{"document":{"slug":"rec-20251121-5536","title":"Motion for Expedited Action of Constellation Energy Generation, LLC re PJM Interconnection, L.L.C.’s Open Access Transmission Tariff et al","issued":"2025-11-21","accession":"20251121-5536","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"Constellation Energy Generation, LLC","kind":"motion","file":"sources/filings/text/20251121-5536_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251121-5536","tier":"record","sha256":"c7542f7412e88c3c9f03cc6a8ae73e4565bc6fda6144dcec9da39d8d7893cc5e","pages":70,"tokens":18888,"emptyPages":[],"textThemes":["colo","study","flex","adequacy"]},"pages":[{"page":1,"startToken":0,"endToken":253,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C., et al. \n \n \nLarge Loads Co-Located at Generating Facilities \n \n \nConstellation Energy Generation, LLC \n \n     v. \n \nPJM Interconnection, L.L.C. \n) \n \n \n)  \n \n \n)  \n) \n) \n) \n) \nDocket No. EL25-49-000 \n \n \nDocket No. AD24-11-000 \n \n \n \n \nDocket No. EL25-20-000 \n    (Consolidated) \nMOTION FOR EXPEDITED ACTION OF \nCONSTELLATION ENERGY GENERATION, LLC \nPursuant to Rule 212 of the Commission’s Rules of Practice and Procedure,1 Constellation \nrespectfully moves for expedited action in the above-captioned proceeding. Specifically, \nConstellation respectfully requests that the Commission immediately issue a full order on the \nmerits in this show cause proceeding that (i) adopts the Commission’s preliminary finding that \nPJM Interconnection, L.L.C.’s Open Access Transmission Tariff is unjust and unreasonable and \n(ii) establishes a full replacement rate, as specified further below. Issuing such a ruling is the \nCommission’s best path forward to promptly carry out the imperatives of the Secretary of Energy’s \nproposed ANOPR2 in PJM while the Commission works in parallel on a comprehensive rule, \nensuring that America continues to lead the AI race while preserving reliable service. \nAlternatively, if the Commission chooses not to immediately issue a full replacement rate in the \n \n1 18 C.F.R. § 385.212. \n2 U.S. Department of Energy, Secretary of Energy, Letter to FERC re: “Ensuring the Timely and Orderly \nInterconnection of Large Loads,” Advance Notice of Proposed Rulemaking (Oct. 23, 2025) (issued pursuant to \nDepartment of Energy Organization Act § 403, 42 U.S.C. § 7173) (cover letter, “Secretary’s Letter,” and Advanced \nNotice of Proposed Rulemaking, “ANOPR”)."},{"page":2,"startToken":253,"endToken":555,"text":"2 \nshow cause proceeding, Constellation respectfully requests that the Commission issue an initial, \ntargeted ruling that (1) clarifies jurisdictional boundaries consistent with the ANOPR, (2) rejects \na one-size-fits-all firm transmission regime based on gross rates, and (3) requires timely, non-\ndiscriminatory, and meaningful cooperation by Transmission Owners on processing large load and \nco-location studies. Those are critical issues that continue to delay large load interconnections in \nPJM and require prompt resolution.  \nThe Commission instituted this show cause proceeding on February 20, 2025, in response \nto a complaint by Constellation and after convening a national technical conference on large loads \nco-located at generating facilities.3 The Commission preliminarily found that PJM’s Tariff is \n“unjust and unreasonable or unduly discriminatory or preferential because it does not contain \nprovisions addressing with sufficient clarity or consistency the rates, terms, and conditions of \nservice that apply to co-location arrangements” between generators and co-located loads.4 The \nCommission also preliminarily found “that this lack of applicable Tariff provisions raises the \npotential for undue discrimination or preferential treatment,” pointing to “allegations in the record \nthat Exelon has delayed work on Constellation’s requests to co-locate load with its generators at \ncertain facilities due to Exelon’s concerns that such requests are not allowed under the Tariff \nwithout arranging for wholesale transmission or retail distribution service.”5  \nThe Commission therefore “direct[ed] PJM and the Transmission Owners, within 30 days \nof the date of the order, to either: (1) show cause as to why the [Tariff] remains just and reasonable \n \n3 See PJM Interconnection, L.L.C., 190 FERC ¶ 61,115 at PP 1-2; see also Complaint Requesting Fast Track \nProcessing of Constellation Energy Generation, LLC, Docket No. EL25-20-000 filed Nov. 22, 2024) (“Constellation \nComplaint”) \n4 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115 at P 74. \n5 Id. P 75."},{"page":3,"startToken":555,"endToken":954,"text":"3 \nand not unduly discriminatory or preferential without provisions addressing with sufficient clarity \nor consistency the rates, terms, and conditions of service that apply to co-location arrangements; \nor (2) explain what changes to the Tariff would remedy the identified concerns if the Commission \nwere to determine that the Tariff has in fact become unjust and unreasonable or unduly \ndiscriminatory or preferential and, therefore, proceeds to establish a replacement Tariff.”6 The \nCommission also posed 38 briefing questions for PJM and the Transmission Owners to answer in \ntheir responses.7  \nThe Commission received submissions from the parties, and the show cause proceeding \nhas been ripe for resolution since early May 2025. The Commission originally targeted late June \n2025 for an order,8 and has reiterated its intent to resolve that matter expediently.9 The matter, \nhowever, remains pending.   \nOn October 23, 2025, the Secretary of Energy proposed an ANOPR under section 403 of \nthe Department of Energy Organization Act10 that “present[s] potential reforms to ensure the \ntimely and orderly interconnection of large loads to the transmission system.”11 As the Secretary \n \n6 Id. P 2. \n7 Id. P 88. \n8 Id. P 90 (estimating that the Commission would be able to issue its decision within approximately three months of \nthe filing of Tariff revisions, which the Commission required to be submitted within thirty days of its order (i.e., by \nMarch 24, 2025)).   \n9 See, e.g., PJM Interconnection, L.L.C., 191 FERC ¶ 61,025, at P 30, n.106 (2025) (“We fully intend to act as \nexpeditiously as possible to address those issues, as we know how important it is to investors, utilities, and all \ninterested parties to have regulatory certainty.”); see FERC, November 20, 2025 Open Meeting, YOUTUBE \n(Nov. 20, 2025), at 19:39 https://www.ferc.gov/news-events/events/november-20-2025-open-meeting-10022024 \n(Commissioner David Rosner expressing he is “confident that we can make some progress” on the open co-location \nproceeding in PJM); Transcript of Oct. 16, 2025 Open Meeting at 7:14-18 (Then-Chairman David Rosner states \n“I’m very optimistic that the Commission will be ready to act later this year on our work on colocation. \nCommissioners See and Chang and I have been working diligently on that, and I’m really happy with the progress \nwe have been making.”), available at: https://www.ferc.gov/media/transcript-october-16-2025-open-meeting. \n10 42 U.S.C. § 7173(a).  \n11 ANOPR at ¶ 1."},{"page":4,"startToken":954,"endToken":1253,"text":"4 \nstated in his letter to the Commission, the interconnection of large loads to the transmission \nsystem—the subject of both the ANOPR and this show cause proceeding—“is an urgent issue that \nrequires prompt attention.”12 The ANOPR sets forth fourteen principles “that are intended to \nensure efficient, timely, and non-discriminatory load interconnections.”13   \nThe ANOPR underscores the urgent need for clarity regarding the rates, terms, and \nconditions that apply to co-location arrangements between a generator and a large load. \nAccordingly, and as explained in Constellation’s comments in response to the ANOPR,14 the \nCommission can start addressing that urgent need by issuing a full order on the merits in this show \ncause proceeding with respect to PJM—even while the Commission develops a comprehensive \nrule in response to the ANOPR. As the ANOPR itself stated, it “is not intended in any way to \ndiscourage public utilities from making filings to address these and similar issues under FPA \nsection 205.”15 If the ANOPR is not intended to discourage public utilities from filing new \nproposals under section 205, all the more so the Commission should not be discouraged from \nruling on pending proceeding under section 206 where it already has a comprehensive record, \nmade a preliminary finding that the existing tariff is unjust, unreasonable and unduly \ndiscriminatory, and indicated it is poised to act. \nAn expedited ruling in PJM is also critical because Transmission Owners are taking \nadvantage of the current regulatory vacuum by blocking large load interconnections unless \ncustomers agree in advance to take both transmission and distribution service from them. As \n \n12 Secretary’s Letter at 1. \n13 ANOPR at ¶¶ 17-32. \n14 Today, Constellation has filed comments in response to the ANOPR, and a copy of those comments is attached to \nthis motion.  \n15 ANOPR at ¶ 32."},{"page":5,"startToken":1253,"endToken":1581,"text":"5 \nConstellation has previously shown and discussed, some Transmission Owners have simply \nrefused to participate in PJM’s Necessary Studies to analyze reliability impacts; and some, acting \nunder unfiled interconnection study procedures, have changed their construct and timetable for \nprocessing load studies.16 Still others have not allowed new load connections unless the load agrees \nto other services consistent with the Transmission Owners’ preferred interpretation of the law and \nhave attempted to change PJM rules to force that preferred interpretation on others.17 \nConstellation therefore respectfully requests that the Commission immediately issue a full \norder on the merits in the show cause proceeding as set forth in Section II.A of Constellation’s \ncomments to the ANOPR, adopting the Commission’s preliminary finding that the Tariff is unjust \nand unreasonable and establishing a replacement rate based on the record in this proceeding and \nthe ANOPR’s guidance, with potential additional measures to enhance resource adequacy and \nreliability. Alternatively, if the Commission does not immediately issue a full replacement rate in \nthe show cause proceeding, Constellation respectfully requests, as set forth in Section II.B of \nConstellation’s comments to the ANOPR, that the Commission issue an initial, partial replacement \nrate that (1) clarifies jurisdictional boundaries consistent with the ANOPR, (2) rejects a one-size-\nfits-all firm transmission regime based on gross rates, and (3) requires timely, non-discriminatory, \nand meaningful cooperation by Transmission Owners on processing large load and co-location \nstudies.  \n \n16 See Constellation Complaint at 6-9 (citing Protest of Constellation Energy Generation, LLC, Docket No. EL24-\n149-000, Exh. 2 (correspondence with Exelon) (filed Oct. 30, 2024); Motion to Lodge of Constellation Energy \nGeneration, LLC, Docket No. EL24-149-000, Exh. 1 (November 12, 2024 Exelon Letter) (filed Nov. 18, 2024)); \nsee also Constellation Complaint, Exh. 5, Declaration of James R. McCoskey (detailing interaction with Exelon to \nstudy co-location projects). \n17 See Atl. City Elec. Co., 190 FERC ¶ 61,109 (2025) (FERC rejecting Exelon Transmission Owners’ attempt to force \nall co-located load to take full transmission service)."},{"page":6,"startToken":1581,"endToken":1710,"text":"6 \n \n \n \n \n \n \n \n    Respectfully submitted, \n \n \n \n \n \n \n \n    /s/ Paul F. Wight \n \n \nNovember 21, 2025 \n \n \nCarrie Hill Allen \nSr. Vice President & Deputy General Counsel \nSeth Lucia \nAssistant General Counsel \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \ncarrie.allen@constellation.com \nseth.lucia@constellation.com \n  \nChristopher A. Wilson \nManaging Director, Federal Regulatory Affairs \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n202-347-7500 \nFERCe-filings1@constellation.com \n \nPaul F. Wight \nCarolyn E. Clarkin \nDLA Piper LLP (US) \n500 Eighth Street NW \nWashington, D.C. 20004 \n703-773-4058 \npaul.wight@us.dlapiper.com \ncarolyn.clarkin@us.dlapiper.com \n \nJacob I. Chefitz \nDLA Piper LLP (US) \n1251 Avenue of the Americas \nNew York, NY 10020 \n212-335-4500 \njacob.chefitz@us.dlapiper.com  \n \nCounsel for Constellation Energy \nGeneration, LLC"},{"page":7,"startToken":1710,"endToken":1793,"text":"7 \n \nCERTIFICATE OF SERVICE \nI hereby certify that I have on this 21st day of November, 2025, caused to be served a copy \nof the foregoing upon all parties on the service lists in these proceedings in accordance with the \nrequirement of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. \n§ 385.2010 (2025). \n/s/ Semhal Fissehaye Gebrekirstos \nSemhal Fissehaye Gebrekirstos \nDLA Piper LLP (US) \n500 Eighth Street NW \nWashington, DC 20004 \n202-799-4471 \nsemhal.gebrekirstos@us.dlapiper.com"},{"page":8,"startToken":1793,"endToken":1806,"text":"Attachment \nSupporting Comments of Constellation Energy \nGeneration, LLC Filed in Docket No. RM26-4-000"},{"page":9,"startToken":1806,"endToken":2055,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nInterconnection of Large Loads to the Interstate\nTransmission System \n \n \n \nPJM Interconnection, L.L.C., et al. \n \n \nLarge Loads Co-Located at Generating Facilities \n \n \nConstellation Energy Generation, LLC \n \n     v. \n \nPJM Interconnection, L.L.C. \n)  \n)  \n \n \n \n)  \n \n \n)  \n \n \n)  \n)  \n)  \n) \n) \nDocket No. RM26-4-000 \n(Not consolidated) \n \n \n \nDocket No. EL25-49-000 \n \n \nDocket No. AD24-11-000 \n \n \n \n \nDocket No. EL25-20-000 \n(Consolidated) \nSUPPORTING COMMENTS OF CONSTELLATION ENERGY GENERATION, LLC  \nConstellation welcomes Secretary of Energy Chris Wright’s proposed ANOPR1 and offers \nthese comments to support (with limited qualifications) its fourteen principles “that are intended \nto ensure efficient, timely, and non-discriminatory [large] load interconnections”2 and the adoption \nof a final rule on the Secretary’s requested timeline. More immediately, “given the urgency of this \nissue,” the Commission should “build upon these principles”3 by issuing a full order in the PJM \nShow Cause proceedings4 consistent with the ANOPR’s guidance based upon the extensive record \n \n1 U.S. Department of Energy, Secretary of Energy, Letter to FERC re: “Ensuring the Timely and Orderly \nInterconnection of Large Loads,” Advance Notice of Proposed Rulemaking (Oct. 23, 2025) (issued pursuant to \nDepartment of Energy Organization Act § 403, 42 U.S.C. § 7173) (cover letter, “Secretary’s Letter,” and Advanced \nNotice of Proposed Rulemaking, “ANOPR”).  \n2 Secretary’s Letter at 1-2. \n3 Id. at 2. \n4 PJM Interconnection, L.L.C., Docket No. EL25-49-000, Large Loads Co-Located at Generating Facilities, Docket \nNo. AD24-11-000, Constellation Energy Generation, LLC v. PJM Interconnection, L.L.C., Docket No. EL25-20-\n000 (consolidated) (collectively, “PJM Show Cause proceedings”)."},{"page":10,"startToken":2055,"endToken":2357,"text":"2 \nalready established in that consolidated docket. Alternatively, if the Commission believes it needs \nadditional time to resolve the PJM Show Cause proceedings, it should issue a targeted PJM order \nthat resolves the few most critical issues that continue to delay large load interconnections in PJM.5 \nThis is the Commission’s best path forward to promptly carry out the imperatives of the ANOPR \nin PJM as the Commission works in parallel on a comprehensive final rule, ensuring that America \ncontinues to lead the AI race while preserving reliable service. \nEXECUTIVE SUMMARY \nConstellation agrees with the motivations and principles outlined in the ANOPR and the \nneed for clear rules to allow the timely interconnection of large loads and their co-location with \ngenerators. Constellation urges the Commission to issue a final comprehensive rule, consistent \nwith the ANOPR, by April 30, 2026. We highlight three points at the outset: \nFirst, the Commission should affirm its jurisdiction over large load interconnections to the \ntransmission system generally and to hybrid facilities (i.e., the generator and load sharing an \ninterconnection to the interstate grid) in particular. Federal authority over the interconnection of \nhybrid facilities is straightforward given that the shared generator interconnection already is \nCommission-jurisdictional (see ANOPR Principle 1). The Commission should reject any argument \nby Transmission Owners (or others) that low-voltage facilities that step down the power from the \ninterstate grid at the point of interconnection to the load are outside the Commission’s jurisdiction. \nContrary to such a contention, the Federal Power Act (“FPA”) gives the Commission jurisdiction \nover “the transmission of electric energy in interstate commerce,”6 which includes “unbundled \n \n5 Today, Constellation is also filing a motion in the PJM Show Cause proceedings to request an immediate \nCommission order consistent with the ANOPR and these comments. \n6 16 U.S.C. § 824(b)(1)."},{"page":11,"startToken":2357,"endToken":2628,"text":"3 \nretail transmissions.”7 Thus, the Commission has jurisdiction over the timing and procedures \napplicable to large load interconnections to the transmission system. \nSecond, the Commission should reject undue discrimination against existing generation. \nThis includes “Bring Your Own Generation” proposals in which only new generation resources \nare eligible to participate. It also includes reliability studies that would apply disproportionate \nrequirements to existing generation as compared to new generation (see ANOPR Principle 10). \nDiscriminatory policies in favor of new generation inevitably lead to the premature retirements of \nexisting generation, including highly reliable dispatchable and baseload generation, including \nmany nuclear plants that have struggled in recent years to remain economic. Resource adequacy \nrequires both new generation and retention of existing resources to ensure the lights stay on and \nthat all load is served. New and existing resources should be able to compete on a level playing \nfield to serve new load. \nThird, the Commission should not wait until a final rule to implement the ANOPR \nprinciples in PJM, where data center development has been stymied by disagreements and \nuncertainty over who controls the timing and nature of large load interconnections, and over the \nterms of any ensuing transmission service. The current load interconnection process in PJM in \npractice cedes control of all large load interconnections to the discretion of Transmission Owners, \nregardless of the facilities to which the load proposes to interconnect. Some Transmission Owners \nhave simply refused to participate in PJM’s studies to analyze reliability impacts; and some, acting \nunder unfiled interconnection study procedures, have changed their entire construct and timetable \n \n7 New York v. FERC, 535 U.S. 1, 16 (2002)."},{"page":12,"startToken":2628,"endToken":2998,"text":"4 \nfor processing load studies.8 Some Transmission Owners have refused to allow new load \nconnections unless the load agrees to the Transmission Owner’s favored configuration or agrees \nto take other services offered by the Transmission Owner that the load does not need or wish to \ntake and should not be required to take.9 \nThe ANOPR proposes to resolve those issues and set forth clear rules for interconnection \nstudy processes and for hybrid load and generation configurations connected to transmission \nfacilities—the same issues that were the impetus for Constellation’s original complaint filed \n12 months ago in Docket No. EL25-20. Constellation supports a final large load interconnection \nrule on the Secretary’s timeline, but in the meantime, the Commission should act first where it \nalready has a fully developed record. In PJM, the Commission still has pending a nine-month-old \npreliminary finding that “the existing [PJM] Tariff appears to be unjust and unreasonable or unduly \ndiscriminatory or preferential because it does not contain provisions addressing with sufficient \nclarity or consistency the rates, terms, and conditions of service that apply to co-location \narrangements.”10 After already soliciting comments in a national proceeding on large loads \n(Docket No. AD24-11-000) and receiving full briefing on Constellation’s complaint seeking \nclarity in the PJM Tariff (Docket No. EL25-49-000), the Commission further expanded the record \nin the PJM Show Cause proceeding with 38 comprehensive briefing questions covering issues \n \n8 For evidence and discussion of Transmission Owners’ refusal to cooperate, see Complaint Requesting Fast Track \nProcessing of Constellation Energy Generation, LLC, Docket No. EL25-20-000, at 6-9 (filed Nov. 22, 2024) \n(“Constellation Complaint”) (citing Protest of Constellation Energy Generation, LLC, Docket No. EL24-149-000, \nExh. 2 (correspondence with Exelon) (filed Oct. 30, 2024); Motion to Lodge of Constellation Energy Generation, \nLLC, Docket No. EL24-149-000, Exh. 1 (November 12, 2024 Exelon Letter) (filed Nov. 18, 2024)); see also \nConstellation Complaint, Exh. 5, Declaration of James R. McCoskey (detailing interaction with Exelon to study co-\nlocation projects). \n9 See Atl. City Elec. Co., 190 FERC ¶ 61,109 (2025) (rejecting Exelon Transmission Owners’ attempt to force all co-\nlocated load to take full transmission service). \n10 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115, at PP 74-75 (2025) (“PJM Show Cause Order”)."},{"page":13,"startToken":2998,"endToken":3446,"text":"5 \nnearly identical to those now raised in the ANOPR.11 The Commission originally targeted late \nJune 2025 for an order,12 and has reiterated its intent to resolve that matter expediently.13 The \nCommission should now issue a ruling in that pending proceeding implementing the ANOPR’s \nprinciples, even as it also initiates a rulemaking to apply those principles outside the PJM region.14  \nCertainly, the ANOPR, which is intended to expeditiously resolve some of the most \ncontroversial issues confronting large load interconnections, should not be the cause of further \ndelay in PJM. According to the Secretary, the ANOPR “is not intended in any way to discourage \npublic utilities from making filings to address these and similar issues under FPA section 205.”15 \nIf the ANOPR is not intended to discourage public utilities from filing new proposals under section \n205, the Commission should not be discouraged from ruling on pending proceedings under section \n206 where it already has a comprehensive record, made a preliminary finding that the existing \ntariff is unjust, unreasonable and unduly discriminatory, and indicated it is poised to act.   \n \n11 Compare id. P 88 (posing 38 briefing questions), with ANOPR at ¶¶ 17-32 (positing 14 principles).  \n12 PJM Show Cause Order, 190 FERC ¶ 61,115 at P 91 (estimating that the Commission would be able to issue its \ndecision within approximately three months of the filing of Tariff revisions, which the Commission required to be \nsubmitted within thirty days of its order (i.e., by March 24, 2025)). \n13 See, e.g., PJM Interconnection, L.L.C., 191 FERC ¶ 61,025, at P 30, n.106 (2025) (“We fully intend to act as \nexpeditiously as possible to address those issues, as we know how important it is to investors, utilities, and all \ninterested parties to have regulatory certainty.”); see FERC, November 20, 2025 Open Meeting, YOUTUBE \n(Nov. 20, 2025), at 19:39 https://www.ferc.gov/news-events/events/november-20-2025-open-meeting-10022024 \n(Commissioner David Rosner expressing he is “confident that we can make some progress” on the open co-location \nproceeding in PJM); Transcript of Oct. 16, 2025 Open Meeting at 7:14-18 (Then-Chairman David Rosner states \n“I’m very optimistic that the Commission will be ready to act later this year on our work on colocation. \nCommissioners See and Chang and I have been working diligently on that, and I’m really happy with the progress \nwe have been making.”), available at: https://www.ferc.gov/media/transcript-october-16-2025-open-meeting. \n14 Constellation recognizes that the Commission has undergone changes in leadership and Commissioners in the \nintervening months, as well as a government shutdown. Now that those transitional issues are behind it, the \nCommission can focus on completing the proceeding. \n15 ANOPR at ¶ 32."},{"page":14,"startToken":3446,"endToken":3793,"text":"6 \nAccordingly, as the Commission develops a final comprehensive rule on the ANOPR,16 \nthe Commission should also immediately issue an order in the PJM Show Cause proceedings as \nset forth below in Section II.A., adopting the Commission’s preliminary finding that the PJM Tariff \nis unjust and unreasonable and establishing a replacement rate based on the record in those \nproceedings that reflects the ANOPR’s guidance, with potential additional measures to enhance \nresource adequacy and reliability. The Commission should focus on establishing transparent \nprocesses that ensure that new large load can be promptly interconnected while reliability is \nmaintained, and on developing transmission rates that (i) are just, reasonable and not unduly \ndiscriminatory and (ii) create strong incentives for load to locate in the most efficient places, where \nnetwork upgrades will be minimized. This approach will serve the dual goals of protecting \nconsumers from unnecessary upgrade costs and timely, effective, and reliable connection of load \nconsistent with the national interest in winning the AI race.   \nAlternatively, if the Commission chooses not to issue a full replacement rate in the PJM \nShow Cause proceedings, it should issue a partial replacement rate as set forth below in \nSection II.B as soon as possible that calls balls and strikes on three critical issues consistent with \nthe record and the ANOPR (all of which should also be part of a comprehensive order on the \nmerits): (1) clarifying jurisdictional boundaries consistent with the ANOPR, (2) rejecting a one-\nsize-fits-all firm transmission regime based on gross rates, and (3) requiring non-discriminatory, \n \n16 The Commission might also consider whether its rule should focus, at least initially, on the Regional Transmission \nOrganization (“RTO”) markets rather than to every Transmission Owner in the nation where, in some cases, the \nfinding under section 206 of the FPA that current rules are unjust and unreasonable may lack sufficient record \nevidence or present a more difficult showing. In PJM, by contrast, the Commission has a comprehensive record of \nevidence that the existing PJM Tariff is unjust and unreasonable because it lacks clear rules for co-location and large \nload interconnections."},{"page":15,"startToken":3793,"endToken":4123,"text":"7 \ntimely, and meaningful cooperation by Transmission Owners on processing large load and co-\nlocation studies.  \nCOMMENTS \nI. \nConstellation Supports the ANOPR’s Fourteen Principles with Limited Qualifications \nConstellation supports a final large load interconnection rule arising out of the ANOPR on \nthe Secretary’s expedited timeline and offers these comments in support of the ANOPR’s fourteen \nprinciples, with a few qualifications specified herein. \nPrinciple 1—Confirming Federal Jurisdiction Over Large Load Interconnections to \nInterstate Transmission Facilities \nConstellation agrees with the ANOPR’s principle that the Commission has jurisdiction \nover interconnections directly to transmission facilities.17 That principle is consistent with the \nFPA, which gives the Commission exclusive jurisdiction over “the transmission of electric energy \nin interstate commerce.”18 Interconnection with the interstate transmission grid falls within that \nscope. As the Commission has long recognized, “interconnection is part and parcel of transmission \nof electric energy in interstate commerce, and thus interconnection service is part and parcel of \njurisdictional transmission service.”19  \nInterconnection of hybrid facilities, in particular, provide a crystal clear case for federal \nauthority. The ANOPR defines hybrid facilities as large loads “seeking to share a point of \n \n17 ANOPR at ¶ 18. While the ANOPR adds that this principle is “consistent with the Commission’s seven-factor test,” \nthe Commission need not resort to that test to conclude that it has jurisdiction over large load interconnections to \ninterstate transmission facilities, as explained further below. \n18 16 U.S.C § 824(b)(1). \n19 Pac. Gas & Elec. Co., 115 FERC ¶ 61,193, at P 36 (2006); see also Duke Energy Progress, LLC v. FERC, 106 F.4th \n1145, 114 (D.C. Cir. 2024) (“Among the transactions that FERC regulates is the connection of a new generation \nfacility to the physical infrastructure owned by a Grid Operator.”); Nat’l Ass’n of Regul. Util. Comm’rs v. FERC, \n475 F.3d 1277, 1280 (D.C. Cir. 2007) (holding that, “[b]y establishing standard [interconnection] agreements,” \nFERC properly “exercised its jurisdiction over the terms of those relationships”) (emphasis in original)."},{"page":16,"startToken":4123,"endToken":4273,"text":"8 \ninterconnection with new or existing generation facilities.”20 Hybrid large loads are transmission \ncustomers that can draw power both from the co-located generator as well as the grid. This hybrid \nconfiguration is one that PJM has itself proposed in the PJM Show Cause proceedings (PJM Option \n2).21 It looks like this: \n \nRegulation of the interconnection between a generator and the interstate transmission grid \nis well within the scope of the Commission’s jurisdiction.22 Because the generator’s point of \ninterconnection is FERC-jurisdictional, so too must be the load’s. It would be inconsistent for the \nshared point of interconnection to be FERC-jurisdictional for the generator but not for the large \nload, and the Commission does not lose its jurisdiction over the interconnection simply because a \n \n20 ANOPR at ¶ 12. \n21 See April 23, 2025 Constellation Answer at 38. \n22 Pac. Gas & Elec. Co., 115 FERC ¶ 61,193 at P 36."},{"page":17,"startToken":4273,"endToken":4619,"text":"9 \nload also happens to interconnect to the interstate grid at the same point. It is irrelevant that the \nload is an end-user of electricity. While the retail sale of energy directly to a load co-located with \na generator at the same point of interconnection is not Commission-jurisdictional, the transmission \nof electricity to the co-located load at the shared point of interconnection is Commission-\njurisdictional.   \nIndeed, the Supreme Court has long made clear that the Commission has jurisdiction over \nall transmissions, including transmissions to end users. “[T]he FPA authorizes FERC’s jurisdiction \nover interstate transmissions, without regard to whether the transmissions are sold to a reseller or \ndirectly to a consumer.”23 That is because “[t]here is no language in the statute limiting FERC’s \ntransmission jurisdiction to the wholesale market, although the statute does limit FERC’s sale \njurisdiction to that at wholesale.”24 Accordingly, as the Commission has itself recognized, it has \njurisdiction over interconnections “based on the nature of interconnection to the transmission \nsystem generally, not the purpose for such interconnection (i.e., to make a wholesale sale or to \nmake a wholesale or retail purchase).”25 Therefore, the transmission of energy from the interstate \ngrid to a hybrid facility, and the interconnection of that facility to the grid, is well within the \nCommission’s jurisdiction. It does not matter that the energy is ultimately transmitted to an end \nuser (i.e., the large load) because the Commission’s transmission jurisdiction is not “specifically \nconfined to the wholesale market.”26 \n \n23 New York v. FERC, 535 U.S. at 20.  \n24 Id. at 17. \n25 PJM Show Cause Order, 190 FERC ¶ 61,115 at P 72. \n26 Id. at 20; see also Nat’l Ass’n of Regul. Util. Comm’rs, 475 F.3d at 1282 (upholding Commission’s jurisdiction over \na “transmission facility [that] also engages in local distribution … insofar as the interconnections are ‘for the purpose \nof making sales of electric energy for resale in interstate commerce” (quoting Standardization of Generator \nInterconnection Agreements & Procedures, Order No. 2003, 104 FERC ¶ 61,103, at P 804 (2003) (“Order \nNo. 2003”)))."},{"page":18,"startToken":4619,"endToken":4810,"text":"10 \nWhile hybrid facilities present a straightforward case for Commission jurisdiction, the \nCommission also has jurisdiction over the interconnection of large loads to transmission facilities \neven when they are not part of a hybrid facility or co-located with a generator, as in this image: \n \nThe ANOPR presents a compelling case for federal jurisdiction over the interconnection \nbetween a large load and the interstate transmission grid, and its reasoning does not depend on \nwhether the large load is a hybrid facility.27 The nature of the interconnection between a large load \nand the interstate grid is no different from the nature of the interconnection between a hybrid \nfacility and the interstate grid. Each is “part and parcel of transmission of electric energy in \ninterstate commerce,”28 and the Commission is fully within its jurisdiction to regulate it. \nThe Commission should reject any argument that low-voltage facilities that step down the \npower from the interstate grid at the point of interconnection to the load are outside the \nCommission’s jurisdiction. Such step-down facilities are necessary components of the \n \n27 ANOPR at ¶¶ 13-16. \n28 Pac. Gas & Elec. Co., 115 FERC ¶ 61,193 at P 36."},{"page":19,"startToken":4810,"endToken":5102,"text":"11 \ninterconnection—a clear transmission facility. The FPA’s plain text gives the Commission \njurisdiction over “the transmission of electric energy in interstate commerce,”29 including \ntransmissions to end-users, and to remove the step-down facilities from the Commission’s \njurisdiction would improperly limit the full scope of transmission jurisdiction that the FPA has \nconferred on the Commission.30 Moreover, as a practical matter, all large loads require step-down \nfacilities to interconnect with the grid, so to hold that such step-down facilities are beyond the \nCommission’s jurisdiction would effectively allow Transmission Owners to retain their control \nover the timing, procedures and services applicable to large load interconnections, thereby \nthwarting the entire purpose of the ANOPR. That cannot be squared with the FPA’s conferral of \njurisdiction to the Commission over the transmission of electricity, including to end-users, as the \nSupreme Court has held. The Commission should issue clear guidance on this point, lest the \nTransmission Owners use litigation over the seven-factor test to thwart the intent of the ANOPR.   \nAt the same time, the ANOPR correctly limited the Commission’s jurisdiction to \n“interconnections directly to transmission facilities,” not retail sales.31 Under the FPA, only the \nstates, not the Commission, may exercise jurisdiction over the sale of energy to end-users.32 The \nCommission therefore has no jurisdiction over the direct sale of energy from a generator to a data \ncenter where the power never flows over the interstate transmission grid. This includes, for \nexample, a behind-the-meter co-location configuration with system protection features that prevent \nany power from flowing over the grid to the load, like this: \n \n29 16 U.S.C. § 824(b)(1). \n30 New York v. FERC, 535 U.S. at 16. \n31 ANOPR at ¶ 18. \n32 See 16 U.S.C § 824(b)(1)."},{"page":20,"startToken":5102,"endToken":5282,"text":"12 \n \nAs the Commission correctly observed—in line with the ANOPR—“states retain exclusive \njurisdiction over the terms of retail sales, generally including the rate designs that determine how \nthe costs of the wholesale sale and transmission of electricity assigned to a wholesale customer are \nallocated among that wholesale customer’s retail customers.”33 This is equally true for the sale \nbetween the generator and a load connected behind the generator meter in a configuration that \nmakes it impossible for the load to draw power from the grid. \nThe Commission reiterated this principle just this past month in Tri-State Generation and \nTransmission Association, Inc.34 There, the Commission rejected Tri-State’s proposed tariff for \nlarge loads because it unlawfully “intru[ded] on retail rate regulation” and thus was outside “the \nCommission’s authority.”35 As the Commission stated, “the plain language of the FPA bars the \nCommission from regulating retail sales and the Supreme Court has been clear: specification of \n \n33 Pac. Gas & Elec. Co., 115 FERC ¶ 61,193 at P 68. \n34 193 FERC ¶ 61,070 (2025) (“Tri-State”). \n35 Id. P 45."},{"page":21,"startToken":5282,"endToken":5601,"text":"13 \nterms of sale at retail ‘is a job for the States alone.’”36 That encompasses direct sales from \ngenerators to large loads.37 \nPrinciple 2—Setting an Appropriate Size Threshold  \nThe ANOPR proposes a 20 MW size threshold, or “for hybrid facilities, where the load is \ngreater than 20 MW.38 Constellation supports the ANOPR’s size threshold concept, but it is \nunnecessary for hybrid facilities where the load shares an interconnection to the transmission grid \nwith generation as all hybrid facilities’ load is FERC-jurisdictional. For large loads not sharing an \ninterconnection with generation, it may be that the size threshold should be based on the voltage \nof the transmission facilities where it connects. But a higher megawatt (or voltage) threshold would \nhave the significant benefit of reducing the potential number of large load projects clogging the \ninterconnection queue. \nPrinciple 3—Combining Studies for Load and Hybrid Facilities with Generation \nThe ANOPR states that “to the extent practicable, load and hybrid facilities should be \nstudied together with generating facilities. Such an approach will allow for efficient siting of loads \nand generating facilities and thereby minimize the need for costly network upgrades.”39 It is our \nunderstanding that a single, combined study is not practicable, as the generation and large loads \ntypically still must be studied separately in case the load or generator trips, and either the generator \n \n36 Id. P 50 (citing FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 280 (2016); New York v. FERC, 535 U.S. at 17). \n37 In Tri-State, the Commission had no occasion to “elaborate … on other matters raised by parties regarding the extent \nof the Commission’s jurisdiction, such as jurisdiction over the process of interconnecting loads to the Commission-\njurisdictional transmission system.” Id. As explained above, the Commission’s jurisdiction does in fact extend to \ninterconnections between large loads and interstate transmission facilities.  \n38 ANOPR at ¶ 19. \n39 Id. at ¶ 20."},{"page":22,"startToken":5601,"endToken":6004,"text":"14 \ninjects its entire output onto the grid, or the load withdraws its full demand from the grid.40 The \nCommission should follow the guidance of the RTOs regarding the technicalities of the studies, \nincluding whether they can be combined for hybrid facilities with a shared point of interconnection \nto the grid.  \nThe “benefits” of combined studies are not as certain as they may appear: First, the goals \nof efficient siting of load and minimizing upgrades should be priorities, but these are benefits of \nco-location, not combining studies. Indeed, other measures would have a greater impact on \nefficient siting and minimizing upgrades than combining studies, including: \n confirming hybrid facilities (generation and load sharing an interconnection to the \ngrid) should pay transmission rates on a net load basis (or standby charges, both as \ndiscussed below at Principle 11),  \n approving large load interconnection standards (see Principle 4), and  \n adopting and enforcing strict study timelines, non-discrimination, and cooperation \n(see Section II.B. below).  \nSecond, combined studies are frequently paired with “bring your own generation” (BYOG) \nproposals that are restricted to new generation and unduly discriminate against existing generation \nresources. The ANOPR itself suggests this, stating that “siting a large load near or at the same \npoint of interconnection as a new generating facility could reduce the network upgrades needed to \ninterconnect only the load or only the generating facility.”41 But all co-location configurations \n \n40 A combined study is appropriate for a behind-the-meter configuration where the large load connects behind the \ngenerator’s meter (in contrast to hybrid facilities where the load and the generator share a point of interconnection \nto the grid “in-front-of-the meter”). In a behind-the-meter configuration, the generator modifies its Commission-\njurisdictional interconnection agreement and the studies are based on the net rights to the transmission system. \n41 ANOPR at ¶ 20 (emphasis added); see also id. at ¶ 22 (studying hybrid facilities’ injection and/or withdrawal rights \n“provides incentives for co-location with new generation facilities and ensures efficient buildout of the transmission \nsystem”) (emphasis added); id. at ¶ 27 (Principle 10 calling for a unique study methodology to apply to “an existing \ngeneration facility in a hybrid facility arrangement) (emphasis added); but see id. at P 12 (defining “hybrid facilities” \nas large loads “seeking to share a point of interconnection with new or existing generation facilities”) (emphasis \nadded). There should be no discrimination between new and existing generation in the co-location rules that the \nCommission adopts."},{"page":23,"startToken":6004,"endToken":6330,"text":"15 \nprovide these benefits, not just those linked to new generation. The Commission should reject \nproposals that would allow a separate load study or load interconnection process solely for load \ncoupled with new resources or any option that would turn combined studies into a vehicle for \ncompelled BYOG arrangements limited to new resources only.  \nThis issue was raised in the PJM Show Cause proceedings, which included a potential \nBYOG proposal (PJM Option 6) focused on PJM extending favorable generation interconnection \nqueue treatment to new generators associated with new loads.42 Constellation provided testimony \nthat “the suggestion that new generation that directly contracts with a customer … should be \nallowed to skip the generation interconnection queue undermines PJM market signals.… These \ngeneration developers will be, in effect, allowed to circumvent the queue process … in a manner \nthat is unfair and not competitive.”43 “This approach is functionally equivalent to an out-of-market \npayment or subsidy (for the same resource adequacy services) which effectively lowers the cost of \nthe with-contract class and thus distorts and depresses market economics for all other resources \n(including all without-contract new resources and all existing resources).”44 The favorable \ninterconnection queue treatment presented by PJM Option 6 does not make up for the \ndiscriminatory nature of this option because “[t]he ultimate endpoint of such a policy is to drive \nall resource additions to seek contracts with large load and depress economics for other resources, \nleading to reduced new entry outside of the large load contract path and potentially retirements of \nexisting resources.”45 \n \n42 Constellation’s April 23, 2025 Show Cause Answer at 52–55 (Option 6—“Bring Your Own Generation”). \n43 Testimony of Zachary Ming at 58-59 (Exh. 2 to Constellation’s April 23, 2025 Show Cause Answer) (“Ming \nTestimony”). \n44 Affidavit of Aaron T. Patterson at ¶ 40 (Exh. 3 to Constellation’s April 23, 2025 Show Cause Answer) (“Patterson \nAffidavit”). \n45 Constellation’s April 23, 2025 Show Cause Answer at 52-53 (quoting Patterson Affidavit at ¶ 40)."},{"page":24,"startToken":6330,"endToken":6745,"text":"16 \nHowever, as bad as PJM’s Option 6 is, far worse would be a rule that provides expedited \nload interconnection treatment to loads that bring their own new generation, effectively creating a \npowerful disincentive for new load to contract with existing resources. This would be unlawful \ndiscrimination and bad policy,46 yet that is what has been discussed in the PJM Stakeholder \nProcess. It takes more than just new resources to supply the power system—we also must retain \nexisting resources and not create policies that cause their premature retirement, such as distorting \nmarket signals by paying above-market premiums or offering special favors solely to new \nresources. In a fight for AI dominance with China, the United States cannot afford to tie one hand \nbehind its back.47 \nThe simple solution is to allow existing resources to compete on an equal footing with new \nresources and to ensure that the final rule treats existing and new resources without discrimination. \nThe Commission should affirm that all market design features should be designed to ensure \nsufficient generation resources, which means to provide efficient signals both to build new \ncapacity and to retain existing resources. BYOG fails this basic test, and the Commission should \nreject a “combined studies” approach as part of a BYOG-like mechanism. In PJM, the Commission \n \n46 See Constellation’s April 23, 2025 Show Cause Answer at 53-55 (discussing unlawful “vintaging” in favor of new \nresources). \n47 In the PJM Show Cause proceedings, seven Retired Generals of the United States Armed Services, stated, “nuclear \nplants serving co-located data centers provide a reliable source of power and are uniquely hardened against cyber \nand physical attacks…. Co-location arrangements provide crucial advantages in terms of the speed with which they \ncan meet defense-critical data center needs, and the resilience of the power that nuclear plants provide. We \nrespectfully request that you take these benefits into account as FERC’s proceedings go forward and ensure that all \noptions to quickly serve data centers are made available.” National Security Experts Letter to FERC, Docket No. \nEL25-49-000, at 2 (Apr. 22, 2025) (Accession No. 20250422-5129). See also Declaration of Dr. Paul Stockton at 3, \n9 (Exh. 1 to Constellation’s April 23, 2025 Show Cause Answer) (“Stockton Declaration”) (“[m]eeting the power \nrequirements for these data centers is crucial so that [the Department of War] can … counter China’s drive for AI \nsupremacy and its use of AI to help achieve military superiority over the United States.… Speed is of the essence \nfor national security.”)."},{"page":25,"startToken":6745,"endToken":7111,"text":"17 \nshould reject PJM Option 6 or any option that provides expedited load interconnection in exchange \nfor BYOG as a potential pathway. \nPrinciple 4—Adopting Standardized Interconnection Rules and Expediting Service \nto Large Loads \nThe ANOPR’s fourth principle proposes standardized study deposits, readiness \nrequirements, and withdrawal penalties to large loads and hybrid facilities.48 While the details \nmatter, this general approach mirrors the proven framework established in Order No. 2003, which \nstandardized \ngenerator \ninterconnection \nprocedures \nby \nrequiring \ndeposits, \nreadiness \ndemonstrations, and withdrawal penalties.49 Extending the same principles to large loads and \nhybrid facilities should improve queue efficiency, enhance forecasting accuracy, and support more \neffective transmission planning. \nThe lack of consistent standards for large loads and hybrid facilities creates a vacuum that \nleaves Transmission Owners with significant discretion to delay or deny large-load and co-location \nproposals and to impose terms that are neither just nor reasonable.50 The same types of \nTransmission Owner discrimination and delays are what caused the Commission to adopt Order \nNo. 2003 for generator interconnections.51 These are the very concerns surfacing today in large-\n \n48 ANOPR at ¶ 21. \n49 Order No. 2003, 104 FERC ¶ 61,103.  \n50 See, e.g., Constellation’s April 23, 2025 Show Cause Answer at 14–15 (discussing Transmission Owner refusals to \nprocess Necessary Studies and requirements for the projects to be in front of the meter and to take service on a gross \nload basis). \n51 See, e.g., Order No. 2003, 104 FERC ¶ 61,103 at P 120 (a Transmission Provider “may not require an \nInterconnection Customer, as a condition of interconnection, to accept responsibility for Network Upgrades on other \nsystems,” because doing so “would create an unreasonable obstacle to the construction of new generation”); id. \nP 115 (requiring transparency on slippage by directing Transmission Providers to “post deviations from the study \ntime lines … along with an explanation for the delay”); id. P 353 (adopting an Option to Build to mitigate \nutility-caused schedule risk “the Interconnection Customer may assume responsibility for the construction of the \nTransmission Provider’s Interconnection Facilities and Stand Alone Network Upgrades if the Transmission Provider \nnotifies [it] that it cannot meet the dates established”) (we discuss the Option to Build in Principle 9)."},{"page":26,"startToken":7111,"endToken":7380,"text":"18 \nload interconnections: absent clear, filed standards, Transmission Owners are again blurring \ninterconnection with other services, imposing delay leverage, and conditioning progress on \nunrelated obligations—conduct Order No. 2003’s reforms were designed to prevent. The \nCommission should direct Transmission Owners to process transmission interconnection requests \nin a non-discriminatory fashion, regardless of the configuration (i.e., a hybrid front-of-the meter \nconnection or a direct connection to the grid, taking service from the Transmission Owner). \nAnother current example of Transmission Owners leveraging their control over \ninterconnection is in the negotiation of Transmission Security Agreements (“TSAs”). While \nConstellation is supportive of the concept of TSAs to deter speculative load interconnection \nrequests, it is important that those TSAs contain some component reflective of upgrade costs (to \ncreate an incentive to locate most efficiently), and that they do not discourage legitimate projects \nby locking in one-size fits all gross billing arrangements.  \nThe ANOPR’s Principle 4 further highlights the benefits of “provid[ing] transmission \nproviders with more useful information to more accurately forecast demand on their systems.”52 \nPJM, for example, currently relies on Transmission Owners’ annual assessments, which are \ninformal and based on unverified estimates of anticipated additions. In the PJM Show Cause \nproceedings, Constellation advocated mandatory, detailed rules for Transmission Owner reporting \nof anticipated load additions, with reporting at least two to four times per year to keep planning \nassumptions.53 Building on that foundation, Constellation, other generators, and several large \ntechnology companies with large load needs have sponsored a “Joint Stakeholder Package,” \n \n52 ANOPR at ¶ 21. \n53 Constellation’s April 23, 2025 Show Cause Answer at 96-97; see also Patterson Affidavit at ¶ 29"},{"page":27,"startToken":7380,"endToken":7672,"text":"19 \ndiscussed in Principle 14 below on reliability standards, which includes a large load forecasting \nproposal to ensure only substantiated load is reflected in planning baselines.54 \nGiven the acute and demonstrable problems with large load forecasting within PJM, the \nCommission should adopt clear, uniform standards, which should also consider large load \nforecasting standards and other measures that will expedite large load studies and interconnections. \nIn the PJM Show Cause proceedings, the Commission could order PJM and Transmission Owners \nto adopt large load forecasting improvements along the lines of the Joint Stakeholder Package’s \nLarge Load Forecasting Improvements proposal. \nPrinciple 5—Basing Interconnection Studies for Hybrid Facilities on Withdrawal \nand/or Injection Rights \nConstellation agrees in principle with concept of studying hybrid facilities and any large \nload configuration “based on the amount of injection and/or withdrawal rights requested,”55 or \nreflecting the net usage of the transmission system, but will defer to the RTOs as to what studies \nare necessary to maintain reliability. Our understanding is that exactly how the studies should work \ndepends on the type of interconnection configuration. \nFor hybrid facilities, which the ANOPR defines as having a shared point of interconnection \n“directly to transmission facilities”—that is, an in-front-of-the-meter connection to Commission-\njurisdictional interstate transmission facilities—it is our understanding that, as a practical matter, \nthe large load’s withdrawals and the generator’s injections typically still must be studied separately \nin case the load or generator trips (see discussion above in Principle 3). A load connected in front \n \n54 See Joint Stakeholder Package (Amazon, Calpine, Constellation, Google, Microsoft, Talen), PJM CIFP – Large \nLoad Additions, Stage 4 (Nov. 19, 2025), Exh. 1 hereto (describing “Large Load Forecasting Improvements” \nproposal); see also infra at Principle 14 (discussing same).  \n55 ANOPR at ¶ 22."},{"page":28,"startToken":7672,"endToken":8033,"text":"20 \nof the meter seeks withdrawal rights equal to its gross load, and the generator requires injection \nrights equal to its gross capacity. That said, transmission rates for hybrid facilities should be based \non the actual usage of the transmission system, rather than the load’s withdrawal rights. And a \nhybrid facility’s actual usage of the transmission system is best measured by net withdrawals.56  \nBy contrast, for a behind-the-meter co-location configuration in which the generator is \nconnected to the grid but the load is not, both the generation and the load can and should be studied \ntogether based on their net rights (injections and withdrawals) to use the transmission system.57  \nA curtailable load, meanwhile, could have withdrawal rights of zero if it is fully curtailable, \neven if it is a hybrid facility (i.e., sharing a point of interconnection with the generator). In that \nscenario, there would be no firm load to be served and, therefore, no network upgrades required \nuntil the transmission service converts to a firm service. (We discuss curtailable loads and \ndispatchable generators associated with hybrid facilities below in Principle 7.) \nContrary to the views of some Transmission Owners, the interconnection studies—and the \nservices offered—should depend on the specific configuration at issue, rather than an assumption \nthat the load must always have full withdrawal rights. This is consistent with how the Commission \ntreats the interconnection of storage facilities, which requires Transmission Owners to conduct \nstudies based on the customer’s proposed operating assumptions whether part of a stand-alone, co-\n \n56 “[T]he starting point for a co-located load configuration should be a net billing construct that measures the actual \nenergy flowing between the entire co-location configuration and the transmission system.” Constellation’s April 23, \n2025 Show Cause Answer at 39. \n57 In the PJM Show Cause proceedings, Constellation explained that “[f]or generators seeking to serve co-located load \nunder PJM Options 4 and 5 [behind-the-meter, generator-contingent options], the generators’ [Interconnection \nService Agreement] would be modified … and PJM would perform a [N]ecessary [S]tudy … with the costs of any… \nupgrades … typically being borne by the co-locating parties.” See Constellation’s April 23, 2025 Show Cause \nAnswer at 94."},{"page":29,"startToken":8033,"endToken":8396,"text":"21 \nlocated or hybrid configuration.58 Just as the Commission has required for storage resources, the \nfinal large load interconnection rule should reflect the withdrawal rights and different types of \nservice that large loads and hybrid facilities wish to take, rather than requiring every resource to \ntake full network service whether they need it or not. In the PJM Show Cause proceedings, this \nwould be reflected in a Commission order upholding behind-the-meter, generator-contingent \nservices (PJM Options 4 and 5) and curtailable service (PJM Option 7), in addition to Firm \nNetwork Integrated Transmission Service (“NITS”) service (PJM Option 2). \nPrinciple 6—Installing Appropriate System Protection Facilities  \nConstellation agrees that a behind-the-meter facility that does not intend to take power \nfrom the grid “sh[ould] be required to install the system protection facilities necessary to prevent \nunauthorized injections or withdrawals that exceed the respective rights.”59 There are other \ncircumstances in which system protection schemes  are unnecessary, such as when the load that is \npart of a hybrid configuration intends to take network integration transmission service. Operational \nlimitations associated with the particular configuration would be set forth in the agreement(s) \ngoverning the interconnection, again just like the Commission has required for storage resources. \nIn PJM, some Transmission Owners have contended that the use of protection schemes for \nco-located load configurations is inadequately specified and unreliable, citing “the recent history \nof faults at the Susquehanna generator that has led to unintended power withdrawals from the PJM \n \n58 Improvements to Generator Interconnection Procedures & Agreements, Order No. 2023, 184 FERC ¶ 61,054, at \nP 1509 (2023), order on reh’g & clarification, Order No. 2023-A, 185 FERC ¶ 61,117 (2023), order on reh’g & \nclarification, Order No. 2023-B, 186 FERC ¶ 61,204 (2024); see also id. P 1525 (“[W]e …  clarify that the \ntransmission provider must not assign network upgrade costs to the interconnection customer based on those worst-\ncase operating assumptions (e.g., charging at maximum capacity during peak load conditions) where there is \nagreement from the interconnection customer to, if required, implement operating restrictions including installing \nor demonstrating that the generating facility already has control technologies … to limit its operations during peak \nload conditions.”). \n59 ANOPR at ¶ 23."},{"page":30,"startToken":8396,"endToken":8694,"text":"22 \ntransmission system.”60 This assertion overlooks the corrective and operational safeguards already \nadopted by PJM and the generating facility. A single historical fault that produced an unintended \nwithdrawal does not demonstrate that protective relays cannot prevent such events. The record in \nthe PJM Show Cause proceedings demonstrates that “[p]rotection schemes are regularly employed \non the PJM transmission system, and the successful operation of such protective systems is a \ncommon observance within PJM.”61 These systems operate effectively to isolate behind-the-meter \nco-located loads in the event of a sudden generator outage, ensuring that “no energy will flow to \nthe co-located load over the transmission grid following a contingency, and no NITS service will \nbe provided by the grid to the co-located load.”62 To address the risk of any misplacement or faulty \nrelay systems, such as the Susquehanna situation, the protective scheme should be tested upon \ninstallation, similar to other electrical equipment. \nThere is also evidence in the record in the PJM Show Cause proceedings on “the minimum \ntechnical requirements for such system protection facilities.”63 “These protective relay schemes \ncan be designed so that there are completely redundant primary and backup protective schemes, \nwith two circuit breakers placed in series. Each circuit breaker has two trip coils, and all elements \nare redundant, resulting in a single-failure-proof design.”64  \n \n60 Protest of Exelon Corporation and American Electric Power Service Corporation re the Non-conforming \nInterconnection Service, Docket No. ER24-2172, at 12 (June 24, 2024).  \n61 Herling Affidavit at ¶ 23 (Exh. 4 to Constellation’s April 23, 2025 Show Cause Answer) (“Herling Affidavit”). \n62 Id. ¶ 29; see also supra note 57 (citing Order No. 2023 where the Commission approved control schemes to prevent \nbatteries from drawing power times of grid stress). \n63 ANOPR at ¶ 23. \n64 Herling Affidavit ¶¶ 21–22."},{"page":31,"startToken":8694,"endToken":9002,"text":"23 \nPrinciple 7—Expediting Interconnection Studies for Curtailable Loads \nThe ANOPR proposes that interconnection studies for “large loads that agree to be \ncurtailable and hybrid facilities that agree to be curtailable and dispatchable should be \nexpedited.”65 Constellation agrees with this principle, but there are additional ways to advance \ncurtailable and dispatchable large loads and hybrid facilities along with expediting their \ninterconnection studies that the Commission should seek to encourage. Curtailability and \ndispatchability of large loads help maximize efficient use of the transmission system, avoid or \ndefer system transmission (and potentially distribution) upgrades, and reduce capacity \nprocurements.66  \nThe recent study by the Nicholas Institute at Duke University explained the benefits of \nflexible loads and permitting them to take non-firm transmission service. Firm service assumes \nfull transmission service all the time, which curtailable loads do not need and should not be \nrequired to buy—yet it currently is the only network transmission service available. The Duke \nStudy explains that, if new load is required to take firm service and one assumes that such load \nwill “operate at 100% of its maximum electricity draw at all times, including during system-wide \npeaks”—which is the assumption underlying traditional NITS—then it is “far more likely” that \n“significant upgrades, such as new transformers, transmission line reconductoring, circuit \nbreakers, or other substation equipment” will be required.67 By contrast, if a different service were \n \n65 ANOPR at ¶ 24. \n66 Sam Walsh, et al., How DOE’s Proposed Large Load Interconnection Process Could Unlock the Benefits of Load \nFlexibility: \nConsiderations \nfor \nRulemaking \nat \n9 \n(Nov. \n2025), \nhttps://nicholasinstitute.duke.edu/sites/default/files/publications/how-does-proposed-large-load-interconnection-\nprocess-could-unlock-benefits-load-flexibility.pdf (“Duke Policy Statement”). \n67 Tyler H. Norris, et al., Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in \nUS Power Systems at 5 (Feb. 2025), https://nicholasinstitute.duke.edu/publications/rethinking-load-growth (“Duke \nStudy”)."},{"page":32,"startToken":9002,"endToken":9340,"text":"24 \noffered to such new load by which the load could “temporarily reduce (i.e., curtail) its electricity \nconsumption from the grid during [] peak stress periods … it may be able to connect while \ndeferring—or even avoiding—the need for certain upgrades.”68 The Duke Study concludes that a \nnew load curtailment rate of just 0.5% annually would result in nearly 18 gigawatts (“GW”) of \npotential new load integration in PJM without capacity expansion.69 This amount increases to \n23.6 GW with a 1.0% curtailment rate. Finally, the Duke Study also explains that a failure to use \nexisting headroom on the transmission system, reflecting the gap between the average and peak \ndemand in the balancing area, increases costs on ratepayers. Specifically, a low system utilization \nrate (i.e., more headroom) means that ratepayers are paying to build and maintain generation assets, \ntransmission infrastructure, and distribution networks that may remain idle for much of the year.70 \nWhile expediting the interconnection studies of flexible load is a good step, the \nCommission should endorse other paths that would allow curtailable large loads and dispatchable \nhybrid resources to connect without first requiring the completion of system upgrades needed to \nsupport firm transmission service at peak, and without requiring any additional capacity.71 For \nexample, if the customer chooses, interruptible service can serve as a bridge to full service while \ntransmission upgrades are completed.72 Importantly, the type of interruptible transmission service \ndiscussed here is different from having the interruptible load count as demand response in a \n \n68 Id. (citing ERCOT, Large Loads—Impact on Grid Reliability and Overview of Revision Request Package, Presented \nat \nthe \nNPRR1191 \nand \nRelated \nRevision \nRequests \nWorkshop \n(Aug. \n16, \n2023), \nhttps://www.ercot.com/files/docs/2023/11/08/PUBLIC-Overview-of-Large-Load-Revision-Requests-for-8-16-23- \nWorkshop.pptx). \n69 Id. at 2. \n70 Id. at 6. \n71 See, e.g., Duke Policy Statement at 12-15 (discussing non-firm withdrawal rights). \n72 See ANOPR at ¶ 22, n.39 (“Any facility should be able to seek additional rights through a separate interconnection \nrequest.”)."},{"page":33,"startToken":9340,"endToken":9698,"text":"25 \ncapacity auction. It is also different from PJM’s ill-fated non-capacity backed load (“NCBL”) \nproposal, as rather than PJM choosing to curtail select classes of customers in a discriminatory \nmanner inconsistent with sections 205 and 202(g) of the FPA,73 in this instance the load is electing \nto receive a lower quality transmission service.74   \nIn the PJM Show Cause proceedings, PJM identified a provisional, interruptible \ntransmission service, PJM’s Option 7, that can be curtailed by PJM during pre-defined conditions \nand that would result in a more efficient use of the system (i.e., increased system utilization rate) \nand significant near-term customer savings as compared to the NITS-only framework.75 Under this \noption, the interconnection study should be expedited because an “interruptible co-located load \ndoes not require the transmission system to be planned, built, or adapted in any way to \naccommodate the load because PJM can interrupt the load when needed to avoid system impacts. \nTherefore, no standby or system impact charges are appropriate.”76 “PJM’s right to curtail the load \nduring defined criteria also means that the load, while it is receiving this service, need not be \ncounted toward the region’s reliability requirement.”77 Large loads also should be able to transition \nfrom curtailable service to firm service with appropriate studies and network upgrades, with lesser \nlevels of service allowing more immediate interconnection. Other related market design features \n \n73 16 U.S.C. §§ 824a(g), 824d. \n74 See PJM, Large Load Additions: PJM Conceptual Proposal and Request for Member Feedback (Aug. 18, 2025), at \nhttps://www.pjm.com/-/media/DotCom/committees-groups/cifp-lla/2025/20250818/20250818-item-03---pjm-\nconceptual-proposal-and-request-for-member-feedback---presentation.pdf (proposing non-capacity backed load \nservice); see also Devin Leith-Yessian, PJM Drops Non-capacity Backed Load, Shifts Focus to Resource Queue, \nPRD, RTO Insider (Oct. 9, 2025), PJM Drops Non-capacity Backed Load, Shifts Focus to Resource Queue, PRD. \n75 Constellation’s April 23, 2025 Show Cause Answer at 55-57. Constellation proposed certain modifications, \nincluding that interruptible service would be available until the transmission upgrades needed for NITS service are \ncompleted. \n76 Ming Testimony at 34. \n77 Constellation’s April 23, 2025 Show Cause Answer at 9; see also id. at 55-56"},{"page":34,"startToken":9698,"endToken":9995,"text":"26 \ncan further maximize current use of the system. In the PJM stakeholder process, Constellation has \njoined a group that proposed the Joint Stakeholder Package of reforms for this purpose, including \nimproving system reliability.78 The Commission’s rule should also consider such measures. \nFinally, the ANOPR inquires whether serial (first-come, first-served) studies are \nappropriate for curtailable loads, and whether a 60-day deadline is reasonable. In Constellation’s \nview, a 60-day period for studying facilities that are likely, by design, to have little impact on the \nPJM system is aligned with the overall timeline of 6 months for the study of a load interconnection \nproject.   \nThe Commission’s proposed rule should adopt these measures to maximize efficient use \nof the transmission system. In the PJM Show Cause proceedings, the Commission should approve \nPJM Option 7 as modified by Constellation.  \nPrinciple 8—Allocating Network Upgrade Costs Based on Appropriate Studies \nThe ANOPR’s eighth principle states that “load and hybrid facilities should be responsible \nfor 100% of the network upgrades that they are assigned through the interconnection studies” and \n“seek[s] comment on whether such costs should be offset through a crediting mechanism.”79 \nConstellation takes no position on this issue at this time. \nPrinciple 9—Granting the Customer the Option to Build \nThe ANOPR’s ninth principle affords large load interconnection customers an option to \nbuild equivalent to what is currently provided to generator interconnection customers.80 \n \n78 See Exh. 1; see also infra at Principle 14 (discussing same). \n79 ANOPR at ¶ 25. \n80 ANOPR at ¶ 26; see Reform of Generator Interconnection Procedures and Agreements, Order No. 845, 163 FERC \n¶ 61,043, at PP 85-87 (2018) (“Order No. 845”), order on reh’g, Order No. 845-A, 166 FERC ¶ 61,137 (2019), \norder on reh’g & clarification, Order No. 845-B, 168 FERC ¶ 61,092 (2019)."},{"page":35,"startToken":9995,"endToken":10323,"text":"27 \nConstellation agrees that the option to build should be provided to large load customers subject to \nhost utility standards as it is currently provided to generator interconnection customers. This is \nconsistent with the Commission’s intentions as stated in its generator interconnection rule, Order \nNo. 845, “of providing interconnection customers more control and certainty during the design \nand construction phases of the interconnection process.”81 Originally, the option to build was \nlimited “to circumstances where the transmission provider cannot meet the interconnection \ncustomer’s requested dates” but the Commission found this too limiting since the customer may \nbe able to build the facilities not only more quickly but also at lower cost.82 The Commission found \n“that in circumstances where an interconnection customer cannot exercise the option to build, it \nmay pay more and/or wait longer for the construction of the transmission provider’s \ninterconnection facilities,” citing record evidence that “savings can occur and have already \noccurred.”83 The option to build has been a success and it should be included in the final large load \ninterconnection rule.  \nPrinciple 10—Assigning Appropriate Upgrade Costs to Co-Locating Existing \nGeneration \nThe ANOPR states that “an existing generating facility that seeks to enter a partial \nsuspension to serve a new load at the same location must go through a system support resource \n(SSR)/reliability must run (RMR) type study,” wait to proceed until “after any network upgrades \nneeded to ensure reliability are placed into service,” and pay for any upgrades.84 By “partial \n \n81 Order No. 845, 163 FERC ¶ 61,043 at P 85. \n82 Id. (“The limitation restricts an interconnection customer’s ability to efficiently build the transmission provider’s \ninterconnection facilities and stand alone network upgrades in a cost-effective manner, which could result in higher \ncosts for interconnection customers.”) (emphasis added). \n83 Id. P 86 (citing a NextEra affiliate’s ability to complete a project “one year sooner and for $6 million less than \nestimated by the transmission provider”). \n84 ANOPR at ¶ 27."},{"page":36,"startToken":10323,"endToken":10623,"text":"28 \nsuspension,” Constellation assumes that the ANOPR is referring to situations in which the RTO \nrequires the generator to delist capacity when a generator serves load directly behind-the-meter \nand the load takes no transmission service. In PJM, there is an existing “reliability type study” \ncalled the Necessary Study process that applies to a circumstance where the generator is directly \nserving the load. The Necessary Study determines the reliability impact of an existing generator \nmodifying its interconnection, including by co-locating with a large load, with the generator \nultimately being responsible to pay for any reliability upgrades necessary to maintain the \ngenerator’s electrical support of the grid.85 Constellation supports this existing Necessary Study \nprocess and agrees with the principle identified in the ANOPR that the generator is responsible for \nthe upgrades the Necessary Study determines are necessary to maintain operational security and \nreliability. \nTo the extent the ANOPR suggests that an existing generator must undergo an SSR/RMR \ntype study if it is required to delist before serving non-network load co-located behind the meter, \nthat should be rejected. It would depart from RTO practice, misapply the existing “retirement” \nparadigm, and would be unduly discriminatory against existing resources seeking to serve co-\nlocated non-network load. The Commission has no authority to force a capacity resource that is \nrequired to delist in order to directly serve a non-network customer to instead serve network load.  \nFirst, the record in the PJM Show Cause proceedings demonstrates that PJM’s existing \nNecessary Study process is sufficient to ensure reliability for a co-location configuration at an \nexisting generation facility. Constellation’s witness, Michael Kormos, PJM’s former Chief \nOperations Officer and former Senior Vice President of Transmission and Compliance at Exelon \n \n85 Constellation’s April 23, 2025 Show Cause Answer at 95; see also PJM’s March 24, 2025 Answer at 34."},{"page":37,"startToken":10623,"endToken":11049,"text":"29 \nwith nearly 30 years’ experience operating and planning transmission systems and running \nelectricity markets, “disagree[d] with any suggestion that [PJM’s] [N]ecessary [S]tudy process is \nanything but a robust, highly effective study of the impact of the modification requested,” \ntestifying that the studies are “led by an independent RTO; uniform and transparent … and focused \non the overall grid impacts of the new load explicitly (and not focused predominantly on local \nimpacts…).”86 There is no evidence that this existing framework has failed to maintain reliability \nin PJM.87 \nSecond, treating an existing unit that continues to run and provide electricity to a co-located \nload as if it were retiring is unprecedented and factually incorrect. Instead of retiring, these units \ncontinue to serve load. There is no contractual or tariff obligation for existing generators to only \nsell energy to the grid. They can sell to any willing customer.88  \nNor should the existing generator in a behind-the-meter co-location configuration with load \nbe treated as if it is retiring for study purposes. If anything, they should be treated like capacity \nresources in PJM that convert to energy only.89 The Independent Market Monitor performs a \nmarket power analysis but there is no reliability analysis. The change in status is reflected in PJM’s \nmodels and studies. For an existing generator seeking to serve non-network load, PJM’s Necessary \n \n86 Constellation’s Show Cause Answer Apr. 23, 2025 at 88 (quoting Kormos Affidavit at ¶ 6). \n87 Any argument that the Susquehanna behind-the-meter configuration had a negative effect on reliability is dispatched \nby the operational record once the protective relay scheme was properly installed and tested.   \n88 Such a rule would also constitute an unconstitutional taking under the Fifth Amendment because, by imposing cost-\nprohibitive upgrades, it would effectively prevent an existing generator from selling to a willing customer and \ncompel the generator to sell to the grid. See Cedar Point Nursery v. Hassid, 594 U.S. 139, 149 (2021) (“Whenever \na regulation results in a physical appropriation of property, a per se taking has occurred.”); Horne v. Dep’t of \nAgriculture, 576 U.S. 351, 364-65 (2015) (holding that “a governmental mandate to relinquish specific, identifiable \nproperty as a ‘condition’ on permission to engage in commerce effects a per se taking”); cf. Duquesne Light Co. v. \nBarasch, 488 U.S. 299, 308 (1989) (“If the rate does not afford sufficient compensation, the State has taken the use \nof utility property without paying just compensation and so violated the Fifth and Fourteenth Amendments.”). \n89 See PJM OATT, Att. DD § 6.6."},{"page":38,"startToken":11049,"endToken":11338,"text":"30 \nStudies process is the correct framework to study the reliability impact of the existing generator’s \nmodified interconnection to the grid (to accommodate the co-located load), not to treat the \ngenerator as if it is gone. \nReplacing PJM’s Necessary Study process with RMR/SSR retirement studies that would \nimpose broad new network costs on a class of existing resources for the simple act of serving a \ncustomer through a co-located configuration chosen by the customer, which may be the only option \nto serve the load in a timely fashion. It would effectively preclude some customer configurations \nthat may be more efficient and expedient and dictate a generator’s perpetual service to the \nmonopoly-controlled grid. By unjustly burdening co-location configurations, it would act in direct \nconflict with the principles of the ANOPR, undermine incentives to locate load as close as possible \nto generation, and create a powerful disincentive for any load to come online on a merchant-only \nbasis.  \nThird, it is unduly discriminatory in violation of section 206 of the FPA to burden existing \ngeneration seeking to serve non-network load with extra costs and requirements through policies \nlike heightened reliability study requirements when the Necessary Study process is sufficient to \nensure reliability.90 It is highly discriminatory to charge these costs to resources entering into such \narrangements compared to resources that are actually retiring altogether which are not burdened \nwith these costs. We are in an era—as identified in the ANOPR—“which will require \nunprecedented and extraordinary quantities of electricity and substantial investment in the \nNation’s interstate transmission system.”91 America needs every megawatt to serve AI \ninfrastructure, whether in-front-of- or behind-the-meter. Undue discrimination against existing \n \n90 16 U.S.C. § 824e(a). \n91 Secretary’s Letter at 2 (emphasis added)."},{"page":39,"startToken":11338,"endToken":11650,"text":"31 \nresources in the interconnection of large loads will inevitably contribute to premature retirements, \ndiscourage generation from coming online on a merchant basis, and likely will hit dispatchable \nand baseload units the hardest.  \nIn the PJM Show Cause proceedings, the Commission should find that PJM’s existing \n“Necessary Studies” process satisfies the reliability concerns animating Principle 10, and that a \ngenerator should be on the hook for the costs identified by a traditional Necessary Study. If the \nCommission proceeds without making this clarification, then, at a minimum, the Commission \nshould recognize that commitments to extend the operating license of an existing resource (without \nwhich license the facility would shut down), and significant investments that expand operational \ncapacity, should result in the existing resource being treated comparably to a new resource. Life \nextensions and significant uprates prevent the existing capacity from retiring and provide the same \nresource adequacy and affordability benefits as construction of a new resource.92  \nSince the ANOPR further prescribes that the reliability “type study” “must consider system \nconditions, including forecasted load growth, at least three years after the proposed suspension \ndate” and “invite[s] comments on whether and how resource adequacy should be considered in the \nSSR/RMR type study,”93 Constellation further highlights its improved load forecasting, demand \nside products, and reliability backstop proposals in its Joint Stakeholder Package pending in PJM \n \n92 The Commission has found just and reasonable ISO New England rules that treat existing resources that have \nundertaken specific investments like new generating capacity resources. See ISO New England Inc., 119 FERC \n¶ 61,045, at P 219 (2007) (approving ISO-NE Tariff, § III.13.1.1.1.2 which “enable[s] a resource that has previously \nbeen counted as a capacity resource (including one that had been deactivated or retired) to participate in a Forward \nCapacity Auction as a new generating capacity resource”). \n93 ANOPR at ¶ 27."},{"page":40,"startToken":11650,"endToken":11921,"text":"32 \nand discussed below (see Principle 14).94 These measures address the ANOPR’s flagged issues \nwithout undue discrimination. \nPrinciple 11—Basing Transmission Rates on the Quantity of Capacity and Energy \nBeing Transmitted Across the Transmission System to the Load  \nThe ANOPR states that “utilities serving large loads, including those at hybrid facilities, \nshould be responsible for transmission service based on their withdrawal rights, as that value \namount reflects the quantity of capacity and energy that is being transmitted across the \ntransmission system to the load.”95 Constellation agrees that transmission rates for large loads and \nhybrid facilities should “reflect[] the quantity of capacity and energy that is being transmitted \nacross the transmission system to the load,” but this is not necessarily equivalent to withdrawal \nrights. Again, it depends on the co-location configuration.  \nConstellation provided detailed record evidence on appropriate rates under all potential co-\nlocation configurations in the PJM Show Cause proceedings including PJM’s eight options, all \ndepending on the level of service that the large loads and hybrid facilities desired. Zachary Ming \nof Energy+Environmental Economics, an expert in electricity market design who teaches a \ngraduate course on this topic at Stanford University, summarized the three basic types of \ntransmission service: firm standard network service, generator-contingent or behind-the-meter \nservice, and interruptible (curtailable) service. Each of PJM’s proposed options for large load \nconfigurations in those proceedings was a variation of these three basic types of service:  \n firm service where the load always has rights to transmission service, the most \nrelevant being PJM Option 2, NITS with in-front-of-the-meter co-location to the \n \n94 See Exh. 1 (Joint Stakeholder Package).  \n95 ANOPR at ¶ 28."},{"page":41,"startToken":11921,"endToken":12288,"text":"33 \ninterstate grid (equivalent to “hybrid facilities” in the ANOPR where large load and \ngeneration share a point of interconnection to the grid); \n generator-contingent service where the load relies on co-located generation, \ncomprised of PJM Option 4 (co-located behind-the-meter load) and Option 5 (same \nbut with the option to purchase as-available energy); and \n interruptible service where the load can be curtailed, PJM Option 7 (NITS with co-\nlocation where load is interruptible, equivalent to ANOPR’s Principle 7 on \ncurtailable load).96  \nFor PJM Option 2, or hybrid facilities as defined in the ANOPR (generation and load \nsharing a point of interconnection “directly to transmission facilities,” or in-front-of-the-meter to \nCommission-jurisdictional interstate transmission facilities),97 the “quantity of capacity and \nenergy … being transmitted across the transmission system to the load” would be the net after \nsubtracting injections by the generator. There already is extensive record evidence in the PJM \nShow Cause proceedings to demonstrate hybrid facilities’ “billing should be based on the load’s \nnet use of the transmission grid, and this is true whether the load is ‘large’ or ‘small.’”98 A “gross \nload construct would apply transmission charges to the load-only portion of the co-located \ncustomer” but a “net load construct is consistent with measuring the actual energy flowing between \nthe entire co-location configuration and the transmission system….”99  \nPJM, moreover, already has numerous behind-the-meter-generation facilities that are billed \non a net basis.100 The Commission found that BTMG netting was appropriate to “encourage \n \n96 Of PJM’s other options, Option 1 (firm NITS without co-location) and Option 8 (interruptible NITS with co-location \nwhere load participates as demand response) are existing Tariff services and require no Tariff changes; PJM Option 3 \n(firm load customer with behind-the-meter generation) also is an existing Tariff service but PJM has asserted it does \nnot apply to large loads. Only PJM Option 6 (firm NITS with co-location plus BYOG but only for new generation) \nwas unjust and unreasonable as proposed because it unduly discriminated against existing resources. \n97 See ANOPR at ¶¶ 12, 18.  \n98 Constellation’s April 23, 2025 Show Cause Answer at 45 (citing Ming Testimony at 55-56). \n99 Ming Testimony at 10. \n100 April 23, 2025 Answer at 42 (the existing BTMG provisions)."},{"page":42,"startToken":12288,"endToken":12590,"text":"34 \nqualifying entities with behind the meter generation to reduce their use of the PJM transmission \nsystem.”101 In another case involving ISO New England Inc. (where netting also is standard for \nbehind-the-meter configurations), the Commission found that netting “reasonably reflect[s] each \nNetwork Customer’s usage of the transmission system and assigns the cost of providing Regional \nNetwork Service accordingly.”102 Likewise, “[e]nergy charges should be assessed to co-located \ngenerators and loads [hybrid facilities] based on the net injection to or withdrawal from the \ntransmission system.”103  \nFor firm service to hybrid facilities (PJM Option 2), Mr. Ming testified that net charges \nwere appropriate (rather than gross), but also discussed a potential “standby charge” since “there \nis a high likelihood that the co-located generator will be available during the coincident peak hours, \nmeaning that the co-located load is unlikely to be withdrawing energy during coincident peak \nhours” and “conventional NITS charges based on net system energy withdrawals may not fully \ncapture the costs associated with designing the transmissions system to ensure the co-located load \ncould be served.”104 This standby charge would “reflect the fact that the transmission system must \nbe built to a certain extent to serve the load on a firm basis.”105 Mr. Ming provided one potential \nmethodology to calculate the standby charge, but it would be based on a “customer-designated \nfirm load subscription level of what the customer could draw from the transmission system.”106 \n \n101 PJM Interconnection, L.L.C., 107 FERC ¶ 61,113, at PP 27-28 (2004) (citing Occidental Chemical Corp. v. PJM \nInterconnection, L.L.C., 102 FERC ¶ 61,275, at P 14 (2003)) (emphasis added). \n102 ISO New England Inc., 178 FERC ¶ 61,086, at P 49 (2022). \n103 Ming Testimony at 45. \n104 Id. at 28.  \n105 Id. at 29 \n106 Id."},{"page":43,"startToken":12590,"endToken":12886,"text":"35 \nMr. Ming’s proposal was that the load in a hybrid facility configuration would pay the greater of \nthe standby charge or its net transmission rate.107  \nFor generator-contingent behind-the-meter co-location configurations (PJM Options 4 and \n5), the load would pay a one-time system impact charge based on the results of the PJM Necessary \nStudy with any as-available energy purchases billed at a discounted $/MWh charge.108 Charges for \ncurtailable service would be based on any as-available energy purchases billed at a discounted \n$/MWh charge.109 Under both generator-contingent and interruptible configurations, the load \nlikely would have zero withdrawal rights and would not rely on “capacity and energy … being \ntransmitted across the transmission system to the load.”110  \nBy contrast, Transmission Owners in PJM have sought to impose one-size-fits-all firm \ntransmission service (as discussed above under Principle 5) and full NITS charges based on gross \nload no matter how much capacity and energy is being transmitted to the load. The Commission \nalready unanimously rejected efforts by Exelon to “clarify” the PJM Tariff to change the definition \nof “Network Load” to require all new load to be NITS customers, finding that Exelon lacked the \nauthority to revise PJM’s Tariff.111 No party sought rehearing. Charging all large loads a “NITS \nrate [network transmission rate] based on gross load (as opposed to net) no matter their actual use \nof the transmission system discriminates because such a construct ‘is incapable of differentiating \ncustomers who impose different costs on the transmission system through co-location.’”112  \n \n107 Id. at 31. \n108 Constellation’s April 23, 2025 Show Cause Answer at 65. \n109 Id. \n110 See ANOPR at ¶ 28. \n111 Atl. City Elec. Co., 190 FERC ¶ 61,109. \n112 Constellation’s April 23, 2025 Show Cause Answer at 32, citing Ming Testimony at 36."},{"page":44,"startToken":12886,"endToken":13194,"text":"36 \nConstellation urges the Commission to reject a one-size-fits all model for services and rates \nto large loads. Instead, the Commission should allow the transmission services customers want \nand rates that reflect the quantity of capacity and energy being transmitted to them over the grid.  \nPrinciple 12—Charging for Ancillary Services Based on Peak Demand \nThe ANOPR proposes that “utilities serving large loads … should be responsible for \nancillary services based on peak demand, without consideration of co-located generation. Any co-\nlocated generating facilities will similarly be fully compensated for the provision of ancillary \nservices.”113 Constellation does not oppose this principle.114  \nPrinciple 13—Establishing a Timely and Responsive Implementation Plan \nThe ANOPR’s thirteenth principle provides that “there must be a plan to implement these \nproposed reforms, including the treatment of large load interconnections that are already being \nstudied for interconnection.”115 The Commission should of course develop such a plan, but as \ndetailed in Section II below, the Commission should begin by taking immediate action in the long-\npending PJM Show Cause (and related) proceedings by ruling on the merits and expediting \nimplementation in PJM. Alternatively, if the Commission believes that the ANOPR adds new \nissues that were not already sufficiently addressed in record in the Show Cause proceedings or \nthrough additional comments submitted in response to this ANOPR, the Commission should issue \na targeted order in the PJM Show Cause proceedings that eliminates ambiguity and delay in three \nkey areas related to jurisdiction, rates, and timeliness so that more large load projects can move \nforward. With respect to the “the treatment of large load interconnections that are already being \n \n113 ANOPR at ¶ 29 (emphasis added). \n114 Separate ancillary service rate arrangements are justified for behind-the-meter large loads that are not connected to \nthe grid. See Constellation’s April 23, 2025 Show Cause Answer. \n115 ANOPR at ¶ 30."},{"page":45,"startToken":13194,"endToken":13472,"text":"37 \nstudied for interconnection” in PJM, the Commission should immediately put a halt to any PJM \nTransmission Owner’s refusal to proceed with the interconnection studies of co-location \nconfigurations (Constellation proposes specific measures in Section II).  \nThe Commission should reject any argument that it must wait to rule in PJM until a final \nrule on the ANOPR is issued. While the Commission’s ruling in PJM clearly will inform the \nCommission’s deliberations on other large load matters including the ANOPR, the Commission \ncan and should undertake those deliberations in parallel to acting on the pending cases under \nsection 206 of the FPA that have long been pending in PJM given the importance of this region \nand the national interests at stake. PJM cannot be allowed to have unclear rules and stalemate any \nlonger. To the extent that the Commission’s later action in response to the ANOPR requires further \nwork in PJM, the Commission can direct PJM to complete that work as part of the compliance \nprocess in that proceeding.   \nAs for a transition plan for “the treatment of large load interconnections that are already \nbeing studied for interconnection,”116 the Commission should grandfather interconnection studies \nthat already are substantially completed by the time the Commission accepts final compliance \nfilings in response to the Commission’s final rules.117 It would be inefficient and cause unnecessary \ncost and delay to require these projects where studies have long been pending or are nearly \ncompleted to start over in the study process. \n \n116 ANOPR at ¶ 30. \n117 The Secretary called for final rules by April 30, 2026. RTOs and Transmission Owners presumably will have to \nsubmit compliance filings in response to the final rules."},{"page":46,"startToken":13472,"endToken":13782,"text":"38 \nPrinciple 14—Meeting Reliability Standards \nThe ANOPR states that “utilities serving large loads must meet all applicable NERC \nreliability standards and OATT provisions.”118 Constellation agrees. To the extent the Commission \nhas concerns that large loads may jeopardize reliability, Constellation proposes measures that can \nremedy reliability concerns without delaying large load interconnections. \nIt must be remembered that one of the primary benefits of the co-location of large loads \nand generators is that it improves reliability. Co-location that “avoids the use of the grid”—such \nas a large load taking its power directly at a shared point of interconnection with a generator as \nhybrid facilities—minimizes “grid operational risks (because fewer grid infrastructure facilities \nand potential failure points are implicated in serving the load),” while also minimizing \n“transmission infrastructure costs, potential supply chain issues and delays on long-lead \ntransmission infrastructure equipment ... [and] line losses.”119 The same logic to applies to both \nnew and existing generation as the same benefits are realized by co-locating with an existing \ngenerator. One of the primary attributes of co-location configurations (all of them) is that they take \nadvantage of existing infrastructure and therefore minimize costs.  \nThe ANOPR’s fourteenth principle on reliability further states that “[u]tilities and we must \nbe prepared to revise large load interconnection procedures and agreements, as necessary,”120 \npresumably to incorporate reliability protections. This is exactly what Susquehanna Nuclear \nattempted to do over a year ago with its modified interconnection agreement to incorporate a co-\n \n118 ANOPR at ¶ 31. \n119 Affidavit of Michael Kormos at ¶ 4 (Exh. 5 to Constellation’s April 23, 2025 Show Cause Answer); see also \nANOPR at ¶ 20 (highlighting that “siting a large load near or at the same point of interconnection as a new generating \nfacility could reduce the network upgrades needed to interconnect only the load or only the generating facility”). \n120 ANOPR at ¶ 31."},{"page":47,"startToken":13782,"endToken":14216,"text":"39 \nlocated large load.121 Other utilities in PJM have since refused to process interconnection \nmodification requests for co-location projects. As set forth below, the Commission should \nimmediately require PJM Transmission Owners to cooperate in current study processes designed \nto ensure reliability, but should also confirm timely utility cooperation is required in any final rule.  \nWhile ensuring the reliability of the grid is essential, large loads also must be served, and \nas quickly as possible, consistent with system reliability. Utility regulation is founded on the \nprinciple that utilities authorized to operate monopolies must submit to regulation, including price \nregulation and the obligation to extend service to customers within their service territory and to \nprovide continued service once commenced.122 The latter is commonly referred to as the “duty to \nserve.” Nearly every jurisdiction in the United States has promulgated regulations establishing a \nduty to serve.123 Although each state applies its own flavor, the general requirement is the same—\nan electric utility must serve customers seeking service and cannot unduly discriminate or delay \nsuch service.124 Illinois’s statute, for example, provides that the duty to serve is “without \ndiscrimination and without delay.”125 Delays of five, seven, or ten years—which are commonplace \nwhen trying to connect a large load to the grid—are untenable and objectively cannot be considered \n \n121 PJM Interconnection, L.L.C., 191 FERC ¶ 61,025, at P 30 (2025). The Commission rejected amendments to a \nCommission-jurisdictional interconnection agreement to accommodate a hybrid facility configuration. Nearly all \nthese amendments dealt with reliability issues. \n122 Jim Rossi, Universal Service in Competitive Retail Electric Power Markets: Whither the Duty to Serve?, 21 \nENERGY L. JOURNAL 27 (2000). \n123 See Heather Payne, Unservice: Reconceptualizing the Utility Duty to Serve in Light of Climate Change, 56 UNIV. \nOF RICH. L. REV. 603, 610-12 (2022) (describing the duty to serve in various states). \n124 See, e.g., 220 Ill. Comp. Stat. 5/8-101 (Illinois statute stating that a “public utility shall, upon reasonable notice, \nfurnish to all persons who may apply therefor and be reasonably entitled thereto, suitable facilities and service, \nwithout discrimination and without delay”); N.J. STAT. ANN. § 48:3-3(a) (“No public utility shall provide or \nmaintain any service that is unsafe, improper or inadequate, or withhold or refuse any service which reasonably can \nbe demanded or furnished....”); VA. CODE ANN. § 56-234(A) (“It shall be the duty of every public utility to furnish \nreasonably adequate service and facilities at reasonable and just rates to any person, firm or corporation along its \nlines desiring same.”). \n125 220 Ill. Comp. Stat. 5/8-101."},{"page":48,"startToken":14216,"endToken":14538,"text":"40 \nservice “without delay.” While “the demand for interconnection by data centers driven by the \nneeds of artificial intelligence and other technologies is a recent phenomenon,” the obligation to \nserve load without delay is as old as utility regulation.126  \nThe FPA also prohibits undue discrimination, with specific provisions against \ndiscrimination during shortage conditions such as those identified in the ANOPR.127 It is unlawful, \nfor example, to decide not to serve large loads to ensure service to others, or to favor new \ngeneration over existing generation in taking measures to remedy the shortage.128  \nAnother fact to keep in mind is that PJM and other regions already have extensive market \ndesign mechanisms, planning requirements, and other carefully developed and scrutinized \nprocesses to ensure both reliability and resource adequacy (which refers to sufficient capacity and \nis not the same as reliability). This includes existing interconnection study processes that already \neffectively analyze the reliability effects of interconnections.  \nIf the Commission is concerned that these reliability tools are insufficient, the solution \ncannot be to prevent service to large loads or to delay service for years. The Commission could \ninstead improve reliability by adopting the Joint Stakeholder Proposal that Constellation along \nwith Amazon, Calpine, Google, Microsoft and Talen proposed, including: (1) load forecast and \nother modeling improvements, (2) limited demand response products that align with the \ncurtailments or operation of backup generation that the large loads are willing and able to provide, \nand (3) reliability backstop mechanism enhancements if a forward capacity auction clears \n \n126 Answer and Motion to Dismiss of PJM Interconnection, L.L.C., Docket No. EL25-20-000, at 5 (filed Dec. 12, \n2024). \n127 See 16 U.S.C. § 824a(g)(3)(B). \n128 Id. (the “manner” of addressing “any anticipated shortage of electric energy or capacity” to “insure continuity of \nservice to customers,” must ensure that all persons served by a public utility are treated “without undue prejudice or \ndisadvantage”) (emphasis added)."},{"page":49,"startToken":14538,"endToken":14807,"text":"41 \ninsufficient capacity to meet the forecast to ensure there is sufficient available generation if the \nmarket mechanism fails to do so.129  \nLoad Forecasting and Modeling Improvements \nOne suite of enhancements goes to the persistent problem of load forecasting. Our proposal \nis to: \n Include only large new loads backed by meaningful, verifiable commitments such \nas executed energy-service agreements, posted credit or collateral, significant \ninfrastructure investment, or long-term supply commitments with new or existing \nresources. \n Use realistic ramp-rate trajectories, utilization factors, and safeguards to avoid \ndouble-counting across overlapping proposals or procurement paths. \n Require aggregate large-load forecasts to account for project-realization indicators \nsuch as historical success rates, development progress, supply-chain constraints \n(e.g., chip availability), independent expert assessments, and structured information \nexchange among large-load customers, PJM, and Transmission Owners. \nNew Demand Side Products \nOne way of increasing the capacity available to the market is to allow for limited demand \nresponse products more aligned with the capability of data centers and their backup generation. \nFor example, in the stakeholder process, Constellation supported new means of obtaining demand-\nside resource adequacy services from large loads (including data centers) that could be offered into \nthe capacity market, thereby allowing large loads to tap into their already-available operational \nflexibility to provide resource adequacy services in response to system stress. Large loads could \nvoluntarily submit offers into PJM’s capacity auction to serve as limited demand response \nresources under one of two new limited demand response categories: (i) a maximum of 24 \nhours/year of curtailment with no single interruption greater than 6 hours and (ii) a maximum of \n \n129 See Exh. 1 (Joint Stakeholder Package)."},{"page":50,"startToken":14807,"endToken":15144,"text":"42 \n100 hours/year of curtailment with no single interruption greater than 10 hours. PJM would \ndevelop a new Effective Load Carrying Capability (ELCC) for each category allowing large load \ncapacity market offers and, if cleared, performance when dispatched by PJM (consistent with the \nlimitations associated with their demand response category).     \nReliability Backstop Enhancements \nThe Joint Stakeholder Package also proposed enhancements to PJM’s existing Reliability \nBackstop Mechanism to provide further incentives for new resources to enter the market when the \nsupply and demand balance is particularly tight. Under this enhancement, eligible resources, \nincluding new/reactivated generation, existing generation with an offer cap above the highest point \non the Variable Resource Requirement (“VRR”), and traditional demand response, would have the \noption to offer a minimum term supply commitment, priced at the top of the VRR for a multi-year \nperiod. Resources cleared by PJM in this fashion would receive a capacity commitment for the \nterm of years and price offered. The features of this enhancement were carefully structured to \nrespond to only legitimate resource adequacy deficits but to minimize overreliance on potentially \nlower quality and/or out-of-market services which could have a long-term detrimental impact on \nthe market and its ability to signal investment when needed. The following elements were included \nin this proposal to strike this balance:  \n To ensure the mechanism is only available in years with a meaningful potential \nshortfall, the reliability backstop alternative would only be triggered in years when \nRPM would otherwise clear below 98% of the reliability requirement. \n Bidders may offer up to 7 years, but shorter-term offers will clear first to minimize \nthe duration of any market intrusion. PJM would stop clearing reliability backstop \nresources once a cleared volume clears above 98% of the reliability requirement. \n To ensure “phantom” capacity is not offered, eligible resources must be reasonably \nlikely to perform in the delivery years cleared. \n To minimize the impact on clearing prices for the rest of the market, in subsequent \nyears, cleared resources with multi-year commitments will be entered into the RPM"},{"page":51,"startToken":15144,"endToken":15435,"text":"43 \npotentially based on the technology-specific default gross avoidable cost minus the \nunit-specific projected Energy and Ancillary Services (“EAS”) offset. \n To ensure any winning offers do not receive a windfall, if the market clearing price \nin subsequent years is different than their original offer price of cleared multi-year \nresources, the resource will receive the multi-year price agreed – no higher/lower. \n To ensure the mechanism does not outlast its need, it will be in place for the four \nBRAs corresponding to the current Quadrennial Review (2028/29 through \n2031/32) and will automatically sunset thereafter. \nThe Commission should adopt measures like these in a final rule and in an order in the \nPJM Show Cause proceedings. The solution to reliability concerns cannot be to allow service to \nlarge loads to be delayed for years. \nII. \nThe Commission Should Find the Existing PJM Tariff Unjust and Unreasonable and \nProvide Immediate Relief \nA. The Commission Should Immediately Issue a Full Order on the Merits in the \nPJM Show Cause Proceedings \nConsistent with the ANOPR and based on the comprehensive record it has assembled in \nthree separate proceedings, comprised of a fully-briefed complaint proceeding, a national inquiry \ninto co-location issues, and another fully-briefed Show Cause proceeding (with 38 itemized \nbriefing questions), the Commission should issue a full order in the PJM Show Cause proceedings \nconfirming its preliminary finding that the PJM Tariff is unjust and unreasonable because it does \nnot contain “provisions addressing with sufficient clarity or consistency the rates, terms, and \nconditions of service that apply to co-location arrangements”130 and “[t]he absence of such \nprovisions may leave entities unable to determine what steps they can or must take to effectuate \n \n130 PJM Show Cause Order, 190 FERC ¶ 61,115 at P 74."},{"page":52,"startToken":15435,"endToken":15748,"text":"44 \nco-location arrangements of various configurations.”131 That reasoning remains just as true today, \nand the PJM Tariff’s lack of clarity continues to impede timely large load development.  \nThe comprehensive record in the PJM Show Cause proceedings also supports a \nCommission ruling on a full replacement rate. That replacement rate should modify the existing \nPJM Tariff to provide for a variety of co-location options to provide strong incentives for large \nnew load to locate in places and on terms that maximize the efficiency of the existing transmission \ngrid and allow for timely service without jeopardizing reliability or unjustly shifting costs. PJM \nhas identified eight potential options for how large, new load might connect to the interstate grid: \n PJM Option 1: Firm NITS without co-location (i.e., standard service); \n PJM Option 2: Firm NITS with in-front-of-the-meter co-location (equivalent to \n“hybrid facilities” in the ANOPR where large load and generation share a point of \ninterconnection to the grid); \n PJM Option 3: Firm NITS with the generation behind-the-meter of the load with \ntransmission charges based on net usage of the grid (existing “BTMG” under the \nPJM Tariff, which PJM claims is limited to small loads);132 \n PJM Option 4: Co-located behind-the-meter load with “generator-contingent” \nprotections; \n PJM Option 5: Co-located behind-the-meter load with “generator-contingent” \nprotections plus as-available energy purchase option; \n PJM Option 6: Firm NITS with co-location plus expedited generation \ninterconnection for BYOG; \n PJM Option 7: NITS with co-location where load is interruptible (equivalent to \nANOPR’s Principle 7 on curtailable load);133 and \n \n131 Id. \n132 Contra Constellation’s April 23, 2025 Show Cause Answer at 44 (“there is no size limitation for BTMG in the \nPJM Tariff, and it has been implemented for large loads”). \n133 The Commission should clarify that provisional interruptible services (PJM Option 7 with Constellation’s proposed \nrate treatment) end once the network upgrades are built. See Constellation’s May 8, 2025 Answer at 14."},{"page":53,"startToken":15748,"endToken":16143,"text":"45 \n PJM Option 8: NITS with co-location where load participates as demand response. \n(Constellation proposes additional demand response measures in the Joint \nStakeholder Package).134 \nConstellation explained how PJM options 2-5 and 7 were viable replacement rates, with some \nclarifications and modifications, including to the appropriate rate treatment, and the Commission \nshould order PJM to implement them in a compliance filing within 60 days.135 \nIn particular, the Commission should: \n Adopt a replacement rate that allows for PJM’s proposed co-location configuration \noptions, including the equivalent of the ANOPR’s “hybrid facilities” (as defined in \nthe ANOPR, equivalent to PJM Option 2), and the ANOPR’s curtailable load \n(equivalent to PJM Option 7), as well as behind-the-meter configurations (PJM \nOptions 4 and 5), as clarified and modified by Constellation, with rate treatments \nthat recognize the different uses of the transmission system of these different \nconfigurations,136 and direct PJM to implement the options in a compliance filing \nwithin 60 days.137 \n Reject Bring-Your-Own-Generation (PJM Option 6) as unduly discriminatory and \npreferential because only new generation would qualify.138 \n Find that the Commission does not have jurisdiction over behind-the-meter sales \nbetween a co-located generator and load, regardless of whether the load is \n“synchronized” to the grid.139 \n Order Transmission Owners to provide timely participation in relevant studies \nrequested by PJM and in the interconnection agreement amendment process.140 \n \n134 See Exh. 1; see also supra at Principle 14 (discussing same). \n135 Constellation’s April 23, 2025 Show Cause Answer at 6; see also id. at 50; see also Constellation’s May 8, 2025 \nPreliminary Finding Answer at 14-15. \n136 Constellation’s April 23, 2025 Show Cause Answer at 37-38, 65, 108. Note that PJM Option 1 (firm NITS without \nco-location), Option 3 (co-location with behind-the-meter-generation), and Option 8 (firm NITS with demand \nresponse) all are already in the PJM Tariff. The Commission should clarify that provisional interruptible services \n(PJM Option 7 with Constellation’s proposed rate treatment) ends once the network upgrades are built. See \nConstellation’s May 8, 2025 Preliminary Finding Answer at 14. \n137 Constellation’s April 23, 2025 Show Cause Answer at 6, 52-55; see also Constellation’s May 8, 2025 Preliminary \nFinding Answer at 14-15. \n138 Constellation’s April 23, 2025 Show Cause Answer at 52-55. \n139 Id. at 71-73; see also Herling Affidavit at ¶ 33 (explaining synchronization does not imply transmission usage). \n140 Constellation’s April 23, 2025 Show Cause Answer at 89."},{"page":54,"startToken":16143,"endToken":16415,"text":"46 \n Direct Transmission Owners to process load interconnection requests on the same \ntimelines regardless of configuration to avoid the exact type of discrimination that \nled to Order No. 2003 for generator interconnections. \nSome will argue that facilitating large load interconnections is a threat to resource adequacy \nand that a full order on the merits in PJM is premature. Constellation recognizes the resource \nadequacy concerns associated with significant load growth. But resource adequacy concerns are \nnot a reason to leave interconnection rules undefined, effectively ceding regulatory control to \nTransmission Owner discretion. Nor are they an excuse to discriminate against existing generation \nin favor of new resources.  \nNevertheless, to the extent that the Commission determines reliability enhancements are \nrequired, the Commission should not delay a ruling in PJM but should proceed on its own \nexpedited track. For example, Commission could order PJM to submit compliance filings on the \nJoint Stakeholder Package’s three reliability-enhancing measures that Constellation has proposed \n(jointly with Amazon, Calpine, Google, Microsoft and Talen).141  \nThe Commission should also direct PJM to propose a standard large load interconnection \nprocess of 3-6 months for interconnections to transmission facilities,142 consistent with the \nANOPR’s core expediency concerns. This basic timeline is imperative to get projects moving \nthrough the interconnection process.  \n \n141 See Exh. 1 (Joint Stakeholder Package); see also supra at Principle 14 (discussing same).  \n142 See, e.g., Pa. Pub. Utils. Comm'n, Interconnection and Tariffs for Large Load Customers, Docket No. M-2025-\n3054271, Tentative Order at 25 (Nov. 6, 2025), https://www.puc.pa.gov/pcdocs/1901687.pdf (proposing a six-\nmonth maximum timeline for completion of interconnection studies for large load customers)."},{"page":55,"startToken":16415,"endToken":16748,"text":"47 \nB. Alternatively, the Commission Should Immediately Issue a Targeted Order in the \nPJM Show Cause Proceedings to Jumpstart Large Load Development \nIn the event the Commission determines that it needs more time to issue a comprehensive \norder on the merits in the PJM Show Cause proceedings at this time, it should still at a minimum \nissue an order confirming its preliminary finding that the PJM Tariff is unjust and unreasonable \nand providing targeted rulings consistent with the ANOPR’s principles on three core issues to \nensure that development of large loads proceeds without further delay: (1) the Commission’s \njurisdiction includes the interconnection to the grid by hybrid facilities; (2) NITS charges for \nhybrid facilities should be based on the load’s net usage of the transmission system; and (3) PJM \nand Transmission Owners must immediately act on large load studies and process large load \ninterconnection requests, including those that have long been pending, to ensure timely \ninterconnection of large loads to the grid.  \n1. The Commission Should Affirm Jurisdiction Over Hybrid Facilities \nAs discussed above, the ANOPR correctly notes the Commission’s jurisdiction over large \nload interconnections to transmission facilities.143 The jurisdictional boundaries relating to large \nload interconnections have been extensively analyzed by the Commission in the PJM Show Cause \nOrder, briefed by the scores of parties in PJM Show Cause proceedings in response to the \nCommission briefing questions, and now further analyzed by the Secretary in the ANOPR.144 Yet \nthe lack of a Commission determination is enabling utilities to delay the processing of large load \n \n143 ANOPR at ¶ 18; see also Secretary’s Letter at 1 (“It is my view that the interconnection of large loads directly to \nthe interstate transmission system to access the transmission system and the electricity transmitted over it falls \nsquarely within the Commission's jurisdiction.”) (emphasis added). \n144 See PJM Show Cause Order, 190 FERC ¶ 61,115 at P 88 (Briefing Question a.i. on “jurisdictional principles”); see \nalso Constellation’s April 23, 2025 Show Cause Answer at 68-74 (answering)."},{"page":56,"startToken":16748,"endToken":17061,"text":"48 \ninterconnection requests and use their control over the process to force load to accede to \ndistribution service or configurations that make netting impossible.  \nAccordingly, the Commission should issue an order in PJM that at a minimum finds that \nthe interconnection of hybrid facilities—where a large load and a generator share a point of \ninterconnection—is FERC-jurisdictional. The Commission could make the same finding with \nrespect to all large load interconnections connecting to the interstate grid and taking transmission \nservice, but to the extent the Commission determines it needs further briefing on some large load \ninterconnections, it should still address the interconnection of hybrid facilities—facilities over \nwhich the Commission already has asserted jurisdiction with respect to the generator connected to \nthem.  \n2. The Commission Should Rule that Hybrid Facilities Should Pay Net NITS \nThe Commission should rule that the appropriate transmission rate for hybrid facilities \nsharing an interconnection to the transmission grid is based on the load’s net usage of the \ntransmission system, “reflect[ing] the quantity of capacity and energy that is being transmitted \nacross the transmission system to the load.”145  \nConstellation has long advocated that transmission service based on “net” usage of the \ntransmission system is the correct rate for an in-front-of-the-meter co-location configuration where \nthe load and generator share the same interstate point of interconnection (what the ANOPR calls \n“hybrid facilities” and equivalent to PJM Option 2 in the PJM Show Cause proceedings). As set \nforth in detail below, Constellation has also explained why it may also be appropriate to charge \nthe greater of net withdrawals or a standby charge for hybrid facilities sharing an interconnection \n \n145 ANOPR at ¶ 28. As set forth in our discussion of Principle 11, the ANOPR appears to equate withdrawal rights \nwith the quantity of capacity and energy being transmitted to a large load or hybrid facilities. They are not always \nequivalent."},{"page":57,"startToken":17061,"endToken":17393,"text":"49 \nto the interstate grid. This issue of netting has been a long-standing point of disagreement in the \nongoing complaint, Show Cause and other proceedings—including one Commission-rejected \nattempt by Transmission Owners to amend the PJM Tariff to require gross charges146—that can \nbe quickly resolved through the PJM Show Cause proceedings. For purposes of an immediate \norder in PJM, the Commission should affirm NITS charges for hybrid facilities should be based \non net transmission usage, not gross.   \n3. The Commission Should Require PJM and Transmission Owners to \nImmediately Act on Large Load Studies and Interconnections \nThe ANOPR’s central objective is “to ensure the timely and orderly interconnection of \nlarge loads.”147 Accordingly, the Commission should order Transmission Owners to timely \nprocess large load requests. Currently, they are not all doing so. Large load projects that are moving \nforward are either the transmission utilities’ own projects, or projects where the customer agrees \nto connect in exactly the configuration that the utilities—in their unilateral discretion—require. \nThis is untenable and is blocking progress on critical infrastructure development needed to \nfacilitate AI. It also is contrary to the core objectives of Order No. 888 to stop Transmission \nOwners from granting faster service to their own or to favored projects.148 \nIn the PJM Show Cause Order it issued nine months ago, the Commission preliminarily \nfound that the “lack of applicable [PJM] Tariff provisions raises the potential for undue \ndiscrimination or preferential treatment,” citing in support record evidence of Exelon’s refusal to \n \n146 Atl. City Elec. Co., 190 FERC ¶ 61,109. \n147 ANOPR at ¶ 1. \n148 Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public \nUtilities and Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888, FERC Stats. \n& Regs. P 31,036 (1996), order on reh’g, Order No. 888-A, FERC Stats. & Regs. P 31,048 (1997), order on \nreh’g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), order on reh’g, Order No. 888-C, 82 FERC ¶ 61,046 (1998)."},{"page":58,"startToken":17393,"endToken":17732,"text":"50 \nprocess Constellation’s co-location projects because—according to Exelon—co-location of load \nand generation is “not allowed under the Tariff without arranging for wholesale transmission or \nretail distribution service.”149 Nothing relevant to the Commission’s prior preliminary finding has \nchanged since then—despite the fact that the PJM Tariff already states that PJM “is responsible \nfor the preparation of all studies required by the Tariff … [and] Transmission Owner(s) shall \nsupply such information and data reasonably required.”150  \nAccordingly, the Commission should immediately order the following: \n PJM must establish a timeline – with milestones – for the completion of load \ninterconnection studies for hybrid in-front-of-the-meter configurations (those \nwhere load is connecting at the same point on the transmission system as the \nexisting or new generation), with an absolute study completion deadline, including \nTransmission Owner input, of six months.  \n PJM must require that Transmission Owners comply, cooperate in, and provide \ntimely feedback on the Necessary Studies and other processes to ensure completion \nwithin PJM’s timeline for large load interconnection requests that are behind-the-\nmeter arrangements.  \n PJM must compile and maintain a list of all pending large load interconnection \nrequests (over a certain size threshold and with defined meaningful/verifiable \ncommitments) and require progress updates from the applicable Transmission \nOwner every 30 days. \n PJM must file a quarterly status report with the Commission on all pending large \nload interconnection requests and Necessary Studies. In the same docket, PJM must \nsubmit a monthly information filing to the Commission in the event that any \nTransmission Owner misses a milestone or fails to make meaningful progress on \nany pending large load interconnection request in the previous 30 days. The \nCommission should require Transmission Owners to explain the lack of progress \nwithin five days. \n No Transmission Owner can expedite service or study processing for projects \ntaking the Transmission Owner’s preferred type of service or configuration, or \nrefuse to process a complete large load interconnection request on the ground that \n \n149 PJM Show Cause Order, 190 FERC ¶ 61,115 at P 75. \n150 PJM OATT Part VII, § 322."},{"page":59,"startToken":17732,"endToken":18045,"text":"51 \nthe large load has not “arranged for wholesale transmission or retail distribution \nservice.”  \n Transmission Owners will be subject to referral to the Commission’s Office of \nEnforcement for any failure to diligently process large load interconnection \nrequests or for conditioning the processing of such requests on the applicant’s \nacceding to the Transmission Owner’s favored configuration or unnecessary \nservices, so that the Commission can investigate any Tariff or statutory violations \n(including undue discrimination or preference, manipulation, or false \ncommunications). \n Clarify that Transmission Owners must complete any large load interconnection \nstudies and Necessary Studies already in progress, and any studies that are \nsubstantially completed when the Commission accepts final compliance filings on \nlarge load interconnection rules need not restart the study process. \nThese requirements would immediately get numerous data center projects back on track. \nWhile the Commission has the record to rule on the merits of every issue in the PJM Show \nCause proceeding, and should do so, to the extent the Commission decides otherwise, it should at \nleast issue rulings on these three issues. Doing so would be a critical first step to implementing the \nANOPR in PJM.151 \nCONCLUSION \nWHEREFORE, Constellation requests that the Commission propose and implement a final \nlarge load interconnection rule consistent with the Secretary of Energy’s fourteen principles, as \nqualified herein, by April 30, 2026. Constellation also requests an immediate comprehensive order \non the merits in the PJM Show Cause proceedings as informed by the guidance in the ANOPR. To \nthe extent that the Commission is not prepared to issue a full PJM order on the merits on the well-\n \n151 The Commission could also require PJM to submit a compliance filing on the Joint Stakeholder Package of three \nreliability-enhancing reforms. See Exh. 1 (Joint Stakeholder Package). The Commission should also direct PJM to \npropose a standard large load interconnection process of 3-6 months for interconnections to transmission facilities."},{"page":60,"startToken":18045,"endToken":18193,"text":"52 \ndeveloped record in those proceedings, Constellation requests an order in PJM on (1) jurisdiction, \n(2) rates, and (3) timeliness. \n \n \n \n \n \n \n \n    Respectfully submitted, \n \n \n \n \n \n \n \n     \nNovember 21, 2025 \n \nCarrie Hill Allen \nSr. Vice President & Deputy General Counsel \nSeth Lucia \nAssistant General Counsel \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \ncarrie.allen@constellation.com \nseth.lucia@constellation.com \n  \nChristopher A. Wilson \nManaging Director, Federal Regulatory Affairs \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n202-347-7500 \nFERCe-filings1@constellation.com \n \n/s/ Paul F. Wight  \n \n \nPaul F. Wight \nCarolyn E. Clarkin \nDLA Piper LLP (US) \n500 Eighth Street NW \nWashington, D.C. 20004 \n703-773-4058 \npaul.wight@us.dlapiper.com  \ncarolyn.clarkin@us.dlapiper.com  \n \nJacob I. Chefitz \nDLA Piper LLP (US) \n1251 Avenue of the Americas \nNew York, NY 10020 \n212-335-4500 \njacob.chefitz@us.dlapiper.com  \n \nCounsel for Constellation Energy \nGeneration, LLC"},{"page":61,"startToken":18193,"endToken":18203,"text":"Exhibit 1 \n \nJoint Stakeholder Package \nPJM CIFP – Large Load Additions"},{"page":62,"startToken":18203,"endToken":18221,"text":"Joint Stakeholder Package\nPJM CIFP – Large Load Additions\nAmazon, Calpine, Constellation, Google, Microsoft, Talen\nNovember 7, 2025\n1"},{"page":63,"startToken":18221,"endToken":18232,"text":"Package\n•\nLarge Load Forecasting Improvements\n•\nDemand Side\n•\nReliability Backstop Alternative \n2"},{"page":64,"startToken":18232,"endToken":18377,"text":"Large Load Forecasting Improvements\n•\nOnly include large new load that has a meaningful/verifiable commitment. Examples \nof which include:\no Energy Service Agreement\no Credit/collateral support \no Financially significant infrastructure investment\no Long-term supply commitment with new or existing resources\n•\nImprove large load modeling assumptions including, but not limited to, ramp rate \nassumptions, utilization rates, and reduction of double counting\n•\nImplement a Large Load Forecast “Reality Check”: Consider other relevant factors \nthat may predict whether all proposed large load is likely to come to fruition. \nExamples include, but are not limited to:\no Historic large load success rate and development progress reviews along with \ncomparison to supplemental projects\no Supply chain and other limitations such as chip (un)availability  \no Other business expert reviews (McKinsey, S&P, BNEF, LEI Study, LBNL, etc.)\no Conversations/information exchange among large load customers, PJM, and TOs\n3"},{"page":65,"startToken":18377,"endToken":18494,"text":"New Demand Side Products\n•\nVoluntary large load limited demand response\no Allow large load to clear as limited demand response. Discounted \nEffective Load Carrying Capability (ELCC) to reflect the reduced \navailability. Two, new limited products would be defined as:\n•\n24 hours/year with no single interruption greater than 6 hours\n•\n100 hours/year  with no single interruption greater than 10 hours\n•\nBack-up generator operations\no Provide relief during system emergencies using back-up generators. Agree \nto operate within criteria acceptable to the owners (i.e., consistent with \ntheir commitment to the environment, noise reduction, etc.). Establish \nnew PJM emergency procedure step, 9A, for deployment immediately \nprior to manual load dump. Discounted ELCC to reflect the reduced \navailability. \n4"},{"page":66,"startToken":18494,"endToken":18563,"text":"Reliability Backstop Alternative\n•\nThe following reliability backstop alternative would only be utilized if \ntriggered.\no Trigger: Only used in years when RPM clears below 98% of the reliability \nrequirement.\n•\nAvoid overreliance on potentially lower quality and/or out-of-market services \nwhich could have a long-term impact on the market and its ability to signal \ninvestment when needed. Every attempt made to minimize such impact \nalthough it can’t be eliminated.\n5"},{"page":67,"startToken":18563,"endToken":18724,"text":"Reliability Backstop Alternative (cont.)\n•\nEligible resources can (at their option) offer a minimum term supply commitment at the top of the Variable \nResource Requirement (VRR) curve.\n•\nBidders may offer up to 7 years but shorter-term offers will clear first.\n•\nEligible resources include: new/reactivated generation, existing generation with an offer cap above top of the \nVRR curve, traditional demand response. \n•\nEligible resources must be reasonably likely to perform in the delivery years cleared.\n•\nIn subsequent years, cleared resources with multi-year commitments will be entered into the RPM potentially \nbased on the technology-specific default gross avoidable cost minus the unit-specific projected Energy and \nAncillary Services (EAS) offset.\n•\nIf the market clearing price in subsequent years is different than their original offer price of cleared multi-year \nresources, the resource will receive the multi-year price agreed – no higher/lower.  \n•\nMechanism will be in place for the four BRAs corresponding to the current Quadrennial Review (2028/29 through \n2031/32) and will automatically sunset\n•\n \n6"},{"page":68,"startToken":18724,"endToken":18769,"text":"Summary\nProposed Solution Options\n•\nImprove load forecast.\n•\nUtilize new demand side resource products.\n•\nIn the event the system remains short, utilize reliability backstop alternative.\nOther Future Potential Considerations\n•\nExtension of cap and floor, with price adjustments\n•\nImprovement of energy and ancillary service markets\nFeedback\n7"},{"page":69,"startToken":18769,"endToken":18771,"text":"Appendix\n8"},{"page":70,"startToken":18771,"endToken":18888,"text":"PJM Emergency Procedure Steps\n•\nEEA1 = PJM Maximum Generation Emergency Alert\n•\nStep 1: Pre-Emergency Load Management Reduction Action (30, 60 or 120-minute) \n•\nStep 2: Emergency Load Management Reduction Action (30, 60 or 120-minute) (EEA2)\n•\nStep 3 (real-time): Primary Reserve Warning\n•\nStep 4 A (Real-time): Maximum Generation Emergency Action (M18 – Max Emergency \nGeneration Action)\n•\nStep 4 B (Real-time): Emergency Voluntary Energy Only Demand Response Reduction \nAction\n•\nStep 5 (Real-time): Voltage Reduction Warning & Reduction of Non-Critical Plant Load \n(EEA2)\n•\nStep 6 (Real-time): Curtailment of Non-Essential Building Load\n•\nStep 7 (Real-time): Deploy All Resources Action\n•\nStep 8 (Real-time): Manual Load Dump Warning\n•\nStep 9 (Real-time): Voltage Reduction Action (EEA2)\n•\nStep 10 (Real-time): Manual Load Dump Action (EEA3)\n•\nLoad Shed Directive \n9"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":7,"endAt":5,"startToken":0,"endToken":1711},{"p":7,"at":5,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":10,"endAt":563,"startToken":1711,"endToken":2144},{"p":10,"at":563,"title":"EXECUTIVE SUMMARY","method":"printed heading","endPage":15,"endAt":124,"startToken":2144,"endToken":3810},{"p":15,"at":124,"title":"I. Constellation Supports the ANOPR’s Fourteen Principles with Limited Qualifications","method":"printed heading","endPage":51,"endAt":853,"startToken":3810,"endToken":15277},{"p":51,"at":853,"title":"II. The Commission Should Find the Existing PJM Tariff Unjust and Unreasonable and","method":"printed heading","endPage":51,"endAt":964,"startToken":15277,"endToken":15293},{"p":51,"at":964,"title":"A. The Commission Should Immediately Issue a Full Order on the Merits in the","method":"printed heading","endPage":55,"endAt":4,"startToken":15293,"endToken":16416},{"p":55,"at":4,"title":"B. Alternatively, the Commission Should Immediately Issue a Targeted Order in the","method":"printed heading","endPage":59,"endAt":1295,"startToken":16416,"endToken":17920},{"p":59,"at":1295,"title":"CONCLUSION","method":"printed heading","endPage":68,"endAt":0,"startToken":17920,"endToken":18724},{"p":68,"at":0,"title":"Summary","method":"printed heading","endPage":70,"endAt":868,"startToken":18724,"endToken":18888}]}