{"document":{"slug":"rec-20250515-0003","title":"Comments of Exus Renewables North America in support of Option 6 proposed in PJM Interconnection, L.L.C.’s 03/24/2025 response to FERC's February Order to…","issued":"2025-05-15","accession":"20250515-0003","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EXUS RENEWABLES NORTH AMERICA","kind":"comments","file":"sources/filings/text/20250515-0003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250515-0003","tier":"record","sha256":"9ce5ed8f9ff75c5b41d342ab78a4b11489b01a3d40825f30ffcc7ed16a61a186","pages":3,"tokens":694,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":13,"text":"ORIGINAL \nFILED \nSECRETARY OF THE \n\"ISSION \n1015 rAY I S P 1: 5L."},{"page":2,"startToken":13,"endToken":403,"text":"exus \nRenewables \nNORTI4 AMERICA \nEdith Webster-Freed \nSenior Vice President & General Counsel \nEWF(&exus.us \n929-715-3876 \nNew York \nwww.exus.us \nApril 23, 2025 \nDebbie-Anne A. Reese \nSecretary, Office of the Secretary \nFederal Energy Regulatory Commission \n888 First Street, NE \nWashington, DC 20426 \nRE: \nLarge Loads Co-Located at Generating Facilities and Show Cause Proceeding in \nPJM Interconnection, L.L.C.; Docket Nos. EL25-49-000 and AD24-11-000 \nDear Secretary Reese: \nOn behalf of Exus Renewables North America (\"Exus\"), a leading independent owner, \ndeveloper, and operator of utility-scale renewable energy projects throughout the United States, I \nam writing in support of Option 6 proposed by PJM Interconnection, L.L.C. (\"PJM\") in PJM's \nMarch 24, 2025 answer (\"Answer\") to the Federal Energy Regulatory Commission's \n(\"Commission\" or \"FERC\") February \"Order to Show Cause\" in the above-referenced dockets.' \nPJM, in furtherance of its fundamental responsibility to maintain grid reliability, proposes to \nmaintain Existing Option 1 and Existing Option 2 because those options should achieve the \nhighest levels of reliability while utilizing existing Network Integration Transmission Service \n(\"NITS\") rules.2 \nIn its Answer, PJM emphasizes the obligation to serve new large loads and advances several new \noptions to serve large loads. Option 6, which incentivizes a new large load to become a \nnetworked load and bring its own generation that would serve as a PJM Capacity Resource, \npresents several compelling features to a project developer like Exus while also addressing \nreliability, operational, and fairness concerns raised in the Commission's Show Cause Order. \nOption 6 balances the interests of new large loads with existing consumers. Exus understands \nthat Option 6 ensures fair treatment to existing customers because the new networked load would \nremain responsible for the appropriate NITS charges based on the load's actual use of the \ntransmission system. The co-located, front-of-the-meter generation resource would be \nresponsible for reasonable costs associated with the generator interconnection. As a result, the \nExus is not requesting to intervene in the above-referenced proceedings out of time or to otherwise become a party \nof record. Exus is instead submitting these brief comments from the perspective of an active project developer for \nconsideration by the Commission in rendering a decision in response to PJM's Answer. \n2  See \"Answer of PJM Interconnection, L.L.C.\" PJM Interconnection, L.L.C. et al. Docket Nos. EL25-49-000, \nAD24-11-000, and EL25-20-000 at Exhibit A (filed Mar. 24, 2025)."},{"page":3,"startToken":403,"endToken":694,"text":"existing grid and customer base would not be adversely impacted by the large load addition \nbecause the large load would not be causing improper cost shifts or facilitating the removal of \nany existing generation capacity from participating in the PJM-administered markets. \nUnlike other new proposed options, Option 6 addresses resource adequacy in an accelerated \nfashion by incentivizing the new large load to bring networked generation in exchange for a \nfaster interconnection with accelerated interconnection studies of any new (or replacement) \ngeneration. Critically, Option 6 would be open to both existing generation and new generation \nthat has arrangements in place with generation that is scheduled to deactivate, thereby advancing \nseveral state and federal policies around economic redevelopment and repurposing existing \ninfrastructure. \nOption 6 would allow bilateral transactions (transparently reflected in the market) between the \nnetworked co-located generation and the new large load for financial and contractual purposes. \nThe co-located generation would be able to retain its Capacity Resource status through a grid \nconnection, thereby allowing PJM to call on the resource during capacity emergencies. \nOption 6 also accommodates different state policies, allowing an interested state to pursue its \npolicy goals on a case-by-case basis through the State Agreement Approach that would allow \naccelerated investment in the new large load infrastructure connection via the State's assumption \nof cost responsibility for applicable transmission upgrades in PJM's Regional Transmission \nExpansion Plan. \nFurther, PJM explains that, while some Tariff revisions may be required, most of the existing \nframework is in place and the new large load would be studied pursuant to the existing \ntransmission owner/electric distribution company application and study processes for new \ncustomers and new load connections. \nThank you for the Commission's consideration of these comments. \nSincerely, \nEdith Webster-Freed \nSenior Vice President & General Counsel"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 3","method":"page range","endPage":3,"endAt":2073,"startToken":0,"endToken":694}]}