{"document":{"slug":"rec-20251125-4000","title":"Comments of U.S. Senator Edward J. Markey et al. urging FERC to reject unfair grid operator proposals, proactively investigate and address bad utility…","issued":"2025-11-25","accession":"20251125-4000","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"US SENATOR","kind":"comments","file":"sources/filings/text/20251125-4000_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20251125-4000","tier":"record","sha256":"7c4ced18e11e688d4f9532490cf8748b1a40f5a5835b66140e10423a145a1e36","pages":4,"tokens":1500,"emptyPages":[],"textThemes":["registry"]},"pages":[{"page":1,"startToken":0,"endToken":453,"text":"1\nNovember 13, 2025\nThe Honorable Laura Swett\nChairman\nFederal Energy Regulatory Commission\n818 First Street, NE\nWashington, DC 20426\nDear Chairman Swett,\nArtificial intelligence (AI) and cryptomining are fueling a rising demand for energy \ndriven by massive, energy-intensive data centers. The resulting surge in electricity use is \ncontributing to skyrocketing residential electric bills. We write to urge the Federal Energy \nRegulatory Commission (FERC) to take immediate action to ensure that U.S. households are not \nforced to bear the costs of the growing nationwide demand for energy by data centers. \nThese are not merely hypothetical future electricity price hikes, even if some of the data \ncenters themselves are hypothetical at this point. PJM’s 2024 capacity market auction, which \naims to secure resources to guarantee that the grid will be able to meet peak demand in the \ncoming months, closed at a record high of $16.6 billion, up from just $2.2 billion in 2023.1  These\ncosts are being paid by PJM’s 65 million ratepayers.2 In West Virginia, just two transmission \nlines proposed in response to forecasted data center energy demand growth are expected to \nincrease residents’ electricity bills by $440 million.3 These prices hikes are not just limited to \nPJM – costs are going up in nearly every state. Thus far in 2025, at least 210 utilities have either \nalready raised or proposed to raise electric bills by more than $71 billion for 65 million electric \ncustomers.4 Without reforms, continued data center expansion will exacerbate this trend. \nOver the next three years, energy-intensive AI and cryptomining processors could triple \ntheir electricity consumption, adding more than 10,000 megawatts of demand annually.5 In PJM \nInterconnection, the regional transmission organization (RTO) that serves thirteen states and the \n1 Ethan Howland, Data Centers ‘Primary Reason’ For High PJM Capacity Prices: Market Monitor, Utility Dive \n(October 2, 2025), www.utilitydive.com/news/data-centers-pjm-capacity-auction-market-monitor/801780/\n2 Tom Rutigliano, PJM Auction Results in Higher Prices for Ratepayers in 13 States, Natural Resources Defense \nCouncil (July 22, 2025), https://www.nrdc.org/press-releases/pjm-auction-results-higher-prices-ratepayers-13-states.\n3 Cathy Kunkel, West Virginia Ratepayers Footing the Bill for Infrastructure Build Out, Institute for Energy \nEconomics and Financial Analysis (May 29, 2025), https://ieefa.org/sites/default/files/2025-05/UPDATED_West\n%20Virginia%20Ratepayers%20Footing%20the%20Bill%20for%20Infrastructure_May%202025.pdf.\n4  Residents of 49 States and Washington, D.C., Face Increasing Electric and Natural Gas Bills, Center for \nAmerican Progress (October 27, 2025),\n https://www.americanprogress.org/article/residents-of-49-states-and-washington-d-c-face-increasing-electric-and-\nnatural-gas-bills/\n5 Nichola Groom, Power Costs Soar in PJM Region as Data Center Demand Spikes, Reuters (Aug. 7, 2025), \nhttps://www.reuters.com/business/energy/power-costs-soar-pjm-region-data-center-demand-spikes-2025-08-07/. \nBy The Federal Energy Regulatory Commission at 11:51 am, Nov 13, 2025"},{"page":2,"startToken":453,"endToken":922,"text":"2\nDistrict of Columbia in the mid-Atlantic region, data centers will drive 90% of new power \ndemand over the next five years.6 Prompted by projections like these – many of which rely on \nuncertain and speculative data center proposals – utilities and transmission planning regions are \nspending billions to guarantee the grid can meet this demand.7 These costs are then passed to \nratepayers through higher monthly bills.   \nAmerican households simply cannot afford inaction from FERC. Under the Federal \nPower Act, FERC is obligated to ensure that utilities and transmission planning regions maintain \njust and reasonable rates that are neither discriminatory nor preferential.8 In order to protect \nratepayers from unreasonable or unjust price hikes driven by data center energy demand, FERC \nshould reject transmission-related filings that do not properly address cost allocation or allow the\ncost of transmission built to serve data centers to be spread across the region—such as when \nFERC reviews Order 1920 compliance filings.9 \nBeyond addressing proposals as they are presented to FERC, the Commission must \nproactively investigate and act if it finds the practices of a regional operator or utility to be \nunjust, unreasonable, unduly discriminatory, or preferential to data centers at the expense of \nresidential ratepayers. In February 2025, FERC used its authority to open an investigation into \nthe rules for PJM’s transmission system, aiming to address the build-out of data centers that are \ntied directly to large-scale generators.10 This is an important start to address the crisis at hand. \nFERC can and should investigate existing methods for cost allocation to determine how much \nresidential ratepayers are paying for transmission and, if necessary, require subsequent action to \nensure data center owners and operators do not burden households with more than their fair share\nof power infrastructure costs.\nNor should FERC fall for the argument that data center demand projections must allow \nlarge fossil fuel generators to jump the queue for interconnection to the nation’s energy grid. \nNear-term capacity shortfalls are better met by faster-to-deploy renewable technologies and \n6 Laila Kearney & Tim McLaughlin, Power Costs Soar in PJM Region As Data Center Demand Spikes, Reuters \n(August 7, 2025), https://www.reuters.com/business/energy/power-costs-soar-pjm-region-data-center-demand-\nspikes-2025-08-07/. \n7 Edison Elec. Inst., 2024 Financial Review, EEI (July 23, 2025), \nhttps://www.eei.org/-/media/Project/EEI/Documents/Issues-and-Policy/Finance-And-Tax/Financial_Review/\nFinancialReview_2024.pdf; Jeff St. John, Utilities are flying blind on data center demand. That’s a big problem. \nCanary Media (Feb. 25, 2025), https://www.canarymedia.com/articles/utilities/utilities-are-flying-blind-on-data-\ncenter-demand-thats-a-big-problem\n8 16 U.S. Code § 824d (2018).\n9 Order No. 1920 Compliance Filings Schedule, (June 16, 2025), Federal Energy Regulatory Commission, \nhttps://www.ferc.gov/news-events/news/order-no-1920-compliance-filings-schedule\n10 FERC Orders Action on Co-Location Issues Related to Data Centers Running AI, FERC (Feb. 20, 2025), \nhttps://www.ferc.gov/news-events/news/ferc-orders-action-co-location-issues-related-data-centers-running-ai."},{"page":3,"startToken":922,"endToken":1388,"text":"3\nbattery storage than by large, polluting, and expensive fossil fuel generation that takes years to \nbuild and get online. Bad interconnection queue proposals will only increase costs to ratepayers \nwithout addressing any immediate energy supply issues, as Commissioner Judy Chang rightly \nnoted in her February dissent to FERC’s ruling on PJM's interconnection proposal to fast-track \nfossil power plant resources.11\nFERC should also consider broader proceedings that would standardize load forecasting \nand other practices relevant to addressing data center demand growth. We appreciate the \nCommission’s recent call to the RTOs and independent system operators (ISOs) to provide \nthoughts on how to improve load forecasting.12 Without transparency into load forecasting, it is \ndifficult to assess the quality of a utility’s load projections, making it challenging to ensure the \neconomically responsible build-out of new generation or transmission assets. With a guaranteed \nrate of return of around 11%, there is an obvious incentive for utilities to push for huge \ninvestments in transmission, including transmission for speculative data center interconnection \nrequests that may not materialize.13 This means that FERC has an outsized role to play in \nprotecting ratepayer interests and ensuring utility investments are both necessary and well-\ndesigned for the grid.14\nFinally, as FERC considers Energy Secretary Chris Wright’s recent request for a \nrulemaking to standardize and accelerate the interconnection of large loads like data centers, We \nurge FERC to prioritize the concerns of residential ratepayers.15 FERC is moving quickly on this \nrequest – just a few days after receiving the letter from Wright, FERC established a new docket \nto consider the proposed Advanced Notice of Proposed Rulemaking (ANOPR) and issued a \nnotice inviting comments.16 The outcomes of this Administration-directed ANOPR could \n11 Ethan Howland, FERC approves PJM’s fast-track power plant interconnection plan, Utility Dive (Feb. 12, 2025),\nhttps://www.utilitydive.com/news/ferc-pjm-fast-track-surplus-interconnection-queue/739908/; Commissioner \nChang’s Dissent on PJM’s RRI, ER25-712 (February 11, 2025), \nhttps://www.ferc.gov/news-events/news/commissioner-changs-dissent-pjms-rri-er25-712.\n12 David Rosner, Chairman Rosner’s Letter to the RTOs/ISOs on Large Load Forecasting, FERC (Sept. 18, 2025), \nhttps://www.ferc.gov/news-events/news/chairman-rosners-letter-rtosisos-large-load-forecasting.\n13 Ivan Penn, Wall St. Firms Are Buying Utilities to Tap Into the A.I. Boom, N. Y. Times (July 17, 2025), \nhttps://www.nytimes.com/2025/07/17/business/energy-environment/blackrock-minnesota-power.html.\n14 Peter Freed & Allison Clements, How to reduce large load speculation? Standardize the interconnection process, \nUtility Dive (Feb. 19, 2025), https://www.utilitydive.com/news/data-center-large-load-interconnection-process-\nclements/740272/.\n15 Letter from Chris Wright, Secretary of Energy, U.S. Dep’t. of Energy, to David Rosner, Chairman, Federal \nEnergy Regulatory Commission (Oct. 23, 2025), https://www.energy.gov/sites/default/files/2025-10/403%20Large\n%20Loads%20Letter.pdf. \n16 Notice Inviting Comments, (Oct. 27, 2025), Federal Energy Regulatory Commission, \nhttps://media.mcguirewoods.com/publications/2025/RM26-4-000-DOE-Large-Loads-ANOPR-Notice.pdf."},{"page":4,"startToken":1388,"endToken":1500,"text":"4\nsignificantly change the degree to which households are charged for connecting big electricity \nusers to the grid.  \nWith energy bills already skyrocketing, FERC must use its authorities to reject unfair grid\noperator proposals, proactively investigate and address bad utility company practices and ensure \njust and reasonable rates for all Americans. We urge you to protect residential ratepayers over \ncorporate profits, as FERC’s mission demands.\nThank you for your consideration of this request.\nSincerely,\nEdward J. Markey\nUnited States Senator\nChris Van Hollen\nUnited States Senator\nElizabeth Warren\nUnited States Senator\nPeter Welch\nUnited States Senator\nRaphael Warnock\nUnited States Senator\nRichard Blumenthal\nUnited States Senator\nAdam B. Schiff\nUnited States Senator"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":4,"endAt":779,"startToken":0,"endToken":1500}]}
