemic anti-competitive behavior); South Carolina Pub. Svc. Comm. v. FERC, 762 F.3d 41, 63 (D.C. Cir. \n2014) (Statute supports Commission's assertion of authority over transmission planning matters in the challenged \norders, notwithstanding petitioners' contention that the orders intrude on the States' authority). \n11 New York v. FERC, 535 U.S. 1, 42 (2002)."},{"page":8,"startToken":2091,"endToken":2434,"text":"8 \n \n \non new load or develop supply.12 Central to Order No. 1920’s reforms is the transparency of \ninformation regarding future load and supply, without which the ability of transmission planners \nto meaningfully conduct scenario-based planning and choose the best transmission solutions \nbecome impossible. The Order No. 1920 planning process must incorporate information about \nexpected large loads, with or without co-located generation, in order to ensure that regional \ntransmission infrastructure is accurately sized and appropriately located. Such information is also \nessential to ensure that the costs of building the transmission system are fairly assessed and \nallocated. Especially in light of estimates regarding the magnitude of potential load growth from \ndata centers, cryptocurrency, electrification, and increased manufacturing, if Order No. 1920 \nreforms are to succeed, FERC must require these and other large loads be planned as part of that \nprocess.  \nThe system is already experiencing bottlenecks due to the need for additional transmission \nbuildout. Studies estimate that a three to four-fold increase in transmission is needed to meet the \ndemand of the next thirty years.13 Approximately 2,600 gigawatts of generation and storage \ncapacity – of which 95 percent are zero-carbon, low or zero air polluting resources – are waiting \nto connect to the grid today and more transmission is necessary to connect many of these and \nother resources that have been waiting in interconnection queues for years.14 The Commission \n \n12 Order No. 1920 at ¶¶ 107-108. \n13 Nicole Pavia, Future-fitting the grid: How to accelerate federal transmission permitting, Clean Air Task Force \n(Jul. 18, 2024), https://www.catf.us/2024/07/future-fitting-grid-how-accelerate-federal-transmission-permitting/; \nClean Air Task Force & Niskanen Center, How are we going to build all that clean energy infrastructure? (Aug. \n2021), https://www.niskanencenter.org/wp-\ncontent/uploads/2021/08/CATF_Niskanen_CleanEnergyInfrastructure_Report.pdf.   \n14 Nicole Pavia, Testimony Before the United States Senate Committee on Environment and Public Works \nImproving the Federal Review and Permitting Processes, \nhttps://www.epw.senate.gov/public/_cache/files/4/d/4dbae8e8-0f66-4ddc-9d2e-\n8ec431e6ed26/18CF4B86636126A39982FF1854890BB02118CC591EA301C8C1C3D3307E78AE66.02-19-2025-\npavia-testimony.pdf (citing Lawrence Berkeley National Laboratory, Queued Up: Characteristics of Power Plants"},{"page":9,"startToken":2434,"endToken":2779,"text":"9 \n \n \nand grid stakeholders have already invested years in building consensus for a path forward to \ndeal with all of the resources in need of increased transmission and have embodied those \nsolutions in Order Nos. 1920 and 2023.15 Improved regional and interregional transmission will \nalleviate current grid congestion, provide lower-priced energy, and reduce incentives for large \nloads to try and avoid the long delays associated with the planning and interconnection \nprocesses.16 But if the Commission were to bless the ability of large loads capable of buying \nresources currently relied upon by the entire grid to essentially exempt themselves from these \nprocesses, those reforms will fail. \nPer Order No. 1920, transmission planners must integrate data centers and co-located \ngeneration into their long-term planning for upgrading transmission. As stated above, see Section \nI, data centers with co-located generation are not wholly isolated from the grid in the first place \nand thus must not be permitted to be treated as such. The load growth from data centers is \nunprecedented,17 but must be treated as a long-term issue–their usage is but one driver of \nexponential load growth and must be planned for accordingly. While it may appear faster for \ndata centers to “skip” the interconnection process and pursue behind-the-meter connections to \nload without connection to the transmission system, evidence in this docket has shown such an \narrangement to be physically impossible, presenting major risks in reliability and costs to the \n \nSeeking Transmission Interconnection (April 2024), https://emp.lbl.gov/queues.); Department of Energy, National \nTransmission Needs Study (October 2023) 20, 74-79, at: https://www.energy.gov/sites/default/files/2023-\n12/National%20Transmission%20Needs%20Study%20-%20Final_2023.12.1.pdf (hereinafter “National \nTransmission Needs Study”). \n15 Improvements to Generator Interconnection Procedures and Agreements, 184 FERC ¶ 61,054 (2023) (“Order No. \n2023”). \n16 Id. at 32-34.  \n17 See Arman Shehabi et al., 2024 United States Data Center Energy Usage Report (Dec. 2024), available at \nhttps://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers \n(showing domestic energy usage from data centers is expected to double or triple by 2028)."},{"page":10,"startToken":2779,"endToken":3107,"text":"10 \n \n \nentire grid system.18 Many loads urgently need to be connected to the grid,19 and data centers are \nbut one kind of such demand. There is little reason and considerable risk in establishing tariff \nterms that allow data centers and co-located generation to effectively do an end run around the \nmuch needed and required long-term transmission planning process designated by Order No. \n1920 or the interconnection queue reforms put into place by Order 2023. \nIV. FERC MUST ENSURE COSTS ASSOCIATED WITH CO-LOCATED LARGE \nLOADS ARE FAIRLY ALLOCATED \nAllocating the transmission system costs of co-located loads and generation in a just, \nreasonable, and not unduly discriminatory manner requires a thorough and transparent evaluation \nof the costs and benefits associated with large co-located loads. The need for FERC to act \nexpeditiously to establish straightforward rules applicable across the regions is necessary to get \nin front of a rapidly growing industry whose attendant load, costs, and operations could upend \ngrid operations if not the Commission does not act. There is already considerable pressure on \nregional and interstate grid operators due to large loads seeking interconnection, with or without \nco-located generation.20 This pressure is exacerbated by interconnection queue delays in PJM \nthat have motivated data centers to “skip” the queue via co-location and proposed reshuffling of \nqueues.21 There is already clear evidence of such queue skipping occurring, where large loads \n \n18 See, e.g., generally, UCS Comments; PIO Comments at 30-32.  \n19 Nicole Pavia, supra note 14. \n20 National Transmission Needs Study at 87. \n21 See, e.g., Protest of Public Interest Organizations, at 2-4, 6-11, Docket No. ER24-2045 (June 20, 2024), Accession \nNo. 20240620-5242 (documenting PJM’s backlogged interconnection queue and significant delays in processing \ninterconnection requests); \nFinal Brief of Respondent-Intervenors Interconnection Reform Advocates, at 39-44, Advanced Energy United et al. \nv. FERC, Case No. 23-1282, Document No. 211411 (Apr. 16, 2025) (“PJM had, and still has, one of the longest and \nmost-backlogged interconnection queues of any region”)."},{"page":11,"startToken":3107,"endToken":3498,"text":"11 \n \n \n“shop” multiple queues, making the amount of co-located load pressure on the system seem \nlarger than it is.22 \nThis uncertainty makes planning for such rapid growth both precarious and expensive. As \nPIOs aptly point out, energy costs in the PJM region are skyrocketing, and PJM has already \nissued a call to build $5.9B in new transmission lines needed largely to serve expected growth \nfrom data centers—incurring immense costs23 that are being borne by PJM’s ratepayers.24 FERC \nhas recently approved price ceilings for capacity markets limiting price hikes for consumers,25 \nbut more needs to be done to ensure that the costs and benefits of transmission infrastructure and \nservices associated with the growth of data centers are accurately assessed and justly allocated. \nThe evidence of speculation and queue jumping by generators seeking to quickly serve data \ncenters via co-location end runs around standard planning and interconnection requirements, \nalong with attendant risks to reliability and market manipulation as outlined by PIOs,26 reinforces \nthe need to level the planning playing field by requiring co-located generation serving large loads \nto be addressed as part of a holistic grid planning, interconnection, and cost-allocation process \napplicable to all stakeholders connected to the grid. To do otherwise for an economic sector that \n \n22 PIO Comments at 17, n.43, citing 2025 Pennsylvania Environmental Law Forum (April 14, 2025), \nhttps://www.pbi.org/product/pba-environmental-energy-law-section-annual-dinner/; id. at 18 n.44, citing Technical \nConference Transcript at 26 Docket No. AD24-11 (Nov. 1, 2024), https://www.ferc.gov/media/transcript-technical-\nconference-regarding-large-loads-co-located-generating-facilities  \n23 Zachary Skidmore, PJM approves $5.9bn in new transmission projects to support data centers, Data Center \nDynamics (Mar. 4, 2025), https://www.datacenterdynamics.com/en/news/pjm-approves-59bn-in-new-transmission-\nprojects-to-support-data-centers/.  \n24 Renee Sanders, 2025-2026 PJM Capacity Auction & Its Consumer Impact, Integrity Energy, (last edited Feb. 27, \n2025), https://www.integrityenergy.com/about/news-media/pjm-announces-expensive-energy-changes-in-2025/ \n(“Businesses can expect commercial energy bills to increase by up to 29% starting in June 2025”); Ethan Howland, \nMaryland electric customers face up to 24% bill hikes from PJM capacity auction: report, Utility Dive (Aug. 15, \n2024), https://www.utilitydive.com/news/maryland-bge-pepco-electricity-bill-pjm-capacity-auction-opc-\nratepayer/724319/ (price hikes from 2024 in the PJM region).  \n25 Peter Behr, FERC approves ceiling on PJM power supply payments, EnergyWire (Apr. 23, 2025), \nhttps://www.eenews.net/articles/ferc-approves-ceiling-on-pjm-power-supply-payments/.  \n26 See PIO Comments at 17-19, 26-30."},{"page":12,"startToken":3498,"endToken":3843,"text":"12 \n \n \nis estimated to consume as much as 12 percent of the nation’s electricity as soon as 202827 could \nfatally undermine the critical reforms necessary to develop transmission infrastructure for all \nstakeholders that was achieved as part of Order Nos. 1920 and 2023.   \nIn order for the cost allocation of improved transmission to be just, reasonable, and not \nunduly discriminatory, FERC must first require clean and transparent accounting of benefits and \nburdens of each large co-located load interconnection for the transmission system and detailed \naccounting of what costs and benefits actually flow to the broader group of ratepayers charged \nwith paying them. As other commenters have demonstrated, this is not currently occurring.28 \nTransparent and accurate accounting is crucial for ensuring accurate load forecasts that directly \ndetermine what rates are set.  \nTariffs should also enable potential benefits of co-located load and generator arrangements to \nflow toward the grid, including establishing provisions for co-located facilities to perform \ndemand response or other grid services based on the full value of any benefits they may provide \nfrom either side of the meter. These include but are not limited to avoided investment costs, \naccess to lower cost power, or blackstart and other ancillary services, and in certain situations \nwhere zero- or low-carbon firm generation is co-located, helping states to meet their clean \nenergy obligations. Tariff provisions also can and should be written to enable participation by \nany type of resource and establish reasonable penalties for non-performance that reflect the \noperating limitations of the type of resource.29 Co-located generation and storage could increase \n \n27 Arman Shehabi, et al., 2024 United States Data Center Energy Usage Report, 5, LBNL-2001637, Lawrence \nBerkley Nat‘l Lab at: lbnl-2024-united-states-data-center-energy-usage-report.pdf. \n28 See Comments of PIOs, pages 11-14.  \n29 Order Denying Complaint, 184 FERC ¶ 61,137 (Aug. 31, 2023), Cmr’s Phillips and Clements concurring, at ¶ 3 \n(“Should DIRs become significantly and demonstrably more likely to clear ancillary services when they are \ndeliverable, a tariff that fails to allow DIRs to provide those services could be rendered unjust and unreasonable and \nunduly discriminatory or preferential.”)"},{"page":13,"startToken":3843,"endToken":4158,"text":"13 \n \n \nthe flexibility potential of the net-load of the whole facility (load and generation resources) \nrelative to traditional load. As the Nicholas Institute describes in a recently-issued study \nconcerning planning for the interconnection of large loads into the U.S. power system, “load \nflexibility can accelerate interconnections, reduce ratepayer costs through higher system \nutilization, and expand the role of demand response, particularly for A.I.-specialized data \ncenters,”30 which are of high concern.  \nV. PJM’s SUGGESTION THAT THERE IS NEED FOR LESSENED AIR \nPOLLUTION STANDARDS FOR CO-LOCATED GENERATION SHOULD \nBE REJECTED \nThe Commission can and should prioritize transmission planning and tariff provisions for co-\nlocated configurations that do not rely on additional diesel generator back up supply or the \nlessening of air pollution standards. In response to the Commission’s original request to PJM and \nthe Transmission Owners to discuss the benefits of back-up service in co-located load situations, \nPJM suggests an option that would allow more reliance on stationary reciprocating internal \ncombustion engines (“RICE”), as back up resources to serve the co-located load when the \nprimary co-located generator is not available.31 Additionally, PJM suggests that current \nlimitations on the situations and total number of hours when units can be used should be \nloosened “to address resource adequacy concerns in the short term.”32 \nCATF disagrees with assertions that current restrictions on the use of diesel RICE must be \nlifted or lessened in order to avoid resource adequacy concerns. As noted above, co-located \n \n30 T. Norris, T. Profeta, D. Patino-Echeverri, A. Cowie-Haskell, Nicholas Institute for Energy, Environment & \nSustainability, “Rethinking Load Growth Assessing the Potential for Integration of Large Flexible Loads in U.S. \nPower Systems” (February, 2025) at 2, available at: https://nicholasinstitute.duke.edu/publications/rethinking-load-\ngrowth. \n31 PJM Answer at 9, 19, 69-70 & Exh. A (Option 8).   \n32 Id. at 70. Notably, a decision to weaken air quality standards is not FERC-jurisdictional."},{"page":14,"startToken":4158,"endToken":4473,"text":"14 \n \n \ngeneration and loads cannot be fully islanded, and indeed new large loads even where they bring \ntheir own generation should be considered full transmission system participants. FERC should \nprioritize transmission planning efforts to accommodate even large loads and co-located \ngeneration interconnections that can alleviate the asserted need for additional onsite diesel \nbackup RICE units. \nAnd, as noted above in the Section IV, co-located loads offer demand response attributes that \ncan and should be considered in developing tariff provisions, and in transmission planning \ngenerally. Where those loads “bring their own generation” resources, those too can provide \nsupport and ancillary services where interconnected with the transmission system. And where \nco-located generation provides clean firm service, it may also yield a benefit to states in meeting \ntheir own clean energy standards or portfolio requirements; such benefits also should be \nrecognized.33 Those considerations mitigate against the need either for a larger number of back \nup diesel RICE or loosened air quality regulatory requirements on RICE units. \nImportantly, limitations on backup RICE to supply electricity to co-located loads, except in \nemergency situations, are a necessary requirement in order for those RICE units to comply with \nstandards established by the Environmental Protection Agency (“EPA”) for the control of \nemissions of hazardous and other air pollutants.34 RICE units emit several toxic air pollutants, \nincluding formaldehyde and benzene which are known human carcinogens, as well as smog-\n \n33 For an explanation of the benefits of clean firm generation, see Clean Air Task Force, Clean Firm Electricity \nSupply and Load Growth (March 26, 2025), https://www.catf.us/events/clean-firm-electricity-supply-load-growth/; \nsee also Clean Air Task Force, Tracking clean energy in U.S. states (2025), https://www.catf.us/us/state-\npolicy/clean-electricity-standards/ (showing state requirements for clean energy). \n34 NESHAP for Hazardous Air Pollutants for Reciprocating Internal Combustion Engines, and New Source \nPerformance Standards, 78 Fed. Reg. 6674 (Jan. 30, 2013)."},{"page":15,"startToken":4473,"endToken":4766,"text":"15 \n \n \nforming NOx and VOCs, and particulate matter which causes and worsens respiratory ailments.35 \nCalls for lessening those requirements are both outside of FERC’s jurisdiction, as the standards \nare completely within EPA’s authority, 42 U.S.C. § 7412, and unnecessary. FERC planning and \ntariff provisions must accommodate co-located loads and generation, assuming all onsite \ngeneration is compliant with environmental regulations.  \nIt is CATF’s position that as FERC considers co-located generation and large loads in its \ntransmission planning processes, and in developing tariff provisions, there are many transmission \nsystem benefits offered both by co-located clean firm generating resources, and by the co-located \nlarge loads, that make the need to add additional RICE or longer run hours for existing RICE \nunnecessary. And CATF disagrees that “accessing this additional [RICE] capability more \nactively” by loosening air quality and public health-beneficial limitations on RICE run time is \nneeded to facilitate large load interconnections.36   \nVI. CONCLUSION \nCATF applauds FERC’s consideration of these important issues. Increased demand for \ntransmission services, driven in part by large loads such as data centers, whether or not co-\nlocated with generation have made careful consideration of how tariff provisions properly can \nsupport interconnection and transmission access and assure just, reasonable, and non-\ndiscriminatory rates. Co-located large loads and generation cannot be fully isolated from the \ngrid, and the costs associated with the additional load, as well as the benefits provided to the \nsystem and to the states by clean firm co-located generation, must be reflected in rates, practices, \n \n35 Regulatory Impact Analysis (RIA) for the Reconsideration of the Existing Stationary Compression Ignition \nEngines (SI) RICE NESHAP (January 2013) at Ch. 7, https://www.epa.gov/sites/default/files/2020-\n07/documents/ic-engines_ria_reconsider-existing-si-engines_2013-01.pdf.  \n36 PJM Answer at 70."},{"page":16,"startToken":4766,"endToken":4907,"text":"16 \n \n \nand procedures that are consistent with transmission access and cost-causation principles \napplicable to all other loads and generators. That analysis must consider the benefits to the grid \npresented by flexible load that is demand responsive, as well as the costs to the grid of the \nadditional services the new load or generator will necessarily require. FERC must require large \nloads with co-located generation (such as data centers) to follow the same interconnection \nrequirements of Order 2023 and long-term transmission process set forward in Order No. 1920, \nassuming all co-located generation meets otherwise applicable environmental standards. We \nthank the Commission for the opportunity to comment on this matter. \n \nRespectfully submitted on this 24th day of April 2025. \n \n \n \n \n \n/s/ Ann Brewster Weeks \n \n \n \n \n \nAnn Brewster Weeks \n \n \n \n \n \nClean Air Task Force \n \n \n \n \n \n114 State Street, 6th Floor \n \n \n \n \n \nBoston, MA 02109 \n \n \n \n \n \n(617)-642-0234 \n \n \n \n \n \naweeks@catf.us"},{"page":17,"startToken":4907,"endToken":4971,"text":"17 \n \n \nCERTIFICATE OF SERVICE \nI hereby certify that the foregoing has been served in accordance with 18 C.F.R. § 385.2010 \nupon each party designated in the official service list compiled by the Secretary in this \nproceeding, by email. \n \n \n \n/s/ Ann Brewster Weeks \nAnn Brewster Weeks, Of Counsel \nClean Air Task Force \n114 State Street, 6th Floor \nBoston, MA 02109 \naweeks@catf.us"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":4,"endAt":261,"startToken":0,"endToken":725},{"p":4,"at":261,"title":"I. CO-LOCATED GENERATION TO SERVE LARGE LOADS CANNOT BE","method":"printed heading","endPage":5,"endAt":7,"startToken":725,"endToken":1058},{"p":5,"at":7,"title":"II. FERC HAS JURISDICTION IN THIS MATTER TO REQUIRE REGIONAL","method":"printed heading","endPage":7,"endAt":784,"startToken":1058,"endToken":1853},{"p":7,"at":784,"title":"III. PER ORDER NO. 1920, DATA CENTERS MUST BE INTEGRATED INTO","method":"printed heading","endPage":10,"endAt":466,"startToken":1853,"endToken":2855},{"p":10,"at":466,"title":"IV. FERC MUST ENSURE COSTS ASSOCIATED WITH CO-LOCATED LARGE","method":"printed heading","endPage":13,"endAt":518,"startToken":2855,"endToken":3917},{"p":13,"at":518,"title":"V. PJM’s SUGGESTION THAT THERE IS NEED FOR LESSENED AIR","method":"printed heading","endPage":15,"endAt":1064,"startToken":3917,"endToken":4624},{"p":15,"at":1064,"title":"VI. CONCLUSION","method":"printed heading","endPage":17,"endAt":8,"startToken":4624,"endToken":4908},{"p":17,"at":8,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":17,"endAt":384,"startToken":4908,"endToken":4971}]}