{"document":{"slug":"rec-20250919-4001","title":"Chairman David Rosner requests PJM Interconnection President and CEO, Manu Asthana's perspective re large load forecasting for America's significant…","issued":"2025-09-19","accession":"20250919-4001","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"CHAIR AND IMMEDIATE STAFF (FERC)","kind":"filing","file":"sources/filings/text/20250919-4001_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20250919-4001","tier":"record","sha256":"0ef72cac6072ee18a18c2c8152e00ffc06f4947b303afc795e6ae315796d85ca","pages":2,"tokens":540,"emptyPages":[],"textThemes":["registry"]},"pages":[{"page":1,"startToken":0,"endToken":378,"text":"888 First Street | Washington, DC 20426 \nSeptember 18, 2025 \n \nMr. Manu Asthana \nPresident and CEO \nPJM Interconnection \n2750 Monroe Boulevard \nNorristown, PA 19403 \n \nDear Mr. Asthana, \nAmerica’s energy landscape is experiencing a transformation as regions across the country see \nsignificant electricity demand growth to power industries of the future—from the artificial \nintelligence revolution to the re-shoring of advanced manufacturing.  Fostering these projects and \nthe energy infrastructure needed to serve them represents an extraordinary economic opportunity \nfor our country.  I also acknowledge there are challenges too.  We must work together to seize this \nunique moment in the nation’s history. \n \nIn that spirit, I write today to ask for your perspective on a critical but often overlooked tool: load \nforecasting.  At a time when utilities forecast hundreds or thousands of megawatts of growth, \nimproving forecasts by even a few percentage points in the right direction—up or down—can \nimpact billions of dollars in investments and customer bills.  Put simply, we cannot efficiently plan \nthe electric generation and transmission needed to serve new customers if we don’t forecast how \nmuch energy they will need as accurately as possible. \n \nOur experience to date tells us that large loads, such as data centers, have characteristics that call for \nnew and improved forecasting methods.  Given the size and volume of new large load \ninterconnection requests, I’m optimistic that utilities have an opportunity to apply similar criteria to \nthose currently used to assess the commercial readiness of large projects in the generator \ninterconnection queue.  These objective criteria include observable milestones such as contracts, \nfinancial security deposits, and physical site control.1 \n \nI appreciate that many regions are still exploring and learning how best to improve their load \nforecasting tools for new large loads, while other regions have been integrating large loads for some \ntime.  To help me understand how the Commission might support these efforts and promote best \npractices across the country, I would like to open up a dialogue on the following questions:  \n \n \n1 See, e.g., post-Technical Conference comments submitted in FERC Docket No. AD24-11-000, including  \nCEBA December 9 Post-Technical Conference Comments at 12-13; DCC December 9 Post-Technical Comments at 12; \nGoogle December 9 Post-Technical Conference Comments at 7-8; Wilson Energy Economics December 9 Post-\nTechnical Conference Comments at 2, 7."},{"page":2,"startToken":378,"endToken":540,"text":"888 First Street | Washington, DC 20426 \n(1) How do you, the utilities in your footprint, and state regulators obtain information that \nverifies when and whether prospective large loads in your region will reach commercial \noperation? \n(2) To what extent are prospective large load requests subject to consistent, objective \nscreening criteria before they are included in the load forecast? \n(3) How do you forecast how the actual electricity consumption of a large load will compare \nto its requested level of interconnection service? \n(4) How do you coordinate with utilities at the regional or interregional level to share best \npractices on large load forecasting and ensure that large load interconnection requests \nare not double-counted? \nI look forward to discussing these issues with you soon.  The Commission stands ready to \ncollaborate with you to ensure our country can fully realize the opportunities before us and ensure \nreliable, affordable, and abundant energy for all American families and businesses.  \n \nSincerely,  \n \nDavid Rosner \nChairman \nFederal Energy Regulatory Commission"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 2","method":"page range","endPage":2,"endAt":1100,"startToken":0,"endToken":540}]}