{"document":{"slug":"rec-20250603-5174","title":"Motion for Leave to Answer and Answer of the Indicated PJM Transmission Owners to various filings made on and after 04/23/2025","issued":"2025-06-03","accession":"20250603-5174","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Exelon CorporationAmerican Electric Power CorporationAMP Transmission, LLC ,City of Cleveland, Department of Public Utilities, Division ,City of Hamilton, OH ,southern maryland electric cooperative ,Duke Energy Corporation ,Duquesne Light Company ,The FirstEnergy Transmission Companies ,East Kentucky Power Cooperative, Inc. ,Old Dominion Electric Cooperative ,PPL Electric Utilities Corporation ,Rockland Electric Company ,UGI Utilities Inc. ,Wabash Valley Power Association, Inc. ,","kind":"answer","file":"sources/filings/text/20250603-5174_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250603-5174","tier":"record","sha256":"4bb94b43218b8ce47363ace80e85ba83ec112d39f1e5d610c96a0a72e5280f15","pages":48,"tokens":12951,"emptyPages":[],"textThemes":["colo","study","flex","cost"]},"pages":[{"page":1,"startToken":0,"endToken":352,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n \n) \nDocket No. EL25-49-000 \n \nLarge Loads Co-Located at Generating \nFacilities \n) \nDocket No. AD24-11-000 \nConstellation Energy Generation, LLC \n \nv. \n \nPJM Interconnection, L.L.C. \n) \n \n) \n \n) \nDocket No. EL25-20-000 \n(consolidated) \n \nMOTION FOR LEAVE TO ANSWER AND ANSWER  \nOF THE INDICATED PJM TRANSMISSION OWNERS \n \nPursuant to Rules 212 and 2131 of the Rules of Practice and Procedure of the Federal \nEnergy Regulatory Commission (“FERC” or “Commission”) and the Commission’s Show Cause \nOrder,2 the Indicated PJM Transmission Owners (“Indicated TOs”)3 submit this Motion for Leave \nto Answer and Answer to the various filings made in the above-captioned dockets on and after \n \n1  \n18 C.F.R. §§ 385.212, 385.213 (2024). \n2  \nPJM Interconnection, L.L.C., 190 FERC ¶ 61,115, at Ordering Paragraph (D) (2025) (“Show Cause Order”). \n3  \nThe Indicated TOs include: American Electric Power Service Corporation, on behalf of Appalachian Power \nCompany, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio \nPower Company, Wheeling Power Company, AEP Appalachian Transmission Company, Inc., AEP Indiana \nMichigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission \nCompany, Inc., and AEP West Virginia Transmission Company, Inc.; AMP Transmission, LLC; City of \nCleveland, Department of Public Utilities, Division of Cleveland Public Power; City of Hamilton, OH; Duke \nEnergy Corporation on behalf of its affiliates Duke Energy Ohio, Inc., Duke Energy Kentucky, Inc., and Duke \nEnergy Business Services LLC; Duquesne Light Company; East Kentucky Power Cooperative; Exelon \nCorporation, on behalf of Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth \nEdison Company, Commonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO \nEnergy Company, and Potomac Electric Power Company; FirstEnergy Service Company, as agent for its affiliates \nAmerican Transmission Systems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate \nTransmission LLC, Keystone Appalachian Transmission Company, The Potomac Edison Company, \nMonongahela Power Company and Trans-Allegheny Interstate Line Company (collectively, the “FirstEnergy \nTransmission Companies”); Old Dominion Electric Cooperative; PPL Electric Utilities Corporation; Rockland \nElectric Company; Southern Maryland Electric Cooperative, Inc.; UGI Utilities Inc; and Wabash Valley Power \nAssociation, Inc."},{"page":2,"startToken":352,"endToken":746,"text":"2 \n \nApril 23, 2025.  Under Rule 213(a)(2)4 of the Commission’s Rules of Practice and Procedure, the \nCommission may authorize an answer to an answer.  There is good cause to accept this answer \nbecause it ensures a further developed record for the Commission’s decision making.5 \nI. The Standard Under Federal Power Act Section 206 Has Not Been Met. \nThe Federal Power Act (“FPA”), under section 205, requires “[a]ll rates and charges made, \ndemanded, or received by any public utility for or in connection with the transmission or sale of \nelectric energy subject to the jurisdiction of the Commission, and all rules and regulations affecting \nor pertaining to such rates or charges shall be just and reasonable.”6  FPA section 206, on the other \nhand, empowers the Commission, on its own motion or upon complaint from a third party, to \nremedy any “rate [or] charge” or “any rule, regulation, practice, or contract affecting such rate [or] \ncharge” that is found to be “unjust [or] unreasonable.”7  The requirement that the rate or charge \nmust be found to be unjust and unreasonable before alternatives may be considered is a necessary, \nreal, and meaningful one.  Only after a successful showing that the existing rate is unjust and \nunreasonable, may the Commission order a replacement rate.8  And, “[t]he burden of proving an \nunjust or unreasonable rate rests with the party that initiated the proceeding—that is, the \nCommission or the third-party complainant.”9  Neither the Commission nor any of the parties \nsupporting the initiation of this FPA section 206 proceeding have demonstrated that the existing \n \n4  \n18 C.F.R. § 385.213(a)(2). \n5  \nSee, e.g., PJM Interconnection, L.L.C., 191 FERC ¶ 61,112 at P 29 (2025) (accepting “answers because they . . . \nprovided information that assisted [the Commission] in [its] decision-making process”). \n6  \n16 U.S.C. § 824d(a). \n7  \nId. § 824e(a). \n8  \nId.  See also N.J. Bd. of Pub. Utils. v. FERC, 744 F.3d 74, 94–95 (3d Cir. 2014) (”[U]nder § 206, FERC may \nchange a rate in response to a complaint or on its own motion, only if the moving party demonstrates that the \nexisting rate is unjust and unreasonable and the proposed alternative is just and reasonable.”). \n9  \nPub. Citizen, Inc. v. FERC, 7 F.4th 1177, 1183 (D.C. Cir. 2021)."},{"page":3,"startToken":746,"endToken":1096,"text":"3 \nPJM Open Access Transmission Tariff (“PJM Tariff”) is unjust and unreasonable.  Consequently, \nthe only action that may lawfully be taken is to terminate this proceeding. \nA. The Current PJM Tariff Is Just and Reasonable and Not Unduly\nDiscriminatory, and No One Has Demonstrated Otherwise.\nNotwithstanding proposed alternative arrangements for co-located load, no party has \nshown that the PJM Tariff is unjust and unreasonable.  Several parties have offered proposals that \nthey claim would aid the development of co-located loads.  But, the Indicated TOs have explained \nat length why these proposals would harm, rather than help, the ability of PJM to accommodate \nco-located interconnection arrangements, and the attached Declaration of Danielle S. Powers \n(“Powers Declaration”) elaborates on those arguments.  More importantly, however, the claim—\neven if it were true, which it is not—that a different tariff might advantage certain load does not \ndemonstrate that the existing tariff is unjust or unreasonable.   \nSome parties try to turn this process on its head.  They claim that the PJM Tariff should be \nchanged because the Indicated TOs have not made an adequate “showing that PJM’s Tariff is just \nand reasonable or not unduly discriminatory, or that changes are not needed to enable progress.”10  \nAs the Indicated TOs have also repeatedly stressed, that is not the law; indeed, it is 180 degrees \noff.  The burden is not on PJM or the transmission owners to show that the PJM Tariff is just and \nreasonable; the burden is on parties seeking a change in the rate to demonstrate the existing tariff \nis not just and reasonable.  The Commission may order a replacement rate under Section 206 only \nafter a successful showing that the prevailing rate is unjust and unreasonable.11  No such showing \nhas been made.   \n10  EPSA/P3 Comments at 3 (Apr. 23, 2025). \n11  16 U.S.C. § 824e(a); see also Pub. Citizen, Inc. v. FERC, 7 F.4th 1177, 1183 (D.C. Cir. 2021) (“The burden of \nproving an unjust or unreasonable rate rests with the party that initiated the proceeding—the Commission [(as in \nthis case)] or the third-party complainant.”)."},{"page":4,"startToken":1096,"endToken":1409,"text":"4 \n \nConstellation argues that requiring all new load to become Network Load,12 like all other \nend use load, will cause “years of delay” and “induce[] massive and unnecessary overbuild of the \nsystem.”13  This claim is sensationalist and unsubstantiated.  No party has demonstrated that it has \nbeen unable to receive service under the existing system or that it is experiencing an undue delay \nfor a request for service under the current PJM Tariff.  Nor has there been a coherent explanation \nfor the claim that study processes of new large loads are unjust and unreasonable.  To the contrary, \nthe evidence in the proceeding points to huge potential system impacts arising from contemplated \ncity-sized loads, and a need for a reliability study regardless of how such loads propose to be \nconnected.   \nNor does the fact that some parties are complaining about the PJM Tariff show that it is \nunjust or unreasonable.  There are two transmission options under the existing PJM Tariff: \nNetwork Integration Transmission Service (“Network Service” or “NITS”) or Point-to-Point \nTransmission Service (“PTP Service”).  A preference for alternative rate structures is not evidence \nthat the existing forms of transmission service are unjust and unreasonable.  Vistra claims the \nexisting PJM Tariff includes “a structural bias in favor of network transmission-serviced load and \nagainst competitive, bilateral supply arrangements between sophisticated buyers and market-based \nrate . . . sellers.”14  However, what Vistra wants is an alternative form of service that is cheaper for \nit at the expense of other transmission customers.  But the fact that the cheaper-for-Vistra (and \nother similarly situated entities) service is unavailable does not make the existing PJM Tariff \nunreasonable.  As explained above, there are options for customers to obtain service.  Those \n \n12  Capitalized terms not otherwise defined herein shall have the meanings set forth in the PJM Tariff. \n13  Constellation Answer at 4 (Apr. 23, 2025). \n14  Vistra Comments at 4 (Apr. 23, 2025)."},{"page":5,"startToken":1409,"endToken":1725,"text":"5 \n \noptions work and are provided at rates that the Commission has found to be just and reasonable \nand are designed to recover the embedded costs of the PJM grid.  There is nothing unjust or \nunreasonable about these well-established structures.  Moreover, the establishment of tariff \nprovisions that would grant an advantage or preference in favor of co-located loads that would \ntake but not pay for grid services—which is what is being attempted by some in this proceeding—\nwould result in a structural bias that benefits co-located load at the expense of other customers \npaying Network Service.  \nTalen similarly argues that the PJM Tariff is unjust and unreasonable because it “do[es] \nnot presently outline regulatory guardrails for many of the potential configurations that co-located \nload arrangements may take.”15  This argument amounts to nothing more than a desire for a \ncheaper option, without demonstrating why the existing service is unjust and unreasonable.  The \nnecessary guardrails are the express service definitions.  No one has alleged that they cannot get \nservice for their customers using existing transmission services.  Nothing in the FPA requires that \na tariff provide alternative, more favorable treatment for co-located load.  In fact, such “regulatory \nguardrails” would flout the requirement in the FPA that a tariff not grant undue preference or undue \nrate discrimination among customers.16 \nBeyond these untenable claims of harm, some parties’ arguments about the services to end-\nuse load connecting “behind” a generator’s meter rely on a single, flawed premise: that moving \nthe location of the meter changes the degree to which a load relies on grid services or the nature \nof those services.  This is fiction.  So when Constellation claims that the Indicated TOs have \n“conflat[ed] the benefits received from ancillary services by the co-located generator with the use \n \n15  Talen Answer to Settlement Motion at 3 (May 13, 2025). \n16  See 16 U.S.C. § 824(b)."},{"page":6,"startToken":1725,"endToken":2055,"text":"6 \n \nof the transmission system to deliver energy,”17 or Vistra states that “transmission system charges \nfor load served by co-located generation should be based on actual use of the transmission \nsystem,”18 they are pretending that the position of the generator’s meter actually changes those \nservices.  It does not.  Nor does it change the fact that the generator and the load continue to rely \non the grid connection to function.   \nThe Commission has rejected arguments that transmission service must be based on \nspecific load flows because the “assessment of [Network Integration Transmission Service] is not \nbased on actual use over a particular transmission path, but rather based on the network customer’s \nright to use the entire system.”19  This approach to transmission service also comports with FPA \nsection 205(b), which prohibits an undue advantage or preference or “any unreasonable difference \nin rates, charges, service, facilities, or in any other respect . . . as between classes of service.”20  \nAnd this is not the first time parties have attempted to argue for a new class of service.  In one such \nexample, Amtrak v. PPL Electric Utilities Corp.,21 the complainant attempted to argue that it made \nlesser use of the grid and thus should be charged under some new arrangement that differed from \nthe charges applicable to ordinary Network Service.  The Commission, however, rejected the \ncomplaint and found in accordance with the facts that the load was served by the PJM transmission \nsystem and thus was appropriately served through the Network Service applicable to Network \nLoad.22 \n \n17  Constellation Comments at 8 (Apr. 23, 2025) (emphasis omitted). \n18  Vistra Comments at 24 (Apr. 23, 2025) (emphasis omitted). \n19  Nat’l R.R. Passenger Corp. v. PPL Elec. Utils. Corp., 173 FERC ¶ 61,043, at PP 13–14 (2020) (emphasis added). \n20  See 16 U.S.C. § 824d(b). \n21  171 FERC ¶ 61,237, reh’g denied, 173 FERC ¶ 61,043 (2020) (“Amtrak”). \n22  Amtrak, 171 FERC ¶ 61,237 at PP 6–9, 39-43."},{"page":7,"startToken":2055,"endToken":2233,"text":"7 \nAs demonstrated by the following diagram depicting an example configuration, moving \nthe meter does not change grid usage: \nParties supporting more favorable accommodations for co-located load under the PJM Tariff share \none thing in common: their arguments are premised on the fiction that moving the location of the \nmeter (from the example configuration at A and B to a new single meter at C) justifies a new form \nof service with a new rate construct.  In truth, moving placement of the meter does not change grid \navailability and support.  However, placement of load behind the meter can obscure load and hide \ninformation needed for system planning and grid operations.  It can result in obscured load that is \nnot appropriately accounted for that can unpredictably move grid flows and voltages up and down, \ncreating potentially dire circumstances if those variations were not planned for or accounted for \nby system operators.  Whether the meters are at C or at A and B, the grid operator and transmission \nowners must support and plan for both the load and the generator."},{"page":8,"startToken":2233,"endToken":2570,"text":"8 \n \nMeter placement does not change the physics of the system—if the load suddenly increases \nor drops by 100 MW, the grid will experience that increase or decrease, no matter where the meter \nis located.  This is particularly true when the co-located unit is a nuclear plant as such plants cannot \nfollow the load variations, so if there is an increase or decrease in load, it must be generators \nelsewhere on the grid that respond.  Regardless of whether a large load is behind the meter or in \nfront of it, it impacts flows on the grid, and relies on grid services, and grid operators and \ntransmission owners must therefore support and plan for it.  That does not justify a new form of \nservice with a new rate construct.  The PJM Tariff in its current form allows the co-location of \nend-use load and generation on terms commensurate with cost-causation principles.23  And as the \nIndicated TOs have previously explained, “the mere presentation of potential options” does not \nrender the existing PJM Tariff unjust and unreasonable.24  The PJM Tariff remains just and \nreasonable, so it cannot be changed as a result of this proceeding. \nWhen parties claim that the PJM Tariff is unjust and unreasonable in requiring Network \nService because co-located load is “fully isolated” from the grid, they are using misleading \nnomenclature to misrepresent the physical reality.  As the Indicated TOs have explained \npreviously, there is no such thing as a data center load configured to be “fully isolated” behind the \nmeter through “system protection facilities,” because co-located load that is connected to the \nelectric grid (a) necessarily relies on essential reliability services, such as ancillary services, \nincluding black start; (b) retains the potential to draw real or reactive power from the grid at any \ntime; and (c) relies on and benefits from its connection to the transmission system at all times.25  \n \n23  See Indicated TOs Answer at 10 (Mar. 24, 2025). \n24  Indicated TOs Answer at 9 (Apr. 23, 2025). \n25  Id. at 8."},{"page":9,"startToken":2570,"endToken":2964,"text":"9 \n \nThat generator and the end-use load also continue to rely on the transmission connection and \ninvestment to operate, just as if the load were “in front of the meter.”  Notably, PJM agrees that \nthere is no such thing as “fully isolated” co-located load arrangement when there is a connection \nto the electric grid.26  Constellation is mistaken that a “protective relay scheme” will “prevent \npower flows from the PJM Transmission System . . . to the load,”27 and equally mistaken that the \ndirection of real power flows is a sine qua non for use of, and reliance on, the transmission system.  \nAs explained by PJM, \nThe notion that any of the proposed co-location arrangements can \nbe “wholly isolated” is misleading. The load and generator are \nconnected to and synchronized with the multi-state bulk power \nsystem.  It is not operating as a micro grid (nor can it if the \ngenerating facility is a nuclear unit).  Nor is the generator delivering \npower through an intermediary to a load with a breaker open.  \nFurther, by way of example, there are obligations to ensure power \nto nuclear plants to ensure safe shutdown (among other things).  The \nload and generator are benefiting from ancillary services (including \nbut not limited to black start).  Any system protection facilities are \ndesigned to only handle less complex N-1 conditions, and can \nmisoperate (and indeed have misoperated).28 \n \nThere is simply no guarantee that the relay systems and protection schemes will ensure that the \nreliability impacts of hidden load are mitigated or eliminated.  For example, the protection schemes \nappear to be largely focused on dealing with situations where the co-located generation unit has \nan outage, but the reliability concerns are not limited to a generation outage; even while the nuclear \ngenerator is producing its full output, there could be a reliability disaster due to rapid variations in \n \n26  See Answer of PJM Interconnection, L.L.C., at 42 (Mar. 24, 2025) (“PJM Answer”) (explaining that co-located \nload is not fully isolated and “object[ing] to the [Commission’s] use of the phrase ‘wholly isolated from the grid’ \n[in a question] as it is contrary to engineering and economic principles”); id. at 44 (“PJM is not aware of a \nconfiguration that would ‘ensure the co-located load never takes any form of transmission service.’”). \n27  Constellation Answer at 78 (Apr. 23, 2025). \n28  PJM Answer at 42–43."},{"page":10,"startToken":2964,"endToken":3345,"text":"10 \n \ndemand caused from hidden load unexpectedly appearing (or disappearing) on the electric grid.29  \n(Or to get back to the diagram, consider the situation where the meters are at A and B.  If the load \nat B has a relay installed so that it shuts off when the generator at A experiences an outage, that \ndoes not change the fact that the load at B impacts the grid second to second throughout the day.  \nPutting a meter at C does not change that continual grid impact.) \nFurther, requiring co-located loads to obtain Network Service is consistent with bedrock \nprinciples of Order Nos. 88830 and 200331 and the PJM Tariff.  It ensures that co-located load is \nproperly accounted for in reliability planning and pays for its share of transmission and ancillary \nservices from the grid.  Order No. 888 codifies the Commission’s decades-long endeavor of \n“Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission \nServices by Public Utilities.”32  It accomplishes this goal by requiring “all transmission-owning \nutilities to provide transmission service for electricity generated by others on the same basis that \nthey provided transmission service of the electricity they themselves generated.”33  Consistent with \nthis goal, co-located loads are—and should continue to be—treated like all other Network Load.  \n \n29  Powers Declaration at P 14. \n30  See Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Servs. by Pub. \nUtils.; Recovery of Stranded Costs by Pub. Utils. and Transmitting Utils., Order No. 888, FERC Stats. & Regs. ¶ \n31,036, at 31,707 (1996) (cross-referenced at 75 FERC ¶ 61,080), order on reh’g, Order No. 888-A, FERC Stats. \n& Regs. ¶ 31,048 (cross-referenced at 78 FERC ¶ 61,220), order on reh’g, Order No. 888-B, 81 FERC ¶ 61,248 \n(1997), order on reh’g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom. Transmission \nAccess Pol’y Study Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom. New York v. FERC, 535 U.S. 1 \n(2002). \n31  See Standardization of Generator Interconnection Agreements and Procedure, 104 FERC ¶ 61,103 (2003) (Order \nNo. 2003). \n32  Order No. 888, 61 Fed. Reg. 21,540, 21,541 (May 10, 1996). \n33  Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1363–64 (D.C. Cir. 2004) (opinion of Roberts, J.)."},{"page":11,"startToken":3345,"endToken":3666,"text":"11 \nContrary to some commenters’ assertions, this treatment of co-located load does not limit \ncompetition or stifle innovation.34  Instead, it places all load, co-located or not, on a level playing \nfield where all customers pay for the transmission services that they receive.  It is not “anti-\ncompetitive” to force everyone to play by the same rules.  Quite the opposite.  Classification as \nNetwork Load accounts for the physical reality that service to the co-located load requires \nCommission-jurisdictional services from the grid and should pay for those services in the same \nmanner that all other load must pay. \nSeveral comments argue that co-location provides “benefits” to the grid, including \nreducing the need for new transmission infrastructure and improving reliability, and therefore co-\nlocated load does not have to pay for its share of grid services.35  These unquantifiable benefits do \nnothing of the sort.  Similar benefits could be said to result from all types of load.  Indeed, as the \nIndicated TOs have previously explained, these benefits of efficient transmission planning and \nreliability are best served by treating co-located load as Network Load.36  Many loads are sited \nefficiently and could claim that their siting provides grid-wide benefits, but they still must pay \ntheir share of grid services because they rely on the grid for safe reliable service to keep the light \non.  The current PJM Tariff enables just that.  Clarification from the Commission that co-located \nload is Network Load would further facilitate the benefits that these commenters emphasize.  They \nhave failed to demonstrate that the way in which co-located load connects to the grid under the \ncurrent PJM Tariff is unjust and unreasonable.  Treating co-located load in its current form under \n34  See EPSA/P3 Comments at 12–13 (Apr. 23, 2025). \n35  E.g., PJMCC & IECA Comments at 12–13; ENGIE Comments at 6–7; Clean Air Task Force Comments at 12. \n36  Indicated TOs Answer at 7 (Apr. 23, 2025)."},{"page":12,"startToken":3666,"endToken":3938,"text":"12 \n \nthe PJM Tariff (i.e., as Network Load) is essential for reliability, transmission planning, PJM’s \nprocurement of adequate capacity, and appropriate cost allocation. \nWhat it comes down to is this: “[t]he reasonableness of a rate is assessed in light of the \nFPA’s goals of promoting reliable service at reasonable rates and developing plentiful energy \nsupplies.”37  The existing PJM Tariff comports with those goals.  Rather than stymy transmission \nplanning through allowing for load to be hidden from the transmission planning process and place \nthe electric grid at risk, the existing PJM Tariff allows for effective planning, maintains reliability \nof the electric grid, provides transparent outcomes, and results in an even-handed approach to cost \nallocation.  Nothing in the FPA requires transmission operators to offer a service more favorable \nto co-location arrangements when there is a service that can already accommodate these \narrangements (i.e., Network Service). \nUltimately, the arguments presented by Talen, Vistra, and Constellation fail to demonstrate \nthat the existing PJM Tariff is unjust or unreasonable. And while behind-the-meter generation \narrangements have been “accommodat[ed]” in PJM for decades,38 as the Indicated TOs have \npreviously explained and as further discussed below, behind-the-meter generation (“BTMG”) is \nnot similarly situated to behind-the-meter co-located load.39  Different treatment of co-located load \nfrom BTMG, on account of the real differences between the two, is not unduly discriminatory.  \nAccordingly, the existing PJM Tariff remains just and reasonable. \n \n37  Constellation Mystic Power, L.L.C. v. FERC, 45 F.4th 1028, 1035 (D.C. Cir. 2022).   \n38  Vistra Comments at 3 (Apr. 23, 2025). \n39  See Indicated TOs Answer at 5–9 (Apr. 23, 2025)."},{"page":13,"startToken":3938,"endToken":4305,"text":"13 \n \nB. There Is No Basis to Change the Existing PJM Tariff to Accommodate Co-\nlocated Load. \n \nParties have lost sight of something throughout the course of this proceeding.  FERC cannot \norder a new type of service unless there is a finding that the existing arrangement is unlawful.  It \nis worth taking a moment to turn back to Order No. 888-A.  In that order, FERC stated the \nfollowing: \n[T]here is no dispute that the FPA does not explicitly give this \nCommission authority to order, sua sponte, open access \ntransmission services by public utilities.  However, the fact remains \nthat the FPA does explicitly require this Commission to remedy \nundue discrimination by public utilities.  The finding of the D.C. \nCircuit in the AGD case, with regard to sections 4 and 5 of the NGA \n(which parallel sections 205 and 206 of the FPA), are equally \napplicable here: the Act “fairly bristles” with concerns regarding \nundue discrimination and it would turn statutory construction on its \nhead to let the failure to grant a general power prevail over the \naffirmative grant of a specific one.40  \n \nAnd the Supreme Court took note of this, stating that, “FERC acknowledged that it did not have \nthe ‘authority to order, sua sponte, open-access transmission services by public utilities,’ but \nexplained that § 206 of the FPA explicitly required it to remedy the undue discrimination that it \nhad found.”41  This can be read to mean that, to the extent FERC required open access, FERC \nacknowledged that there was not express authority to do that without a finding that there was undue \ndiscrimination.  For FERC to require transmission service to accommodate certain loads, it would \nnecessarily follow that FERC cannot order the creation of a new service under the PJM Tariff \nunless it makes a finding that the current treatment in the tariff constitutes undue discrimination.  \nThere is no basis to make that finding.  Under the existing PJM Tariff, Network Service is available \n \n40  Order No. 888-A, 62 Fed. Reg. 12,274, 12,290 (Mar. 14, 1997) (footnote omitted). \n41  New York v. FERC, 535 U.S. 1, 13 (2002) (citing Order No. 888–A, at 30,202; 16 U.S.C. § 824e(a))."},{"page":14,"startToken":4305,"endToken":4703,"text":"14 \nto accommodate co-located loads.  There is no undue discrimination as this is the same service \noffered to other customers.  FERC, consequently, cannot order any of the replacement rates \ncontemplated by parties seeking a change in the PJM Tariff solely on the basis of accommodating \nthe type of service they would prefer for co-located load.   \nFERC action to the contrary would amount to an issue under the major questions doctrine. \nIf Congress wanted to give FERC authority to order its preferred transmission service to benefit \ncertain customers, it could have done so.42  It did not.  “Agencies have only those powers given to \nthem by Congress, and ‘enabling legislation’ is generally not an ‘open book to which the agency \n[may] add pages and change the plot line.’”43  Not only does the Commission not have any \nauthority to require a new type of transmission service to accommodate co-located load under the \nFPA, but any attempt by the Commission to set a replacement rate that would be a means to \naccommodate a narrow category of customers, such as co-located load, would run contrary to the \ndeclaration in the FPA that rates that provide an undue preference or advantage are unlawful. \nSpecifically, FPA section 205(b) states that “[n]o public utility shall, with respect to any \ntransmission or sale subject to the jurisdiction of the Commission, (1) make or grant any undue \npreference or advantage to any person or subject any person to any undue prejudice or \n42  Cf. Whitman v. Am. Trucking Ass’ns, 531 U.S. 457, 468 (2001) (“Congress, we have held, does not alter the \nfundamental details of a regulatory scheme in vague terms or ancillary provisions—it does not, one might say, \nhide elephants in mouseholes.”). \n43  West Virginia v. EPA, 142 597 U.S. 697, 735 (2022); see also Midship Pipeline Co., L.L.C. v. FERC, 45 F.4th 867, \n877 (5th Cir. 2022) (vacating part of the Commission’s order and remanding the remainder because “[t]he FERC’s \ninterpretation of the NGA to give the agency power to determine ‘the reasonable cost’ of remediation efforts \n‘change[d] the plot line’ of its enabling legislation, and was therefore erroneous” and “[t]he FERC lacks such \nauthority under the NGA, and it likewise lacked authority to order an ALJ to make such a determination \nindirectly” (quoting West Virginia v. EPA, 597 U.S. at 723))."},{"page":15,"startToken":4703,"endToken":5056,"text":"15 \n \ndisadvantage, or (2) maintain any unreasonable difference in rates, charges, service, facilities, or \nin any other respect, either as between localities or as between classes of service.”44   \nFinally, any suggestion the existing PJM Tariff is unduly discriminatory45 or preferential \nfalls flat because the same service is offered to all customers and co-located loads can move \nforward using the existing PJM Tariff approach.   \nII. There Is No Inconsistency in the Indicated TOs’ Jurisdictional Position. \nTalen asserts that “the Utilities have sought to extract two holdings from the Commission: \n(1) that co-located load always takes a form of FERC-jurisdictional transmission service and (2) \nthat the interconnection of co-located load is not FERC jurisdictional.”46  Talen goes on to state \nthat in “Exelon’s pending [petition for declaratory order] Proceeding (EL24-149), the Utilities \nhave argued that the interconnection of end-use load is not FERC jurisdictional, supposedly \nbecause the interconnection procedures implemented by Order No. 2003 apply only to generation \nand not to load.”47  Talen then questions whether the utilities’ jurisdictional position is consistent \nwithin the various proceedings dealing with co-location.48  It is fully consistent.  It is the Network \nService customer that is taking FERC-jurisdictional transmission service in serving the co-located \nload.  That is typically an LSE, but if a state allows, it may be the load itself.  The interconnection \n \n44  16 U.S.C. § 824d(b). \n45  See, e.g., Vistra Comments at 5 (Apr. 23, 2025) (claiming that “PJM has recently been implementing, and \ncontinues to implement, its tariff in an unduly discriminatory or preferential manner” and that more clarity is \nneeded for “the rates, terms, and conditions of service associated with behind-the-meter co-location \narrangements”). \n46  Talen Comments at 5 (Apr. 23, 2025). \n47  Id. at 8 . \n48  See id. at 8 (stating that it is “odd” for “the Utilities to argue in one proceeding that FERC lacks jurisdiction over \nco-located load, only to turn on a dime and argue in numerous other proceedings that FERC does have jurisdiction \nover co-located load and should leverage that jurisdiction to approve tariff proposals that would treat co-located \nload as always taking FERC-jurisdictional transmission service”)."},{"page":16,"startToken":5056,"endToken":5356,"text":"16 \n \nof end-use load is not jurisdictional to FERC.  Rather, the transmission service provided by the \ninterstate grid to the LSE is FERC-jurisdictional. \nConstellation also claims that “the PJM Tariff is being interpreted in such a way as to \npreclude states from exercising their jurisdictional authority” and asserts that by requiring co-\nlocated load to take Network Service, “that all sales to co-located load (which is by design an end \nuser) . . . would become subject to wholesale transmission rates,” which Constellation submits is \ninconsistent with the Commission’s jurisdiction.49  There is no inconsistency.  And, nothing the \nIndicated TOs argue suggests that service to retail load is FERC-jurisdictional.  It really is quite \nsimple: if there is a connection to the interstate electric grid in PJM, then there is a reliance on the \ninterstate transmission services and that service is FERC-jurisdictional. \nIII. The Different Treatment of BTMG and Behind-The-Meter Load Does Not Render the \nPJM Tariff Unjust and Unreasonable. \n \nAs an initial matter, BTMG is not similarly situated to behind-the-meter load.  \nConstellation states that the Indicated TOs’ position is “that anything ‘synchronized’ to the grid \nmust take [Network Service] for their gross load and that [Network service] charges based on gross \nload regardless of configuration are just and reasonable” and that this position overlooks that “there \nalready are tens of thousands of MWs of load synchronized to the grid who do not pay [Network \nservice] based on gross billing determinants.”50  To support this statement, Constellation points to \nthe Public Service Electric and Gas response, which describes customer reliance on BTMG.  As \nexplained in the Indicated TOs’ prior answer, however, BTMG is different than co-located load.51  \n \n49  Constellation Answer at 27 (Apr. 23, 2025).   \n50  Constellation Answer at 29 (Apr. 23, 2025). \n51  Indicated TOs Answer at 5–9 (Apr. 23, 2025)."},{"page":17,"startToken":5356,"endToken":5671,"text":"17 \nBTMG is already accounted for in the PJM Tariff, which has specific provisions on BTMG.52  This \nproceeding concerns behind the meter load—a different paradigm in which load is located behind \na meter and avoids taking Network Service yet benefits from the services provided by the network.  \nAlthough PJM plainly states that BTMG was “not intended” for large loads,53 Vistra tries \nto present netting as a solution for co-located load.54  Specifically, Vistra states that, under the \nBTMG netting framework, \n[R]etail BTMG loads are currently able to avoid transmission\ncharges by using on-site generation or curtailing load during\nexpected coincident peak events.  In doing so, these loads are\npermitted to net their usage of NITS to zero.  If Option 3 loads are\npermitted to net in this way, it is unduly discriminatory to prohibit\nbehind-the-meter loads from engaging in exactly the same type of\nnetting.  In fact, Option 4 configurations actually use the\ntransmission system less than a retail BTMG configuration because\nprotective systems ensure that the load never draws energy from the\ngrid, whereas retail BTMG arrangements can draw from the grid at\nthe discretion of the customer.55\nThe PJM Tariff states, in pertinent part, that BTMG “shall refer to a generation unit that delivers \nenergy to load without using the Transmission System.”  Unlike this definition of BTMG, co-\nlocated load arrangements use and rely upon the transmission system and therefore cannot qualify \nas BTMG under the PJM Tariff.  Service to co-located load using generators connected to the \ntransmission system inherently both use and rely on the transmission system. \n52\nPJM OATT §§ 1 (Definition of Behind the Meter Generation), 34.2 (Netting of Behind the Meter Generation), \n34.3 (Netting of Non-retail Behind the Meter Generation), and 36.1A (Behind the Meter Generation). \n53\nPJM Answer at 11, 76. \n54\nVistra Comments at 14 (Apr. 23, 2025). \n55\nId."},{"page":18,"startToken":5671,"endToken":5994,"text":"18 \n \nIV. The Fact that Co-location Arrangements Employing Network Service Take Time Does \nNot Mean that the PJM Tariff Provisions for Transmission Service are Unjust and \nUnreasonable. \n \nConstellation argues that the Indicated TOs “omit the elephant in the room: it takes at least \nfour to five years, and often seven to ten years, to complete the study process and build all the \ntransmission upgrades necessary to provide [Network Service] to a hyperscale data center.”56  \nSpecifically, Constellation asserts that if it is “start[ed] today, a large data center might be able to \nobtain service by 2030, but more likely not before 2035.”57  Omitted from this vague accusation \nis any explanation of how this is the fault of the existing PJM Tariff.  Nor will creating a new class \nof transmission service change that.  Rather, Constellation’s effort to create different reliability \nrules for co-located loads—perhaps pretending that problems do not exist because load is hidden \nbehind the meter—would be unduly discriminatory to other system additions and also jeopardize \nsystem reliability.  If an interconnection creates reliability concerns requiring upgrades, the siting, \ndesign, and construction of those upgrades will reasonably take time.58  As discussed below, \nConstellation has consistently sought to minimize reliability concerns around co-location.  The \nreality is that studies have a critical purpose and circumventing them based on the fiction that co-\nlocated load cannot impact the system is not something FERC should entertain.   \nV. Replacement Rates that Would Not Require Network Service for Co-located Load \nCould Put Grid Reliability at Risk. \n \nConstellation minimizes the reliability concerns that would attend its proposed co-located \nload arrangement and states that “the necessary study process provides transparency and \n \n56  Constellation Answer at 15 (Apr. 23, 2025). \n57  Id. \n58  AEP Ohio’s efforts in this regard, referenced by Constellation in its April 23, 2025 Answer at 18, footnote 49, \nare appropriate and necessary regardless of the litigation concerning cost allocation in this and other \nproceedings."},{"page":19,"startToken":5994,"endToken":6284,"text":"19 \n \npredictability into the development of co-location arrangements.”59  As the Indicated TOs \nexplained in their prior answer, however, when co-located load is hidden and not appropriately \naccounted for, there is not only a cost-allocation problem, but the study process is undermined.60  \nIn comments in this docket, North American Electric Reliability Corporation (“NERC”) \nunderscored some of the reliability risks: (1) “system operators may lack sufficient information to \nperform reliability analysis on co-located large loads”; (2) “large loads may or may not be visible \nto system operators depending on the load’s operation and interconnection type”; (3) “[i]f a load \nis connected but operating conditions are providing only partial or no generation, there is a risk of \nthermal overloads and voltage or stability issues”; and (4) “[f]luctuations from large loads during \nfaults or switching can cause issues with voltage support, frequency response, stability, and \nprotection system coordination.”61   \nVistra asserts that the co-location configurations do not appear overnight and lists out the \nsteps that would be taken that would add time to when the co-located load appears on the grid.62  \nThe fact that these configurations take time does not at all change the fact that reliability is at risk \nshould these configurations be treated as entities such as Vistra would prefer.  Again, when co-\nlocated load is hidden and not appropriately accounted for, a cost-allocation problem exists and \nthe study process is undermined.  PJM may be unable to adequately procure enough capacity to \nserve the load because the full load will not be accounted for in the Reliability Pricing Model.  Nor \n \n59  Constellation Answer at 47 (Apr. 23, 2025). \n60  Indicated TOs Answer at 13 (Apr. 23, 2025). \n61  NERC Comments at 7 (Apr. 23, 2025). \n62  Id."},{"page":20,"startToken":6284,"endToken":6609,"text":"20 \n \nwould the full load be reliably and safely factored into both PJM’s transmission planning and \noperations processes and protocols. \nMoreover, as explained in the Powers Declaration, a discounted marginal cost approach is \nnot an appropriate replacement rate for co-located load.63  Under the existing PJM Tariff, system \ncosts are charged to all other customers on a full embedded cost basis, independent of the marginal \ncost each individual customer imposes on the system and without any discount.64  The full \nembedded cost approach for the development of transmission rates, which is applied to all \ncustomers, including co-located customers, ensures that the PJM Tariff is not unduly \ndiscriminatory and, for that reason, should be maintained.65  Any rate discounts to a favored class \nof customers (i.e., co-located load) would be unduly discriminatory against existing and new load \nthat does not fall within the proposed favored class.66  Providing discounted rates to some \ncustomers will result in other customers offsetting that discount by paying a yet higher rate.67  Such \nan approach to rate design (i.e., giving one group of customers a discount and charging a \ndisproportionately higher rate to all other customers) does not comport with the FPA.  And such \nproposals lose sight of the fact that other customers might likewise be able to make a claim that \ntheir incremental system usage, by some metric, is lower than average.68 \n \n63  Powers Declaration at P 7. \n64  Id.  \n65  Id. \n66  Id. at P 9.  See also id. at PP 25–29 (providing examples and explaining why discounted Network Service rates \nfor co-location arrangements would be inappropriate and unduly discriminatory); id. P 31 (“[O]ffering a \ndiscounted rate to co-located load while requiring other load customers to pay the full transmission rate \ncontravenes the Bonbright principle of Fairness in Cost Allocation, which holds that costs should be allocated \nequitably and without undue discrimination among customer classes or individuals.”). \n67  Id. P 32. \n68  Id."},{"page":21,"startToken":6609,"endToken":6912,"text":"21 \nNor does creating a favored rate treatment for co-located load comport with NERC’s \nReliability Standards.  Specifically, allowing certain transmission customers with bundled load \nand generation to choose their own level of transmission service, especially outside of NITS, as \nConstellation proposes, would represent a significant departure from NERC Reliability Standards \nFAC-002-2 and TPL-001-5 and would undercut transmission operators’ planning criteria and \ninterconnection requirements that are in place to comply with those NERC requirements.69  The \nresult would be reduced scrutiny of load, mismanagement of the transmission system, risks to \nreliability, and undue discrimination for other customers that take Network Service. \nIt is also worth reiterating that, as explained in the Powers Declaration, “the interconnection \nof load and generation are studied separately in accordance with [NERC Reliability Standards] to \nensure that the impact of a new generator on the transmission system is fully assessed, and any \nnew load is able to be reliably served by the power system,” and therefore, any suggestion that a \nsingle study would suffice under the PJM Tariff to assess reliability impacts on an interconnection \nwith hidden co-located load is based on a misunderstanding of the current PJM Tariff \nrequirements.70 \nVI. PJM’s Options 4 and 5 Have Not Been Demonstrated to Be Just and Reasonable.\nAs stated above, the Indicated TOs emphasize that the first step of FPA section 206 has not \nbeen satisfied and, for that reason, there is no basis to set a replacement rate.  And as the Indicated \nTOs explained in their April 23 Answer, the options presented by PJM are unnecessary to resolve \nthis Show Cause proceeding.71  It is worth spending a moment on PJM’s Options 4 and 5, for \n69  See Powers Declaration at PP 10–13. \n70  Id. at P 5. \n71  See Indicated TOs Answer at 9–12 (Apr. 23, 2025)."},{"page":22,"startToken":6912,"endToken":7222,"text":"22 \n \nwhich some parties are advocating.72  Options 4 and 5 are not preferred by PJM, will have a \nnegative impact on reliability, and, most importantly, have not been demonstrated to be just and \nreasonable in this proceeding.  Rather, such arrangements should be treated as Network Load.  \nFirst, Option 4—“Co-located load with connection to the grid with protections to avoid \ndelivery of system energy to serve the load”—should be Network Load because it “relies on and \ntakes grid services.”73  The load, then, is appropriately charged as Network Load because it uses \nwholesale transmission service.  Option 5 is identical to Option 4 “but with back-up service from \nPJM with permission,”74 so it too should be treated as Network Load.  This underscores that the \nPJM Tariff remains just and reasonable because PJM’s existing mechanisms for serving Network \nLoad accommodate co-located loads.75  \n \nIn arguing for the adoption of Options 4 and 5 as new types of service, Vistra states that \n“requiring all new large loads to interconnect through Options 1 or 2 increases transmission costs \nfor consumers and creates a structural bias in favor of transmission-served load while \ndisadvantaging competitive bilateral supply arrangements between sophisticated buyers and MBR \nsellers.”76  Vistra claims that Options 4 and 5 would “decreas[e] costs and enhanc[e] reliability.”77  \nTo the extent that co-located load would be permitted to rely on wholesale transmission service, \nto circumvent the planning process by being hidden from the system, and to avoid costs that are \napplied to every other customer on the system, it cannot be said that those options would provide \n \n72  See, e.g., Vistra Comments at 8 (Apr. 23, 2025). \n73  PJM Answer at 13–14. \n74  Id. at 14–15. \n75  See Indicated TOs Answer at 11–12 (Apr. 23, 2025). \n76  Vistra Comments at 13 (Apr. 23, 2025). \n77  Id."},{"page":23,"startToken":7222,"endToken":7529,"text":"23 \n \ndecreased costs and enhanced reliability.  To the contrary, it would permit the avoidance of costs, \nthe preferential and discriminatory treatment of customers, and significant risks to reliability of \nPJM’s electric grid. \n \nVistra seeks several revisions to the PJM Tariff to implement a replacement rate based on \nOptions 4 and 5.  Specifically, Vistra asks the Commission, \n(1) to require transmission owners to cooperate in the necessary \nstudy process, (2) determine the transmission and ancillary service \ncharges that are appropriate for behind-the-meter co-located load, \n(3) incorporate surgical revisions to the pro forma ISA to address \nco-located load, and (4) develop a reasonable policy on the capacity \ntreatment of secondary generators that only serve co-located load \noccasionally on an interruptible, backup basis.78  \n \nNone of these changes are required.  Nor have they been shown to be just and reasonable.  First, \nthe Commission cannot require transmission owners to participate in a study process as a \nprerequisite to interconnecting load, which is not FERC jurisdictional and, therefore, not subject \nto the PJM Tariff.  Second, for the reasons stated above, it is not appropriate to allow a unique \nform of service for co-located load in this proceeding because it would provide an undue advantage \nand preferential rate treatment because the “assessment of [Network Integration Transmission \nService] is not based on actual use over a particular transmission path, but rather based on the \nnetwork customer’s right to use the entire system.”79  Third, the request for a policy on the capacity \ntreatment of secondary generators that only serve co-located load occasionally on an interruptible, \nbackup basis is outside of the scope of this proceeding and there has not been any showing that the \ncapacity treatment in the existing PJM Tariff is unjust and unreasonable. \n \n78  Id. at 23. \n79  Nat’l R.R. Passenger Corp., 173 FERC ¶ 61,043 at PP 13–14 (2020)."},{"page":24,"startToken":7529,"endToken":7906,"text":"24 \n \nVII. \nThe Commission Should Reaffirm that the Existing PJM Tariff Is Just and \nReasonable to Remove Uncertainty and Should Dismiss this FPA Section 206 \nProceeding. \n \nThis proceeding has fueled fire to misguided claims and uncertainty in the application of \nthe PJM Tariff.  One such claim is that “co-location of large loads and generation facilities is not \na new phenomenon in the PJM region.”80  FERC, though, acts through its orders and has never \nblessed a treatment of load that ignores its impact on the grid.81  Even still, Vistra goes on to state \nthat “PJM’s own filings over the past few years—including as recently as last month—\ndemonstrate, PJM has repeatedly applied the tariff’s necessary study provisions to facilitate \nbehind-the-meter co-location configurations.”82  To support this, Vistra cites to the Doswell \nNecessary Studies Agreement (“NSA”).83  But, as the Commission explained in P 34 of that order, \nit was not ruling on the propriety of any arrangement, but was simply allowing PJM to conduct a \nstudy, while the proceeding plays out.   \nUltimately, all concerned will benefit from a dose of clarity, if the Commission affirms that \nservice to end-use customers, even if they are large load customers, falls under state jurisdiction. \nThese customers are indisputably taking retail electric service, which is carved out from FERC’s \njurisdiction.84  But transmission service to the Load Serving Entity is in turn governed by the \n \n80  Vistra Comments at 3 (Apr. 23, 2025). \n81  See, e.g., Californians for Renewable Energy v. Cal. Indep. Sys. Operator Corp., 175 FERC ¶ 61,213 at P 13 \n(2021) (“The Commission speaks through, and only through, its orders.” (emphasis added)). \n82  Vistra Comments at 4 (Apr. 23, 2025). \n83  Id. at 4 n. 10 (citing PJM Interconnection, L.L.C., Necessary Studies Agreement, Original Service Agreement \nNo. 7476, Queue Position No. AA1-145, Docket No. ER25-1623-000, at Attach. 1 (filed Mar. 14, 2025)). \n84  See Powers Declaration at P 20; see also 16 U.S.C. § 824(b)(1) (“The provisions of this subchapter shall apply to \nthe transmission of electric energy in interstate commerce and to the sale of electric energy at wholesale in \ninterstate commerce, but except as provided in paragraph (2) shall not apply to any other sale of electric \nenergy . . . .” )."},{"page":25,"startToken":7906,"endToken":8266,"text":"25 \n \nexisting PJM Tariff rules relating to Network Service.  That divide is well-functioning, and just \nand reasonable.  There is no basis for those rules to change.   \nVIII. Motion for Leave to Answer \nAlthough an answer to an answer is not permitted as a matter of right under the \nCommission’s regulations,85 the Commission routinely permits such answers when the answer \nprovides useful and relevant information that will assist the Commission in its decision-making \nprocess,86 corrects factual inaccuracies and clarifies the issues,87 assures a complete record in the \nproceeding,88 or provides information helpful to the disposition of an issue.89  The information set \nforth in this answer satisfies each of these criteria.  The Indicated TOs therefore respectfully \nrequest that the Commission grant leave and accept this answer. \nIX. Conclusion \nFor the reasons stated above, and in the prior comments and answers of the Indicated TOs, \nthe Commission should terminate this show cause proceeding, affirming that the existing PJM \nTariff, and existing transmission service categories remain just and reasonable. \n \n85  18 C.F.R. § 385.213(a)(2). \n86  See, e.g., Pioneer Transmission, LLC v. N. Ind. Pub. Serv. Co., 140 FERC ¶ 61,057 at P 94 (2012) (accepting \nanswers that “provided information that assisted us in our decision-making process”); Tallgrass Transmission, \nLLC, 125 FERC ¶ 61,248 at P 26 (2008) (same), order on reh’g, 150 FERC ¶ 61,224 (2015); Midwest Indep. \nTransmission Sys. Operator, Inc., 120 FERC ¶ 61,083 at P 23 (2007) (permitting answer to protests when it \nprovided information that assisted the Commission in its decision-making process). \n87  See, e.g., Entergy Servs., Inc., 126 FERC ¶ 61,227 at P 76, order on clarification & reh’g, 127 FERC ¶ 61,225 \n(2009). \n88  See, e.g., Pac. Interstate Transmission Co., 85 FERC ¶ 61,378, at 62,443 (1998), order on reh’g, 89 FERC \n¶ 61,246 (1999); see also Morgan Stanley Cap. Grp., Inc. v. N.Y. Indep. Sys. Operator, Inc., 93 FERC ¶ 61,017 \nat 61,036 (2000) (accepting an answer that was “helpful in the development of the record”). \n89  See, e.g., CNG Transmission Corp., 89 FERC ¶ 61,100 at 61,287 n.11 (1999)."},{"page":26,"startToken":8266,"endToken":8474,"text":"26 \n \nRespectfully submitted, \n \n \n \n \n/s/ William Sauer \nWilliam Sauer \nVice President, Federal Regulatory Affairs  \nExelon Corporation  \n701 Ninth St. N.W.  \nWashington, DC 20001  \nTelephone: 202-868-7499  \nEmail: william.sauer@exeloncorp.com   \n/s/ Max Minzner \n \nMax Minzner \nVice President and Deputy General Counsel \nExelon Corporation \n701 Ninth St. N.W.  \nWashington, DC 20001  \nTelephone: 202-934-4740 \nEmail: max.minzner@exeloncorp.com \n \n \nOn behalf of Exelon Corporation \n \n/s/ Jessica Cano \nJessica Cano \nAssociate General Counsel – Regulatory East \nAmerican Electric Power Service Corporation \n1 Riverside Plaza  \nColumbus, OH 43215 \nTelephone: 614-716-2921  \nEmail: jacano@aep.com \n \n/s/ Lisa G. McAlister \nLisa G. McAlister \nAMP Transmission, LLC \n1111 Schrock Road, Suite 100 \nColumbus, Ohio 43229 \nTelephone: 614-540-6400 \nEmail: lmcalister@amppartners.org \n \nOn behalf of American Electric Power \nService Corporation \n \nOn behalf of AMP Transmission, LLC \n \n/s/ Martin J. Keane \nMartin J. Keane \nDirector of Public Utilities \nCleveland Public Power \n1300 Lakeside Ave. \nCleveland, OH 44114 \nTelephone: 216-664-2444 ext. 75604 \nEmail: martin_keane@clevelandwater.com \n \n/s/Debra D. Roby \nDebra D. Roby \nWashington Energy Law LLP \n900 17th Street N.W., Suite 500-A \nWashington, D.C. 20006 \nTelephone: 703-785-9270 \nEmail: droby@washingtonenergylaw.com \n \nOn behalf of City of Cleveland, Department of \nPublic Utilities, Division of Cleveland Public \nPower \n \nOn behalf of the City of Hamilton, OH"},{"page":27,"startToken":8474,"endToken":8704,"text":"27 \n/s/ Damon L. Krieger \nDamon L. Krieger \nGroup Vice President, Legal, Strategy, and \nSustainability, and Deputy General Counsel \nSouthern Maryland Electric Cooperative, Inc. \n15035 Burnt Store Road \nP.O. Box 1937 \nHughesville, Maryland 20637-1937 \nTelephone: 301-274-4323 \nEmail: Damon.Krieger@SMECO.coop \n/s/ Molly Suda  \nMolly Suda \nAssociate General Counsel \nAnnelise Rickert  \nFederal Government Affairs Director \nDuke Energy Corporation \n1301 Pennsylvania Ave NW, Suite 200 \nWashington, DC 20004 \nTelephone: 202-824-8011 \nEmail:  molly.suda@duke-energy.com  \nAnnelise.rickert@duke-energy.com        \nOn behalf of Southern Maryland Electric \nCooperative \nOn behalf of Duke Energy \n/s/ Michael Brechlin \nMichael Brechlin \nPA Bar # 335424 \nDuquesne Light Company \n411 7th Ave \nPittsburgh, PA 15219 \nTelephone: 412-393-6431 \nEmail: mbrechlin@duqlight.com \n/s/   Amanda P. Parker \nAmanda P. Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OH 44308 \nTelephone: (330) 384-4592 \nEmail: aparker@firstenergycorp.com \nOn behalf of Duquesne Light Company \nOn behalf of The FirstEnergy Transmission \nCompanies \n/s/ Denise R. Foster Cronin \nDenise R. Foster Cronin \nVice President, Federal and RTO Regulatory \nAffairs \nEast Kentucky Power Cooperative, Inc. \n4775 Lexington Road, P.O. Box 707 \nWinchester, KY 40392-0707 \nTelephone: 859-745-9615 \nEmail: denise.cronin@ekpc.coop \n/s/ Daniel E. Frank\nDaniel E. Frank \nKelly Cuthbertson \nEversheds Sutherland (US) LLP \n700 Sixth St., N.W., Suite 700 \nWashington, DC 20001-3980 \nTelephone: 202-383-0100 \nEmail:  \ndanielfrank@eversheds-sutherland.com \nkellycuthbertson@eversheds-sutherland.com \nOn Behalf of East Kentucky Power \nCooperative, Inc."},{"page":28,"startToken":8704,"endToken":8896,"text":"28 \n \n/s/ Adrienne E. Clair \nAdrienne E. Clair \nThompson Coburn LLP \n1909 K Street, N.W., Suite 600 \nWashington, D.C.  20006-1167 \nTelephone: 202-585-6900 \nEmail: aclair@thompsoncoburn.com \n \n/s/ Steve Nadel \nSteven M. Nadel \nSenior Counsel \nPPL Services Corp.  \n645 Hamilton Street, Suite 601 \nAllentown, PA 18101 \nTelephone: 610-774-4775   \nEmail: SMNadel@pplweb.com \n \nOn behalf of Old Dominion Electric \nCooperative \n \nOn behalf of PPL Electric Utilities Corp. \n \n/s/David Burns  \nDavid Burns  \nSenior Manager,  \nFERC Policy & Regulatory Affairs  \nConsolidated Edison Company of New York, \nInc.   \n4 Irving Place \nNew York, NY 10003   \nTelephone: 571-678-9152  \nEmail: burnsd@coned.com \n/s/Joshua Kirstein \nJoshua A. Kirstein  \nSenior Attorney  \nLaw Department \nConsolidated Edison Company of New York, \nInc.  \n4 Irving Place, 18th Floor  \nNew York, NY 10003  \nTelephone: 929-656-5971 \nEmail: kirsteinj@coned.com \n \n \nOn behalf of Rockland Electric Company \n \n/s/ Lindsay Berkstresser \nLindsay Berkstresser \nCounsel – Energy & Regulatory \nUGI Corporation \n500 North Gulph Road \nKing of Prussia, PA 19406 \nTelephone: 717-504-9925 \nEmail: berkstresserl@ugicorp.com \n \n/s/ Richard P. Bonnifield \nRichard P. Bonnifield \nHusch Blackwell \n1801 Pennsylvania Avenue, NW, \nSuite 1000 \nWashington, DC 20006-3606 \nTelephone: 202-243-8844 \nEmail: \nrichard.bonnifield@huschblackwell.com \n \n \n \nOn behalf of UGI Utilities Inc."},{"page":29,"startToken":8896,"endToken":8932,"text":"29 \n \n/s/ Jeremy L. Fetty \n \nJeremy L. Fetty \nParr Richey \n251 N. Illinois, Suite 1800 \nIndianapolis, Indiana 46204  \nTelephone: 317-269-2500 \nEmail: j_fetty@wvpa.com \n \n \n \nOn behalf of Wabash Valley Power \nAssociation, Inc. \n \n \n \nJune 3, 2025"},{"page":30,"startToken":8932,"endToken":9117,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nPJM Interconnection, L.L.C., et al \n) \nDocket Nos. EL25-49-000 \nLarge Loads Co-Located at Generating \nFacilities \n) \n) \nDocket No. AD24-11-000 \nConstellation Energy Generation, LLC \nv. \nPJM Interconnection, L.L.C. \n) \n) \n) \nDocket No. EL25-20-000 \n(Consolidated) \n \nDECLARATION OF DANIELLE S. POWERS \n \nI. \nINTRODUCTION \n1. My name is Danielle S. Powers. I am an engineer and Chief Executive Officer of \nConcentric Energy Advisors, Inc. (“Concentric”). My business address is 293 \nBoston Post Road West Suite 500, Marlborough, MA 01752. \n2. I have over thirty-five years of direct experience in the public utility industry. \nI have worked for an investor-owned utility, an independent system operator, \nand most recently as a consultant. I have managed and/or participated in a \nwide variety of consulting engagements as an expert in wholesale market \ndesign and power system operations, as well as resource planning. I have \nprovided expert testimony or reports before the Indiana Utility Regulatory \nCommission, the Federal Energy Regulatory Commission (“FERC”), the Illinois \nCommerce Commission, the Connecticut Siting Council, the Massachusetts \nDistrict Court, the Regulatory Commission of Alaska, the New York Public"},{"page":31,"startToken":9117,"endToken":9345,"text":"2 \nService Commission, the United States Bankruptcy Court, the Missouri House \nUtilities Committee, and the Indiana Senate Utilities Committee. My previous \ntestimony has typically addressed issues related to wholesale energy market \ndesign, transmission policy, and resource planning. \n3. In these proceedings, FERC directed PJM Interconnection, L.L.C. (“PJM”) and \nthe Transmission Owners (“TOs”) to demonstrate why the PJM Open Access \nTransmission Tariff (“OATT”), the Amended and Restated Operating \nAgreement of PJM, and Reliability Assurance Agreement Among Load Serving \nEntities in the PJM Region (the “Tariff”) remain just and reasonable with \nrespect to their applicability to co-location arrangements, and to explain what \nchanges to the Tariff would remedy the concerns identified by FERC if it were \nto determine that the Tariff requires a replacement Tariff.  \n4. In the Testimony of Zachary Ming, Mr. Ming, a Partner at Energy and \nEnvironmental Economics, Inc. (“E3”) testifying on behalf of Constellation \nEnergy Generation, LLC (“Constellation”), puts forth new tariff options for \nthree different co-location configurations: firm, generator-contingent, and \ninterruptible. Mr. Ming’s proposed rate options (the “E3 Proposal”) are based \non his analysis of rate design principles with respect to the Tariff and his \nanalysis of the interaction of co-location configurations and costs, including \ntransmission costs.  \nII. \nSUMMARY \n5. The E3 Proposal improperly conflates the interconnection studies for load and \nsupply by suggesting that a single study should be conducted that recognizes"},{"page":32,"startToken":9345,"endToken":9591,"text":"3 \nthe net impact of the addition of both the load and supply while ignoring the \nunique characteristics of each.  Under the current PJM tariff, and the tariffs of \nmost \nother \nIndependent \nSystem \nOperators/Regional \nTransmission \nOrganizations (“ISOs/ RTOs”), the interconnection of load and generation are \nstudied separately in accordance with North American Electric Reliability \nCorporation (“NERC”) standards to ensure that the impact of a new generator \non the transmission system is fully assessed, and any new load is able to be \nreliably served by the power system.  The E3 Proposal to net the impacts of \nthe generator and load so that the transmission system is designed to serve \nthe reduced peak demand is inappropriate. \n6. As discussed below, large loads create significant risk with respect to system \nreliability. Any change to the current tariff approach, that would study co-\nlocated generation and load purely on a “net” basis, cannot be reasonably \nconsidered until NERC completes its development of reliability guidelines for \nlarge load interconnection requirements by June 2026.  \n7. E3’s proposed replacement Network Integration Transmission Service \n(“NITS”) rate for co-located load reflects a discounted marginal cost approach. \nHowever, transmission system costs are charged to all other customers on a \nfull embedded cost basis, independent of the marginal cost each individual \ncustomer imposes on the system and without any discount. A full embedded \ncost approach for the development of transmission rates should be maintained \nfor all customers, including co-located customers. To do otherwise is unduly \ndiscriminatory."},{"page":33,"startToken":9591,"endToken":9815,"text":"4 \n8. The E3 Proposal relies on Mr. Ming’s contention that the existing tariff does \nnot provide price signals that incentivize co-located loads to interconnect in \nan economically efficient manner. Mr. Ming’s reliance on rate design \nprinciples, however, is flawed.  In addition, he conflates the manner in which \ntransmission rates provide a price signal in a regulated utility framework with \nthe manner in which PJM’s locational marginal prices (“LMPs”) provide a price \nsignal in PJM’s energy market. Furthermore, Mr. Ming ignores the fact that load \nentities already have strong financial incentives to minimize total costs under \nthe existing tariff. Finally, Mr. Ming ignores the fact that the primary \nmotivation for large loads seeking co-location arrangements is not avoidance \nof transmission costs, but timely interconnection.  \n9. Ultimately, the E3 Proposal ignores the fact that the current tariff already \nprovides most of what E3 is seeking, other than the rate discounts which are \nunduly discriminatory against existing load as well as new load not included \nin the proposed favored class. Under the current tariff, loads that are capable \nof actually reducing demand at the time of the system peak can do so and \nthereby achieve a smaller peak coincident load and a lower allocation of costs \nas network customers. A discount for certain customers only is not justified \nunder this framework and would be unduly discriminatory."},{"page":34,"startToken":9815,"endToken":10041,"text":"5 \nIII. \nE3’s Proposal Does Not Consider Reliability Concerns and Operational Impacts \nAddressed Through the Interconnection Process. \nA. Existing NERC Reliability Standards Ensure the Grid Can Reliably Serve the \nFull Requirement of the Load Under Both Normal and Contingency \nConditions. \n10. TOs and Transmission Planners must determine the reliability impact of \ninterconnecting new loads and generation in accordance with NERC \nReliability Standards FAC-002-21 and TPL-001-5.2 TOs establish their own \nplanning criteria and interconnection requirements in compliance with these \nNERC Reliability Standards. They assess the reliability impacts of the full-load \nrequirement across a range of operating conditions. If a new load presents \nreliability concerns, the TO collaborates with the new load and the ISO to \nidentify and implement appropriate mitigation measures.  \n11. Allowing certain transmission customers with bundled load and generation to \nchoose their own level of transmission service, especially outside of NITS, \nwould represent a significant departure from these reliability standards. In \nfact, it would effectively bypass these requirements, introducing new and \nuntested reliability risks. Without formal revisions to NERC’s Reliability \nStandards, TOs and ISOs are not authorized to operate under the parameters \nproposed by E3.  \n12. The NERC Large Load Task Force is currently investigating the implications of \nlarge loads interconnecting to the Bulk Power System. This work includes \n \n1  \nNERC Facilities Design, Connections, and Maintenance Reliability Standards. \n2  \nNERC Transmission Planning Reliability Standards."},{"page":35,"startToken":10041,"endToken":10298,"text":"6 \nevaluating whether and how forecasting, modeling, and interconnection \nprocesses could incorporate flexible demand profiles or on-site generation \nwhile still ensuring grid reliability. \n13. NERC’s study of these issues did not arise in a vacuum. There is growing \nexperience with these new large loads and research into their power demand, \nand that experience and research suggest large and extreme system impacts. \nOne regional operator, Electric Reliability Council of Texas (“ERCOT”), \nreported a 300 MW drop in data center demand in 24 seconds, and oscillations \nof 25 MW repeatedly up and down in under one second, recurring again with \n50 MW oscillations three days later.3   \n14. It is not at all clear that the relay schemes and protection mechanisms that \nhave been proposed by various large loads would protect the grid against such \nvariations in data center demand. The protection schemes appear to be largely \nfocused on dealing with situations where the co-located generation unit has \nan outage, but the above concerns do not relate to a generation outage and \ninstead relate to rapid variations in demand. Given real concerns about \nextreme system impacts, adoption of a proposal to permit reduced scrutiny of \nlarge loads is contrary to the prioritization of reliability and system security. \n15. NERC has committed to developing a reliability guideline by June 2026 that \nwill “identify risk mitigations and improvements to planning and operations \n \n3  \nERCOT Large Load Oscillation Event, LFLTF Meeting (stakeholder presentation) (Mar. 4, 2025), \nhttps://www.ercot.com/calendar/03042025-LFLTF-Meeting (choose “LL \nOscillation_LFLTF_Mar2025_Final” link under “Key Documents”)."},{"page":36,"startToken":10298,"endToken":10554,"text":"7 \nfor large loads interconnection requirements.”4 At the very least, until NERC’s \nassessment is complete, it is premature for FERC to approve proposals like \nE3’s that assume capabilities and standards that do not yet exist. \nB. E3’s Proposal Relies on a Flexible Bundled Interconnection Framework that \nDoes Not Exist \n16. E3 mapped the eight co-located configurations proposed by PJM into three \ndifferent co-location configurations: \nfirm, generator-contingent, and \ninterruptible. Both the generator-contingent and interruptible options assume \nthat large loads can interconnect to the grid without the need for full \ntransmission service, based on their ability to use large onsite generation or \nload shedding to offset consumption during peak conditions. For example, \naccording to E3’s Proposal, if a 100-MW load can reduce its draw to 40 MW \nduring the system peak by dispatching on-site generation or potentially by \nshedding a portion of its load, the grid should only be planned to serve the net \n40 MW load. This implies a flexible interconnection regime analogous to \nERCOT’s “Connect and Manage” construct used for generation.  However, no \nsuch flexible interconnection framework currently exists for load nor for \nbundled load and generation anywhere in North America. \n17. In considering the interconnection study to be performed for the co-located \ngeneration and load, it is instructive to contemplate the circumstance where a \nnew generator is proposed near a large load but not formally “co-located” with \nthat large load.  For this example, consider an aluminum smelter, which is a \n \n4  \nComments of the North American Electric Reliability Corporation at 6 (Apr. 23, 2025)."},{"page":37,"startToken":10554,"endToken":10816,"text":"8 \nlarge electrical industrial load, and assume it is in a relatively import-\nconstrained area. In this example, the industrial load and the new generator \nare not co-located behind a meter point; they are physically adjacent but they \nare owned by different entities and have no contractual relationship. \n18. In evaluating the interconnection of this hypothetical new generator, the \nISO/RTO and TO will recognize the import constraint as well as the industrial \nload, and the analysis will account for the fact that operation of this new \ngenerator will reduce congestion on the constraint. Because of this, the \ninterconnection requirements will generally be minimal, aside from potential \nsecondary issues such as short circuit duty or voltage control. The proposed \ngenerator would be required to fund transmission modifications to address \nthese issues, a point conceded in the Ming testimony,5 but otherwise the \ninterconnection requirements are likely to be significantly less than would be \nthe case if it were interconnected outside the import constraint. \n19. Nothing changes from a reliability or electrical interconnection standpoint if \nthis hypothetical new generator were to agree to formally co-locate with the \nindustrial load inside the load pocket. The electrical and operational \ncharacteristics of the load and the generator are unchanged, the \ninterconnection analysis must still account for the specific characteristics of \neach, and the interconnection requirement will be the same. The metering \npoint makes no difference. Both the generator and the load do benefit from \n \n5  \nSee Answer of Constellation Energy Generation, LLC, at Ex. 2, Testimony of Zachery Ming, at 27:16–19 \n(Apr. 23, 2025)."},{"page":38,"startToken":10816,"endToken":11058,"text":"9 \nphysically locating close together, but nothing about the contractual \narrangement between the parties changes the physics of the system. \nTherefore, the interconnection study, the required reinforcements, and the \ninterconnection cost are all the same whether the generation and load are \ncontractually co-located or not. \n20. Importantly, interconnection of large load customers falls under state \njurisdiction because it involves the provision of retail electric service, which is \nnot regulated by FERC. When a large load, such as a data center, seeks to \ninterconnect to the electric grid, it does so as a retail customer of the local \nutility, like any other load. The interconnection process, applicable rates, and \nservice classifications are governed by the state-approved retail tariff, which \nestablishes the rights and obligations of both the customer and the utility. This \nincludes determinations about interconnection requirements and whether \nspecial rate treatment, such as generator-contingent or interruptible service, \nis available. \nC. Many Types of Large Load Have Not, Cannot, or Will Not Sign Up for these \nTypes of Contractual Co-location Arrangements. \n21. It is important to note that a substantial amount of large load has already been \nadded to the PJM grid under the existing interconnection rules. These loads \nhave been studied and planned as Network Loads. They are paying for \ntransmission costs just like any other load that depends on the grid for electric \nservice. Applying a different standard would be inconsistent and unfair to \nthose who have followed the established process."},{"page":39,"startToken":11058,"endToken":11303,"text":"10 \n22. While certain types of large loads—such as crypto mining operations—may \noffer meaningful load flexibility due to their ability to curtail or reduce \nconsumption almost instantly with minimal operational impact, other large \nloads, such as data centers and industrial facilities, may face significant \nconstraints that limit their flexibility. \n23. For example, a large load such as a data center arranged as a tenant facility, \nwherein a number of different tenants contract with the owner of the data \ncenter facility, would not necessarily have the same operational \ncharacteristics as a large data center owned and operated by a single entity. In \na tenant facility, portions of the facility might be able to curtail rapidly, while \nothers might not. The provision of retail service to locations with tenant \narrangements that serve customers with varying operational needs is normal. \nFERC rules that assume that an entire facility can be used one way or another \nsimply do not comport with this reality. \n24. Given that the majority of large loads entering the PJM footprint cannot be \nreadily interrupted, these loads would not be suitable for generator-\ncontingent or interruptible service. However, the types of loads capable of \nrapidly curtailing operation already possess the ability to minimize \ntransmission costs through closely monitoring system conditions and \ncurtailing whenever the system approaches its expected coincident peak. \nOperating in this manner may significantly reduce transmission charges since \ntransmission costs are allocated based on the load contribution to system \ncoincident peaks."},{"page":40,"startToken":11303,"endToken":11540,"text":"11 \nIV. \nRole of a “Marginal Cost Discount” in Embedded Cost Ratemaking  \n25. E3 references rate design principles established by Bonbright, among which is \nthe idea that rates should be non-discriminatory.6 At the same time, E3 \nproposes the use of marginal-cost discounted rate design for a specific class of \ncustomers while other similar transmission service customers would be \ncharged rates that would continue to be based on full embedded costs. The \napplication of E3’s rate design concepts leads to inequitable treatment of \ncustomer classes that is unduly discriminatory. For example, E3’s proposed \ntreatment of customers taking “generator-contingent” service includes the \nidea that these customers should benefit from co-located generation to pay a \ndiscounted NITS rate for transmission service. \n26. E3 proposes that the full NITS rate applies for firm interconnection \nservice.  However, for the other service options, contingent and interruptible, \nE3 is proposing a discount from the full NITS rate, which seems to reflect an \navoided cost concept. The calculation starts with use of the net present value \nof the ten-year Regional Transmission Expansion Plan (“RTEP”) incremental \ninvestment forecast. While PJM and every other RTO attempt to develop \naccurate forecasts, no RTO has come close to accurately forecasting \ntransmission expansion costs and, in most cases to date, their forecasts have \nbeen substantially lower than their observed actuals. \n \n6  \nSee Answer of Constellation Energy Generation, LLC, at Ex. 2, Testimony of Zachary Ming, at 9:14–15."},{"page":41,"startToken":11540,"endToken":11825,"text":"12 \n27. E3 then proposes to assume that only 50% of the projected incremental \ninvestment is due to load growth, so the projected marginal cost used in \ncalculating the rate discount is only half of the projected incremental \ninvestment.  No basis is given for the use of 50%, and while some other \npercentage could be used, any such number would be pure speculation over a \nten-year forecast period. Using E3’s example numbers, the NITS rate is \n$63/kW-year while the incremental investment (without the 50% load \ngrowth discount) is $52/kW-year. The 50% reduction brings this to $26/kW-\nyear, which is how E3 generates what they refer to as a 41% discount factor to \nbe applied to the NITS rate. None of these numbers has any basis in fact, and \nultimately there is no basis in using this discount or any other discount for “as \navailable” or interruptible transmission service. Use of the transmission \nsystem to deliver power is a use of the system, regardless of whether that use \nis firm, contingent, or interruptible.7 \n28. E3 applies the “as-available” concept only to its proposed interconnection \narrangements. The “as-available” concept depends on the idea that “as-\navailable” energy purchases do not impose any costs on the transmission \nsystem while at the same time, as stated in the Ming testimony, “withdrawing \nenergy from the transmission system clearly reflects a ‘use’ of the transmission \nsystem.”8 Setting aside an analysis of the methodology employed by E3, the \n \n7  \nSee Answer of Constellation Energy Generation, LLC, at Ex. 2, Testimony of Zachary Ming, at 38:1–39:12. \n8  \nSee Answer of Constellation Energy Generation, LLC, at Ex. 2, Testimony of Zachary Ming, at 37:9–16."},{"page":42,"startToken":11825,"endToken":12057,"text":"13 \nconcept of “use” proposed by E3, which is the basis of the development of the \n“as-available” charge, is predicated on the novel idea that a charge \nrepresenting a service for which there is supposedly no incremental cost \nshould be developed on a discounted basis and applied to a limited number of \ncustomers. This disparate treatment of customer classes is unduly \ndiscriminatory.  \n29. The discriminatory nature of this proposal is apparent when considering \notherwise similarly situated loads. For example, a ski resort operates only in \nwinter and runs its snow guns at night. A large greenhouse also operates its \nlighting at night. Even though these transmission customers may or may not \nbe firm loads, they pay the same NITS rate for transmission service that is paid \nby a large high load factor industrial load. However, these customers likely pay \nonly de minimis transmission charges because most of their load occurs \nduring off peak times. They do not impose incremental load on the \ntransmission system and they pay the full NITS rate for whatever transmission \nservice they do use, but because transmission charges are allocated based on \ncontribution to coincident peak, their charges are minimized.  No additional \nrate discount is needed or applied. The fact that a data center with co-located \ngeneration is much larger is irrelevant to the discussion of discrimination, and \ndiscounted NITS rates for co-location are inappropriate and unduly \ndiscriminatory."},{"page":43,"startToken":12057,"endToken":12312,"text":"14 \nV. \nPrice Signals through NITS Are Neither Appropriate Nor Required to Incent \nEconomically Efficient Siting Decisions. \nA. Bonbright Rate Design Principles Do Not Support Price Signaling for Specific \nCommercial Arrangements. \n30. E3 contends that the proposed rate designs are consistent with the Bonbright \nprinciples and are therefore just and reasonable. However, the use of price \nsignals—specifically, a discounted transmission rate—to facilitate commercial \narrangements such as a co-located business model is not among Bonbright’s \ncriteria for sound rate design. \n31. As explained previously, offering a discounted rate to co-located load while \nrequiring other load customers to pay the full transmission rate contravenes \nthe Bonbright principle of Fairness in Cost Allocation, which holds that costs \nshould be allocated equitably and without undue discrimination among \ncustomer classes or individuals.  \n32. E3’s proposal to send price signals to facilitate the co-located business model \nalone, while charging undiscounted rates to all other customer classes, is \nmisaligned with sound rate design principles. Indeed, if some customers pay \ndiscounted rates, other customers will have to make up that slack (the amount \nnot paid on account of the discounts) by paying a yet higher rate. The Indicated \nPJM Transmission Owners have previously documented, in this proceeding, \nthe material existence of unduly discriminatory cost shifting that would attend \nto such proposals.9 It is not sound rate design to give one group of customers a \ndiscount and charge a disproportionately high rate to all other customers, even \n \n9  \nSee Answer of the Indicated PJM Transmission Owners at 19 (Mar. 24, 2025)."},{"page":44,"startToken":12312,"endToken":12550,"text":"15 \nthough many customers might be able to make a claim that their incremental system \nusage, by some metric, is lower than average.  \nB. Transmission Rates Differ Fundamentally from PJM’s LMPs. \n33. E3 attempts to justify its price signal rationale by drawing a parallel to PJM’s \nenergy market.10 However, this comparison is flawed—PJM’s energy market is \nin a competitive framework, whereas transmission is part of a regulated utility \nframework. Applying market-based pricing logic to the pricing framework of a \nregulated transmission system misconstrues the role and purpose of transmission \nrates.  \n34.  Among other things, the LMP energy market sends short-term price signals that \nallow market participants to rapidly respond to the changing need for energy. The \ntransmission grid, however, is a fixed investment in both the short-term and \nintermediate-term. When one customer avoids the cost of the transmission grid, it \nfalls to another to pay it.    \nC. Load Entities Already Have Strong Financial Incentives to Minimize Total \nCosts \n35. E3 contends that without a transmission discount, load has no incentive to co-\nlocate with generation. This is incorrect: load entities seeking interconnection \nalready face strong financial drivers to minimize overall costs, including those \nassociated with transmission upgrades, transmission charges, and energy \nprocurement. Co-location often requires fewer transmission upgrades and \nreduces energy costs due to lower congestion and losses.   \n \n10  Answer of Constellation Energy Generation, LLC, Ex. 2, Testimony of Zachary Ming, at 23 (Apr. 23, 2025)."},{"page":45,"startToken":12550,"endToken":12776,"text":"16 \n36. Additionally, data center siting decisions include the consideration of other \nsignificant factors such as climate conditions, tax and regulatory incentives, \nfiber-optic infrastructure, and security. All transmission customers would like \nto pay less for their service, but billions of dollars are going to be spent on data \ncenters, and the data centers face a broad array of cost drivers. There is no \nreason to believe that transmission discounts are even a primary driver in that \ncost portfolio. \nD. Transmission Rates Are Not the Primary Driver of Co-location Decisions. \n37. As noted by the Data Center Coalition, the main motivation for co-location is \naccess to timely interconnection, not transmission costs. Their statement \nreads: “co-location of load with generation—whether front-of-the-meter or \nbehind-the-meter—is a pragmatic, common, and commercially legitimate \nstrategy to secure timely access to power as markets grapple with years-long \ninterconnection \nqueue \nbacklogs.”11 \nIn \nshort, \nspeed-to-power, \nnot \ntransmission pricing, is the decisive factor when large load seeks to co-locate \nwith generation. E3’s price signaling through a discounted transmission rate \nis unnecessary given existing economic incentives and market behavior for co-\nlocation decisions. \nVI. \nConclusion \n38. The E3 Proposal put forth by Mr. Ming is untenable. It is premised on a flexible \ninterconnection framework that does not currently exist and is not applicable \n \n11  Comments of the Data Center Coalition at 2 (Apr. 23, 2025)."},{"page":46,"startToken":12776,"endToken":12863,"text":"17 \nto the issue at hand. It fails to consider significant reliability and safety \nconcerns presented by the interconnection of large loads such as data centers. \nThese concerns are still being studied. It inappropriately utilizes a marginal \ncost discount in the design of transmission rates for certain customers only, \nan approach that is unwarranted and unduly discriminatory. Finally, it relies \non an application of rate design principles that is flawed and fails to consider \nthe primary motivation of co-location decisions (i.e., the ability to interconnect \nquickly)."},{"page":47,"startToken":12863,"endToken":12905,"text":"VERIFICATION \n \nI declare under penalty of perjury that the foregoing Declaration is true and correct \nto the best of my information, knowledge, and belief. \nExecuted this 3rd day of June 2025.  \n \n \n \n \n \n \n \n/s/ Danielle S. Powers \nChief Executive Officer, Concentric Energy \nAdvisors, Inc."},{"page":48,"startToken":12905,"endToken":12951,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document upon each person \ndesignated on the official service list in the above captioned dockets. \nDated at Chicago, IL this 3rd day of June, 2025. \n/s/ Geneva Kennedy \nGeneva Kennedy  \nExelon Corporation"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":281,"startToken":0,"endToken":400},{"p":2,"at":281,"title":"I. The Standard Under Federal Power Act Section 206 Has Not Been Met.","method":"printed heading","endPage":3,"endAt":175,"startToken":400,"endToken":772},{"p":3,"at":175,"title":"A. The Current PJM Tariff Is Just and Reasonable and Not Unduly","method":"printed heading","endPage":13,"endAt":6,"startToken":772,"endToken":3939},{"p":13,"at":6,"title":"B. There Is No Basis to Change the Existing PJM Tariff to Accommodate Co-","method":"printed heading","endPage":15,"endAt":437,"startToken":3939,"endToken":4767},{"p":15,"at":437,"title":"II. There Is No Inconsistency in the Indicated TOs’ Jurisdictional Position.","method":"printed heading","endPage":16,"endAt":924,"startToken":4767,"endToken":5194},{"p":16,"at":924,"title":"III. The Different Treatment of BTMG and Behind-The-Meter Load Does Not Render the","method":"printed heading","endPage":18,"endAt":6,"startToken":5194,"endToken":5672},{"p":18,"at":6,"title":"IV. The Fact that Co-location Arrangements Employing Network Service Take Time Does","method":"printed heading","endPage":18,"endAt":1557,"startToken":5672,"endToken":5907},{"p":18,"at":1557,"title":"V. Replacement Rates that Would Not Require Network Service for Co-located Load","method":"printed heading","endPage":21,"endAt":1340,"startToken":5907,"endToken":6803},{"p":21,"at":1340,"title":"VI. PJM’s Options 4 and 5 Have Not Been Demonstrated to Be Just and Reasonable.","method":"printed heading","endPage":24,"endAt":6,"startToken":6803,"endToken":7530},{"p":24,"at":6,"title":"VII. The Commission Should Reaffirm that the Existing PJM Tariff Is Just and","method":"printed heading","endPage":25,"endAt":170,"startToken":7530,"endToken":7932},{"p":25,"at":170,"title":"VIII. Motion for Leave to Answer","method":"printed heading","endPage":25,"endAt":841,"startToken":7932,"endToken":8035},{"p":25,"at":841,"title":"IX. Conclusion","method":"printed heading","endPage":30,"endAt":385,"startToken":8035,"endToken":8980},{"p":30,"at":385,"title":"I. INTRODUCTION","method":"printed heading","endPage":31,"endAt":1437,"startToken":8980,"endToken":9319},{"p":31,"at":1437,"title":"II. SUMMARY","method":"printed heading","endPage":34,"endAt":3,"startToken":9319,"endToken":9816},{"p":34,"at":3,"title":"III. E3’s Proposal Does Not Consider Reliability Concerns and Operational Impacts","method":"printed heading","endPage":34,"endAt":135,"startToken":9816,"endToken":9832},{"p":34,"at":135,"title":"A. Existing NERC Reliability Standards Ensure the Grid Can Reliably Serve the","method":"printed heading","endPage":36,"endAt":228,"startToken":9832,"endToken":10334},{"p":36,"at":228,"title":"B. E3’s Proposal Relies on a Flexible Bundled Interconnection Framework that","method":"printed heading","endPage":38,"endAt":1057,"startToken":10334,"endToken":10965},{"p":38,"at":1057,"title":"C. Many Types of Large Load Have Not, Cannot, or Will Not Sign Up for these","method":"printed heading","endPage":40,"endAt":4,"startToken":10965,"endToken":11304},{"p":40,"at":4,"title":"IV. Role of a “Marginal Cost Discount” in Embedded Cost Ratemaking","method":"printed heading","endPage":43,"endAt":4,"startToken":11304,"endToken":12058},{"p":43,"at":4,"title":"V. Price Signals through NITS Are Neither Appropriate Nor Required to Incent","method":"printed heading","endPage":43,"endAt":125,"startToken":12058,"endToken":12074},{"p":43,"at":125,"title":"A. Bonbright Rate Design Principles Do Not Support Price Signaling for Specific","method":"printed heading","endPage":44,"endAt":135,"startToken":12074,"endToken":12335},{"p":44,"at":135,"title":"B. Transmission Rates Differ Fundamentally from PJM’s LMPs.","method":"printed heading","endPage":44,"endAt":967,"startToken":12335,"endToken":12460},{"p":44,"at":967,"title":"C. Load Entities Already Have Strong Financial Incentives to Minimize Total","method":"printed heading","endPage":45,"endAt":511,"startToken":12460,"endToken":12628},{"p":45,"at":511,"title":"D. Transmission Rates Are Not the Primary Driver of Co-location Decisions.","method":"printed heading","endPage":45,"endAt":1298,"startToken":12628,"endToken":12734},{"p":45,"at":1298,"title":"VI. Conclusion","method":"printed heading","endPage":48,"endAt":0,"startToken":12734,"endToken":12905},{"p":48,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":48,"endAt":288,"startToken":12905,"endToken":12951}]}