{"document":{"slug":"rec-20250612-5210","title":"Motion for Leave and Answer of Constellation Energy Generation, LLC in response to the Indicated Transmission Owners’ fourth answer, etc","issued":"2025-06-12","accession":"20250612-5210","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"answer","file":"sources/filings/text/20250612-5210_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250612-5210","tier":"record","sha256":"a7d257680400fb45ecd4803c70ec5ce4aa141d0becd1a7d6a4ff7b8430f8138c","pages":32,"tokens":7127,"emptyPages":[],"textThemes":["colo","flex","study"]},"pages":[{"page":1,"startToken":0,"endToken":412,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nPJM Interconnection, L.L.C., et al. \n \n \nLarge Loads Co-Located at Generating Facilities \n \n \nConstellation Energy Generation, LLC \nv. \nPJM Interconnection, L.L.C. \n) \n \n \n) \n \n \n) \n) \n) \nDocket No. EL25-49-000 \n \n \nDocket No. AD24-11-000 \n \n \nDocket No. EL25-20-000 \n(Consolidated) \n \n \n \n \nMOTION FOR LEAVE AND ANSWER OF \nCONSTELLATION ENERGY GENERATION, LLC \nConstellation Energy Generation, LLC (“Constellation”) moves for leave and submits this \nanswer1 in response to the Indicated Transmission Owners’ fourth answer in this proceeding, and \nthe belated claims of their new witness, Danielle S. Powers.2  Nearly every party in this proceeding \nagrees that the PJM Tariff is unclear and confusing and requires clarification.3  The Indicated \nTransmission Owners do not contend otherwise.  Nor do they offer any evidentiary rebuttal to \nConstellation’s expert testimony on (1) the critical national interest in expediting the efficient \ninterconnection and co-location of data center loads,4 (2) the lack of any resource adequacy \n \n1 Constellation submits this answer and motion for leave pursuant to Rules 212 and 213 of the Commission’s Rules \nof Practice and Procedure, 18 C.F.R. §§ 385.212 and 385.213, and respectfully submits there is good cause for the \nCommission to accept the motion for leave.  See Alaska Gasline Dev. Corp., 171 FERC ¶ 61,134, at P 7 (2020) \n(accepting answers that “clarify the concerns raised and provide information that has assisted in our decision making”); \nSaltville Gas Storage Co., 164 FERC ¶ 61,212, at P 2 n.6 (2018) (accepting answers that “assist the Commission in \nunderstanding the issues raised[] and will ensure a complete record”). \n2 See Motion for Leave to Answer and Answer of the Indicated PJM Transmission Owners (filed June 3, 2025) \n(“Indicated TOs’ Fourth Answer”) and Declaration of Danielle S. Powers (“Powers Decl.”), attached thereto; see also \nAnswer of the Indicated PJM Transmission Owners (filed Mar. 24, 2025) (“Indicated TOs First Answer”); Answer of \nthe Indicated PJM Transmission Owners (filed Apr. 23, 2025) (“Indicated TOs’ Second Answer”); Answer of the \nIndicated PJM Transmission Owners to the Motion to Stay Proceedings at 3-4 (filed May 7, 2025) (“Indicated TOs’ \nThird Answer”). \n3 See Motion for Leave and Answer of Constellation Energy Generation, LLC (filed May 8, 2025) (“Constellation’s \nSecond Answer”), at 2-9 (summarizing the parties’ positions on this core point). \n4 See Answer of Constellation Energy Generation, LLC (filed April 23, 2025) (“Constellation’s First Answer”), Exh. \n1, Declaration of Dr. Paul Stockton; see also Exh. 1 hereto, Rebuttal Testimony of Zachary Ming (“Ming Rebuttal”)"},{"page":2,"startToken":412,"endToken":802,"text":"2 \nconcerns caused by co-location versus load growth generally,5 (3) the much higher transmission \nupgrade costs caused by large loads not locating near generation,6 (4) the use of the transmission \nsystem under co-location configurations from an expert electrical engineering perspective and how \nthat use differs from front-of-the-meter configurations,7 and (5) the broad system benefits of the \nco-location of large loads and generation.8   \nInstead, several weeks after the deadline for timely filings in this proceeding, based on the \nschedule outlined by the Commission in its Show Cause Order,9 the Indicated Transmission \nOwners recently submitted a pleading full of misstatements of the record and a few new but \nirrelevant arguments.  The only accompanying evidence was the Powers Declaration, which \npurports to respond to the Testimony of Zachary Ming, Constellation’s witness on the rate design \nissues associated with large loads.  Consistent with PJM’s eight co-location configuration options, \nMr. Ming advocated for three classes of transmission service for large loads:  firm, generator-\ncontingent, and interruptible, with corresponding transmission rates reflecting actual use of the \ntransmission system.10  The objective is to reliably utilize the transmission system most fully at \nlowest overall cost.  Instead of addressing the merits of Constellation’s rate arguments, Ms. Powers \nmisstates the record, makes flawed assumptions, and propounds numerous erroneous arguments.  \n \nat 13 (citing Energy and Environmental Economics, Inc. report that “even under a ‘moderate’ data center growth \nscenario, electric demand could double in [Virginia] over a 25-year period. Under an ‘unconstrained’ scenario, the \ntime to double is reduced to 10 years”). \n5 See, e.g., Constellation’s First Answer, Exh. 3, Affidavit of Aaron Patterson. \n6 Id. \n7 Id., Exh. 4, Affidavit of Steven Herling (“Herling Aff.”). \n8 Id., Exh. 5, Affidavit of Michael Kormos (“Kormos Aff.”). \n9 PJM Interconnection, L.L.C., et al., 190 FERC ¶ 61,115 (2025) (“Show Cause Order”) at P 87 (PJM and the \nTransmission Owners filings were due 30 days after the Show Cause Order, with responses due 30 days thereafter).  \nThe Commission’s process did not provide for Transmission Owners to file their initial expert testimony 103 days \nafter the Show Cause Order.  (The Show Cause Order issued on February 20, 2025; the Indicated Transmission Owners \nfiled their initial expert testimony on June 3, 2025—103 days later.) \n10 Constellation’s First Answer, Exh. 2, Testimony of Zachary Ming (“Ming Testimony”)."},{"page":3,"startToken":802,"endToken":1116,"text":"3 \nTo ensure an accurate record, Constellation attaches hereto as Exhibit 1 the Rebuttal Testimony of \nZachary Ming.   \nIn addition to Mr. Ming’s rebuttal of Ms. Powers’ declaration, Constellation—rather than \nresponding to points it previously covered—instead offers the following brief clarifications to the \nrecord: \nFirst, the Indicated Transmission Owners claim that “[p]arties have lost sight of something \nthroughout the course of this proceeding,” which according to the Indicated Transmission Owners, \nis that “FERC cannot order a new type of service unless there is a finding that the existing \narrangement is unlawful.”11  But it is the Indicated Transmission Owners who appear to “have lost \nsight” of the detailed explanation in Constellation’s comments—comprising 23 pages, with \nadditional supporting expert testimony—that the existing rate is unjust and unreasonable because \nit lacks sufficient clarity about the rules for co-location.12  The Indicated Transmission Owners \nhave no answer.  Constellation also submitted a separate answer itemizing the positions of every \nparty in this proceeding on this issue, listing the parties supporting the Commission’s preliminary \nfinding that the PJM Tariff does not contain “provisions addressing with sufficient clarity or \nconsistency the rates, terms, and conditions of service that apply to co-location arrangements” and \n“[t]he absence of such provisions may leave entities unable to determine what steps they can or \nmust take to effectuate co-location arrangements of various configurations.”13  Indeed, nearly \nevery party in this proceeding agrees that the existing PJM Tariff requires clarification about how \nto serve large loads.14   \n \n11 Indicated TOs’ Fourth Answer at 13 (emphasis added). \n12 Constellation’s First Answer at 13-36 (citing statute, cases, and supporting evidence); see also Ming Testimony at \n19-24 (providing expert testimony on the same showing); Ming Rebuttal at 5-6 (repeating showing in initial \ntestimony). \n13 Constellation’s Second Answer at 2-3; see Show Cause Order at PP 74-75. \n14 See Constellation’s Second Answer at 2-9."},{"page":4,"startToken":1116,"endToken":1597,"text":"4 \nSecond, the Indicated Transmission Owners belatedly trot out the “major questions \ndoctrine” to argue that the Commission does “not have any authority to require a new type of \ntransmission service” and “cannot order any of the replacement rates contemplated by the \nparties.”15  This smacks of desperation.  In at least six rounds of prior filings in these proceedings, \nthe Indicated Transmission Owners never previously raised this argument.16  And it is no wonder \nwhy: it is meritless.  Confirming that existing behind-the-meter generation rules in PJM apply to \nlarge loads, and adopting generator-contingent or interruptible forms of transmission service with \naccompanying rates, is well within the Commission’s statutory authority to ensure just and \nreasonable and non-discriminatory rates for transmission service, and is far narrower in its scope \nthan, for example, the Commission’s recent transmission reforms in Order No. 1920, let alone \nOrder No. 888.17  Ironically, if any party’s position implicates the “major questions doctrine,” it is \nthe Indicated Transmission Owners’:  Congress expressly left to the states jurisdiction over retail \npower sales, yet the Indicated Transmission Owners ask the Commission to override a state’s \nchoice to allow co-location and direct retail service by mandating that all large loads must be \nwholesale Network Integrated Transmission Service customers and pay on a gross basis.18 \n \n15 Indicated TOs’ Fourth Answer at 14 & nn. 42, 43 (citing cases). \n16 See Indicated TOs’ First, Second, and Third Answers (all failing to raise “major questions” issue); see also Exelon \nComments in Opposition to Complaint, Docket No. EL25-20-000 (filed Dec. 12, 2024); Exelon Answer and Motion \nfor Leave to Answer Constellation and Vistra Answers, Docket No. EL25-20-000 (filed Jan. 7, 2025); Comments of \nDavid Weaver, PE on Behalf of Exelon (Docket No. AD24-11-000) (all also failing to raise “major questions” issue). \n17 See, e.g., Bldg. for the Future Through Elec. Reg’l Transmission Plan. & Cost Allocation, Order No. 1920, 187 \nFERC ¶ 61,068 (2024), order on reh’g & clarification, Order No. 1920-A, 189 FERC ¶ 61,126 (2024), order on reh’g \n& clarification, Order No. 1920-B, 191 FERC ¶ 61,026 (2025); Promoting Wholesale Competition Through Open \nAccess Nondiscriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities \nand Transmitting Utilities, [Regs. Preambles 1991-1996] FERC STATS. & REGS. ¶ 31,036 (1996), 61 Fed. Reg. 21,540 \n(1996), order on reh’g, Order No. 888-A, FERC STATS. & REGS. ¶ 31,048 (1997), order on reh’g, Order No. 888-B, \n81 FERC ¶ 61,248, 62 Fed. Reg. 64,688 (1997), order on reh’g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff’d in \nrelevant part sub nom., Transmission Access Policy Study Group v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff’d sub \nnom., New York v. FERC, 535 U.S. 1 (2002). \n18 See Constellation’s First Answer at 26-28 (explaining that requiring co-located loads to always take Network \nIntegrated Transmission Service unduly limits state jurisdiction and flexibility contrary to law) (citing cases)."},{"page":5,"startToken":1597,"endToken":2078,"text":"5 \nThird, the Indicated Transmission Owners repeat allegations that “BTMG [Behind-the-\nMeter Generation] is not similarly situated to behind-the-meter load” because “co-located load \narrangements use and rely upon the transmission system and therefore cannot qualify as BTMG.”19  \nThe Indicated Transmission Owners continue to simply assume the premise of this argument \nwithout any expert evidentiary support for the claim.  Ms. Powers does not address it.  Instead, the \nIndicated Transmission Owners leave unrebutted the only expert engineering testimony that is in \nthe record on this point by Steven R. Herling, a former Vice President of Planning for PJM with \nover 30 years’ experience in the operations and planning of the transmission system.  He explained \nthat these two configurations (BTMG and co-located loads and generation) can be designed “in \nexactly the same manner.”20   \nIn addition, the Indicated Transmission Owners’ new diagram purporting to show that the \nlocation of the meter has no effect on the amount of grid services used by a configuration in fact \nconfirms that there is no meaningful difference between BTMG and co-located loads:  simply \nremove the word “large” throughout the Indicated Transmission Owners’ illustration and the same \ndiagram depicts BTMG.21  As Mr. Ming already testified, “[t]here is no physical, technical, or \n \n19 Indicated TOs’ Fourth Answer at 16-17. \n20 Constellation’s First Answer, Exh. 4, Affidavit of Steven R. Herling at ¶ 30 (“BTMG arrangements and co-located \nload arrangements can be designed from an engineering perspective in exactly the same manner.  In one, the load is \ntypically greater in magnitude than the generating facility.  In the other, the load is typically lesser in magnitude than \nthe generating facility.”); see also id. (“The physics of energy delivery are the same in both arrangements and are not \nrelated to contractual arrangements or rate structures.”). \n21 Indicated TOs’ Fourth Answer at 7 (illustration of “Large” Load Meter Scenarios, depicting a “Large” Load and a \n“Large” Generator).  Note also that the Indicated Transmission Owners’ diagram also fails to depict protective \nrelays—the electrical equipment that does change usage of the transmission grid (meters do not).  See Constellation’s \nFirst Answer at 46 (showing a generator-contingent (behind-the-meter) configuration with protective relays); see also \nid. 48-49 (relying on expert engineering testimony to refute the Indicated Transmission Owners’ and others’ \nunsupported and erroneous assertions that protective relays cannot be relied upon to prevent power flows).  The \nIndicated Transmission Owners and their sponsored witness both repeat these false claims that protective relays cannot \nwork.  See Indicated TOs’ Fourth Answer at 9-10; Powers Decl. at ¶ 14 (“It is not at all clear that the relay schemes \nand protection mechanisms … would protect the grid”).  However, Ms. Powers could have, but did not, challenge the \ntestimony of Steven Herling or Michael Kormos, which specifically affirmed the widespread use and efficacy of relay \nschemes and protection mechanisms in PJM operations and designs.  See Herling Aff.at ¶ 23; Kormos Aff. at ¶ 7."},{"page":6,"startToken":2078,"endToken":2394,"text":"6 \neconomic reason why a netting construct should apply differently for customers with behind-the-\nmeter generation or co-located generation.”22      \nFourth, Indicated Transmission Owners claim that any form of transmission service other \nthan full Network Integrated Transmission Service “would represent a significant departure from \nNERC Reliability Standards FAC-002-2 and TPL-001-5” and “[t]he result would be reduced \nscrutiny of load” and “mismanagement of the transmission system,” among other reliability \nallegations.23  They are incorrect.  NERC Reliability Standard FAC-002-2 states that “[e]ach \nTransmission Planner … shall study the reliability impact of: (i) interconnecting new … electricity \nend-user Facilities and (ii) materially modifying existing interconnections of generation.”24  No \none is advocating that co-located load should be connected without a study.  Worse still, unrebutted \nrecord evidence shows that some Indicated Transmission Owners are refusing to “work on … \nrequests to co-locate load with … generators at certain facilities,” which appears to be a plain \nviolation of FAC-002-2.25   \nMs. Powers, for her part, cites recent load drops in ERCOT as proof that large loads \njeopardize reliability.26  But as Mr. Ming testifies, the dropped load in ERCOT was not co-located; \nit was grid-connected.27  The Indicated Transmission Owners previously raised the same type of \n \n22 Ming Testimony at 55. \n23 Indicated TOs’ Fourth Answer at 21. \n24 NERC Reliability Standard FAC-002-2 R1.  NERC Reliability Standard TPL-001-5 is about Transmission Planners \nmaintaining system models for performing planning assessments.  The Indicated Transmission Owners do not explain \nhow all other potential types of transmission service necessarily violate this Reliability Standard. \n25 See Show Cause Order at PP 74-75 (the Commission preliminarily finding that the “absence of [clear co-location] \nprovisions [in the PJM Tariff] may leave entities unable to determine what steps they can or must take to effectuate \nco-location arrangements of various configurations” and this “raises the potential for undue discrimination or \npreferential treatment”).   \n26 Powers Decl. at ¶ 13.   \n27 Ming Rebuttal at 17."},{"page":7,"startToken":2394,"endToken":2608,"text":"7 \nreliability concerns about grid-connected large load drops in Virginia.28  It is misleading for the \nIndicated Transmission Owners to keep repeating claims that co-location jeopardizes reliability \nbut then citing load drops by grid-connected loads.  For reasons that Constellation already fully \nexplained, it also is misleading to claim that co-location jeopardizes resource adequacy when co-\nlocation has no effect on it whatsoever—load is load that must be served, whether it is co-located \nor grid-connected.29 \nCONCLUSION \nWHEREFORE, Constellation respectfully requests that the Commission grant leave and \naccept this answer and adopt its preliminary finding that the PJM Tariff is unjust and unreasonable \nand unduly discriminatory and preferential because it lacks clear provisions for the treatment of \nlarge loads co-located with generation, and this lack of clarity has caused undue discrimination \nagainst large loads seeking to co-locate.  The Commission should fix replacement rates as set forth \nin Constellation’s First and Second Answers.  The Commission should not order a stakeholder or \nother process that relies on the good faith and cooperation of the Indicated Transmission Owners \nto resolve the issues raised in this proceeding.   \n \n28 See Constellation’s First Answer at 22 (pointing out that Virginia load drops were of grid-connected load, not co-\nlocated load). \n29 See id. at 58-63 (explaining misplaced resource adequacy concerns)."},{"page":8,"startToken":2608,"endToken":2680,"text":"8 \nRespectfully submitted, \n /s/ Paul F. Wight \nCarrie Hill Allen \nSr. Vice President & Deputy General Counsel \nSeth Lucia \nAssistant General Counsel  \nConstellation Energy Generation, LLC  \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001     \ncarrie.allen@constellation.com   \nseth.lucia@constellation.com  \n \n \nPaul F. Wight \nKirkland & Ellis LLP \n1301 Pennsylvania Ave., NW \nWashington, D.C. 20004 \n(202) 389-3321 \npaul.wight@kirkland.com \n \n \n \n \nCounsel for Constellation Energy \nGeneration, LLC \n \nJune 12, 2025"},{"page":9,"startToken":2680,"endToken":2763,"text":"9 \nCERTIFICATE OF SERVICE \nI hereby certify that I have on this 12th day of June, 2025, caused to be served a copy of the \nforegoing upon all parties on the service list in these proceedings in accordance with the \nrequirements of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. \n§ 385.2010 (2024). \n \n/s/ Mack Dowiak \n \n \n \n \n \n \n \nMack Dowiak \nKirkland & Ellis LLP \n \n \n \n \n \n \n \n1301 Pennsylvania Ave., N.W. \n \n \n \n \n \n \n \nWashington, D.C. 20004 \n \n \n \n \n \n \n \nTel: (202) 389-3266 \n \n \n \n \n \n \n \nmack.dowiak@kirkland.com"},{"page":10,"startToken":2763,"endToken":2770,"text":"Exhibit 1 \n \nRebuttal Testimony of \nZachary Ming"},{"page":11,"startToken":2770,"endToken":2792,"text":"Rebuttal Testimony of Zachary Ming \nPartner \nEnergy and Environmental Economics, Inc. (“E3”) \n \n \nOn behalf of \nConstellation Energy Generation, LLC \n \nJune 12, 2025"},{"page":12,"startToken":2792,"endToken":2807,"text":"2 \nTable of Contents \n1 \nIntroduction .............................................................................................. 3 \n2 \nResponses to Criticisms ............................................................................ 8 \n3 \nRecommendation .................................................................................... 21"},{"page":13,"startToken":2807,"endToken":3008,"text":"3 \nConstellation Energy Generation, LLC \n1 \n \n2 \nRebuttal Testimony of Zachary Ming, Partner, Energy and Environmental \n3 \nEconomics, Inc. (“E3”) \n4 \n1 Introduction \n5 \nQ1. \nPLEASE STATE YOUR NAME, OCCUPATION, BUSINESS ADDRESS. \n6 \nA1. \nMy name is Zachary Ming. My current position is Partner at Energy and \n7 \nEnvironmental Economics (“E3”). My business address is 44 Montgomery Street \n8 \nSuite 1500, San Francisco, California 94104. \n9 \nQ2. \nPLEASE STATE ON WHOSE BEHALF YOU ARE FILING TESTIMONY. \n10 \nA2. \nI am filing this testimony as an independent expert, and it represents my own \n11 \npositions and perspectives. This testimony was funded by Constellation Energy \n12 \nGeneration, LLC (“Constellation”).  \n13 \nQ3. \nARE YOU THE SAME ZACHARY MING WHO FILED DIRECT \n14 \nTESTIMONY IN THIS PROCEEDING? \n15 \nA3. \nYes. I filed direct testimony on behalf of Constellation in this proceeding on April \n16 \n23, 2025. \n17 \nQ4. \nPLEASE PROVIDE A SUMMARY OF YOUR DIRECT TESTIMONY. \n18 \nA4. \nMy testimony demonstrated that there are three fundamental configurations of co-\n19 \nlocated load: firm, generator-contingent, and interruptible. For each configuration, \n20 \nI outlined an ideal rate structure that adheres to accepted rate design principles \n21 \nincluding fair apportionment of costs and economic efficiency. Finally, I \n22"},{"page":14,"startToken":3008,"endToken":3242,"text":"4 \ndemonstrated how each of the eight rate design options proposed by PJM can \n1 \ngenerally be mapped to one of these three fundamental configurations and how they \n2 \ncan be modified to align with ideal rate structures. \n3 \nQ5. \nWHAT IS THE PURPOSE OF THIS REBUTTAL TESTIMONY? \n4 \nA5. \nThis testimony responds to the declaration of Danielle S. Powers, who submitted a \n5 \nrebuttal to my direct testimony. Ms. Powers’ rebuttal was submitted on behalf of \n6 \nthe Indicated PJM Transmission Owners. \n7 \nQ6. \nPLEASE PROVIDE A SUMMARY OF MS. POWERS’ REBUTTAL TO \n8 \nYOUR TESTIMONY. \n9 \nA6. \nMs. Powers asserts that the existing NITS tariff is adequate in its current form. She \n10 \noffers the following criticisms of my proposal for rate options for three \n11 \nconfigurations of co-located load: \n12 \n1. Ms. Powers describes my proposal as unduly discriminatory and \n13 \ninequitable because it results in a different rate for co-located loads \n14 \ncompared to NITS customers; \n15 \n2. Ms. Powers argues that because many large loads will lack flexibility to \n16 \nrespond, additional tariff options are not needed; \n17 \n3. Ms. Powers argues that the more flexible approach for interconnection that \n18 \nmy proposal enables is unprecedented; \n19 \n4. Ms. Powers argues that some loads may site efficiently (e.g. close to \n20 \ngenerators) even in the absence of a rate design that encourages them to do \n21 \nso; \n22"},{"page":15,"startToken":3242,"endToken":3540,"text":"5 \n5. Ms. Powers expresses concern that my proposal does not consider \n1 \nreliability concerns and operational impacts; and \n2 \n6. Ms. Powers asserts that the true motivation of large loads is to secure faster \n3 \ninterconnection – not to avoid transmission costs – so no alternative options \n4 \nor discounts are needed. \n5 \nQ7. \nDOES MS. POWERS’ AFFIDAVIT ADDRESS YOUR ARGUMENTS AS \n6 \nTO WHY THE CURRENT PJM TARIFF IS NOT JUST AND \n7 \nREASONABLE WITH RESPECT TO CO-LOCATED LOADS? \n8 \nA7. \nNo. While Ms. Powers declares the existing tariff to be sufficient, she fails to \n9 \nrespond to the most fundamental deficiency with the current tariff: the ambiguity \n10 \nand lack of clarity it provides regarding co-located loads – a topic I discussed in my \n11 \ndirect testimony. In fact, this deficiency is the entire underlying reason that FERC \n12 \nordered this show-cause proceeding in the first place, finding that the PJM Tariff \n13 \ndoes not contain “provisions addressing with sufficient clarity or consistency the \n14 \nrates, terms, and conditions of service that apply to co-location arrangements” and \n15 \n“[t]he absence of such provisions may leave entities unable to determine what steps \n16 \nthey can or must take to effectuate co-location arrangements of various \n17 \nconfigurations.”1 While PJM’s stance is that the existing tariff remains just and \n18 \nreasonable, it concedes that “clarification and enhancements could well be in order \n19 \ngiven that this is an evolving area and Tariff provisions did not contemplate the \n20 \ntype of arrangements at issue in this docket or their implications.”2 PJM asserts that \n21 \n \n1 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115 at PP 74-75 (2025). \n2 Answer of PJM Interconnection, L.L.C., Docket No. EL25-49-000, et al., (filed Mar. 24, 2025) (“PJM \nAnswer”) at 32."},{"page":16,"startToken":3540,"endToken":3801,"text":"6 \nthe current tariff allows for multiple options for co-located loads – including one \n1 \noption where load and generation are physically co-located but metered separately \n2 \n(Existing Option #2) and another where load and generation are located behind the \n3 \nsame meter (Existing Option #3).   \n4 \nQ8. \nPLEASE \nSUMMARIZE \nYOUR \nRESPONSE \nTO \nMS. \nPOWERS’ \n5 \nCRITICISMS. \n6 \nA8. \nIn general, Ms. Powers misrepresents many of my arguments and in some cases \n7 \nasserts positions that I simply do not take. In other cases, her rebuttals are flawed. \n8 \nSpecifically: \n9 \n1. The assertion that my proposal is discriminatory and inequitable is \n10 \nunfounded: under my proposal, co-located customers are provided with a \n11 \ndiscount in exchange for imposing fewer costs on the transmission system \n12 \nthan NITS customers. Further, the level of the discount is proposed in a \n13 \nmanner that ensures these customers still equitably contribute to the \n14 \nembedded costs of the system to create positive impacts for all customers. \n15 \n2. Ms. Powers’ assertion that many loads will not have the flexibility to curtail \n16 \nis entirely compatible with my proposal; such customers would have the \n17 \nopportunity to elect firm service. My proposal expands the number of \n18 \noptions available so that loads that do have the flexibility to curtail can \n19 \nselect a rate option that simultaneously lowers their own cost and the \n20 \noverall cost of the electric system. \n21 \n3. The argument that there are few similar parallels for flexible transmission \n22 \nservice in North America neglects to recognize the significance of this \n23"},{"page":17,"startToken":3801,"endToken":4025,"text":"7 \nmoment: the number and magnitude of new large loads seeking \n1 \ninterconnection has no historical precedent. Simply assuming the existing \n2 \ntariff is adequate to address the scale, scope, and pace of change occurring \n3 \nbecause it has been deemed just and reasonable in the past misses the point. \n4 \n4. The argument that some loads may site efficiently even in the absence of a \n5 \nrate design that encourages them to do so ignores the theoretical and \n6 \nempirical benefits of efficient rate design. \n7 \n5. Ms. Powers’ concern that my proposal does not consider reliability \n8 \nconcerns or operational impacts is either a misunderstanding or \n9 \nmisrepresentation of my proposal. I propose that PJM account for all \n10 \nunique load and supply characteristics and fully comply with all NERC \n11 \nstandards. \n12 \n6. Nothing in my testimony claims insight over the motivation of large loads \n13 \nlooking to interconnect nor does it “ignore” the potential motivation of \n14 \nspeed-to-market. The goals of my proposed rate designs are to ensure that \n15 \nloads are charged fairly and efficiently. The prospect of faster \n16 \ninterconnection as a potential benefit to large loads is aligned with – not \n17 \nopposed to – the potential for reductions in transmission cost relative to \n18 \nfirm service. \n19 \nI elaborate on each of these responses in subsequent sections. \n \n20"},{"page":18,"startToken":4025,"endToken":4269,"text":"8 \n2 Responses to Criticisms \n1 \n2.1 Ms. Powers’ arguments that my proposed tariff options would be \n2 \n“discriminatory” and “inequitable” are unfounded. \n3 \nQ9. \nMS. \nPOWERS \nARGUES \nTHAT \nYOUR \nPROPOSED \nTARIFF \n4 \nSTRUCTURES ARE “DISCRIMINATORY” AND “INEQUITABLE” \n5 \nBECAUSE ONE CLASS OF CUSTOMERS (CO-LOCATED LOADS) \n6 \nWOULD \nBE \nCHARGED \nA \n“DISCOUNTED \nMARGINAL \nCOST \n7 \nAPPROACH” BASED PRICE WHILE ALL OTHERS WOULD PAY NITS \n8 \nCHARGES BASED ON A “FULL EMBEDDED COST APPROACH.” DO \n9 \nYOU AGREE WITH THIS ASSESSMENT? \n10 \nA9. \nNo. Ms. Powers characterizes the generator-contingent and interruptible options I \n11 \npresent as discriminatory and inequitable solely on the basis that they are provided \n12 \nwith a discounted transmission rate. There are multiple fundamental flaws with this \n13 \nargument. \n14 \nFirst, the ideal rate structures that I propose can only be characterized as a \n15 \n“discount” when compared to full “gross” billing for co-located loads. 3 When \n16 \ncompared to “net” billing (a structure supported by multiple parties in this \n17 \nproceeding), the rate structures I propose result in increased costs. \n18 \nSecond, my proposal is fully consistent with a “full embedded cost \n19 \napproach.” In fact, the entire point of calculating marginal costs in my proposal is \n20 \nto determine the residual (i.e. embedded cost) contribution that all loads make to \n21 \nthe system to ensure that co-located customers contribute equivalently. \n22 \n \n3 The differences between “gross” and “net” billing are discussed in more detail in my direct testimony."},{"page":19,"startToken":4269,"endToken":4540,"text":"9 \nFinally, what Ms. Powers fails to acknowledge in asserting that differently \n1 \npriced rate options are discriminatory is that these different options also provide \n2 \ndifferent standards of service from traditional NITS customers. A co-located load \n3 \non a generator-contingent or interruptible tariff would be subject to curtailment by \n4 \nPJM based on on-site generator capability and/or grid conditions – a reduced \n5 \nservice level compared to conventional NITS. Providing a discount for inferior \n6 \nservice is neither discriminatory nor inherently inequitable. \n7 \nQ10. TO \nSUPPORT \nHER \nCLAIM \nTHAT \nYOUR \nPROPOSAL \nIS \n8 \nDISCRIMINATORY AND INEQUITABLE, MS. POWERS ASSERTS \n9 \nTHAT “IF SOME CUSTOMERS PAY DISCOUNTED RATES, OTHER \n10 \nCUSTOMERS WILL HAVE TO MAKE UP THAT SLACK” AND “[W]HEN \n11 \nONE CUSTOMER AVOIDS THE COST OF THE TRANSMISSION GRID, \n12 \nIT FALLS TO ANOTHER TO PAY FOR IT.”4 DO YOU AGREE? \n13 \nA10. No. This claim rests upon a flawed premise that the costs of the transmission system \n14 \nare fixed and fails to acknowledge that customers’ behavior may also reduce the \n15 \ntotal costs to the system. If the cost reductions to the system are equivalent to the \n16 \ndiscount provided to the customer, then other customers will see no incremental \n17 \ncosts. If the cost reductions to the system are greater than the discount provided to \n18 \nthe customer (as is the case in my proposed ideal rate designs), then other customers \n19 \nwill see lower costs.  \n20 \n \n4 See Motion for Leave to Answer and Answer of the Indicated PJM Transmission Owners (filed June 3, \n2025), Declaration of Danielle S. Powers (“Powers Decl.”) at 14."},{"page":20,"startToken":4540,"endToken":4733,"text":"10 \nQ11. HOW DOES YOUR PROPOSED APPROACH FOR DESIGNING \n1 \nGENERATOR-CONTINGENT \nAND \nINTERRUPTIBLE \nTARIFFS \n2 \nACCOUNT FOR EQUITY BETWEEN THESE CUSTOMERS AND NITS \n3 \nCUSTOMERS? \n4 \nA11. The frameworks for ratemaking presented in the generator-contingent and \n5 \ninterruptible arrangements are designed to ensure an equitable contribution of all \n6 \ncustomers toward system embedded costs. For all of these customers, the \n7 \ncontribution toward system embedded costs is equal to the full NITS rate minus \n8 \nmarginal cost. The difference is that full NITS customers also impose marginal cost \n9 \non the system and therefore pay additionally. Under my proposed construct, there \n10 \nare aligned incentives between co-located customers and NITS customers. All \n11 \ncustomers contribute to the embedded costs of the system and therefore reduce rates \n12 \nfor other customers. \n13 \n2.2 Ms. Powers’ position that many large loads are not flexible is \n14 \nentirely compatible and consistent with my proposed options for \n15 \nservice. \n16 \nQ12. REGARDING \nTHE \nGENERATOR-CONTINGENT \nAND \n17 \nINTERRUPTIBLE SERVICES YOU PROPOSE, MS. POWERS ALSO \n18 \nASSERTS THAT “[M]ANY TYPES OF LARGE LOAD HAVE NOT, \n19 \nCANNOT, OR WILL NOT SIGN UP FOR THESE TYPES OF \n20"},{"page":21,"startToken":4733,"endToken":4991,"text":"11 \nCONTRACTUAL CO-LOCATION ARRANGEMENTS.”5 WHAT IS YOUR \n1 \nRESPONSE? \n2 \nA12. The fact that large loads “have not” opted for these types of contractual co-location \n3 \narrangements is hardly a useful observation, as those options have not historically \n4 \nbeen available to new load loads under the PJM tariff, and their consideration is the \n5 \nvery reason for this proceeding. For loads that “cannot” and “will not” agree to such \n6 \narrangements, Ms. Powers herself observes that “these loads would not be suitable \n7 \nfor generator-contingent or interruptible service,” nearly reaching the logical \n8 \nconclusion that those types of loads could elect to receive firm service under my \n9 \nproposal. \n10 \nIn her focus on lack of flexibility among a subset of large loads, Ms. Powers \n11 \nseems to suggest that because some loads may not be flexible, the same tariff should \n12 \napply to all co-located loads, flexible or not. What my proposed framework \n13 \nprovides is options: if a load is not flexible, as Ms. Powers expects, they can elect \n14 \nto take firm service; if a load is flexible, it can opt for a service that better meets its \n15 \nneeds rather than be forced into a “one-size-fits-all” agreement.  \n16 \n2.3 Ms. Powers’ arguments that such tariff options lack precedent \n17 \nignores the fact that the current dynamics for load growth are \n18 \nunprecedented and require a novel approach. \n19 \nQ13. MS. POWERS CHARACTERIZES YOUR PROPOSAL AS RESEMBLING \n20 \nA “CONNECT AND MANAGE” APPROACH FOR LOADS, AND CLAIMS \n21 \n \n5 Id. at 9."},{"page":22,"startToken":4991,"endToken":5235,"text":"12 \nTHAT \nTHERE \nARE \nNO \nFRAMEWORKS \nFOR \nLOAD \n1 \nINTERCONNECTION IN NORTH AMERICA. IS THIS CORRECT? \n2 \nA13. No. As discussed in my direct testimony, the Alberta Electric System Operator \n3 \n(“AESO”)’s Demand Opportunity Service (“DOS”) for transmission customers \n4 \nbears many similarities to the interruptible example I proposed.6 AESO’s rate is \n5 \none that allows existing customers to use electricity beyond a contracted capacity \n6 \nsubject to the following conditions: \n7 \n• AESO’s service of this additional load is subject to transmission \n8 \navailability, and the load can be interrupted with limited notice; \n9 \n• The customer must be capable of curtailing its load within 10 minutes of \n10 \nnotification from AESO; and \n11 \n• Customers using the system under a DOS agreement are subject to a \n12 \ntransmission charge denominated in $/MWh, providing a mechanism for \n13 \nsome recovery of embedded costs corresponding to their use of the system. \n14 \nQ14. NONETHELESS, THERE ARE RELATIVELY FEW EXAMPLES OF \n15 \nOPTIONS FOR LOADS TO INTERCONNECT IN THIS MANNER. IS \n16 \nTHAT A REASON THAT PJM/FERC SHOULD NOT CONSIDER IT \n17 \nHERE? \n18 \nA14. No. The absence of comparable tariffs in other jurisdictions is hardly a sound \n19 \njustification to dismiss its potential usefulness in the present circumstance in PJM. \n20 \nThe bulk electric system is in a state of rapid and unprecedented transformation, \n21 \n \n6 See, generally, materials on Rate Demand Opportunity Service, available at https://www.aeso.ca/rules-\nstandards-and-tariff/tariff/rate-demand-opportunity-service-dos"},{"page":23,"startToken":5235,"endToken":5515,"text":"13 \ndriven both by changes in the generation mix and significant new loads. In such an \n1 \nenvironment, it is incumbent upon grid operators and regulators to critically \n2 \nreassess how well market design and tariffs are suited to handle the changing needs \n3 \nof the grid – especially as PJM acknowledges that “[t]ariff provisions did not \n4 \ncontemplate the type of arrangements at issue in this docket or their implications.”7 \n5 \nDismissing that opportunity simply because it may differ from how things have \n6 \nbeen done in the past is short-sighted and narrow. \n7 \nAs it pertains to the specific matter at hand – tariff design for large co-\n8 \nlocated loads – it is worth recognizing that the nature of prospective load growth \n9 \ndriven by data centers and large industrial customers has no historical parallel. E3’s \n10 \nrecent report to Virginia’s Joint Legislative Audit and Review Commission \n11 \n(“JLARC”) indicated that even under a “moderate” data center growth scenario, \n12 \nelectric demand could double in the state over a 25-year period. Under an \n13 \n“unconstrained” scenario, the time to double is reduced to 10 years. Today’s \n14 \nelectric system is the cumulative product of more than a century of steady growth, \n15 \nand serving new loads at that scale would require nearly doubling the scale of the \n16 \nelectric grid in a fraction of the time. In such a period of dramatic change, it is \n17 \nessential that PJM and FERC consider improvements and innovations to supply \n18 \nnew customer segments – while continuing to adhere to sound ratemaking \n19 \nprinciples – particularly if those services could mitigate the need for new \n20 \ninfrastructure.  \n21 \n \n7 PJM Answer at 32."},{"page":24,"startToken":5515,"endToken":5802,"text":"14 \nQ15. ARE OTHER JURISDICTIONS CURRENTLY EXAMINING SPECIAL \n1 \nRATE TREATMENTS FOR LARGE CUSTOMERS ON ACCOUNT OF \n2 \nTHESE DYNAMICS? \n3 \nA15. Yes. The Texas legislature has recently examined a novel approach for loads that \n4 \nallows for faster interconnection under the premise that these loads will curtail if \n5 \nthe system is unable to serve them. 8 Additionally, many utilities are currently \n6 \nconsidering special tariffs for large loads that are designed to balance enabling \n7 \ngrowth with the need to protect existing customers from cost increases.9 \n8 \n2.4 Ms. Powers’ argument that some loads may site efficiently even in \n9 \nthe absence of a rate design that encourages them to do so is \n10 \neconomically unfounded. \n11 \nQ16. MS. POWERS STATES THAT “PRICE SIGNAL THROUGH NITS ARE \n12 \nNEITHER \nAPPROPRIATE \nNOR \nREQUIRED \nTO \nINCENT \n13 \nECONOMICALLY EFFICIENT SITING DECISIONS.”10 WHAT IS YOUR \n14 \nRESPONSE TO THIS? \n15 \nA16. This position contradicts one of the, if not the, core tenets of economics – that the \n16 \nrole of prices serves as an “invisible hand” to guide the action of individual \n17 \nproducers and consumers. Just because a consumer can do something without a \n18 \nprice incentive does not mean that they will. When loads do not see a price signal \n19 \n \n8 For example see Senate Bill 6 from the 2025/2026 legislative session \nhttps://legiscan.com/TX/bill/SB6/2025, whose concepts are explained more by Goff Policy \nhttps://www.linkedin.com/pulse/texas-way-trust-market-fix-queue-eric-goff-f4q3c/  \n9 See, generally, Berkeley Lab Energy Markets & Policy Technical Brief, available at https://eta-\npublications.lbl.gov/sites/default/files/2025-\n01/electricity_rate_designs_for_large_loads_evolving_practices_and_opportunities_final.pdf . \n10 Powers Decl. at 14."},{"page":25,"startToken":5802,"endToken":6000,"text":"15 \nthat reflects transmission costs, they will not consider these costs in their siting and \n1 \nconfiguration, which will almost certainly result in large loads in aggregate \n2 \nconfiguring in higher cost-manner than they would otherwise. \n3 \nQ17. MS. POWERS STATES THAT “THE USE OF PRICE SIGNALS – \n4 \nSPECIFICALLY, A DISCOUNTED TRANSMISSION RATE – TO \n5 \nFACILITATE COMMERCIAL ARRANGEMENT SUCH AS A CO-\n6 \nLOCATED BUSINESS MODEL IS NOT AMONG BONBRIGHT’S \n7 \nCRITERIA FOR SOUND RATE DESIGN.”\n11  WHAT IS YOUR \n8 \nRESPONSE? \n9 \nA17. This statement misrepresents my testimony. The purpose of my proposal is to \n10 \nencourage economic efficiency – both through load’s decisions of where to locate \n11 \nphysically on the grid and through their operational decisions in response to \n12 \navailability of co-located generation and the conditions on the grid – while \n13 \nproviding for fair apportionment of costs among co-located loads and other \n14 \ncustomers. The fact that a commercial agreement between a co-located load and \n15 \ngenerator may also exist is not relevant and is certainly not the purpose of my rate \n16 \nproposal. \n17 \nQ18. MS. POWER STATES THAT “APPLYING MARKET-BASED PRICING \n18 \nLOGIC TO THE PRICING FRAMEWORK OF A REGULATED \n19 \n \n11 Id."},{"page":26,"startToken":6000,"endToken":6234,"text":"16 \nTRANSMISSION SYSTEM MISCONSTRUES THE ROLE AND PURPOSE \n1 \nOF TRANSMISSION RATES.”12 WHAT IS YOUR RESPONSE? \n2 \nA18. What my testimony highlights is that both sound market design and sound rate \n3 \ndesign should both be economically efficient. This means getting an outcome that \n4 \nyields the most value for the least cost. The principle of economic efficiency is \n5 \nincluded in Bonbright's Principles of Public Utility Rates that was originally \n6 \npublished in 1961, long before the restructuring of the electricity system and the \n7 \nadvent of electricity markets. This principle is absolutely applicable in the context \n8 \nof a regulated transmission utility. \n9 \n2.5 Ms. Powers mischaracterizes the impact of co-located loads on grid \n10 \nreliability and my position on the topic. \n11 \nQ19. MS. POWERS ASSERTS THAT YOUR TESTIMONY “IMPROPERLY \n12 \nCONFLATES THE INTERCONNECTION STUDIES FOR LOAD AND \n13 \nSUPPLY BY SUGGESTING THAT A SINGLE STUDY SHOULD BE \n14 \nCONDUCTED THAT RECOGNIZES THE NET IMPACT OF BOTH THE \n15 \nLOAD \nAND \nSUPPLY \nWHILE \nIGNORING \nTHE \nUNIQUE \n16 \nCHARACTERISTICS OF EACH.”13 IS HER CHARACTERIZATION OF \n17 \nYOUR TESTIMONY ACCURATE? \n18 \nA19. No. Nowhere in my testimony do I assert that the study process should be conducted \n19 \nusing a simplistic net framework. A single study is eminently capable of \n20 \nsimultaneously capturing the \"unique characteristics\" of both load and supply. \n21 \n \n12 Id. at 15. \n13 Id. at 2."},{"page":27,"startToken":6234,"endToken":6453,"text":"17 \nNothing in my testimony suggests that PJM would not rigorously do so or that the \n1 \noutcome would not be compliant with NERC standards. \n2 \nQ20. MS. POWERS RAISES GENERAL CONCERNS WITH THE ABILITY OF \n3 \nTHE GRID TO PROTECT AGAINST THE CHALLENGES OF \n4 \nINTEGRATING LARGE LOADS – FOR EXAMPLE BY STATING THAT \n5 \n“IT IS NOT AT ALL CLEAR THAT THE RELAY SCHEMES AND \n6 \nPROTECTION MECHANISMS THAT HAVE BEEN PROPOSED BY \n7 \nVARIOUS LARGE LOADS WOULD PROTECT THE GRID AGAINST \n8 \nSUCH VARIATIONS IN DATA CENTER DEMAND.”14 WHAT IS YOUR \n9 \nRESPONSE TO THIS CONCERN? \n10 \nA20. This concern appears to be wholly unrelated to co-location. In fact, the data center \n11 \nincident in ERCOT that Ms. Powers cites in paragraph 13 is specifically not a co-\n12 \nlocated load.  Therefore, this concern should have no bearing on the decision to \n13 \nfacilitate co-location in PJM.  \n14 \n2.6 Faster interconnection – which Ms. Powers describes as the primary \n15 \nmotive behind large loads’ desire to co-locate – is a co-benefit with \n16 \navoided transmission costs enabled by my proposal, not a competing \n17 \nobjective. \n18 \nQ21. MS. POWERS ASSERTS THAT YOUR TESTIMONY “…IGNORES THE \n19 \nFACT THAT THE PRIMARY MOTIVATION FOR LARGE LOADS \n20 \nSEEKING CO-LOCATION ARRANGEMENT IS NOT AVOIDANCE OF \n21 \n \n14 Id. at 6."},{"page":28,"startToken":6453,"endToken":6732,"text":"18 \nTRANSMISSION COSTS, BUT TIMELY INTERCONNECTION.” 15  DO \n1 \nYOU VIEW THIS AS INCONSISTENT WITH THE POSITIONS YOU’VE \n2 \nTAKEN? \n3 \nA21. No, I do not. First, taken at face value, this statement appears to suggest that \n4 \nprincipled ratemaking for co-located loads is unnecessary because transmission \n5 \ncosts are a small portion of the costs borne by data centers. \n6 \nSecond, it is inaccurate to say that my proposal focuses solely on cost rather \n7 \nthan speed. For example, I state that “unnecessary and inefficient costs may slow \n8 \ndown - or even discourage - the interconnection of new beneficial load.\" 16 \n9 \nAdditionally, I discuss how allowing large loads to take service under generator-\n10 \ncontingent or interruptible service on an interim basis could facilitate more timely \n11 \ninterconnection of these loads.17 \n12 \nThird, Ms. Powers’ comments seem to suggest that the motivation to \n13 \ninterconnect more quickly should be a reason not to include additional tariff \n14 \noptions. Indeed, she elaborates: “In short, speed-to-power, not transmission pricing, \n15 \nis the decisive factor when large load seeks to co-locate with generation. E3’s price \n16 \nsignaling through a discounted transmission rate is unnecessary given existing \n17 \neconomic incentives and market behavior for co-location decisions.” This position \n18 \nis problematic for multiple reasons: (1) because it fails to recognize that faster \n19 \ninterconnection is a co-benefit that is aligned with, rather than opposed to, \n20 \ncustomers that impose fewer costs on the transmission system and; (2) because it \n21 \n \n15 Id. at 4. \n16 See Answer of Constellation Energy Generation, LLC (filed April 23, 2025), Exh. 2, Testimony of \nZachary Ming (“Ming Direct Testimony”), at 22. \n17 Id. at 48."},{"page":29,"startToken":6732,"endToken":6978,"text":"19 \nsuggests that it is appropriate to price discriminate by charging the same tariff rates \n1 \nto customers receiving a lower standard of service because of their willingness to \n2 \npay. \n3 \nQ22. PLEASE \nELABORATE \nON \nTHE \nIDEA \nTHAT \nFASTER \n4 \nINTERCONNECTION \nFOR \nCO-LOCATED \nLOADS \nSEEKING \n5 \nGENERATOR-CONTINGENT AND INTERRUPTIBLE SERVICE IS A \n6 \nCO-BENEFIT TO REDUCED TRANSMISSION COSTS. \n7 \nA22. My testimony focused on the benefit of avoided transmission investments because \n8 \nthe rate design proposals I offer are directly linked to that value. The ability to \n9 \ninterconnect more rapidly to the system if transmission investments are not needed \n10 \nis a potential additional benefit to the co-located load that is independent of the \n11 \ncosts of the electric system. Two things are simultaneously true of transmission \n12 \ninvestments: (1) they result in incremental costs to the system, and (2) their \n13 \nplanning and construction require long periods of time – often five to ten years. To \n14 \nthe extent a co-located load seeking interconnection can do so in a manner that \n15 \navoids the need for the transmission cost, two benefits result: (1) the transmission \n16 \ncosts are avoided, and (2) the load can be interconnected more quickly. In other \n17 \nwords, these are co-benefits, not competing priorities, and the fact that loads may \n18 \nbe motivated to seek alternative service arrangements by the prospect of faster \n19 \ninterconnection should be understood as an added benefit of my proposal, not a \n20 \ndrawback. \n21"},{"page":30,"startToken":6978,"endToken":7043,"text":"20 \nQ23. DOES THE CURRENT NITS TARIFF PROVIDE CUSTOMERS WITH A \n1 \nMEANS OF SEEKING FASTER INTERCONNECTION? \n2 \nA23. No. Under the current tariff, if the interconnection study process identifies new \n3 \ntransmission upgrades as required to meet a load, the new load has no opportunity \n4 \nto seek faster interconnection, even if it is willing to accept a lower standard of \n5 \nreliability. \n \n6"},{"page":31,"startToken":7043,"endToken":7093,"text":"21 \n3 Recommendation \n1 \nQ24. IN LIGHT OF THE RESPONSES YOU MAKE, DO YOU HAVE A \n2 \nRECOMMENDATION? \n3 \nA24. Yes. Based on the arguments I make above, I recommend that FERC disregard the \n4 \ndeclaration of Ms. Powers. \n5 \nQ25. DOES THIS CONCLUDE YOUR TESTIMONY? \n6 \nA25. Yes. \n7"},{"page":32,"startToken":7093,"endToken":7127,"text":"VERIFICATION \nI declare under penalty of perjury that the foregoing Rebuttal Testimony is true and correct to \nthe best of my knowledge, information, and belief.  \nExecuted this 12th day of June 2025. \n________________________ \nZachary Ming"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":7,"endAt":520,"startToken":0,"endToken":2470},{"p":7,"at":520,"title":"CONCLUSION","method":"printed heading","endPage":9,"endAt":3,"startToken":2470,"endToken":2681},{"p":9,"at":3,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":12,"endAt":3,"startToken":2681,"endToken":2793},{"p":12,"at":3,"title":"Table of Contents","method":"printed heading","endPage":32,"endAt":240,"startToken":2793,"endToken":7127}]}
